PROJECT TITLE: PETRORabigh - UOU PROJECT COMP. PROG: EXCEL DSN NO: 6598
SUBJECT
DRAWING Nos.
REMARKS
CONTENTS
1.0 SCOPE 2
2.0 REFERENCES 2
8.0 SUMMARY 8
This calculation covers the analysis and design of Piperack of West Area
(WA15) of PETRORabigh Project, The Kingdom of Saudi Arabia. The superstructure is of steel and is analysed and
designed using STAAD Pro-2004 for various load combinations.
2.0 REFERENCES
2.2 Drawings
2411-8320-46-O000-0001 - Steel work-General Notes
2411-8310-43-O000-0001 - Civil General Notes
2411-8230-46-CA00-0031 - Piping layout- Construction area-CA10-Rack section
2411-8230-01-CA00-0001 - Plot Plan- Construction area -CA00
2411- 8230-02-CA00-0001 - Central Sub area Plot plan Keyplan
In STAAD Model, the +ve X-axis is oriented towards North direction of the piperack.
The structure is checked for lateral deflection of H/100 as per SAES -M-001-AMD-Rev D2.
Load Case
Description
(Staad)
1 SEISMIC LOAD +X EX
2 SEISMIC LOAD -X E-X
3 SEISMIC LOAD +Z EZ
4 SEISMIC LOAD -Z E-Z
41 WIND LOAD +Z WZ
42 WIND LOAD -Z W- Z
51 SURGE LOAD +X SX
52 SURGE LOAD -X S-X
1.4(Dead Load +Operating Load+anchor Load)+0.23 Friction Load+1.4 Temperature Load+1.0(Surge Load)
128 1.4(DS+D0+AF1)+0.23FT1+1.4T+1.0S X
129 1.4(DS+D0+AF2)+0.23FT2+1.4T+1.0S -X
1.4(Dead Load +Operating Load+anchor Load)+0.23 Friction Load+1.4 Temperature Load+1.0(Surge Load)
153 1.4(DS+D0+AF1)+0.47FT1+1.4T+1.0S X
154 1.4(DS+D0+AF2)+0.47FT2+1.4T+1.0S -X
1.0(Dead Load +Operating Load+anchor Load)+0.17 Friction Load+1.0 Temperature Load+1.0(Surge Load)
228 1.0(DS+D0+AF1)+0.17FT1+1.0T+1.0S X
229 1.0(DS+D0+AF2)+0.17FT2+1.0T+1.0S -X
1.0(Dead Load +Operating Load+anchor Load)+0.33 Friction Load+1.0 Temperature Load+1.0(Surge Load)
253 1.0(DS+D0+AF1)+0.33FT1+1.0T+1.0S X
254 1.0(DS+D0+AF2)+0.33FT2+1.0T+1.0S -X
a) Dead Load
Th empty weight of pipe is taken as 0.6 times the pipe operating weight as per Saudi Aramco Standards,
SAES-M-001-AMD.Rev.D2.clause 5.2.4.8.
2
For pipes less than 12" and for future load, a load intensity of 1.91 kN/m is applied as per SABP -007
Cl. 4.1.2 & 4.2.2 and SAES-M-001 AMD Cl. 5.2.4.8. For pipes >12" the load is applied as concentrated
load and is as per pipe stress report. The load calculation is as per SABP-007, Cl.4.1.2.
c) Thermal Load
c1) Piping Friction Loads in Longitudinal Dir.
For pipe with diameter less than 12", a udl of 10% of the operating load is applied as friction force on the
supporting beam. For pipes with diameter greater than 12", the piping friction force in the longitudinal direction
is taken as per Stress Input Load Data.
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 6 of 8
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
c2) Piping Friction Loads in Transverse Dir.
The piping friction load in transverse direction are taken as per Stress Input Load Data.
c3) Piping Anchor Loads in Longitudinal Dir.
The piping anchor load in longitudinal direction are taken as per Stress Input Load Data.
c4) Piping Anchor Loads in Transverse Dir.
The piping anchor load in transverse direction are taken as per Stress Input Load Data.
Thigh 0
Highest one day mean temperature, = 35 C
Tlow 0
Lowest one day mean temperature, = 17 C
Tmetal 0
Metal temperature due to sun heating, = 20 C
0
Design temperature = (Thigh-Tlow)+Tmetal = 38 C
e) Surge Load
The surge load of 15 T is applied for pipe line >12" at the anchor location. This is applied on the structure as if
surging action for single pipe will occur at a time.
Seismic Load calculation is based on ASCE 7-02. Seismic data is as per as per SAES-A-112 Rev. D2. All gravity loads (self
weight, piping dead load, equipment dead load(if any), piping opereating load and equipment operating load(if any), cable tray
dead load) are considered for the Base shear calculation.(Refer Appendix -D)
Isolated Footing foundations are adopted. The design and analysis for the foundation will be covered under Appendix-J
The calculation is based on ACI 318-2002, Appendix D. For anchor bolt design at braced and unbraced areas, refer Appendix
J.
Shear keys are provided with baseplate where the shear at column base is more,i.e., at braced areas of columns. Refer
Appendix K for typical calculations.
11.0 Summary
Interaction
Item Section Member Load Case
ratio
Columns
Columns HEA400 27 0.619 104
Main Transverse bent beams @ EL. +5.90m
Main beams HE300B 523 0.790 110
Main Transverse bent beams @ EL. +10.500m
Main Beams at braced bay IPE360 155 0.864 104
Anchor beam HEA280 131 0.598 110
Main beams Non- braced bay IPE360 128 0.408 110
Main Transverse bent beams @ EL. +12.400m
Main Beams at braced bay IPE360 291 0.790 104
Anchor beam HEA280 290 0.570 110
Main beams Non- braced bay IPE360 289 0.412 110
Main Transverse bent beams @ EL. +14.0m
Main beams HE140A 320 0.540 103
Intermediate Transverse beams @ EL. +10.50 IPE300 264 0.440 153
Intermediate Transverse beams @ EL. +12.40 IPE300 183 0.550 125
Main longitudinal beams @EL. +10.500
Main Longitudinal beams IPE300 255 0.240 110
Main Longitudinal beams IPE450 103 0.400 102
Main longitudinal beams @EL. +12.400 m
Main Longitudinal beams IPE360 487 0.120 125
Main Longitudinal beams IPE450 94 0.600 125
Main Longitudinal beams IPE300 272 0.250 110
Main longitudinal beams @EL. +14.00 m
Main Longitudinal beams IPE300 323 0.190 129
Longitudinal Tie beams@ EL. +17.475/20.95 m
Longitudinal Tie beams IPE360 558 0.190 109
Longitudinal Tie beams IPE300 301 0.068 110
Longitudinal Tie beams HE280A 374 0.200 110
Longitudinal Tie beams@ EL. +5.9/7.845 m
Longitudinal Tie beams HEA280 540 0.56 128
Longitudinal Tie beams IPE300 368 0.1 104
Vertical Bracing
All bracings IPE400 -Tee 484 0.68 128
Bottom bracing IPE400 570 0.372 129
Horizontal Bracing
Bracing @ EL. 10.500 m L130X130X12 500 0.761 110
Bracing @ EL. 12.500 m L130X130X12 506 0.56 129
PNT/PN
mnz MNZ mny MNY pnt/pnc r=(mnz/MNZ)+(mny*2/MNY)
Beam no C
(kNm) (kNm) (kNm) (kNm) (kNm) +(pnt/PNT)
(kNm)
131 109.76 253.31 17.58 115.24 16.12 678.00 0.76
290 139.72 253.31 0.10 115.24 18.36 493.41 0.59
Where
mnz = Actual Bending Moment in Z dir.
MNZ = Design Bending Moment in Z dir.
mny = Actual Bending Moment in Y dir.
MNY = Design Bending Moment in Z dir.
pnt = Actual axial capacity in compression
PNT = Design compressive force
pnc = Actual axial capacity in tension
PNC = Design tensile force
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 1 of 2
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2412/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
APPENDIX - A
Typical cross section of the Piperack
APPENDIX - B
Piping stress report
( Received from Stress Dept. on 7th November 2006 )
Pipe Support Load Data Sheet for Elevation _10.5 m (AREA WA-15)
For Non analysed lines along Grid S10-S20
SL. Operating wt Hydrotest
Service Grid From - To Axial Operating support loads Fz at Rack Grids (KN) [ Note-7] Remarks
No. (KN/M) wt (KN/M)
Vertically Vertically
S10 S11 S12 S13 S14 S15 S16 S17 S18 S19
Down (G) Down (Q)
Between S3 and S20
1 10"-P-O000-091-1SC0P01-NI 0.272 0.272
Between S5 and S20
2 6"-OW-O000-007-12LC1U16-NI 0.277 0.277
Between S3 and S20
3 3"-CA-O000-011-1CC2C06-NI 0.111 0.111 3(0.55)
Between S5 and S20
4 3"-FG-O000-028-1CC1P01-NI 0.111 0.157 3(0.55)
Between S5 and S20
5 3"-G-O000-010-3CC1P01-NI 0.111 0.157
3(0.55)
6 8"-G-O000-017-3CC1P01-NI Stress analysed line
NORTH Y (UP)
NOTE :
1. All Forces are in KN until and unless specified.
2. G= Permanent load (Maximum of Sustained and operating)
3. Q= Test load
4. X,Y and Z are the direction of force
5. Combination of above loads are to be carried out by Structural Designer.
6. Horizontal load of 30% of Vertical load to be considered for the non-analysed lines
7. Number in paranthesis indicates the maximum seismic load.(without combination with operating load) .
8. Explanation of grid numbering in row 4 is as follows:
Z X
As an examle, 85-86-1 means the first steel beam as we proceed from grid 85 to 86.
Date: 14/09/2006
Pipe Support Load Data Sheet for Elevation _12.4 m (AREA WA-15)
For Non analysed lines along Grid S10 - S20
SL. Operating wt Hydrotest
Service Grid From - To Axial Operating support loads Fz at Rack Grids (KN) [ Note-7] Remarks
No. (KN/M) wt (KN/M)
Vertically Vertically
S10 S11 S12 S13 S14 S15 S16 S17 S18 S19
Down (G) Down (Q)
Between Grid S5 and S20
1 4"-DMW-O000-012-1SC0U16-NI 0.082 0.082 4(0.41)
Between Grid S5 and S20
2 3"-IA-O000-027-12CG0U01-NI 0.111 0.157 3(0.55)
Between Grid S5 and S20
3 3"-UA-O000-028-12CG0U01-NI 0.111 0.157 3(0.55)
Between Grid S5 and S20
4 3"-UW-O000-033-1CS2U16-NI 0.111 0.111 3(0.55)
Between Grid S5 and S20
5 3"-SWS-O000-033-1CS4U16-NI 0.111 0.111 3(0.55)
Between Grid S5 and S20
6 8"-LC-O000-028-1CS1P05-PP 0.416 0.416
Between Grid S5 and S20
7 6"-N-O000-030-1CC1P01-NI 0.277 0.277
8 24"-MS-O000-017-3CS1P05-IH
Stress analysed line
9 24"-LS-O000-037-1CS1P05-IH
Stress analysed line
10 8"-HS-O000-018-6CS1P05-IH
Stress analysed line
NORTH Y (UP)
Note : 1. All Forces are in KN until and unless specified.
2. G= Permanent load (Maximum of Sustained and operating)
3. Q= Test load
4. X,Y and Y are the direction of force
5. Wind and Seismic forces to be applied again with reversal of Direction and are in addition to the Operating Loads.
6. Combination of above loads are to be carried out by Structural Designer.
7. Nodes have been named to match column numbers to simplify reference between the Caesar output and the Load Spreadsheet.
To determine the input node corresponding to a particular node name use the Node Names tab in the List Input Function of the Cae
Z
X
NORTH Y (UP)
Note : 1. All Forces are in KN until and unless specified.
2. G= Permanent load (Maximum of Sustained and operating)
3. Q= Test load
4. X,Y and Y are the direction of force
5. Wind and Seismic forces to be applied again with reversal of Direction and are in addition to the Operating Loads.
6. Combination of above loads are to be carried out by Structural Designer.
7. Nodes have been named to match column numbers to simplify reference between the Caesar output and the Load Spreadsheet.
To determine the input node corresponding to a particular node name use the Node Names tab in the List Input Function of the Cae
Z
X
NORTH Y (UP)
7. Nodes have been named to match column numbers to simplify reference between the Caesar output and the Load Spreadsheet.
To determine the input node corresponding to a particular node name use the Node Names tab in the List Input Function of the Cae Z
X
NORTH Y (UP)
Note : 1. All Forces are in KN until and unless specified.
2. G= Permanent load (Maximum of Sustained and operating)
3. Q= Test load
4. X,Y and Y are the direction of force
5. Wind and Seismic forces to be applied again with reversal of Direction and are in addition to the Operating Loads.
6. Combination of above loads are to be carried out by Structural Designer.
7. Nodes have been named to match column numbers to simplify reference between the Caesar output and the Load Spreadsheet.
To determine the input node corresponding to a particular node name use the Node Names tab in the List Input Function of the Cae
Z
X
NORTH Y (UP)
Note : 1. All Forces are in KN until and unless specified.
2. G= Permanent load (Maximum of Sustained and operating)
3. Q= No Test load (Pnematic testing only)
4. X,Y and Z are the direction of force
5. Wind and Seismic forces to be applied again with reversal of Direction and are in addition to the Operating Loads.
6. Combination of above loads are to be carried out by Structural Designer.
7. Nodes have been named to match column numbers to simplify reference between the Caesar output and the Load Spreadsheet.
To determine the input node corresponding to a particular node name use the Node Names tab in the List Input Function of the Caesar Z X
input sheet
APPENDIX - C
Wind Load Calculation
Basic Wind Speed V = 93 mph = 41.59 m/sec Ref SAES-A-112 Table 1-Rabigh Plant Site
Exposure Category(A,B,C or D) = C Ref SAES-A-112 Table 1-Rabigh Plant Site
Building & other structure Category = IV Ref SABP-006, Cl.3.6
Height of the Structure h= 18.35 m (EL.20.95-EL.2.600)
APPENDIX - C
Wind Load Calculation
Basic Wind Speed V = 93 mph = 41.59 m/sec Ref SAES-A-112 Table 1-Rabigh Plant Site
Exposure Category(A,B,C or D) = C Ref SAES-A-112 Table 1-Rabigh Plant Site
Building & other structure Category = IV Ref SABP-006, Cl.3.6
Height of the Structure h= 18.35 m (EL.20.95-EL.2.600)
APPENDIX - D
Seismic analysis-load data
Load data
Seismic Load is calculated as per ASCE-7-02
Site Data:-
Seismic Load data is as per SAES-A-112 Rev. D2 and SAES-M-001-AMD, Rev.D2
Seismic use group: II soil type : D
Response acceleration at short period Ss = 0.176 SAES-A-112, Rev. D2, Cl. 4.4
Response acceleration at one second S1 = 0.07 SAES-A-112, Rev. D2, Cl. 4.4
Height above base hn = 18.35 m (Max Ht taken)
Basic equations
Basic equations used for the base shear calculation of nonbuilding structures are as follows
The piperack is designed for earthquake resistance using Staad pro 2004 in accordance with International Building Code -2003
CHECK
Calculations
Vmax = 0.040 *W
= 66.206 kN
Vmin = 0.033 *W
= 54.159 kN
So V = 0.040 *W
= 66.206 kN
In Z Direction
Time period Ta = 0.743 s
Tmax = 1.245 s
T = 0.392 s (As per Staad result-by Rayleigh Method)
T = 0.392 s (As per Cl.9.5.5.3)
Vz = 0.047 *W
= 77.371 kN
Vmax = 0.071 *W
= 117.751 kN
Vmin = 0.033 *W
= 54.159 kN
So V = 0.047 *W
= 77.371 kN
Coefficient Load(W)
Empirical formula
Load case By Staad Staad result
Staad DL (kN)
Formulae
Seismic force
0.0402 0.039 1648.52 1648.52 66.206 65.03
(X Dir.)
