General Submittal

Employer Design Contract Administrator Quantity Surveyor Contractor:


Representative: & Supervision
Consultant:

Project name: Abdali Views Ref No. S.G-ATC-SUB-098

Subject: Technical offer of Building Maintenance Unit (BMU) Date: 11-Mar-20

Arch Interior Design Structural Land Scape Mech Elec Other


No. Item Descrip on. Specifica on Ref.
1 Technical offer of Building Maintenance Unit (BMU) Sec on 112423

Attachment: Yes No.

Submitted by ATCCO QAQC Date 11-Mar-20

Received by CA Date:

Received by

AOR Comments

Status Approved Approved as Noted Revise & Resubmit Rejected


Signed by Signature: Date: / /

Handed Over to CA: Signature: Date: / /


Handed over to
Signature: Date: / /
ATCCO:
Offer Reference : 9E05MCH-R22-T
Subject : Sino Gulf (Abdali Tower)
Building Maintenance Unit (BMU)
Manufacture : Ademsan (Turkey)
BMU : AST25 & AST20
TECHNICAL OFFER
TECHNICAL OFFER
PROJECT: Sino Gulf (Abdali Tower)
Building Maintenance Unit (BMU)
OFFER NO.: 9E05MCH-R22-T
Dear Sir,

Referring to the above mentioned subject, and upon your request we have the pleasure to submit
Building Maintenance unit technical specification with Scope of Work, and BOQ.

 Origin : Turkey
 Manufacturer : Ademsan Makine

 Details & Specifications:-

Socket and Davit System at Tower and Podium.

 List of Quantities (for 24th LVL & 8th LVL) :-

NO. COMPONENTS DISCERPTION QTY

1 Davit AST 25 Suspension Arm System 1 Set

2 Sockets AST 25 Suspension Arm System Pedestals 49 Nos.

3 Davit AST 20 Suspension Arm System 2 sets

4 Sockets AST 20 Suspension Arm System Pedestals 40 Nos.

5 Restrain Sockets 316 S.S. 375 Nos.

6 Cradle AST10 working platform / Two person 1 No.

7 Capacity 240 Kg 1 No.

Our proposed equipment works on 3Ph+N+E


8 Power Rating 1 No.
318-415 V, 50 Hz

Number of sockets is according to the final


approved design layout,,also if extra is
required due to site fixation condition
Supplier shall provide the same.

Contractor to consider the same while


execution
List of Quantities as per level

NO. LEVEL COMPONENTS DISCERPTION QTY

1 Davit AST 25 Suspension Arm System 1 Set

AST 25 Suspension Arm System


2 Sockets 49 Nos.
Tower Roof Pedestals

3 24th LVL Davit AST 20 Suspension Arm System 1 sets

AST 20 Suspension Arm System


4 Sockets 16 Nos.
Pedestals

5 Davit AST 20 Suspension Arm System 1 sets


Podium
AST 20 Suspension Arm System
6 8th LVL Sockets 24 Nos.
Pedestals

 Technical Specifications:- Same as commented on previous system for the sockets


quantity
 OUR SYSTEMS ARE DESIGNED AND MANUFACTURED ACCORDING TO EUROPEAN STANDARD

EN 1808 STANDARDS
“SAFETY REQUIREMENTS FOR SUSPENDED ACCESS EQUIPMENT - DESIGN CALCULATIONS,
STABILITY CRITERIA, CONSTRUCTION - EXAMINATIONS AND TESTS”

1- SPEED DATA ( AST 25 & AST 20 )

Discerption Specification
Hoisting Drum 8 m/min.
.

2- WIRE ROPE FEATURES

Discerption Specification
Diameter ∅8.3 mm
Features 5 x 19 W (Galvanized)
Lop wire rope 4 Piece
Breaking load for one wire rope 54 KN
3
3- CRADLE (AST10)

Discerption Specification
Construction Aluminum and Steel
Working Area 800 x 2000 x 1000 mm
Outer Dimensions 850 x 2530 x 1870 mm
Hoisting 1,1 kW Elec.Engine-2units
Wire Rope Reeler's 0,25 kW Elec.Engine-2units
Block Stop 2 unit
Control Cable Control
Cable Box
Box for Cleaning Materials
Polyurethane Side Wheel

4- PEDESTAL DATA ( AST 25 )

Discerption Specification
Steel Pedestal Galvanized
Anchor Bolts M24 - 6.8
Total Pedestal (Socket) 49 set – 24th Lvl

5- PEDESTAL DATA ( AST 20 )

Discerption Specification
Steel Pedestal Galvanized
Anchor Bolts M20 - 6.8
Total Pedestal (Socket) 16 set – 24th Lvl
24 set – 8th Lvl
Total = 40 set

6- PROTECTION

All the movable steel parts of the machine will be covered with electro-galvanization Protecting paint
will be applied for the other equipment of the machine

- Hot dip Galvanized


- One Coat epoxy primer solvent
Hot dip galvanization will be applied to rails and strap clamps Cradle Paint and galvanized

4
7- SAFETY FEATURES

a. Top Limit Switches


b. Lower Limit Switches (Trip Bar)
c. Traversing End Limit Switches
d. Electrical Three Phase Protection Relay
e. Emergency Manual Descent In Power Failure
f. Emergency Stop
g. Façade Fixing Tools for Wire Rope
h. Block Stop Safety Brake
i. Over load Protection
j. Electromagnetic Brake
k. Façade Restrain System

8- PROVISIONAL LOAD DATA DURING OPERATION AND PARKING ( AST 60 )

Discerption Specification
Basket (Cradle) 210 Kg
Total Machine Weight 400 KG
Safe Working Load (SWL) 240 Kg
Total Suspended Load (TSL) 850 Kg

a. High Rise Davit (AST 25)

Discerption Specification
Maximum dynamic
compression load on one 32.7 KN
pedestal during operation

Maximum dynamic tensile


load on one pedestal during 39.8 KN
operation

5
b. Low Rise Davit (AST 20)

Discerption Specification
Maximum dynamic
compression load on one 39 KN
pedestal during operation

Maximum dynamic tensile


load on one pedestal during 39 KN
operation

9- RESTRAIN SOCKET: As specified

Restraint Sockets 316 SS will be installed at three levels (supplied by Alghanem & installed
by others):
the same shall be distributed in respect to
1- Lvl 10 (+39.00)
2- Lvl 15 (+60.00) the Arcitectural elements, CW,
3- Lvl 21 (+77.50) Slidingdoor,, etc

6
10- INSTALLATION SEQUENCE:

No. Description Scope of Work


1 Site survey. Alghanem & Main Contractor
2 Technical meeting with main contractor.to discuss Alghanem & Main Contractor
the installation sequence
3 Technical meeting with main contractor and Façade Alghanem & Main Contractor &
Contractor to locate the restrain socket their method Façade Contractor
of installation
4 Locate Socket location and holes with survivor. Alghanem & Main Contractor survivor
5 Connect the bolts with Roof steel rebar as per Alghanem & Main Contractor survivor
survivor report
6 Prepare the pedestal (Main Contractor Scope) Main Contractor
7 Install Sockets Alghanem
8 Provide electrical power points Main Contractor
9 Check electrical component and connections Alghanem
10 Install Davit to check system Alghanem
11 Test all system movement. Alghanem
12 Testing and commissioning with the authority party Alghanem & Main Contractor

7
11- Parking/Maintenance:
The system designed to dismantle the basket at any time for maintenance or parking.

a. High Rise Davit (AST25):

b. Low Rise Davit (AST 20)

8
This notes shall be respected,noting that
Supplier shall respect the need of site , fixation
requirements and that any changes on site
condition the same will be considered by the
Supplier, therefore quantities of item is not
limited to the one mentioned at the submittal.
 Special Notes:-

a. The proposal is based on drawings provided for pricing, any discrepancies or future changes
in the dimensions/drawings from the actuals will be reassessed and our proposal will be
subject to change accordingly.
b. Our offer is strictly as per the quantities mentioned in the technical description above.
c. Parking position for the units must be coordinated.
d. All bolting and embedded items are locally manufactured.
e. Our offer is based on the terms and conditions mentioned and alteration on those, the price
will change accordingly.
.

 Scope Of Work:-
a. Installation of complete system by our set-up men and electrician under supervision of our
engineers.
b. Fine installation, like electric connection of machines by our set-up men and electrician under
super vision of our engineers.
c. Training of your staff, the proper use of the system.

 Exclusions: Client/Operator staff

a. All kind of civil works related to window cleaning equipment works (such as grout, water
proofing, etc.…).
b. Earthing and lightning protection are not in our scope of work.
c. Lifting the proposed equipment with all the required accessories to the corresponding roof
locations and installation areas is the main contractor’s responsibility.
d. Cranage, scaffolding, loading, offloading, lifting of the proposed equipments and materials
etc. on site to the location as required for installation purposes.
e. Temporary / permanent power and water points including all accessories required for the
working of the Window cleaning equipment beyond the control box of the machines.
f. Any type of insurance will be the main contractor’s responsibility
g. Any type of testing / approvals beyond the testing and commissioning to the main contractor
/ consultant at the end of the installation will be the responsibility of the party demanding
such tests (i.e. third party tests).
We hope the above offer meets your requirement. Should you need any further clarification,
please do not hesitate to contact us.

Best Regards,

Eng. Amen Zaied

Mechanical Department

9
Calculation

refer to comments on attached photos.


2500

G = 300 kg FH = 425 kg
4596

3465
400

270

600 600
FH = 425 kg Davit System Design Details

Total Cradle Weight


FH = 425 kg
FH = 425 x 9,81= 4170 N

DAVIT Weight
G = 300 x 9,81 = 2943 N

Wx : INERTIA MOMENT M : MOMENT

F= 850 kg Ix : INERTIA MOMENT Fk : CUTTING FORCE

: BENDING STRESS τk : SHEAR STRESS

S : SAFETY FACTOR Ad : d-SECTION AREA


WIRE ROPE CALCULATION
FH = 4170 N FH = 4170 N
= 4,2 KN = 4,2 KN

F= 850 kg

FH = 4,2 KN (Wire Effect Load)


FHK = 54 KN (Wire Rupture Load)
4,2 KN < 54 KN
2660
2340

Loading Conditions As Per EN 1808


Load Calculation
G = 2943 N FH = 8338 N

M =0
240
4170N
FH x L + G x l = RV1 x 320
560
RV1 = ( 4170 x 2660 + 2943 x 560) / 320
RV1 = 39,8 kN

M =0
FH x L + G x l = RV2 x 260
RV2 = (4170 x 2340 + 2943 x 240) / 320
RV2 = 32,7 kN
RV2(x2) RV1(x2)

320
2310
210

A
A - A SECTION CALCULATION
G = 2943 N FH = 4170 N

** Me = F x L + G x l
Me = (4170 x 2310) + (2943 x 210)

160
Me = 10250730 Nmm

** Me
σx = Wx
74

σx =10250730 2
117000 = 87,6 N/mm NPI -160
4
Ix = 9350000 mm
2 3
Wx = 117000 mm
σem =235 N/ mm (YIELD)
S= σem/σx = 235 / 87,62,7
= Security factor.

