Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 8

FORM TECH-6B CURRICULUM VITAE (CV)

Position Title and No. Deputy Team Leader/Highway Engineer


Name of Firm Development Design Consultants LTD
Name of Expert: Md. Rafiqul Islam
Date of Birth: January16, 1953
Citizenship Bangladeshi
Education:
1 .B.Sc in Civil Engineering from Chittagong Engineering College under Chittagong University in 1978.

Employment record relevant to the assignment:


Employing organization and your
Period title/position. Country Summary of activities performed relevant to the Assignment
Contact information for references
August Bets Consulting Services Ltd, Bangladesh. Bangladesh Responsible for design review (Expressway/ highway) ,
2018 - Till Highway Engineer survey setting out, alignment survey( Highway &Structures),
Date For References curves setting( Horizontal & Vertical) ,cross section survey
Tel : + 8801713010416 .BM(Cheching) and Construction supervision of Earth work,
E –Mail : shabur@betsbd.com &others work during implementation stage ( consultancy
Dr Abdus Shabur services) funded by ADB for the work of rehabilitation,
Managing Director reconstruction , new construction , widening & Maintenance
etc 157 km long Highway four Lane of ( Elenga-Hatikamrul-
Rangpur Road ) SASEC-2 Road Connectivity Project Cost of
Project US$130 million. 8 nos Packages
Responsible for preparation of plan & program during design
Nov,2017- Bets Consulting Services Ltd, Bangladesh. Afghanistan review & construction supervision of earth work &others
July 2018 Team Leader/Highway Engineer work ( consultancy services), funded by ADB for the work of
For References rehabilitation, strengthening reconstruction , new construction
Tel : + 8801713010416 , widening ,Operation &Maintenance etc 50 km long
E –Mail : shabur@betsbd.com Expressway/ Highway Four Lane of Jabul Saraj Nijrab Road.
Dr Abdus Shabur with allied structures Viaduct, Bridge Steel Girder
Managing Director Interchange, RCC, Bridges & under pass, Culverts etc .The
project being implementing under the FIDIC condition of
contract and PMC Cost of Project US$35million.[Worked hilly
region in Afghanistan] 2nos packages.

Feb2014- Feed Back Infra Pvt ltd, India India Responsible for preparation of plan & program during design
Nov 2017 Team Leader Cum Sr Highway Engineer & construction supervision of earth work & others work for
For References Independent Engineer Services( consultancy services)
Tel: +9110244169375 funded by Indian Government, for the work of rehabilitation,
E-Mail : puja.jain@feedbackinfra.com strengthening operation &,Maintenance and six Lane
Puja Jain in/c( Service road) of Srinagar- banihal Section of NH-1A
Asst. Vice President( Highway Division) from Km 187.000 ti Jn 189.350 ( Banihal-By pass) & Km
220.700 to Km 286.110 onPPP/ DBFOT (Annuity) basis in
the State of Jammu & Kashmir India Under NHDP phase-
II” .with allied structures (PC girder/ RCC, Bridges ( 6
nos ),interchange, Flyover(2nos), underpass & Culverts). etc
The project being implementing under the FIDIC condition of
contract and PMC Cost of Project US$60million ( Eqvt). 2nos
packages
Mar 2012-. Bangladesh Consultants Ltd. Bangladesh Feasibility Study, Detailed Engineering Design& Preparation
Jan2014 Senior Highway Engineer[ Design Team of study of Expressway/Highways, preparation of bidding
Lead] documents, BoQs, cost estimates, etc. including associated
For references: structures, bridges, culverts etc in different projects.10 nos
Tel: +8801711422216 packages [Design of Highways in Different part of
E-mail: transport@bclgroup.com Bangladesh].
M.A. Aziz, Managing Director
_Aug2007 – SARM Associates Ltd. Afghanistan a.Feasibility Study,Detailed Engineering Design& Preparation
Mar 2012 Team Leader (Highway & Bridge) / Senior of study of Super Highway//’ Highway, Preparation of Bidding
Highway Engineer documents,BOQS,Cost Estimates etc including associated
For references: structures,Bridges,Culverts etc.
Tel: +8801711520168 b.Overall management of the project, supervision and guide of

