Petrochina International Jabung LTD.: Job Safety Analysis

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 10

1

PCID/J/F2/HSE/EHSMS/4.4.6/30
Date :
PetroChina International Jabung Ltd. Job Safety Analysis Tanggal :

Job : Install Gorong-gorong Title of person who does the job : Analyzed by lead of crew :
Pekerjaan : Jabatan personil yang melakukan pekerjaan : Supervisor Di analisa oleh pemimpin regu kerja :

Work Crew Supervisor : Executor Department : Section : Reviewed by HSE : Approved by Area Supv :
Pengawas Regu Kerja : Departemen Pelaksana : Bagian :Project Di Periksa Oleh HSE : Disetujui Oleh pengawas daerah kerja :
Alwan Arif Construction Team

Write down correct specifications of personal


Personal protective equipment (PPE) : 
Put On PPE required for a safe job. protective equipment required (Consult HSE Dept) :
1. Safety hat / helmet √ 6. Face shield √ 11. SCBA 16. Safety shoes / boots √ Tuliskan spesifikasi alat pelindung diri yang
dibutuhkan (Konsultasikan dengan HSE Dept) :
2. Safety glasses √ 7. Ear plugs / muffs 12. Gloves – Ordinary √ 17. Rubber boots
3. Goggles – ordinary 8. Dust mask 13. Gloves - Chemicals 18. Prot. Clothing/ Apron
4. Goggles – tinted lenses 9. Air-purifying respirator 14. Gloves – Thermal √ 19.Body harness-line
5. Goggles – Chemicals 10. Air-line respirator 15. Rubber gloves 20. Life vest
Sequence of Basic Job Steps Potential Hazards Protective Equipment Safe Procedures
Urutan Pekerjaan Potensi Bahaya Peralatan Pelindung Prosedur Aman
1) Preparation  Miscommunication  Prepare Permit To Work
 Misunderstanding  Pre-job safety meeting.
 Failure  Discuss JSA to workers before
job
 Discuss emergency response
preparedness to workers if
emergency situation happen
 Good communication with
personnel
 Everyone has permission to
stop the job when any unsafe
condition.
1) Persiapan  Miskomunikasi  Persiapan Izin Kerja
 Kesalahpahaman  Melakukan pembicaraan
 Terjadi kegagalan keselamatan sebelum bekerja
 Membicarakan JSA kepada
2

pekerja sebelum bekerja


 Membicarakan tanggap
darurat ke pekerja jika terjadi
situasi darurat
 Komunikasi yang baik antar
personil
 Setiap orang mendapatkan hak
untuk menghentikan pekerjaan
jika dapat membahayakan
pekerja di segala kondisi.
2) Preparation of Tools, and Equipment and Safety  Pinch point  Use hand gloves  Ensure all the equipment has
Sign  Miscommunication been inspected and check by
 Misunderstanding PCI and fit for use
 Failure  Be careful when pick up tools
 Watch body position
 Everyone must pay attention at
all times
 Stay focused
 Ensure tools ready to use
 Ensure all document for
already accepted and reviewed
by PCI
 Proper Safety Sign and
barricade will be install prior
execution
 During Mobilization to the
work location, ensure that
proper access and safe for
heavy equipment layout and
position
 The equipment layout do not
interfere with another traffic or
transportation
 Check list all equipment and
tools will be use before work
activity.
2) Mempersiapkan Izin Kerja dan alat-alat  Terjepit  Menggunakan sarung tangan  Pastikan semua peralatan
3

 Miskomunikasi yang dipergunakan untuk


 Kesalahpahaman pekerjaan sudah lulus inspeksi
 Terjadi kegagalan dan baik untuk digunakan.
 Berhati-hati ketika mengambil
peralatan
 Memperhatikan posisi tubuh
 Setiap orang harus
memperhatikan pekerjaannya
dan lingkungannya setiap
waktu
 Tetap focus
 Memastikan semua peralatan
siap untuk digunakan
 Memastikan semua dokumen
telah disetujui dan ditinjau
kembali oleh pihak PCI
 Tanda Tanda Keselamatan
dan barricade terpasang
sebelum aktivitas dimulai.
 Ketika mobilisasi alat berat ke
lokasi dipastikan lokasi
penempatan alat berat yang
aman dan tidak menganggu
aktivitas lalu lintas
transportasi
 Periksa semua peralalatan dan
alat-alat yang akan digunakan
selama pekerjaan.
3) Trenching  Excavator swing and collision  Using Standard PPE  Ensure the excavator position
is not at the edge of the soil
 Hit by excavator bucket on existing heap.
pipe on location
 Make sure the position of
 Fallen down to the excavated hole excavator is stable
 Hit by excavator bucket, personnel  Ensure the workers position
injury out of radius bucket swing
 Erosion  Make sure the operator of view
is not blocked
 Lack of lighting ( work at night )  Working whit full
4

