Prefabricated installation pit in

filled-chamber design
Maintenance pit for trucks and buses

Typ MSG 102 W

- One-piece prefabricated installation pit up to


40 m length and longer.
- Monocoque filled-chamber honeycomb design
with integrated formwork and armouring.
- Little deadweight.
- Accessories installed, piped and wired at our
works.
- No installation work required at the site of
installation. All connections are available
according to overall planning.
- Installation time in existing halls reduced to 5
hours due to special installation technology.
- Specialist firm acc. to § 19 I WHG
(Water Resources Act)
- Licenses: WHG § 19 i.l.g., BGR 157, UVV, VBG,
VbF, Betr. Si. TÜV-certified type approval.
- Recognized company with certificate for
manufacturing shops acc. to ISO 9001.
- Quality products - the better solution in the
long run.
OKF ± 0 OKF ± 0

1st phase 4th phase


Excavating the ground Fill soil from the sides,
ca. -2.20 and pour concrete into
the filled chambers

OKF ± 0 OKF ± 0

2nd phase 5th phase


Preparing a granular sub base Running the empty pipes
-2.00 by the customer; fill the rest
of the holes with soil and
compact it

OKF ± 0 OKF ± 0

3rd phase 6th phase


-1.40
Connect reinforcement -1.60
Inserting, aligning and
of hall floor with the bay,
fixing the pit
concrete

Technical description:

Axle load: 20,0 t


Surface load: 60,0 t
Working load acc. to SLW60, DIN1055 and 1072.

Length: optional up to 40m


Width, inside: 1,02m i.l.
Working width: 1,62m i.l.
Headroom: 1,40 / 1,60 / 1,80

All connections acc. to design planning for


electrical and compressed air supply, exhaust air,
and oil supply and disposal.
Pit water disposal optionally via drainage pit or The Idea -
pump sump.
Double pit frame with installation fixtures for
sliding cover, lifter, oil pan, support bridges, etc.
The Solution -
Complete accessories: e.g. sponson, lighting, Simply Better!
compressed air, exhaust air, oil supply and
disposal, including piping and wiring inside the
© www.konzept-g.de, 08-2008

prefabricated installation pit up to socket for


service connection. Hans Balzer GmbH & Co. KG
Zeissweg 9 - D-87700 Memmingen
Oil and acid resistant inside coating acc. to RAL. Phone: +49 8331 / 99041-0 - Fax: +49 8331 / 99041-29
info@balzer-mm.de - www.balzer-mm.de