AL QOOZ CONTRACTING LLC

HAZARD IDENTIFICATION AND RISK ASSESMENT DATE


page 6
PAGE

TASK/JOB/OPERATION: BACK FILLING


PROJECT : PROPOSED FACTORY AND FACILITIES ON PLOT NO:KHIA5-14A_B
CREW/SUBCONTRACTORS:

DATE: Date next Review :


Recommended PPE: Hard hat,Safety shoes,Safety Harness overalls,Dust mask,Goggles,Gloves
EQUIPMENT REQUIRED: Excavator,shovel,skid steer loader(bobcat)

Legal compliance
harm/consequ
Risks Who

Control E/I/R
/Activities
Job steps

might be
/potential
identified

Hazards

Remarks
Risk Rating/Risk
Hazard

ences
Sl no

Mitigation action to be taken/Hazard/risk Residual Risk


level Control METHOD

L S R L S R
workers fell down and Ensure all the equipments and operators are approved by EHS third
possible of minor/major party,workers must be using proper PPEs in the night shift,toolbox
talks must be conducted for the workers before starting the
Inadequate or poor accident or injuries
work,safety officer & first aider should be available at
lightings,electrical,shoc worker get electerical site,competent electrician,security and emergency vehicle should be
shock due to unavailable available at site for night shift,ensure safety inducted to all the
k due to poor or loose
5 work at night of competent electrician No 3 4 High R employees,do not work without EHS-NOC for night works,adequate 3 3 Med
connection/damage on site,machinery or fire cylinders provided and fire marshall,ensure proper lighting for
cable,poor equipment aacident
the work area ,ensure proper emergency exits/procedure are
available on site,ensure all electricl conection is connected with
supervision,fire damage of property fire industrial socket,ensure proper acess provided for the work
hazard and emergency area,ensure adequate/safe woring platform is available on site,lone
situation/ burn work is not allowed

1-Improbable 1-Negligible Likelihood X


Review by Main -Contractor Approved by Consultant
Severity

2-Remote 2-Minor Severity E -Eliminate


Control
Likely

Risk

3-Occassional 3-Reportable High 15-25 I- Isolate


COENGR Engineering
4-Probable 4-serious Medium 7-12 R-Reduce Al Qooz Contracting LLC
Consultancy
5-Frequent 5-Catastrophic Low 1-6