Professional Documents
Culture Documents
Team Leader/Highway Engineer: ORM ECH
Team Leader/Highway Engineer: ORM ECH
Feb2014- Feed Back Infra Pvt ltd, India India Responsible for preparation of plan & program during design
Nov 2017 Team Leader Cum Sr Highway Engineer & construction supervision of earth work & others work for
For References Independent Engineer Services( consultancy services)
Tel: +9110244169375 funded by Indian Government, for the work of rehabilitation,
E-Mail : puja.jain@feedbackinfra.com strengthening operation &,Maintenance and six Lane
Puja Jain in/c( Service road) of Srinagar- banihal Section of NH-1A
Asst. Vice President( Highway Division) from Km 187.000 ti Jn 189.350 ( Banihal-By pass) & Km
220.700 to Km 286.110 onPPP/ DBFOT (Annuity) basis in
the State of Jammu & Kashmir India Under NHDP phase-
II” .with allied structures (PC girder/ RCC, Bridges ( 6
nos ),interchange, Flyover(2nos), underpass & Culverts). etc
The project being implementing under the FIDIC condition of
contract and PMC Cost of Project US$60million ( Eqvt). 2nos
packages
Mar 2012-. Bangladesh Consultants Ltd. Bangladesh Feasibility Study, Detailed Engineering Design& Preparation
Jan2014 Senior Highway Engineer[ Design Team of study of Expressway/Highways, preparation of bidding
Lead] documents, BoQs, cost estimates, etc. including associated
For references: structures, bridges, culverts etc in different projects.10 nos
Tel: +8801711422216 packages [Design of Highways in Different part of
E-mail: transport@bclgroup.com Bangladesh].
M.A. Aziz, Managing Director
_Aug2007 – SARM Associates Ltd. Afghanistan a.Feasibility Study,Detailed Engineering Design& Preparation
Mar 2012 Team Leader (Highway & Bridge) / Senior of study of Super Highway//’ Highway, Preparation of Bidding
Highway Engineer documents,BOQS,Cost Estimates etc including associated
For references: structures,Bridges,Culverts etc.
Tel: +8801711520168 b.Overall management of the project, supervision and guide of
Jan 1979 – Bangladesh Shilpa Bank Bangladesh Planning, design preparation of cost estimates, sub-soil
Oct 1983 Civil Engineer investing (pile foundation), testing of soils in laboratory,
For references: N/A quality control of building materials and supervision of
construction of works etc.
Jun 1978 M/S Nirmata Construction Bangladesh Construction supervision and quality control of works.
Dec 1978 Site Engineer
For references: N/A
Certification:
I, the undersigned, certify to the best of my knowledge and belief that
(i) This CV correctly describes my qualifications and experience
(ii) I am not a current employee of the Executing or the Implementing Agency
(iii) In the absence of medical incapacity, I will undertake this assignment for the duration and in terms of the inputs specified for me in Form
TECH 6 provided team mobilization takes place within the validity of this proposal.
(iv) I was not part of the team who wrote the terms of reference for this consulting services assignment
(v) I am not currently debarred by a multilateral development bank
(vi) I, as the authorized representative of the firm submitting this Proposal for the consultancy services for “……. : …………( Loan No:……) ,
certify that I have obtained the consent of the named expert to submit his/her CV, and that s/he will be available to carry out the
assignment in accordance with the implementation arrangements and schedule set out in the Proposal, and confirm his/her compliance
with para (i) to (v) above.
I understand that any willful misstatement described herein may lead to my disqualification or dismissal, if engaged.
DATE 30/09/2021
[Signature of expert or authorized representative of the firm] Day/Month/Year
Full name of authorized representative: …………………………..