DAFTAR HARGA SATUAN UPAH

NO. URAIAN SATUAN UPAH 2020(Rp.) Upah 2021


1 Kepala Tukang Batu o/h(7jam) 81,494.88 82,701.00
2 Tukang Batu o/h(7jam) 73,860.00 74,953.13
3 Kepala Tukang kayu o/h(7jam) 83,130.00 84,360.32
4 Tukang Kayu o/h(7jam) 76,180.00 77,307.46
5 Kepala Tukang Cat o/h(7jam) 81,494.88 82,701.00
6 Tukang Cat o/h(7jam) 73,860.00 74,953.13
7 Kepala Tukang Besi o/h(7jam) 83,130.00 84,360.32
8 Tukang Besi o/h(7jam) 76,180.00 77,307.46
9 Mandor Lapangan o/h(7jam) 80,630.00 81,823.32
10 Juru ukur o/h(7jam) 90,000.00 91,332.00
11 Mekanik Terampil o/h(7jam) 96,000.00 97,420.80
12 Operator terampil o/h(7jam) 96,000.00 97,420.80
13 Pembantu operator o/h(7jam) 70,780.00 71,827.54
14 Penganyam bronjong o/h(7jam) 70,000.00 71,036.00
15 Sopir personil o/h(7jam) 72,400.00 73,471.52
16 Kepala Tukang Listrik o/h(7jam) 96,000.00 97,420.80
17 Site manager o/h(7jam) 150,000.00 152,220.00
18 Geologis o/h(7jam) 120,000.00 121,776.00
19 Tukang las o/h(7jam) 76,180.00 77,307.46
20 Kepala Tukang Las o/h(7jam) 81,494.88 82,701.00
21 Tukang Pelitur o/h(7jam) 90,000.00 91,332.00
22 Kepala Tukang Pelitur o/h(7jam) 81,494.88 82,701.00
23 Tukang Bor o/h(7jam) 90,000.00 91,332.00
24 Kepala Tukang Bor o/h(7jam) 81,494.88 82,701.00
25 Tukang Listrik o/h(7jam) 83,130.00 84,360.32
26 Tukang pipa o/h(7jam) 73,860.00 74,953.13
27 Kepala Tukang Pipa o/h(7jam) 81,494.88 82,701.00
28 Pembantu Mekanik o/h(7jam) 78,200.00 79,357.36
29 Pembantu Sopir o/h(7jam) 61,550.00 62,460.94
30 Pekerja o/h(7jam) 61,550.00 62,460.94
31 Penjaga malam o/h(7jam) 73,580.00 74,668.98
DAFTAR HARGA SATUAN BAHAN/MATERIAL

NO. BAHAN/MATERIAL SATUAN HARGA 2020(Rp.)


1 Kayu kaso Borneo lokal usuk 5/7 m³ 5,147,000.00
2 Paku kayu 7 cm (paku usuk) Kg 17,210.00
3 Paku kayu 10 cm (usuk,kuda-kuda) Kg 17,210.00
4 Paku skrup 6x2 Kotak(144biji) 12,250.00
5 Kayu Borneo super papan 2/20 x 4 m m³ 5,147,000.00
6 Tanah urug m³ 96,311.00
7 Tanah urug padas m³ 82,520.00
8 Sirtu Klas C m³ 164,560.00
9 Batu pecah 1 - 2 (mesin) m³ 212,470.00
10 Batu pecah 2 - 3 (mesin) m³ 195,120.00
11 Batu pecah 3 - 5 m³ 181,570.00
12 Batu pecah 5 - 7 m³ 155,050.00
13 Batu pecah kg 18,150.00
14 Batu Belah 15/20 m³ 130,000.00
15 Semen PC kg 1,372.00
16 Semen Warna kg 13,250.00
17 Mortar MU 301 kg 4,500.00
18 Mortar MU 200 kg 5,250.00
19 Pasir beton m³ 210,540.00
20 Pasir pasang m³ 135,278.00
21 Pasir urug m³ 100,000.00
22 Kapur Pasang m³ 104,000.00
23 Besi Beton Polos kg 9,573.00
24 Besi Beton Ulir kg 9,688.00
25 Kawat ikat beton/bendrat kg 23,100.00
26 Wiremesh 2.1 x 5.4 (8 mm) Lembar 664,100.00
27 Acuan Kayu Begisting m³ 2,575,000.00
28 Kayu Kelas II ( balok 8/12 ) m³ 4,600,000.00
29 Plywood 122x244 tebal 8 lbr 115,700.00
30 Trucuk / bambu bh 20,200.00
31 Bata Ringan (Exterior) 60x20x10 bh 15,000.00
32 Perekat Bata Ringan 40 kg MU-380 zak 181,100.00
33 Homogeneus Tile 60 x 60cm dos 164,000.00
34 Homogeneus Tile 60 x 60cm (anti slip) dos 357,000.00
35 Keramik 20 x 25 cm motif dos 57,200.00
36 Gypsumboard (120x240) 9 mm lbr 71,800.00
37 Paku kayu 2-3 cm ( paku plafond eternit, triplek) Kg 19,250.00
38 Hollow 2/4 - 4m btg 75,000.00
39 Besi siku kg 14,980.00
40 Besi UNP kg 14,980.00
41 Besi CNP kg 14,980.00
42 Besi Profil WF kg 16,635.00
43 Solar Liter 4,500.00
44 Pertamax Liter 8,600.00
45 Minyak pelumas Liter 26,900.00
46 Kawat las kg 29,900.00
47 Kusen Alumunium Putih doff / hitam 4 m 187,000.00
48 Sealand Tube 40,200.00
49 Pintu aluminium ( toilet ) set 1,209,740.00
50 Spandex 0,35 Lebar 80 cm m' 61,800.00
51 Paku payung 7 cm ( asbes gelombang kecil ) Kg 30,700.00
52 Klosed duduk putih porselen komplit Buah 1,243,334.00
DAFTAR HARGA SATUAN BAHAN/MATERIAL

NO. BAHAN/MATERIAL SATUAN HARGA 2020(Rp.)


53 Bak air (tandon) Fibre kapasitas 550 m3 Buah 927,014.00
54 Bata Merah bh 720.00
55 Pipa PVC AW 1/2 m' 16,463.00
56 Pipa PVC AW 3/4 m' 18,026.00
57 Pipa PVC AW 1 m' 79,376.00
58 Pipa PVC AW 1 1/4 m' 15,025.00
59 Pipa PVC AW 1 1/2 m' 31,204.00
60 Pipa PVC AW 2 m' 46,753.00
61 Pipa PVC AW 2,5 m' 40,725.00
62 Pipa PVC AW 3 m' 81,821.00
63 Pipa PVC AW 4 m' 109,101.00
64 Pipa PVC AW 5 m' 118,800.00
65 Pipa PVC AW 6 m' 217,298.00
66 Pipa PVC AW 8 m' 291,800.00
67 Pipa PVC AW 10 m' 688,550.00
68 Pipa Galvanis 1/2" m' 46,023.00
69 Pipa Galvanis 3/4" m' 60,027.00
70 Pipa Galvanis 1" m' 79,376.00
71 Pipa Galvanis 1,5" m' 387,684.00
72 Pipa Galvanis 2" m' 114,033.33
73 Pipa Galvanis 3" m' 339,789.00
74 Pipa Galvanis 4" m' 501,103.00
75 Plastik Cor beton m² 7,200.00
76 Kran air stainless 3/4" Buah 63,200.00
77 Seal Tape Buah 4,700.00
78 Floor drain logam tebal Buah 74,700.00
79 Shower kloset biasa Buah 84,300.00
80 Kaca bening 8 mm m² 169,600.00
81 Dempul Kg 32,700.00
82 Cat kayu, besi Kg 49,500.00
83 Cat menie (besi/kayu) Kg 49,500.00
84 Lem kayu Kg 13,200.00
85 Plamur besi / Dempul besi Kg 41,400.00
86 Plamur kayu Kg 28,700.00
87 Plamur tembok 5 Kg 26,400.00
88 Thinner Liter 25,800.00
89 Menie Besi kg 33,900.00
90 Cat tembok biasa 1 kg kg 30,100.00
91 Cat tembok biasa 5 kg 5kg 101,900.00
92 Cat tembok biasa 5 kg 5kg 105,800.00
93 Cat tembok biasa 5 kg 5kg 137,400.00
94 Cat tembok biasa kg 28,500.00
95 Cat genteng 2,5 liter 2,5 l 276,000.00
96 Cat genteng 2,5 liter 2,5 l 207,700.00
97 Cat genteng 2,5 liter 2,5 l 189,700.00
98 Cat genteng Liter 103,200.00
99 Cat dinding interior 2,5 liter 2,5 l 271,260.00
100 Cat dinding interior 2,5 liter 2,5 l 254,600.00
101 Cat dinding interior 2,5 liter 2,5 l 165,600.00
102 Cat dinding interior 2,5 liter 2,5 l 161,000.00
103 Cat dinding interior Liter 83,800.00
104 Cat dinding interior kg 55,800.00
DAFTAR HARGA SATUAN BAHAN/MATERIAL

