Stop Hrs. Stop Hrs.

100 Concern
Date Stop time Start time frq.
60 scale scale Dept.
01.03.2021 2.25am
28.03.2021 7.50am 8.05am MECh
28.03.2021 17.00pm 17.15pm MECH
02.04.2021 3.15 pm 4:20 PM Electrical
08.04.2021 9:10am 9:20am instu.
22.04.2021 1.00 am Process
01.06.2021 7.30 am
3.06.2021 3.40 am 4.40 am instt.
2.50 pm 4.40 pm Electrical
04.06.2021
5.35 pm 7.10 pm instt.
27.06.2021 9.00am 9.35am
30.06.2021 3.15 am 3.45 am

4.10pm 4.30pm
05.07.2021 5.05pm 6.20pm
6.35pm 9.45pm
06.07.21 17.15pm 20.20pm
09.07.2021 3.00 pm 3.50 pm
12.07.2021 3.50 am 4.20 am

14.07.2021 10.00am 2.50pm


15.07.2021 3.30 pm 5.30 pm
25.07.2021 6am 9:45am
28.07.2021 10.00am 10.15am
29.07.2021 3.35am 3.55am

03.08.2021 10.40pm
04.08.2021 2.40am
28.08.2021 8.15 pm
Stoppage Description
Started
FK Pump chnge over
FK Pump chnge over
Electric supply failure due to cable cut
kiln main drive tripped with barring alarm
General maintainence

I/O supply failure


Power supply failure due to cable damage
I/O Communication failure, 20 min delay due to instt problem in BH fan
kiln discharge chute jammed,by coating pieces.
kiln discharge chute jammed,by coating pieces.

fk pump change over


airslid jammed material leakage
cyclone jammed
dbc discharge chute jammed
W08 and controlled air compressor breaker tripped
First tyre bearing B1 temp sudden rise and kiln tripped

Mechanical maintenance
kiln 1 tyre roller bearing tremp high due to water pipeline Was broken by jcb
kiln main drive overload tripped ( cable earthed)
F.K. pump change over A20 to A21
F.K. pump change over A21 to A20

GCT drag chain motion alarm, chain stucked in wet material

kiln stopped due to general maintenance


Stop Hrs. Stop Hrs. 100 Concern
Date Stop time Start time frq.
60 scale scale Dept.
02.03.2021 7.00am
07.03.2021 5:00am
02.04.2021 3.15 pm 4:20 PM Electrical
06.04.2021 8.10 AM 3.40pm
08.04.2021 8:05am 8:30am instu.
23.04.2021 10.15 PM
27.04.2021 2.00 pm 3.45 pm ELE.DEP.
28.05.2021 1.24 pm 2.16 pm
2.50 pm 4.30 pm
04.06.2021
5.35 pm 6.50 pm
05.06.2021 6.55am 7.05am
8.06.2021 10.41 am 10.51 am

04.07.2021 3.30PM 3.50PM


06.07.21 17.15pm 20.15pm
09.07.2021 3.10 pm 3.40 pm
11.07.2021 11.35 pm
12.07.2021 12.05 am
3.35am 5.15am
23.07.21
24.07.2021 2.30pm
27.07.2021 12.05 pm

28.07.2021 7.50pm 8.05pm


30.07.21 5.05PM 5.20PM
04.08.2021 7:10pm 7:55pm
Stoppage Description
general maintenance
kiln taken on main motor
Electric supply failure due to cable cut
Kiln Stopped due to Bag house DP
kiln main drive tripped with barring alarm
general maintenance
power failure
fk pump compressure tripping
Power supply failure due to cable damage
I/O Communication failure
fk pump change over
fk pump change over

Kiln fk pump change over A21 to A20


dbc u2j01 discharge chute jammed
Controlled air compressor breaker tripped

Kiln feed weighfeeder scrapper change work and tare done

Kiln feed weighfeeder scrapper change work and tare done

kiln taken at main motor

F.k. pump change over A21 to A20 due material leakage from airslide
W2A20 F.K. PUMP LOAD GOT LOW.
FK compressors water pressure got low, delayed due to insufficient purge
air pressure
Stop Hrs. Stop Hrs. 100 Concern
Date Stop time Start time frq.
60 scale scale Dept.
07.03.21 12.00 pm Process
08.03.2021 10.20am

5.35 PM 9.50 PM instrument


09.03.2021
10.03.2021 12.10pm 1.10pm ele.
13.03.2021 5.00pm 5.20pm instrument

17.03.2021 11.35 PM
instrument
18.03.2021 12.20 AM
20.03.2021 04:15am 12.45 PM 8 8.50

3.15 PM 7.45 PM
02.04.2021

8.20 PM 9.50pm

06.04.2021 6.40am
10.04.2021 7.20am
10.45AM 11.20AM
12.04.2021
13.04.21 5:00 PM 5:30 PM
23.04.2021 11.20AM 11.40AM
27.04.2021 2.00 pm 3.25 pm ELE.DEP.
28.04.2021 2.45am 7.10 am ELE.DEP.
2.05.2021 5.20 AM 7.25am
6.05.2021 6.10 am
5.30 am
09.05.21
2.35 PM 3.35 PM
10.05.2021 11.10 AM 12.30 pm
12.05.21 4.30 am
Stoppage Description
kiln 4 th cyclone draught zero [ jam ]
started

kiln main drive overload alarm (RPM SIGNAL CABLE CUT)

due to U0J03 DBC Tripped overload.


False Alarm kiln barring drive -2 Engaged (instru.probelm)

False alarm Generate of both down position of Kiln

kiln string 4th cyclone got jam by big coating pieces


Electrical supply failure due to cable cut near RM-4, delay
due to instrument work on P22 fan power point (Not
healthy)

CF Silo MT-1 Elevator Derailed

gen. maintinance

kiln feed solid flow meter tripped due to someone apply


local stop at - L.P.B.
KILN 3 STOPPAGE WITH OVERLOAD ALARM
BOTH SG FAN AND MAIN DRIVE OVERLOAD
power failure
MAIN WATER TANK CABEL BURN
power failure
red spot, emergency maintainence
Kiln started
Overload,power fluctuation,grate tripped due to overload
Bag house fan 3 tripped due to MCC return fault

KILN HOOK UP WORK


Stop Hrs. Stop Hrs. 100 Concern
Date Stop time Start time frq.
60 scale scale Dept.
07.03.21 12.00 pm Process
08.03.2021 1050am
09.03.2021 5.35 PM 9.55 PM instrument
10.03.2021 12.10pm 01.20pm ele.
13.03.2021 3.45pm 9.25pm 5 5.67 Process
17.03.2021 11.35 PM
instrument
18.03.2021 12.35 AM
20.03.2021 04.15am 01.00 PM 8 8.75

3.15 PM 10.20pm
02.04.2021
06.04.2021 5.25am
10.04.2021 8.30am

10.45AM 11.30AM
12.04.2021
13.04.21 5.00 PM 5.35 PM
23.04.2021 11.20AM 11.50AM
27.04.2021 2.00 pm 3.45 pm ELE.DEP.
28.04.2021 2.45am 7.40 am ELE.DEP.
29.04.2021 1.10pm 1.40pm instu.
2.05.2021 5.20 AM 7.40am
6.05.2021 5.10 am
6.15 am
09.05.21
2.35 PM 3.35 PM
10.05.2021 11.10 AM 12.40 pm
12.05.21 2.05 AM
Stoppage Description
kiln stoppage
started
kiln stoppage
due to U0J03 DBC Tripped overload.
pc 5th cyclone checking work

