Contract No.

DC/2018/02 Upgrading of Sewage Pumping Stations and


Particular Specification Appendix 30.3 Sewerage Along Ting Kok Road

APPENDIX 30.3
(Particular Specification Clause 30.128(1))

OPERATION AND MAINTENANCE REPORTING TEMPLATE

Log Sheet
Ting Kok Road Sewage Pumping Station No.5

Date & Time :

Submersible Pump Sequence (1st, 2 nd, Stby)


No.1 (Running Meter) hrs.
No.2 (Running Meter) hrs.
No.3 (Running Meter) hrs.

Mechanical Bar Screen No.1 (Running Meter) hrs.


No.2 (Running Meter) hrs.
Screening skip No.1 % full
Screening skip No.2 % full

Flow Meter No.1 (Totalizer) m3


No.2 (Totalizer) m3

Deodorization Unit (Running Meter) hrs.


H2S Level (Inlet) ppm
H2S Level (Outlet) ppm

Electricity Meter No.1 (x 10 kwh) kwh


No.2 (x 10 kwh) kwh

Water Meter (General) m3


(Irrigation) m3

Recorded By :
Name / Rank

Checked By :
Name / Rank

AECOM PSA30.3-1
Contract No. DC/2018/02 Upgrading of Sewage Pumping Stations and
Particular Specification Appendix 30.3 Sewerage Along Ting Kok Road