Seismic force
0.047 0.047 1648.52 1648.52 77.371 78.3
(Z Dir.)
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No :
E1 OF E3
PROJECT: PETRORabigh, UOU PROJECT Rev. Date Originator Checker Approver
CONTRACT NO 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
APPENDIX - E
Effective Length Factor Calculation
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No :
E2 OF E3
PROJECT: PETRORabigh, UOU PROJECT Rev. Date Originator Checker Approver
CONTRACT NO 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
Calculation is based on AISC-Manual of steel construction- ASD-9th Edition, Part 3, Column Design
and ACI 318- 02 Commentary.
where Σ indicates the summation of all members rigidly connected to that joint and lying in the plane
in which buckling of the column is being considered.
Ιc = Moment of ineria of the column
Lc = Unsupported length of first column
Ιb = Moment of ineria of the beam.
Lb = Unsupported length of the beam.
Ψm = Average of the Ψ values at the two ends of the
compression member
Calculation
4
Iz= 13670 inch
ψ = 3.08
# 13670 5.6
Kz = 2.8 Kz = 2.3
8.55 HE280A
4
Iz= 28860 inch
ψ = 8.04
# 28860 8.7
IPE360
1.9
4
Iz= 28860 inch
ψ = 9.29
# 28860 9
Kz = 2.8
#
IPE360
4.6
4
Iz= 25170 inch
ψ = 8.67
# 25170 9.3
HE300B
Kz = 2.89
2.58
4
Iz= 45070 inch
# 45070
HE400A
8
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No :
E3 OF E3
PROJECT: PETRORabigh, UOU PROJECT Rev. Date Originator Checker Approver
CONTRACT NO 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
FOR 3 LATERAL BEAMS
ψ = 4.93
# 28860 6
Kz = 2.4
#
IPE360
1.9
4
Iz= 28860 inch
ψ = 6.97
# 28860 6.9
Kz = 2.5
IPE360
4.6
4
Iz= 25170 inch
ψ = 6.91
# 25170 8.5
HE300B
Kz = 2.77
2.35
4
Iz= 45070 inch
# 45070
HE400A
6
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No :
E1 OF E1
PROJECT: PETRORabigh, UOU PROJECT Rev. Date Originator Checker Approver
CONTRACT NO 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
FOR 4 LATERAL BEAMS
4
Iz= 13670 inch
ψ = 3.08
# 13670 5.6
Kz = 2.8 Kz = 2.3
8.6 HE280A
4
Iz= 28860 inch
ψ = 8.04
# 28860 8.7
IPE360
1.9
4
Iz= 28860 inch
ψ = 9.29
# 28860 7.7
Kz = 2.7
#
IPE360
4.6
4
Iz= 25170 inch
ψ = 6.18
# 25170 8.1
HE300B
= 2.71
4.68
4
Kz
ψ = 10.41
# 13670 13
Kz = 3.3
#
HE280A
1.9
4
Iz= 13670 inch
ψ = 14.71
# 13670 11
Kz = 3.1
HE280A
4.6
4
Iz= 25170 inch
ψ = 6.91
# 25170 8.5
HE300B
Kz = 2.77
2.35
4
Iz= 45070 inch
# 45070
HE400A
6
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 1 OF 3
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
APPENDIX F
STAAD MODEL
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 2 OF 3
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
Y
X Loa d 31
Z
TYPICAL 3D MODEL
Y X Load 31 Y X Load 31
Z Z
Y X Load 31
Z Y
X Z Load 31
Y
X Z Load 31
Y Y
Z X Load 31 Z X Load 31
APPENDIX G
STAAD INPUT AND OUTPUT FILE
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 2 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
****************************************************
* *
* STAAD.Pro *
* Version 2004 Bld 1002.UK.1001 *
* Proprietary Program of *
* Research Engineers, Intl. *
* Date= JAN 3, 2007 *
* Time= 18:46:32 *
* *
* USER ID: Foster Wheeler *
****************************************************
1. STAAD SPACE
INPUT FILE: WA15.STD
2. START JOB INFORMATION
3. JOB NAME WA15
4. JOB CLIENT PETRO RABIGH
5. ENGINEER NAME PRAKASH
6. CHECKER NAME ASHOKAN
7. ENGINEER DATE 01-NOV-06
8. END JOB INFORMATION
9. INPUT WIDTH 79
10. UNIT METER KN
11. JOINT COORDINATES
12. 1 -7 3.55 -7; 2 0 3.55 -7; 3 -7 3.55 -11.5; 4 0 3.55 -11.5; 5 -7 3.325 -22
13. 6 0 3.325 -22; 9 -7 10.5 -7; 10 0 10.5 -7; 11 -7 12.4 -7; 12 0 12.4 -7
14. 13 -3.5 12.4 -7; 18 -7 10.5 -11.5; 19 0 10.5 -11.5; 20 -7 12.4 -11.5
15. 21 0 12.4 -11.5; 22 -3.5 12.4 -11.5; 27 -7 10.5 -22; 28 0 10.5 -22
16. 29 -7 12.4 -22; 30 0 12.4 -22; 31 -3.5 12.4 -22; 36 -7 10.5 -29; 37 0 10.5 -29
17. 38 -7 12.4 -29; 39 0 12.4 -29; 40 -3.5 12.4 -29; 55 0 10.5 -13.75
18. 56 0 10.5 -16.5; 57 0 10.5 -19.25; 58 0 12.4 -13.75; 59 0 12.4 -16.5
19. 60 0 12.4 -19.25; 61 -7 10.5 -13.75; 62 -7 10.5 -16.5; 63 -7 10.5 -19.25
20. 64 -7 12.4 -13.75; 65 -7 12.4 -16.5; 66 -7 12.4 -19.25; 68 -3.5 10.5 -7
21. 70 -3.5 10.5 -11.5; 77 -3.5 10.5 -13.75; 78 -3.5 10.5 -16.5
22. 79 -3.5 10.5 -19.25; 80 -3.5 10.5 -22; 82 -3.5 10.5 -29; 91 -3.5 12.4 -13.75
23. 92 -3.5 12.4 -16.5; 93 -3.5 12.4 -19.25; 117 0 10.5 -9.25; 118 -3.5 10.5 -9.25
24. 119 -7 10.5 -9.25; 120 0 10.5 -24.5; 121 0 10.5 -26.5; 122 -3.5 10.5 -24.5
25. 123 -7 10.5 -24.5; 124 -3.5 10.5 -26.5; 125 -7 10.5 -26.5; 126 0 12.4 -9.25
26. 127 -3.5 12.4 -9.25; 128 -7 12.4 -9.25; 129 0 12.4 -24.5; 130 0 12.4 -26.5
27. 131 -3.5 12.4 -24.5; 132 -7 12.4 -24.5; 133 -3.5 12.4 -26.5; 134 -7 12.4 -26.5
28. 139 -2.5 12.4 -7; 140 -2.5 12.4 -11.5; 141 -2.5 12.4 -22; 142 -2.5 12.4 -29
29. 143 0 20.95 -7; 144 0 20.95 -11.5; 145 0 20.95 -22; 146 0 20.95 -29
30. 147 -2.5 14 -7; 148 -2.5 14 -11.5; 149 -2.5 14 -22; 150 -2.5 14 -29
31. 151 0 14 -7; 152 0 14 -11.5; 153 0 14 -22; 154 0 14 -29; 155 0 14 -13.75
32. 156 0 14 -16.5; 157 0 14 -19.25; 158 -2.5 14 -13.75; 159 -2.5 14 -16.5
33. 160 -2.5 14 -19.25; 161 0 14 -24.5; 162 0 14 -26.5; 163 -2.5 14 -24.5
34. 164 -2.5 14 -26.5; 165 0 14 -9.25; 166 -2.5 14 -9.25; 169 0 20.95 -25.5
35. 170 0 5.9 -11.5; 171 -7 5.9 -11.5; 172 0 5.9 -7; 173 -7 5.9 -7
36. 178 0 17.325 -29; 179 0 17.325 -22; 180 0 17.325 -25.5; 181 -7 20.95 -29
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 3 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
37. 190 0 8.4 -7; 191 -7 8.4 -7; 192 0 8.4 -4.4; 193 -7 8.4 -4.4
38. 194 -3.5 8.4 -4.5; 195 -3.5 8.4 -7; 196 0 11.4 -7; 197 -7 11.4 -7
39. 198 0 11.4 -4.4; 199 -7 11.4 -4.4; 200 -3.5 11.4 -7; 201 -3.5 11.4 -4.4
40. 202 0 7.845 -29; 203 -7 7.845 -29; 204 0 7.845 -29.8; 205 -7 7.845 -29.8
41. 216 -7 10.5 -25.5; 217 0 10.5 -25.5; 218 0 14 -25.5; 219 0 12.4 -23.9
42. 220 0 12.4 -27.1; 221 -7 12.4 -25.5; 222 0 9.4 -7; 223 -7 9.35 -7
43. 224 -7 12.4 -23.75; 225 -7 12.4 -27.25; 226 0 5.9 -29; 227 0 5.9 -22
44. 228 0 8 -22; 229 0 8 -29; 230 0 5.9 -25.5; 231 0 8 -25.5; 232 -7 5.9 -29
45. 233 -7 5.9 -22; 234 -7 5.9 -25.5; 235 -7 8 -29; 236 -7 8 -22; 237 -7 8 -25.5
46. 238 -7 1.225 -29; 239 0 1.225 -29; 240 -7 20.95 -22; 241 -7 17.325 -29
47. 242 -7 17.325 -22; 243 -7 17.325 -25.5; 244 -7 20.95 -25.5; 245 -7 3.563 -29
48. 246 0 3.563 -29; 249 -7 3.5625 -25.5; 250 0 3.5625 -25.5
49. MEMBER INCIDENCES
50. 1 1 173; 2 2 172; 3 9 197; 4 10 196; 5 10 68; 6 12 139; 14 3 171; 15 4 170
51. 16 18 20; 17 19 21; 18 19 70; 19 21 140; 27 5 233; 28 6 227; 29 27 29
52. 30 28 30; 31 28 80; 32 30 141; 40 238 245; 41 239 246; 42 36 38; 43 37 39
53. 44 37 82; 45 39 142; 53 10 117; 54 19 55; 55 28 120; 56 9 119; 57 18 61
54. 58 27 123; 59 12 126; 60 21 58; 61 30 219; 62 11 128; 63 20 64; 64 29 224
55. 89 55 56; 90 56 57; 91 57 28; 92 58 59; 94 59 60; 96 60 30; 102 61 62
56. 103 62 63; 104 63 27; 105 64 65; 107 65 66; 109 66 29; 128 68 9; 131 70 18
57. 132 68 118; 133 55 77; 135 57 79; 139 56 78; 149 77 61; 150 70 77; 151 78 62
58. 152 77 78; 153 79 63; 154 78 79; 155 80 27; 156 79 80; 158 80 122; 159 82 36
59. 162 58 91; 163 59 92; 164 60 93; 180 13 127; 181 91 64; 182 22 91; 183 92 65
60. 184 91 92; 185 93 66; 186 92 93; 187 93 31; 189 31 131; 192 18 77; 193 77 62
61. 194 62 79; 195 79 27; 201 20 91; 202 91 65; 203 65 93; 204 93 29; 255 117 19
62. 256 118 70; 257 117 118; 258 119 18; 259 118 119; 261 120 217; 262 121 37
63. 263 122 124; 264 120 122; 265 123 216; 266 122 123; 267 124 82; 268 121 124
64. 269 125 36; 270 124 125; 272 126 21; 273 127 22; 274 126 127; 275 128 20
65. 276 127 128; 277 129 130; 278 130 220; 279 131 133; 280 129 131; 281 132 221
66. 282 131 132; 283 133 40; 284 130 133; 285 134 225; 286 133 134; 289 13 11
67. 290 22 20; 291 31 29; 292 40 38; 293 139 13; 294 140 22; 295 141 31
68. 296 142 40; 297 12 151; 298 21 152; 299 30 153; 300 39 154; 301 143 144
69. 303 145 169; 304 139 147; 305 140 148; 306 141 149; 307 142 150; 308 147 166
70. 309 148 158; 310 149 163; 311 151 143; 312 152 144; 313 151 165; 314 153 179
71. 315 152 155; 316 154 178; 317 153 161; 318 154 150; 319 153 149; 320 152 148
72. 321 151 147; 322 155 156; 323 156 157; 324 157 153; 325 158 159; 326 155 158
73. 327 159 160; 328 156 159; 329 160 149; 330 157 160; 331 161 218; 332 162 154
74. 333 163 164; 334 161 163; 335 164 150; 336 162 164; 337 165 152; 338 166 148
75. 339 165 166; 340 152 158; 341 158 156; 342 156 160; 343 160 153; 353 153 163
76. 354 163 162; 355 162 150; 356 169 146; 357 179 169; 358 178 169; 364 170 19
77. 365 171 18; 366 172 190; 367 173 191; 368 173 171; 369 172 170; 374 144 145
78. 378 178 146; 379 179 145; 380 179 180; 381 180 178; 382 153 180; 383 154 180
79. 384 146 181; 385 38 241; 406 190 222; 407 191 223; 408 190 192; 409 191 193
80. 410 173 193; 411 172 192; 412 190 195; 413 192 194; 414 194 193; 415 195 191
81. 416 194 195; 417 194 191; 418 194 190; 419 196 12; 420 197 11; 421 196 198
82. 422 197 199; 425 198 201; 426 196 200; 427 200 197; 428 201 199; 429 201 200
83. 430 201 197; 431 196 201; 432 202 229; 433 203 235; 434 202 204; 435 203 205
84. 436 204 205; 477 238 249; 479 239 250; 480 216 125; 481 217 121; 482 228 217
85. 483 229 217; 484 236 216; 485 235 216; 486 218 162; 487 219 129; 488 28 219
86. 489 219 218; 490 220 39; 491 37 220; 492 220 218; 493 221 134; 496 222 10
87. 497 223 9; 500 120 80; 501 123 80; 502 121 122; 503 125 122; 504 37 124
88. 505 36 124; 506 129 31; 507 132 31; 508 130 131; 509 134 131; 510 39 133
89. 511 38 133; 512 192 198; 513 193 199; 518 27 224; 519 216 224; 520 216 225
90. 521 36 225; 522 226 232; 523 227 233; 524 170 171; 525 172 173; 526 224 132
91. 527 225 38; 528 226 202; 529 227 228; 530 228 28; 531 229 37; 532 229 231
92. 533 226 230; 534 230 227; 535 231 228; 536 228 230; 537 232 203; 538 233 236
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 4 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
93. 539 232 234; 540 234 233; 541 235 36; 543 236 27; 544 235 237; 545 237 236
94. 546 234 236; 551 217 219; 552 217 220; 553 29 242; 554 181 244; 555 241 181
95. 556 242 240; 557 241 243; 558 243 242; 559 244 240; 560 29 243; 561 38 243
96. 562 242 244; 563 241 244; 564 145 240; 566 245 232; 567 246 226; 568 232 249
97. 569 226 250; 570 249 233; 571 250 227; 572 245 249; 573 246 250; 574 234 237
98. 575 230 231
99. DEFINE MATERIAL START
100. ISOTROPIC STEEL
101. E 2.05E+008
102. POISSON 0.3
103. DENSITY 76.8195
104. ALPHA 1.2E-005
105. DAMP 0.03
106. END DEFINE MATERIAL
107. MEMBER PROPERTY EUROPEAN
108. 53 55 56 58 59 62 255 258 261 262 265 269 272 275 301 308 TO 310 313 315 317 -
109. 322 TO 325 327 329 331 TO 333 335 337 338 368 369 480 481 -
110. 486 TABLE ST IPE300