2
σ =350 N/ mm (ULTIMATE)
S= σ/σx = 350 / 87,64=Security factor.
2500
400

B-B SECTION CALCULATION


G = 2943 N FH = 4170 N

** Me = F x L + G x l
Ø219.1
Ø209.1
Me = (4170 x 2500) + (2943 x 400)
Me = 11602200 Nmm

** Me
σx = Wx
Ix = 19280428,8 4mm
σx =11602200 2
= 66 N/mm Wx = 175996,7 3mm
175996,7
2
B B σem =355 N/ mm (YIELD)
S= σem / σx = 355 / 66 5,3
= Security factor.
2
σ =500 N/ mm (ULTIMATE)
S= σ / σ
x = 500 / 66 7,57
= Security factor.
M24 Bolt Calculation

Fk =FH x g ax L + G x b
2500
400

Fk = 4170 x 2500
320
+ 2943 x 400

Fk = 36256,9 N
G = 2943 N FH = 4170 N

Ad = p x 2r = p x 24
(2 )2
2
Ad = 452,3 mm

Tk = Ad xFk
mc x nc
Tk = 36256,9
452,3 x 1 x 1
Fk = N 2
Tk = 80 N/mm

Ty = 6.8 Quality
Ty = 6 x 8 x 10
320
2
Ty = 480 N/mm

S = Ty / Tk = 480 / 80 = 6 safety factor


Data Sheet
Temporary Cradle
Building Maintenance Units

www.ademsan.net
Light Construction Machinery | Building Maintenance Units

AST-10
SERIES TWO
PERSON HOISTED AST-10-01
AST-05 WORKING SERIES TWO
SERIES ON PLATFORM PERSON
HOISTED AST-12
PERSON 8
WORKING SERIES TWO
WORKING
PLATFORM PERSON
PLATFORM
WORKING
6 10
ABOUT US PLATFORM
4
12

AST-35 AST-50
SERIES CLIMBING SERIES
AST-40
MONORAIL FAÇADE FAÇADE
SERIES
AST-30 CLEANING SYSTEM CLEANING
FAÇADE
SERIES MONRAIL SYSTEM
28 CLEANING
FAÇADE CLEANING SYSTEM AST-45 38
SYSTEM SERIES FAÇADE
24 30
CLEANING SYSTEM
34

2 www.ademsan.net info@ademsan.net www.facebook.com/AdemsanMakina www.twitter.com/ademsanmakine


Light Construction Machinery | Building Maintenance Units

AST-12-01 PROPOSED
SERIES OPENABLE AST-15-02 SYSTEMS
SCISSORED SERIES
COUNTERWEIGHT AST-25
(PANTOGRAPH) AST-20
SUSPENSION SERIES
TYPE, DOUBLE AST-15-01 SERIES
SYSTEM DAVİT ARM
PERSON WORKING SERIES ANCHORAGE SUSPENSION
PLATFORM COUNTERWEIGHT 18 (LOW RIDE SYSTEM
SUSPENSION SYSTEM DAVİT) ARM
14
SUSPENSION 22
16
SYSTEMED
20

THIS TO BE
AST-60 ELECTRICAL SUBMITTED, FOR
SERIES FAÇADE SUSPENDED THE IREQUIRED
AST-70
CLEANING SYSTEM SCAFFOLDING
SERIES FAÇADE FLOORS
42 SYSTEM RESTRAINT
CLEANING SPEACIAL
SYSTEM 50 SOCKETS
DESIGN SYSYEMS
44 SUSPENDED
SCAFFOLD 58

56

www.twitter.com/ademsanmakine www.facebook.com/AdemsanMakina info@ademsan.net www.ademsan.net 3


Light Construction Machinery | Building Maintenance Units

Our company, one of the leading for the development and analysis of the

About Us
companies of Building Maintenance Units products is active.
( BMU , Light construction machinery and
Ademsan Machinery provides
equipments is continuing its activities
sales,installation and technical support
in its Ankara factory located in the area
services for Building Maintenance Units,
of Ostim Organizational Industrial Zone
Istanbul, sales and service departments Special Design Platforms and Rebar Cutting
continues its activities at Istanbul Ikıtelli & Rebar Bending Machines.
Organizational Industrial zone. Ademsan Machinery offers products to
Together with 20 dealers in Turkey and customers use that undergo rigorous testing
overseas 15 distributors, manufactures and multidisciplinary quality control from the
start of raw material to end.
Production Areas
products oriented to construction sector.
With its experienced and extended Along with standard machines , in Buiding Maintenance Units
staff; provides project design. accordance with customer requests
different assortments and custom made Facade Cleaning Machines
manufaturing,assembly and maintenance
services. platforms are manufactured. Elecrical Suspended Scaffolding
Machine designs belongs to itself , during Ademsan Machinery provides and serves
the years of 2013 and 2014 has successfully its customers with its; project department Special Design/ Custom Made
completed the research and development of engineers,professional technical staff Rebar Cutting Machines
program of developing façade cleaning ,continuous development and with wide
systems /building maintenance units range of machinery. Rebar Bending Machines
together with TUBITAK. With its quality focused operation has signed
Cooperation with Hacettepe University to major project in Turkey and overseas.
Resistance Bending Machine

4 www.ademsan.net info@ademsan.net www.facebook.com/AdemsanMakina www.twitter.com/ademsanmakine


Light Construction Machinery | Building Maintenance Units

www.twitter.com/ademsanmakine www.facebook.com/AdemsanMakina info@ademsan.net www.ademsan.net 5


Light Construction Machinery | Building Maintenance Units

AST-10
SERIES TWO PERSON HOISTED WORKING PLATFORM

• Two Person double hoisted platform. • 240 kg lod capacity (custom made and upon request load
• Used together with counterweigh, davit arm, monorails capacity can vary ).
and other terracce systems. • Security wire ropes and safety locks allows safe working
• Double hoisted and doube wire rope reelered platfrom. environment.
• With 200x60x100 cm dimensions used within all general • Over load sensor,Lower collision bar,Upper and Lower
purpose works. limit switches prevents operator errors.
• 2 Pieces of carrying wire ropes and 2 units of security wire • Manufacturing and assembly is in accordance within EN
ropes are available. 1808 standards and norms

8 www.ademsan.net info@ademsan.net www.facebook.com/AdemsanMakina www.twitter.com/ademsanmakine


Light Construction Machinery | Building Maintenance Units

Esenler Hospital, İstanbul - Turkey

Turkcell Kartal Plaza, İstanbul - Turkey Tüze Tower, Bursa - Tukey Black Sea Trade Center, Batum

Min 1500- Max 3000


Min 1500- Max 3000 WIRE ROPE 660
8mm(6x19) Galvanized Steel
WIRE ROPE 660
4 units
8mm(6x19) Galvanized Steel
4 units

BLOCK STOP
BLOCK STOP

Top Limit Switches Magnetic Brake


Top Limit Switches Magnetic Brake

HOIST SYSTEM
HOIST SYSTEM

FEATURES
1870

1870
1870

1870
1550
1550
1000

Used with AST 15, AST 20, AST 25, AST 30,
1000

Wheel
Wheel

AST 35 systems
Power 3 kW
850
Wire rope 4 Pieces 8 mm Wire Rope
2630 850
2630 Bottom Limit Switch
Bottom Limit Switch
Voltage 380 V
2630
2630
Min1500 - Max3000
Control Cable
Min1500 - Max3000
HOIST SYSTEM Vertical Movement 7 m /min 2 Units 2,2 kw
HOIST SYSTEM

Horizontal Movement Manual & Hoisted


Platform Weight 300 kg … ( differs in accordance
660

BLOCK STOP MODEL : AST 10


660
850

MODEL : AST PLATFORM


10
with building height )
BLOCK STOP
WORKING
850

WORKING PLATFORM
FOR TWO OPERATORS
FOR TWO OPERATORS

WIRE ROPE REELERS


Working Capacity 240 Kg
WIRE ROPE REELERS

CABLE BOX BOX for CLEANING MATERIALS


CABLE BOX BOX for CLEANING MATERIALS

www.twitter.com/ademsanmakine www.facebook.com/AdemsanMakina info@ademsan.net www.ademsan.net 9


Light Construction Machinery | Building Maintenance Units

AST-20
SERIES ANCHORAGE
(LOW RIDE DAVIT) ARM
SUSPENSION SYSTEMED

• It is a suspension arms’ system where arm bases are anchored


on the terrace floor or on the inner parapet.
• Steel pedestals (brackets) with appropriate intervals ,according
to the project, are anchored on the terrace floor or on the parapet.
• L type Suspension Arms are used.
• Suspenson arms’ are fixed with pims to the steel pedestals
(brackets).
• Suspension arms are dismantelled and mantelled manually by
hand and moved.
• The points where the pedestals are anchoraged should be at the
standart and quality to carry the weight of the system.
• According to request the system is manufactured to mantle
single person or double person cradle / platform.
• Height of the suspension arms’ and dimensions are
manufactured in different types in accordance with the parapet
height and the buildings terrace dimensions.
• Manufacturing and assembly is in accordance within EN 1808
standards and norms.
TO ENSURE PROVIDE
ARM DIMESION ARE
20 www.ademsan.net SUITABLE FOR THE
info@ademsan.net www.facebook.com/AdemsanMakina www.twitter.com/ademsanmakine
PARAPETS HEIGHTS.
Light Construction Machinery | Building Maintenance Units

Dedeman, Antalya - Turkey Pelican Hill Residence, Antalya - Turkey

1800
1800 50 350
560
560
224

240
170
1292
724
1292

454

50 50
454

140
150 200
150 200

50 350
400
400
454
200
200

150

İmpaş, İstanbul - Turkey Çardak Hotel, Aşkabat 80 290

1800
1800 1800
560 2100 50 350 660
1800 1059 50 350
560 560
560

FEATURES
224

240
170
1292

Platforms Open Person or Double Person


224

240
170
1292
724
1292

724
1292

Engined Platfrom AST 05-AST 10


454

440 50 50
454
454

0 50 50
454

140
150 200

140

Suspension Arm L Type


150 200
150 200

1769

1769
150 200

50 350
400
50 350

Suspension Arm Standard 1 m to the Façade,


400 400
400

140

Dimension 1,20 m Height


140
454
454

Vertical Movement Manual with hand


200

Anchorage Bolts 4 Pieces M 20


200

889
200

150
200

Final Coating Hot-dipped galvanised (painted


150

80 290
739

80 290

according to request).
2100 660
1059
2100 660
1059 1059

1059
2650

PAINT IS REQUIRED, THE


SAME SHALL BE APPLIED
1769

1769

www.twitter.com/ademsanmakine www.facebook.com/AdemsanMakina info@ademsan.net www.ademsan.net 21