Stopped due to Kiln Stoppage

kiln string 4th cyclone got jam by big coating pieces


Electrical supply failure due to cable cut near RM-4, delay
due to instrument work on P22 fan power point (Not
healthy)
gen. maintinance

kiln feed solid flow meter tripped due to someone apply


local stop at - L.P.B.
KILN tripped with overload alarm
BOTH SG FAN AND MAIN DRIVE OVERLOAD
power failure
MAIN WATER TANK CABEL BURN
ROTTER PROTECT FAULT IN PC FISTER
power failure
kiln stopped
Pc started
Kiln stopped
Bag house fan 3 tripped due to MCC return fault
KILN HOOK UP WORK
Stop Hrs. Stop Hrs. 100 Concern
Date Stop time Start time frq.
60 scale scale Dept.
27.03.2021 8.20pm 9.45pm PROCESS
28.03.21 8.15am 9.15am PROCESS
28.03.21 6.00pm 7.30pm PROCESS
29.03.2021 16.45pm 18.45pm PROCESS
30.03.2021 6.45pm 8.00pm PROCESS
31.03.2021 7.50pm 8.30pm. mech
31.03.2021 11.00pm 12:00am mech
01.04.2021 12.45am 1.30am. mech
01.04.2021 1.40 PM 1.55 PM Mech
02.04.2021 3.15 PM 4:45 PM Electrical
04.04.021 8.2pm 9.20pm
05.04.2021 10:10pm 11:10pm
06.04.2021 5.20pm 6.20pm
07.04.2021 6:15pm 7pm
10.04.2021 6:15pm 6:45pm
14.04.2021 9.25 Am 9.55 Am Process
23.55pm 12.25am
16.04.2021
8.10pm 10.40pm
21.04.2021 5:30 PM PROCESS
30.05.2021 7 .00 pm
01.06.2021 07:00am
03.06.2021
04.06.2021 2.50 pm
6.06.2021 10:00 PM 10.20 pm
07.06.2021 9.30 am Mech
09.06.2021 3.00 pm
12.40pm 1.20pm
15.06.2021 3.20 pm 4.20 pm
16.06.2021 5.20 pm 6.00pm Instt
19.06.2021 12.40 am 1.10 am
20.06.2021 8am 8.30am
30.06.2021 3.00 am 3.45 am
01.07.2021 5.40 pm 6.30 pm
03.07.2021 4.00 pm 5.00 pm
05.07.2021 5.15 PM 10.30 pm
06.07.21 18.00pm 21.20pm
07.07.2021 4.30pm 5.30pm
08.07.2021 7.30 am 8.30 am
09.07.2021 2.45 pm 4.45 pm
11.07.2021 9.00pm 9.35pm
12.07.2021 4.20 am 7.15 am
13.07.21 1.30 pm 2.30pm
9.30am 3.00pm
14.07.2021
10.35pm 10.50pm
15.07.2021 3.45 pm 6.30 pm
7;25am 8:35am
16.07.2021 9:20 AM 9:40 AM
6.20 pm 7.00 pm
12.10am 12.50am
4.20am 4.50am
17.07.2021
8.05am 8.30am
3.15 pm 4.15 pm
19.07.2021 5.00 am 6.05am
20.07.21 10.45 am 11.20am
3.45pm 4.45pm
25.08.2021 8.20pm 8.40pm

31.07.2021 5.25pm 5.45pm


3.08.2021 11.25pm 3.10pm
04.08.2021 2.05am 2.25am
10.08/2021 9:15am 11.00PM
13.08.2021 4:35pm 7:15pm
17.08.2021 5pm 5:30pm
18.08.2021 10am 10:20am
19.08.2021 6:35pm 7:05pm
27.08.2021 9.00 AM
27.08.2021 2.00 pm 2:20pm
27.08.2021 3.30am 9.00am
28.08.2021 7.40 pm
Stoppage Description
bin full
bin full
bin full
bin full
bin full
feed table safety shaft broken
feed table safety shaft broken
feed table safety shaft broken
Seperator bottom Bearing Temp High
Electric supply failure
bin full
power management
Bin Full
bin full
bin full
Bin Full
Bearing temp high of inlet.
Bin Full
general maintainence
Mill started
Mill Started

Power supply failure due to cable damage


seperator bearing temp high
separator abnormal sound
Started
Bin Full
Bin Full
Separator group problem
Disharge chute jam by wet material
mill I/L brg.temp. high
Kiln stopped and mill I/L brg. Temp high
bin full
bin full
Kiln Stoppage
bin full
bin full
bin full
bin full + kiln stoppage
bin full
Kiln stoppage and bin full
bin full
bin full
feed tabel discharge chute jammed
bin full
bin full
feed table incomer supply failure
coal mill outlet abnormal sound , found grinding media stuck
coal mill outlet abnormal sound , found grinding media and lime stone stuck
coal mill outlet abnormal sound , found grinding media and lime stone stuck
coal mill outlet abnormal sound , found lime stone stuck
bin full
bin full
Mill inlet brg.temp.high
Bin full
feed tabel discharge chute jamm

Mill inlet brg.temp.high


bin full
feed tabel discharge chute jamm
Maintanance work
Furnance plate welding work for castable
bin full
bin full
bin full
Start
Feed table overload trip
coal hopper empty
Due to kiln stoppage
Stop Hrs. Stop Hrs. 100 Concern
Date Stop time Start time frq.
60 scale scale Dept.
13.03.2021 3:40pm 4:40pm
17.03.2021 09.35am 09.50am ele
19.03.2021 5.20 AM 6.00 AM Process
20.03.2021 4.45pm 6.00pm mech
24.03.2021 09.30PM 10.15pm 45min Process
25.03.2021 5.15 PM 5.50 PM Process
12.20 AM 1.00 am Process
26.03.21
7.50 PM 8.20 PM Process
27.03.2021 12.10am 1.00am Process
27.03.2021 4.00pm 4.45pm Process
3.20 AM 3.50 AM Process
28.03.2021
7.45am 9.30am
29.03.2021 7.00am 9.00am Process
15.5pm 18.1pm Process
8.30pm 9.30pm Process
30.03.2021 8.00pm 8.45pm Process
01.04.2021 9.40 PM Process
02.04.2021 8.25am 9.25am
02.04.2021 3.15 PM 4:45 PM Electrical
3.04.2021 9:30pm 9:45pm
05.04.2021 4.50pm 5.50pm Process
8.10 Am 3.30pm
06.04.2021
10.30pm 11.15pm
07.04.2021 03.20pm 3.50pm Electrical
08.04.2021 8.50am 9.40am
08.04.2021 10.10pm 11.10pm
12.4.2021 8.55PM 9.30pm
18.04.2021 7.45am 8.45am
18.04.2021 10.45am 12.00pm
20.04.2021 9.30pm 10.30pm

7:45am 8:45am
10:45am 12pm

21.04.2021 10:15 AM 11:15 AM 60


22.04.2021 1.00 pm 1.45 pm
10.45 pm 11.45 pm 60
23.04.2021 2.30PM
1.29 PM 2.03 PM
28.05.2021
3.48 pm 5.51 pm
6.30 am 7.00 AM
4.06.2021 10.30 pm
2.50 pm
05.06.2021 1.50 am 2.30 am
15.06.2021 7.40 pm 9.00 pm
17.06.2021 10.00 pm 10.30pm
18.06.2021 10.00 pm 10.30pm
19.06.2021 12.30 am 2.45 am
20.06.21 12.35 am 12.50am

