Check Isometric Only - Do Not Issue: Cont. From Unit 43 Steam Line DRG 1

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

A B C D E F G H J K L M

N CONT. FROM
UNIT 43 STEAM LINE DRG 1

1 1

178

2 2

51NS
323

EL +4.755M

405
250

3 3
373
289 183
30 178
51N
S
51X51NS
4 4

134
5
195 267
272
371
178
5 160 5
6
292

289 CONT. ON
178 UNIT 43 STEAM LINE DRG 3

6 324 6
339
51X51NS

30
6
377 51X51NS

7 CONT. ON 7
UNIT 43 STEAM LINE DRG 4
6

PIPING SPEC. OP. TEMP. REV.


CHECK ISOMETRIC ONLY - DO NOT ISSUE INSULATION SPEC.
INSULATION THKS.
PROJECT NO.
SYSTEM
PAINTING SPEC. AREA DRG.
24 SEP 2021 THIS DRAWING IS THE PROPERTY OF INTERGRAPH LTD AND MUST NOT MATERIAL DRAWN BY PIPELINE REFERENCE
REV. CHANGE DATE BE COPIED OR LENT WITHOUT THE CONSENT OF THE COMPANY OP. PRESSURE E.L.DIAGRAM 2 OF 9

You might also like