1769

1769

889
889
739
739
Light Construction Machinery | Building Maintenance Units

• Is a system with speacial high the pedestals (brackets) by the means


AST-25SERIES DAVİT ARM
mast attached to suspension arms of pims. SUSPENSION SYSTEM
pedestals which are either anchored • Davit Arm is manually moved from the
on the building terrace or on the inner pedestals by the means of plug and
parapet wear.
• System is prefered, when necessary, • Anchored points of the steel pedestals FEATURES
for the working platfrom to park on , should bear the quality and the Platfrom One Person and Two Person
the terrace floor / level. standarts of the systems’ weight Hoisted Platfrom AST 05 - AST 10
• By means of two davit suspension • Upon request the system is Davit Arm Type Long L Type (customed dimensions)
arms, parapet or other overcoming manufactured to have either a one Davit Arm Dimensions Standard 1,5 m towards the
obstacles are cleared and the person working platform or two
façade and 2,5 height.
platfrom parked upon the terrace person
level / floor. • Suspension arm height and Swivel Manual by hand
• Steel pedestals (brackets), are dimensions differ in types in Horizontal Movement Manual by hand
anchored according to project and to accordance with the parapet height Lifting Winch Manual by hand
the platform dimensions, either on to and the buildings’ terrace dimendions. Anchorage Bolt /Pim 4 Units M 20
the parapet or on the concrete • Manufacturing and assembly is in Final Coating Hot Dipped Galvanized (painted
• L type Davit Arms are used. accordance within EN 1808 standards according to request)
• Davit Arms are fastened / fixed upon and norms

22 www.ademsan.net info@ademsan.net www.facebook.com/AdemsanMakina www.twitter.com/ademsanmakine


Light Construction Machinery | Building Maintenance Units

DAVİT ARM SUSPENSION SYSTEM

DAVİT ARM SUSPENSION SYSTEM MOUNTED TO THE PARAPET

DAVİT ARM SUSPENSION SYSTEM MOUNTED TO THE FLOOR

Konum 1 Konum 1

Konum 2 Konum 2

Konum 1 Konum 1
Konum 1 Konum 1
AST 25

1535

Konum 3 Konum 3
AST 25

Konum 2
2817

Konum 2 Konum 1

Konum 3
550

Konum 4 Konum 4
150

Konum 4

PLATFORM PLATFORM PARK AŞAMALARI


PARK AŞAMALARI
PLATFORM PARK AŞAMALARI Konum 1 Konum 2 Konum 2 Konum 3 Konum 3 AST 10
AST 10
Konum 2 Konum 3

Konum 3 DAVIT ARM MONTAJI


DAVIT ARM DAVIT ARM MONTAJI
MONTAJI DAVIT SİSTEM - MODEL: AST 25

www.twitter.com/ademsanmakine www.facebook.com/AdemsanMakina info@ademsan.net www.ademsan.net 23

Konum 4
Light Construction Machinery | Building Maintenance Units

RESTRAINT SOCKETS
• On buildings where the total • Connecting point of the
descent is 40m or more in sockets and their ranges are
height, restraint systems are calculated in detail by our
used for safety and security project engineers.
of the platform. • Sockets can be connected
• In accordance with the upon profiles or upon carrier
building height, first band of elemants.
restraint sockets are applied • Restraint socket system
on the first 40 m then each consist of ; one female
and every 20 m. sockets connected on the
• As per request the quantity façade , a ring connected
and the ranges could be upon the wire rope from the
incremented. platfrom and a steel ring
• Horizontal spacing depends connected in between the
on the width of the platfrom ; joists.
application approximately is • Sockets can be either
performed every 2 m’s stainlesss steel or
TYPE (1) TYPE (2) TYPE (3) TYPE (4) TYPE (5)

TYPE (1) TYPE (2) TYPETYPE


(3) (1) TYPE (2)
TYPE (4) TYPE (3)
TYPE (5) TYPE (4)

DETAIL

DETAIL
DETAIL

TYPE (1) TYPE (2) TYPE (3) TYPE (4) TYPE (5)

TYPE (4) TYPE (5) TYPE (1) TYPE (2)

DETAIL

DETAIL

Ademsan

58 www.ademsan.net info@ademsan.net www.facebook.com/AdemsanMakina www.twitter.com/ademsanmakine


Light Construction Machinery | Building Maintenance Units

Quality & Production

We manufacture the machines in the awareness and importance that they run smoothly long years. All parts and pieces are
manufactured at high standards and are individually checked, tested. All the machines produced are tested many times over
their capacity and are gotten ready for their mission at the site.

Quality Standards

• EN 1808 European Norms


• CE Certificate
• 98/37 EC Machinery Safety Directive
• 2004/108 / EC Electromagnetic
Compatibility Directive
• 2006/95 / EC Low Voltage Directive

Safety Systems

• Electromagnetic brake
• Block stop brake system
• Overload switch
• Emergency stop
• Manually descend / lowering system
• Façade wheels
• Safety rope
• Top collision safety switch
• Lower collision safety switch
• Hydraulic upper switch
• Hydraulic lower switch
• Telescopic system safety switch
• Right-left end switch
• The main body right - left switch
• Rotary / Separator arm right -
left switch

www.twitter.com/ademsanmakine www.facebook.com/AdemsanMakina info@ademsan.net www.ademsan.net 59


MILL'S TEST CERTIFICATE
DATE : 02.08.2018
NO : 18012087
ORDERING COMPANY : ÇOPUROĞLU DIAMETER (mm) : 8,3
ORDER NO : 0 LAY : s/Z
STANDARD : EN 12385-4 LUBRICATION : DRY
REEL NO : 1103505868
TENSILE STRENGTH (N/mm2) : 2160
LENGTH (M) : 2500
NET WEIGHT (Kg) : 0
CONSTRUCTION : 5x19 W PPC COMP.
COATING : GALVANIZED
CHEMICAL ANALYSE OF WIRE ROD:
C% Si % Mn % P% S%
0,68 - 0,75 0,10-0,30 0,50-0,80 0,006-0,013 0,003-0,006

TEST RESULTS:
Tensile Test on
Number of Diameter Bend test Torsion test Zinc
Strength knotted wire
wires (mm) (Number) (Number) (gr/m²)
(N/mm²) (daN)
5 0,74 2214 20 42 78
30 0,67 2243 22 39 70
30 0,70 2252 23 37 80
30 0,51 2218 22 38 75

We hereby certify that the commodity is inspected according to EN 12385 and found good in all
respects as stated above. You can use QR CODE for certificate verification
Minumum Breaking Load : 54 KN
Actual Breaking Load : 56 KN
Alghanem Reference List
(Jordan & Qatar)

ACKNOWLEDGE.
JORDAN BMU PROJECTS

SN. PROJECT System Status


1 Al –Hijaz Towers Bldg Fully automatic trackless machine Completed

2 Damac Fixed roof machine Completed


3 Housing Bank Fully automatic trackless machine Completed
Monorail system
4 Ajib Bank Motorized roof top machine Completed
5 The Atrium / EDGO Fully automatic trackless machine Completed
Monorail system
6 Meridian Hotel Fully automatic track machine Completed
7 Crown Plaza Hotel Fully automatic trackless machine Completed
Monorail system
8 HSBC Bank + extension Socket & davit system with platform Completed
6.5m telescopic platform
Fully automatic trackless machine
9 Holiday inn Hotel Socket & davit with motorized cradle Completed
10 Hayat Amman Hotel Socket & davit with motorized cradle Completed
11 Arab Bank + Extension Fully automatic trackless machine Completed
Monorail system
12 Commerce Building Fully automatic track machine Completed
Motorized gantry system
13 Vertex Tower Fully automatic track machine Completed
14 Kempinski Hotel Socket & davit with motorized cradle Completed
15 Boulevard Motorized roof top machine Completed
16 Ammar Towers Monorail with power cradle Completed
17 Al- Seraj Gate Fixed roof machine with telescopic must Completed
18 Commercial Bank Roof car machine Completed
19 Zain Building Monorail system Completed
20 KHCC Fully automatic track machine Completed
21 St. Regis Hotel Fully automatic track machine Completed
Socket & davit with motorized cradle
22 HTBF (Housing Bank) Fully automatic track machine Completed
Monorail system
23 Kuwait Embassy -Jordan Fully automatic track machine Completed
Motorized gantry system
24 ABC Bank Monorail system Completed
QATAR BMU PROJECTS
SN. PROJECT NAME SYSTEM STATUS
1. MARINA - 25 IN LUSAIL ONE MACHINE WITH 28M JIB & DAVIT SYSTEMS COMPLETED.

2. RAMADA HOTEL EXT. MONORAIL SYSTEM WITH POWERED CRADLE. COMPLETED

3. THE REGENCY TOWER 28M TELESCOPIC JIB AND FIXED MACHINE. COMPLETED
4. AL ASMAKH TOWER 5.5M JIB WITH PANTOGRAPHIC CRADLE. COMPLETED
5. AL WOSAIL TOWER CONCRETE MOUNTED CAR MACHINE WITH DAVIT COMPLETED
SYSTEM.
6. Q.P. CEREMONIAL COURT DAVIT SYSTEM WITH POWERED CRADLE COMPLETED
7. TEXAS COLLEGE OF 4M JIB MACHINE ON STEEL TWIN STRUCTURE COMPLETED
ENGINEERING
8. AL BIDDA TOWER 6M MACHINE ON AN INCLINED TWIN RAIL COMPLETED
9. QATAR NAVIGATION 6M MACHINE ON STEEL STRUCTURE COMPLETED
10. TORNADO TOWER 11M MACHINE WITH PANTOGRAPH COMPLETED
(QIPCO)
11. CMU COLLEGE TWO TRACKLESS 5M MACHINE COMPLETED
12. DUBAI TOWER 3 HUGE MACHINE, AND OTHER SYSTEMS REACH 40 M COMPLETED

