Download as pdf
Download as pdf
You are on page 1of 3
Maras Project . Construction Package BPa 154 Forward North Coast - amt Ret BP¥ISs/ FC: TIME/ 171 21/8 Tamer international Wide ast (TPE) (Project Manager) Subjec: PKG#154 — $1 Building — installation of tomy Dear sir, ith Reference fo allached e-mail and coordination meeting held at 10h of June 2021 ‘would ke fo daw your kind attention that requested insulation ond comecting of ‘temepory facade lighting at a / m buliding wil considered as addtione work and Variation carder will be submitted including the cost ofthe whole process af suppiyng and instaling temporary power circulls and instaling the lighting fixtures For your kind infromation’s ond Record Cem PROVE ERA NOSE acne: oY Related mals saadawi@ forward-cr.com Frome shmedabdalah@onwarcrcom Sent ‘Sunday te 20,1057 2021 AM To aad @onwar-rcom Subject Fur 6.238-2 Toad iting atures instalation tes Attachments: RAWdat From: Mahmoud, Mahmoud tSsid- (MME) Sent: Saturday, ne 19, 2023 1005 at ‘Torahmed.abalahetorwar-rcom er alimaky engl com; ame monamedeforuar-zcom; mahmoud masougha@forwaré ‘Subject: RE: 0.255-2fogade iphtingFatures installation steps ‘ee Arad eae proceedin te 5 Agreed Regards Manenoud Etats ecres Manager ‘Tumor Construction Intemational LC ‘sznz22.99220 120222609228 20.128 102489 .mamatmoud@iec.con aw mesconseion sorfetetonal Orga mesage From: aed abesiah@torwad.ccom Date 6/17/21 3:11 PM (GMT 02:00) ‘To:"Mahmaud, Mahmoud eid (MME) (e almaly.eog@emal com, ancimahamedatorwsed- ‘Stnjet:8.25-8-28 fade ping fatures installation stops EXTERNAL EMAIL — Please Handle Gautously Greetings Eng. Mahmoud, ‘sper your nstractins, so for your appv facade iting ftares 3¢ 823 an 824 1. FORWARD Receive the recited ht kindly anf the folowing step to proceed the installation of ng nurs os inate in th able Blow rom TS company warchouses a Deseiton A Interior Lighting Fixture Typ. at Owe Install temporary power source to power the mentioned gti ire [ining co ‘anel boards an necessary ecessois) Insta the anti fates EMAAR delve al fad hing iturs to FORWARD warehouses, FORWARD Return the same lighting fates quantities rece fom ATS. FORWARD it strat Variation order incuding the cor the le process of supplying aninstaling ‘temporary power cats an instaling the lighting iaree us, ebles, wires, ere ‘Ahmed Abdali ‘Sonor leet! Enginger ‘Mob. #201000 99 1827 e/a forwardtcom

You might also like