Md. Rafiqul Islam 1/8


E-mail: info@sarm.com.bd subordinate team members of the project forExpressway/
H.M. Abdul Matin, Managing Director Highway and structures including operation & maintenance
design, drawing, followed by international standards like
AASHTO, ASTM, STAAD PRO, AASHTO LRFD Bridge Design
specification, and ACI code etc. Preparation of bid documents
as per FIDIC conditions of contract., construction supervision of
earth work & others work, soil & materials test, (all relevant test)
pile foundation, (casting situ and precast pile) trial pavement
works etc. Preparation of inception report, monthly progress
report etc. The project being implementing under the FIDIC
condition of contract and PMC Cost of Project US$30million.(
Design & supervision Phases) [worked hilly region in
Afghanistan].2 n0s packages.
1.Bangladesh Consultants Ltd. Bangladesh
1Nov 2005 Sr. Highway Engineer[Desigh Team Lead] 1Feasibility Study,Deatailed Engineeriing.Design&Preparartion
–Jun 2007 For references: of study of Expressway/highways .,preparation of Bidding
Tel: +880 1711 422216 documents, BOQs, Cost Estimate etc including associated
E-mail: transport@bclgroup.com Structures bridges, culverts etc in diferent projects in different
M.A. Aziz, Managing Director part of Bangladesh[ 4 n0s 0f packages] Cost is 100 US$ Million
2..Feb 2001 2. Bangladesh Consultants Ltd
–Oct 20005 Resident Engineer
3.Mar1996 For Reference 2.Design, design review and construction supervision roadway
–Jan 2001 Tel embankment with structures (PC girder, RCC Bridges &
Culverts), improved sub-grade, sub-base, lower base, upper
base course and asphalt concrete work (binder course and
wearing course i.e Flexible AC pavement ) construction of
bridges and culverts, soil & materials test, (all relevant test) pile
foundation, (casting situ and tubular pile), trial pavement works,
preparation of bidding documents, BoQs, cost estimates
including checking and certifying of contractor’s bills for
payment. Cost of Project US$180million.
3.Same as above Road Rehabilitation and Maintenance
project -2 3n0s widening packages ,4 nos Reconstruction
packages & 1270Km Maintenance highways 8 nos
packaGES Cost is US$200Million
Aug 1995 – Development Design Consultants Ltd. Bangladesh Quality control and supervision of construction of feeder road,
Feb 1996 Quality Control Engineer markets and structures (PC girder, RCC Bridges & Culverts)
For references: improvement works of rural roads. Preparation of monthly
Tel: 88 02 58813733, 58815231, progress report and liaison maintain with client etc.
58810801
E-mail: ddcon@bangla.net
A.K.M. Rafiquddin, Managing Director
Jun 1993 – SARM Associates Ltd. Bangladesh Preparation of plan & program, design review, redesign of
Jul 1995 Resident Engineer (Highway & Bridge) pavement, bridges and structures etc. Construction
For references: supervision of earth work & others work. Cost of Project
Tel: +880 1711 520168 US$160million. 7 nos of packages Road Rehabilitation and
E-mail: info@sarm.com.bd Maintenance project -1
H.M. Abdul Matin, Managing Director
May 1992 – The Designers Collaborative Ltd. Bangladesh Study of structural designs, drawing, specification of works,
May 1993 Senior Bridge Engineer / Senior cost estimate, hydrological and weather effects for making
Construction Engineer (Zonal in-charge) necessary modification, alternation and addition in designs,
For references: N/A and drawing, supervision of construction of PC girder, RCC
bridges (all relevant test of soil & materials test including
welding and painting test for ms rod / steel, casting situ and
precast pile foundation) and culverts including checking and
certifying of contractor’s bills for payment and preparation of
revised cost estimates. 4 nos packages and cost is 10
US$Million
Jan 1992 ECA, ESL & DUL Consortium Bangladesh Construction supervision, all tests of soil aggregate of material,
-- Quality Control Engineer mix design concrete (by BS and ACI method) and asphalt mix
May 1992 For references: N/A design tests by sand cone and core cutter method etc.Feeder
Road Improvement Project Cost is20 US$ Million 2 nos
packages
Oct 1988 – Development Design Consultants Ltd. Bangladesh 1Survey, design, sub-soil investigation, all kinds of tests of
Jan 1992 Senior Engineer / Resident Engineer materials, supervision of construction of earth work, improved

Md. Rafiqul Islam 2/8


(Highway & Bridge) / Mid-Level Engineer sub-grade, sub-base, lower base, upper base bituminous
For references: wearing course, concrete works etc.Road *Improvement
Tel: 88 02 58813733, 58815231, Project .and cost iis 120 USS$ Million 2 flood Damage
58810801 Rehabilitation project ,cost is 15 USS$ Million [Multiple
E-mail: ddcon@bangla.net packages ,23 nos]
A.K.M. Rafiquddin, Managing Director
Nov 1983 – Al-Aswad Establishment, Jeddah, KSA KSA Construction supervision and quality control of works,
Oct 1988 Civil Engineer (Highway & Bridge) preparation of progress reports, maintain liaison with consultant
For references: and client etc. Cost of Project US$200million. Al Gasim –
Tel: +966 12 6603844 Airport Project and Boriada Ring Road Project .6 nos of
Sheikh Ali, Director packages