01.07.2021 1:40pm 2.20 pm


12.15am 12.50am
03.07.2021 4.20am 5.20am
9.10 pm 9.40 pm

04.07.2021 2.00PM 2.40PM


06.07.21 18.00pm 21.15pm
08.07.2021 5:50pm 6;35pm
12.00am 12.40am
6.00am 6.45am
9.07.2021
10.50am 12.00pm
3.30 pm 4.30 pm
12.07.2021 12.45 am 1.45 am
13.07.2021 4.30pm 5.10pm
15.07.2021 10.40 am 4.05 pm
16.07.2021 6:45 AM 6.00 pm
12.50pm 1.25pm
17.07.2021
5.20 pm 6.00 pm
18.07.2021 6.30am 7.00am
19.07.2021 3.30 am 4.30 am
23.07.21 4.30am 5.50am
24.07.2021 4.00pm
27.07.2021 10.30am
29.07.2021 4.00am 5.00am
30.07.21 5.20PM 5.40PM
2.08.2021 9.25pm 10.00pm
10.30pm 11.15pm
07.08.2021 9:10pm 9:40pm
10.08.2021 15:30hr 12.0AM
17.08.21 11.30pm 12.15am
18.08.21 6.25pm 7.00pm
19.08.22 12.35AM 1.25AM
20.08.2021 1.50PM 2.40PM
4.20PM 4.50PM
25.08.21
10.30pm 11.10pm
29.08.2021 9.10am 9.50am
29.08.21 6.55 pm 7.35 pm
30.08.2021 5:20AM 6AM
2.00AM 2.40 AM
31.08.21
1.25 pm 2.10pm
8:15pm 8:55pm
05.09/2021
9:30pm 11:45pm
06.09.2021 12:40am
Stoppage Description
Bin full and electrical work on main drive
local stopped alarm at separator reject conveyor
Bin full
mech. Work on reject conveyer k2jo1
Bin full
Bin full
Bin full
Bin full
Bin full
Bin full
Bin full
bin full delay from 9.00am mill fan damper projection overtravelled
Bin full
Bin full
Bin full
Bin full
Power Management
Bin full
Electric supply failure
feed table jammed
Bin full
Bin Full
Power Management
voltage fluctuation due to mangrol grid failure.
Bin full
Bin full
BIN FULL
feed table checked by Elec. And Inst. Side
Feed table motor changed by elec. Dept
BIN FULL

feed table checked by Elec. And Inst. Side


Feed table motor changed by elec. Dept

BIN FULL
BIN FULL
BIN FULL
general maintainence

bin full
bin full
Mill started
Power supply failure due to cable damage
Feed table jam
raw coal hopper empty
raw coal hopper empty
Feed table jam due to wet coal
K2J01 conveyor jam
Chute jammed

bin full
bin full
bin full
bin full

bin full
bin full
bin full
bin full
bin full
bin full
Kiln stoppage
bin full and kiln stoppage
bin full
Abnormal sound from gear box bearing
Mech work on mill gear box
bin full
bin full
bin full
bin full
bin full
bin full
mill started
bin full
BIN FULL.
feed table discharge chute jam.
raw coal hopper empty
chute jam
bin full
bin full
bin full
BIN FULL
BIN FULL
BIN FULL
BIN FULL
BIN FULL
BIN FULL
BIN FULL
BIN FULL
BIN FULL
bin full
bin full
coal mill-4 started
Stop Hrs. Stop Hrs. 100 Concern
Date Stop time Start time frq.
60 scale scale Dept.
1.10AM 1.50 AM process
06.10am 7.40am process
29.03.2021 10.40am 12.40pm process
4.10pm 6.10pm process
10.30pm process
12.15am process
3.50am 5.00am process
30.03.2021
8.00 AM 9.30 Am process
7.00pm 9.00pm process
31.03.2021 5.00 AM 6.00 AM process
9.10pm 9.50PM misc

01.04.2021 12.30pm 1.30pm


01.04.2021 10.00pm 11.00pm
01.04.2021 3.40am 5.00am
02.04.2021 10.20am 11.40am
3.15PM 8.10 PM Electrical
02.04.2021
8.55 PM 10.25pm process
03.00am 04.20am process
03.04.2021
1.00pm 2.00pm
05.04.2021 06.15am 08.35AM process
06.00pm 06.20pm misc
06.04.2021 2.45AM
10.04.2021 6.30am

12.04.2021 11.10AM 12.35PM

13.04.21 5:50 PM 7:10 PM


15.04.2021 12.10pm 12.50pm
16.04.2021 12.15 PM 1.15 PM
17.04.2021 11.00am 11.50am
5.15am 6.00am
20.04.2021 5.30PM 6.30PM
9.30pm 10.40pm
21.04.2022 10:10 AM 11:10 AM
9.10 am 10.30 am
22.04.2021
10.15 pm 11.15 pm
6.40 am 8.00 am
23.04.2021
7.45 pm 8.50 pm

3.30 PM 4.15
24.04.2021
24.04.2021
11.30pm
12.50am
25.04.2021
7.30am 8.45 am
12.30 am 1.40 am
26.04.2021
7.00am 9.20am ELE.DEP.
27.04.2021 2.00 pm 3.25 pm ELE.DEP.
2.45am 8.30 am ELE.DEP.
28.04.2021
2.50 pm 3.10 pm
29.04.2021 2.10pm 3.10pm
30.04.2021 11.40 AM 11.55 AM
02.05.2021 5.20am 8.10am
12.00 am 12.50 am
03.05.2021
5.05 am 5.20 am
3.30 am 3.45 am
04.05.2021
8.54 am 10.00 am
5.05.2021 11.40 pm
4.15 am
09.05.21 3.15 pm 4.30 pm
8.30 pm 9.05 pm
9.05 am 10.05 am
10.05.2021
11.10 am 2.10 PM
1.25 pm 2.45 pm
11.05.2021
8.30 pm
Stoppage Description
Bin Full
Bin Full
Bin Full
Bin Full
Bin Full
Bin Full
Bin Full
Bin Full
Bin Full
Bin Full
power management

Bin Full
Bin Full
Bin Full
Bin Full
Electric supply failure
Bin Full
Bin Full
Bin Full
Bin Full
feed table jaamed due to wooden piece stucked.
Bin Full
Started

BIN FULL

BIN FULL
BIN FULL
BIN FULL
BIN FULL
BIN FULL
BIN FULL
BIN FULL
BIN FULL
BIN FULL
BIN FULL
BIN FULL
BIN FULL

BIN FULL
BIN FULL
BIN FULL
BIN FULL
bin full and delay fom 8.20am due to GRR CONTRACTORS PROBLEM
power failure
power failure
Feed table jam
BIN FULL
Feed table jam
power failure
BIN FULL
Feed table jam
Feed table jam
bin full
bin full
Mill started
bin full
bin full
bin full
bin full
Raw coal hopper empty
Hopper empty
Stop Hrs. Stop Hrs. 100 Concern
Date Stop time Start time frq.
60 scale scale Dept.
6.00 AM 07.35AM Process
29.03.2021 11.25am 12.50pm Process
8.00pm 9.30pm Process
3.00am 4.00am Process
30.03.2021 8.00 AM 9.00 AM Process
7:15 PM 8.30pm Process
31.03.2021 9.10pm 9.50PM misc.

