Samples 033 C
Samples 033 C
SWP
04-01
Plan for Integrity
In O&M
SAES-L-133
SWP-04-04
SSWP-04-05
Maintain
Inspect Assets
assets
2
TWP Measurement / SGWP-01
TWP Inspection
04-05-02 Manage
04-02-02
Implement Corrosion Records Improvement &
Operate Plant
Management O&M Change
3
TWP
Corrosion
04-05-03
Assess Corrosion
Review A
Management O&M SGWP-01
Manage
Improvement &
3 Change
EWP
02-04-01-02 SGWP-05
Design Manage
for Audit &
Maintainability Review
GWP-04
Manage Integrity
in O&M
Manage
Projects
1 Top
SWP
04-05
Corrosion
Management
TWP
02-05-03
Corrosion Control
Develop
Plan(design)
Corrosion
Mgt Tactical
Design
1
EWP-04-05-01-01
Develop Corrosion
Management Strategy
1.1
2
EWP-04-05-01-02
SSWP-04-05
Perform Corrosion
Inspect Assets
Risk Assessment
1.2
3 4 EWP 5 EWP
EWP TWP
02-03-03 04-05-01-04 04-05-01-05
04-05-01-03
Develop Develop Corrosion Develop Corrosion
Plan Process Stream Preliminary Control Strategy Monitoring
Monitoring EIS Strategy
TWP
04-05-02
Implement
Corrosion
Management
TWP
04-05-01
Plan Corrosion
Management
Establish Roles
Responsibilities
Corrosion
Review
SAES-L-133
TWP 3
02-05-03 Corrosion Control Plan
Establish Strategy
Develop Corrosion Plan(design) documentation
Allocation/modification
Mgt Tactical
to inspection/monitoring/
Design
maintenance//control
Establish
4 procedures
for prevention of
damage during start
up/shutdown and
prevention of damage
during downtime
KPI review
5
Establish KPIs
KPI targets
Frequency of KPI
SARCOP reporting
procedures
6
Establish O&M,
Analysis procedures
7
Establish Data
Mgt system (CMS)
SAIF(OSI)
8
Establish Reporting
Frequency from CMS
9
Establish reporting
Systems and
Lines of communication
1.1b
CorManPro_14 integrated 14/12/2009 3
1.1bEWP-04-05-01-01
1.1a
10
Establish MOC
procedure
11
Establish timing/frequency
for Corrosion Review
(EWP-04-05-03-02)
12
Establish timinig of
SAEP-308
PIUA (Plant inspection
unit assessment)
13
SAEP-343
Assess need for
RBI, timing, scope,
level
RBI Y
performed?
14
Corrosion
Review
15
Update corrosion
SSWP-05-02 Criticality ranking
MOC Update strategy for
Inspection/monitoring
/control/maintenance
SWP-04-04
SSWP-04-05
Maintain
Inspect Assets
assets
16
SAEP-20
SAEP-1135 Reset schedules
For programs
TWP
04-05-01
Plan Corrosion
Management
1.1
EWP
04-05-01-01
TWP Develop Corrosion
CCP (Corrosion Management
02-05-03
Control Plan at Strategy
Develop Corrosion
Design)
Mgt Tactical
Design
SAES-L-133
1
AWP
02-03-02-01-02
I Update/Identify
Identify Damage
Damage Mechanisms
Mechanisms
SGWP-01
Manage
SWP-02-03 Improvement &
Inspect Change
Assets
AWP 2
02-03-02-01-01 EWP
Update/Identify 04-03-01-01
Identify Maintain
Corrosion Loops
Corrosion EIS
Loops
3 4
SAEP-20 Determine Corrosion Determine RBI Risk
Service Class Ranking
CRA report
Review CRA
EWP
EWP EWP
04-05-01-05
04-05-01-03 04-05-01-04
Develop Corrosion
Plan Process Develop Corrosion
Monitoring
Stream Monitoring Control Strategy
Strategy
1.2
EWP
04-05-01-02
Perform Corrosion
Risk Assessment
SABP-A-013
SABP-A-016
SABP-A-018
SABP-A-019
SABP-A-020
SABP-A-021
1
Select process
parameter
Establish sampling
locations
CRA
3
Establish sampling SM
Frequency and schedule
Methodology
4
Establish field and lab
Operating procedures
5
Establish storage
function for data to
protect from loss
6 7
Prepare Method
Stream monitoring Prepare lab statements and
Method statements Quality plan Quality plans
(sampling techniques)
SM resource
Prepare resource plan plan
10
Submit draft
For approval
N Y Agreed SM
Approved? plan
1.3b
CorManPro_14 integrated 14/12/2009 6
1.3bEWP-04-05-01-03
1.3a
11
SM
Prepare monitoring
schedule
list
12
Review/Revise
Existing Method
Statements/Quality
plans
13
Draft method
Statements/Quality
plans
14
Establish acceptance
Criteria,accuracy reqts,
Turnaround time
15
Submit drafts
for approval
16
N Y Method
Issue approved statements
Approved?