13. AL SAAD DEVELOPMENT 4 ROOF CAR MACHINES REACH 12 M. COMPLETED


COMPLEX
14. 3B+G+14F OFFICE BLDG 2 MACHINES, ONE ON TWIN TRACK REACH 4.5 M AND COMPLETED
OTHER FIXED ON ROOF REACH 12M
15. VIVA BAHRIYA TOWER 2 ROOF MOUNTED MACHINES ON TWIN TRACK REACH COMPLETED
17 M
16. AL SAMRIYA TOWER SINGLE MACHINE WITH 21M MACHINE JIB ON TWIN COMPLETED.
TRACK AND MONORAIL.
17. VIVA BAHRIYA - 09 2 TELESCOPIC MACHINES OF 21.0 M JIB. COMPLETED.
18. QATAR AIRWAYS CREW HIGH RISE DAVIT SYSTEM COMPLETED.
ACCOMODATION.
19. HILTON HOTEL IN OLD ONE MACHINE WITH 30M JIB COMPLETED.
SALATA
20. AL RABBAN TOWER TWO MACHINES - 18 M JIB COMPLETED.
21. AL ALI OFFICE BUILDING SINGLE MACHINE WITH 10M JIB COMPLETED.
22. QIB TOWER HOTEL MONORAIL & DAVIT SYSTEM COMPLETED.
23. AL BANDARY HOTEL & SINGLE MACHINE WITH TELESCOPIC 28M JIB COMPLETED.
APARTMENTS PROJECT IN
WESTBAY
24. SINYAR TOWER IN SINGLE MACHINE WITH 5,5M JIB COMPLETED.
WESTBAY
25. UNION RESIDENTIAL BMU WITH 26M TELESCOPIC JIB COMPLETED.
TOWER
26. PREMIER INN HOTEL ` PARAPET MOUNTED DAVIT SYSTEM. COMPLETED.
27. MARINA COM 11 IN SINGLE TELESCOPIC MACHINE WITH 18M JIB COMPLETED.
LUSAIL TRAVERSING ON TWIN TRACKS
Qatar Ongoing Project
1. BURJ MARINA - 08 IN 3 DIFFERENT MACHINES WITH 1 MONORAIL SYSTEM ON GOING.
LUSAIL
2. SALWA HOTEL RESORT 1 MACHINE ON GUIDE ANGLE AND 1 MONORAIL ONGOING.
SYSTEM.
3. AL ARWA TOWER SINGLE MACHINE WITH 13M JIB WITH SOFTROPE ON GOING.
SYSTEM
4. AL MANA SQUARE SINGLE TELESCOPIC MACHINE WITH 16,5M JIB ON GOING.
6. AL SYLIAH TOWER SINGLE MACHINE RUNS ON PARAPET WITH 5,5M JIB ON GOING.

7. AL THURAYA TOWER SINGLE MACHINE WITH 6 M JIB TRAVERSING ON ON GOING.


TWIN TRACKS
8. AL SENDIAN TOWER SINGLE MACHINE WITH 6.0 M JIB RUNNING ON ON GOING.
TWIN TRACKS
9. SIMULATION CENTER, HIGH RISE DAVIT SYSTEM & ANCHORAGE ARM ON GOING.
HAMAD MEDICAL CITY SUSPENSION SYSTEM.
10. VIVA BAHARIYA 06 TWO MACHINES WITH 19.5 M JIB RUNNING ON ON GOING.
TWIN TRACKS.
11. VIVA BAHARIYA 07 TWO MACHINES WITH 19.5 M JIB RUNNING ON ON GOING.
TWIN TRACKS.
12. VIVA BAHARIYA 19 TWO MACHINES WITH 29.0 M JIB FIXED ON ON GOING.
CONCRETE PEDESTALS.
13. VIVA BAHARIYA 26 TWO MACHINES WITH 26.0 M JIB FIXED ON ON GOING.
CONCRETE PEDESTALS.
14. TRAUMA CENTER - MONORAIL SYSTEM,DAVIT SYSTEM and SAFETY LINE ON GOING.
HAMAD MEDICAL CITY SYSTEM.
15. DOHA OASIS MALL 4 MONORAIL SYSTEM and BMU SYSTEM FOR THE ON GOING,
HOTEL TOWER.
16. J.W MARRIOT 3 BMU MACHINES , MONORAIL SYSTEM and ON GOING,
CLIMBING MONORAIL SYSTEM.
17. MARINA RES 11 ONE FIXED MACHINE WITH 23 ON GOING,
MTR TELESCOPIC JIB
18. MARINA RES 15 - ONE FIXED MACHINE WITH 29 ON GOING.
NUWAT TOWER MTR TELESCOPIC JIB & PANTO GRAPHIC CRADLE.
19. MKM TOWER, OLD MONORAIL SYSTEM ON GOING.
SALATA
20. FEREEJ BIN DERHEM MACHINE RUNNING ON GUIDE ANGLE RAIL. ON GOING.
COMMERCIAL BUILDING
21. WALDORF ASTORIA ONE FIXED MACHINE WITH ELESCOPIC JIB & PANTO ON GOING.
GRAPHIC CRADLE.
22. QATAR FOUNDATION SAFETY LIFE LIE SYSTEM ON GOING
HEAD QUARTERS
Ademsan Reference List
ADEMSAN BMU PROJECTS
BAHRAIN
Manama / Bahreyn
Project Name Kanoo Tower
Contrator Kanoo Tower
Working Height 120 Mt
Person In Charge
Machine AST 70 Model 30 Meter Jıb
Façade Cleaning Machine

Manama / Bahrain BAHRAIN


Project Name Fakhroo Tower
Contrator Fakhroo Tower
Working Height 110 m
Person In Charge
Machine AST 45 Model 5,5 Meter Jıb
with 200M Rail.

Manama / Bahrain BAHRAIN


Project Name Prince Khalife PARK (PKP)
Contrator GGLS
Working Height 40 m
Person In Charge
Machine AST 30 Model Monorail

Manama / Bahrain BAHRAIN


Project Name Busaitten Links
Contrator GGLS
Working Height 30 M
Person In Charge
Machine AST 30 Model Monorail

Manama / Bahrain BAHRAIN


Project Name SLRB
Contrator GGLS
Working Height 65 m
Person In Charge
Machine AST 30 Model Monorail

Manama / Bahrain BAHRAIN


Project Name AL SALAM HOSPITAL
Contrator GGLS
Working Height
Person In Charge
Machine AST 30 Model Monorail & Suspended Scaffold
Manama / Bahrain BAHRAIN
Project Name Juffair
Contrator GGLS
Working Height 40 m
Person In Charge
Machine AST 50 Model 10m Jib

Manama / Bahrain BAHRAIN


Project Name KHUN Oncology and Malkiya Hospital
Contrator GGLS
Working Height 50 m
Person In Charge
Machine AST 30 & AST 20 Façade Cleaning System

Manama / Bahrain BAHRAIN


Project Name AL NOOR
Contrator GGLS
Working Height 50 m
Person In Charge
Machine AST 30 Monorail Façade Cleaning System

Manama / Bahrain BAHRAIN


Project Name Infinity Tower
Contrator GGLS
Working Height
Person In Charge Mr Tahir
Machine AST 30 Monorail

Manama / Bahrain BAHRAIN


Project Name LandMark City Tower
Contrator GGLS
Working Height
Person In Charge Mr Tahir
Machine AST 30 Monorail

Manama / Bahrain BAHRAIN


Project Name Danat Tower
Contrator GGLS
Working Height
Person In Charge Mr Tahir
Machine AST 30 Monorail
Manama / Bahrain BAHRAIN
Project Name Danat Tower
Contrator GGLS
Working Height
Person In Charge Mr Tahir
Machine AST 30 Monorail

Manama / Bahrain BAHRAIN


Project Name Catamaran 1 & 2
Contrator GGLS
Working Height
Person In Charge Mr Tahir
Machine AST 70 Model 270

Jeddah Saudi Arabia


Project Name İnternational İslamic Bank
Contrator Saudi Structures Contracting Co.
Working Height 30 m
Person In Charge Arch. Bashar Shareef Al Shahed
Machine AST 50- 12m Jib.
180 m Double Rail.

Doha Qatar
Project Name Proposed Office Building / Qatar
Contrator Midmac Contracting
Working Height 70m Person In
Charge Mr Hamidi Machine
AST 50 12 m Jib
AST 45 4m Jib

Doha Qatar
Project Name Viva Vahriya VB2
Contrator SEG Contracting
Working Height 100m Person
In Charge Mr Hamidi Machine
AST 70 18m Jib

Doha Qatar
Project Name Salwa Hotel
Contrator Al Bader Engineering (Al Bader Group)
Working Height 25m Person
In Charge Mr Hamidi Machine
AST 45 4m Jib
Doha Qatar
Project Name Qatar Airways Crew Accommodation
Contrator Redco International
Working Height 25m Person
In Charge Mr Hamidi Machine
AST 45 4m Jib

Doha Qatar
Project Name Viva Vahriya09
Contrator United Construction Establishment W.L.L
Working Height 100m Person
In Charge Mr Hamidi Machine
AST 70 18m Jib

Amman Jordan
Project Name Damac
Contrator Damac
Working Height 140m
Person In Charge Mr Asad
Machine AST 70 19m Jib

Amman Jordan
Project Name ST REGIS
Contrator
Working Height
Person In Charge Mr Laith
Machine AST 70 & AST 50

Amman Jordan
Project Name KHCC
Contrator
Working Height 70m Person In
Charge Mr Asad Machine
AST 70 & AST 50

Egypt

Contrator Eclipse EIGHPT


Working Height 40 Mt
Person In Charge Mr Abdelhamid, Tel:+2-03 4845745
Machine AST 30 Monoray
Cephe Temizlik Makinesi
Egypt Egypt
Project Name Hauter
Contrator hauter
Working Height 50 Mt
Person In Charge Mr Beshoy, Tel:+2-03 4845745
Machine AST 70 19 Mt Bumlu raylı
Cephe Temizlik Makinesi

Darusselam Tanzania
Project Name PSPF
Contrator DarGlass
Working Height 100m
Person In Charge Mr Shiraj
Machine AST 60 Parapet İçi Raylı
Cephe Temizlik Makinesi

Hartum Sudan
Project Name Wahat Mall Hartum
Contrator TURKISH EMIRATES for CONSTRCUTION CO. LTD
Working Height 70m
Person In Charge Mr Korhan
Machine AST 40

Türkmenbaşı Turkmenistan
Project Name Çardak Otel ***** Türkmenbaşı
Contrator Asist İnşaat A.Ş.
Working Height 30m
Person In Charge Ms. Oznur
Machine AST 20

TürkmenlimanProject Turkmenistan
Project Name TLP ( TurkmenistanPortProject)
Contrator GAP
Working Height
Person In Charge
Machine Skylight & AST 30

Turkmenistan
Project Name END CRH ( HOSPITAL PROJECT)
Contrator GAP
Working Height 320m
Person In Charge
Machine AST 15 & AST 10
Baku Azerbaijan
Project Name Aga Center
Contrator Aga Grup INC
Working Height 100m
Person In Charge Aydın Bey /
Machine AST 50

Bakü Azerbaijan
Project Name Marina Plaza
Contrator Erbay Alüminyum
Working Height 60m
Person In Charge Mr. Oktay
Machine AST 15 CounterWeight