NO. BAHAN/MATERIAL SATUAN HARGA 2020(Rp.)


105 Cat dinding interior 2,5 liter 2,5 l 143,700.00
106 Cat dinding interior 2,5 liter 2,5 l 223,600.00
107 Cat dinding exterior 2,5 liter 2,5 l 187,550.00
108 Cat dinding exterior 2,5 liter 2,5 l 270,160.00
109 Cat dinding exterior 2,5 liter 2,5 l 188,600.00
110 Cat dinding exterior 2,5 liter 2,5 l 207,000.00
111 Cat dinding exterior 2,5 liter 2,5 l 218,500.00
112 Cat dinding exterior Liter 107,600.00
113 Cat dinding exterior kg 71,700.00
114 Galvalume C-075 btg (6m) 89,700.00
115 Paku skrup 6x2 Kotak(144biji) 30,400.00
116 Gypsumboard (120x240) 9 mm lbr 71,800.00
117 Kabel NYM 2 x 2,5 mm m' 9,500.00
118 Pipa Konduit 20mm m' 2,500.00
119 Flexible KonduitT 20mm m' 6,300.00
120 Lampu Downlight LED 18 W bh 91,500.00
121 Tiang Listrik Beton unit 3,000,000.00
122 Minyak Tanah liter 12,700.00
123 Aspal Curah kg 16,600.00
124 Paving stone segi enam tebal 8 cm halus m² 63,900.00
125 Tegel Trotoar m² 58,700.00
126 Kanstin BDCM 21.5 bh 12,000.00
127 Stopper / Uskup tebal 8 cm Warna bh 5,200.00
Harga 2021
5,223,175.60
17,464.71
17,464.71
12,431.30
5,223,175.60
97,736.40
83,741.30
166,995.49
215,614.56
198,007.78
184,257.24
157,344.74
18,418.62
131,924.00
1,392.31
13,446.10
4,566.60
5,327.70
213,655.99
137,280.11
101,480.00
105,539.20
9,714.68
9,831.38
23,441.88
673,928.68
2,613,110.00
4,668,080.00
117,412.36
20,498.96
15,222.00
183,780.28
166,427.20
362,283.60
58,046.56
72,862.64
19,534.90
76,110.00
15,201.70
15,201.70
15,201.70
16,881.20
4,566.60
8,727.28
27,298.12
30,342.52
189,767.60
40,794.96
1,227,644.15
62,714.64
31,154.36
1,261,735.34
Harga 2021
940,733.81
730.66
16,706.65
18,292.78
80,550.76
15,247.37
31,665.82
47,444.94
41,327.73
83,031.95
110,715.69
120,558.24
220,514.01
296,118.64
698,740.54
46,704.14
60,915.40
80,550.76
393,421.72
115,721.03
344,817.88
508,519.32
7,306.56
64,135.36
4,769.56
75,805.56
85,547.64
172,110.08
33,183.96
50,232.60
50,232.60
13,395.36
42,012.72
29,124.76
26,790.72
26,181.84
34,401.72
30,545.48
103,408.12
107,365.84
139,433.52
28,921.80
280,084.80
210,773.96
192,507.56
104,727.36
275,274.65
258,368.08
168,050.88
163,382.80
85,040.24
56,625.84
Harga 2021
145,826.76
226,909.28
190,325.74
274,158.37
191,391.28
210,063.60
221,733.80
109,192.48
72,761.16
91,027.56
30,849.92
72,862.64
9,640.60
2,537.00
6,393.24
92,854.20
3,044,400.00
12,887.96
16,845.68
64,845.72
59,568.76
12,177.60
5,276.96
DAFTAR HARGA SEWA PERALATAN

NO. URAIAN SATUAN SEWA ALAT 2020 (Rp.)


1 ASPHALT MIXING PLANT /Jam 7,970,730.43
2 ASPHALT FINISHER /Jam 978,110.90
3 ASPHALT SPRAYER /Jam 72,339.85
4 BULLDOZER 100-150 HP /Jam 598,815.30
5 COMPRESSOR 4000-6500 L/M /Jam 194,125.12
6 CONCRETE MIXER 0.3-0.6 M3 /Jam 90,926.63
7 CRANE 10-15 TON /Jam 702,533.69
8 DUMP TRUCK 3.5 TON /Jam 293,852.80
9 DUMP TRUCK 10 TON /Jam 556,878.80
10 EXCAVATOR 80-140 HP /Jam 557,488.63
11 FLAT BED TRUCK 3-4 M3 /Jam 540,167.33
12 GENERATOR SET /Jam 487,753.84
13 MOTOR GRADE > 100 HP /Jam 499,687.09
14 TRACK LOADER 75-100 HP /Jam 320,966.66
15 WHEEL LOADER 1.0-1.6 M3 /Jam 384,823.69
16 THREE WHEEL ROLLER 6-8 T /Jam 240,824.70
17 TANDEM ROLLER 6-8 T /Jam 505,783.93
18 TIRE ROLLER 8-10 T /Jam 476,097.63
19 VIBRATORY ROLLER 5-8 T /Jam 438,978.23
20 CONCRETE VIBRATOR /Jam 49,406.68
21 STONE CRUSHER /Jam 785,121.92
22 WATER PUMP 70-100 mm /Jam 47,490.90
23 WATER TANKER 3000-4500 L /Jam 282,985.66
24 PEDESTRIAN ROLLER /Jam 97,924.90
25 TAMPER /Jam 54,475.92
26 JACK HAMMER /Jam 40,911.22
27 CRANE ON TRACK 35 TON /Jam 506,154.63
28 BORE PILE MACHINE /Jam 879,066.37
29 TRONTON /Jam 593,585.56
30 COLD MILLING MACHINE /Jam 1,800,841.73
31 ROCK DRILL BREAKER /Jam 331,669.13
32 COLD RECYCLER /Jam 4,268,886.39
33 HOT RECYCLER /Jam 8,006,125.96
34 AGGREGAT (CHIP) SPREADER /Jam 531,942.08
35 ASPHALT DISTRIBUTOR /Jam 408,209.59
36 SLIP FORM PAVER /Jam 593,585.56
37 CONCRETE PAN MIXER /Jam 650,682.47
38 CONCRETE BREAKER /Jam 916,799.30
39 ASPHALT TANKER /Jam 611,733.80
40 CEMENT TANKER /Jam 565,313.80
41 CONDRETE MIXER (350) /Jam 90,087.83
42 VIBRATING RAMMER /Jam 43,152.00
43 TRUK MIXER (AGITATOR) /Jam 601,336.00
44 BORE PILE MACHINE /Jam 628,664.00
45 CRANE ON TRACK 75-100 TON /Jam 598,070.00
DAFTAR HARGA SEWA PERALATAN

NO. URAIAN SATUAN SEWA ALAT 2020 (Rp.)