Jan 1979 – Bangladesh Shilpa Bank Bangladesh Planning, design preparation of cost estimates, sub-soil
Oct 1983 Civil Engineer investing (pile foundation), testing of soils in laboratory,
For references: N/A quality control of building materials and supervision of
construction of works etc.
Jun 1978 M/S Nirmata Construction Bangladesh Construction supervision and quality control of works.
Dec 1978 Site Engineer
For references: N/A

Membership in Professional Associations and Publications:


Member, Institution of Engineers, Bangladesh.
Member, American Society of Civil Engineers (ASCE).
Member, Canadian Society of Civil Engineers (CSC.}
Know CPM/PERT/ Microsoft Project Office. 3 month Training over Project Management by Institution of Engineers, Bangladesh
Bangladesh Professional Engineers Registration Board Grade = PEng
ADB CMS REGITRATION NO: 147339
Language Skills:
Speaking Reading Writing
Bangla Mother tongue
English Excellent Excellent Excellent
Arabic Good Fair Fair
Hindi Good Fair Fair

Adequacy for the Assignment:


Detailed Tasks Assigned on Consultant’s Team Reference to Prior Work/Assignments that Best Illustrates Capability to Handle the
Leader: Assigned Tasks
 To Act as Employers Representative Name of assignment or project :( Elenga-Hatikamrul-Rangpur Road) SASEC-2 Road
Connectivity Project
 Assist the Employer in Contract Year: August 2018- till Date
Administration and Management of the
Project and Civil Work Contract including Location : Rangpur
 Interpret the Technical Specification and Client: Roads and Highways department (RHD), Bangladesh.
Contract Documents Main Project Features: Responsible for design review( Expressway/highway) , survey
 Administer and Supervise the temporary setting out, alignment survey( Highway &Structures), curves setting( Horizontal &
and permanent works in accordance with Vertical) ,cross section survey .BM(Checking) and Construction supervision of earth
the provisions of the contract including work & others work during implementation stage ( consultancy services) funded by
 Ensure that the notice to commence has ADB for the work of rehabilitation, reconstruction , new construction , widening &
been issued. Maintenance etc 157 km long Highway four Lane of ( Elenga-Hatikamrul-Rangpur
 Ensure receipt of requisite insurances as Road )SASEC-2 Road Connectivity Project
per contract requirement Activities Performing;
Responsible for design review( highway) , survey setting out, alignment
 Review the contractor”s securities being in
survey( Highway &Structures), curves setting( Horizontal & Vertical) ,cross section
Approved Format
survey .BM(Checking) and Construction supervision of earth work & & others work
 Review Documents and advance actions
during implementation stage ( consultancy services) funded by ADB for the work of
for handing over of site and on on issuing
rehabilitation, reconstruction , new construction , widening & Maintenance etc 157
notice to set the commencements date
km long Highway four Lane of (Elenga-Hatikamrul-Rangpur Road) SASEC-2 Road
 Ensure Contractor effects and implements Connectivity Project
Quality and Position Held :Highway Engineer
 Review Assurance system.
 Issue approval to the Contractor’s detailed Name of assignment or project : Jabul –Saraj –Nijranb Project
work programme, suggest modifications if Year :Nov 2017 to July 2018: ( 08 months )
any and ensure contractor compliance with Location : Gulbar
the Program Client: Ministry of Public Works, Islamic Republic of Afghanistan.
 and agree with the Employer the Main Project Features: Design review & construction supervision of earth work &