01.04.2021 8.05am 8.45am


01.04.2021 4.00 PM 4.30 PM process
01.04.2021 00.30Am 1.15pm
01.04.2021 04.0am 5.00am
7.50am 8.50am
1.25pm 2.20 PM
02.04.2021
3:15 PM 8.15pm Electrical
9.20pm 10.25pm
03.04.2021 10.20am 11.20am
04.04.2021 11.20am 12.20pm
05.04.2021 07.00AM 7.50AM
06.04.2021 3.50AM
09.04.2021 12.10pm
09.04.20201 2.05 PM 5.35 PM Mechanical
09.04.20201 9.45 PM Process
10.04.2021 7.30am
12.04.201 9.50AM 11.20PM
13.04.21 5.10 PM 7.10 PM
14.04.2021 6.00pm 7.00pm
15.04.2021 1.10pm 1.55PM
16.04.2021 1.30am 2.20am
4.0pm 4.40pm
17.04.2021 2.40pm 3.20pm
19.04.2021 5.50AM 6.30AM
2.30pm 2.50pm
20.04.2021
8.35 pm 9.55 pm
21.04.2021 2:30pm 3:30 PM
22.04.2021 1.30pm 2.30pm
10.30 pm 11.15 pm
23.04.2021 12.40PM 1.40PM
24.04.2021 8.30 PM 9.15 PM
1.00am 2.30am
25.04.2021
10.15 am 11.10 am
3.30 pm 4.27 pm
12.30 am 1.30 am
26.04.21
7.00am 8.20am
9:00 AM 10:00 AM
27.04.2021 2.00 pm 3.25 pm ELE.DEP.
2.45am ELE.DEP.
28.04.2021 8.30 am ELE.DEP.
5.00 AM 5.35 AM
29.04.2021
1.20PM 3.00pm
3.30 am 4.15 am
30.04.2021
10.10 AM 10.50 AM
3.40 pm 4.15 pm
01.05.2021
2.00 AM 3.00AM
5.20 AM 7.40am
02.05.2021 11.20am 12.05pm
8.40 pm 9.20 pm
03.05.2021 7.40 am 8.40 AM
04.05.2021 3.30 am 4.10 am
8.56 am 10:00 AM
10.00am 10.33 am
1.50 AM 2.35 AM
5.05.2021
9.50 am 10.40 am
6.05.2021 1.50 am
08.05.21 11.00 pm
1.00 am 4.00 am
09.05.21 3.35 pm 4.35pm
10.35pm 11.30 pm
6.50 am 7.35 am
10.05.2021
11.10 am 2.06 PM
11.05.2021 12.55 pm 1.35 pm
11.05.21 11.30 pm
04.06.2021 12.00 pm 2.40 pm
05.06.2021 2.30 am 4.15 am
8.50 am 10.10 am
07.06.2021
3.30 pm
1.45 am
09.06.2021
8.00 am
11.00 am
10.06.2021
12 .00 am
11.06.2021 1.00 am
16.06.2021 6.50am
8.10am
2.50pm
18.06.2021
3.50pm
19.06.2021 12.25 am 2.15 am
7.15am
8.20am 11.10am
3.30 pm
3.50 am 1.15 am
20.06.21
11.10pm
21.06.2021 2.10am 4.50pm
6.05pm
11.20AM
24.06.2021
1.50pm
4.30pm
25.06.2021
7.45pm
5.00pm
26.06.2021
7.20pm
15.07.2021 8.05 pm
9.25 pm
8:20am 12:20pm
16.07.2021
2.10 pm 9.00 pm
22.07.2021 9.50 am 12.05 pm
23.07.2021 11.5
3.0am
24.07.2021
1.00am
26.07.2021
4.00am 10:30PM
1:15am 5:45pm
27.07.2021
8;45pm
7.35am 4.30am
28.07.2021

1.00am
29.07.2021
3.00am
29.07.21 5.00pm
8pm
30.07.2021 4.15PM 1.15pm
31.07.2021 5.50pm 3.10pm
02.08.2021 3.00 pm 5.45pm
03.08.2021 3.30 pm 7.15 pm
04.08.2021 2.00 pm 5.30 pm
5/8/2021 6:30am 10:20am
6/8/2021 9am 5.20am
6.8.21 5.45PM 335PM
7.08.2021 7:15pm 3pm
08.08.2021 10:30hr 13:30hr
09.08.21 12.10pm
9:40am
10.08.2021
20:00hr 21:15hr
10.08.21 12.35AM 12.40PM
10.8.21 12.35AM
05.09.2021 11:45am
Stoppage Description
Bin Full
Bin Full
Bin Full
Bin Full
Bin Full
Bin Full
power management

bin full
Outlet jali cleaning
Bin Full
Bin Full
Bin Full
Bin Full
Electric supply failure
Bin Full
Bin Full
Bin Full
Bin Full
Bin Full

K4J01 conveyor gearbox changing work


Bin Full
Started
Bin Full
BIN FULL
BIN FULL
BIN FULL
BIN FULL
BIN FULL
BIN FULL
BIN FULL
BIN FULL
BIN FULL
BIN FULL
BIN FULL
BIN FULL
BIN FULL
BIN FULL
BIN FULL
BIN FULL
BIN FULL
BIN FULL
BIN FULL
BIN FULL
power failure
power failure
power failure
BIN FULL
BIN FULL
BIN FULL
BIN FULL
BIN FULL
BIN FULL
power failure
BIN FULL
BIN FULL
BIN FULL
BIN FULL
BIN FULL
feed table jam
Bin Full
Bin Full
Bin Full
Mill started

bin full
bin full
bin full
bin full
bin full
Coal hopper empty
coal milll2 stopped
Coal mill 2 stopped in feed table jam, Started in coal bin 2 level down
bin full
Started due to coal mill 1 separator under maintaince by mech side
Started due to coal crusher 2 support arm work under progress, bin level down

Started due to coal bin 2 level down


Started due to coal bin 2 level down

Started due to coal bin 2 level down

Started due to coal bin 2 level down as of coal mill 2 stoppage


bin level poor
bin level poor

bin level poor


Started due to coal bin 2 level down
bin level down

bin level down

bin level down

bin level down

fan vcb local stop alarm


coal mill-2 fine dust bin level low
coal mill-2 bin level low
Fine coal bin 1,2 level down
Fine coal bin 1,2 level down
stopped
Fine coal bin 1 level down
Fine coal bin 1 level down
Fine coal bin 1 level down
Fine coal bin 1,2 level down

Fine coal bin 1,2 level down

Fine coal bin 2 level down

fine coai bin level down

Fine coal bin 1,2 level down


Fine coal bin 1,2 level down
Fine coal bin 1,2 level down
Fine coal bin 1,2 level down
Fine coal bin 1,2 level down
Fine coal bin 1,2 level down
Fine coal bin 1,2 level down
Fine coal bin 1,2 level down
Fine coal bin 1,2 level down
Fine coal bin 1,2 level down
Fine coal bin 1,2 level down
started
Fine coal bin 1,2 level down
COAL BIN LEVEL FUL
COAL BIN LEVEL FUL
mill started
Stop Hrs. Stop Hrs. 100 Concern
Date Stop time Start time frq.
60 scale scale Dept.
9.30PM
07.03.21 12.00 pm Process
14.03.2021 7.15 AM
14.03.2022 9.20 AM 11.40 AM
15.03.2021 5.00am
16.03.2021 11:30 Mech
17.03.2021 11.35 PM
18.03.2021 2.00 AM
20.03.2021 3.30am 4.35pm
21.03.2021 1.00 PM 4.17 PM
21.03.2021 7.00PM
22.03.2021 2.25am
02:15am 03:00am
25.03.2021 7.00 PM 8.00 PM
8.30 PM
28.03.2021 17.30pm
01.04.2021 3.24 PM
8.13 PM
03.04.2021 5.00pm
03.04.2021 19.00pm
08.50AM
05.04.2021
12.00am