46 BLENDING EQUIPMENT /Jam 274,097.00
47 ASPHALT LIQUID MIXER /Jam 101,165.00
48 BAR BENDER /Jam 29,947.00
49 BAR CUTTER /Jam 52,833.05
50 BREAKER /Jam 331,669.16
51 GROUTING PUMP /Jam 231,669.16
52 JACK HIDROLIC /Jam 36,812.00
53 MESIN LAS /Jam 35,550.00
54 PILE DRIVER LEADER 75 Kw /Jam 300,057.00
55 PILE HAMMER /Jam 47,690.00
56 PILE HAMMER 2,5 TON /Jam 26,822.00
57 STRESSING JACK /Jam 258,844.00
58 WELDING MACHINE 300A /Jam 126,753.11
SEWA ALAT (Rp.) 2021
8,088,697.24
992,586.94
73,410.48
607,677.77
196,998.17
92,272.34
712,931.19
298,201.82
565,120.61
565,739.46
548,161.81
494,972.60
507,082.46
325,716.97
390,519.08
244,388.91
513,269.53
483,143.87
445,475.11
50,137.90
796,741.72
48,193.77
287,173.85
99,374.19
55,282.16
41,516.71
513,645.72
892,076.55
602,370.63
1,827,494.19
336,577.83
4,332,065.91
8,124,616.62
539,814.82
414,251.09
602,370.63
660,312.57
930,367.93
620,787.46
573,680.44
91,421.13
43,790.65
610,235.77
637,968.23
606,921.44
SEWA ALAT (Rp.) 2021
278,153.64
102,662.24
30,390.22
53,614.98
336,577.86
235,097.86
37,356.82
36,076.14
304,497.84
48,395.81
27,218.97
262,674.89
128,629.06
ANALISA HARGA SATUAN PEKERJAAN

No. Uraian Kegiatan Koef Satuan Harga Satuan Jumlah Harga


1 2 3 4 5 6
1 1 m2 Pekerjaan Pembersihan Lapangan dan Perataan

Tenaga :
- Pekerja 0.1000 O.H 62,460.94 6,246.09
- Mandor Lapangan 0.0500 O.H 81,823.32 4,091.17
Jumlah: 10,337.26
Nilai HSPK: 10,337.26
2 1 m' Pengukuran dan Pemasangan Bouwplank

Bahan :
- Kayu lokal usuk 5/7 0.0120 m3 5,223,175.60 62,678.11
- Paku kayu 10 cm (usuk,kuda-kuda) 0.0200 kg 17,464.71 349.29
- Kayu lokal papan 2/20 x 4 m 0.0070 m3 5,223,175.60 36,562.23
Jumlah: 99,589.63
Tenaga :
- Pekerja 0.1000 OH 62,460.94 6,246.09
- Tukang Kayu 0.1000 OH 77,307.46 7,730.75
- Kepala Tukang kayu 0.0100 OH 82,701.00 827.01
- Mandor Lapangan 0.0050 OH 81,823.32 409.12
Jumlah: 15,212.97
Nilai HSPK: 114,802.60
3 1 m3 Menggali Tanah Keras Sedalam 1 Meter

Tenaga :
- Pekerja 1.0000 OH 62,460.94 62,460.94
- Mandor Lapangan 0.0320 OH 81,823.32 2,618.35
Jumlah: 65,079.29
Nilai HSPK: 65,079.29
4 Galian Tanah Kedalaman 0 - 6 meter

Peralatan :
- Exavator (standard) 0.0810 Jam 565,739.46 45,824.90
Jumlah: 45,824.90
Tenaga :
- Pekerja 0.4899 OJ 62,460.94 30,599.61
- Mandor Lapangan 0.0489 OJ 81,823.32 4,001.16
Jumlah: 34,600.78
Nilai HSPK: 80,425.67
5 1 m3 Urugan Tanah

Bahan :
- Tanah urug 1.2000 m3 97,736.40 117,283.68
Jumlah: 117,283.68
Tenaga :
- Pekerja 0.2500 OH 62,460.94 15,615.24
- Mandor Lapangan 0.0250 OH 81,823.32 2,045.58
Jumlah: 17,660.82
Nilai HSPK: 134,944.50
ANALISA HARGA SATUAN PEKERJAAN

No. Uraian Kegiatan Koef Satuan Harga Satuan Jumlah Harga


1 2 3 4 5 6
6 1 m3 Urugan Tanah Padas

Bahan :
- Tanah urug padas 1.2000 m3 83,741.30 100,489.56
Jumlah: 100,489.56
Tenaga :
- Pekerja 0.2500 OH 62,460.94 15,615.24
- Mandor Lapangan 0.0250 OH 81,823.32 2,045.58
Jumlah: 17,660.82
Nilai HSPK: 118,150.37
7 1 m3 Urugan Sirtu Padat

Bahan :
- Tanah urug sirtu 1.2000 m3 166,995.49 200,394.59
Jumlah: 200,394.59
Tenaga :
- Pekerja 0.2500 OH 62,460.94 15,615.24
- Mandor Lapangan 0.0250 OH 81,823.32 2,045.58
Jumlah: 17,660.82
Nilai HSPK: 218,055.40
8 1 m3 Pemasangan Pondasi Batu Belah Campuran 1 SP : 4 PP

Bahan :
- Batu Belah 15/20 1.2000 m3 131,924.00 158,308.80
- Semen PC 163.0000 kg 1,392.31 226,945.81
- Pasir pasang 0.5200 m3 137,280.11 71,385.66
Jumlah: 456,640.27
Tenaga :
- Pekerja 1.5000 OH 62,460.94 93,691.41
- Tukang Batu 0.7500 OH 74,953.13 56,214.85
- Kepala Tukang Batu 0.0750 OH 82,701.00 6,202.58
- Mandor Lapangan 0.0750 OH 81,823.32 6,136.75
Jumlah: 162,245.58
Nilai HSPK: 618,885.85
9 1 m3 Pemasangan Batu Kosong (Anstamping)

Bahan :
- Batu Belah 15/20 1.2000 m3 131,924.00 158,308.80
- Pasir urug 0.4320 m3 101,480.00 43,839.36
Jumlah: 202,148.16
Tenaga :
- Pekerja 0.7800 OH 62,460.94 48,719.53
- Tukang Batu 0.3900 OH 74,953.13 29,231.72
- Kepala Tukang Batu 0.0390 OH 82,701.00 3,225.34
- Mandor Lapangan 0.0390 OH 81,823.32 3,191.11
Jumlah: 84,367.70
Nilai HSPK: 286,515.86
ANALISA HARGA SATUAN PEKERJAAN

No. Uraian Kegiatan Koef Satuan Harga Satuan Jumlah Harga


1 2 3 4 5 6
10 1 m2 Beton untuk Lantai Kerja

Bahan :
- Semen PC 10.0000 kg 1,372.00 13,720.00
- Pasir beton 0.0260 m3 210,540.00 5,474.04
- Batu Pecah 0.0440 m3 18,418.62 810.42
- Air 2.0000 liter 100.00 200.00
Jumlah: 20,204.46
Tenaga :
- Pekerja 1.0500 OH 62,460.94 65,583.99
- Tukang Batu 0.0200 OH 74,953.13 1,499.06
- Kepala Tukang Batu 0.0020 OH 82,701.00 165.40
- Mandor Lapangan 0.0060 OH 81,823.32 490.94
Jumlah: 67,739.39
Nilai HSPK: 87,943.85
11 1 m3 Beton Mutu fc' = 19,3 Mpa (K225) ready mix

Bahan :
- Beton Ready Mix K 225 1.0200 m3 954,500.00 973,590.00
Jumlah: 973,590.00
Tenaga :
- Pekerja 1.0000 OH 62,460.94 62,460.94
- Tukang Batu 0.2500 OH 74,953.13 18,738.28
- Kepala Tukang Batu 0.0250 OH 82,701.00 2,067.53
- Mandor Lapangan 0.1000 OH 81,823.32 8,182.33
Jumlah: 91,449.08
Tenaga :
- Pompa Beton Standart 0.1200 koef 610,235.77 73,228.29
Jumlah: 73,228.29
Nilai HSPK: 1,138,267.37
12 1 m3 Beton Mutu fc' = 24,0 Mpa (K275) ready mix