Md. Rafiqul Islam 3/8


contractor’s work programme and others work ( consultancy services) funded by ADB for the work of rehabilitation,
subsequently monitoring the construction strengthening operation& Maintenance etc. 50 km long road and Four Lane of Jabul
progress in accordance with the contract Saraj Nijrab Expreway/Road. with allied structures Viaduct, interchange, Bridge steel
requirements. girder interchange, RCC, Bridges & Under Pass Culverts etc .
 Review all surveys, field investigations,
designs, drawings & specifications, Activities Performing;
recommending any changes to provide during design review & construction supervision of earth work & others work
more cost effective solutions and ( consultancy services) funded by ADB for the work of rehabilitation, strengthening &
approving the design, drawings and operation &Maintenance etc. 50 km road and Two lane &Four Lane of Jabul Saraj
changes in the specifications. Nijrab Expreway/Road. with allied structures Viaduct interchange, Bridge Steel
 Ensure that the Contractor is granted Girder, RCC, Bridges Under Pass & Culverts etc . The project being implementing
possession of the site in accordance with under the FIDIC condition of contract and PMC
the agreed programme or otherwise Position Held : Team leader CUM/Highway Engineer
providing accordance notice to the EA of Name of assignment or project : Srinagar- Banihal 4 lane Highways Project
possible delays due to lack of possession. Year : Feb2014–Nov 2017( 54 months)
 Maintain close liaison with the EA and Location : Srinagar
other relevant agencies including the Client : Govt of India
police, Government and regional Main Project Features: Govt funded 63 Km long 6 lane Expressway/highway,
authorities and local stakeholders rehabilitation,Strenghing,new construction of Srinagar- Banihal project. Responsible
 Measures the works agreed and certifying for preparation of plan & program during design & construction supervision of earth
interim and final payment certificates for work & others work for Independent Engineer Services (consultancy services) funded
submission to the EA and assisting the EA by Indian Government, for the work of rehabilitation, strengthening ,operation &
in preparing loan withdrawal Maintenance and6 Lane of Srinagar- banihal Section of NH-1A from Km 187.000 to
documentations to ADB. 189.350 (Banihal-Bypass) & Km 220.700 to Km 286.110 on DBFOT (Annuity) basis
 Assess and where appropriate make in the State of Jammu & Kashmir India Under NHDP phase- II .
recommendations on applications for
extension of time, claims for additional Position Held : Team Leader cum Sr Highway Engineer
payment and other contractual disputes
Activities Performing : Responsible for preparation of plan & program during design &
construction supervision of earth work &others wok for Independent Engineer
issuing site instructions, variations orders, Services( consultancy services) funded by Indian Government, for the work of
provisional sum orders and day works as rehabilitation, strengthening, operation &Maintenance and Four Lane of Srinagar-
appropriate. banihal Section of NH-1A from Km 187.000 to 189.350 ( Banihal-Bypass) & Km
 Monitor the contractor’s laboratory testing 220.700 to Km 286.110 onPPP/ DBFOT (Annuity) basis in the State of Jammu &
and carrying out Independent testing as Kashmir India Under NHDP phase- II with allied structures (PC girder/ RCC, Bridges
required. & Culverts). Also Responsible for Over all Management of the project.
 Check and approve the contractor’s works Name of assignment or project :Different Roads and Highways Projects undertaken
and “as built “drawings. by BCL
 Prepare a final report for the contract Year: Mar 2012 to Jan 2014 20months
which will be a compilation and Location: Dhaka
condensation of data presented in regular Client: Roads and Highways Department
monthly and quarterly progress reports Main project features:Feasibility Study,Preliminary Engineering Design of Highways,
together with copies of “as built” drawings preparation of specification and contract documents.
within three months of the issues of the Positions held: Senior Highway Engineer[Design Team Lead]
defect liability certificates. Activities performed: Worked Feasibility Study,Preliminary Engineering design in
 Develop training programme for EA staff section at BCL Head Office for design Section, preparation of bidding documents,
and provide on the job training on BOQs, cost estimates, etc. for different roads andExpressway/ highways projects
construction supervision including contract including associated structures bridges, culverts The project being implementing
administration, quality control, monitoring under the FIDIC condition of contract and PMC
and evaluation, environmental monitoring Name of assignment or project: Rehabilitation of Doshi-Pol-E Khumri Super Highway
and the project performance monitoring Project(Design & Supervision phases)
system. Year: Aug 2007 to Mar 2012; 55 months
 Assist the EA to update and Location: Doshi-Pol-E Khumri, Afghanistan
implementation the LARP including Client: Ministry of Public Works (MPW),Islamic Republic of Afghanistan
reporting. Main project features:Feasilibility Study,Preliminary Engineering Design, Detailed
 Prepare and implement the PPMS in Engineering Design, Project Management and full time Supervision to upgrade and
consultation with ADB and the EA. rehabilitate the 52 km of existing Road having 2 lane & 4 laneExpressway/ Highway
 Ensure that the construction methods as with allied structures including operation & maintenance (flexible AC Pavement ,PC
proposed by contractors comply the girder, RCC, Bridges & Culverts). Available information with regard to topographic
requirements of the approved EMP surveys, soils and materials, surveys, bridge/culvert surveys, hydrological/hydraulic
including implementation of the surveys, Benkelman Beam tests etc. The project funded by IDB.
Environmental monitoring plan. Positions held: Team Leader (Highway & Bridge) / Senior Highway Engineer
 Monitor the implementation of the health Activities performed: Worked with the international team of HI-TECK OF
and safety programmme at camp site with AFGHANISTAN &BETS-SARM OF BANGLADESH. Assist the Employer in contract
the including information and education, administration and management of the Project and Civil Work Contract. Interpret the
campaign on sexually transmitted Technical Specifications and Contract Documents. was responsible for overall
diseases including human management of the project, supervision and guide of subordinate team members of