10.04.2021 10.40am
12.04.2021 10.00am
13.04.2021 10.30 AM
13.04.2021 5.00pm 6.30pm
13.04.2021 9.30pm
16.04.2021 12.10 PM
12.20pm 8.30pm
17.04.2021 5.30 am
18.04.2021 1.00pm
20.04.2021 5.00am

13.04.2021 9.30pm
20.04.2021 8.20 pm

21.04.2021 2:40 PM 3:20 PM 40 MIN


22.04.2021 11.30 am 1.30 pm
23.04.2021 11.20 am 1.00 pm
1.20am 2.30am
25.04.2021
25.04.2021 6.50am 7.30am
2.40 pm
9.00 pm
26.04.2021
10.00 pm
1.00 am
27.04.2021 2.00 PM 5.20 PM
11.00 pm
28.04.2021 10.30 am
30.04.2021 9.50 AM
9.05.2021 discontinuity in flow of solid AFR due to Flap no. 10 issues
10.05.2021 11.10 am
11.05.2021 9.40 am
11.05.21 11.25 pm
Stoppage Description
high chloride
kiln stoppage
Started
J06 belt overload due to chute jamming
J06 belt overload due to chute jamming
mech Work on RBC -W4J03

kiln stoppage

J06 belt overload due to chute jamming


J06 belt overload due to chute jamming
J06 belt overload due to chute jamming(Belt Cut)

flap no.-10 jammed.


flap no.-10 jammed.
Unavailabilty of Stock
Solid Afr Stopped due high cl liquid AFR running

stopped due to kiln disturb


Started bec liquid Afr Stopped
Liquid Afr Started
Started

stopped due to chloride high


Started
Kiln 3 Tripped
No Availability of material
Started
Stopped due to No Availability of material
Stopped due to No Availability of material
Solid Started
Stopped due to No Availability of material

No Availability of material
Started

Flap no.10 jam


Air pressure down problem followed by J06 chute jam
Kiln stopped
J06 CHUTE JAM
J06 CHUTE JAM
Unavaibility of material
Started
Stopped due to high SO3
Started
kiln stoppage

Overburden of material on PC feed.


R due to Flap no. 10 issues ,informed to Instt.,mech. Mr. seemant
Kiln stopped
J06 CHUTE JAM
Unavaibility of material
Stop Hrs. Stop Hrs. 100 Concern
Date Stop time Start time frq.
60 scale scale Dept.
18.03.2021 5:20 PM 7:10 PM Process
18.03.2021 9:00 PM 10.00 PM Process
19.3.2021 10.00pm
20.03.2021 4.15am 3.50pm
21.03.2021 1.45 PM 3.45 PM
22.03.2021 12.00am 1.00am
24.03.2021 02.25pm
25.03.2021 6.00 PM
27.03.2021 03.50am
28.03.2021 13.00pm 17.30pm
29.03.2021 12.50 AM
31.03.2021 10.20pM
01.04.2021 8.10 PM
03.04.2021 12.05am
03.04.2021 16.45pm 19.00pm
04.04.2021 3.10 AM 3.50 AM
05.04.2021 4.00 Am 4.35 AM

10.04.2021 10.30am
11.04.2021 09.00 PM 10.00 PM
12.04.2021 10.55AM 12.10PM
13.04.2021 5.00pm 6.30pm
14.04.2021 7.35 PM
29.04.2021 3.00pm
1.30 pm 2.15 pm
30.04.2021
4.25 pm 7.00PM

01.05.2021 12.05PM 1.40pm


12.08 AM 1.35 PM
10:00 PM 10.52 pm
2.05.2021 5.20 AM 9.35 AM
3.05.2021 6.00 AM 6.30 AM
10.08 am 11.10 am
5.05.2021 2.20 AM 3.20 AM
6.05.2021 3.00 am
09.05.2021 5.40 pm
11.05.2021 1.30 pm
12.05.21 2.05 AM
Stoppage Description
V17 Tanker Changed
V17 Tanker Changed towards V14
V16 tanker point started in place of v14 pump but feeding at same point 14 point at pc cone
kiln stopped
V14 Tanker empty
V14 Tanker empty
V14 Tanker started
tanker Empty no tanker available
V14 Tanker empty
V14 pump problem , tanker inchange work btw.v14&v16 pump& kiln 1to 3
tanker Empty no tanker available
tanker Empty no tanker available
tanker Empty no tanker available
V14 Tanker started
Stopped for project work
V14 Tanker empty
V14 Tanker empty

V16 Tanker empty


DUE TO KILN STOPPED
Kiln 3 Tripped
tanker Empty no tanker available(V16 Pump for PC)

nozzle jamming(V14)
tank shifting

V14 Tanker empty


Tanker empty
Tanker empty
power failure
TANKER EMPTY
TANKER EMPTY
TANKER EMPTY
TANKER EMPTY
TANKER EMPTY
Started
DUR TO PC STOPPED
14 point at pc cone
Stop Hrs. Stop Hrs. 100 Concern
Date Stop time Start time frq.
60 scale scale Dept.
01.03.2021 09.05am
04.35pm 5.35pm
02.03.2021

2.50 AM 4.20 AM
03.03.2021
5.15PM 6.30PM
05.03.2021 6.30pm 7.30pm
05.03.2021 10.10pm mech.
12.35am
06.03.2021

10.00am 11.45am
08.03.21
2.30pm 3.45pm
08:00am 10:00am
09.03.2021
10.50pm
12.15am
11.03am 11.20am
10.03.2021
4.20pm 5.40pm

7.00am 8.45am
11.03.2021
11.40 PM 12.30 AM
12.04.2021
1.15pm 6.00pm
14.03.2021 9.00 AM
15.03.2021 5.10am 6.00am
3.00am 5.00am
16.03.2021
9.15PM 10.15PM
17.03.2021 06.20pm 7.10pm
18.03.2021 05:50pm 06:30pm
9.40am MECH.
19.03.2021

20.03.2021 10.00 AM 1.30 PM


21.03.2021 2.20 PM
2:50 4:20
25.03.2021
10.15am 11.15am mech.
26.03.2021 5.00 PM
27.03.2021 04:30pm 05:30pm
28.03.2021 6.30AM
28.03.2021 13.30pm 14.50pm
29.03.2021 5.30 AM

