I. VISION
II. RATIONALE
The barangay as a smallest political unit is challenged by an increasing disaster and climate risk caused
by dynamic combinations of natural and human induced hazards, exposures and people’s vulnerabilities
and capacities.
There is an urgent need for the barangay to prepare and adopt a Barangay Disaster Risk Reduction
Management Plan to respond to any form of emergency and disaster to mitigate its impact on the
community and the residents so that they can live in a safer, adaptive and disaster-resilient community
on the path to developing sustainability.
The Barangay Disaster Risk Reduction Management Plan for Calendar Year 2014-2016 is based on the
following laws and issuances:
Local government unit shall have the powers expressly granted, those necessarily implied there
from as well as powers necessary, appropriate and incidental for its efficient and effective
governance, and those which are essential to the promotion of the general welfare xxx local
government units shall xxx
- Organize and lead an emergency group whenever may be necessary for the
maintenance of peace and order or on occasions of emergency or calamity within the
barangay
B. R. A. No. 10121. The Philippine Risk Reduction and Management Act 2010
Institutional Mechanism
Punong Barangay shall facilitate and ensure participation of two (2) CSO representatives
from existing and active community-based people’s organizations representing the most vulnerable
and marginalized groups in the barangays (section 12, (25) (d)- R.A. 10121).
Vice Chairman
Buklod
Tao
Security Relief Supplies /
Operation Logistics
- Not less than 5% of the estimated revenue from the regular sources can now be used to
support disaster risk management activities such as, but not limited to:
- 30% of the Local DRRM Fund shall be allocated as Quick Response Fund (QRF) or stand by
fund to support relief and recovery programs (section 12, R.A. 10121)
IV. DISASTER RISK REDUCTION ECOLOGICAL PROFILE
A. GENERAL INFORMATION
1. Population
2. Exposure to Hazard
Volcanic Eruption
Lahar
Others:
_____
B. DISASTER-PREPAREDNESS INDICATORS
3. Funding
PARTICULARS AMOUNT
At least 5% of Regular Sources
Quick Response Fund (QRF) allocated (at least 30% of
BDRRM Fund
Other Sources of Funds that could be Tapped
TOTAL
a. EWS
2. Trainings
Sponsor / Training
Type of Trainings
Providers
1.
2.
3.
4
5.
6.
IV. PREPAREDNESS FOR EFFECTIVE RESPONSE AND EARLY RECOVERY
Location : ______________________________________
2. Evacuation Center/s
Evacuation Center 1 : __________________________________________
Person-in-Charge
Contact Number
Location
Hotline/Contact Number
Capacity (evacuees
accommodation)
Basic Necessities
Food Supply
Potable Water
Medicine Kits
Sleeping Mats
Blankets
Pillows
Others._______________
Basic Facilities
Power Supply
Kitchen/Cooking Area
Sanitary Toilet
Waste Disposal
Mobile Communication
System
Evacuation Center 2 : _________________________________________
Person-in-Charge
Contact Number
Location
Hotline/Contact Number
Capacity (evacuees
accommodation)
Basic Necessities
Food Supply
Potable Water
Medicine Kits
Sleeping Mats
Blankets
Pillows
Others._______________
Basic Facilities
Power Supply
Kitchen/Cooking Area
Sanitary Toilet
Waste Disposal
Mobile Communication
System
Person-in-Charge
Contact Number
Location
Hotline/Contact Number
Capacity (evacuees accommodation)
Basic Necessities
Food Supply
Potable Water
Medicine Kits
Sleeping Mats
Blankets
Pillows
Others._______________
Basic Facilities
Power Supply
Kitchen/Cooking Area
Sanitary Toilet
Waste Disposal
Mobile Communication
System
3. Transportation
a. BERT
1.
2.
3.
4.
5.
6.
7.
b. ACDVs
1.
2.
3.
4.
5.
6.
7.
c. Others: ____________
1.
2.
3.
4.
The Barangay Disaster Risk Reduction Management Plan shall have the following
goals :
2. To avoid hazards and mitigate their potential impacts by reducing vulnerabilities and
exposure and enhancing capacities of communities;
3. To provide life preservation and meet the basic subsistence needs of the affected
population based on acceptable standards during or immediately after a disaster;
and
4. To restore and improve facilities, livelihood and living conditions and organizational
capacities of affected residents and reduced disaster risks in accordance with
building back better principle.