111. 1 TO 4 14 TO 17 27 TO 30 40 TO 43 297 TO 300 311 312 314 316 364 TO 367 378 -
112. 379 385 406 407 419 420 432 433 496 497 528 TO 531 537 538 541 543 553 555 -
113. 556 566 567 TABLE ST HE400A
114. 192 TO 195 201 TO 204 326 328 330 334 336 339 TO 343 353 TO 355 417 418 430 -
115. 431 500 TO 511 TABLE ST L130X130X12
116. 132 150 152 154 156 158 180 182 184 186 187 189 256 263 267 273 279 283 416 -
117. 429 TABLE ST HE100A
118. 304 TO 307 318 TO 321 TABLE ST HE140A
119. 61 64 277 278 281 285 303 356 380 381 487 490 493 526 527 554 557 TO 558 -
120. 559 TABLE ST IPE360
121. 133 135 139 149 151 153 162 TO 164 181 183 185 257 259 264 266 268 270 274 -
122. 276 280 282 284 286 TABLE ST IPE300
123. 18 19 131 290 294 374 384 532 TO 535 539 540 544 545 564 TABLE ST HE280A
124. 5 6 31 32 44 45 128 155 159 289 291 TO 293 295 296 TABLE ST IPE360
125. 54 57 60 63 89 TO 92 94 96 102 TO 105 107 109 TABLE ST IPE450
126. 408 409 412 TO 415 421 422 425 TO 428 434 TO 436 512 513 TABLE ST HE200A
127. 522 TO 525 TABLE ST HE300B
128. 357 358 382 383 410 411 482 TO 485 488 489 491 492 518 TO 521 536 546 551 -
129. 552 560 TO 563 568 569 572 TO 575 TABLE T IPE400
130. 477 479 570 571 TABLE ST IPE400
131. CONSTANTS
132. BETA 90 MEMB 436 477 479 522 570 571
133. MATERIAL STEEL MEMB 1 TO 6 14 TO 19 27 TO 32 40 TO 45 53 TO 64 89 TO 92 94 -
134. 96 102 TO 105 107 109 128 131 TO 133 135 139 149 TO 156 158 159 162 TO 164 -
135. 180 TO 187 189 192 TO 195 201 TO 204 255 TO 259 261 TO 270 272 TO 286 289 -
136. 290 TO 301 303 TO 343 353 TO 358 364 TO 369 374 378 TO 385 406 TO 422 425 -
137. 426 TO 436 477 479 TO 493 496 497 500 TO 513 518 TO 541 543 TO 546 -
138. 551 TO 564 566 TO 575
139. SUPPORTS
140. 1 TO 6 238 239 PINNED
141. MEMBER RELEASE
142. 53 TO 64 132 133 135 139 150 152 154 156 158 162 TO 164 180 182 184 186 187 -
143. 189 256 257 263 264 267 268 273 274 279 280 283 284 301 303 TO 310 313 315 -
144. 317 326 328 330 334 336 339 368 369 374 380 408 409 412 413 416 421 422 425 -
145. 426 429 436 512 513 532 533 539 544 554 557 START MY MZ
146. 91 96 104 109 132 149 TO 154 156 158 180 TO 187 189 255 256 258 259 262 263 -
147. 266 267 269 270 272 273 275 276 279 282 283 286 301 324 326 328 TO 330 332 -
148. 334 TO 339 356 368 369 374 381 414 TO 416 427 TO 429 436 490 512 513 527 -
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 5 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
149. 534 535 540 545 558 559 END MY MZ
150. 357 358 382 383 410 411 482 TO 485 488 489 491 492 518 TO 521 536 546 551 -
151. 552 560 TO 563 568 569 572 TO 575 START MY MZ
152. 357 358 382 383 410 411 482 TO 485 488 489 491 492 518 TO 521 536 546 551 -
153. 552 560 TO 563 568 TO 575 END MY MZ
154. MEMBER TRUSS
155. 192 TO 195 201 TO 204 340 TO 343 353 TO 355 417 418 430 431 500 TO 511
156. *******************************************************************************
157. *-----------------------------------------------------------------------------
158. *PRIMARY LOAD CASES
159. *-----------------------------------------------------------------------------
160. *LOAD 1 SEISMIC LOAD IN +X DIRECTION E(+X)
161. *LOAD 2 SEISMIC LOAD IN -X DIRECTION E(-X)
162. *LOAD 3 SEISMIC LOAD IN +Z DIRECTION E(+Z)
163. *LOAD 4 SEISMIC LOAD IN -Z DIRECTION E(-Z)
164. *-----------------------------------------------------------------------------
165. *LOAD 11 DEAD LOAD (SELF WEIGHT OF STRUCTURE) DS
166. *LOAD 12 OPERATING LOAD- PIPING/EQUIPMENT DO
167. *-----------------------------------------------------------------------------
168. *LOAD 21 DEAD LOAD- PIPING/EQUIPMENT DE
169. *LOAD 22 PIPING TEST LOAD DT
170. *-----------------------------------------------------------------------------
171. *LOAD 31 THERMAL-ANCHOR LOAD IN +VE DIR. AF1
172. *LOAD 32 THERMAL-ANCHOR LOADI IN -VE DIR. AF2
173. *LOAD 33 THERMAL-FRICTION- IN +VE DIR. FF1
174. *LOAD 34 THERMAL-FRICTION- IN -VE DIR. FF2
175. *LOAD 35 TEMPERATURE LOAD T
176. *---------------------------------------------------- -------------------------
177. *LOAD 41 WIND LOAD IN +X DIRECTION W(+X)
178. *LOAD 42 WIND LOAD IN -X DIRECTION W(-X)
179. *-----------------------------------------------------------------------------
180. *LOAD 51 SURGE LOAD +X S(X)
181. *LOAD 52 SURGE LOAD -X S(-X)
182. ******************************************************************************
183. *LOADING
184. *****************************************************************************
185. *SEISMIC LOAD
186. *CALCULATIONS ARE AS PER ASCE-7 2002
187. **REFER DOCUMENT NO: 2411-8320-CA-CA10-0064-APPENDIX D
188. DEFINE IBC 2003
189. SDS 0.19 SD1 0.11 S1 0.07 IE 1.25 RX 3.5 RZ 5 SCLASS 4
190. SELFWEIGHT
191. MEMBER WEIGHT
192. *******FOR BEAMS AT EL.+10.500 & 12.4 M
193. *FOR PIPES <12"
194. *UDL=1.9*3=5.7 KN/M
195. 5 6 18 19 31 32 44 45 128 131 133 135 139 149 151 153 155 159 162 TO 164 181 -
196. 183 185 257 259 264 266 268 270 274 276 280 282 284 286 289 TO 296 UNI 5.7
197. *FOR BEAMS AT +14.00M LVL
198. * FOR SINGLE LEVEL CABLE TRAY OPERATING DEAD LOAD = 1.0 KPA
199. * 1.0*0.5*3 = 1.5KN (0.5M WIDTH OF TRAY AND 3M BEAM SPACING ARE CONSIDERED )
200. 318 TO 321 326 328 330 334 336 339 CON 1.5 0.5
201. 318 TO 321 326 328 330 334 336 339 CON 1.5 1.5
202. *FOR PIPES >12"
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 6 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
203. *24"-LS-O000-037-1CS1P05-IH (S10-S11-A)
204. *G
205. 533 CON 20 2.2
206. *24"-LS-O000-037-1CS1P05-IH (S10-S11-A)
207. *G
208. 539 CON 43.86 2.2
209. *24"-LS-O000-037-1CS1P05-IH
210. *G-(5.7*24"*25.4/1000)=16.176KN
211. 291 CON 16.176 2.79
212. *24"-LS-O000-037-1CS1P05-IH
213. *G-(5.7*24"*25.4/1000)=11.756KN
214. 290 CON 11.756 2.79
215. *24"-MS-O000-017-3CS1P05-IH
216. *G
217. 533 CON 27.71 1.225
218. *24"-MS-O000-017-3CS1P05-IH
219. *G-(5.7*24"*25.4/1000)=9.63KN
220. 280 CON 9.63 0.92
221. *24"-MS-O000-017-3CS1P05-IH
222. *G-(5.7*24"*25.4/1000)=9.186KN
223. 163 CON 9.186 0.92
224. *24"-MS-O000-017-3CS1P05-IH
225. *G-(5.7*24"*25.4/1000)=3.066KN
226. 19 CON 3.066 0.92
227. *24"-MS-O000-017-3CS1P05-IH
228. *G-(5.7*24"*25.4/1000)=10.116KN
229. 6 CON 10.116 0.92
230. *8"-G-O000-017-3CC1P01-NI
231. *G-(5.7*8"*25.4/1000)=8.462KN
232. 44 CON 8.462 1.4
233. *8"-G-O000-017-3CC1P01-NI
234. *G-(5.7*8"*25.4/1000)=0.792KN
235. 264 CON 0.792 1.4
236. *8"-G-O000-017-3CC1P01-NI
237. *G-(5.7*8"*25.4/1000)=1.352KN
238. 31 CON 1.352 1.4
239. *8"-G-O000-017-3CC1P01-NI
240. *G-(5.7*8"*25.4/1000)=2.322KN
241. 135 CON 2.322 1.4
242. *8"-G-O000-017-3CC1P01-NI
243. *G-(5.7*8"*25.4/1000)=1.068KN
244. 139 CON 1.068 1.4
245. *8"-G-O000-017-3CC1P01-NI
246. *G-(5.7*8"*25.4/1000)=1.512KN
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 7 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
247. 133 CON 1.512 1.4
248. *8"-G-O000-017-3CC1P01-NI
249. *G-(5.7*8"*25.4/1000)=0.922KN
250. 18 CON 0.922 1.4
251. *8"-G-O000-017-3CC1P01-NI
252. *G-(5.7*8"*25.4/1000)=5.91KN
253. 5 CON 5.91 1.4
254. *8"-HS-O000-018-6CS1P05-IH
255. *G-(5.7*8"*25.4/1000)=3.072KN
256. 45 CON 3.072 1.8
257. *8"-HS-O000-018-6CS1P05-IH
258. *G=11.07KN
259. 533 CON 11.07 0.5
260. *8"-HS-O000-018-6CS1P05-IH
261. *G-(5.7*8"*25.4/1000)=6.222KN
262. 284 CON 6.22 1.8
263. *8"-HS-O000-018-6CS1P05-IH
264. *G-(5.7*8"*25.4/1000)=6.572KN
265. 163 CON 6.572 1.8
266. *8"-HS-O000-018-6CS1P05-IH
267. *G-(5.7*8"*25.4/1000)=2.222KN
268. 19 CON 2.222 1.8
269. *8"-HS-O000-018-6CS1P05-IH
270. *G-(5.7*8"*25.4/1000)=8.382KN
271. 6 CON 8.382 1.8
272. *LOAD FROM FLARE LINE
273. *FOR 6"-RLL-S130-XXX-1CC2P03-NI
274. 356 CON 3.52 2
275. 303 CON 3.12 0.01
276. 374 CON 4.69 2.25
277. *IN PROJECTED AREA
278. *FROM 24"-LS-O000-037-1CS1P05-IH
279. 413 414 425 428 UNI 5.7
280. 436 UNI 2
281. SET NL 100
282. LOAD 1 SEISMIC LOAD +X
283. IBC LOAD X 1
284. PERFORM ANALYSIS
PROBLEM STATISTICS
-----------------------------------
************************************************************
* IBC 2003 SEISMIC LOAD ALONG X : *
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 8 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
* CT = 0.035 Cu = 1.660 *
* TIME PERIODS : *
* Ta = 0.799 T = 0.996 Tuser = 0.000 *
* TIME PERIOD USED (T) = 0.996 *
* LOAD FACTOR = 1.000 *
* DESIGN BASE SHEAR = 1.000 X 0.039 X 1648.52 *
* = 65.03 KN *
************************************************************
285. CHANGE
286. LOAD 2 SEISMIC LOAD -X
287. IBC LOAD X -1.
288. PERFORM ANALYSIS
************************************************************
* IBC 2003 SEISMIC LOAD ALONG X : *
* CT = 0.035 Cu = 1.660 *
* TIME PERIODS : *
* Ta = 0.799 T = 0.996 Tuser = 0.000 *
* TIME PERIOD USED (T) = 0.996 *
* LOAD FACTOR = -1.000 *
* DESIGN BASE SHEAR = -1.000 X 0.039 X 1648.52 *
* = -65.03 KN *
************************************************************
289. CHANGE
290. LOAD 3 SEISMIC LOAD +Z
291. IBC LOAD Z 1
292. PERFORM ANALYSIS
************************************************************
* IBC 2003 SEISMIC LOAD ALONG Z : *
* CT = 0.035 Cu = 1.660 *
* TIME PERIODS : *
* Ta = 0.799 T = 0.392 Tuser = 0.000 *
* TIME PERIOD USED (T) = 0.392 *
* LOAD FACTOR = 1.000 *
* DESIGN BASE SHEAR = 1.000 X 0.047 X 1648.52 *
* = 78.30 KN *
************************************************************
293. CHANGE
294. LOAD 4 SEISMIC LOAD -Z
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 9 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
295. IBC LOAD Z -1.
296. PERFORM ANALYSIS
************************************************************
* IBC 2003 SEISMIC LOAD ALONG Z : *
* CT = 0.035 Cu = 1.660 *
* TIME PERIODS : *
* Ta = 0.799 T = 0.392 Tuser = 0.000 *
* TIME PERIOD USED (T) = 0.392 *
* LOAD FACTOR = -1.000 *
* DESIGN BASE SHEAR = -1.000 X 0.047 X 1648.52 *
* = -78.30 KN *
************************************************************
297. CHANGE
298. *******************************************************************************
299. LOAD 11 DEAD LOAD
300. *******************************************************************************
301. *SELFWEIGHT OF THE STRUCTURE INCLUDING 10% EXTRA CONSIDERED TO ACCOUNT
302. *FOR CONNECTIONS
303. SELFWEIGHT Y -1.1
304. ***************************************************************************
305. LOAD 12 OPERATING LOAD-PIPING
306. *******************************************************************************
307. *FOR PIPES <12" , LOAD INTENSITY = 1.9 KN/M2. THIS IS AS PER SABP-007
308. *CL. 4.1.2 & 4.2.2 AND SAES -M-001 AMD CL. 5.2.4.8
309. *FOR PIPES >12" , LOAD APPLIED AS CONCENTRATED LOAD AND LOAD DATA IS AS PER
310. *PIPING INPUT DATA AND THE LOAD CALCULATION IS AS PER SABP07, CL. 4.1.2
311. *FOR CABLE TRAY, LOAD INTENSITY = 1.9 KN/M2. (AS PER SAES-M-001 -AMD CL. 5.2.5
312. *AND SABP-007 CL. 4.1.2)
313. *FUTURE PIPE LOAD OF 1.9 KN/M2 IS CONSIDERED FOR THE ANALYSIS.