02.04.2021 11.00am
02.04.2021 9.00 PM
03.04.2021 03.00pm 05.30pm
04.04.2021 17.00pm 17.40pm
05.04.2021 11.30am 01.15pm
07.04.2021 02.45pm 03.30pm
9.10AM 9.55AM
08.04.2021
12.45pm
09.04.2021 10.00am 12.00pm
10.04.2021 4.30pm 5.30pm
11.04.2021 2.30pm 3.15pm
9.55am 10.50am
12.04.2021
9.30pm 11.00pm
13.04.2021 9.15 AM
01.06.2021 5.45 pm
02.06.2021 4.05 pm 5.00 pm
3.06.2021 6.15 PM 7.15 PM
3.40 am 4.50 am
04.06.2021 2.50 pm
06.06.2021 11.40am 2.30pm
07.06.2021 11.20 am 5.45 pm
8.06.2021 3.43 pm 7.51 pm
09.06.2021 2.30 am 3.00 am
11.30AM 6.40PM
11.06.2021 2.25 am 3.15 am
12.06.2021 11.25 pm
13.06.2021 12.10 am
14.06.2021 4pm 4.50pm
15.06.2021 9.20 am 2.30 pm
16.06.2021 9.40am 11.10am
10pm 11pm
17.06.2021 3.00 pm 5.00 pm
18.06.2021 5.15am 6.15am
19.06.2021 12.30 am 1.15 am
10am 11am
20.06.2021
11.50pm
21.06.2021 12.30am
12.50am 1.35am
23.06.2021
5.10 pm 6.00 pm
27.06.21 1.15 am 2.00am
6.30am 10.30am
12.45am 2.00am
28.06.2021
8.00pm 12.00am instu.
4.00 pm 7.00 pm
29.06.2021
11.00am 11.50am
30.06.2021 10.00 pm 11.00 pm
01.07.21 1.35 pm 3.30 pm
10.50AM 11.40AM
02.07.02021
5.00 pm 5.30 pm
10.40pm 11.40pm
5.10am 6.10 am
03.07.2021
4.00 pm 5.15 pm
04.07.2021 9.00 PM 2.30 am
.05.07.2021 4.10pm 11.15 pm
6.07.2021 7.10am 7.40 am
6.07.21 17.15pm 22.30pm
07.07.2021 5.20am 6.00AM
08.07.2021 10.10 am 11.00 am
08.07.2021 9:30 PM 10.00pm
09.07.2021 2.40 pm 5.00 pm
10.30am 5.15 pm
10.07.2021
8.50 pm 9.45 pm
11.07.2021 10.20am 7.30pm
4.20 am 8.15am
12.07.2021 11.15am 12.05pm
11.30 pm 12.00 am
13.07.21 10AM 10.45AM
4.00am 4.45am
14.07.2021
10.30pm 11.20pm
15.07.2021 3.45 pm 6.30 pm
8:30am 9;30am
16.07.2021
8:30pm 9:30pm
17.07.2021 9.45am 10.30am
17.07.21 10PM 10.30PM
9.20am 10am
18.07.2021
9.00pm 9.30pm
7.25am 8.35am
19.07.2021
9.45 pm 11.15 pm
20.07.2021 11.00pm 11.45pm
3.10am 4.00am
22.07.2021
6.30 am 6.50 am
4.0pm
1.00am 1.40am
23.07.2021
1.45 pm 2.25 pm
24.07.2021 3.0am 5.0am
11.00 pm 11.30 am
25.07/2021 6am 10:25am
26.07.21 6.40 am 7.10 am
28.07.2021 12.00am 12.35am
2.35pm 4.20pm
29.07.2021 4.10am 5.10am
1.30pm 2.25pm
1.40am 2.30am
30.07.2021 4.0am 4.20am
10.30 pm 11.10pm
31.07.2021 3.00pm 3.50pm
5.20pm 9.45pm
1.08.2021 7.30am 8.20am
4.30pm 5.00pm
2.00am 2.30am
6.4am 7.00am
2.08.2021
12.50pm 1.50 pm
5.15 pm 5.50 pm
03.08.2021 12.45 pm 3.50 pm
4.45 pm 5.45 pm
04.08.2021
11.40pm
12.25am
05.08.2021
1.30am
5.08.21 12.45AM
6.08.21 4.35PM
7.08.2021 11.20am 11.40am
08.08.2021 12:20hr 13:30hr
10.15pm 12.00am
09.08.21 8.15AM 9.45AM
4.45pm 11.00pm
10.08.21 1.05AM 1.50AM
11.08.21 3.05 am 4.38 am
5.45 am 6.45 am
13.08.21
4:30pm 5:45pm
4.00 am 4.45 am
14.08.21
3:15pm 5:15pm
5:10am 6:10am
15.08.21 1pm 1:45pm
9:15pm 10:15pm

9.15am 11.15pm
16.08.2021
8.55 pm 9.50pm
7.40AM 8.40AM
17.08.21
6pm 6:30pm
4.0AM 5.05AM
17.08.21 10:45am 11:45am
12:50pm 1.50pm
18.08.21 2.30pm 3.00pm
4.00pm 4.45pm
5.00pm 5.15pm
5.30pm 6.40pm
18.08.21 4.35AM
11.30 am
19.08.21
10pm 10:30pm
20.08.2021 7am 8am
20.08.2021 6.00PM 6.30PM
20.08/21 3.50AM 4.40AM
21.08.21 2.0pm 2.35pm
22.08.2021 12.00am 12.45am
22.08.21 9.30AM 11.0AM
8.06 PM 12.29 AM
23.08.21 9.15am 10.30am
23.08.21 7.25PM 7.45PM
24.08.21 5.30 am 6.10 am
24.08.21 3.00 pm 3.30 pm
12.50am 1.50 am
25.08.21 6:35am 7:05am
8:15am 9:35am
25.08.21 5.0PM 5.30PM
26.08.2021 2.50am 3.50am
12.05PM 12.35PM
26.08.21
6.55 pm 7.25pm
6.40 am 7.40 am
27.08.2021
4:30pm 5:30pm
27.08.21 2.0AM 3.10AM
5.45AM
23.08.2021 1.45 am 2.45am
Stoppage Description
started
tanker empty

Tanker shifted toward kiln 3 and new tanker connect


Tanker shifted toward kiln 3 and new tanker connect
tanker empty
liquid afr return pipe line got damaged. Informed mech. For pipe changing.

afr line checking work


tanker empty
Tanker removed from Point for JCb movement for Elevator cleaning
tanker empty

line -1/2 filter cleaning work


tanker empty

tanker empty
tanker changeover

tanker empty
Started
tanker empty
tanker empty
tanker empty
tanker empty
tanker empty
AFR pump leakage

Stopped due to return pipe and filter cleaning work after tanker changeover
tanker empty
tanker empty/ tanker change over
AFR pump leakage
started
Tanker changeover
HIGH CO FORMATIONS
tanker inter change over
tanker Empty no tanker available

tanker Empty no tanker available


Started
Tanker change
Tanker change
Tanker changeover and deley start due to result awaited
Tanker change
KILN STOPPAGE
Tanker changeover
Tanker changeover and deley start due to afr pipe damaged
Tanker changeover
Tanker changeover
Tanker changeover
afr stopped due to pipe damaged
tanker Empty no tanker available
Started
Tanker changeover
Tanker changeover
kiln sttopage
Power supply failure due to cable damage
Tanker changeover
Tanker changeover
tanker empty no tanker available
spillage from NRV, stopped for repair
Tanker changeover DEALY due to leakage from return valve
Tanker changeover
Tanker changeover

tanker change over


tanker change over and mechanical work
tanker change over
tanker change over
tanker change over
tanker change over
tanker change over
tanker change over
tanker change over