Batumi Georgia
Project Name KEMPİNSKY Otel
Contrator KEMPİNSKY Otel
Working Height 50 Mt
Person In Charge Mr Mamuka Bey / Tel:
Machine AST 30 Monoray Sistem
Cephe Temizlik Makinesi

Batum Georgia
Project Name Black Sea Trade Center
Contrator Zimo Ltd
Working Height 140m
Person In Charge Mr. Melih
Machine AST 30 Monorail System

Erbil Iraq
Project Name Van Royal Hotel
Contrator Van Royal Hotel
Working Height 40m
Person In Charge Mr. Cuneyt
Machine AST 30 Monorail System

Erbil Iraq
Project Name Erbil Royal Mall
Contrator Erbil Royal Mall
Working Height 40m
Person In Charge Kamuran
Machine AST 30 Monoray Sistem
Cephe Temizlik Makinesi
Erbil Iraq
Project Name Empire World Business Res
Contrator Empire World / BC Group
Working Height
Person In Charge Mr Moustafa
Machine AST 45 /AST 30
Façade Cleaning System

Dushanbe Tacikistan
Project Name Serena Otel
Contrator Zafer İnşaat AŞ
Working Height 50 Mt
Person In Charge Mesut Bey / +90 312 447 7000
Machine
AST 30 Monorail System

Doha Qatar Project


Name Burj Marina Contrator
Redco International Working Height
Person In Charge Mr Hamidi
Machine AST 70

Beirut Lebanon
Project Name Credit Libanis
Contrator Alumco
Working Height
Person In Charge
Machine AST 70-360

Doha Qatar
Project Name Al Syliah Tower
Contrator Ebid Group - AL Bder Group
Working Height
Person In Charge Mr. F. Hamidi
Machine AST 60
Doha Qatar
Project Name DOHA OASIS
Contrator Redco Construction AL Mana
Working Height
Person In Charge Mr.F. Hamidi
Machine AST 60 & AST 30

Doha Qatar
Project Name MARINA RES 11
Contrator Gulf Contracting Co. W.L.L.
Working Height
Person In Charge Mr.F. Hamidi
Machine AST 70

Doha Qatar
Project Name DRAGON AND GEYSER
Contrator Servtech Intrnational
Working Height
Person In Charge Mr.F. Hamidi
Machine AST 70 / SPEACIAL MADE

Doha Qatar
Project Name Double Tree Hotel (Hilton Hotel)
Contrator KCT - UCC
Working Height
Person In Charge
Machine

Doha Qatar
Project Name Al Rabban Tower
Construction & Reconstruction Engineering Co.
Contrator
CRC
Working Height 180
Person In Charge
Machine AST 70 LR 180

Kuwait Kuwait
Project Name TAMDEEN
Contrator UAMCCO
Working Height
Person In Charge Mr. SALAH
Machine AST 70 / SPEACIAL MADE
Kuwait Kuwait
Project Name Kuwait Jabriya Project
Contrator Dupond
Working Height
Person In Charge
Machine AST 30 Model Monorail Façade Cleaning Machine

Georgia
Project Sea Tower 1
Contractor Orbi Grup
Building Height 110m
Contact Ms Irina
Machine AST 30 Model Monorail Façade Cleaning Machin e

Georgia
Project Sea Tower 2
Contractor Orbi Grup
Building Height 110m
Contact Ms Irina
Machine AST 30 Model Monorail Façade Cleaning Machin e

Georgia
Project Black Sea Trade Center
Contractor Zimo Ltd
Building Height 140m
Contact Mr.Melih / Phone : +995 599 135548
Machine AST 30 Model Monorail Façade Cleaning Machin

Georgia
Project Batum Hotel Casino
Contractor LTD Mersin Turizm
Building Height
Contact Mr.Yasin / Phone : +995 557 757837
Machine AST 45 Model Façade Cleaning Machine with bo
and rail

Qatar
Project QIB Hotel
Contractor Shanon Engineering
Building Height
Contact Mr Hamidi
Machine AST 30 Model Monorail Façade Cleaning
AST 25 Model Façade Cleaning Machine wit
Qatar
Project HILTON AL BANDARY
Contractor MOFTAH AL MOFTAH
Building Height 170
Contact
Machine AST 50

Amman/JORDAN
Project Damac
Contractor Damac
Building Height 140m
Contact Mr Asad Mustafa, Phone : +962 6 4395155
Machine AST 70 Model Façade Cleaning Machine19m

Saudi Arabia / Riyadh


Project Amaken
Contractor
Building Height
Contact Mr Arabi
Machine AST 30 & AST 35 Climbing Monorail

Saudi Arabia / Riyadh


Project Hilton Jubail
Contractor
Building Height
Contact Mr Alaa Barakat
Machine AST 30 Monorail

Saudi Arabia
Project CMC CAYAN
Contractor
Building Height 71
Contact Mr Alaa Barakat
Machine AST 45 LKW 45
Saudi Arabia
Project HALA TOWER
Contractor
Building Height
Contact Mr Alaa Barakat
Machine AST 30 Monorail

Dubai / UAE
Project City Of Arabia
Contractor
Building Height
Contact Al Laith
Machine AST 35

Doha/QATAR
Project Oreedoo TOWER
Contractor Servtech
Building Height
Contact Mr Hamidi
Machine AST 25 Model Façade Cleaning
Machine with Davit Arm Suspension System

Doha/QATAR
Project Al Mana Square
Contractor Servtech
Building Height
Contact Mr Hamidi
Machine AST-50 16,5m Boom
and Rail

Doha/QATAR
Project AL ALI
Contractor Servtech
Building Height 64
Contact Mr Hamidi
Machine AST-50 10 m Boom
and Rail
Doha / QATAR
Project ABRAJ QUARTIER
Contractor Servtech
Building Height
Contact Mr Hamidi
Machine 8 AST 70
Concept Drawing
TYPE 1 OUR SYSTEMS ARE DESIGNED AND MANUFACTURED ACCORDING TO EUROPEAN EN 1808
STANDARDS
TECHNICAL DATA
240+mm 260+mm These data are for informative purpose. At production stage data can be verified. as per site condition
SPEED DATA ( AST 25 & AST 20 )
Hoisting :8 m / min.
TYPE 2 WIRE ROPE FEATURES
10 11 12 13

Diameter :Ø8,3 mm
SENTRI TEMPERED LAMINATED
CLEAR GLASS BALUSTRADE
TYPE 2 Features :5 x 19 W (Galvanized)
Lop wire rope :4 Piece

A3-205
VWS05
110mm RWP
RD SLOPE1% 80+mm
110mm SRWP

E1%
50+mm

Breaking load for :54 KN one wire rope

SLOP
TYPE 2 70+mm
SLOPE0.5%
+88.40
RD

50+mm
E

CRADLE (AST10)
170+mm 170+mm SLOPE1.7%
Construction :Aluminum and Steel
TYPE 1 TYPE 2 Working Area :800 x 2000 x 1000 mm
TYPE 2 Outher Dimensions :850 x 2530 x 1870 mm

SLOP
Hoisting :1,1 kW Elec.Engine -2units

E1.2%
RD SLOPE1% 80+mm
SLOPE1% SLOPE1%

PE1%
120+mm 100+mm 120+mm
50+mm
Wire Rope Reeler's :0,25 kW Elec.Engine -2units

SLO
F
90+mm 90+mm

110mm RWP Block Stop :2unit


TYPE 2 Control :Cable Control, Cable Box

SLO
90+mm G
1%
PE

PE1.
O

Box for Cleaning Materials


SL

PE1%

3%
SLO

RD 50+mm
SLOPE
0.5% SENTRI TEMPERED LAMINATED
Polyurethane Side Wheel
110mm RWP
CLEAR GLASS BALUSTRADE
140+mm +88.40 120+mm
PEDESTEL DATA ( AST 25 )

SLOP
SLOP 170+mm 170+mm
E1.7 SLOPE1.1% 110+mm

E1%
5%

Steel Pedestel ( Galvanized )


170+mm 170+mm H
110mm RWP

90+mm

90+mm
190+mm
190+mm
190+mm 220+mm
220+mm +87.93 TOS
190+mm
SLOPE
0.5%
Anchor Bolts :M24 - 6.8 ( Galvanized )
+88.40 170+mm
Total Pedestel : 49 Units

%
180+mm

.1
180+mm

E1
Restaint Socket : 375 Units
160+mm

OP
%

SL
1.6 110mm RWP
PE
O
SL

TYPE 2
SLOPE

SLOP
E1% PEDESTEL DATA ( AST 20) Tower PEDESTEL DATA ( AST 20) Poduim
1%

Steel Pedestel ( Galvanized ) Steel Pedestel ( Galvanized )

SLOPE1%
Anchor Bolts :M20 - 6.8 ( Galvanized ) Anchor Bolts :M20 - 6.8 ( Galvanized )

SL
180+mm A

O
PE
I

proposed

1%
170+mm 210+mm 180+mm
RD 50+mm
Total Pedestel :16 Units Total Pedestel :24 Units
TYPE 1 110mm SRWP
110mm RWP
RD
50+mm

FAHU-02 EXIT +88.00 FFL


LOBBY
24-005 TELE.
24-004 SLO BMU PROTECTION
PE
FACADE CLEANING &
SLO
PE1%
+87.93 TOS
EL-05 1.3
Top Limit Switches
SLOPE2.5%

%
MAINTENANCE SYSTEM , SEE NOTE1
pedistal All the movable steel parts of the machine will be covered with electro-galvanization
SLOPE0.5%

A BLOCK STOP
ELEC. SENTRI TEMPERED LAMINATED
CLEAR GLASS BALUSTRADE
Protecting paint will be applied for the other equipments of the machine
foundation
24-003 +87.93 TOS
CORRIDOR
HOIST SYSTEM
ST-02 24-002
Magnetic Brake -Hotdip Galvanized
110mm RWP
220+mm
200+mm
80+mm 200+mm
210+mm
210+mm

210+mm
210+mm

SLOPE2.1% RD
50+mm
on 8th J -1 Coat epoxy primer solvent
Hot dip galvanization will be applied to rails and strap clamps
floor
240+mm
Ø110 RWP

1830
Ø50RWP
240+mm 240+mm MECH. SHAFT
Cradle Paint and galvanized

1000
12 ST-01
STAIR
TYPE 1 slab
A6-205
+89.70 TOS
LOBBY
24-001
Connected to concrete TYPE 2 SAFETY FEATURES Façade Fixing Tools For Wire Rope
SLO

Wheel
PE1%

170+mm 170+mm 160+mm

EXIT
210+mm 12
A6-201
Top Limit Switches Block Stop Safety Brake
Lower Limit Switches (Trip Bar)
E1.3%

Over load Protection


1%

Traversing End Limit Switches


SLOP
SLOPE
SL
OP

Electromagnetic Brake
E1
%

Electrical The Phase Protection Relay

EIGHTH FLOOR PLAN Emergency Manual Descent In Power Failure Façade Restraint System
SLOP