Md. Rafiqul Islam 4/8


immunodeficiency, virus acquired the project for Highway and structures (2 nos. new Bridges & 15 nos. new Culverts)
immunodeficiency syndrome( HIV/AIDS)as design, drawing, followed by international standards like AASHTO, ASTM, STAAD
required by the contract.. PRO, AASHTO LRFD Bridge Design specification, and ACI code etc. and preparation
 Ensure that no child labour is employing in of bid documents, process the bidding documents for award of contract. Also
the contract. responsible for construction supervision of roadway embankment, sub-grade, sub-
 Assess and design for approval by these base, base course and asphalt concrete work (binder course and wearing course),
and ADB the community outreach construction of bridges and culverts, soil & materials test, (mix design of asphalt
programme and supervise implementation concrete, concrete and all relevant test) pile foundation, (casting situ and precast pile)
by the contractor. trial pavement works etc. Preparation of inception report, monthly progress report etc.
 Coordinate the preparation, approval by Preparation of Maintenance Manual. Obtain related approvals from concerned
the EA and ADB of the project security authorities for any redesign of road realignment, modifications and redesign of
plan and supervise implementation by the bridges. Review the contractor’s securities being in approved format. Ensure receipt
contractor. of requisite insurances as per contract requirement. Review documentations and
 Prepare and implement he consultant advance actions for handing over of site and advise on issuing notice to set the
Security plan. commencement date. Ensure contractor effects and implements Quality Assurance
 Prepare daily Reports System. Issue approval to the contractors detailed work program, suggest
 Prepare monthly progress reports, in a modifications if any and ensure contractor compliance with the Program. Issue
form agreed with the EA and ADB and approval to the Contractor’s Superintendence Personnel with modifications if any.
submit these within 10 days of the end of The project being implementing under the FIDIC condition of contract and PMC
the month to which they refer. Name of assignment or project: Different Roads and Highways Projects undertaken
 Prepare quarterly progress reports, in a by BCL
form agreed with the EA and ADB and Year: Nov 2005 to Jun 2007; 20 months
submit these with 1month of the end of Location :Dhaka
the reporting period ,these reports are Client: Roads and Highways Department
cover physical and financial progress, loan Main project features: Feasibility Study,Preliminary Engineering Design of Highwayst,
withdrawal, compliance with the preparation of specification and contract documents.
environmental mitigation requirements, Positions held: Senior Highway Engineer{DesignTeam Lead]
Results of the project performance Activities performed: Worked Feasibility Study,Preliminary Engineering in design
monitoring system and results of other section at BCL Head Office for design of Highways, preparation of bidding
environmental monitoring. documents, BOQs, cost estimates, etc. for different roads and highways projects
 Advise the EA on all matters concerning including associated structures, bridges, culverts etc.
implementation of the contracts including
quality control, work progress,
Name of assignment or project: Southwest Road Network Development project
implementation issues and arbitration or
Year: Feb 2001 to Oct 2005; 57 months
litigation etc.
Location: Dhaka–Khulna corridor
Client: Roads and Highways Department
 Review and approve the contractors
Main project features: Construction, improvement and rehabilitation of 163 km long 2
staffing management plans.
lane Flexible AC Pavement highway including bridges & culverts and construction of
 Carryout checks on the contractor’s setting protection works for 138 nos. structures including 450m long Arial Khan bridges with
out and ensuring that works are carried out extensive river training works (reconstruction Dhaka to Khulna highway). The project
in accordance with drawings and others financed by ADB.
design details. Positions held: Resident Engineer (Highway & Bridge)
 Maintain full and details permanent site Activities performed: Worked with the international team of Japan Overseas
records in/c site correspondence, survey Consultants co. Ltd of Japan-BCL OF Bangladesh. Was responsible for design
data, quality acceptance data, site diaries, review and construction supervision 30 km long highway of Mollahhat-Noapara
management and certification ,minutes of Section (Contrnct-No-5) with structures (PC girder, RCC, 18 nos. new Bridges & 29
meeting, and records of all others nos. new Culverts). Also responsible for construction supervision of 16 km Soft
contractually relevant matters. Ground Treatment, roadway embankment, sub-grade, sub-base, lower base, upper
 Monitor contractor’s quality control base course and asphalt concrete work (binder course and wearing course)
procedure and laboratory testing and construction of bridges and culverts, soil & materials test, (all relevant test) pile
carrying out Independent testing as foundation, (casting situ and precast pile) trial pavement works etc. Preparation of
required. monthly progress report for the project. The project implemented under FIDIC
conditions of contract. Issue approval to the contractors detailed work program,
 Ensure that works are excluded in suggest modifications if any and ensure contractor compliance with the Program.
accordance with all provisions of the Issue approval to the Contractor’s Superintendence Personnel with modifications if
contract including those relating to any. Scrutinize contractor’s mobilization of equipment in accordance with the
standards materials and workmanship, contractors program. Scrutinize and approve contractor’s construction methods
health and safety requirement and statement. Preparation of Maintenance Manual.
environmental protection requirements.
 Measures, the works, agree and certify Name of assignment or project: Second Road Rehabilitation and Maintenance project
interim and final payment certificates for Year:Mar1996 to Jan 2001; 59 months
submission to the employer in consultation Location: South and Western Zones of RHD
with the Team Leader and assisting the Client: Roads and Highways Department
Employer in preparing loan withdrawal Main project features: Preparation of plan & program during construction supervision
documentation to ADB. phase for consultancy services of 60 km long 2 lane highway and structures of (PC