Method/Quality plans Quality plans
EWP
04-05-02-01
Implement
Process stream
monitoring
1 2.1
1.2
TWP EWP
02-05-03 CCP (Corrosion 04-05-01-02
Develop Corrosion Control Plan) Perform Corrosion
Management Tactical Risk Assessment
Design
SWP-04-03 1
Inspect
Assets Review and Update
T&I plans
3 4 5 6
AWP-04-05-01-04-02 AWP-04-05-01-04-03 AWP-04-05-01-04-04
AWP-04-05-01-04-01
Plan Cathodic Plan Chemical Plan Paints/Coats/
Plan Chemical
Protection Cleaning/ Linings
Injection/Inhibition
Scraping
EWP
04-05-02-02
Implement
Corrosion
Control
1 2.2
1.4
EWP
04-05-01-04
Develop Corrosion
Control Strategy
SABP-A-015
1
Strategic Plan
Select system
types
CRA Report
Select injection
points
4
01-SAIP-04 Establish inspection Inspection
SAEP-20 plan (location/ Plan
frequency)
3 5
Establish injection Maintenance
Establish injection
System maintenance Plan
requirements
plan
6
Define solution
Dosage
7 Injection rates
Establish operating/
maintenance safety
procedures
8
SAES-A-205 Establish chemical
SAES-A-208 quality control
procedure
SGWP-03
Manage
Change
9
Establish MOC
procedure
00-SAIP-72
10
Establish Resource
Resource Plan
Plan
11
SGWP-07 Injection point
Establish
Manage details
documentation system
Knowledge
12
Establish KPIs
EWP
04-05-01-04
Develop Corrosion
Control Strategy
2.2.1 1.4
1.4
EWP
04-05-01-04
Develop Corrosion
Control Strategy
SAES-X-
300,400,500,600,
700,800
Standard
Drawings
1
Establish Roles
Responsibilities
Competencies
SAEP-333
2
Establish Protection
Criteria and Protection
KPIs
3
Equipment Inspection
Plan
CP Schedules
Rectifiers, anodes,
solar power systems,
connections
4
Establish equiipment CP Maintenance
Maintenance/test Plan
plan
5
CP Schedules
CP potential
Locations
Survey plan
6
Resource
Establish
Plan
Resource Plan
EWP
04-05-01-04
Develop Corrosion
Control Strategy
1.4
1.4
EWP
04-05-01-04
Develop Corrosion
Control Strategy
SAEP-1025
SAEP-1662
Establish Roles
Responsibilities
Inspection
Establish need
Sample analysis
EWP 3
04-05-01-05
Develop Define
Corrosion Schedule
Monitoring
T&I Strategy
Scale
Select stages
analysis
Establish
procedures
Review Approve
procedures procedures
8
Establish safety
requirements
Establish Resource
plan
10
Establish KPIs
EWP
04-05-01-04
Develop Corrosion
Control Strategy
1.4
CorManPro_14 integrated 14/12/2009 11
1.4.4AWP-04-05-01-04-04
1.4
EWP
04-05-01-04
Develop Corrosion
Control Strategy
SAES-L-133
2
Corrosion
Identify inspection
Review
locations
3
Coating
Inspect Assets Prepare detailed
Inspection plan
T&I inspection plan
EWP Paints/Coats/Linings
Corrosion
04-05-02-02-04 Inspection
Review
Implement Paints/ Records 4
Coats/Linings Coating
Plan for coatings
Maintenance plan
repair/maintenance
SWP-04-04
Maintain
assets
5
Establish HSE (health,
SAES-H-102
safety and
environment) reqts.
