Maras Project
. Construction Package BPa 154
Forward North Coast - amt
Ret BP¥ISs/ FC: TIME/ 171
21/8 Tamer international Wide ast (TPE)
(Project Manager)
Subjec: PKG#154 — $1 Building — installation of tomy
Dear sir,
ith Reference fo allached e-mail and coordination meeting held at 10h of June 2021
‘would ke fo daw your kind attention that requested insulation ond comecting of
‘temepory facade lighting at a / m buliding wil considered as addtione work and Variation
carder will be submitted including the cost ofthe whole process af suppiyng and instaling
temporary power circulls and instaling the lighting fixtures
For your kind infromation’s ond Record
Cem PROVE ERA NOSE
acne:
oY Related malssaadawi@ forward-cr.com
Frome shmedabdalah@onwarcrcom
Sent ‘Sunday te 20,1057 2021 AM
To aad @onwar-rcom
Subject Fur 6.238-2 Toad iting atures instalation tes
Attachments: RAWdat
From: Mahmoud, Mahmoud tSsid- (MME)
Sent: Saturday, ne 19, 2023 1005 at
‘Torahmed.abalahetorwar-rcom
er alimaky engl com; ame monamedeforuar-zcom; mahmoud masougha@forwaré
‘Subject: RE: 0.255-2fogade iphtingFatures installation steps
‘ee Arad
eae proceedin te 5 Agreed
Regards
Manenoud Etats
ecres Manager
‘Tumor Construction Intemational LC
‘sznz22.99220
120222609228
20.128 102489
.mamatmoud@iec.con
aw mesconseion sorfetetonal
Orga mesage
From: aed abesiah@torwad.ccom
Date 6/17/21 3:11 PM (GMT 02:00)
‘To:"Mahmaud, Mahmoud eid (MME)
(e almaly.eog@emal com, ancimahamedatorwsed-
‘Stnjet:8.25-8-28 fade ping fatures installation stopsEXTERNAL EMAIL — Please Handle Gautously
Greetings Eng. Mahmoud,
‘sper your nstractins, so for your appv
facade iting ftares 3¢ 823 an 824
1. FORWARD Receive the recited ht
kindly anf the folowing step to proceed the installation of
ng nurs os inate in th able Blow rom TS company warchouses
a Deseiton
A Interior Lighting Fixture Typ.
at Owe
Install temporary power source to power the mentioned gti ire [ining co
‘anel boards an necessary ecessois)
Insta the anti fates
EMAAR delve al fad hing iturs to FORWARD warehouses,
FORWARD Return the same lighting fates quantities rece fom ATS.
FORWARD it strat Variation order incuding the cor the le process of supplying aninstaling
‘temporary power cats an instaling the lighting iaree
us, ebles, wires,
ere
‘Ahmed Abdali
‘Sonor leet! Enginger
‘Mob. #201000 99 1827
e/a forwardtcom