Md. Rafiqul Islam 5/8


 Assist Employer in administrating, girder, RCC 4 nos. new Bridges & 50 nos. new Culverts) of widening contracts
assessing and where approval, making (W2&W3) and periodic maintenance contracts 150 Km long 2 lane highway under
recommendations on applications for WB funded 1270 km long 2 lane Flexible AC Pavement Highway (reconstruction
extension of time, claims for additional contract 170 km, widening contract 100 Km and periodic maintenance contract 1000
payment other contractual disputes. km). The project funded by The World Bank Preparation of Maintenance Manual67.
 Maintain regular estimates of the cost to Positions held: Resident Engineer(Highway & Bridge)
completion and time to completion for Activities performed: Worked with the international team of SMEC&-QUEENSLAND
contracts. TRANSPORT OF AUSTRALIA – BCL OF BANGLADESH. Was responsible for
 Reviewing Contractor’s proposed work construction supervision of roadway embankment, improved sub-grade, sub-base,
programme and recourses for routine lower base, upper base course and asphalt concrete work (binder course and
emergency and the winter maintenance wearing course i.e flexible AC Pavement) construction of bridges and culverts, soil &
and provide training to EA staff who will materials test, (all relevant test) pile foundation, (casting situ and tubular pile), trial
take quality control and administration of pavement works including checking and certifying of contractor’s bills for payment.
maintenance. Also guide and supervise the work of other team member of the project. Preparation
 Assist Land acquisition and resettlement of monthly progress report for the project. (Compare with the target). Project
activities being undertaken by GOVT implemented under FIDIC conditions of contact. Issue finalized or revised “Good for
Provincial authorities’ cooperation with Construction drawings” and additional detailed drawings required for the execution of
resettlement specialist. the work. Issue to contractor amended alignment plan and profile drawings based on
 Prepare with assistance of environment review of tender drawings and updated topographic surveys. Issue bridge details and
specialist, environmental monitoring modified drawings wherever required due to change in founding level, as a result of
reports for inclusion in the quarterly and change in founding strata or any other reason at the time of execution. Approve
annual reports contractors working drawings based on setting out details
 Monitor the implementation of the health Name of assignment or project: Rural Roads and Markets Improvement and
and safety programme. Maintenance Project (RD-7)
 Ensure that no child labour is employed Year: Aug 1995 to Feb 1996; 07 months
under the contract. Location: Greater Rajshahi, Pabna and Bogra districts
 Approve contractors working drawings Client: Local Government Engineering Department
based on setting out details Main project features: The project comprised construction of 500 km. of Type-B
 Approve setting out data for the Works feeder roads in the old districts of Rajshahi, Pabna and Bogra, maintenance of these
finalized as a result of ground verification roads for full project period, construction of about 3700 running meters of structures
and survey (culverts and small bridges) on rural roads, improvement of physical facilities of one
 Monitor supervision of all works and market in each of 65 Upazilas (Sub-districts). The project financed by The World
ensure proper supervision as per contract Bank, KFW, SDC and Government of Bangladesh.
requirement Positions held: Quality Control Engineer
 Monitor closely and regularly the progress Activities performed: Worked with the international team of TPO'Sullivan & Partners,
of work and advise the contractor about Sir. M. MacDonald and Partners of UK and DDC Ltd. of Bangladesh. Was
corrective measures. responsible for quality control and supervision of construction of feeder road, markets
 Monitor status of contractor’s equipments, and structures (PC girder, RCC Bridges & Culverts) improvement works of rural
plant, machinery installations, housing and roads. Preparation of monthly progress report and liaison maintain with client etc.
medical facilities. Name of assignment or project: Road Rehabilitation and Maintenance Project
 Direct and/or advise contractor to avoid (Phase-II)
and/or reduce the risk in case of any Year: Jun 1993 to Jul 1995; 26 months
emergency Location: Pirgonj to Rangpur section
 Prepare Financial statement Client: Roads and Highways Department
 Approve “as built” Drawings Main project features: The project funded by World Bank comprised of assessment,
 Inspect Works on Completion of each detailed investigation, redesign of pavement (Flexible AC Pavement), bridges and
milestone before accepting the work and necessary structures, assist RHD in pre-qualification of contractors and contract
report to the PIU award services, contract management, construction monitoring and full time
 Inspect Works at appropriate Intervals supervision of construction works etc.
during Defect Notification Period and Positions held: Resident Engineer (Highway & Bridge)
advise to the PIU Activities performed: Worked with the international team Louis Berger of US and
 Ensure the contractor Implements and SARM Associates Ltd. of Bangladesh. Was responsible for preparation of plan &
Maintains the Environmental monitoring in program, design review, redesign of pavement, bridges and structures etc.&
compliant with the Environmental Construction supervision of earth work & others work Monitor status of contractor’s
Management Plans equipments, plant, machinery installations, housing and medical facilities. Direct
 Assist PWD Staff to carry out all the duties and/or advise contractor to avoid and/or reduce the risk in case of any emergency.
as apply to Maintenance Works Contracts Advise contractor in all matters covering safety and care of work, environmental
 Preparation of maintenance manual, aspects and labor welfare. Review the test results / certificate of all construction
 Advise contractor in all matters covering material and/or sources of materials to ensure quality. Review mix designs proposed
safety and care of work, environmental by the Contractors. Prepare monthly reports. Prepare Financial Statement. Approve
aspects and labor welfare “as built” drawings
 Review the test results / certificate of all Name of assignment or project: Bridges and Culvert Structures Program, 1990-93
construction material and/or sources of Year: May 1992 to May 1993; 13 months
materials to ensure quality. Location: Chittagong Zone