Bahan :
- Beton Ready Mix K 275 1.0200 m3 966,000.00 985,320.00
Jumlah: 985,320.00
Tenaga :
- Pekerja 1.0000 OH 62,460.94 62,460.94
- Tukang Batu 0.2500 OH 74,953.13 18,738.28
- Kepala Tukang Batu 0.0250 OH 82,701.00 2,067.53
- Mandor Lapangan 0.1000 OH 81,823.32 8,182.33
Jumlah: 91,449.08
Tenaga :
- Pompa Beton Standart 0.1200 koef 610,235.77 73,228.29
Jumlah: 73,228.29
Nilai HSPK: 1,149,997.37
ANALISA HARGA SATUAN PEKERJAAN

No. Uraian Kegiatan Koef Satuan Harga Satuan Jumlah Harga


1 2 3 4 5 6
13 1 m3 Beton Mutu fc' = 26,4 Mpa (K300) ready mix

Bahan :
- Beton Ready Mix K 300 1.0200 m3 977,500.00 997,050.00
Jumlah: 997,050.00
Tenaga :
- Pekerja 1.0000 OH 62,460.94 62,460.94
- Tukang Batu 0.2500 OH 74,953.13 18,738.28
- Kepala Tukang Batu 0.0250 OH 82,701.00 2,067.53
- Mandor Lapangan 0.1000 OH 81,823.32 8,182.33
Jumlah: 91,449.08
Tenaga :
- Pompa Beton Longbow 0.1200 koef 610,235.77 73,228.29
Jumlah: 73,228.29
Nilai HSPK: 1,161,727.37
14 1 m3 Beton Mutu fc' = 26,4 Mpa (K500) ready mix

Bahan :
- Beton Ready Mix K 300 1.0200 m3 977,500.00 997,050.00
Jumlah: 997,050.00
Tenaga :
- Pekerja 1.0000 OH 62,460.94 62,460.94
- Tukang Batu 0.2500 OH 74,953.13 18,738.28
- Kepala Tukang Batu 0.0250 OH 82,701.00 2,067.53
- Mandor Lapangan 0.1000 OH 81,823.32 8,182.33
Jumlah: 91,449.08
Tenaga :
- Pompa Beton Longbow 0.1200 koef 128,629.06 15,435.49
Jumlah: 15,435.49
Nilai HSPK: 1,103,934.57
15 10 kg Pembesian Dengan Besi Polos

Bahan :
- Besi Beton Polos 10.5000 kg 9,714.68 102,004.14
- Kawat ikat beton/bendrat 0.1500 kg 23,441.88 3,516.28
Jumlah: 105,520.43
Tenaga :
- Pekerja 0.0700 OH 62,460.94 4,372.27
- Tukang Besi 0.0700 OH 77,307.46 5,411.52
- Kepala Tukang Besi 0.0070 OH 84,360.32 590.52
- Mandor Lapangan 0.0040 OH 81,823.32 327.29
Jumlah: 10,701.60
Nilai HSPK: 116,222.03
16 10 kg Pembesian Dengan Besi Ulir

Bahan :
- Besi Beton Ulir 10.5000 kg 9,831.38 103,229.52
- Kawat ikat beton/bendrat 0.1500 kg 23,441.88 3,516.28
Jumlah: 106,745.80
Tenaga :
- Pekerja 0.0700 OH 62,460.94 4,372.27
- Tukang Besi 0.0700 OH 77,307.46 5,411.52
- Kepala Tukang Besi 0.0070 OH 84,360.32 590.52
ANALISA HARGA SATUAN PEKERJAAN

No. Uraian Kegiatan Koef Satuan Harga Satuan Jumlah Harga


1 2 3 4 5 6
- Mandor Lapangan 0.0040 OH 81,823.32 327.29
Jumlah: 10,701.60
Nilai HSPK: 117,447.40
17 1 kg Pemasangan Jaringan Kawat Baja (Wiremesh)

Bahan :
- Wiremesh 2.1 x 5.4 (8 mm) 1.0200 kg 10,906.76 11,124.89
- Kawat ikat beton/bendrat 0.0500 kg 23,441.88 1,172.09
Jumlah: 12,296.99
Tenaga :
- Pekerja 0.0250 OH 62,460.94 1,561.52
- Tukang Besi 0.0250 OH 77,307.46 1,932.69
- Kepala Tukang Besi 0.0250 OH 84,360.32 2,109.01
- Mandor Lapangan 0.0010 OH 81,823.32 81.82
Jumlah: 5,685.04
Nilai HSPK: 17,982.03
18 1 m2 Pemasangan Bekesting untuk Pondasi

Bahan :
- Acuan Kayu Begisting 0.0400 m3 2,613,110.00 104,524.40
- Paku kayu 10 cm (usuk,kuda-kuda) 0.3000 kg 17,464.71 5,239.41
Jumlah: 109,763.81
Tenaga :
- Pekerja 0.5200 OH 62,460.94 32,479.69
- Tukang Kayu 0.2600 OH 77,307.46 20,099.94
- Kepala Tukang kayu 0.0260 OH 84,360.32 2,193.37
- Mandor Lapangan 0.0260 OH 81,823.32 2,127.41
Jumlah: 56,900.40
Nilai HSPK: 166,664.22
19 1 m2 Pemasangan Bekesting untuk Sloof

Bahan :
- Acuan Kayu Begisting 0.0450 m3 2,613,110.00 117,589.95
- Paku kayu 10 cm (usuk,kuda-kuda) 0.3000 kg 17,464.71 5,239.41
Jumlah: 122,829.36
Tenaga :
- Pekerja 0.5200 OH 62,460.94 32,479.69
- Tukang Kayu 0.2600 OH 77,307.46 20,099.94
- Kepala Tukang kayu 0.0260 OH 84,360.32 2,193.37
- Mandor Lapangan 0.0260 OH 81,823.32 2,127.41
Jumlah: 56,900.40
Nilai HSPK: 179,729.77
20 1 m2 Pemasangan Bekesting untuk Kolom

Bahan :
- Acuan Kayu Begisting 0.0400 m3 2,613,110.00 104,524.40
- Paku kayu 10 cm (usuk,kuda-kuda) 0.4000 kg 17,464.71 6,985.88
- Kayu Kelas II ( balok 8/12 ) 0.0150 m3 4,668,080.00 70,021.20
- Plywood 122x244 tebal 8 0.3500 lbr 117,412.36 41,094.33
- Trucuk / bambu 2.0000 Btg 20,498.96 40,997.92
Jumlah: 263,623.73
Tenaga :
- Pekerja 0.6600 OH 62,460.94 41,224.22
ANALISA HARGA SATUAN PEKERJAAN

No. Uraian Kegiatan Koef Satuan Harga Satuan Jumlah Harga


1 2 3 4 5 6
- Tukang Kayu 0.3300 OH 77,307.46 25,511.46
- Kepala Tukang kayu 0.0330 OH 84,360.32 2,783.89
- Mandor Lapangan 0.0330 OH 81,823.32 2,700.17
Jumlah: 72,219.74
Nilai HSPK: 335,843.47
ANALISA HARGA SATUAN PEKERJAAN

No. Uraian Kegiatan Koef Satuan Harga Satuan Jumlah Harga


1 2 3 4 5 6
21 1 m2 Pemasangan Bekesting untuk Balok

Bahan :
- Acuan Kayu Begisting 0.0400 m3 2,613,110.00 104,524.40
- Paku kayu 10 cm (usuk,kuda-kuda) 0.4000 kg 17,464.71 6,985.88
- Kayu Kelas II ( balok 8/12 ) 0.0180 m3 4,668,080.00 84,025.44
- Plywood 122x244 tebal 8 0.3500 lbr 117,412.36 41,094.33
- Trucuk / bambu 2.0000 Btg 20,498.96 40,997.92
Jumlah: 277,627.97
Tenaga :
- Pekerja 0.6600 OH 62,460.94 41,224.22
- Tukang Kayu 0.3300 OH 77,307.46 25,511.46
- Kepala Tukang kayu 0.0330 OH 84,360.32 2,783.89
- Mandor Lapangan 0.0330 OH 81,823.32 2,700.17
Jumlah: 72,219.74
Nilai HSPK: 349,847.71
22 1 m2 Pemasangan Bekesting untuk Plat Lantai (Tanpa Stegger)