6
Establish competency
SGWP-02
of personnel identified
Manage
to undertake
Competency
application
7
Coating
Prepare resource plan Resource plan
EWP
04-05-01-04
Develop Corrosion
Control Strategy
2.2.4 1.4
SSWP-04-05
Inspect
Assets
1.2
EWP
04-05-01-02
Perform Corrosion
TWP Risk Assessment
04-03-01
Plan
Inspections
SABP-A-013
SABP-A-016
SABP-A-019
SABP-A-020
SABP-A-021
SAES-L-133
1 2 3 4 5
AWP AWP
AWP AWP
04-05-01-05-01 04-05-01-05-02
Plan OSI, EIS,NDT 04-05-01-05-03 04-05-01-05-04
Plan Coupons Plan Probe
Plan CUI Program Plan ILI
Program Management
EWP
04-05-02-03
Implement
Corrosion
Monitoring
Strategy
1 2.3
1.5
EWP
04-05-01-05
Develop Corrosion
Monitoring
SABP-A-013
Strategy
SABP-A-016
SABP-A-018
SABP-A-019
SABP-A-020
SABP-A-021
SAES-L-133
1
SARCOP & Other Establish
Chemical Alliance Roles/responsibilities
Programs
SAES-A-205
2
Establish
Safety
procedures
Establish schedule
4
Establish
Monitoring points
Establish
Coupon types
Establish
Times of retrieval
EWP
04-05-01-05
Develop Corrosion
Monitoring
Strategy
1.5
1.5
EWP
04-05-01-05
Develop Corrosion
SABP-A-013 Monitoring
SABP-A-016 Strategy
SABP-A-018
SABP-A-019
SABP-A-020
SABP-A-021
SAES-L-133
01-SAMSS-023
SWP
02-05 2
Prepare Corrosion
Review selection of
Management Strategy
probe types
(Design)
3
Establish probe
measurement
schedule for non
continuous monitoring
4
Establish probe
system maintenance
plan
Establish
KPIs
EWP
04-05-01-05
Develop Corrosion
Monitoring
Strategy
2.3.2 1.5
1.5
EWP
04-05-01-05
Develop Corrosion
NACE-RP0198 Monitoring
EFC-55 Strategy
SAES-L-133
00-SAIP-74
1
Identify manpower for
00-SAIP-73
inspection/
maintenance
Corrosion
Review
2
Review construction
records to verify if
system coated
3
TWP
SSWP-04-05
04-03-01 Identify all susceptible
Inspect
Plan systems
Assets
Inspections
5
Identify inspection
methods
(visual/instrumental/
stripping)
Review Repair 8
Procedures
Prepare Visual
Inspection Plan
7 Prepare
9 Instrumental
Inspection Plan
SSWP-04-05 Prepare inspection CUI
(low power
Inspect plan (location/method/ Inspection plan
radiography/X-ray/
Assets frequency)
linear accelerator/
insulation sensors)
10
SAEP-20
11
Prepare Stripping Plan
Plan fire risk control
1.5.3
b
1.5.3
a
12
EWP CUI
Corrosion CUI maintenance
04-05-02-03-03 Inspection Plan for CUI repair/
Review plan
Implement CUI Records maintenance
program
SWP-04-04
Maintain
assets 13
CUI
Prepare
Resource plan
Resource plan
EWP
04-05-01-05
Develop Corrosion
Monitoring
Strategy
2.3.3 1.5
1.5
EWP
04-05-01-05
Develop Corrosion
Monitoring
Strategy
SABP-A-019
SAES-L-133
1
Identify characteristics
of line in terms of fluid
corrosivity, material
Establish schedule
/inspection date
3
Establish method
U/T, MFL
Establish KPIs
Establish verification
plan
EWP
04-05-01-05
Develop Corrosion
Monitoring
Strategy
1.5
TWP
04-05-01
Plan Corrosion
Management
TWP
04-05-03
Assess
Corrosion
Management
2.1 1.3
EWP
04-05-01-03
Plan Process
Stream
SABP-A-013 Monitoring
SABP-A-016
SABP-A-019
SAES-L-133
23-SAMSS-070
SAES-Y-501
AWP
On-line Y 04-05-02-03-02
SM? Implement probe
management
11
Prepare monitoring
instructions