Md. Rafiqul Islam 6/8


 Review mix designs proposed by the Client: Ministry of Relief and Rehabilitation
Contractor. Main project features: Construction of BC bridge, PC girder, RCC bridges, culverts
 Maintain a permanent record of all etc. including bridge approach roads.
payments made to the contractor Positions held: Senior Bridge Engineer/Senior Construction Engineer (Zonal in
 Prepare a Project Completion Report Charge)
(PCR.) for each of the civil works contracts Activities performed: Responsible for study of structural designs, drawing,
after physical project Completion. specification of works, cost estimate, hydrological and weather effects for making
necessary modification, alternation and addition in designs, and drawing, supervision
of construction of PC girder, RCC 13 Nos. bridges (all relevant test of soil & materials
test including welding and painting test for ms rod / steel, casting situ and precast pile
foundation) and 6 Nos. culverts including checking and certifying of contractor’s bills
for payment and preparation of revised cost estimates.
Name of assignment or project: Feeder Roads Improvement Project
Year: Jan 1992 to May 1992; 05 months
Location: Tangail-Modhupur
Client: Roads and Highways Department
Main project features: Construction and Improvement of 46 km of roads and 33 nos.
structures (PC girder, RCC Bridges & Culverts). The project funded by ADB.
Positions held: Quality Control Engineer
Activities performed: Responsible for supervision of construction of 46 km of Road
and 33 nos. structures (PC girder, RCC Bridges & Culverts), all tests of soil
aggregate of material, mix design concrete (by BS and ACI method) and asphalt mix
design tests by sand cone and core cutter method and mix designs (concrete and
asphalt) etc.
Name of assignment or project: Road Improvement Project
Year: Mar 1990 to Jan1992; 23 months
Location: Daulatdia-Faridpur-Jhenaidah-Kushtia Highway and Dhaka-Comilla-Feni-
Chittagong-Cox's Bazar Highway
Client: Roads and Highways Department
Main project features: The main objectives of the consulting services were to
undertake detailed engineering of about 100 km national roads and construction
supervision, quality control and project management of 300 km of selected national
highways for improvement. The project financed by ADB.
Positions held: Senior Engineer /Resident Engineer (Highway & Bridge)
Activities performed: Worked with the international team of Consulting Engineering
Services (India) Ltd. of India; Rougton and Partners of UK and DDC Ltd.of
Bangladesh. Was responsible for survey
design, sub-soil investigation, all kinds of tests of materials, supervision of
construction of earth work, improved sub-grade, sub-base, lower base, upper base
bituminous wearing course(Flexible Ac pavement), concrete work for construction of
bridges and culverts, trial pavement of 145 Km long 2 lane highway and structures
(PC girder, RCC Bridges & Culverts) etc. Approve setting out data for the Works
finalized as a result of ground verification and survey. Monitor supervision of all works
and ensure proper supervision as per contract requirement. Monitor closely and
regularly the progress of work and advise the contractor about corrective measures.
Name of assignment or project: Flood Damage Rehabilitation and Maintenance
Project
Year: Oct 1988 to Feb 1990; 17 months
Location: Greater Sylhet District
Client: Roads and Highways Department
Main project features: The project involved assessment of flood damage of the
existing national, regional highway and rural road, bridges and culverts and
undertaking detailed engineering for reconstruction and or rehabilitation and
maintenance of the distressed structures i.e. roads, bridges, culverts etc. The project
financed by ADB.
Positions held: Mid-Level Engineer/ Resident Engineer (Highway)
Activities performed: Worked with the international team of Consulting Engineering
Services (India) Ltd. of India; and DDC Ltd.of Bangladesh. Was responsible for
survey, design, checking of quality, sub soil investigation, all kinds of test for
materials, concrete and asphalt mix design, supervision of 210 km long 2 lane
highway and structures including national, regional highway and rural road, checking
and certifying of contractor’s bills for payment etc.