Bahan :
- Acuan Kayu Begisting 0.0400 m3 5,223,175.60 208,927.02
- Paku kayu 10 cm (usuk,kuda-kuda) 0.4000 kg 17,464.71 6,985.88
- Plywood 122x244 tebal 8 0.3500 lbr 117,412.36 41,094.33
Jumlah: 257,007.23
Tenaga :
- Pekerja 0.6600 OH 62,460.94 41,224.22
- Tukang Kayu 0.3300 OH 77,307.46 25,511.46
- Kepala Tukang kayu 0.0330 OH 84,360.32 2,783.89
- Mandor Lapangan 0.0330 OH 81,823.32 2,700.17
Jumlah: 72,219.74
Nilai HSPK: 329,226.98
23 1 m2 Pemasangan Plastik Cor Beton

Bahan :
- Plastik Cor Beton 1.1000 m2 7,306.56 8,037.22
Jumlah: 8,037.22
Tenaga :
- Pekerja 0.0130 OH 62,460.94 811.99
- Tukang Besi 0.0040 OH 77,307.46 309.23
- Mandor Lapangan 0.0040 OH 81,823.32 327.29
Jumlah: 1,448.52
Nilai HSPK: 9,485.73
ANALISA HARGA SATUAN PEKERJAAN

No. Uraian Kegiatan Koef Satuan Harga Satuan Jumlah Harga


1 2 3 4 5 6
24 1 m' Kolom Praktis Beton Bertulang (11x11 cm)

Bahan :
- Kayu lokal usuk 5/7 0.0020 m3 5,223,175.60 10,446.35
- Paku kayu 7 cm (paku usuk) 0.0100 kg 17,464.71 174.65
- Besi Beton Polos 3.0000 kg 9,714.68 29,144.04
- Kawat ikat beton/bendrat 0.4500 kg 23,441.88 10,548.85
- Semen PC 4.0000 kg 1,392.31 5,569.22
- Pasir beton 0.0060 m3 213,655.99 1,281.94
- Batu pecah 2 - 3 (mesin) 0.0090 m3 198,007.78 1,782.07
Jumlah: 58,947.11
Tenaga :
- Pekerja 0.1800 OH 62,460.94 11,242.97
- Tukang Batu 0.0200 OH 74,953.13 1,499.06
- Tukang kayu 0.0200 OH 77,307.46 1,546.15
- Tukang Besi 0.0200 OH 77,307.46 1,546.15
- Kepala Tukang Batu 0.0060 OH 82,701.00 496.21
- Mandor Lapangan 0.0090 OH 81,823.32 736.41
Jumlah: 17,066.95
Nilai HSPK: 76,014.06
25 1 m' Ring Balok Beton Bertulang (15x20 cm)

Bahan :
- Kayu lokal usuk 5/7 0.0060 m3 5,223,175.60 31,339.05
- Paku kayu 7 cm (paku usuk) 0.0400 kg 17,464.71 698.59
- Besi Beton Polos 7.2000 kg 9,714.68 69,945.70
- Kawat ikat beton/bendrat 0.1000 kg 23,441.88 2,344.19
- Semen PC 11.0000 kg 1,392.31 15,315.36
- Pasir beton 0.0180 m3 213,655.99 3,845.81
- Batu pecah 2 - 3 (mesin) 0.0300 m3 198,007.78 5,940.23
Jumlah: 129,428.93
Tenaga :
- Pekerja 0.5940 OH 62,460.94 37,101.80
- Tukang Batu 0.0660 OH 74,953.13 4,946.91
- Tukang kayu 0.0660 OH 77,307.46 5,102.29
- Tukang Besi 0.0660 OH 77,307.46 5,102.29
- Kepala Tukang Batu 0.0200 OH 82,701.00 1,654.02
- Mandor Lapangan 0.0300 OH 81,823.32 2,454.70
Jumlah: 56,362.01
Nilai HSPK: 185,790.94
ANALISA HARGA SATUAN PEKERJAAN

No. Uraian Kegiatan Koef Satuan Harga Satuan Jumlah Harga


1 2 3 4 5 6
26 1 m3 Pondasi Strous Beton (150 kg Besi + Bekesting)

Bahan :
- Kayu lokal usuk 5/7 0.2000 m3 5,223,175.60 1,044,635.12
- Paku kayu 10 cm (usuk,kuda-kuda) 1.5000 kg 17,464.71 26,197.06
- Besi Beton Polos 157.5000 kg 9,714.68 1,530,062.16
- Kawat ikat beton/bendrat 2.2500 kg 23,441.88 52,744.23
- Semen PC 336.0000 kg 1,392.31 467,814.68
- Pasir beton 0.5400 m3 213,655.99 115,374.24
- Batu pecah 2 - 3 (mesin) 0.8100 m3 198,007.78 160,386.30
Jumlah: 3,397,213.79
Tenaga :
- Pekerja 5.3000 OH 62,460.94 331,042.98
- Tukang Batu 0.2750 OH 74,953.13 20,612.11
- Tukang kayu 1.3000 OH 77,307.46 100,499.70
- Tukang Besi 1.0500 OH 77,307.46 81,172.84
- Kepala Tukang Batu 0.2620 OH 82,701.00 21,667.66
- Mandor Lapangan 0.2650 OH 81,823.32 21,683.18
Jumlah: 576,678.48
Nilai HSPK: 3,973,892.27
27 1 m3 Sloof Beton Bertulang (200 kg Besi + Bekesting)

Bahan :
- Kayu lokal usuk 5/7 0.2700 m3 5,223,175.60 1,410,257.41
- Paku kayu 7 cm (paku usuk) 2.0000 kg 17,464.71 34,929.42
- Besi Beton Polos 210.0000 kg 9,714.68 2,040,082.88
- Kawat ikat beton/bendrat 3.0000 kg 23,441.88 70,325.64
- Semen PC 336.0000 kg 1,392.31 467,814.68
- Pasir beton 0.5400 m3 213,655.99 115,374.24
- Batu pecah 2 - 3 (mesin) 0.8100 m3 198,007.78 160,386.30
Jumlah: 4,299,170.57
Tenaga :
- Pekerja 5.6500 OH 62,460.94 352,904.31
- Tukang Batu 0.2750 OH 74,953.13 20,612.11
- Tukang kayu 1.5600 OH 77,307.46 120,599.64
- Tukang Besi 1.4000 OH 77,307.46 108,230.45
- Kepala Tukang Batu 0.3230 OH 82,701.00 26,712.42
- Mandor Lapangan 0.2830 OH 81,823.32 23,156.00
Jumlah: 652,214.94
Nilai HSPK: 4,951,385.51
ANALISA HARGA SATUAN PEKERJAAN

No. Uraian Kegiatan Koef Satuan Harga Satuan Jumlah Harga


1 2 3 4 5 6
28 1 m3 Kolom Beton Bertulang (300 kg Besi + Bekesting)

