Download as pdf
Download as pdf
You are on page 1of 12
Eurobent ° c€ TECHNICAL DATA SHEET EUROBENT CS 0,5 (4750) EURORENT CS 0.5 (4750) is a mechanically bonded composite, consisting of granutated bentonite, embedded and fed between two layers of geotextle and glued to an ane side textured HOPE membrane (type T in accordance with EN 13967+A12012). The GCL i Impeegrated wth adstona bertonit @00 g/t along the outer 500 rm ofthe long edges ofthe ls opts ante Tetmetiod ae Cari Leon cwoBHs — [sie gat [Cover Layer - PP Nonwoven EN 150 9864 2 200 g/m | aperier oar Teta [vane HOPE Membrane On ide Tred eve03e81 [osm ‘Mass per unit area EN ISO 9864 +2 500 g/m? _| Chana chia estan nmasspertarea | ONS a7 206 —|=58 Gaetan! | oy saps [08 apie oa a Tontmoene omen ores] 2300 nae Sealine 0s |sa4g aos astm oster —[s0in Permebiy fhe Compote SIM O=t67 | hen Te Pur he Compete TSIM OSH) | PEER | Permeability of the GCL ASTM D S887 £5,010" m/s index Flux of the GCL ‘ASTM D S887 '£4,0% 10" (m'/m')/s Treva shee sve fst 06263 [is Pets ro Sandra Omens Tainenal [vane Wat ene Sinial [sam 1 | Quantity: Typical 1785 m? _ Paced Tat este Mgt 12% moisture content changes without tie 3 any tna howska #2 © sanw.owrcbent.com: DA oticomeurte: wiped Gospodereay KRS ne 0000297596. 2ahfodbivego 50 000,002) REGON 020578548, Sad Rejonowy ala Wroe ve Wroctaus. i Fabyene} Rev 1omayz018 Pr Grunadohi 36. PL-80-364 Wocew PL 191910 1048 2792 0978 «147 001 1 4910 1048 2702 O37e 4147 0002 1 53 1910 1048 2702 0378 4147 0003 7) BICS Laboratories Ltd Reliable testing, Superior service T 444 (01 1904 717776 E info@bics-atscouk W wwwbics-labs.couk REPORT GEOSYNTHETICS TEST REPORT REPORT REFERENCE: BS.N844/a Report Date 19042018 Gllent Eurobent Sp 2.0.0, Poland Contact Lech Bokszczanin Contract Reference N/A Client PORetNo NIA Material Tested GCL {with SST geomembrane bonded to nonwoven geotextle} Date Received vosn2018 Sample IDs Eurobent CS 0,5 (4750) Tests Requested Mass per Unit Area of Woven Component - EN ISO $864:2005 Mass per Unit Area of Non-Woven Component - EN ISO 9864:2005 ‘Mass per Unit Area of Geomembrane Component - EN ISO 9864:2005 Mass per Unit Area of GCL - EN 14196:2016 Mass per Unit Area of Bentonite - EN 14196-2016 Thickness of Geomembrane Component - EN ISO 9863-1:2005 Thickness of GCL - EN ISO 9863-1:2005 Tensile Properties - EN ISO 10319:2015 Swell Index - ASTM D5860-11 Peo! Strength - ASTM D8496-15, Puncture Resistance - EN ISO 12236:2006 Fluid Loss - ASTM D5891-02 Internal Shear Strength - ASTM D6243-16 Montmorionite Content - VOG P69 Data Pending > Index Flux & Hydraulic Conductivity - ASTM D5867-16 you have any questions or require edationsl information, please do net hesitate to contact us. Prepared by: ‘Approved by: Ryan Hackney Clit Butt Laboratory Manager ‘Managing Director Page 1 of 4 ‘TH Meat mwah) WO ep we nol UTA Rn. dt we BCAA UNIS Rian Sia oo WO ‘Tass mad Bh ben aac wre KAS pein. Teste ara ae ected rh corpus WAS Pest Sore ‘hate epertism condreetrmat nett ta eros cp ean ‘islet prima ett pou tartan ec hp won ror NC ator Ut 2 Leh A, Oak Dec Cif at Sheen a Poa. righ, Wes Yori, HO SN pay Feienton Rees 4213020 Ly BICS Laboratories Ltd Unit 2 Little John Mil, Oak ill Road, Brighouse, West Yorkshire HOB TSN T 444 (0) 1484-71776 “se E info@bics-labs.co.uk W wwn.bies-labs.couk GEOSYNTHETICS TEST RESULTS EUROBENT Sp z.0.0. P.O NO: NIA Contract Ret: NIA Report Ref No: BS-Neaala Matorfal: Geosynthotic Clay Liner BICS Sample Rof: 01 ‘Sample ID; Eurobent CS 0,6 (4760) Dates Tested: 11-13/04/2018 “est vETHOD [TEST SPECIMEN NUMBER MEAN sid Dev Tr ‘Mass Per Unit Area of Woven Component (EN 180 €864:2006) om? ts 35 tatters) a0 ta | te Mace Per Unit Ares of NonNoven Gomponent (EN 150 0864:2008) ain eg 2152008224106 250 azar | maz er Unit Area of Geomembrane Component (EN 160 8864:2008) Se 5756087 SSeS zs | 0 "Mass