314. MEMBER LOAD
315. *******FOR BEAMS AT EL.+10.500 & 12.4 M
316. *FOR PIPES <12"
317. *UDL=1.9*3=5.7 KN/M
318. 5 6 18 19 31 32 44 45 128 131 133 135 139 149 151 153 155 159 162 TO 164 181 -
319. 183 185 257 259 264 266 268 270 274 276 280 282 284 286 289 TO 295 -
320. 296 UNI GY -5.7
321. *FOR BEAMS AT +14.00M LVL
322. * FOR SINGLE LEVEL CABLE TRAY OPERATING DEAD LOAD = 1.0 KPA
323. * 1.0*0.5*3 = 1.5KN (0.5M WIDTH OF TRAY AND 3M BEAM SPACING ARE CONSIDERED )
324. 318 TO 321 326 328 330 334 336 339 CON GY -1.5 0.5
325. 318 TO 321 326 328 330 334 336 339 CON GY -1.5 1.5
326. *FOR PIPES >12"
327. *24"-LS-O000-037-1CS1P05-IH (S10-S11-A)
328. *G
329. 533 CON GY -20 2.2
330. *24"-LS-O000-037-1CS1P05-IH (S10-S11-A)
331. *G
332. 539 CON GY -43.86 2.2
333. *24"-LS-O000-037-1CS1P05-IH
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 10 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
334. *G-(5.7*24"*25.4/1000)=16.176KN
335. 291 CON GY -16.176 2.79
336. *24"-LS-O000-037-1CS1P05-IH
337. *G-(5.7*24"*25.4/1000)=11.756KN
338. 290 CON GY -11.756 2.79
339. *24"-MS-O000-017-3CS1P05-IH
340. *G
341. 533 CON GY -27.71 1.225
342. *24"-MS-O000-017-3CS1P05-IH
343. *G-(5.7*24"*25.4/1000)=9.63KN
344. 280 CON GY -9.63 0.92
345. *24"-MS-O000-017-3CS1P05-IH
346. *G-(5.7*24"*25.4/1000)=9.186KN
347. 163 CON GY -9.186 0.92
348. *24"-MS-O000-017-3CS1P05-IH
349. *G-(5.7*24"*25.4/1000)=3.066KN
350. 19 CON GY -3.066 0.92
351. *24"-MS-O000-017-3CS1P05-IH
352. *G-(5.7*24"*25.4/1000)=10.116KN
353. 6 CON GY -10.116 0.92
354. *8"-G-O000-017-3CC1P01-NI
355. *G-(5.7*8"*25.4/1000)=8.462KN
356. 44 CON GY -8.462 1.4
357. *8"-G-O000-017-3CC1P01-NI
358. *G-(5.7*8"*25.4/1000)=0.792KN
359. 264 CON GY -0.792 1.4
360. *8"-G-O000-017-3CC1P01-NI
361. *G-(5.7*8"*25.4/1000)=1.352KN
362. 31 CON GY -1.352 1.4
363. *8"-G-O000-017-3CC1P01-NI
364. *G-(5.7*8"*25.4/1000)=2.322KN
365. 135 CON GY -2.322 1.4
366. *8"-G-O000-017-3CC1P01-NI
367. *G-(5.7*8"*25.4/1000)=1.068KN
368. 139 CON GY -1.068 1.4
369. *8"-G-O000-017-3CC1P01-NI
370. *G-(5.7*8"*25.4/1000)=1.512KN
371. 133 CON GY -1.512 1.4
372. *8"-G-O000-017-3CC1P01-NI
373. *G-(5.7*8"*25.4/1000)=0.922KN
374. 18 CON GY -0.922 1.4
375. *8"-G-O000-017-3CC1P01-NI
376. *G-(5.7*8"*25.4/1000)=5.91KN
377. 5 CON GY -5.91 1.4
378. *8"-HS-O000-018-6CS1P05-IH
379. *G-(5.7*8"*25.4/1000)=3.072KN
380. 45 CON GY -3.072 1.8
381. *8"-HS-O000-018-6CS1P05-IH
382. *G=11.07KN
383. 533 CON GY -11.07 0.5
384. *8"-HS-O000-018-6CS1P05-IH
385. *G-(5.7*8"*25.4/1000)=6.222KN
386. 284 CON GY -6.22 1.8
387. *8"-HS-O000-018-6CS1P05-IH
388. *G-(5.7*8"*25.4/1000)=6.572KN
389. 163 CON GY -6.572 1.8
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 11 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
390. *8"-HS-O000-018-6CS1P05-IH
391. *G-(5.7*8"*25.4/1000)=2.222KN
392. 19 CON GY -2.222 1.8
393. *8"-HS-O000-018-6CS1P05-IH
394. *G-(5.7*8"*25.4/1000)=8.382KN
395. 6 CON GY -8.382 1.8
396. *LOAD FROM FLARE LINE
397. *FOR 6"-RLL-S130-XXX-1CC2P03-NI
398. 356 CON GY -3.52 2
399. 303 CON GY 3.12 0.01
400. 374 CON GY -4.69 2.25
401. *IN PROJECTED AREA
402. *FROM 24"-LS-O000-037-1CS1P05-IH
403. 413 414 425 428 UNI GY -5.7
404. 436 UNI GY -2
405. ******************************************************************************
406. LOAD 21 PIPING EMPTY LOAD
407. *******************************************************************************
408. *FOR PIPING EMPTY CONDITION 0.6*OPERATING LOAD IS CONSIDERED AS PER
409. *SAES-M-001 AMD
410. REPEAT LOAD
411. 12 0.6
412. *******************************************************************************
413. LOAD 22 PIPING TEST LOAD
414. *******************************************************************************
415. *FOR PIPES <12" , LOAD INTENSITY = 1.9 KN/M2
416. *FOR PIPES >12" , LOAD APPLIED AS CONCENTRATED LOAD AND LOAD DATA IS AS PER
417. *PIPING INPUT DATA AND THE LOAD CALCULATION IS AS PER SABP07, CL. 4.1.2
418. *FOR CABLE TRAY, LOAD INTENSITY = 1.9 KN/M2. (AS PER SAES-M-001 -AMD CL. 5.2.5
419. *AND SABP-007 CL. 4.1.2)
420. *FUTURE PIPE LOAD OF 1.9 KN/M2 IS CONSIDERED FOR THE ANALYSIS.
421. MEMBER LOAD
422. *******FOR BEAMS AT EL.+10.500 & 12.400 M
423. *FOR PIPES <12"
424. *UDL=1.9*3=5.7 KN/M
425. 5 6 18 19 31 32 44 45 128 131 133 135 139 149 151 153 155 159 162 TO 164 181 -
426. 183 185 257 259 264 266 268 270 274 276 280 282 284 286 289 TO 295 -
427. 296 UNI GY -5.7
428. *FOR PIPES >12"
429. *24"-LS-O000-037-1CS1P05-IH (S10-S11-A)
430. *G-0=48.79KN
431. 539 CON GY -48.79 2.5
432. *24"-LS-O000-037-1CS1P05-IH (S10-S11-B)
433. *G-0=54.19KN
434. 533 CON GY -54.19 2.5
435. *24"-LS-O000-037-1CS1P05-IH
436. *G-(5.7*24"*25.4/1000)=44.176KN
437. 291 CON GY -45 2.79
438. *24"-LS-O000-037-1CS1P05-IH
439. *G-(5.7*24"*25.4/1000)=34.236KN
440. 290 CON GY -34.236 2.79
441. *24"-MS-O000-017-3CS1P05-IH (S10-S11-A)
442. *G-0=65.67KN
443. 533 CON GY -65.67 2.5
444. *24"-MS-O000-017-3CS1P05-IH
445. *G-(5.7*24"*25.4/1000)=30.846KN
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 12 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
446. 280 CON GY -30.846 0.92
447. *24"-MS-O000-017-3CS1P05-IH
448. *G-(5.7*24"*25.4/1000)=29.526KN
449. 163 CON GY -29.526 0.92
450. *24"-MS-O000-017-3CS1P05-IH
451. *G-(5.7*24"*25.4/1000)=9.326KN
452. 19 CON GY -9.326 0.92
453. *24"-MS-O000-017-3CS1P05-IH
454. *G-(5.7*24"*25.4/1000)=29.426KN
455. 6 CON GY -29.426 0.92
456. *8"-G-O000-017-3CC1P01-NI
457. *G-(5.7*8"*25.4/1000)=5.26KN
458. 5 CON GY -5.26 1.4
459. *8"-G-O000-017-3CC1P01-NI
460. *G-(5.7*8"*25.4/1000)=0.732KN
461. 18 CON GY -0.732 1.4
462. *8"-G-O000-017-3CC1P01-NI
463. *G-(5.7*8"*25.4/1000)=0.922KN
464. 133 CON GY -0.922 1.4
465. *8"-G-O000-017-3CC1P01-NI
466. *G-(5.7*8"*25.4/1000)=0.862KN
467. 139 CON GY -0.862 1.4
468. *8"-G-O000-017-3CC1P01-NI
469. *G-(5.7*8"*25.4/1000)=0.782KN
470. 135 CON GY -0.782 1.4
471. *8"-G-O000-017-3CC1P01-NI
472. *G-(5.7*8"*25.4/1000)=1.132KN
473. 31 CON GY -1.132 1.4
474. *8"-G-O000-017-3CC1P01-NI
475. *G-(5.7*8"*25.4/1000)=0.612KN
476. 264 CON GY -0.612 1.4
477. *8"-G-O000-017-3CC1P01-NI
478. *G-(5.7*8"*25.4/1000)=7.582KN
479. 44 CON GY -7.582 1.4
480. *8"-HS-O000-018-6CS1P05-IH
481. *G-(5.7*8"*25.4/1000)=4.162KN
482. 45 CON GY -4.162 1.8
483. *8"-HS-O000-018-6CS1P05-IH
484. *G-0=13.91KN
485. 533 CON GY -13.91 0.5
486. *8"-HS-O000-018-6CS1P05-IH
487. *G-(5.7*8"*25.4/1000)=8.122KN
488. 284 CON GY -8.122 1.8
489. *8"-HS-O000-018-6CS1P05-IH
490. *G-(5.7*8"*25.4/1000)=8.552KN
491. 163 CON GY -8.552 1.8
492. *8"-HS-O000-018-6CS1P05-IH
493. *G-(5.7*8"*25.4/1000)=3.092KN
494. 19 CON GY -3.092 1.8
495. *8"-HS-O000-018-6CS1P05-IH
496. *G-(5.7*8"*25.4/1000)=9.392KN
497. 6 CON GY -9.392 1.8
498. ******************************************************************************
499. LOAD 31 ANCHOR LOAD IN +VE DIR
500. ******************************************************************************
501. *PIPING THERMAL-ANCHOR LOADS -IN LONGITUDINAL DIRECTION
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 13 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
502. *PIPE ANCHOR LOADS AS PER PIPING INPUT DATA
503. MEMBER LOAD
504. *AT EL. +10.500
505. *3"-CA-0000-011-1CC2C06-NI
506. 18 CON GZ 3 1.15
507. *3"-FG-0000-026-1CC1P01-NI
508. 18 CON GZ 3 1.7
509. *3"-G-0000-010-3CC1P01-NI
510. 18 CON GZ 3 1.92
511. *FOR FUTURE
512. 18 CON GZ 10 2.2
513. 18 CON GZ 10 2.6
514. 18 CON GZ 10 3
515. 18 CON GZ 10 3.3
516. 131 CON GZ 10 0.1
517. 131 CON GZ 10 0.5
518. 131 CON GZ 10 0.8
519. 131 CON GZ 10 1.2
520. 131 CON GZ 10 1.6
521. 131 CON GZ 10 1.9
522. 131 CON GZ 10 2.3
523. 131 CON GZ 10 2.6
524. 131 CON GZ 10 3
525. 131 CON GZ 10 3.3
526. *AT EL. +12.400
527. *4"-DMW-0000-011-1CC2C06-NI
528. 294 CON GZ 4 0.19
529. *3"-IA-0000-027-12CG0U01-NI
530. 294 CON GZ 3 0.4
531. *3"-UA-0000-028-12CG0U01-NI
532. 294 CON GZ 3 0.57
533. *3"-UW-0000-033-1CS2U16-NI
534. 294 CON GZ 3 0.72
535. *3"-SWS-0000-033-1CS4U16-NI
536. 290 CON GZ 3 0.01
537. *FOR FUTURE
538. 290 CON GZ 10 0.29
539. 290 CON GZ 10 0.65
540. 290 CON GZ 10 0.9
541. 290 CON GZ 10 1.25
542. 290 CON GZ 10 1.55
543. 290 CON GZ 10 1.9
544. ******************************************************************************
545. LOAD 32 ANCHOR LOAD IN -VE DIR
546. ******************************************************************************
547. REPEAT LOAD
548. 31 -1.0
549. ******************************************************************************
550. LOAD 33 FRICTION LOAD IN +VE DIR
551. ******************************************************************************
552. *30% OF THE OPERATING LOAD IS CONSIDERED FOR PIPES <L2" AS PER PIPING INPUT DAT
553. *FOR PIPES >12", LOAD IS AS PER PIPING INPUT DATA AND THE LOAD CALCULATION
554. *IS AS PER SABP07, CL. 4.1.2
555. *PIPING THERMAL-FRICTION LOADS -IN LONGITUDINAL DIRECTION
556. MEMBER LOAD
557. *******FOR BEAMS AT EL.+12.500 M
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 14 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
558. *FOR PIPES <12"
559. **UDL = 30% OF 5.7 = (30/100)*5.7 = 1.71 KN/M
560. 5 6 18 19 31 32 44 45 128 131 133 135 139 149 151 153 155 159 162 TO 164 181 -
561. 183 185 257 259 264 266 268 270 274 276 280 282 284 286 289 TO 295 -
562. 296 UNI GZ 1.71
563. *8"-G-O000-017-3CC1P01-NI
564. *-HL-(1.7*8"*25.4/1000)=-1.397KN
565. 135 CON GZ -1.397 1.4
566. *8"-HS-O000-018-6CS1P05-IH
567. *HL=1.45KN
568. 284 CON GX 1.45 1.8
569. *8"-HS-O000-018-6CS1P05-IH
570. *-HL-(1.7*8"*25.4/1000)=-2.645KN
571. 284 CON GZ -2.645 1.8
572. *8"-HS-O000-018-6CS1P05-IH
573. *-HL-(1.7*8"*25.4/1000)=-2.0865KN
574. 163 CON GZ -2.086 1.8
575. *8"-HS-O000-018-6CS1P05-IH
576. *-HL-(1.7*8"*25.4/1000)=-3.165KN
577. 6 CON GZ -3.165 1.8
578. *8"-HS-O000-018-6CS1P05-IH
579. *HL-0=3.24KN
580. 533 CON GX 3.24 0.5