Bahan :
- Kayu lokal usuk 5/7 0.4000 m3 5,223,175.60 2,089,270.24
- Paku kayu 7 cm (paku usuk) 4.0000 kg 17,464.71 69,858.83
- Besi Beton Polos 315.0000 kg 9,714.68 3,060,124.33
- Kawat ikat beton/bendrat 4.5000 kg 23,441.88 105,488.46
- Semen PC 336.0000 kg 1,392.31 467,814.68
- Pasir beton 0.5400 m3 213,655.99 115,374.24
- Batu pecah 2 - 3 (mesin) 0.8100 m3 198,007.78 160,386.30
- Kayu Kelas II ( balok 8/12 ) 0.1500 m3 4,668,080.00 700,212.00
- Plywood 122x244 tebal 8 3.5000 lembar 117,412.36 410,943.26
- Trucuk / bambu 20.0000 btg. 20,498.96 409,979.20
Jumlah: 7,589,451.53
Tenaga :
- Pekerja 7.0500 OH 62,460.94 440,349.63
- Tukang Batu 0.2750 OH 74,953.13 20,612.11
- Tukang kayu 1.6500 OH 77,307.46 127,557.32
- Tukang Besi 2.1000 OH 77,307.46 162,345.67
- Kepala Tukang Batu 0.4030 OH 82,701.00 33,328.50
- Mandor Lapangan 0.3530 OH 81,823.32 28,883.63
Jumlah: 813,076.87
Nilai HSPK: 8,402,528.40
29 1 m3 Balok Beton Bertulang (200 kg Besi + Bekesting)

Bahan :
- Kayu lokal usuk 5/7 0.3200 m3 5,223,175.60 1,671,416.19
- Paku kayu 7 cm (paku usuk) 3.2000 kg 17,464.71 55,887.07
- Besi Beton Polos 210.0000 kg 9,714.68 2,040,082.88
- Kawat ikat beton/bendrat 3.0000 kg 23,441.88 70,325.64
- Semen PC 336.0000 kg 1,392.31 467,814.68
- Pasir beton 0.5400 m3 213,655.99 115,374.24
- Batu pecah 2 - 3 (mesin) 0.8100 m3 198,007.78 160,386.30
- Kayu Kelas II ( balok 8/12 ) 0.1400 m3 4,668,080.00 653,531.20
- Plywood 122x244 tebal 8 2.8000 lembar 117,412.36 328,754.61
- Trucuk / bambu 16.0000 btg. 20,498.96 327,983.36
Jumlah: 5,891,556.17
Tenaga :
- Pekerja 6.3500 OH 62,460.94 396,626.97
- Tukang Batu 0.2750 OH 74,953.13 20,612.11
- Tukang kayu 1.6500 OH 77,307.46 127,557.32
- Tukang Besi 1.4000 OH 77,307.46 108,230.45
- Kepala Tukang Batu 0.3330 OH 82,701.00 27,539.43
- Mandor Lapangan 0.3180 OH 81,823.32 26,019.82
Jumlah: 706,586.10
Nilai HSPK: 6,598,142.26
ANALISA HARGA SATUAN PEKERJAAN

No. Uraian Kegiatan Koef Satuan Harga Satuan Jumlah Harga


1 2 3 4 5 6
30 1 m3 Plat Beton Bertulang (150 kg Besi + Bekesting)

Bahan :
- Kayu lokal usuk 5/7 0.3200 m3 5,223,175.60 1,671,416.19
- Paku kayu 7 cm (paku usuk) 3.2000 kg 17,464.71 55,887.07
- Besi Beton Polos 157.5000 kg 9,714.68 1,530,062.16
- Kawat ikat beton/bendrat 2.2500 kg 23,441.88 52,744.23
- Semen PC 336.0000 kg 1,392.31 467,814.68
- Pasir beton 0.5400 m3 213,655.99 115,374.24
- Batu pecah 2 - 3 (mesin) 0.8100 m3 198,007.78 160,386.30
- Kayu Kelas II ( balok 8/12 ) 0.1200 m3 4,668,080.00 560,169.60
- Plywood 122x244 tebal 8 2.8000 lembar 117,412.36 328,754.61
- Trucuk / bambu 32.0000 btg. 20,498.96 655,966.72
Jumlah: 5,598,575.79
Tenaga :
- Pekerja 5.3000 OH 62,460.94 331,042.98
- Tukang Batu 0.2750 OH 74,953.13 20,612.11
- Tukang kayu 1.3000 OH 77,307.46 100,499.70
- Tukang Besi 1.0500 OH 77,307.46 81,172.84
- Kepala Tukang Batu 0.2650 OH 82,701.00 21,915.77
- Mandor Lapangan 0.2650 OH 81,823.32 21,683.18
Jumlah: 576,926.58
Nilai HSPK: 6,175,502.37
31 1 m2 Pemasangan Dinding Bata Ringan tebal 10cm Dengan Mortar Siap Pakai

Bahan :
- Bata Ringan (Exterior) 60x20x10 8.4000 bj 15,222.00 127,864.80
- Perekat Bata Ringan 40 kg MU-380 0.0630 kg 4,527.50 285.23
Jumlah: 128,150.03
Tenaga :
- Pekerja 0.6710 OH 62,460.94 41,911.29
- Tukang batu 1.3000 OH 74,953.13 97,439.07
- Kepala Tukang Batu 0.1300 OH 82,701.00 10,751.13
- Mandor Lapangan 0.0030 OH 81,823.32 245.47
Jumlah: 150,346.96
Peralatan :
- 10% x harga bahan 1.0000 ls 15,034.70 15,034.70
Jumlah: 15,034.70
Nilai HSPK: 293,531.69
32 1 m2 Pemasangan Plesteran Bata Ringan

Bahan :
- Mortar MU 301 6.2400 kg 4,566.60 28,495.58
- Pasir pasang 0.0240 m3 137,280.11 3,294.72
Jumlah: 31,790.31
Tenaga :
- Pekerja 0.3000 OH 62,460.94 18,738.28
- Tukang Batu 0.1500 OH 74,953.13 11,242.97
- Kepala Tukang Batu 0.0150 OH 82,701.00 1,240.52
- Mandor Lapangan 0.0150 OH 81,823.32 1,227.35
Jumlah: 32,449.12
Nilai HSPK: 64,239.42
ANALISA HARGA SATUAN PEKERJAAN

No. Uraian Kegiatan Koef Satuan Harga Satuan Jumlah Harga


1 2 3 4 5 6
33 1 m2 Pekerjaan Acian Bata Ringan

Bahan :
- Mortar MU 200 2.1000 kg 5,327.70 11,188.17
Jumlah: 11,188.17
Tenaga :
- Pekerja 0.2000 OH 62,460.94 12,492.19
- Tukang Batu 0.1000 OH 74,953.13 7,495.31
- Kepala Tukang Batu 0.0100 OH 82,701.00 827.01
- Mandor Lapangan 0.0100 OH 81,823.32 818.23
Jumlah: 21,632.74
Nilai HSPK: 32,820.91
34 1 m' Benangan

Bahan :
- Semen PC 3.0000 kg 1,392.31 4,176.92
Jumlah: 4,176.92
Tenaga :
- Pekerja 0.2000 OH 62,460.94 12,492.19
- Tukang Batu 0.1000 OH 74,953.13 7,495.31
- Kepala Tukang Batu 0.0100 OH 82,701.00 827.01
- Mandor Lapangan 0.0100 OH 81,823.32 818.23
Jumlah: 21,632.74
Nilai HSPK: 25,809.66
35 1 m2 Pemasangan Lantai HT 60x60cm

Bahan :
- Homogeneus Tile 60 x 60 cm 2.9170 buah 57,054.23 166,427.20
- Semen PC 9.8000 kg 1,392.31 13,644.59
- Pasir pasang 0.0450 m3 137,280.11 6,177.61
- Semen warna 1.3000 kg 13,446.10 17,479.93
Jumlah: 203,729.33
Tenaga :
- Pekerja 0.7000 OH 62,460.94 43,722.66
- Tukang Batu 0.3500 OH 74,953.13 26,233.59
- Kepala Tukang Batu 0.0350 OH 82,701.00 2,894.54
- Mandor Lapangan 0.0350 OH 81,823.32 2,863.82
Jumlah: 75,714.60
Nilai HSPK: 279,443.93
36 1 m2 Pemasangan Lantai HT 60x60cm (Anti Slip)