tanker change over


tanker change over
Filter cleaning
tanker change over + nozzle jammed.
tanker change over
tanker change over and delay due to flow not show in ccr instu.probelm
tanker change over + nozzle jammed.
tanker change over
tanker change over
tanker change over
tanker change over
Filter jammed
filter jammed
tanker empty
tanker change over+ filter cleaning
tanker change over + nozzle jammed.
tanker change over
tanker change over
kiln stopped
tanker change over
tanker change over
tanker change over
tanker change over + kiln stoppage
due to high cloride
Tanker Changeover
CL high
Kiln stoppage due to first tyre bearing temp high
Tanker Changeover
Tanker Changeover
TANKER CHANGING WORK
TANKER CHANGING WORK
TANKER CHANGING WORK
due to kiln stoppage
tanker changed over
tanker changed over
tanker changed over
TANKER CHANGE OVER
tanker change over
tanker change over
tanker change over
tanker change over + filter jammed
tanker change over
tanker change over
Tanker unavaibility
started
tanker change over
tanker change over
tanker change over delay flange mismatch
tanker change over
Kiln stoppage
tanker changeover
tanker changeover
tanker changeover
tanker changeover
variation in flow, filter cleaning work undergoing.
tanker change over
Nozzel Cleaning Work (flow not coming proper)
tanker changeover
tanker changeover
chloride high
tanker changeover
tanker changeover
tanker changeover
nozzle cleaning
chloride high
tanker changeover
tanker changeover + filter jam+ connecting Flange mismatch
Nozzle changeover

tanker changeover
chloride high
chloride high

tanker changeover
tanker changeover
tanker changeover and filter cleaning
tanker change over
tanker not available and tanker connecting pipe changed.
TANKER CHANGING WORK
TANKER CHANGING WORK
TANKER CHANGING WORK
TANKER CHANGING and nozzle installation WORK
tanker change over
tanker change over and nozzle jammed
tanker change over
tanker change over

tanker change over and filter cleaning


tanker change over
tanker change over
tanker change over
TANKER CHANGE OVER
earthing unhealthy problem
flow got zero, filter cleaning underprogress
flow got zero, filter cleaning underprogress
flow got zero, filter cleaning underprogress
flow got zero, filter cleaning underprogress
Tanker changed
TANKER CHANGING W ORK
Started
tanker change over
tanker change over
tanker change over
TANKER CHANGE OVER
tanker change over
tanker change over
TANKER CHANGE OVER,FILTER CLEANING WORK
TANKER CHANGE OVER,FILTER CLEANING WORK AND LINE CHOKING REMOVAL
Tanker empty and change over
Tanker empty and change over
Tanker empty and change over
Tanker empty and change over
Tanker empty and change over
earthing unhealthy problem
Tanker empty and change over
TANKER CHANGING W ORK
TANKER CHANGING W ORK
TANKER CHANGE OVER
TANKER CHANGE OVER
TANKER CHANGE OVER
TANKER CHANGE OVER
TANKER CHANGE OVER
flow got zero, filter cleaning underprogress
TANKER CHANGE OVER
Stop Hrs. Stop Hrs. 100 Concern
Date Stop time Start time frq.
60 scale scale Dept.
02.03.2021 7.00am
07.03.2021 9.40 AM

08.3.21 10.00am 11.45am


08.03.21 2.30pm 3.45pm
09.03.2021 08:00am 10:00am
7.00am 8.45am
11.03.2021
11.40 PM 12.30 AM
1.15pm 6.00pm
12.03.2021

13.03.2021 11:00pm 01:00pm Inst


15.03.2021 5.10am 6.00am
3.00am 5.00am
16.03.2021
9.15PM 10.15PM
17.03.2021 06.20pm 7.10pm
18.03.2021 05:50pm 06:30pm
6.10am 8.10am MECH.
19.03.2021
11.10am
20.03.2021 10.00 AM 1.30 PM
21.03.2021 2.20 PM
25.03.2021 2:50 4:20
26.03.2021 5.00 PM
27.03.2021 04:30pm 05:30pm
28.03.2021 6.30AM
28.03.2021 13.30pm 14.50pm
29.03.2021 5.30 AM

02.04.2021 11.00am
02.04.2021 9.00 PM
03.04.2021 03.00pm 05.30pm
04.04.2021 17.00pm 17.40pm
8.05AM 8.45AM
08.04.2021
12.45pm
09.04.2021 10.00am 12.00pm
10.04.2021 4.30pm 5.30pm
11.04.2021 2.30pm 3.15pm
12.04.2021 9.30pm 11.00pm
13.04.2021 9.15 AM

29.05.2021 9.05 pm
30.05.2021 7.00 pm 8.45 pm
01.06.2021 1.40 pm 5.20 pm
02.06.2021 4.05 pm 5.00 pm
3.06.2021 6.15 PM 7.15 PM
04.06.2021 2.50 pm
06.06.2021 11.40am 2.30pm
07.06.2021 11.20 am 5.45 pm
8.06.2021 3.43 pm 7.51 pm
09.06.2021 1.00 am 3.00 am
11.30AM 6.40PM
11.06.2021 2.25 am 3.15 am
12.06.21 10.10am 11.10am
12.06.2021 11.25 pm
12.10 am
13.06.2021
9.15pm 11.15pm
14.06.2021 4pm 4.50pm
15.06.2021 9.20 am 4.30 pm
16.06.2021 9.40am 11.10am
10pm 11pm
17.06.2021 3.00 pm 5.00 pm
18.06.2021 5.15am 6.15am
19.06.2021 12.30 am 1.15 am
10am 11am
20.06.2021
11.50pm
21.06.2021 12.30am
5.00pm 5.35pm
12.50am 1.35am
23.06.2021
5.10 pm 6.00 pm
27.06.21 1.15 am 2.00 am
7.10am 8.30am
28.06.2021 12.45am 2.00am
4.00 pm 7.00 pm
29.06.2021
11.00am 11.50am
30.06.2021 10.00 pm 11.00 pm
01.07.21 1.35 pm 3.30 pm
10.50AM 11.40AM
02.07.02021
5.00 pm 5.30 pm
10.40pm 11.40pm
5.10am 6.10 am
03.07.2021
4.00 pm 5.15 pm
3.30PM 3.50PM
04.07.2021
8.30PM 2.30 am
05.07.2021 4.40pm 5.20pm
6.07.2021 7.10am 7.40am
6.07.21 17.15pm 22.30pm
07.07.2021 5.20am 6.00AM
08.07.2021 10.10 am 11.00 am
08.07.2021 9:30 PM 10.00pm
09.07.2021 2.40 pm 5.00 pm
10.07.2021 8.50 pm 9.45 pm
6.50pm 7.30pm
11.07.2021
11.40 pm 12.25 am
11.05am 12.05pm
12.07.2021
11.30 pm 12.00 am
13.07.21 10AM 10.45AM
4.00am 4.45am
14.07.2021
10.30pm 12.30am
15.07.2021 3.50 pm 4.35 pm
8:30am 9;30am
16.07.2021
8:30pm 9:30pm
17.07.2021 9.45am 10.30am
17.07.21 10PM 10.30PM
9.20am 10.00am
18.07.2021
9.00pm 9.30pm
7.25am 8.35am
19.07.2021
9.45 pm 11.15 pm
20.07.2021 11.00pm 11.45pm
6.30pm 9.00pm
21.07.2021
10.50pm 12.00am
22.07.2021 3.10am 4.00am
6.30 am 6.50 am
4.0pm
1.00am 1.40am
23.07.2021 3.35am
1.45 pm 2.25 pm
3.0am 5.0am
24.07.2021
2.30pm
27.07.2021 5.30pm
28.07.2021 12.00am 12.35am
2.35pm 4.20pm
29.07.2021 4.10am 5.10am
1.30pm 2.25pm
30.07.20211.40am 2.30am
30.07.21 5.0PM 5.50PM
30.07.2021 10.30 pm 11.10pm
31.07.2021 3.00pm 3.50pm
1.08.2021 7.30am 8.20am
4.30pm 5.00pm
2.08.2021 2.00am 2.30am
5.15 pm 5.50 pm
03.08.2021 12.45 pm 3.50 pm
04.08.2021 11.40pm
05.08.2021 12.25am
5.08.21 12.45AM
6.8.21 4.35PM
07.08.2021 11.20am 11.40am
08.08.2021 12:20hr 13:30hr
10.15pm 12.00am
09.08.21 8.15AM 10.30AM
4.45pm 11.20pm
10.08.21 1.05AM 1.50AM
11.08.21 3.05 am 4.38 am
5.45 am 6.45 am
13.08.21
4:30pm 5:30pm
4.00 am 4.45 am
14.08.21
3:15pm 5:15pm
5:10am 6:10am
15.08.21 1pm 1:45pm
9:15pm 10:15pm