581. *24"-LS-O000-037-1CS1P05-IH
582. 291 CON GZ -1.62 2.79
583. 291 CON GX -1.05 2.79
584. 290 CON GZ -2.9 2.79
585. 533 CON GZ 1.2 2.5
586. 539 CON GZ -11.07 2.5
587. 539 CON GX -3.3 2.5
588. *24"-MS-O000-017-3CS1P05-IH
589. 280 CON GX -4.35 0.92
590. 280 CON GZ -3.32 0.92
591. 163 CON GZ -1.18 0.92
592. 19 CON GZ -1.96 0.92
593. 6 CON GX -1.32 0.92
594. 6 CON GX -3.72 0.92
595. 533 CON GZ -7.42 1.25
596. 533 CON GX 3.76 1.25
597. ******************************************************************************
598. LOAD 34 FRICTION LOAD IN -VE DIR
599. ******************************************************************************
600. *30% OF THE OPERATING LOAD IS CONSIDERED FOR PIPES <L2" AS PER PIPING INPUT DAT
601. *FOR PIPES >12", LOAD IS AS PER PIPING INPUT DATA AND THE LOAD CALCULATION
602. *IS AS PER SABP07, CL. 4.1.2
603. *PIPING THERMAL-FRICTION LOADS -IN LONGITUDINAL DIRECTION
604. *MEMBER LOAD
605. *******FOR BEAMS AT EL.+12.500 M
606. *FOR PIPES <12"
607. **UDL = 30% OF 5.7 = (30/100)*5.7 = 1.71 KN/M
608. REPEAT LOAD
609. 33 -1.0
610. *******************************************************************************
611. LOAD 35 TEMPERATURE LOAD
612. *******************************************************************************
613. *REFER DOCUMENT NO: 2411-8320-CA-CA10-0064-APPENDIX B
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 15 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
614. TEMPERATURE LOAD
615. 1 TO 6 14 TO 19 27 TO 32 40 TO 45 53 TO 64 89 TO 92 94 96 102 TO 105 107 109 -
616. 128 131 TO 133 135 139 149 TO 156 158 159 162 TO 164 180 TO 187 189 -
617. 192 TO 195 201 TO 204 255 TO 259 261 TO 270 272 TO 286 289 TO 301 -
618. 303 TO 343 353 TO 358 364 TO 369 374 378 TO 385 406 TO 422 425 TO 436 477 -
619. 479 TO 493 496 497 500 TO 513 518 TO 541 543 TO 546 551 TO 564 566 TO 574 -
620. 575 TEMP 38
621. ******************************************************************************
622. LOAD 41 WIND LOAD IN +X DIR
623. *CALCULATION BASED ON SABP-006
624. *ALSO REFER DOCUMENT NO: 2411-8320-CA-CA10-0064-APPENDIX C
625. *WIND LOAD IN TRANSVERSE DIRECTION ALONE CONSIDERED
626. *WIND ON PIPES
627. *WINDWARD
628. JOINT LOAD
629. 19 28 56 FX 4.65
630. 10 37 FX 2.71
631. 21 30 59 FX 6.4
632. 12 39 FX 3.72
633. 145 144 FX 0.89
634. 146 143 FX 0.51
635. MEMBER LOAD
636. 374 CON GX 0.89
637. *WINDWARD
638. MEMBER LOAD
639. *ON BEAMS
640. 53 TO 64 89 TO 92 94 96 102 TO 105 107 109 255 258 261 262 265 269 272 275 -
641. 277 278 281 285 368 369 408 409 421 422 480 481 487 490 493 526 527 -
642. 532 TO 535 539 540 544 545 572 573 UNI GX 0.58
643. 301 303 308 TO 310 313 315 317 322 TO 325 327 329 331 TO 333 335 337 338 356 -
644. 374 380 381 486 554 557 TO 559 UNI GX 0.54
645. *ON COLUMNS
646. 1 TO 4 14 TO 17 27 TO 30 40 TO 43 364 TO 367 406 407 419 420 432 433 496 497 -
647. 528 TO 531 537 538 541 543 566 567 UNI GX 0.55
648. 297 TO 300 311 312 314 316 378 379 385 553 555 556 UNI GX 0.65
649. *ON VERTICAL BRACING
650. 410 411 477 479 482 TO 485 488 489 491 492 512 513 518 TO 521 536 546 551 -
651. 552 568 TO 571 574 575 UNI GX 0.28
652. 304 TO 307 357 358 382 383 560 TO 563 UNI GX 0.33
653. *IN PROJECTED AREA
654. *FROM 24"-LS-O000-037-1CS1P05-IH
655. **************************************************************************
656. LOAD 42 WIND LOAD IN -X DIR
657. REPEAT LOAD
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 16 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
658. 41 -1.0
659. LOAD 51 SURGE LOAD (+VE)
660. *****************************************************************************
661. *CONSIDERING 150KN OF SURGE LOAD FOR 24" PIPELINE @0.869 M FROM THE COLUMN
662. MEMBER LOAD
663. 290 CON GZ 150 0.29
664. *646 CON GZ 150 0.869
665. *1010 CON GX 150 0.869
666. *1007 CON GX 150 0.869
667. *1021 CON GX 150 0.869
668. *******************************************************************************
669. LOAD 52 SURGE LOAD (-VE)
670. ******************************************************************************
671. REPEAT LOAD
672. 51 -1.0
673. *******************************************************************************
674. *LOAD COMBINATION FOR STEEL STRUCTURES DESIGN-STRENGTH DESIGN (LRFD)
675. *******************************************************************************
676. *AS PER SAES-M-001 CL. 6.2
677. **1.4(DEAD LOAD +OPERATING LOAD+THERMAL LOAD)
678. **1.2(DEAD+OPERATING LOAD+ANCHOR)+ (1.6WIND OR 1.0 SEISMIC LOAD)
679. **0.9 DEAD LOAD(EMPTY) + 1.6WIND
680. **0.9 DEAD LOAD +0.6 OPERATING+ 1.0 SEISMIC (OPERATING)
681. **0.9 DEAD LOAD + 1.0 SEISMIC (EMPTY)
682. *~ 0.9 DEAD LOAD + 0.6 SEISMIC (OPERATING)
683. **1.4(DEAD LOAD )+ 1.4(TEST LOAD)
684. **1.2(DEAD LOAD )+ 1.2(TEST LOAD) +(WIND @50MPH)
685. *~ 1.2(DEAD LOAD )+ 1.2(TEST LOAD) +0.25WIND
686. *******************************************************************************
687. *LOAD COMBINATIONS
688. *******************************************************************************
689. *LOAD COMBINATION FOR STRENGTH CHECK
690. *FOR COLUMN,LONGITUDINAL BEAM,STRUT,BRACING
691. *(WITH FRICTION LOAD AS 5% OF OPERATING)
692. *******************************************************************************
693. LOAD 101 1.4DS+1.4DO+1.4AF(+VE)+0.23FF(+VE)+1.4T(+VE)
694. REPEAT LOAD
695. 11 1.4 12 1.4 31 1.4 33 0.23 35 1.4
696. LOAD 102 1.4DS+1.4DO+1.4AF(-VE)+0.23FF(-VE)+1.4T(-VE)
697. REPEAT LOAD
698. 11 1.4 12 1.4 32 1.4 34 0.23 35 1.4
699. *******************************************************************************
700. LOAD 103 1.2DS+1.2DO+1.2AF(+VE)+1.6W(+Z)
701. REPEAT LOAD
702. 11 1.2 12 1.2 31 1.2 41 1.6
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 17 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
703. LOAD 104 1.2DS+1.2DO+1.2AF(+VE)+1.6WL(-Z)
704. REPEAT LOAD
705. 11 1.2 12 1.2 31 1.2 42 1.6
706. LOAD 105 1.2DS+1.2DO+1.2AF(+VE)+1.0E(+X)
707. REPEAT LOAD
708. 11 1.2 12 1.2 31 1.2 1 1.0
709. LOAD 106 1.2DS+1.2DO+1.2AF(+VE)+1.0E(-X)
710. REPEAT LOAD
711. 11 1.2 12 1.2 31 1.2 2 1.0
712. LOAD 107 1.2DS+1.2DO+1.2AF(+VE)+1.0E(+Z)
713. REPEAT LOAD
714. 11 1.2 12 1.2 31 1.2 3 1.0
715. LOAD 108 1.2DS+1.2DO+1.2AF(+VE)+1.0E(-Z)
716. REPEAT LOAD
717. 11 1.2 12 1.2 31 1.2 4 1.0
718. LOAD 109 1.2DS+1.2DO+1.2AF(-VE)+1.6W(+Z)
719. REPEAT LOAD
720. 11 1.2 12 1.2 32 1.2 41 1.6
721. LOAD 110 1.2DS+1.2DO+1.2AF(-VE)+1.6WL(-Z)
722. REPEAT LOAD
723. 11 1.2 12 1.2 32 1.2 42 1.6
724. LOAD 111 1.2DS+1.2DO+1.2AF(-VE)+1.0E(+X)
725. REPEAT LOAD
726. 11 1.2 12 1.2 32 1.2 1 1.0
727. LOAD 112 1.2DS+1.2DO+1.2AF(-VE)+1.0E(-X)
728. REPEAT LOAD
729. 11 1.2 12 1.2 32 1.2 2 1.0
730. LOAD 113 1.2DS+1.2DO+1.2AF(-VE)+1.0E(+Z)
731. REPEAT LOAD
732. 11 1.2 12 1.2 32 1.2 3 1.0
733. LOAD 114 1.2DS+1.2DO+1.2AF(-VE)+1.0E(-Z)
734. REPEAT LOAD
735. 11 1.2 12 1.2 32 1.2 4 1.0
736. *******************************************************************************
737. LOAD 115 0.9DS+0.9DE+1.6W(+Z)
738. REPEAT LOAD
739. 11 0.9 21 0.9 41 1.6
740. LOAD 116 0.9DS+0.9DE+1.6W(-Z)
741. REPEAT LOAD
742. 11 0.9 21 0.9 42 1.6
743. *******************************************************************************
744. LOAD 117 0.9DS+0.6DO+1.0EO(+X)
745. REPEAT LOAD
746. 11 0.9 12 0.6 1 1.0
747. LOAD 118 0.9DS+0.6DO+1.0EO(-X)
748. REPEAT LOAD
749. 11 0.9 12 0.6 2 1.0
750. LOAD 119 0.9DS+0.6DO+1.0EO(+Z)
751. REPEAT LOAD
752. 11 0.9 12 0.6 3 1.0
753. LOAD 120 0.9DS+0.6DO+1.0EO(-Z)
754. REPEAT LOAD
755. 11 0.9 12 0.6 4 1.0
756. *******************************************************************************
757. LOAD 121 0.9DS+0.9DE+0.67EO(+X)
758. REPEAT LOAD
759. 11 0.9 21 0.9 1 0.7
760. LOAD 122 0.9DS+0.9DE+0.67EO(-X)
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 18 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
761. REPEAT LOAD
762. 11 0.9 21 0.9 2 0.7
763. LOAD 123 0.9DS+0.9DE+0.67EO(+Z)
764. REPEAT LOAD
765. 11 0.9 21 0.9 3 0.7
766. LOAD 124 0.9DS+0.9DE+0.67EO(-Z)
767. REPEAT LOAD
768. 11 0.9 21 0.9 4 0.7
769. *******************************************************************************
770. LOAD 125 1.4(DS+DT)
771. REPEAT LOAD
772. 11 1.4 22 1.4
773. *******************************************************************************
774. LOAD 126 1.2(DS+DT)+0.29W(+Z)
775. REPEAT LOAD
776. 11 1.2 22 1.2 41 0.29
777. LOAD 127 1.2(DS+DT)+0.29W(-Z)
778. REPEAT LOAD
779. 11 1.2 22 1.2 42 0.29
780. *******************************************************************************
781. LOAD 128 1.4DS+1.4DO+1.4AF(+VE)+0.23FF(+VE)+1.4T(+VE)+1.0SL(+VE)
782. REPEAT LOAD
783. 11 1.4 12 1.4 31 1.4 33 0.23 51 1.4 35 1.4
784. LOAD 129 1.4DS+1.4DO+1.4AF(-VE)+0.23FF(-VE)+1.4T(-VE)+1.0SL(-VE)
785. REPEAT LOAD
786. 11 1.4 12 1.4 32 1.4 34 0.23 35 1.4 52 1.0
787. *******************************************************************************
788. LOAD 130 1.2DS+1.2DO+1.2AF(+VE)+1.0SL(+VE)
789. REPEAT LOAD
790. 11 1.2 12 1.2 31 1.2 51 1.0
791. LOAD 131 1.2DS+1.2DO+1.2AF(+VE)+1.0SL(-VE)
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 19 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
792. REPEAT LOAD
793. 11 1.2 12 1.2 31 1.2 52 1.0
794. LOAD 132 1.2DS+1.2DO+1.2AF(-VE)+1.0SL(+VE)
795. REPEAT LOAD
796. 11 1.2 12 1.2 32 1.2 51 1.0
797. LOAD 133 1.2DS+1.2DO+1.2AF(-VE)+1.0SL(-VE)
798. REPEAT LOAD
799. 11 1.2 12 1.2 32 1.2 52 1.0
800. *******************************************************************************
801. *LOAD COMBINATION FOR STRENGTH CHECK
802. *FOR TRANSVERSE BEAM DESIGN
803. *(WITH FRICTION LOAD AS 10% OF OPERATING)
804. *******************************************************************************
805. LOAD 151 1.4DS+1.4DO+1.4AF(+VE)+0.47FF(+VE)+1.4T(+VE)
806. REPEAT LOAD
807. 11 1.4 12 1.4 31 1.4 33 0.47 35 1.4
808. LOAD 152 1.4DS+1.4DO+1.4AF(-VE)+0.47FF(-VE)+1.4T(-VE)
