Professional Documents
Culture Documents
NCGM XX XX D Aec DR 930 1104 (8) Drainage Layout
NCGM XX XX D Aec DR 930 1104 (8) Drainage Layout
NCGM XX XX D Aec DR 930 1104 (8) Drainage Layout
NCGM-XX-XX-D-AEC-DR-930-1101
STUB STACK
NOTES
STUB STACK
DWIC12 INTERNAL BAY DRAINAGE UNDER REVIEW INTERNAL BAY DRAINAGE UNDER REVIEWFLOOR GULLY
FWIC94
FWIC12
FLOOR GULLY FLOOR GULLY 111 209 FLOOR GULLY FLOOR GULLY
DWIC51
FWIC52 DWIC90
112 210
DWIC13 DWIC52 FLOOR GULLY RISK
THIS DRAWING SHOULD BE READ IN CONJUNCTION
FLOOR GULLY FLOOR GULLY FLOOR GULLY FLOOR GULLY FWIC53 WITH DRAINAGE MASTER PLAN. REFER TO DRAWING No. In addition to the hazard/risks normally associated with the types of work
FWIC13 NCGM-MP-XX-D-AEC-DR-930-1100 DWIC91 detailed on this drawing take note of above.
It is assumed that all works on this drawing will be carried out by a competent
contractor working, where appropriate, to an appropriate method statement.
STUB STACK STUB STACK
SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION BOX
FWIC96
113
DWIC14
211 DWIC53 FLOOR GULLY
FWIC14 FLOOR GULLY FLOOR GULLY FLOOR GULLY FLOOR GULLY FWIC54
- FOUL WATER CONNECTIONS TO BE 150Ø DWIC93
UNLESS STATED OTHERWISE
STUB STACK - DIRTY WATER CONNECTIONS TO BE 100Ø
STUB STACK
UNLESS STATED OTHERWISE
- SURFACE WATER CONNECTIONS TO BE 150Ø FWIC97
114 212
DWIC15 DWIC54 UNLESS STATED OTHERWISE FLOOR GULLY
\ \ \ \ \ \
FLOOR GULLY FLOOR GULLY FLOOR GULLY FLOOR GULLY FWIC55 - ROAD GULLIES CONNECTIONS TO BE 150Ø
FWIC15 UNLESS STATED OTHERWISE DWIC94
³ - DISTRIBUTION UNITS CROSS PASSAGE GULLY
CAST IRON PIPE
CONNECTIONS TO BE 100Ø UNLESS STATED
STUB STACK STUB STACK OTHERWISE
DWIC54A
DWIC15a
FWIC98
115 213
PIPE GRADIENTS UNLESS SHOWN ARE: FLOOR GULLY
FWIC16 FLOOR GULLY
FLOOR GULLY FLOOR GULLY FLOOR GULLY FWIC55A FOUL/DIRTY WATER: MINIMUM GRADIENT WITHOUT W.C. DWIC95
PETROL INTERCEPTOR VENTS
TO BE 1:40
STUB STACK STUB STACK ALL GULLIES WITH DISTRIBUTION UNITS TO BE KENT
KHA265 UNLESS NOTED OTHERWISE
FWIC18A
ALL GULLIES WITHIN CROSS PASSAGES AND TOILETS
FWIC18 TO BE WADE F304 WITH WADE U1704 REMOVABLE BELL
IN ABEYANCE. SS
FG SVP SS TRAPS UNLESS STATED OTHERWISE.