E1%

+87.93 TOS BOX for CLEANING MATERIALS CABLE BOX


E1%

FAHU-01
SLOP

Emergency Stop
SL

1%
PE
OPE

PROVISIONAL LOAD DATA DURING OPERATION AND PARKING ( AST 20 )


O
SL
1%

FACADE CLEANING
&
MAINTENANCE SYSTEM
, SEE NOTE

* FOR ROOF FLOOR ENLARGEMENT

800
(SWIMMING POOL
)
WIRE ROPE REELERS
& DETAILS PLEASE REFER TO
DWG.NO. A6-106

120+mm 120+mm SLOPE1%


SL

120+mm
OP

+88.40 +88.40 120+mm 120+mm +88.40


E1

5%
%

1.7
PE
E1% 70+mm SLOPE0.5% 50+mm SLO 70+mm SLOPE0.5% 50+mm
SLOPE0.5% 50+mm SLOPE0.5% 50+mm 2000
Rv1 Rv1
OP RD RD 70+mm 70+mm
SL RD RD

SLOPE1% 2600
50+mm SLOPE1% 80+mm 50+mm 80+mm
110mm SRWP 110mm SRWP 50+mm SLOPE1%
RD RD 80+mm
170+mm RD 200+mm

110mm RWP 110mm RWP 110mm RWP


Rv2 Rv2

Rv2(x2)

Rv1(x2)
110mm SRWP

SENTRI TEMPERED LAMINATED SENTRI TEMPERED LAMINATED


CLEAR GLASS BALUSTRADE CLEAR GLASS BALUSTRADE

TYPE 2 2500

PROVISIONAL LOAD DATA DURING OPERATION AND PARKING ( AST 20 )

RESTRAINT SOCKET
840 TSL Total Suspended Load 850 kg

SWL Safe Working Load 240 kg

+91.46 BMU Total Machine Weight (Include CW and Cradle) 400 kg

4596
3465
Maximum dynamic compression load on one pedestal
during operation Rv1 39 KN.

Maximum dynamic tensile load on one pedestal


during operation Rv2 39 KN.

PROVISIONAL LOAD DATA DURING OPERATION AND PARKING( AST 25 )

+87.85 TOS

400
600 600
TSL

3250

560

+91.35 TOS +91.35 TOS

Rv2(x2) Rv1(x2)

602 B

No
0

Teklif İçin Gönderildi.


Revizyon / Modification
0

09.03.2020

Tarih / Date
0

F.NUR YAGCI

İsim / Name
PROVISIONAL LOAD DATA DURING OPERATION AND PARKING ( AST 25 )

TSL Total Suspended Load 850 kg


+87.85 TOS

Ademsan SWL Safe Working Load 240 kg


Makine
+87.90 TOS A3-101 B A2-100 01
Müşteri / Cient

Müşteri Çizim No / Client Drawing No Yapı / Structure


Proje / Project

SINO GULF (ABDALI TOWER)


BMU Total Machine Weight (Include CW and Cradle) 600 kg

Bu çizim, yerleşim planı ve burada tanımlanan Maximum dynamic compression load on one
herhangi bir bilgi gizli bilgidir. ADEMSAN'ın yazılı
izni olmadan kullanılamaz, kopyalanamaz. pedestal during operation Rv1 32,7 KN.
Üretim, ihale ya da başka bir amaç için
HIGH RISE RESIDENTIAL
kullanılamaz. Sipariş No / Order No Ademsan Dwg No
TOWER ( ABDALİ TOWER)

This drawing / floorplan and any information or - Ademsan Proje No 17.260


descriptive matter set out here on
are the confidential property of ADEMSAN and Model Maximum dynamic tensile load on one pedestal
must
not be loaned, copied or used for manufacturing,
Ölçek / Scale Tarih / Date İsim / Name
AST 25(TYPE1) 1 Set
during operation Rv2 39,8 KN.
AST 20(TYPE2) 1 Set
tendering or any other purpose without their 1/1
AST 10 1 Unit
wirtten permission. CAD - Nr:
TYPE 1
240+mm 260+mm

TYPE 2
SENTRI TEMPERED LAMINATED
CLEAR GLASS BALUSTRADE

Roof Floor Plan

A3-205
VWS05
110mm RWP
RD SLOPE1% 80+mm
110mm SRWP

PE1%
50+mm

TYPE 2

SLO
24th Level
RD
SLOPE0.5%
70+mm +88.40 50+mm

170+mm 170+mm SLOPE1.7%

TYPE 1
TYPE 2

SLO
PE1.2%
RD SLOPE1%
80+mm

%
SLOPE1% SLOPE1%

PE1
50+mm
120+mm 100+mm 120+mm

O
SL
90+mm 90+mm

110mm RWP

TYPE 2

SL
90+mm

1%
PE

OP
O

E1.3
SL %
PE1

%
SLO

RD 50+mm
SLOPE
0.5% SENTRI TEMPERED LAMINATED
110mm RWP
CLEAR GLASS BALUSTRADE
140+mm +88.40 120+mm

SLO
SLO 170+mm 170+mm

PE1%
PE1 SLOPE1.1% 110+mm
.75%
110mm RWP 170+mm 170+mm

90+mm 220+mm
190+mm 190+mm 190+mm
SLOPE
90+mm 190+mm 220+mm +87.93 TOS 0.5%

+88.40 170+mm

1%
180+mm
180+mm

.
E1
160+mm

OP
6 %

SL
1. 110mm RWP
O PE
SL
SLO

PE1%
PE1%

SLO

SLOPE1%
SL
180+mm

OP
E1
%
170+mm 210+mm 180+mm
RD 50+mm

TYPE 1 110mm SRWP


110mm RWP
RD
50+mm

FAHU-02 EXIT +88.00 FFL


LOBBY
24-005 TELE.
24-004 SL
OP
FACADE CLEANING &
SL
OP +87.93 TOS
EL-05 E1.3
%
SLOPE2.5%

E1 %
MAINTENANCE SYSTEM , SEE NOTE1
SLOPE0.5%

SENTRI TEMPERED LAMINATED


ELEC. CLEAR GLASS BALUSTRADE
24-003 +87.93 TOS
CORRIDOR
ST-02 24-002

210+mm 210+mm 50+mm


110mm RWP
80+mm 200+mm
220+mm SLOPE2.1% RD
200+mm 210+mm 210+mm
240+mm
Ø110 RWP
Ø50RWP
240+mm 240+mm MECH. SHAFT

A6-205
12
+89.70 TOS
ST-01
STAIR
LOBBY
24-001
TYPE 1
SLO
PE1
%

170+mm 170+mm 160+mm 210+mm 12


EXIT A6-201

E1.3%
E1%

P
SLO
SLOP
SL
OP
E1
%

there architrave/structural high


SLO
PE1

+87.93 TOS
FAHU-01
PE1
%

frame with stone cladding


SLO

Not accepted location,


SL

1%
PE
OP

O
SL
E1%

FACADE CLEANING
&

* FOR ROOF FLOOR ENLARGEMENT


refer to atached MAINTENANCE SYSTEM
, SEE NOTE
1

& DETAILS PLEASE REFER TO


DWG.NO. A6-106 comments
120+mm 120+mm SLOPE1%

SL
120+mm

OP
+88.40 +88.40 120+mm 120+mm +88.40

E1
%
75

%
E1.
OP
1% 70+mm SLOPE0.5% 50+mm SL 70+mm SLOPE0.5% 50+mm
PE RD RD 70+mm SLOPE0.5% 50+mm 70+mm SLOPE0.5% 50+mm
S LO RD RD

SLOPE1% SLOPE1%
50+mm 80+mm 50+mm 80+mm 50+mm
110mm SRWP 110mm SRWP SLOPE1% 80+mm
170+mm RD RD RD 200+mm

110mm RWP 110mm RWP 110mm RWP


110mm SRWP

SENTRI TEMPERED LAMINATED SENTRI TEMPERED LAMINATED


CLEAR GLASS BALUSTRADE CLEAR GLASS BALUSTRADE

TYPE 2 TYPE 2
TYPE 2
TYPE 1
10
pergola existing, to
consider the height 11 12 13 Poduim Floor Pla
TYPE 2
toilet full height
8th LevelE

TYPE 2
F

TYPE 2
A
I

Different level.
proposed
BMU
A pedistal
foundation
on 8th J

floor
slab
Connected to concrete TYPE 2
01 02 03 04 05 06 07 08 09 10 11 12 13
K J I H G F E D C B A

+94.40

to ensure that davite +92.55


+92.15 TOS
D-08
A6-403

arm can maneuver/


+91.80 + 91.80 +91.80 +91.80 + 91.50 + 91.50 + 91.50 + 91.50
+91.46 +91.46 +91.40 TOS +91.50 +91.40 TOS

ST02
TYPE 2 SENTRI TEMPERED LAMINATED CLEAR GLASS
BALUSTRADE
D06
A6-403 TYPE 2 SENTRI TEMPERED LAMINATED CLEAR GLASS
BALUSTRADE

602
+87.90 TOS
rotate without hitting
D-06
A6-403 +88.00 FFL +87.90 TOS +88.00 FFL +87.90 TOS
ST01 STAIR LOBBY

+87.90 TOS
+ 89.00 + 89.00

the stone structural


LIVING SPACE + 87.00
ELEVATORS LOBBY TOILET
MASTER BEDROOM BEDROOM
TOILET
LIVING SPACE
SENTRI TEMPERED LAMINATED CLEAR GLASS
+86.25FFL +86.25FFL BALUSTRADE TOILET LIVING SPACE GUEST LIVING SPACE
GUEST
LIVING SPACE MASTER BEDROOM GUEST TOILET LIVING SPACE LIVING SPACE ST01 STAIR LOBBY TOILET
+85.50 TOILET

+84.43 TOS
frame TOILET
+84.50 FFL +84.40 TOS
ST02
+84.50 FFL

ELEVATORS LOBBY
+84.40 TOS +84.43 TOS
+84.50 FFL

MASTER BEDROOM
84.40+TOS

TOILET
LIVING SPACE
+84.40 TOS + 84.50 FFL

BEDROOM
+ 83.50
+ 84.50

LIVING SPACE
+82.75FFL +82.75FFL TOILET LIVING SPACE GUEST LIVING SPACE
LIVING SPACE MASTER BEDROOM GUEST TOILET LIVING SPACE LIVING SPACE STAIR LOBBY GUEST
TOILET
+82.00 TOILET