809. REPEAT LOAD
810. 11 1.4 12 1.4 32 1.4 34 0.47 35 1.4
811. *******************************************************************************
812. LOAD 153 1.4DS+1.4DO+1.4AF(+VE)+0.47FF(+VE)+1.4T(+VE)+1.0SL(+VE)
813. REPEAT LOAD
814. 11 1.4 12 1.4 31 1.4 33 0.47 35 1.4 51 1.0
815. LOAD 154 1.4DS+1.4DO+1.4AF(-VE)+0.47FF(-VE)+1.4T(-VE)+1.0SL(-VE)
816. REPEAT LOAD
817. 11 1.4 12 1.4 32 1.4 34 0.47 35 1.4 52 1.0
818. *******************************************************************************
819. *LOAD COMBINATION FOR SERVICEABILITY CHECK
820. *FOR LONGITUDINAL BEAMS, STRUTS, COLUMNS AND FOUNDATION
821. *(WITH FRICTION LOAD AS 5% OF OPERATING)
822. *******************************************************************************
823. LOAD 201 1.0DS+1.0DO+1.0AF(+VE) )+0.17FF(+VE)+1.0T(+VE)
824. REPEAT LOAD
825. 11 1.0 12 1.0 31 1.0 33 0.17 35 1.0
826. LOAD 202 1.0DS+1.0DO+1.0AF(-VE) +0.17FF(-VE)+1.0T(-VE)
827. REPEAT LOAD
828. 11 1.0 12 1.0 32 1.0 34 0.17 35 1.0
829. *******************************************************************************
830. LOAD 203 1.0DS+1.0DO+1.0AF(+VE)+1.0W(+Z)
831. REPEAT LOAD
832. 11 1.0 12 1.0 31 1.0 41 1.0
833. LOAD 204 1.0DS+1.0DO+1.0AF(+VE)+1.0WL(-Z)
834. REPEAT LOAD
835. 11 1.0 12 1.0 31 1.0 42 1.0
836. LOAD 205 1.0DS+1.0DO+1.0AF(+VE)+0.7E(+X)
837. REPEAT LOAD
838. 11 1.0 12 1.0 31 1.0 1 0.7
839. LOAD 206 1.0DS+1.0DO+1.0AF(+VE)+0.7E(-X)
840. REPEAT LOAD
841. 11 1.0 12 1.0 31 1.0 2 0.7
842. LOAD 207 1.0DS+1.0DO+1.0AF(+VE)+0.7E(+Z)
843. REPEAT LOAD
844. 11 1.0 12 1.0 31 1.0 3 0.7
845. LOAD 208 1.0DS+1.0DO+1.0AF(+VE)+0.7E(-Z)
846. REPEAT LOAD
847. 11 1.0 12 1.0 31 1.0 4 0.7
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 20 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
848. LOAD 209 1.0DS+1.0DO+1.0AF(-VE)+1.0W(+Z)
849. REPEAT LOAD
850. 11 1.0 12 1.0 32 1.0 41 1.0
851. LOAD 210 1.0DS+1.0DO+1.0AF(-VE)+1.0WL(-Z)
852. REPEAT LOAD
853. 11 1.0 12 1.0 32 1.0 42 1.0
854. LOAD 211 1.0DS+1.0DO+1.0AF(-VE)+0.7E(+X)
855. REPEAT LOAD
856. 11 1.0 12 1.0 32 1.0 1 0.7
857. LOAD 212 1.0DS+1.0DO+1.0AF(-VE)+0.7E(-X)
858. REPEAT LOAD
859. 11 1.0 12 1.0 32 1.0 2 0.7
860. LOAD 213 1.0DS+1.0DO+1.0AF(-VE)+0.7E(+Z)
861. REPEAT LOAD
862. 11 1.0 12 1.0 32 1.0 3 0.7
863. LOAD 214 1.0DS+1.0DO+1.0AF(-VE)+0.7E(-Z)
864. REPEAT LOAD
865. 11 1.0 12 1.0 32 1.0 4 0.7
866. *******************************************************************************
867. LOAD 215 1.0DS+1.0DE+1.0W(+Z)
868. REPEAT LOAD
869. 11 1.0 21 1.0 41 1.0
870. LOAD 216 1.0DS+1.0DE+1.0W(-Z)
871. REPEAT LOAD
872. 11 1.0 21 1.0 42 1.0
873. *******************************************************************************
874. LOAD 217 0.9DS+0.6DO+0.7EO(+X)
875. REPEAT LOAD
876. 11 0.9 12 0.6 1 0.7
877. LOAD 218 0.9DS+0.6DO+0.7EO(-X)
878. REPEAT LOAD
879. 11 0.9 12 0.6 2 0.7
880. LOAD 219 0.9DS+0.6DO+0.7EO(+Z)
881. REPEAT LOAD
882. 11 0.9 12 0.6 3 0.7
883. LOAD 220 0.9DS+0.6DO+0.7EO(-Z)
884. REPEAT LOAD
885. 11 0.9 12 0.6 4 0.7
886. *******************************************************************************
887. LOAD 221 0.9DS+0.9DE+0.5EO(+X)
888. REPEAT LOAD
889. 11 0.9 21 0.9 1 0.5
890. LOAD 222 0.9DS+0.9DE+0.5EO(-X)
891. REPEAT LOAD
892. 11 0.9 21 0.9 2 0.5
893. LOAD 223 0.9DS+0.9DE+0.5EO(+Z)
894. REPEAT LOAD
895. 11 0.9 21 0.9 3 0.5
896. LOAD 224 0.9DS+0.9DE+0.5EO(-Z)
897. REPEAT LOAD
898. 11 0.9 21 0.9 4 0.5
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 21 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
899. *******************************************************************************
900. LOAD 225 1.0DS+DT
901. REPEAT LOAD
902. 11 1.0 22 1.0
903. *******************************************************************************
904. LOAD 226 1.0DS+1.0DT+0.29W(+Z)
905. REPEAT LOAD
906. 11 1.0 22 1.0 41 0.29
907. LOAD 227 1.0DS+1.0DT+0.29W(-Z)
908. REPEAT LOAD
909. 11 1.0 22 1.0 42 0.29
910. *******************************************************************************
911. LOAD 228 1.0DS+1.0DO+1.0AF(+VE)++0.17FF(+VE)+1.0T(+VE)+1.0SL(+VE)
912. REPEAT LOAD
913. 11 1.0 12 1.0 31 1.0 33 0.17 35 1.0 51 1.0
914. LOAD 229 1.0DS+1.0DO+1.0AF(-VE)+0.17FF(-VE)+1.0T(-VE)+1.0SL(-VE)
915. REPEAT LOAD
916. 11 1.0 12 1.0 32 1.0 34 0.17 35 1.0 52 1.0
917. *******************************************************************************
918. LOAD 230 1.0DS+1.0DO+1.0AF(+VE)+1.0SL(+VE)
919. REPEAT LOAD
920. 11 1.0 12 1.0 31 1.0 51 1.0
921. LOAD 231 1.0DS+1.0DO+1.0AF(+VE)+1.0SL(-VE)
922. REPEAT LOAD
923. 11 1.0 12 1.0 31 1.0 52 1.0
924. LOAD 232 1.0DS+1.0DO+1.0AF(-VE)+1.0SL(+VE)
925. REPEAT LOAD
926. 11 1.0 12 1.0 32 1.0 51 1.0
927. LOAD 233 1.0DS+1.0DO+1.0AF(-VE)+1.0SL(-VE)
928. REPEAT LOAD
929. 11 1.0 12 1.0 32 1.0 52 1.0
930. *******************************************************************************
931. *LOAD COMBINATION FOR SERVICEABILITY CHECK
932. *FOR TRANSVERSE BEAM AND FOUNDATION(FOR BEARING CAPACITY AND STABILITY CHECK) D
933. *(WITH FRICTION LOAD AS 10% OF OPERATING)
934. *******************************************************************************
935. LOAD 251 1.0DS+1.0DO+1.0AF(+VE)+0.33FF(+VE)+1.0T(+VE)
936. REPEAT LOAD
937. 11 1.0 12 1.0 31 1.0 33 0.33 35 1.0
938. LOAD 252 1.0DS+1.0DO+1.0AF(-VE)+0.33FF(-VE)+1.0T(-VE)
939. REPEAT LOAD
940. 11 1.0 12 1.0 32 1.0 34 0.33 35 1.0
941. *******************************************************************************
942. LOAD 253 1.0DS+1.0DO+1.0AF(+VE)+0.33FF(+VE)+1.0T(+VE)+1.0SL(+VE)
943. REPEAT LOAD
944. 11 1.0 12 1.0 31 1.0 33 0.33 35 1.0 51 1.0
945. LOAD 254 1.0DS+1.0DO+1.0AF(-VE)+0.33FF(-VE)+1.0T(-VE)+1.0SL(-VE)
946. REPEAT LOAD
947. 11 1.0 12 1.0 32 1.0 34 0.33 35 1.0 52 1.0
948. *******************************************************************************
949. PERFORM ANALYSIS PRINT STATICS CHECK
950. *PDELTA 3 ANALYSIS
STAAD SPACE -- PAGE NO. 20
951. *******************************************************************************
952. *DESIGN
953. PARAMETER
954. CODE LRFD
955. FYLD 355000 ALL
956. BEAM 1 ALL
957. RATIO 1 ALL
958. MAIN 0 ALL
959. *TRACK 2 ALL
960. ****************
961. *LZ 7.1 MEMB 1 2 14 15 27 28 40 41 65 TO 68 364 TO 367
962. LZ 6.95 MEMB 314 316 378 379
963. LZ 13.9 MEMB 311 312
964. LZ 4.6 MEMB 366 367 406 407 496 497
965. LY 4.6 MEMB 366 367 406 407 496 497
966. LY 1.9 MEMB 3 4 419 420
967. LZ 1.9 MEMB 3 4 419 420
968. LZ 4.6 MEMB 432 433 528 TO 531 537 538 541 543
969. LY 2.1 MEMB 432 433 528 537
970. LZ 8.55 MEMB 385 553 555 556
971. LZ 4.68 MEMB 40 41 566 567
972. LY 2.5 MEMB 61 64 278 285 487 490 526 527
973. *LY 7.1 MEMB 1 2 14 15 364 TO 367 406 407 437 438 441 453
974. LY 7.1 MEMB 1 2 14 15 364 TO 367 406 407 496 497
975. LZ 4.5 MEMB 53 56 59 62 255 258 272 275 308 313 337 338
976. LY 4.5 MEMB 53 56 59 62 255 258 272 275 308 313 337 338
977. LZ 7 MEMB 310 333 335 384 564
978. LY 2 MEMB 261 265 277 281 331 480 481 486 493
979. LY 7 MEMB 303 356 532 TO 535 539 540 544 545 554 557 TO 559
980. LY 3.5 MEMB 5 6 18 19 31 32 44 45 128 131 133 135 139 149 151 153 155 159 -
981. 162 TO 164 181 183 185 257 259 264 266 268 270 274 276 280 282 284 286 289 -
982. 290 TO 296 412 TO 415 425 TO 428
983. LY 1.6 MEMB 434 435
984. LZ 7 MEMB 5 6 18 19 31 32 44 45 128 131 133 135 139 149 151 153 155 159 162 -
985. 163 TO 164 181 183 185 257 259 264 266 268 270 274 276 280 282 284 286 289 -
986. 290 TO 296 412 TO 415 425 TO 428
987. LZ 10.5 MEMB 54 57 60 63 89 TO 92 94 96 102 TO 105 107 109 309 315
988. 322 TO 325 327 329
989. LZ 3.5 MEMB 55 58 261 262 265 269 317 331 332 480 481 486
990. LZ 3.5 MEMB 277 278 487
991. LZ 3.5 MEMB 281 285 493 526
992. LZ 1.6 MEMB 434 435
993. LZ 8.42 MEMB 477 479 570 571
994. *LZ 7.1 MEMB 1 2 14 15 27 28 40 41 65 TO 68 364 TO 367 406 407 432 433 496 497
995. ***************
996. KZ 2.77 MEMB 1 2
997. KZ 2.54 MEMB 366 367 406 407 496 497
998. KZ 2.37 MEMB 3 4 419 420
999. KZ 2.77 MEMB 14 15
1000. KZ 3.09 MEMB 364 365
1001. KZ 3.31 MEMB 16 17
1002. KZ 2.89 MEMB 27 28
1003. KZ 2.84 MEMB 529 530 538 543
1004. KZ 2.8 MEMB 29 30
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 23 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
1005. KZ 2.31 MEMB 299 314 379 553 556
1006. KZ 2.71 MEMB 40 41 566 567
1007. KZ 2.66 MEMB 432 433 528 531 537 541
1008. KZ 2.8 MEMB 42 43
1009. KZ 2.31 MEMB 300 316 378 385 555
1010. ****************
1011. UNT 2.25 MEMB 53 56 59 62 255 258 272 275 308 313 337 338
1012. UNB 2.25 MEMB 53 56 59 62 255 258 272 275 308 313 337 338
1013. UNT 2.75 MEMB 54 57 60 63 89 TO 92 94 96 102 TO 105 107 109 309 315 -
1014. 322 TO 325 327 329
1015. UNB 2.75 MEMB 54 57 60 63 89 TO 92 94 96 102 TO 105 107 109 309 315
1016. 322 TO 325 327 329
1017. UNT 2.5 MEMB 55 58 61 64 261 262 265 269 277 278 281 285 310 317 331 TO 333 -
1018. 335 480 481 486 487 490 493 526 527
1019. UNB 2.5 MEMB 55 58 61 64 261 262 265 269 277 278 281 285 310 317 331 TO 333 -
1020. 335 480 481 486 487 490 493 526 527
1021. UNT 7 MEMB 532 TO 535 539 540 544 545
1022. UNB 7 MEMB 532 TO 535 539 540 544 545
1023. UNT 3.5 MEMB 413 414 425 428
1024. UNB 3.5 MEMB 413 414 425 428
1025. UNT 1.6 MEMB 434 435
1026. UNB 1.6 MEMB 434 435
1027. NSF 0.85 MEMB 192 TO 195 201 TO 204 340 TO 343 353 TO 355 357 358 382 383 -
1028. 410 411 417 418 430 431 477 479 482 TO 485 488 489 491 492 500 TO 511 518 -
1029. 519 TO 521 536 546 551 552 560 TO 563 568 TO 575
1030. LOAD LIST 101 TO 133
1031. *FOR COLUMNS
1032. CHECK CODE MEMB 1 TO 4 14 TO 17 27 TO 30 40 TO 43 297 TO 300 304 TO 307 311 -
1033. 312 314 316 364 TO 367 378 379 385 406 407 419 420 432 433 496 497 512 513 -
1034. 528 TO 531 537 538 541 543 553 555 556 566 567
1056. *********************
1057. STEEL TAKE OFF LIST 1 TO 6 14 TO 19 27 TO 32 40 TO 45 53 TO 64 89 TO 92 94 -
STEEL TAKE-OFF
--------------