Name of assignment or project: Algasim to Airport Highway/Expressway Project and

Md. Rafiqul Islam 7/8


Borida ring road Project
Year: Nov 1983 to Oct 1988; 60 months
Location: Algasim and Borida
Consultant : Khatib Alami,Lanon
Client: Ministry of Communications, KSA
Main project features: Construction of 40 km long 4 lane Dual Highway/Expressway
and 26 km long 8 lane Ring Roads (I/c Service Road) and structures (PC girder, RCC
Bridges & Culverts) including 8 nos. grade separated flyover at different locations of
Saudi Arabia.
Positions held: Civil Engineer/Deputy Project Manager (Highway & Bridge)
Activities performed: Was responsible for construction supervision earth work &
others work and quality control of works, preparation of progress reports, maintain
liaison with consultant and client etc.
Name of assignment or project: Construction of different Buildings, Complex under
Bangladesh Shilpa Bank
Year: Jan 1979 to Oct 1983; 58 months
Location: Dhaka
Client: Ministry of Finance
Main project features: Construction of 25-storied Shilpa Bank Building, Industrial
Buildings, Commercial Complex namely Cinema Hall, Hotel, etc.
Positions held: Civil Engineer/Asst. Resident Engineer
Activities performed: Responsible for planning, design preparation of cost estimates,
sub-soil investing (pile foundation), testing of soils in laboratory, quality control of
building materials and supervision of construction of works etc.
Name of assignment or project: Construction of a Housing complex for
AshuganjFirtilizer Project
Year: Jun 1978 to Dec 1978; 07 months
Location: Ashuganj, Brahmnbaria
Client: Ministry of Industry
Main project features: Construction of Housing Complex at Ashuganj, Brahmnbaria.
Positions held: Site Engineer/Asst Project Manager
Activities performed: Responsible for construction supervision and quality control of
works.

Expert’s contact information: (E-mail: engr_rafiqulislam@yahoo.com,engr.rafiqul.islam1601@gmail.com / Phone: + 8801884534949 ,+


8801738647456)
Name of Address and phone number for referes:
1 Md Sirajul Islam Chief Engineer of CUTE 2. H.M. Abdul Matin, Managing Director
Chittagong University of Technology& Engineering [CUTE] SARM Associates Ltd.
Tel: +8801818980540 Tel: +880 1711 520168
E-mail: chiefengineercute@gmail.com E-mail: info@sarm.com.bd

Certification:
I, the undersigned, certify to the best of my knowledge and belief that
(i) This CV correctly describes my qualifications and experience
(ii) I am not a current employee of the Executing or the Implementing Agency
(iii) In the absence of medical incapacity, I will undertake this assignment for the duration and in terms of the inputs specified for me in Form
TECH 6 provided team mobilization takes place within the validity of this proposal.
(iv) I was not part of the team who wrote the terms of reference for this consulting services assignment
(v) I am not currently debarred by a multilateral development bank
(vi) I, as the authorized representative of the firm submitting this Proposal for the consultancy services for “……. : …………( Loan No:……) ,
certify that I have obtained the consent of the named expert to submit his/her CV, and that s/he will be available to carry out the
assignment in accordance with the implementation arrangements and schedule set out in the Proposal, and confirm his/her compliance
with para (i) to (v) above.

I understand that any willful misstatement described herein may lead to my disqualification or dismissal, if engaged.

DATE 30/09/2021
[Signature of expert or authorized representative of the firm] Day/Month/Year
Full name of authorized representative: …………………………..

Md. Rafiqul Islam 8/8

You might also like