The disaster, whether natural or man made, have always been part of life of the
people in the barangay since time immemorial. But the people have learned to live with
them by force of nature and or circumstances. The resiliency
of the barangay residents and the community to overcome those difficulties is a system
of their firm and resolute decision to rise to whatever emergency, hazard, disaster and
risk that may come in their midst.
Thus, an assessment of any hazard which has the potentials of causing disruption
to human lives and damage to properties and their surrounding is inevitable.
The State of Barangay Readiness for Disaster can be assessed using the Barangay
Hazard Map and Barangay Disaster Readiness Checklist:
HAZARD MAP
BARANGAY _____________________________
Municipality of _____________________, ZDN
Region : IX__
Ne Name of Punong Barangay ____________________ Contact No. ___________________
Total Population ________________ Source: __________ NSO __________ RBI
Total No. of Families ______________
EXPOSURE TO HAZARD
Please check all that apply:
Typhoon Tsunami Others. Please specify.
Flood Volcanic Eruption __________________
Landslide Lahar
Earthquake
Lahar
Others ____
B. DISASTER-PREPAREDNESS INDICATORS
I. ORGANIZATIONAL REQUISITES
1. Organization of Barangay DRRM Committee State the reason why there is
(BDRRMC) no BDRRMC.
1.1 BDRRMC in accordance to RA 10121
1.2 BDRRMC supported with EO or Sangguniang
Barangay Ordinance
1..3. BDRRMC includes at least two (2) CSO
representatives
1..4 BDRRMC conducts meeting
____________________
1.5 Disaster-related signages, markers and directional Display Areas:
signs displayed in strategic locations 1. Barangay Hall
2. Others: __________
________________________
________
3.5 There are collaborative undertakings with nearby
barangay
3.6. There is a transportation facility available for use by
the search and rescue teams or ACDVs
3.7. There are emergency equipment available at the Specify type of equipment:
barangay ________________________
________________________
________________________
________________________
______________________________ _________________________________
Barangay Secretary Punong Barangay
The following are most common problem areas that are considered hazard and risk to
the community residents
- Flashfloods
- Earthquake
- Landslide
- Drought
- Tsunami
- Fire Incident
- Pollution
- Etc
A. Resources:
a. Financial Resources
b. Human Resources
Following are presently available tools and equipment for Disaster Risk
Reduction Operation and Management
B. Constraints
Lack of tools and other disaster-rescue equipment will also affect disaster risk
reduction rescue and response operations.
IX. STRATEGIES AND INTERVENTIONS
1. Information and education campaign on the hazard, emergency and risk and how to
prevent and mitigate them using the BDRRM Plan;
2. Capacity building on Disaster Risk Reduction Management and Climate Change Act;
II. PREPAREDNESS
III. RESPONSE
_______________________ _____________________
Barangay Secretary Punong Barangay
KINAKAILANGANG
INAASAHANG
PROGRAMA/PROYAKTO/GAWAIN TAGAPANGASIWA PONDO AT
RESULTA
PINAGMULAN
l. MITIGATION (Bago ang
Kalamidad)
ll. PREPAREDNESS (Kahandaan
bago ang kalamidad)
lV. RECOVERY/REHABILITATION
(Pagkatapos ng Kalamidad)
_______________________ __________________________
Barangay Secretary Punong Barangay
C. 2014 Local Disaster Risk Reduction and Management Fund Investment
Plan(LDRRMFIP)
Prepared by: Approved by:
__________________ __________________
BDRRMC Punong Barangay
The implementation of BDRRM Plan shall be monitored and evaluated in terms of:
1. Project Output – projects that are deliverable arising from the activities earned out with the
use of project inputs or resources
2. Project Outcome – results and long term impacts arising from the utilization of project
outputs
3. Project Impact – a date of change over a reference point (baseline or term period) arising
from the production and utilization of project outputs, or long term (when related to the
achievement of project goals)
4. Risk Reduction Management Impact – a state of prevention and mitigation arising from the
implementation of the plan (program/project) on account of action taken by agents outside
the control or influence of the BDRRM Planning system or both.