2 Acquire Samples
Using approved
technique
3 6
Perform field
Transport samples to
measurement
Lab
(if applicable)
4 7 8
Perform lab Use Alert
Enter data into CMS
measurement Management System Operate
Using mobile device
Finger Print Analysis if limits exceeded
EWP
04-05-01-01
Develop Corrosion
Management
Strategy
TWP
04-05-03
Assess Corrosion
Management
1.4
EWP
04-05-01-04
Develop Corrosion
Control Strategy
1 2 3 4
AWP-04-05-02-02-02
AWP-04-05-02-02-01 Implement Cathodic AWP-04-05-02-02-03 AWP-04-05-02-02-04
Implement Chemical Protection Implement Chemical Implement Paints/
Injection/inhibition Cleaning/Scraping Coatings/Linings
TWP
04-05-03
Assess Corrosion
Management
2.2
1.4.1
SAES-A-205
SAES-A-208 EWP
SAES-L-133 04-05-02-02
Implement
Corrosion Control
SARCOP, Gas
plant Alliance
agreements
1
NACE-34101 SGWP-02 Safety
SABP-A-012 Manage Ensure safe operation Record
SABP-A-015 Competency
SABP-A-016
SABP-A-018
SABP-A-019
SABP-A-020
SABP-A-021 SAES-L-133
SABP-A-025 NACE-34101
SABP-A-026 SAIF 2
Ensure effectiveness
of operation
(versus plan)
Record of injection
system
effectiveness
3
Ensure effectiveness
of chemical
performance
5
Updated injection
Update documentation point details
EWP
04-05-02-02
Implement
Corrosion Control
2.2
2.2
EWP
04-05-02-02
Implement
Corrosion Control
1
AWP Perform equipment
04-02-04-01-03
Perform Checks as per
ODR schedule
Record data
2
SAEP-333
NACE RP0104 (2004) Perform equipment
SABP-X-003 maintenance
3
Potential survey
Measurements
4 5 6
Structure-electrolyte Soil corrosion
Record data Structure-soil Record data Record data
Potentials Probe readings
Potentials
Anode current Corrosion rates
CP Acceptance
coupons Criteria No
readings Satisfied?
7
Correct CP
Record
Deficiency at
earliest
Yes
Measure KPIs
EWP
04-05-02-02
Implement
Corrosion Control
2.2
2.2
EWP
04-05-02-02
Implement
Corrosion Control
SAEP-1025
SAEP-1662
Perform
Inspection
Density
Lab evaluation
composition
Scale analysis
N
Reqt to
Clean?
Specify chemical
treatments
4
Mech Y
Scraping Perform
Reqd? Mech scraping
5
Hot Y Perform
Alkali clean Alkali removal
Reqd? process
6
Cu Y Perform
Removal Cu removal
Reqd? process
Select Acid
Select inhibitor
compatible with acid
9
Install ML coupons
LPR continuous
monitoring (performed
with HCl only)
2.2.3
b
2.2.3
a
10
Test acid/inhibitor by
LPR
11
Record Monitoring
Perform
data
Acid cleaning
12
Perform Neutralisation
Passivation stage
13
HPJ? Y HPJ
(High Pressure
clean
Jetting)
14
Perform passivisation
if required
15
Inspection
Perform
details
Inspection
16
Evaluate cleaning
performance
17
Cleaning
History update
18
Measure KPIs
EWP
04-05-02-02
Implement
Corrosion Control
2.2
2.2
1.4.4
EWP
04-05-02-02
Implement
Corrosion Control
1
SAEP-316
Mobilise personnel
2
Paints/Coats/Linings
Coating
Perform Coating Inspection
Inspection plan
Inspections Records
SAES-L-133
Corrosion Maintenance
Review Plan
N
Coating
Required?
SAES-H-001 3
SAES-H-002
SAES-H-004
SAES-H-101 Specify proper coating
SAES-H-003
4
Carry out internal/
external maintenance
coating applications
Perform Audit
N Audit
Compliant?