+81.00 FFL 80.90+TOS +80.90 TOS + 81.00 FFL + 81.00


+80.93 TOS +81.00 FFL +80.90 TOS +81.00 FFL +80.90 TOS +80.93 TOS
5

RESTRAINT SOCKET LIVING SPACE

+77.43 TOS
MASTER BEDROOM
TOILET

GUEST TOILET

+77.50 FFL
LIVING SPACE

+77.40 TOS
+79.25FFL

ST02
ELEVATORS LOBBY

+77.50 FFL +77.40 TOS


LIVING SPACE
+79.25FFL
ST01 STAIR LOBBY

+77.43 TOS
A6-203

+78.50
MASTER BEDROOM

+77.50 FFL
TOILET LIVING SPACE

77.40+TOS
TOILET

GUEST
TOILET
LIVING SPACE

+77.40 TOS
LIVING SPACE
GUEST
TOILET
LIVING SPACE

+77.50 FFL
BEDROOM
+ 80.00

+ 77.50
RESTRAINT SOCKET
LIVING SPACE + 76.50
ELEVATORS LOBBY TOILET
TOILET MASTER BEDROOM BEDROOM
LIVING SPACE
+75.75FFL +75.75FFL
TOILET LIVING SPACE GUEST LIVING SPACE
LIVING SPACE MASTER BEDROOM GUEST TOILET LIVING SPACE LIVING SPACE STAIR LOBBY GUEST
TOILET

21st Level (+77.50)


+75.00 TOILET

+74.00 FFL 73.90+TOS +73.90 TOS +74.00 FFL + 74.00


+73.93 TOS +74.00 FFL +73.90 TOS +74.00 FFL +73.90 TOS +73.93 TOS

LIVING SPACE + 73.00


TOILET ELEVATORS LOBBY MASTER BEDROOM TOILET
BEDROOM
LIVING SPACE
+72.25FFL +72.25FFL
TOILET LIVING SPACE GUEST LIVING SPACE
LIVING SPACE MASTER BEDROOM GUEST TOILET LIVING SPACE LIVING SPACE ST01 STAIR LOBBY GUEST
TOILET
+71.50 TOILET

ST02
+70.50 FFL +70.50 FFL +70.50 FFL 70.40+TOS +70.40 TOS +70.50 FFL + 70.50
+70.43 TOS +70.40 TOS +70.40 TOS +70.43 TOS

LIVING SPACE + 69.50


ELEVATORS LOBBY TOILET
TOILET MASTER BEDROOM BEDROOM
LIVING SPACE
+68.75FFL +68.75FFL
LIVING SPACE AOR96m2 D-03 D-03 LIVING SPACE STAIR LOBBY TOILET AOR96m2
GUEST
GUEST
TOILET
LIVING SPACE
+68.00 TOILET
A6-403 A6-403
+67.00 FFL +67.00 FFL +67.00 FFL 66.90+TOS +66.90 TOS +67.00 FFL + 67.00
+66.93 TOS +66.90 TOS +66.90 TOS +66.93 TOS

LIVING SPACE + 66.00


TOILET ELEVATORS LOBBY TOILET
MASTER BEDROOM BEDROOM
LIVING SPACE
+65.25FFL +65.25FFL
LIVING SPACE MASTER BEDROOM GUEST TOILET LIVING SPACE LIVING SPACE ST01 STAIR LOBBY TOILET LIVING SPACE GUEST LIVING SPACE
GUEST
TOILET
+64.50 TOILET

ST02
+63.43 TOS +63.50 FFL +63.40 TOS +63.50 FFL +63.40 TOS +63.43 TOS +63.50 FFL 63.40+TOS +63.40 TOS +63.50 FFL + 63.50

RESTRAINT SOCKET RESTRAINT SOCKET


ELEVATORS LOBBY LIVING SPACE + 62.50
TOILET TOILET
MASTER BEDROOM BEDROOM
SENTRI TEMPERED LAMINATED CLEAR GLASS
+61.75FFL +61.75FFL LIVING SPACE
BALUSTRADE
LIVING SPACE MASTER BEDROOM GUEST TOILET LIVING SPACE LIVING SPACE STAIR LOBBY TOILET LIVING SPACE GUEST LIVING SPACE
+61.00
D03 GUEST
TOILET
TOILET

A6-403
+59.93 TOS +60.00 FFL +59.90 TOS +60.00 FFL +59.90 TOS +59.93 TOS +60.00 FFL 59.90+TOS +59.90 TOS +60.00 FFL + 60.00

TOILET ELEVATORS LOBBY LIVING SPACE + 59.00


TOILET
MASTER BEDROOM BEDROOM
+58.25FFL +58.25FFL LIVING SPACE
LIVING SPACE MASTER BEDROOM GUEST TOILET LIVING SPACE LIVING SPACE ST01 STAIR LOBBY TOILET LIVING SPACE GUEST LIVING SPACE
4 GUEST

15th Level (+60.00)


TOILET
+57.50 TOILET

ST02
A6-203
+56.43 TOS +56.50 FFL +56.40 TOS +56.50 FFL +56.40 TOS +56.43 TOS +56.50 FFL +56.50 FFL + 56.50
56.40+TOS +56.40 TOS

ELEVATORS LOBBY LIVING SPACE + 55.50


TOILET TOILET
MASTER BEDROOM BEDROOM
+54.75FFL +54.75FFL LIVING SPACE
LIVING SPACE MASTER BEDROOM GUEST TOILET LIVING SPACE LIVING SPACE STAIR LOBBY TOILET LIVING SPACE GUEST LIVING SPACE
D-03 +54.00
GUEST
TOILET
TOILET D03
A6-403
A6-403
+52.93 TOS +53.00 FFL +52.90 TOS +53.00 FFL +52.90 TOS +52.93 TOS +53.00 FFL +53.00 FFL + 53.00
52.90+TOS +52.90 TOS

TOILET ELEVATORS LOBBY LIVING SPACE + 52.00


TOILET
MASTER BEDROOM BEDROOM
+51.25FFL +51.25FFL LIVING SPACE
LIVING SPACE MASTER BEDROOM GUEST TOILET LIVING SPACE LIVING SPACE ST01 STAIR LOBBY
TOILET LIVING SPACE GUEST LIVING SPACE
GUEST
TOILET
+50.50 TOILET
ST02
+49.43 TOS +49.50 FFL +49.40 TOS +49.50 FFL +49.40 TOS +49.43 TOS +49.50 FFL +49.50 FFL
49.40+TOS +49.40 TOS + 49.50

TOILET TOILET
+ 48.50

+47.75FFL +47.75FFL
AOR96m2 LIVING SPACE STAIR LOBBY
AOR96m2
GUEST
+47.00 TOILET

+45.93 TOS +46.00 FFL +45.90 TOS +46.00 FFL +45.90 TOS +45.93 TOS +46.00 FFL 45.90+TOS +45.90 TOS +46.00 FFL + 46.00

TOILET ELEVATORS LOBBY LIVING SPACE + 45.00


MASTER BEDROOM TOILET
BEDROOM
+44.25FFL +44.25FFL D08 LIVING SPACE
LIVING SPACE MASTER BEDROOM GUEST TOILET LIVING SPACE LIVING SPACE ST01 STAIR LOBBY
A3-300 TOILET LIVING SPACE
GUEST
GUEST LIVING SPACE
TOILET
+43.50 TOILET
ST02
+42.43 TOS +42.50 FFL +42.40 TOS +42.50 FFL +42.40 TOS +42.43 TOS
+42.50 FFL +42.40 TOS +42.40 TOS +42.50 FFL + 42.50

RESTRAINT SOCKET LIVING SPACE

+38.93 TOS
MASTER BEDROOM
TOILET

GUEST TOILET

+39.00 FFL
LIVING SPACE

D-03

+38.90 TOS
A6-403
+40.75FFL
ELEVATORS LOBBY

+39.00 FFL +38.90 TOS


LIVING SPACE
+40.75FFL
STAIR LOBBY

+38.93 TOS
SENTRI TEMPERED LAMINATED CLEAR GLASS
BALUSTRADE

+40.00
MASTER BEDROOM

+39.00 FFL
TOILET LIVING SPACE

+37.90 TOS
TOILET

GUEST
TOILET
LIVING SPACE

LIVING SPACE
GUEST
TOILET
LIVING SPACE

+39.00 FFL
BEDROOM
+ 41.50

+ 39.00
RESTRAINT SOCKET
TOILET ELEVATORS LOBBY
MASTER BEDROOM
TOILET
LIVING SPACE
BEDROOM
A3-101b
+37.25FFL +37.25FFL
LIVING SPACE
LIVING SPACE MASTER BEDROOM GUEST TOILET LIVING SPACE LIVING SPACE ST01 STAIR LOBBY

10th Level (+39.00)


+36.50 A3-101a TOILET LIVING SPACE
GUEST
GUEST
TOILET
LIVING SPACE
+36.50 TOILET
ST02
+35.43 TOS +35.50 FFL +35.40 TOS +35.50 FFL +35.50 FFL+35.40 TOS +35.50 FFL +35.40 TOS +35.43 TOS SENTRI TEMPERED LAMINATED CLEAR
+35.50 +35.50
GLASS BALUSTRADE +35.50 FFL +35.40 TOS +35.40 TOS +35.50 FFL

TOILET ELEVATORS
LOBBY D05 LIVING SPACE LIVING SPACE +34.50
TOILET
GUEST KIDS SWIMMING POOL MASTER BEDROOM BEDROOM
+33.75FFL +33.75FFL A6-403
TOILET +33.50 TOS +33.50
LIVING SPACE MASTER BEDROOM LIVING SPACE
D03 LIVING SPACE STAIR LOBBY TOILET LIVING SPACE GUEST LIVING SPACE
3160

GUEST
TOILET TOILET
A6-403 +32.70 TOS
SWIMMING POOL
+33.00
S +32.20 TOS
+31.90 TOS +32.00 FFL +31.90 TOS +32.00 FFL+31.90 TOS +32.00 FFL +31.90 TOS +31.97 FFL
+32.00 FFL +31.90 TOS +31.90 TOS +32.00 FFL +32.00 FFL +32.00
340

ELEVATORS LIVING SPACE +31.00


TOILET TOILET
LOBBY LIVING SPACE LIVING SPACE +31.00
MAID TOILET
+30.25FFL +30.25FFL MASTER BEDROOM BEDROOM
ST01 LIVING SPACE
LIVING SPACE MASTER BEDROOM GUEST LIVING SPACE LIVING SPACE STAIR LOBBY GUEST

Restrain
TOILET TOILET TOILET LIVING SPACE GUEST LIVING SPACE
GUEST
TOILET
+29.50 TOILET
ST02
+28.50 FFL +28.40 TOS +28.50 FFL+28.40 TOS +28.50 FFL +28.40 TOS +28.50 FFL +28.40 TOS +28.50
+28.50 FFL +28.40 TOS +28.40 TOS +28.50 FFL +28.50 FFL +28.50
340