Lift
Outline of bridge link above
CGMA Easement
on NR Ownership
1:54
THESSALY ROAD
Fire escape route from football pitches
+5.3
Fire escape route from football pitches
9
Pallet yard
+6.6
FINAL LOCATIONS TBC. 100MM DIA SUPPLY PIPE (REFER TO GREASE
8
Waste Compound Cycle Storage
Pedestrian Route
New
MSCP Exit
MSCP pedestri
an walkway
restricted head-room
below ramp above Exit
SS SS
Potential
SS SVP
access through
1 arches
2
MSCP Pedestrian Exit
Access
Ground at
A 3
Level
New
4
AOD
3700
FFL 3.250
UP
UP
Entrance B pedestr
ian walkwa 5
y
6
C
Access
7
Ground at
Level
Shared 8
Surface
Security 9
D Exit 10 11
12
13
Unit
101 E 14
15
Shared 16
Surface 17
Unit 18
Emergency 102 19
20
Access Market Loop Road 21
22
Unit
103 Unit +3.120
23
24
+3.100
201 Turning Head
25
+3.125
+3.040
26
27
+3.030
+3.000
Unit Unit
1:40
1:22
+3.400
202
+3.010
1:21
+3.600 TOW
+3.350
301 +3.600
+3.600
+2.880
+3.285
TOW +3.435
+3.600
+3.425
+3.600
TOW +3.324
117
TOW
DWIC18
215
+3.449
+3.440
+3.442
1:40
+2.830
Unit
+3.600
+3.485
TOW
Unit Unit
1:60
1:60
105 1:60
+2.840
+3.520
+3.520
+3.525 FFL
+3.525
+3.525
+3.525
+3.525
+3.525
FFL
DWIC57
Unit
1:60
Unit Unit Unit
106 204 401
303
Extent of MSCP above
Unit Unit
108 Unit Unit
206 305 403
FLOOR GULLY
Unit Unit
FLOOR GULLY
208 Unit Unit Unit
110
FLOOR GULLY
307 405
FWIC58
502
FWIC19 FWIC102
Unit Unit
FLOOR GULLY
Unit Unit
111 209 308 406 Unit Unit
503
Riser
601
HGV
114 212 Unit Unit Unit
311 409 506 604
Unit Unit Unit
115 213 Unit Unit
312 410 Unit
507 605
Accommodation Stair
313
Lockers
Double
Unit Unit
THESSALY ROAD
117 215 Unit Unit Unit Unit
314 412 509 607
Secure Access
Unit
Cycle Storage
Unit
72 spaces
118 Unit Unit
216 315 413 Unit Unit
510 608
Unit Unit Unit Unit
Bin Store
119 217 Unit Unit
316 414 609
511
STUB STACK
Unit
T3
Unit Unit Unit
120 218 415 Unit Unit
317 512 610
STUB STACK
aisle Unit Unit Unit Unit
121 219 318 Unit Unit
416 513 611
Ramp 1:12
320 418 515 613
Unit Unit Unit
124 Unit Unit
222 321 419 Unit
516 614
Unit Unit
125 Unit Unit
223 322 420 Unit Unit HGV
-01.20
FWIC103
517 615
HGV 1:80
Unit Unit Unit
126 224 Unit Unit Unit
323 421 518 616 -01.07 HGV
-01.00
DWIC19
118 216
FLOOR GULLY
Unit Unit Unit Unit
-00.50
1:40
Unit 00.00
DWIC58
-00.65 -00.50
Unit
T4
129 Unit Unit Unit
227 326 424 Unit
521 619
-00.28
Unit
522
Unit
DWIC99
Unit
130 Unit Unit Unit 620
228 327 Unit
425 523
Unit
Unit Unit Unit Unit 621
131 229 328 426
FLOOR GULLY
UP
Unit
Unit 524
FLOOR GULLY
132 Unit Unit Unit
FLOOR GULLY
427
FLOOR GULLY
230 329
FWIC59
Unit
Unit 525
133 Unit Unit Unit
231 330 428
Unit
Unit Unit Unit 526 HV
Switchroom
Temp 8500x5000mm
FWIC20
Unit Unit Unit
135 233 Unit
332 430
MI
Unit Unit Unit
LL
136 234 333
Unit
PO
Unit 431
2.43
ND
235 334
Unit
Unit 432
CL
Unit
2.33
138
Road
236
Unit
OS
Unit
335 433 op
t Lo
Unit Unit
2.39
E
139 237
rke
Unit
Unit
336
Unit
434
Ma
Unit 4500
140 238
2.47
Unit
337
Unit t
141
er en
2.50
Barri sem
AD
Unit RO
stic ble Ea
3.725
2.44
338
DEELEY
TH
Acou Ca
OR
IMSW
Unit
2.34
339 HV CR
PN
3.10
3.10
2.31
Unit UK
ROA
340
3m
2.68
2.97
2.61
2.32
2.40
2.52
1.58
2.69
1.01
1.86
Brick 2.12
1.88
Wall
(not surveyed)
2.04
2.09
cl=2.51
cl=2.39
2.20
7.0m
HGV
land
r
scap
tic Barrie
Acous
e buffe
HGV
r
AD AD
H RO
HGV
RO
PA
RC O'
OR OR
UKPN
TH SB
Acou
ROOM
INTAKE LV
Switch