Compliance
report
Y
Corrosion
Review
Coating
findings
EWP
04-05-02-02
Implement
Corrosion Control
2.2
1.5
SSWP-04-05
Inspect
EWP
Assets
04-05-01-05
Develop
Corrosion
Monitoring
Strategy
TWP
04-03-02
Implement
Inspections
1 2 3 AWP 4 5 6 AWP
AWP AWP
04-05-02-03-02 AWP 04-05-02-03-05
Implement OSI, 04-05-02-03-01 04-05-02-03-03
Implement on-line 04-05-02-03-04 Implement ECDA
EIS, NDT Implement Implement CUI
Corrosion Implement ILI (External Corrosion
Coupons Program Program
Monitoring Direct Assessment)
TWP
04-05-03
Assess Corrosion
Management
2.3
EWP
04-05-02-03
Implement
Corrosion
Monitoring
Strategy
1
Install , monitor and
ASTM G1, G4
retrieve Coupons
at planned time
2
Measure Corrosion
Rate
SAIF
3
SABP-A-019
ASTM G1
Measure Pitting Rates
ASTM G46
4
SAEP-20 Establish
Corrosion class
EWP
04-05-02-03
Implement
Corrosion
Monitoring
Strategy
2.3
1.5.2 2.3
EWP
04-05-02-03
Implement
Corrosion
Monitoring
StrategyI
01-SAMSS-023
SAES-L-133
3
Ensure correct data
input into data
management system
for all probe locations
EWP
N
CR within 04-05-01-01
Acceptable Develop Corrosion
Limits? Management
Strategy
Measure KPIs
EWP
04-05-02-03
Implement
Corrosion
Monitoring
Strategy
2.3
1.5.3 2.3
EWP
04-05-02-03
Implement
Corrosion
Monitoring
Strategy
00-SAIP-74
EFC 55
NACE RP0198
Mobilise
personnel
SSWP
04-05
Inspect Assets
2
CUI inspection
Implement CUI
plan
inspection plan
N
Damage
Indication?
Perform
Further tests/inspection
CUI inspection
records
4
Corrosion CUI
Perform repair/
Review Maintenance Plan
maintenance
Maintain 5
Assets
Reinstate coatings/
linings
EWP
04-05-03-02
Corrosion
Management
Review
3.2
2.3
EWP
04-05-02-03
Implement
Corrosion
Monitoring
SABP-A-019 Strategy
SABP-A-016
SAES-L-133
NACE-RP0102
NACE- R35100
Prepare Line
SABP or
Specialist 2 ML (Metal Loss) data
Contractor Perform Pit dimensions/
approved ILI locations
procedures/tools
Measure
KPIs
EWP
04-05-02-03
Implement
Corrosion
Monitoring
Strategy
2.3
AWP-04-05-02-03-05 : Implement ECDA (External Corrosion Direct Assessment for Underground Pipelines)
2.3
EWP
04-05-02-03
Implement
Corrosion
Monitoring
Strategy
1
Pre-Assessment
(Gather information on
the system)
2
Indirect Assessment
(Gather data on
system)
3
Direct Examination
(Excavation of Priority
Areas)
4
Remediation
(Repair or
Replacement)
5
Post-Assessment
(Effectiveness of
Remediation)
EWP
04-05-02-03
Implement
Corrosion
Monitoring
Strategy
2.3
TWP
04-05-02
Implement
Corrosion
Management
AWP 1
EWP AWP
04-03-02-02-02
Thickness 04-05-03-01 04-02-03-01-07
Carry out OSI
Evaluate Asset
Thickness data Corrosion Data Performance
Measurement Assessment Degradation
3.1
2 EWP
04-05-03-02 Corrosion
Corrosion Review
Management
Review
3.2
TWP
04-05-04
Corrosion
Management
Actions
TWP
04-05-03
Assess
Corrosion
Management
Generic assessment
Eg. SABP-A-018
SAES-L-133 Record
1 2
Perform Root Cause
Failures Perform Remaining Get to next
analysis
Incidents Life, FFS analysis Shutdown?
Failure Analysis
4
Inspection Perform
Monitoring Validation
data analysis
5 6 EWP
Determine Update 04-05-01-01
SAEP-20
Corrosion Rate Remaining Life Develop Corrosion
Corrosion Class Management
Strategy
7
Perform Corrosion
Rate trend analysis
8
Record
Operating Perform Correlation
discrepancy
data analysis
Record results
In CMS
TWP
SWP-04-02 N 04-05-02
Compliance
Manage Plant Approved IOW Implement
With control
Integrity for Corrosion
Criteria?