LIVING SPACE +27.50


TOILET ELEVATORS TOILET
LOBBY LIVING SPACE LIVING SPACE +27.50
MAID TOILET
AOR96m2 +26.75FFL +26.75FFL MASTER BEDROOM BEDROOM
LIVING SPACE LIVING SPACE STAIR LOBBY GUEST
TOILET
LIVING SPACE
D06
TOILET AOR96m2 GUEST LIVING SPACE
A6-412 GUEST
+26.00 D03 TOILET
TOILET

+25.00 FFL +24.90 TOS +25.00 FFL+24.90 TOS +25.00 FFL +24.90 TOS +25.00 FFL +24.90 TOS +25.00 A6-403
+25.00 FFL +25.00 FFL +25.00 FFL +25.00
340

+24.90 TOS +24.90 TOS

ELEVATORS LIVING SPACE +24.00


TOILET TOILET
LOBBY LIVING SPACE LIVING SPACE +24.00
MAID TOILET
+23.25FFL +23.25FFL MASTER BEDROOM BEDROOM
LIVING SPACE
LIVING SPACE MASTER BEDROOM GUEST LIVING SPACE LIVING SPACE STAIR LOBBY GUEST
TOILET TOILET
TOILET LIVING SPACE GUEST LIVING SPACE
GUEST
TOILET
ST02 +22.50 TOILET

+21.50 FFL +21.40 TOS +21.50 FFL+21.40 TOS +21.50 FFL +21.40 TOS +21.50 FFL +21.40 TOS +21.50
+21.50 FFL +21.50 FFL +21.50 FFL +21.50
340

+21.40 TOS +21.40 TOS


TOILET ELEVATORS LIVING SPACE +20.50
LOBBY TOILET
MAID LIVING SPACE LIVING SPACE LIVING SPACE +20.50
TOILET
+19.75FFL +19.75FFL MASTER BEDROOM BEDROOM
LIVING SPACE MASTER BEDROOM GUEST LIVING SPACE LIVING SPACE STAIR LOBBY GUEST D03

System
TOILET TOILET
A6-403 D03 TOILET LIVING SPACE
GUEST
GUEST
TOILET
LIVING SPACE
+19.00 TOILET
A6-403
+18.00 FFL +17.90 TOS +18.00 FFL+17.90 TOS +18.00 FFL +17.90 TOS +18.00 FFL +17.90 TOS +18.00
+18.00 FFL +18.00 FFL +18.00 FFL +18.00
340

+17.90 TOS +17.90 TOS


TOILET LIVING SPACE +17.00
ELEVATORS TOILET
LIVING SPACE LOBBY MAID LIVING SPACE LIVING SPACE +17.00
+16.25FFL +16.25FFL TOILET
LIVING SPACE MASTER BEDROOM GUEST LIVING SPACE STAIR LOBBY GUEST
LIVING SPACE D08 MASTER BEDROOM BEDROOM

TOILET D03 TOILET


A3-300 TOILET LIVING SPACE GUEST LIVING SPACE
GUEST
A6-403 +15.50 TOILET
TOILET
ST02
+14.50 FFL +14.40 TOS +14.50 FFL+14.40 TOS +14.50 FFL +14.40 TOS +14.50 FFL +14.40 TOS +14.50
340

+14.50 FFL +14.50 FFL +14.50 FFL +14.50


LIVING SPACE +13.50
D01 +14.40 TOS +14.40 TOS
TOILET ELEVATORS TOILET
LOBBY MAID A6-411 LIVING SPACE LIVING SPACE +13.50
+12.75FFL +12.75FFL TOILET
LIVING SPACE MASTER BEDROOM BEDROOM
LIVING SPACE MASTER BEDROOM GUEST LIVING SPACE LIVING SPACE GUEST
TOILET TOILET
TOILET LIVING SPACE GUEST LIVING SPACE
GUEST
TOILET
+12.00 TOILET
+11.00 FFL +10.90 TOS +11.00 FFL+10.90 TOS +11.00 FFL +10.90 TOS +11.00 FFL +10.90 TOS +11.00

D06
340

+10.93 TOS +11.00 FFL +10.90 TOS +10.90 TOS +11.00 FFL +11.00 FFL +11.00
TOILET ELEVATORS LIVING SPACE +10.00
A6-400 TOILET
LOBBY MAID
LIVING SPACE LIVING SPACE +10.00
+9.25FFL +9.25FFL ST01 TOILET
D06 MASTER BEDROOM BEDROOM

Section
LIVING SPACE GUEST LIVING SPACE STAIR LOBBY GUEST LIVING SPACE
TOILET TOILET
MASTER BEDROOM A6-412 TOILET LIVING SPACE GUEST LIVING SPACE
GUEST TOILET
+8.50 TOILET
ST02
+7.50 FFL +7.40 TOS +7.50 FFL +7.40 TOS +7.50 FFL +7.40 TOS +7.50 FFL +7.40 TOS +7.50
340

+7.43 TOS +7.50 FFL +7.40 TOS +7.40 TOS +7.50 FFL +7.50 FFL +7.50
+6.50

+5.78FFL +5.78FFL
+6.00 D03
3493

A6-403
+4.06 FFL
+4.50
FEMALE W
.C
6700

ELEVATORS MAIN ENTRANCE


LOBBY
MALE W
.C FEMALE RESTROOM +3.50 LAY DOWN STAFF FACILITIES
ST01 AREA
+2.33FFL +2.33FFL
STAIR LOBBY RETAIL SHOP D05 D02
ST03 A6-403 A6-403 RETAIL SHOP PROPRETY GYM& GYM FACILITIES
+1.11 MANAGEMENT
ST02 OFFICE
+0.61 FFL +0.61 FFL +0.61 FFL +0.61 FFL
Eastern Road Sidewalk +0.46 TOS +0.46 TOS +0.46 TOS +0.59 FFL

+0.03
-0.34
+0.58 FFL +0.61 FFL D02
-0.85 FFL -0.85 FFL A6-403

D05 -1.02 FFL


-1.78
A6-402
-2.31 FFL
REFUSE
-3.00 FFL GAS METER ROOM
RAMP
ELEVATORS
LOBBY
AREA
D02 D08 D07 D02
-3.78 FFL -3.78 FFL A6-402 A6-402
CAR PARKING
33 JAN STAIR LOBBY A6-402 TRANSFORMERS A6-402
CARS
CAR PARKING
33 MDF STORE GENERATOR FAN ROOM
CARS
-5.24 FFL -5.24 FFL -5.24 FFL
-5.39 FFL -5.44 TOS -5.44 TOS -5.44 TOS -5.39 FFL
ST02

-5.44 TOS -5.39 FFL -5.44 TOS -5.39 FFL -5.44 TOS
ST03
-6.43 FFL ELEVATORS
-6.94 FFL LOBBY -6.94 FFL ST01
CAR PARKING
62 MALE W
.C WELFARE FACILITIES STAIR LOBBY
CAR
CAR PARKING
62 FAN ROOM
CAR
-8.64 FFL -8.64 FFL -8.64 FFL
-8.79 FFL -8.84 TOS -8.79 FFL -8.84 TOS -8.84 TOS -8.84 TOS -8.79 FFL

-8.64 FFL
-8.84 TOS -8.79 FFL -8.84 TOS -8.79 FFL -8.84 TOS
-9.83 FFL
ELEVATORS
CURRENT D02 -10.34FFL LOBBY -10.34FFL
LEVEL CAR PARKING
60 A6-402 JAN STORE STAIR LOBBY
ACCORDING CAR
D02
TO SITE A6-402
CAR PARKING
60 FAN ROOM
CAR
SURVEY -12.19 FFL -12.24 TOS
-12.04 FFL
-12.19 FFL -12.24 TOS
-12.04 FFL
-12.24 TOS
-12.04FFL
-12.24 TOS -12.19 FFL
ST02
-12.04 FFL
-12.24 TOS -12.19 FFL -12.24 TOS -12.19 FFL -12.24 TOS
-13.23 FFL
ELEVATORS
ST03 -13.74FFL LOBBY -13.74FFL ST01
CAR PARKING
62 D02 D03 JAN STORE STAIR LOBBY
D02
CAR
A6-402 A6-402 A6-402 D03 D02 CAR PARKING
62 FAN ROOM
-15.44 FFL -15.44 FFL -15.44FFL A6-402 A6-402 CAR
-15.59 FFL -15.64 TOS -15.59 FFL -15.64 TOS -15.64 TOS -15.64 TOS -15.59 FFL

-15.44 FFL
-15.64 TOS -15.59 FFL -15.64 TOS -15.59 FFL -15.64 TOS
-16.63 FFL ELEVATORS
-17.14FFL LOBBY -17.14FFL
CAR PARKING
62 JAN STORE STAIR LOBBY
CAR

CAR PARKING
62 FAN ROOM
-18.84 FFL -18.84FFL CAR
-18.99 FFL -19.04 TOS -18.99 FFL -19.04 TOS ST02 -19.04 TOS -19.04 TOS -18.99 FFL

-18.84 FFL
-20.03 FFL -19.04 TOS -18.99 FFL -19.04 TOS -18.99 FFL -19.04 TOS
ELEVATORS
ST03 LOBBY
D01 -20.54FFL -20.54FFL ST01
D01
CAR PARKING
64 JAN STORE STAIR LOBBY GRAY WATER TANK ROOM
CAR A6-402 A6-402 D01
CAR PARKING
64 FAN ROOM
-22.24 FFL -22.24 FFL
A6-402 CAR
-22.39 FFL -22.44 TOS -22.39 FFL -22.44 TOS -22.44 TOS -22.44 TOS -22.39 FFL

-22.24 FFL
-22.44 TOS -22.39 FFL -22.44 TOS -22.39 FFL -22.44 TOS
Restrain
System
+87.85 TOS
Plan

not clear for what

+91.35 TOS +91.35 TOS

+87.85 TOS

A3-101 B A2-100 01
AST 20 LOW RISE DAVIT

240
380

PARKING
2200

650

1750

1750
2200

300
170 300
1750

NOTE: THE AST20 IS LIGHT WEIGHT (20KG) IT IS


HANDLED MANUALLY FOR SHIFTING AND PARKING
Top Limit Switches

BLOCK STOP

HOIST SYSTEM
Magnetic Brake AST 10
Cradle

1830
1000
Wheel

BOX for CLEANING MATERIALS CABLE BOX


800

WIRE ROPE REELERS

2000

2600
2500

840

High Rise Davit

4596
3465

AST 25
400

600 600

3250

560

WIRE ROPE FEATURES


5 X 19 W ( GALVANIZED ) CRADLE
Ø 8,3 mm
STEP 1 STEP 2 STEP 3

3647

MANUAL TRIFOR
500 KG CAPACITY

1977
PERSPECTIVE VIEW

NOTE: Anchorages are mounteduponconcretepedestals.


After Davit plates are fixed upon the anchoragesand
fastened by bolts and washers.
AST 25
PEDESTAL
DETAIL