Pengukuran Grounding: No Area Pengukuran Hasil Ket Nilai Pengukuran Dokumentasi

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 7

Pengukuran Grounding

Hasil
No Area Pengukuran Ket
Nilai Pengukuran Dokumentasi

1 LV/MCC 0.02 Ω

2 TRAFO 0.09 Ω

3 GENSET 0.04 Ω

4 Air Instrument 0.02 Ω

5 Utility I 1Ω

6 Utility II 0.05 Ω
7 Weigh Bridge I 0.52 Ω

8 Weigh Bridge II 0.04 Ω

9 Timbangan II (1) 0.04 Ω

10 Timbangan II (2) 0.94 Ω

11 Filling Shed 0.02 Ω

12 Water Tank I 0.12 Ω

13 Water Tank II 0.02 Ω


14 Pompa Hydrant I 0.54 Ω

15 Pompa Hydrant II 0.38 Ω

16 Pintu 05 0.15 Ω

17 Samping CCTV CG-04 3.42 Ω

18 Pompa LPG I (Depan) 0.05 Ω

19 Pompa LPG II (Depan) 0.01 Ω

20 Pompa LPG III (Belakang) 0.04 Ω


21 Pompa LPG IV (Belakang) 0.01 Ω

22 Vessel I (samping) 0.04 Ω

23 Vessel I (depan) 0.01 Ω

24 Vessel II (samping) 0.04 Ω

25 Vessel II (depan) 0.01 Ω

26 Vessel III (Samping) 0.02 Ω

27 Vessel III (depan) 0.04 Ω


28 Vessel IV (samping) 0.02 Ω

29 Vessel IV (depan) 0.01 Ω

30 Odoran I 0.46 Ω

31 Odoran II 0.95 Ω

32 Gedung Utama I 0.30 Ω

33 Gedung Utama II 0.03 Ω

34 Gedung Utama II 0.02 Ω


35 Gedung Utama III 0.06 Ω

36 Samping Gedung Serbaguna 0.01 Ω

37 Pantry I 0.06 Ω

38 Pantry II 0.03 Ω

39 Pantry III 0.08 Ω

40 Depan Mushollah 0.06 Ω

41 Depan SHE 0.03 Ω


42 Depan WC Umum 0.06 Ω

Pelaksana

M. Iqbal