LD
FWIC104
HV
GO
IDNO
stic
ROOM
PANEL
Barr
ier
r
tic Barrie
Acous
119 217
DWIC20 FLOOR GULLY
Approx tree canopy
(not surveyed)
120 218
DWIC21 DWIC60 FLOOR GULLY
BLOCK A1 & B1 DRAINAGE UPDATED BASED ON AS-BUILT INFORMATION 14.02.20 C24
RK RK
TB
FLOOR GULLY DWIC101
FLOOR GULLY FLOOR GULLY FLOOR GULLY FWIC61 BLOCK A SOUTHERN CROSS PASSAGE FW DRAINAGE REVISED 04.09.19 C23
TB
FWIC22
FW INTERNAL BAY DRAINAGE COLOUR CHANGED
.19
ATTENUATION TANK DETAILS UPDATED
C18
DS
RK
.03
BLOCK A1 DRAINAGE LAYOUT UPDATED
05
STUB STACK STUB STACK DRAINAGE UPDATED
.18
C17
DS
RK
.12
121 219
FLOOR GULLY
13
DWIC22 DWIC61
FWIC106 DRAINAGE UPDATED
FLOOR GULLY FLOOR GULLY
8
FLOOR GULLY FWIC62
2.1
FLOOR GULLY C16
DS
FWIC23
MO
.1
DWIC103
07
DRAINAGE UPDATED
.18
C15
DS
MO
.11
STUB STACK STUB STACK
26
DRAINAGE UPDATED
8
DS
1.1
DWIC23 C14
122 220
FLOOR GULLY
AP
DWIC62
.1
09
FWIC107
FLOOR GULLY FLOOR GULLY FLOOR GULLY FLOOR GULLY FWIC63 DRAINAGE UPDATED
FWIC24
.18
C13
DS
AP
DWIC104
.10
24
SMH30B ADDED AND TANK LOCATION MOVED
.18
STUB STACK STUB STACK C12
DS
MO
.06
08
CONNECTIONS
GULLY ADDED, MINOR AMENDMENTS
123 221
DWIC24 FLOOR
.18
DWIC63 C11
DS
MO
.04
FWIC108
18
FLOOR GULLY FLOOR GULLY FLOOR GULLY FLOOR GULLY FWIC64
FWIC25 DWIC105 SHEET LAYOUT UPDATED
8
3.1
C10
DS
MO
.0
19
STUB STACK STUB STACK By
Revision Details Date Suffix
Check
124 222
DWIC25 DWIC64 FLOOR GULLY
Purpose of issue
FWIC109
FLOOR GULLY FLOOR GULLY FLOOR GULLY FLOOR GULLY FWIC65
FWIC26 DWIC107 STAGE F
STUB STACK STUB STACK Client
VINCI CONSTRUCTION UK
125 223
DWIC26 DWIC65 FLOOR GULLY
FWIC27
FLOOR GULLY FLOOR GULLY FLOOR GULLY FLOOR GULLY FWIC66
FWIC110
DWIC108
LTD.
STUB STACK STUB STACK
Project Title
126 224
DWIC27 DWIC66 FLOOR GULLY
FWIC111
FWIC28
FLOOR GULLY FLOOR GULLY FLOOR GULLY FLOOR GULLY FWIC67
DWIC109
NEW COVENT GARDEN
STUB STACK
MARKET
STUB STACK
DWIC28
127 225
DWIC67 FLOOR GULLY
FWIC112
FLOOR GULLY FLOOR GULLY FLOOR GULLY FLOOR GULLY FWIC68
FWIC29 DWIC111
Drawing Title
STUB STACK
CAST IRON PIPE IN STUB STACK ³ DRAINAGE LAYOUT
CONCRETE TRENCH
DWIC29
FLOOR GULLY FLOOR GULLY 128 226 BENEATH PAD
FLOOR GULLY FLOOR GULLY 1:21
DWIC68
FWIC113
FLOOR GULLY
SHEET 4 OF 8
FWIC30 150dia
Escape Fire
Crosspassage FWIC69 150dia 1:150 FWIC70 SWIC01 Designed Drawn Checked Approved Date
CAST IRON PIPE 150dia 1:1 HP HP MC MC NOV 2015
50
FG SS FG Lift
URS Internal Project No. Suitability
FWIC31 150dia 1:80 SVP SS Stair (East)
Escape Fire
FOUL / DIRTY WATER Switchroom Room Switchroom Room CAST IRON PIPE
150dia 1:80
Stair (West)
SS CAST IRON
VENTILATION PIPE SS Scale @ A1 PIPE Zone / Mileage
SS SVP 1:250
STUB STACK CAST IRON PIPE
STUB STACK
TRAP MANUFACTUR E (REFER TO GREASE
T
dso
hciumh
ea
n
bsteep
n
erp
a
ne
crid
orah
n
se
th
cw
o
eU
tpo
e
iR
fap
S
p
m
no
'tient
S)
FLOOR GULLY
129 227 DWIC69 a
e
m
hp
rta
FLOOR e
o
p
m
tn
so
a
u
e
tsfU
in
b
rcid
tyjecR
.tn
lstiS
a
ih
lw
b
ctie
nsip
lotGULLY
ER'S REQUIREMENT
ALREADY CONSTRUCTED
URS Infrastructure & Environment UK Limited
STUB STACK
PIP
100mm DIA FILLING PIP
130 228
FLOOR GULLY
5 St. GEORGES ROAD
100MM DIA SUPPLY
131 No.NCGM-XX-XX-D-AEC-DR-930-1107
229
FLOOR GULLY
BD BD
FWIC33
CONTINUED ON DRAWING FLOOR GULLY - FLOOR GULLY -
FWIC73 FWIC116
DWIC116
NCGM-XX-XX-D-AEC-DR-930-1104 C24
KENT KHA265/110DS DWIC71
KENT KHA265/110DS