Per Unit Aree of Whole GCL (EN 14106:2046) om? sot 6170 S764 S010 seed so10 208 ‘Mass Per Unk Area of Bentonite (EN 14196:201@) aint 5122 S260 480540914745 aon 200 Thickness of Geomemnbrane (EN 160 8663-12006) mm ose 087 054 051 050 ast 053 ost ost as7 | os 000 “Thickness of GCL (EN 160 9865-1:2006) ren 995 aos 961 9.18 940 093 982 06s oer 964] 968 ast ‘Tense Proportoe EN ISO 1034:2016) ‘Tonsie Srergin kNim (MD) 253278 261-258 288 ms os Teoaie Srergih kNin (CD) 286-278 275 a? aS ze os Tense Srain % (MD) 136 130 tet 25 on Tenata Svan % (CO) 6 5 2207 11004 eel Sirength (ASTM 6496-04) ‘Average Stonath (Nm) soit 783 moray m8 oak Svengtn (A/cm) 12098 88 Puncture Realstanea (EX 180 12296:2006) Puncture Free kN 383 397 398 amt ats 98 att Punctue Displacment mn «324282688 SE 32703 ‘iow onto ot Tol El 22°. TTR {ICS Laboratories Ut neher accapt eaponsbity for nx rates cama lo ofl uee ane purpor of he mata, Unis nevis deat sample suze en ena nt tr copy wi ated et ae, Tes Yeu re ony obs some) supp668 ‘he company also cbsoves ad mains eset conker, CONFIDENTIAL TEST REPORT Page 2ot3 BICS Laboratories Ltd Unit 2 Little John Mil, Oak Hil Road, Brighouse, West Yorkshire HDS 1SN —_ +44 (0) 1484 717776 E info@bics-labs.co.uk W www.bics-labs.co.uk GEOSYNTHETICS TEST RESULTS EUROBENT Sp z. P.O NO: N/A Contract Ref: NIA Report Ref No: BS-Ned4/a ‘Material: Geosynthetic Clay Liner BICS Sample Ref: 01 ‘Sample ID: Eurobent CS 0,6 (4750) Dates Tested: 11-13/04/2018 Test METiOD TEST SPECIMEN NUMBER MEAN _ S14 Dey Tee a roe Swol (ASTM D8890-11) ieg 310 soe Fluid Lous (ASTM DEB61-02) a 180 wo. {Internal Shear Strength (ASTM 08249-16) £2048 norma tess, 0.1mmfnn, hydrated kor hours under load, submerged Wea 243 ma. Montmarilonite Gontet (Methylene Blue Test) mala 318 ae ‘Aen Conair a Te Gana 213°, Ra iy WE C5 Labrie rel eat port or man Gare alae ad purpose naa Une chris eluted same sise an rene strech tested esl thos, Tes esse iyo segs supli ‘Th company slo obeorve a mata cent conden CONFIDENTIAL TEST REPORT Page $ of 3 7) BICS Laboratories Ltd Reliable testing, Superior service T +48 (0) 1494 71776 E info@bics-labs.co.uk W wurwbies-labs.couk GEOSYNTHETICS TEST REPORT REPORT REFERENCE: BS-N844/a (Supplementary) REPORT Report Date 08/05/2018 Client Eurobent Sp 2.0.0. Poland Contact Lech Bokszezanin Contract Reference N/A Client POIRefNo NIA Material Tested GCL (with SST geomembrane bonded to nonwoven geotextile} Date Received 11/04/2018 ‘Sample IDs Eurobent CS 0,5 (4750) Tests Requested ——_ Index Flux & Hydraulic Conductivity - ASTM D5887-16, Ifyou have any questions or require additional information, please do not hesitate to contact us. ‘Supplementary Test Report - data pending test results Prepared by: Approved by: Ryan Hackney iff Butt Laboratory Manager Managing Director Page 4 of 2 Tess Wariod wih an oso nis epi ae pal UNAS acsediod. and Reve ae Wl nGLaeah he URRS hoediaon See or BEaTIDN “esis marted#have ban utcantactad and ar UKAS sored. Teste mark" ae acceded der he company's UKAS Fete Sea, “Theos opr sina candenre formal, cmp ts deat val non remot ‘ne Yes ropor my nal be rprodioad ar han fl, exe wh pir lon SpE 15 Laborato td, Unit 2 ttl John Mi Oak Ht Re, Brighouse, West asi, HDE 1SN Directors Cfo But haze N.gbal_Company egstation Number: 4213030 LZ BICS Laboratories Ltd 7 Unit 2, Little John Mil, Oak Hill Road, Brighouse, West Yorkshire HDG 1SN 408 ( T +44 (0) 1484 71776 € info@bies-abs co.uk W wwwcbies-labsco.k GEOSYNTHETICS TEST RESULTS EUROBENT Sp z.0.0. P.O NO: NIA Contract Ref: NIA Roport Ref No: BS-N844/a {Sup} Material: Geosynthetic Clay Liner BICS Sample Ref: 01 ‘Sample ID: Eurobent CS 0,5 (4750) Dates Tested: 11/04-08/05/2018 TEST METHOD TEST SPECIMEN NUMBER MEAN TFT Ind Fux & Hydraulic Conductiviy (ASTM 5887-16) Test sample withthe geomembrane component minis. \No recorded flow over 14 