9.15am 11.15pm
16.08.2021
8.55 pm 9.50pm
7.40AM 8.40AM
17.08.21
6pm 6:30pm
4.0AM 5.05AM
17.08.21 10:45am 11:45am
1:10pm
18.08.21 2.30pm 3.00pm
4.00pm 4.45pm
5.00pm 5.15pm
5.30pm 7.30pm
19.08.21 4.35AM
11.30 am
19.08.21
10pm 10:30pm
7am 8am
20.08.2021
6.00PM 6.30PM
20.08.21 3.50AM 4.40AM
21.08.21 2.0pm 2.35pm
22.08.2021 12.00am 12.45am
22.08.21 9.30AM 11.00AM
8.06 PM 12.29 AM
23.08.21 9.15am 10.30am
23.08.21 7.25PM 7.45PM
24.08.21 5.30 am 6.10 am
24.08.21 3.00 pm 3.30 pm
12.50am 1.50 am
25.08.21 6:35am 7:05am
25.08.21
8:15am 9:35am
25.08.21 5.0PM 5.30PM
26.08.2021 2.50am 3.50am
12.05PM 12.35PM
26.08.21
6.55 pm 7.25pm
6.40 am 7.40 am
27.08.2021
4:30pm 5:30pm
27.08.21 2.0AM 3.10AM
29.08.2021 1.45 am 2.45am
29.08.21 8.45 PM 9.15 pm
30.08.2021 2.30pm 3.40pm
31.08.2021 6.00 am 7.05 am
2.05 am 2.50 am
01.09.21
5.25 pm 6.00 pm
02.09.2021 2.00am 2.45am
03.09.2021 7:20pm 7:45pm
10.10am 10.50am
04.09.2021 7pm 8:15pm
11pm 12am
5.09.2021 1:40pm 2:40pm
Stoppage Description
kiln stoppage
StART

afr line checking work


tanker empty
Tanker removed from Point for JCb movement for Elevator cleaning
tanker empty
tanker empty
tanker empty

Afr Flow Meter Problem


tanker empty
tanker empty
tanker empty
tanker empty
tanker empty
afr pump leakage
tanker empty
Stopped due to return pipe and filter cleaning work after tanker changeover
tanker empty
tanker empty/ tanker change over
started
Tanker changeover
HIGH CO FORMATIONS
tanker inter change overbtw 1&3
tanker Empty no tanker available

tanker Empty no tanker available


Started
Tanker change
Tanker change
KILN STOPPAGE
Tanker changeover
Tanker changeover and deley start due to afr pipe damaged
Tanker changeover
Tanker changeover
afr stopped due to pipe damaged
tanker Empty no tanker available

started
Tanker changeover
Tanker changeover
Tanker changeover
Tanker changeover
Power supply failure due to cable damage
Tanker changeover
Tanker changeover
tanker empty no tanker available
Leakage from NRV
Tanker changeover DEALY due to leakage from return valve
Tanker changeover
leakage from pump
Tanker changeover

afr line leakage


Tanker changeover
tanker changeover and leakage arrest
tanker change over
tanker change over
tanker change over
tanker change over
tanker change over
tanker change over
tanker change over

prevent leakage from pump


tanker change over
tanker change over
Filter cleaning
tanker change over
tanker change over
tanker change over + nozzle jammed.
tanker change over
tanker change over
tanker change over
tanker change over
Filter jammed
Filter jammed
tanker change over
tanker change over+ filter cleaning
KILN STOPPAGE
tanker change over + nozzle jammed.
tanker change over
tanker change over
kiln stoppage
tanker change over
tanker change over
tanker change over
tanker change over + kiln stoppage
Tanker Changeover
Tanker Changeover
kiln feed weighfeeder scrapper change work
Tanker Changeover
Tanker Changeover
TANKER CHANGING WORK
TANKER CHANGING WORK
TANKER CHANGING WORK + nozzel cleaning
TANKER CHANGING WORK
tanker changed over
tanker changed over
tanker changed over
tanker changed over
tanker change over
tanker change over
tanker change over
tanker change over + filter jammed
tanker change over
Liquid AFR Stopped due to back pressure in kiln inlet (Nozzel Cleaned)
leakage due to damage of gasket
tanker change over
Tanker unavaibility
started
tanker change over
Kiln Stoppage
tanker change over
tanker change over delay due to flange mismatch
kiln stoppage
started
tanker changeover
tanker changeover
tanker changeover
variation in flow, filter cleaning work undergoing.
tanker change over
DUE TO KILN STOPPAGE.
tanker changeover
tanker changeover
tanker changeover
tanker changeover
tanker changeover
tanker changeover
tanker changeover + filter jam+ connecting Flange mismatch
tanker changeover
CHLORIDE HIGH

tanker changeover
tanker changeover
tanker changeover and filter cleaning
TANKER EMPTY AND CHANGE OVER
tanker not available and tanker connecting pipe changed.
TANKER CHANGING WORK
TANKER CHANGING WORK
TANKER CHANGING WORK
TANKER CHANGING WORK
tanker change over
tanker change over and nozzle jammed
tanker change over
tanker change over
tanker change over

tanker change over and filter cleaning


tanker change over
tanker change over
tanker change over
TANKER CHANGE OVER
earthing unhealthy problem
filter cleaning underprogress
flow got zero, filter cleaning underprogress
flow got zero, filter cleaning underprogress
flow got zero, filter cleaning underprogress
Tanker changed and new nozzle installed
TANKER CHANGING WORK
Started
tanker change over
tanker change over
tanker change over
TANKER CHANGE OVER
tanker change over
tanker change over
TANKER CHANGE OVER,FILTER CLEANING WORK
TANKER CHANGE OVER,FILTER CLEANING WORK AND LINE CHOKING REMOVAL
tanker empty and change over
Tanker empty and change over
Tanker empty and change over
Tanker empty and change over
Tanker empty and change over
earthing unhealthy problem
Tanker empty and change over
TANKER CHANGING WORK
TANKER CHANGING W ORK
TANKER CHANGE OVER
TANKER CHANGE OVER
TANKER CHANGE OVER
TANKER CHANGE OVER
TANKER CHANGE OVER
TANKER CHANGE OVER
TANKER CHANGE OVER
TANKER CHANGE OVER
TANKER CHANGE OVER
TANKER CHANGE OVER
TANKER CHANGE OVER
TANKER CHANGE OVER
TANKER CHANGE OVER
TANKER CHANGE OVER
kiln stoppage
TANKER CHANGE OVER
TANKER CHANGE OVER