1058. 96 102 TO 105 107 109 128 131 TO 133 135 139 149 TO 156 158 159 162 TO 164 -
1059. 180 TO 187 189 192 TO 195 201 TO 204 255 TO 259 261 TO 270 272 TO 286 289 -
1060. 290 TO 301 303 TO 343 353 TO 358 364 TO 369 374 378 TO 385 406 TO 422 425 -
1061. 426 TO 436 477 479 TO 493 496 497 500 TO 513 518 TO 541 543 TO 546 -
1062. 551 TO 564 566 TO 573
ST HE400A 127.20 155.366
ST IPE360 84.00 46.912
ST HE280A 66.50 49.706
ST IPE300 173.50 71.706
ST IPE450 42.00 31.877
ST HE100A 49.10 7.996
ST L130X130X12 142.67 32.880
ST HE140A 16.40 3.956
T IPE400 115.09 37.355
ST HE200A 53.00 21.905
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 41 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
ST IPE400 16.84 10.928
ST HE300B 28.00 32.049
PRISMATIC STEEL 0.00 0.000
----------------
TOTAL = 502.636
1067. FINISH
FOSTER WHEELER
SUBJECT : WA15 PIPERACK- DESIGN CALCULATIONS Sheet No : H11 OF H13
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 16-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
APPENDIX H
BASE PLATE DESIGN (BP1)
FOSTER WHEELER
SUBJECT : WA15 PIPERACK- DESIGN CALCULATIONS Sheet No : H12 OF H13
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 16-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
LOADING CONDITION
Compression Pu 211.5 kip 941.00 kN
Tension T -59.6 kip -265.00 kN
Shear parallel to Flange VF 19.8 kip 88.00 kN
Shear parallel to Web VW 3.6 kip 16.00 kN
b) Middle part
a
a = 352.00 mm
b = 169.50 mm
a*0.5/b = 1.04
β = 0.270 From Moody's chart
So Mu = β*fc"*(b)2
= 46346.0 Nmm
Allowable bending stress Fb = φ∗Fy
= 247.50 N/mm²
Thk.of base Plate Req. tp = √(4*Mu / φFy)
= 27.37 mm
Use Plate Thickness = 1.18 in 30 mm Safe
FOSTER WHEELER
SUBJECT : WA15 PIPERACK- DESIGN CALCULATIONS Sheet No : H14 OF H13
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 16-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
T' T'
yb' yb'
M = T*yb'*(a-yb')/A
= 7895402.1 Nmm
0.5
Thk.of base Pl Req. tp = (6M/φ(Fy*N)
t = 0.9 in 22.59 mm
APPENDIX H
BASE PLATE DESIGN(BP2)
FOSTER WHEELER
SUBJECT : WA15 PIPERACK- DESIGN CALCULATIONS Sheet No : H12 OF H13
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 16-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
LOADING CONDITION
Compression Pu 156.7 kip 697.00 kN
Tension T -58.9 kip -262.00 kN
Shear parallel to Flange VF 0.3 kip 1.50 kN
Shear parallel to Web VW 69.5 kip 309.00 kN
b) Middle part
a
a = 352.00 mm
b = 169.50 mm
a*0.5/b = 1.04
β = 0.267 From Moody's chart
So Mu = β*fc"*(b)2
= 33947.1 Nmm
Allowable bending stress Fb = φ∗Fy
= 247.50 N/mm²
Thk.of base Plate Req. tp = √(4*Mu / φFy)
= 23.42 mm
Use Plate Thickness = 1.18 in 30 mm Safe
FOSTER WHEELER
SUBJECT : WA15 PIPERACK- DESIGN CALCULATIONS Sheet No : H14 OF H13
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 16-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
T' T'
yb' yb'
M = T*yb'*(a-yb')/A
= 7806020.2 Nmm
0.5
Thk.of base Pl Req. tp = (6M/φ(Fy*N)
t = 0.9 in 22.46 mm
APPENDIX J
ANCHOR BOLT DESIGN FOR BP1
Company Foster Wheeler
Project PETRORabigh UOU Project # 1-14-2410/59
Subject PIPERACK WA15
Name TPR Date 11/24/2006 Sheet Number 2 of 3
Checked by Ashokan Check Date Total Sheets 3
Nu and Vu were factored using factors from ACI 318-02? Appendix C Intermediate or high seismic risk? No
Factored tensile load (kips) = N u = 59.18 Specified concrete strength (psi) = f' c = 5000
Factored shear load (kips) = V u = perpendicular to edge 23.40 Cracking
Is there a built-up grout pad? Yes modification 1.4 - Located in region where there isn't cracking at service loads (ft < fr)
factor,Ψ 7
ANCHOR DATA, EMBEDMENT, AND THICKNESS OF MEMBER
Anchor material type = A36, Fu = 58 Adequate supplementary reinf. provided to resist tension loads in anchors? Yes
Nominal anchor diameter (in.) = 1 Adequate reinforcement provided to resist shear loads in anchors? Yes
Effective anchor embedment depth (in.) = hef 3.94 = hef ECCENTRICITY
Thickness of member in which anchor is anchored, (in.) = h 74.80 = h Eccentricity of tensile force on group of tensile anchors (in.)
Number of anchors in tension = n (tension) = 4 eN' = 4.9213 (0=single anchor)
Number of anchors in shear = n (shear) = 4 Eccentricity of shear force on group of anchors (in.)
CONCRETE FAILURE AREAS (Note ev' must be less than s perpendicular to shear) eV'= 4.9213
Do you want to manually input the value of A n? No
no EDGE DISTANCES AND SPACING
An = 418.4283 TENSION SHEAR
Note: Units for A n and Av are sq. in.
An= 388.012276 Edge Distance, in. Spacing, in. Edge Distance, in. Spacing, in.
Do you want to manually input the value of A v? No
no c1 = 7.9 c3 = 7.9 s1 = 7.9 c1 = 7.9 s2 = 7.9
c1 Av = 515.361 c2 = 7.9 c4 = 7.9 s2 = 7.9 c2 = 7.9
NU Av= 280.845 c4 = 7.9
1.5hef 1.5hef 35 o c1 = minimum edge distance c1 = edge distance in direction of V n (perp.)
1.5c1
h or 1.5c1
VU
hef
c2 s2 c4
1.5c1
VU (parallel)
c2 s2 c4
35o VU c1
c4 s2 c2
Breakout cone for tension Breakout cone for shear
SUMMARY OF RESULTS
DUCTILITY INTERACTION OF TENSILE AND SHEAR FORCES RESULTS
φNn = 112.5 kips < Nu = 59.18 Using supplemental reinf to carry Tension
φVn = 50.6 kips < Vu = 23.40 Using supplemental reinf to carry Shear
Nu/(φNn) + Vu/(φVn) = 0.53 + 0.46 = 0.99 <=1.2 ANCHOR OK !
Applied Tension > than Steel Capacity of Anchor, NG 0.99
Applied Shear > than Steel Capacity of Anchor, NG
Company Foster Wheeler Sheet 3 of 3
Project PETRORabigh UOU Project 1-14-2410/59
Subject PIPERACK WA15
Name TPR Date 11/24/2006
Checked by Ashokan Check Date
BOLT PARAMETERS
Grade A36, Fu = 58 fy 36 ksi hef 3.94 in.
Size 1 in. fut 58 ksi n(tension) 4
do 1.000 in. Ase 0.606 sq. in. n(shear) 4
Ab 1.501 sq. in.
DESIGN CONSIDERATIONS
DUCTILITY NOT REQD IN TENSION CONCRETE STRENGTH, f'c 5000 psi
DUCTILITY NOT REQD FOR SHEAR CRACKING MOD FACTOR, Ψ7 1.4
LOW SEISMIC RISK GROUT PAD
ECCENTRICITIES eN' = 4.92 in. eV' = 4.92 in.
Page
FOSTER WHEELER
SUBJECT : ANCHOR BOLT DESIGN-WA15 Sheet No : 1 of 3
PROJECT: PETRORabigh UOU Rev Date Originator Checker Approver
APPENDIX J
ANCHOR BOLT DESIGN FOR BP2
Company Foster Wheeler
Project PETRORabigh UOU Project # 1-14-2410/59
Subject PIPERACK WA15
Name TPR Date 11/24/2006 Sheet Number 2 of 3
Checked by Ashokan Check Date Total Sheets 3
Nu and Vu were factored using factors from ACI 318-02? Appendix C Intermediate or high seismic risk? No
Factored tensile load (kips) = N u = 59.18 Specified concrete strength (psi) = f' c = 5000
Factored shear load (kips) = V u = perpendicular to edge 0.00 Cracking
Is there a built-up grout pad? Yes modification 1.4 - Located in region where there isn't cracking at service loads (ft < fr)
factor,Ψ 7
ANCHOR DATA, EMBEDMENT, AND THICKNESS OF MEMBER
Anchor material type = A36, Fu = 58 Adequate supplementary reinf. provided to resist tension loads in anchors? Yes
Nominal anchor diameter (in.) = 1 Adequate reinforcement provided to resist shear loads in anchors? Yes
Effective anchor embedment depth (in.) = hef 3.94 = hef ECCENTRICITY
Thickness of member in which anchor is anchored, (in.) = h 71.85 = h Eccentricity of tensile force on group of tensile anchors (in.)
Number of anchors in tension = n (tension) = 4 eN' = 4.9213 (0=single anchor)
Number of anchors in shear = n (shear) = 0 Eccentricity of shear force on group of anchors (in.)
CONCRETE FAILURE AREAS (Note ev' must be less than s perpendicular to shear) eV'= 4.9213
Do you want to manually input the value of A n? No
no EDGE DISTANCES AND SPACING
An = 418.4283 TENSION SHEAR
Note: Units for A n and Av are sq. in.
An= 388.012276 Edge Distance, in. Spacing, in. Edge Distance, in. Spacing, in.
Do you want to manually input the value of A v? No
no c1 = 7.9 c3 = 7.9 s1 = 7.9 c1 = 7.9 s2 = 7.9
c1 Av = 515.361 c2 = 7.9 c4 = 7.9 s2 = 7.9 c2 = 7.9
NU Av= 0 c4 = 7.9
1.5hef 1.5hef 35 o c1 = minimum edge distance c1 = edge distance in direction of V n (perp.)
1.5c1
h or 1.5c1
VU
hef
c2 s2 c4
1.5c1
VU (parallel)
c2 s2 c4
35o VU c1
c4 s2 c2
Breakout cone for tension Breakout cone for shear
SUMMARY OF RESULTS
DUCTILITY INTERACTION OF TENSILE AND SHEAR FORCES RESULTS
φNn = 112.5 kips < Nu = 59.18 Using supplemental reinf to carry Tension
φVn = 0.0 kips < Vu = 0.00 Using supplemental reinf to carry Shear
Nu/(φNn) + Vu/(φVn) = 0.53 + 0.00 = 0.53 <=1.2 ANCHOR OK !
Applied Tension > than Steel Capacity of Anchor, NG 0.53
Applied Shear > than Steel Capacity of Anchor, NG
Company Foster Wheeler Sheet 3 of 3
Project PETRORabigh UOU Project 1-14-2410/59
Subject PIPERACK WA15
Name TPR Date 11/24/2006
Checked by Ashokan Check Date
BOLT PARAMETERS
Grade A36, Fu = 58 fy 36 ksi hef 3.94 in.
Size 1 in. fut 58 ksi n(tension) 4
do 1.000 in. Ase 0.606 sq. in. n(shear) 0
Ab 1.501 sq. in.
DESIGN CONSIDERATIONS
DUCTILITY NOT REQD IN TENSION CONCRETE STRENGTH, f'c 5000 psi
DUCTILITY NOT REQD FOR SHEAR CRACKING MOD FACTOR, Ψ7 1.4
LOW SEISMIC RISK GROUT PAD
ECCENTRICITIES eN' = 4.92 in. eV' = 4.92 in.
Page
FOSTER WHEELER
SUBJECT : SHEAR KEY DESIGN-WA15 Sheet No :
PROJECT: PETRORabigh UOU Rev Date Originator Checker Approver
APPENDIX K
SHEAR KEY DESIGN FOR BP2
FOSTER WHEELER
SUBJECT : FOOTING DESIGN FOR WA15-F1 Sheet No : 1 OF 5
PROJECT: PETRORabigh UOU Rev Date Originator Checker Approver
CONTRACT NO : 1 - 14 - 2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
APPENDIX G
FOUNDATION DESIGN - TYPE F1 & CF1
PIPERACK-WA15
FOSTER WHEELER
SUBJECT : FOOTING DESIGN FOR WA15-F1 Sheet No : 2 OF 5
PROJECT: PETRORabigh UOU Rev Date Originator Checker Approver
CONTRACT NO : 1 - 14 - 2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
Fy x1
A C X
I) NOTES Mx Mz
1) Sign convention of forces as per Right Hand Thumb Rule. Fx
2) Cells with italic font and/or marked with are inputs. 0.9 z1
3) In check for sliding, passive pressure along sides of the Footing is NOT considered.