day test period under standard test conditions No Flow me No recorded ow over 14 day tat period under stander teat condtons No Flow inde Fux & Hydraulic Conductivity (ASTM D5887-16) Test sample without the gooremtrane component mils: 5.296-09 5.29E-09 me 2ane-t1 2336-14 29 of tha mate“ nly tothe samp ICS Laboratories 1s Unless ctharisecetaieg sample oz ther accepts responsiblity for nor makes claim oso the nal use and ‘2d rate test ers comply wih te listed est metho, Tost reule “The company aisocbserves and maintains eon content. CONFIDENTIAL TEST REPORT Page 2 of 2 Wroclaw, 2014-04-02 Dlug6w recommends cooperation with reliable entrepreneurs, CERTIFICATE OF RELIABILITY Itis hereby confirmed, that on the certificate issuance day: EUROBENT Sp. z 0.0. TAX ID: 8842651736 thas no overdue liabilities registered in Krajowy Rejestr Dlug6w, which fulfil the conditions defined in the Act of 9th April 2010 on the Access to the Economic Information (Joumal of Laws No. 81, item $30), This certificate is valid 30 days from the day of issue. Authenticity and validity of this cettiticate is available to check on the website www.rzetelnafirma pl, by using the following certificate number: 0000 3182 1685 3493 ¥ socert CERTIFICATE OF MANAGEMENT SYSTEM EUROBENT sp. z 0.0. 58-100 Swidnica, ul. Kliczkowska 42 ISOCERT sp. z 0.0. sodas {hata certified organisation has implemented and uses a management system ing the requirem: PN-EN ISO 9001: 2009 PN-EN ISO 14001:2005 Scope of certificatior production and ae rot Geo-synthetic Clay Liners Gortifcate No. 144985/C/2 Issued on: 07.022048 This ‘alls frorn 08.02.2016 til 18.09.2018 Certificate issued by ISOCERT sp. 20.0, ar = ‘Tomasz Wycisk Director of certftcation ‘AC 138 ays EMS 'SOCERT Sp. 2.0.0. ul. Mifska 38, 54-810 Wroclaw igs International Geosynthetics Society 2014 Certificate of Corporate Membership THE INTERNATIONAL GEOSYNTHETICS SOCIETY certifies that EUROBENT Sp. Z 0.0 isa member in good standing ofthe International Gevsyntheti and is u dedicated contributor to the protessional and technical developmei uch Jorge G. Zomberg abeth Pegs President, IGS ary. IGS 3. Installation of Eurobent ‘The installation can only proceed during dry weather conditions, Never place the liner on top of standing water. Eurobent should be placed on the prepared subgrade without wrinkles or folds. Position the Eurobent GCL with the woven down and the nonwoven facing up. When you use Eurobent Combi remember also to put the PE coating facing up. Unroll the Eurobent ral ke @ carpet. For easier handling and positioning of Eurobent it is recommended to provide a lifting device which allows to lift the rolls with @ bulldozer or front end loader. The iron pipe may Serve as such a device for unloading as well as for installation of the liner, ‘On slopes the orientation of panels shall be paraliel to the slope. The panels should be secured in an anchor trench at the top of the slope. The requirement as well as dimensioning ‘should be based on a stability calculation, 4. Panel overlaps Each panel is marked with two lines, the first located 15 cm from the edge. and the second one is 7 cm farther, It is recommended to make the overlapping between these two lines, which are for assist purpose. If mayor settlements are to be expected the overlapping area Is to be increased. When ‘making the overlapping use the bags which are supplied together with the rolls Cover material should be placed on the bentonite liner Immediately after installation. The thickness of the cover ‘material should be min. 20 - 25 cm after compaction, The cover ‘material should be free of stones larger than 50mm and should be composed of well graded material Apply the cover over head and do nat allow construction vehicles to move directly on top of the GCL. Installation Guidelines ! Bae 1

You might also like