AL QOOZ CONTRACTING LLC

HAZARD IDENTIFICATION AND RISK ASSESMENT DATE


page 7
PAGE

TASK/JOB/OPERATION: BACK FILLING


PROJECT : PROPOSED FACTORY AND FACILITIES ON PLOT NO:KHIA5-14A_B
CREW/SUBCONTRACTORS:

DATE: Date next Review :


Recommended PPE: Hard hat,Safety shoes,Safety Harness overalls,Dust mask,Goggles,Gloves
EQUIPMENT REQUIRED: Excavator,shovel,skid steer loader(bobcat)

Legal compliance
harm/consequ
Risks Who

Control E/I/R
/Activities
Job steps

might be
/potential
identified

Hazards

Remarks
Risk Rating/Risk
Hazard

ences
Sl no

Mitigation action to be taken/Hazard/risk Residual Risk


level Control METHOD

L S R L S R

adequate signage to be placed all


Barricading around the excavated
5 Trip,slip,falls personal injury,fatality No 3 5 High R around,provide edge protection barricade all 3 3 Med
area
around the area with railing net& toe board

1-Improbable 1-Negligible Likelihood X


Review by Main -Contractor Approved by Consultant
Severity

2-Remote 2-Minor Severity E -Eliminate


Control
Likely

Risk

3-Occassional 3-Reportable High 15-25 I- Isolate


COENGR Engineering
4-Probable 4-serious Medium 7-12 R-Reduce Al Qooz Contracting LLC
Consultancy
5-Frequent 5-Catastrophic Low 1-6