4) Overturning check is valid only for footings with pedestal is located at CG of footing in both directions. 0.60 1.2
5) Forces are reactions of STAAD output. Program internally calculates support loads. Fz
1.50 0.60
II) FOOTING DATA
STAAD support No's: 1234
2 0.6
Net safe bearing capacity 150 kN/m B D
2
Surcharge pressure 0 kN/m Z
Factor of safety for sliding 1.5 3.75
Factor of safety for overturning 1.5 X Dir Z Dir Depth Weight
Minimum allowable % of contact area 70 % (m) (m) (m) (kN)
Final net safe bearing capacity 150 kN/m2 Col. size 0.60 0.60 1.83 16
Height of the pedestal above G.L 0.925 m Footing size 3.75 1.20 0.6 68
Bottom of footing below G.L 1.50 m soil 3.75 1.20 0.9 67 < = [1.2*3.75-0.6*0.6]*0.9*18
Density of soil above the footing γs 18 kN/m3
Density of footing concrete 25 kN/m3 151.0 kN
Sl. No Total Pressure (kN/m2) Design Pressure(kN/m 2) Design Pr. at Face of Pedestal side (kN/m 2)
Pa Pb Pc Pd Pa Pb Pc Pd AB CD AC BD
Clear cover for bottom reinf.- X Dir 75mm Eff. depth for bot. reinf. -X Dir (d) = 0.515 m
Clear cover for bottom reinf. - Z Dir 95mm Eff. depth for bot reinf. -Z Dir = 0.495 m
Clear cover to top reinf.- X Dir 75mm Eff. depth for top reinf. -X Dir = 0.517 m
Clear cover to top reinf.- Z Dir 85mm Eff. depth for top reinf. - Z Dir = 0.507 m
2
f1c-Specified compressive strength of concrete 34.4 N/mm = 4989.3 PSI
2
fy-Specified yield strength of steel 412.6 N/mm = 59842.8 PSI
Min. ratio of reinforcement for footings 0.0018 As per Cl. No:10.5.4 & 7.12.2.1 of ACI-318
Hence Ast min =0.0018*600*1000 = 1080.0 mm2/m
2
Bottom X Dir reinf. diameter(Prov) 20 mm @ 150 mm c/c @ bot => 2094 mm /m > 1080 Hence okay
2
Bottom Z Dir reinf. diameter(Prov) 20 mm @ 150 mm c/c @ bot => 2094 mm /m > 1080 Hence okay
2
Top X Dir reinf. diameter (Prov) 16 mm @ 150 mm c/c @ Top => 1340 mm /m > 1080 Hence okay
2
Top Z Dir reinf. diameter (Prov) 16 mm @ 150 mm c/c @ Top => 1340 mm /m > 1080 Hence okay
IV-A- FLEXURE CHECK
Sl. No Bending moment at face of pedestal(kN-m) Ultimate moments (kN-m) Reqd. reinf. in X dir(mm2) Reqd. reinf. In Z dir(mm 2) Reinforcement check
AB CD AC BD AB CD AC BD Bottom Top Bottom Top X dir Bot Top Z dir Bot. Top
1 175 71 4 5 175 71 4 5 1233 0 28 0 Okay Okay Okay Okay
FOSTER WHEELER
SUBJECT : FOOTING DESIGN FOR PIPERACK WA15 : CF1 Sheet No : 2 of 7
PROJECT: PETRORabigh UOU Rev Date Originator Checker Approver
Sl. No. Tot. Mz1 Tot. Fy2 Tot. Mx2 Tot. Mz2 Resultant Total vertical Hor. Resist. Check for CG of Loads from Ped-1 Eccentricity in
Tot. Fy1 (kN) Tot. Mx1 (kN) (kN) (kN) FOS
(kN) (kN) (kN) (kN) Horiz. (kN) Slide X Dir (m) Z Dir (m) X Dir (m) Z Dir (m)
1 395.3 -93.5 -778.6 -111.7 -242.8 74.1 197.6 771.2 308.5 1.56 Okay -2.76 0.00 -6.26 0.00
2 -157.2 13.1 1037.1 672.8 31.6 -38.8 253.0 1003.2 401.3 1.59 Okay 9.13 0.00 5.63 0.00
3 159.4 -93.6 -215.7 11.3 -240.9 28.8 97.0 658.2 263.3 2.71 Okay 0 0.00 -3 0.00
4 13.4 100.1 893.8 735.7 220.5 -43.4 230.1 1236.7 494.7 2.15 Okay 7 0.00 3 0.00
5 27.1 0.0 0.0 27.1 0.0 0.0 0.0 493.1 197.2 No Slide Okay 3.50 0.00 0.00 0.00
6 27.1 0.0 0.0 27.1 0.0 0.0 0.0 493.1 197.2 No Slide Okay 3.50 0.00 0.00 0.00
7 30.2 0.0 0.0 30.2 0.0 0.0 0.0 547.8 219.1 No Slide Okay 4 0.00 0 0.00
8 30.2 0.0 0.0 30.2 0.0 0.0 0.0 547.8 219.1 No Slide Okay 4 0.00 0 0.00
9 30.2 0.0 0.0 30.2 0.0 0.0 0.0 547.8 219.1 No Slide Okay 3.50 0.00 0.00 0.00
10 30.2 0.0 0.0 30.2 0.0 0.0 0.0 547.8 219.1 No Slide Okay 3.50 0.00 0.00 0.00
FOSTER WHEELER
SUBJECT : FOOTING DESIGN FOR PIPERACK WA15 : CF1 Sheet No : 3 of 7
PROJECT: PETRORabigh UOU Rev Date Originator Checker Approver
Total-Mz Total- ex/Lx + Pressure at corners(in kN/m 2) Roark's Total gross Net All. Bearing Check
N.O.T - No Overturning.
FOSTER WHEELER
SUBJECT : FOOTING DESIGN FOR PIPERACK WA15 : CF1 Sheet No : 4 of 7
PROJECT: PETRORabigh UOU Rev Date Originator Checker Approver
Allowable one way shear stress = φ 2 f1c0.5 Cl No: 11.1.1 and Cl. No: 11.3.1
= (0.75*2*5000^0.5)*0.006877
= 0.729 N/mm2
Dead
Fx1 Fy1 Fz1 Mx1 Mz1 Fx2 Fy2 Fz2 Mx2 Mz2
Sl. No. Load case/node nos load
1 115 (238-5) 0.90 -93.5 113.2 38.2 0.0 0.0 9.5 -173.1 99.5 0.0 0.0
2 109 (238-5) 1.20 -263.2 437.3 37.2 0.0 0.0 24.2 -263.1 101.1 0.0 0.0
3 115 (238-5) 0.90 -93.5 113.2 38.2 0.0 0.0 9.5 -173.1 99.5 0.0 0.0
4 109(238-5) 1.20 -263.2 437.3 37.2 0.0 0.0 24.2 -263.1 101.1 0.0 0.0
5 1.20 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6 0.90 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7 1.20 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8 1.40 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9 1.20 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10 0.90 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
FOSTER WHEELER
SUBJECT : FOOTING DESIGN FOR PIPERACK WA15 : CF1 Sheet No : 5 of 7
PROJECT: PETRORabigh UOU Rev Date Originator Checker Approver
IV-B) DESIGN ALONG LONGITUDINAL DIRECTION FOR BM & ONE WAY SHEAR
Tot. Fy1 Tot Mx1 Tot Mz1 Tot. Fy2 Tot. Mx2 Tot Mz2 CG of loads
Eccentric Add. Moment Total Moment Pressure at(kN/m2)
Sl. No. from Left ped.
(kN) (kN-m) (kN-m) (kN) (kN-m) (kN-m) (m) ity (m) Mz (kN-m) Mz (kN-m) Left Right
1 140.3 -150.9 -369.4 -145.9 -393.0 37.6 181.526 178.026 1002 670 31.1 -31.8
2 473.5 -146.8 -1039.7 -227.0 -399.2 95.6 -6.443 -9.943 2452 1507 86.1 -55.3
3 140.3 -150.9 -369.4 -145.9 -393.0 37.6 181.526 178.026 1002 670 31.1 -31.8
4 473.5 -146.8 -1039.73 -227.0 -399.2 95.6 -6.443 -9.943 2452 1507 86.1 -55.3
5 36.2 0.0 0.00 36.2 0.0 0.0 3.500 0.000 0.0 0.0 4.5 4.5
6 27.1 0.0 0.0 27.1 0.0 0.0 3.500 0.000 0 0 3.4 3.4
7 36.2 0.0 0.00 36.2 0.0 0.0 3.500 0.000 0.0 0.0 4.5 4.5
8 42.2 0.0 0.00 42.2 0.0 0.0 3.500 0.000 0.0 0.0 5.3 5.3
9 36.2 0.0 0.00 36.2 0.0 0.0 3.500 0.000 0.0 0.0 4.5 4.5
10 27.1 0.0 0.00 27.1 0.0 0.0 3.500 0.000 0.0 0.0 3.4 3.4
Sl. No. Bot Moment Ast reqd (mm 2) Ast Check Top Ast reqd Ast Check Max. Shear Check
(kN-m) pro.(mm2) Moment (mm2) pro.(mm2) shear stress
(kN) (kN) (N/mm2)
1 376.8 2007.8 6545 Okay -7.6 39.7 2681 Okay 116.1 0.113 Okay
2 1060.5 5804.2 6545 Okay -13.1 68.1 2681 Okay 391.9 0.382 Okay
3 376.8 2007.8 6545 Okay -7.6 39.7 2681 Okay 116.1 0.113 Okay
4 1060.5 5804.2 6545 Okay -13.1 68.1 2681 Okay 391.9 0.382 Okay
5 1.1 5.9 6545 Okay 0.0 0.0 2681 Okay 31.7 0.031 Okay
6 0.8 4.5 6545 Okay 0.0 0.0 2681 Okay 23.7 0.023 Okay
7 1.1 5.9 6545 Okay 0.0 0.0 2681 Okay 31.7 0.031 Okay
8 1.3 6.9 6545 Okay 0.0 0.0 2681 Okay 36.9 0.036 Okay
9 1.1 5.9 6545 Okay 0.0 0.0 2681 Okay 31.7 0.031 Okay
10 0.8 4.5 6545 Okay 0.0 0.0 2681 Okay 23.7 0.023 Okay
IV-C) DESIGN ALONG TRANSVERSE DIRECTION FOR BM & ONE WAY SHEAR
Cantilever Projection of footing 0.7 m
Left Ped.
-116.1 30
140.3 - 29.1
7.4
29.8
-31.8 -7.6
31.1
-111.2
376.8
DESIGN PRESSURE DIAGRAM SHEAR FORCE DIAGRAM BENDING MOMENT DIAGRAM
APPENDIX J
DESIGN OF PEDESTAL-PD1
FOSTER WHEELER
SUBJECT : PIPE RACK WA15 - DESIGN CALCULATIONS Sheet No :
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 16-Nov-06 TPR ASHOKAN
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
1 STRENGTH DESIGN OF PEDESTAL
(Ref. ACI 318-2005)
Critical STAAD file : WA15
Critical Node : 3
Critical Load Case : 115
Fx Fy Fz mx mz
(kN) (kN) (kN) (kNm) (kNm)
69.00 -55.00 4.00 0 0
Axial Force (Fy) at Pedestal level, Pu = -55.0 kN (From support reactions, Section 3)
Width of Pedestal, b = 600.0 mm
Depth of Pedestal, h = 600.0 mm
Effective depth, d = 540.0 mm
Area of cross section of Pedestal, Ag = 360000 mm²
Grade beam is designed as short column with axial force(tension/compression) with bending.
Resultant Shear Force (Fx) at Pedestal level = 69.1 kN (From support reactions, Section 3)
Mu = Fx*H = 126.14 kNm
Moment co-efficient, Φ = 0.90
K = Mn'/(bd²f'c) = 0.01
z/d = 0.5+(0.25-K/1.7)^0.5 = 0.99 Shall not exceed 0.95
z/d = 0.95
Area of steel required
Ast = Mn'/(fy*d(z/d)) + (Pn/fy) = 433 mm²
Ties reqired,
Providing 10.0 mm dia. bars
Spacing, as per ACI 318, Cl. 7.10.5.2
Minimum of
16 *Longitudinal bars = 320 mm
48*Tie dia. = 480 mm
Least lateral dimension = 600 mm
Fx Fy Fz mx mz
(kN) (kN) (kN) (kNm) (kNm)
70.00 440.00 6.00 0 0
Axial Force (Fy) at Pedestal level, Pu = 440.0 kN (From support reactions, Section 3)
Width of Pedestal, b = 600.0 mm
Depth of Pedestal, h = 600.0 mm
Effective depth, d = 540.0 mm
Area of cross section of Pedestal, Ag = 360000 mm²
Resultant Shear Force (Fx) at Pedestal level = 70.3 kN (From support reactions, Section 3)
Mu = Fx*H = 128.22 kNm
Moment co-efficient, Φ = 0.9-(0.2Pu/0.1f'cAg) = 0.83
K = Mn'/(bd²f'c) = 0.03
z/d = 0.5+(0.25-K/1.7)^0.5 = 0.98 Shall not exceed 0.95
z/d = 0.95
Area of steel required
Ast = Mn'/(fy*d(z/d)) - (Pn/fy) = 451 mm²
Ties reqired,
Providing 10.0 mm dia. bars
Spacing, as per ACI 318, Cl. 7.10.5.2
Minimum of
16 *Longitudinal bars = 320 mm
48*Tie dia. = 480 mm
Least lateral dimension = 600 mm
APPENDIX J
DESIGN OF PEDESTAL-PD2
FOSTER WHEELER
SUBJECT : PIPE RACK WA15 - DESIGN CALCULATIONS Sheet No :
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 16-Nov-06 TPR ASHOKAN
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
1 STRENGTH DESIGN OF PEDESTAL
(Ref. ACI 318-2005)
Critical STAAD file : WA15
Critical Node : 5
Critical Load Case : 109
Fx Fy Fz mx mz
(kN) (kN) (kN) (kNm) (kNm)
101.00 -263.00 24.00 0 0
Axial Force (Fy) at Pedestal level, Pu = -263.0 kN (From support reactions, Section 3)
Width of Pedestal, b = 600.0 mm
Depth of Pedestal, h = 600.0 mm
Effective depth, d = 537.5 mm
Area of cross section of Pedestal, Ag = 360000 mm²
Grade beam is designed as short column with axial force(tension/compression) with bending.
Resultant Shear Force (Fx) at Pedestal level = 103.8 kN (From support reactions, Section 3)
Mu = Fx*H = 347.77 kNm
Moment co-efficient, Φ = 0.90
K = Mn'/(bd²f'c) = 0.01
z/d = 0.5+(0.25-K/1.7)^0.5 = 0.99 Shall not exceed 0.95
z/d = 0.95
Area of steel required
Ast = Mn'/(fy*d(z/d)) + (Pn/fy) = 1093 mm²
Ties reqired,
Providing 10.0 mm dia. bars
Spacing, as per ACI 318, Cl. 7.10.5.2
Minimum of
16 *Longitudinal bars = 400 mm
48*Tie dia. = 480 mm
Least lateral dimension = 600 mm
Fx Fy Fz mx mz
(kN) (kN) (kN) (kNm) (kNm)
88.00 940.00 16.00 0 0
Axial Force (Fy) at Pedestal level, Pu = 940.0 kN (From support reactions, Section 3)
Width of Pedestal, b = 600.0 mm
Depth of Pedestal, h = 600.0 mm
Effective depth, d = 537.5 mm
Area of cross section of Pedestal, Ag = 360000 mm²
Resultant Shear Force (Fx) at Pedestal level = 89.4 kN (From support reactions, Section 3)
Mu = Fx*H = 299.63 kNm
Moment co-efficient, Φ = 0.9-(0.2Pu/0.1f'cAg) = 0.75
K = Mn'/(bd²f'c) = 0.07
z/d = 0.5+(0.25-K/1.7)^0.5 = 0.96 Shall not exceed 0.95
z/d = 0.95
Area of steel required
Ast = Mn'/(fy*d(z/d)) - (Pn/fy) = 988 mm²
Ties reqired,
Providing 10.0 mm dia. bars
Spacing, as per ACI 318, Cl. 7.10.5.2
Minimum of
16 *Longitudinal bars = 400 mm
48*Tie dia. = 480 mm
Least lateral dimension = 600 mm