Section A Organizational Chart: Director
Section A Organizational Chart: Director
SECTION A
Organizational Chart
Director
General
Manager
Administration
Manager
M/S CROWN GASKETS PVT LTD Ref No. CGI/QAP/R/003 Date of Issue
Quality Plan Issue No. 1 Rev-1 21.11.2017
SECTION B
QUALIFICATION /EXPERIENCE OF QC PERSONNEL
Qualification of other key personnel and the officials employed in Quality Control Cell:
Technical
S No. Name Designation Experience
Qualification
Shyam Sunder
1 Manager Advocate 26 Years
Sharma
M/S CROWN GASKETS PVT LTD Ref No. CGI/QAP/R/003 Date of Issue
Quality Plan Issue No. 1 Rev-1 21.11.2017
SECTION C
PROCESS FLOW CHART/DESCRIPTION
OF
MANUFACTURING PROCESS
Part – I: Process Flow Chart indicating process of Manufactures for an individual product,
with quality control points.
Receipt of PO along with Drawing
& Specification
Returned to
Vendor
M/S CROWN GASKETS PVT LTD Ref No. CGI/QAP/R/003 Date of Issue
Quality Plan Issue No. 1 Rev-1 21.11.2017
OK Stage inspection Not OK Rejected
OK
Consignee
ID Marking as per Drg OK
Inspection
M/S CROWN GASKETS PVT LTD Ref No. CGI/QAP/R/003 Date of Issue
Quality Plan Issue No. 1 Rev-1 21.11.2017
Part – II: a) Details of the manufacturing & testing process specially mentioned in the
specification.
S No. Para No of spec. Requirement of Details of the process
manufacturing/Testing
Being Installed/follows
Process as per Spec.
NA NA NA
Outside Lab Report
NA NA NA
Part – II: b) Brief description of different manufacturing process mentioned in flow chart
S No. Name of manufacturing process Brief description
Procurement of Raw material as per Drg/Specification
1 As per Drg/ Specification.
No-(EMS 609 Rubber 70 Duro)
Prepared compound as per the specification required. After 24
2 hour we mix up required chemical and prepare Slab & Button as As per Drg/ Specification.
per Specification/drg.
3 Issued Rubber Sheets Batches for Production As per Drg/ Specification.
4 Stage Inspection of all moulded pcs. As per Drg/ Specification.
5 Preparation mental As per Drg/ Specification
Tests / Inspections
Checking dimensional details of cutting pcs with respect to As required Measuring
1
drawings / specification Instruments
Checking quality of workmanship and their conformity Visual / Measuring
2
with the specification/drg Instruments
3 Test for crack & Air issues etc. DPT etc.
M/S CROWN GASKETS PVT LTD Ref No. CGI/QAP/R/003 Date of Issue
Quality Plan Issue No. 1 Rev-1 21.11.2017
SECTION D
INCOMING RAW MATERIAL & INPROCESS/FINAL INSPECTION
Stage inspection detailing inspection procedure, inspection parameters, method of testing/test
procedure including sample sizes for destructive and non-destructive testing etc.
Part I: Incoming raw material
Rejection &
Sample
Mode of disposal
S size & its Parameters Acceptance Traceability
Incoming Inspection/
No frequency For Limits/criteria/ register
product Equipment Reprocessed
. of inspection Specific value No.
used /
inspection
Scrapped
Size,
Visual with No Cracks or
thickness
Proper Any other
Identification Defects
Proper
/ test
Identification
Reports
Of material
Raw (NABL) as &
By measuring
Material Per Spec.
100% for Instruments
EMS-609 As per
Prototype BEYOND
Rubber Chemical Specification
And 10% Material test THE
70 Duro Composition And drawing Register
1 for Certificate SPECIFIED
maintained
Bulk VALUES-
Physical
material Manufacture Rejected
Synthetic Properties
TC/External
Rubber- Like
NABL
polyacrylic Hardness,
type Tensile,
Elongation %
And Tests
At works
(DPT)
M/S CROWN GASKETS PVT LTD Ref No. CGI/QAP/R/003 Date of Issue
Quality Plan Issue No. 1 Rev-1 21.11.2017
Part II: Process Inspection (of the product)
Sample Acceptance
Mode of Rejectio Corrective
S Name of size & its Parameters Limits / Traceability
Inspection/ n& And
No the frequency For criteria / register
Equipment disposal Preventive
. process of inspection Specific No.
used action
inspection value
Prepared
compoun
d as per
the
specifica
tion
required.
After 24 Physical
Visual/ As per NC ,
hour we Verification
Dimension Drawings/ Repro- As per our Register
1 mix up 100% , steel rule,
required
al specificatio cess QSP Doc. maintained
Vernier,
chemical n
etc.
and
prepare
Slab &
Button as
per
Specifica
tion/drg.
Issued
Rubber Visual/ Physical
As per NC ,
Sheets Dimension Verification
Drawings/ Repro- As per our Register
2 Batches 100% al , steel rule,
for
specificatio cess QSP Doc. maintained
, Vernier,
Producti n
jigs/fixture etc.
on
M/S CROWN GASKETS PVT LTD Ref No. CGI/QAP/R/003 Date of Issue
Quality Plan Issue No. 1 Rev-1 21.11.2017
M/S CROWN GASKETS PVT LTD Ref No. CGI/QAP/R/003 Date of Issue
Quality Plan Issue No. 1 Rev-1 21.11.2017
SECTION E
CALIBRATION OF TESTING MEASURING EQUIPMENT
Part I: In house testing facilities available for calibration with the firm
Traceability
Name of Frequency of
S No. Make Range To national
Master calibration
standard
Presently Calibration done from outside agency approved by NABL
Part III: Calibration Plan for the items identified for specified calibration in Drg./ Specification
M/S CROWN GASKETS PVT LTD Ref No. CGI/QAP/R/003 Date of Issue
Quality Plan Issue No. 1 Rev-1 21.11.2017
SECTION F
SYSTEM OF MAINTAINING THE DATE OF CUSTOMER
COMPLAINTS / WARRANTY FAILURES
Warranty failures/In-service failures report from customer
M.R
S No.
Approved by
Date of report of complaint
Letter No.
Revision No.1
Brief details of complaints
Date: 21.11.2017
required to be given during renewal
Classification of failure
(R.P. Singh)
Manager QA
Date of joint Inspection