Bahan :
- Homogeneus Tile 60 x 60 cm (anti slip) 2.9170 buah 124,197.33 362,283.60
- Semen PC 9.8000 kg 1,392.31 13,644.59
- Pasir pasang 0.0450 m3 137,280.11 6,177.61
- Semen warna 1.3000 kg 13,446.10 17,479.93
Jumlah: 399,585.73
Tenaga :
- Pekerja 0.7000 OH 62,460.94 43,722.66
- Tukang Batu 0.3500 OH 74,953.13 26,233.59
- Kepala Tukang Batu 0.0350 OH 82,701.00 2,894.54
- Mandor Lapangan 0.0350 OH 81,823.32 2,863.82
Jumlah: 75,714.60
ANALISA HARGA SATUAN PEKERJAAN

No. Uraian Kegiatan Koef Satuan Harga Satuan Jumlah Harga


1 2 3 4 5 6
Nilai HSPK: 475,300.33
ANALISA HARGA SATUAN PEKERJAAN

No. Uraian Kegiatan Koef Satuan Harga Satuan Jumlah Harga


1 2 3 4 5 6
37 1 m2 Pemasangan Dinding Keramik Uk. (20x25 cm) motif

Bahan :
- Keramik 20x25cm motif 20.0000 buah 2,902.33 58,046.56
- Semen PC 9.3000 kg 1,392.31 12,948.44
- Pasir pasang 0.0180 m3 137,280.11 2,471.04
- Semen warna 2.7500 kg 13,446.10 36,976.78
Jumlah: 110,442.82
Tenaga :
- Pekerja 0.9000 OH 62,460.94 56,214.85
- Tukang Batu 0.4500 OH 74,953.13 33,728.91
- Kepala Tukang Batu 0.0450 OH 82,701.00 3,721.55
- Mandor Lapangan 0.0450 OH 81,823.32 3,682.05
Jumlah: 97,347.35
Nilai HSPK: 207,790.17
38 1 m2 Memasangan Rangka Plafond Hollow 60x60cm

Bahan :
- Hollow 2/4 - 4m 4.0000 m 19,027.50 76,110.00
- Perlengkapan 1.0000 ls 19,027.50 19,027.50
Jumlah: 95,137.50
Tenaga :
- Pekerja 0.3500 OH 62,460.94 21,861.33
- Tukang Besi 0.3500 OH 77,307.46 27,057.61
- Kepala Tukang Besi 0.0350 OH 84,360.32 2,952.61
- Mandor Lapangan 0.0180 OH 81,823.32 1,472.82
Jumlah: 53,344.37
Nilai HSPK: 148,481.87
39 1 m2 Pemasangan Langit-langit Gypsum Board Uk. (120x240x9 mm) tebal 9mm

Bahan :
- Gypsumboard (120x240) 9 mm 0.3640 lembar 72,862.64 26,522.00
- Paku kayu 2-3 cm ( paku plafond eternit, triplek) 0.1100 kg 19,534.90 2,148.84
Jumlah: 28,670.84
Tenaga :
- Pekerja 0.1000 OH 62,460.94 6,246.09
- Tukang Kayu 0.0500 OH 77,307.46 3,865.37
- Kepala Tukang kayu 0.0050 OH 84,360.32 421.80
- Mandor Lapangan 0.0050 OH 81,823.32 409.12
Jumlah: 10,942.39
Nilai HSPK: 39,613.23
40 1 kg Pemasangan Besi Profil Siku, IWF, INP, UNP

Bahan :
- Besi siku 1.1500 kg 15,201.70 17,481.96
Jumlah: 17,481.96
Tenaga :
- Pekerja 0.0600 OH 62,460.94 3,747.66
- Tukang Besi 0.0600 OH 77,307.46 4,638.45
- Kepala Tukang Besi 0.0060 OH 84,360.32 506.16
- Mandor Lapangan 0.0030 OH 81,823.32 245.47
Jumlah: 9,137.74
Nilai HSPK: 26,619.70
ANALISA HARGA SATUAN PEKERJAAN

No. Uraian Kegiatan Koef Satuan Harga Satuan Jumlah Harga


1 2 3 4 5 6
41 1 kg Pemasangan Besi Profil Siku, IWF, INP, UNP

Bahan :
- Besi Profil WF 1.1500 kg 16,881.20 19,413.38
Jumlah: 19,413.38
Tenaga :
- Pekerja 0.0600 OH 62,460.94 3,747.66
- Tukang Besi 0.0600 OH 77,307.46 4,638.45
- Kepala Tukang Besi 0.0060 OH 84,360.32 506.16
- Mandor Lapangan 0.0030 OH 81,823.32 245.47
Jumlah: 9,137.74
Nilai HSPK: 28,551.11
42 100 kg Pekerjaan Perakitan

Bahan :
- Solar 1.0000 ltr. 4,566.60 4,566.60
- Minyak pelumas 0.1000 ltr. 27,298.12 2,729.81
Jumlah: 7,296.41
Tenaga :
- Pekerja 0.1000 OH 62,460.94 6,246.09
- Tukang las 0.1000 OH 77,307.46 7,730.75
- Kepala Tukang Las 0.0100 OH 82,701.00 827.01
- Mandor Lapangan 0.0050 OH 81,823.32 409.12
Jumlah: 15,212.97
Peralatana :
- Mesin Las 0.0080 Jam 36,076.14 288.61
Jumlah: 288.61
Nilai HSPK: 22,797.99
43 10 cm Pengerjaan Pengelasan dengan Las Listrik

Bahan :
- Kawat las 0.4000 Kg 30,342.52 12,137.01
- Solar 0.3000 Liter 4,566.60 1,369.98
- Minyak pelumas 0.0400 Liter 27,298.12 1,091.92
Jumlah: 14,598.91
Tenaga :
- Pekerja 0.0400 OH 62,460.94 2,498.44
- Tukang las 0.0200 OH 77,307.46 1,546.15
- Kepala Tukang Las 0.0020 OH 82,701.00 165.40
- Mandor Lapangan 0.0020 OH 81,823.32 163.65
Jumlah: 4,373.64
Peralatana :
- Mesin Las 0.1700 Jam 36,076.14 6,132.94
Jumlah: 6,132.94
Nilai HSPK: 25,105.49
ANALISA HARGA SATUAN PEKERJAAN

No. Uraian Kegiatan Koef Satuan Harga Satuan Jumlah Harga


1 2 3 4 5 6
44 1 m' Memasang Kusen Pintu Alluminium Puti Doff

Bahan :
- Kusen Alumunium Putih Doff 4 1.1000 m 189,767.60 208,744.36
- Paku skrup 6x2 2.0000 buah 12,431.30 24,862.60
- Sealand 0.0600 tube 40,794.96 2,447.70
Jumlah: 236,054.66
Tenaga :
- Pekerja 0.0430 OH 62,460.94 2,685.82
- Tukang Besi 0.0430 OH 77,307.46 3,324.22
- Kepala Tukang Besi 0.0040 OH 84,360.32 337.44
- Mandor Lapangan 0.0020 OH 81,823.32 163.65
Jumlah: 6,511.13
Nilai HSPK: 242,565.79
45 1 set Memasang Pintu Alluminium (Kusen dan Daun Pintu 0,70x2,00cm) Toilet

Bahan :
- Pintu Toilet Alumunium 1.1000 set 1,227,644.15 1,350,408.57
Jumlah: 1,350,408.57
Tenaga :
- Pekerja 0.2060 OH 62,460.94 12,866.95
- Tukang Kayu 0.2060 OH 77,307.46 15,925.34
- Kepala Tukang kayu 0.0210 OH 84,360.32 1,771.57
- Mandor Lapangan 0.0100 OH 81,823.32 818.23
Jumlah: 31,382.09
Nilai HSPK: 1,381,790.66
46 1 m2 Pemasangan Atap Spandex

Bahan :
- Spandex 0,35 Lebar 80 cm 1.5000 m' 62,714.64 94,071.96
- Paku payung 7 cm ( asbes gelombang kecil ) 0.1200 kg 31,154.36 3,738.52
Jumlah: 97,810.48
Tenaga :
- Pekerja 0.1400 OH 62,460.94 8,744.53
- Tukang Kayu 0.0700 OH 77,307.46 5,411.52
- Kepala Tukang kayu 0.0070 OH 84,360.32 590.52
- Mandor Lapangan 0.0070 OH 81,823.32 572.76
Jumlah: 15,319.34
Nilai HSPK: 113,129.82
47 1 buah Memasang Kloset Duduk / Monoblok