concentration
 Endure the excavator is
operated on hard land base
 Ensure that working area is
safe for excavator movement
 Provide signalman to handle
excavator activity
 Provide barricade and warning
board at the working area
 CTR provide certificate for
Operator
 Uninvolved personnel to keep
away from working area
 Daily check the excavator
condition before use
 Ground disturbance should be
done as per PCI regulation.
 The buried lines and live cable
shall be clearly marked before
start
 Use manual handling if
required.
 Ensure all the worker
competent and authorize to
perform the activity
 Provide ladder and stick for
check pipe available on
location.
 Provide portable light (work at
night)
 Provide Rain Coat
 Install safety sign
 Provide traffic control
3) Penggalian  Excavator terjungkal  Gunakan Peralatan APD  Pastikan excavator berada
tidak di posisi pinggir/tepi
 Terkena cangkul dari excavator pada tumpukan tanah/galian.
lokasi pipa yang sudah ada.
 Patikan posisi excavator stabil
 Terjatuh kedalam galian
5

 Tertabrak cangkul ketika mengayun,  Memastikan pekerja jauh daru


cidera personil radius cangkul dari excavator
 Pastikan pandangan dari
 Tanah longsor
operator tidak tertutup
 Minimnya pencahayan penerangan  Bekerja dengan penuh
(bekerja malam hari) konsentrasi
 Pastikan excavator beroperasi
di tanah landasan yang
keras/padat
 Pastikan area excavator aman
dari pergerakan.
 Sediakan barricade dan
rambu rambu keselamatan .
 Semua certificate peralatan
dan operator harus
disediakan.
 Pekerja yang tidak terlibat
diharapkan tidak berada
dilokasi penggalian.
 Pemeriksaan harian excavator
harus dilakukan dan peralatan
aman untuk digunakan.
 Pengecekan kondisi tanah
yang berhubungan dengan
jalur proses, listrik dan
instrument dibawah tanah
harus dilakukan.
 Tandai jalur proses dan listrik
yang live didalam tanah dan
gunakan metode manual untuk
penggalian.
 Pastikan pekerja yang bekerja
sudah diotorisasi dan cakap
melakukan pekerjaan
penggalian tanah.
 Gunakan tangga dan
stik/tongkat pengecek pipa
tersedia di lokasi.
6

 Sediakan lampu portable


 Sediakan jas hujan
 Pasang rambu penggalian
 Sediakan tim pengatur lalu
lintas
4) Lowering gorong-gorong  Pinch point  Using Standard PPE  Ensure that excavation has
 Miscommunication been prepared for the
 Misunderstanding unloading pipes
 Adjust the position of
 Failure excavators to follow overview
 The equipment is fallen down of the planning work that will
(Excavator) be done.
 Personnel Injury  Ensure that no body
passing/working under the
 Lack of lighting ( work at night )
object, except if consider
necessary by Lifting Supv. and
the number of personnel shall
be as minimum as possible and
lifting gears use properly
 Control and make sure that
sling(s), or lifting gears
required are installed properly
and certified before lifting the
pipeline.
 Control/check and make sure
that part line quantity of lifting
equipment is capable for lifting
object.
 Pre lift the object with gradual
increase.
 Only experienced & qualified /
trained personnel are handling
lifting devices.
 Provide portable light (work at
night)
 Provide Rain Coat
 Install safety sign
 Provide traffic control
7

