Risk Assessment Tables: (Guidance For Assessing Risk)
Risk Assessment Tables: (Guidance For Assessing Risk)
Risk Rating & Rating Number Table Notes: For each hazard: - 1) Estimate Probability. 2) Estimate Impact of potential injury, property
Low Medium Probability High Probability damage or environmental damage. 3) Combine estimates to allocate Initial Risk Rating. 4) Assess Risk
Tolerability or Acceptance. 5) Introduce Control Measures to reduce risk. 6) Reassess revised estimates
probability
of Probabilityand Impact after controls implemented and allocate new risk rating. 7) Reassess Risk
High Impact 5 Medium 15 High Risk 25 High Risk Tolerability and if acceptable, enter Residual Risk Rating and associated Probability and Impact levels. If
Risk not repeat stages 5-7.
Personnel Injury
Carry out Unclear Communication Communication should be clear
/ Property
discussion at tool Unclear of Roles & Responsibilities 3 3 9 Clear Roles & Responsibilities 3 1 3
damage
box meeting Inadequate PPE Adequate PPE
Before Starting activity excavator
should be Inspected & Hydraulic
system must be checked
Personnel Injury Excavator operator should be
Mobilize / Property competent
Mechanical Failure in Excavator 3 3 9 3 1 3
Equipment damage Excavator operators shall use a
and trucks
spotter when they have an
obstructed view to the rear.
All non-essential workers shall
remain outside of the equipment's
swing radius and the excavation
zone.
Essential personnel will remain in a
location where they can be seen by
the operator at all times.
All excavators shall have operational
back-up alarms
Adequate PPES
Daily checking of equipment’s
Before Starting activity excavator
should be Inspected & Hydraulic
system must be checked
Excavator operator should be
competent
Swing Movement of excavator should
be controlled by operator
Failure in excavator All personnel should always stay from
Excessive Swing of Excavator swing of excavator
Loading of Dumper Hitting to personnel or property Personnel injury, Dumper driver should not stand on 3 1 3
3 3 9
by Soil Speed Over limit Property Cabin roof or sit inside cabin
damage/loss Dumper Driver must have a valid
licence of vehicle
Minimum speed of vehicle should be
maintained inside working area
While reversing spotter to ensure no
other personnel are within the area
Personnel injury Soil displacement should be
Damage of minimum 2 feet away from the edge
existing facility of the excavation/trench or Dumper
Property should be provide for transportation
damage/loss of soil
Personnel fall inside Trench
Ensure that the no stones were filled
Filling of Sand Dumping of stones
Cables/pipes 3 3 9 in the trench. 3 1 3
Insufficient lighting
may get damage Excavator operator and stand by
person should monitor the filling
Risk of while transferring the sand.
downpour No worker is allowed underneath
pressure will loads handled by lifting or digging
affect the sheet equipment.
pile and will Area Should be properly Barricaded
cause collapse. with danger sign
All Back filling shall be inspected by
the Competent Person.
Provide sufficient lighting, Ensure
area is well light.
Approved by Approved by
(Name): (Title):
Approved by Date:
(Signature):