Operations Management
3.1b
3.1a
10
Measure
System Performance
KPIs
11 EWP
Pass
04-05-01-01
Compliance Workforce
Develop Corrosion
Review Reward/benefit
Management
Strategy
Fail
12
Corrective
Action
EWP
04-05-03-02
Assess
Review
3.2
3.1
SARCOP EWP
Review 04-05-03-01
Corrosion Data
Assessment
Generic Review
Eg SABP-A-018
SAES-L-133
SABP-343 1
Establish competent
team
SSWP
02-01
Manage
Competency
2
Review analyses
CMS
results
4
Retrieved Evaluate effectiveness
coupon Of corrosion control
data programs
5
SWP-04-02
Manage Plant
Review IOW
Integrity for
Operations
6
SWP-04-05 AWP-04-05-03-02-01
Inspect Review Corrosion
Assets Control Programs
3.2.1
SSWP
02-01
Manage
Audit &
Review 7
Identify and review
potential areas for
Maintenance
8
Review job log and
Identify pending
engineering packages
9
Recommend
EWP
SSWP changes to Mitigation
Corrosion 04-05-01-01
02-01 strategy, Maintenance
Review Develop Corrosion
Manage areas, Control
Management
Competency Optimisattion,
Strategy
Engineering solutions
TWP
04-05-04
Corrosion
Management
O&M Act
3.2
EWP
04-05-03-02
Assess
Review
Review
AWP CUI
04-03-02-02-01
Carry out
External
Visual
Inspection 2
Review Coatings/
Paints/Linings
3
Review
Coupons
Program
4
Review
Cleaning
Program
Review
CP survey
Review Chemical
Treatment Program
AWP 7
04-03-02-02-01
Carry out Review
OSI OSI
Thickness survey
Measurement
8
Review Corrosion
Probe Management
9
TWP
04-03-03
Assess Review ILI
Inspection
Results
10
EWP
04-03-01-01 Review Equipment
Maintain Inspection Schedule
EIS
11
AWP
04-03-02-02-03 Review
Carry out NDT
NDT
12
Review
Stream plan
EWP
04-05-03-02
Assess
Review
3.2
Top 3
TWP
04-05-03
Assess
Corrosion
Management
SWP
04-02
Manage Plant
Integrity for
Operations
EWP 1 2 3
02-02-02-01
Identify EWP-04-05-04-01 EWP-04-05-04-02 EWP-04-05-04-03
Response to
Events & fault Act on Operations Act on Maintenance Act on Inspections
Requirements
SGWP-05
Manage
Audit &
Review
SWP-04-05
Manage Corrosion
Top
4
Top
TWP
04-05-04
Corrosion
Management
O&M Act
Corrosion
Review
1
SGWP Plan changes to
03 Corrosion mitigation
MOC Strategy/operations
SARCOP
Prioritise actions
Complete changes
Audit changes
EWP
04-05-01-01
N
Audit Develop Corrosion
Compliant? Management
Strategy
TWP
04-05-04
Actions for
Corrosion
Management
Top 4
TWP
04-05-04
Corrosion
Management
O&M Act
1
Corrosion
Identify recommended
Review
areas
2
Plan changes to
maintenance
3
Prioritise actions
EWP
04-04-02-01
Process new
Work Order
In SAP
4
Perform
Work Order Maintenance
Activities
AWP
04-02-03-02-03-02 4.2.1
Carry out
NDT
5 Complete
maintenance changes
including updating
inspection and plant
drawings
Audit changes
EWP
04-05-01-01
Audit
No Develop Corrosion
Compliant?
Management
Strategy
Yes
TWP
04-05-04
Actions for
Corrosion
Management
4.2
EWP
04-05-04-02
Act on
Maintenance
1
Paints, Coatings and
Linings
Insulation Systems
Chemical cleaning
Mechanical cleaning
Hydrotest
Others
6
Upgrade
materials
00-SAIP-06
9 7
Weld repair
SWP
04-04
Maintain
SA Welding Assets
Procedures
EWP
04-05-04-02
Act on
Maintenance
4.2
Top 4
TWP
04-05-04
Corrosion
Management
O&M Act
1
Corrosion
Identify recommended
Review
areas
Update inspection
plans
Prioritise actions
4
Perform
SWP-04-05 Inspection
Inspect Activities
assets
4.3.1
5
Update inspection and
plant drawings
Audit inspections
EWP
N 04-05-01-01
Audit
Develop Corrosion
Compliant?
Management
Strategy
TWP
04-05-04
Actions for
Corrosion
Management
4.3
EWP
04-05-04-03
Act on Inspections
1
Deadleg Program
(operational & non-
operational)
Nipple Program
(small & large)
Injection Point
Program
OSI Program
CUI/CUF Program
Internal Inspection
T&I
External Inspection
T&I
10
Subsea Inspections
11
Other
EWP
04-05-04-03
Act on Inspections
4.3
CorManPro_14 integrated 14/12/2009 43