4) Penurunan gorong-gorong  Terjepit  Gunakan Peralatan APD  Pastikan galian telah siap
 Miskomunikasi untuk aktifitas penurunan pipa.
 Kesalahpahaman  Atur posisi excavator
mengikuti gambar
 Terjadi kegagalan perencanaan pekerjaan yang
 Peralartan terjungkal (Excavator) akan di lakukan.
 Cidera personil  Pastikan tidak ada pekerja
lewat / bekerja di bawah objek,
 Minimnya pencahayan penerangan
kecuali jika dianggap perlu
(bekerja malam hari)
oleh Rigging Supv. dan jumlah
personil harus seminimal
mungkin dan pastikan
menggunakan dengan benar
peralatan angkat tersebut
 Kontrol dan pastikan bahwa
sling(s) and
shackle(s)terpasang dengan
benar dan bersertifikasi
sebelum melakukan
penganktan.
 Kontrol dan memastikan bahwa
kuantitas bagian
pengangkatan peralatan yang
mampu
 untuk mengangkat benda.
 Lakukan pengangkatan objek
dengan bertahap.
 Hanya yang berpengalaman
dan berkualitas/tenaga terlatih
yang dapat menangani
peralatan pengangkatan
 Sediakan lampu portable
 Sediakan jas hujan
 Pasang rambu
 Sediakan pengatur lalu lintas
5) Back Filling  Excavator swing and collision  Using Standard PPE  Ensure the excavator position
is not at the edge of the soil
 Hit by excavator bucket on existing heap.
8

pipe on location  Make sure the position of


excavator is stable
 Fallen down to the excavated hole
 Ensure the workers position
 Hit by excavator bucket, personnel out of radius bucket swing
injury  Make sure the operator of view
 Erosion is not blocked
Lack of lighting ( work at night )  Working whit full
concentration
 Endure the excavator is
operated on hard land base
 Ensure that working area is
safe for excavator movement
 Provide signalman to handle
excavator activity
 Provide barricade and warning
board at the working area
 CTR provide certificate for
Operator
 Uninvolved personnel to keep
away from working area
 Daily check the excavator
condition before use
 Ground disturbance should be
done as per PCI regulation.
 The buried lines and live cable
shall be clearly marked before
start
 Use manual handling if
required.
 Ensure all the worker
competent and authorize to
perform the activity
 Provide ladder and stick for
check pipe available on
location.
 Provide portable light (work at
night)
9

 Provide Rain Coat


 Install safety sign
 Provide traffic control
5) Pengisian galian kembali  Excavator terjungkal  Gunakan Peralatan APD  Pastikan excavator berada
tidak di posisi pinggir/tepi
 Terkena cangkul dari excavator pada tumpukan tanah/galian.
lokasi pipa yang sudah ada.
 Patikan posisi excavator stabil
 Terjatuh kedalam galian  Memastikan pekerja jauh daru
 Tertabrak cangkul ketika mengayun, radius cangkul dari excavator
cidera personil  Pastikan pandangan dari
 Tanah longsor operator tidak tertutup
 Bekerja dengan penuh
 Minimnya pencahayan penerangan konsentrasi
(bekerja malam hari)
 Pastikan excavator beroperasi
di tanah landasan yang
keras/padat
 Pastikan area excavator aman
dari pergerakan.
 Sediakan barricade dan
rambu rambu keselamatan .
 Semua certificate peralatan
dan operator harus
disediakan.
 Pekerja yang tidak terlibat
diharapkan tidak berada
dilokasi penggalian.
 Pemeriksaan harian excavator
harus dilakukan dan peralatan
aman untuk digunakan.
 Pengecekan kondisi tanah
yang berhubungan dengan
jalur proses, listrik dan
instrument dibawah tanah
harus dilakukan.
 Tandai jalur proses dan listrik
yang live didalam tanah dan
gunakan metode manual untuk
10

penggalian.
 Pastikan pekerja yang bekerja
sudah diotorisasi dan cakap
melakukan pekerjaan
penggalian tanah.
 Gunakan tangga dan
stik/tongkat pengecek pipa
tersedia di lokasi.
 Sediakan lampu portable
 Sediakan jas hujan
 Pasang rambu
 Sediakan pengatur lalu lintas
6) Housekeeping  Bad housekeeping  Proper PPE  Ensure housekeeping
implemented before and after
working hours.
 All equipment and toos is
stored in a safe place
6) Kebersihan  Housekeeping yang buruk  Gunakan PPE yang benar  Pastikan housekeeping
dilakukan sebelum dan
sesudah jam kerja
 Semua peralatan dan alat-alat
disimpan di tempat yang aman.
Note : - Stop jobs, if found irregularities or changed from the JSA to further discuse with all departments involved.
- Do manual excavation near the existing pipeline.
- Good communication between operator and signalman, ensure the operator follow instruction/sign from signalman.
Catatan : - Stop pekerjaan, jika didapati penyimpangan atau perubahan dari JSA untuk di diskusikan lebih lanjut dengan semua departemen yang terlibat.
- Lakukan penggalian manual di dekat jalur pipa existing
- Komunikasi yang baik antara operator excavator dengan signalmen, yankinkan operator mengikuti instruksi/ tanda dari signalman.