Bahan :
- Klosed duduk putih porselen komplit 1.0000 m' 1,261,735.34 1,261,735.34
- Perlengkapan 1.0000 ls 75,704.12 75,704.12
Jumlah: 1,337,439.46
Tenaga :
- Pekerja 3.3000 OH 62,460.94 206,121.10
- Tukang Pipa 1.1000 OH 74,953.13 82,448.44
- Kepala Tukang Pipa 0.0100 OH 82,701.00 827.01
- Mandor Lapangan 0.1600 OH 81,823.32 13,091.73
Jumlah: 302,488.28
Nilai HSPK: 1,639,927.75
ANALISA HARGA SATUAN PEKERJAAN

No. Uraian Kegiatan Koef Satuan Harga Satuan Jumlah Harga


1 2 3 4 5 6
48 1 buah Memasang Bak Air Fiberglass Vol. 1 m3

Bahan :
- Bak air (tandon) Fibre kapasitas 550 m3 1.0000 m' 940,733.81 940,733.81
- Perlengkapan 1.0000 ls 112,888.06 112,888.06
Jumlah: 1,053,621.86
Tenaga :
- Pekerja 3.3000 OH 62,460.94 206,121.10
- Tukang Pipa 1.1000 OH 74,953.13 82,448.44
- Kepala Tukang Pipa 0.0100 OH 82,701.00 827.01
- Mandor Lapangan 0.1600 OH 81,823.32 13,091.73
Jumlah: 302,488.28
Nilai HSPK: 1,356,110.15
49 1 buah Memasang Bak Kontrol Pasangan Batu Bata Uk. (45x45cm), Tinggi 50cm

Bahan :
- Bata merah 70.0000 bh 730.66 51,145.92
- Semen PC 77.0000 kg 1,392.31 107,207.53
- Pasir pasang 0.1300 m3 137,280.11 17,846.41
- Batu pecah 3 - 5 0.0200 m3 184,257.24 3,685.14
- Besi Beton Polos 2.6000 kg 9,714.68 25,258.17
- Pasir beton 0.0900 m3 213,655.99 19,229.04
Jumlah: 224,372.22
Tenaga :
- Pekerja 3.2000 OH 62,460.94 199,875.01
- Tukang Batu 1.1500 OH 74,953.13 86,196.10
- Kepala Tukang Batu 0.0110 OH 82,701.00 909.71
- Mandor Lapangan 0.0160 OH 81,823.32 1,309.17
Jumlah: 288,289.99
Nilai HSPK: 512,662.21
50 1 m' Memasang Pipa Galvanis Dia. 1,5"

Bahan :
- Pipa Galvanis 1,5" 1.2000 m' 393,421.72 472,106.07
- Perlengkapan 1.0000 ls 137,697.60 137,697.60
Jumlah: 609,803.67
Tenaga :
- Pekerja 0.1080 OH 62,460.94 6,745.78
- Tukang Pipa 0.1800 OH 74,953.13 13,491.56
- Kepala Tukang Pipa 0.0180 OH 82,701.00 1,488.62
- Mandor Lapangan 0.0050 OH 81,823.32 409.12
Jumlah: 22,135.08
Nilai HSPK: 631,938.75
51 1 m' Memasang Pipa Galvanis Dia. 2"

Bahan :
- Pipa Galvanis 2" 1.2000 m' 115,721.03 138,865.23
- Perlengkapan 1.0000 ls 40,502.36 40,502.36
Jumlah: 179,367.59
Tenaga :
- Pekerja 0.1080 OH 62,460.94 6,745.78
- Tukang Pipa 0.1800 OH 74,953.13 13,491.56
- Kepala Tukang Pipa 0.0180 OH 82,701.00 1,488.62
ANALISA HARGA SATUAN PEKERJAAN

No. Uraian Kegiatan Koef Satuan Harga Satuan Jumlah Harga


1 2 3 4 5 6
- Mandor Lapangan 0.0050 OH 81,823.32 409.12
Jumlah: 22,135.08
Nilai HSPK: 201,502.67
52 1 m' Memasang Pipa Galvanis Dia. 3"

Bahan :
- Pipa Galvanis 3" 1.2000 m' 344,817.88 413,781.45
- Perlengkapan 1.0000 ls 120,686.26 120,686.26
Jumlah: 534,467.71
Tenaga :
- Pekerja 0.1080 OH 62,460.94 6,745.78
- Tukang Pipa 0.1800 OH 74,953.13 13,491.56
- Kepala Tukang Pipa 0.0180 OH 82,701.00 1,488.62
- Mandor Lapangan 0.0050 OH 81,823.32 409.12
Jumlah: 22,135.08
Nilai HSPK: 556,602.79
53 1 m' Memasang Pipa PVC Tipe AW Dia. 3/4"

Bahan :
- Pipa PVC AW 3/4" 1.2000 m' 18,292.78 21,951.34
- Perlengkapan 1.0000 ls 6,402.47 6,402.47
Jumlah: 28,353.82
Tenaga :
- Pekerja 0.0360 OH 62,460.94 2,248.59
- Tukang Pipa 0.0600 OH 74,953.13 4,497.19
- Kepala Tukang Pipa 0.0060 OH 82,701.00 496.21
- Mandor Lapangan 0.0020 OH 81,823.32 163.65
Jumlah: 7,405.63
Nilai HSPK: 35,759.45
54 1 m' Memasang Pipa PVC Tipe AW Dia. 1"

Bahan :
- Pipa PVC AW 1" 1.2000 m' 80,550.76 96,660.92
- Perlengkapan 1.0000 ls 28,192.77 28,192.77
Jumlah: 124,853.69
Tenaga :
- Pekerja 0.0360 OH 62,460.94 2,248.59
- Tukang Pipa 0.0600 OH 74,953.13 4,497.19
- Kepala Tukang Pipa 0.0060 OH 82,701.00 496.21
- Mandor Lapangan 0.0020 OH 81,823.32 163.65
Jumlah: 7,405.63
Nilai HSPK: 132,259.32
55 1 m' Memasang Pipa PVC Tipe AW Dia. 1,5"

Bahan :
- Pipa PVC AW 1,5" 1.2000 m' 31,665.82 37,998.98
- Perlengkapan 1.0000 ls 11,083.04 11,083.04
Jumlah: 49,082.02
Tenaga :
- Pekerja 0.0360 OH 62,460.94 2,248.59
- Tukang Pipa 0.0600 OH 74,953.13 4,497.19
- Kepala Tukang Pipa 0.0060 OH 82,701.00 496.21
- Mandor Lapangan 0.0020 OH 81,823.32 163.65
ANALISA HARGA SATUAN PEKERJAAN

No. Uraian Kegiatan Koef Satuan Harga Satuan Jumlah Harga


1 2 3 4 5 6
Jumlah: 7,405.63
Nilai HSPK: 56,487.65
ANALISA HARGA SATUAN PEKERJAAN

No. Uraian Kegiatan Koef Satuan Harga Satuan Jumlah Harga


1 2 3 4 5 6
56 1 m' Memasang Pipa PVC Tipe AW Dia. 3"

Bahan :
- Pipa PVC AW 3" 1.2000 m' 83,031.95 99,638.34
- Perlengkapan 1.0000 ls 29,061.18 29,061.18
Jumlah: 128,699.52
Tenaga :
- Pekerja 0.0810 OH 62,460.94 5,059.34
- Tukang Pipa 0.1350 OH 74,953.13 10,118.67
- Kepala Tukang Pipa 0.0135 OH 82,701.00 1,116.46
- Mandor Lapangan 0.0040 OH 81,823.32 327.29
Jumlah: 16,621.77
Nilai HSPK: 145,321.29
57 1 Buah Memasang Kran Stainless Dia. 3/4"

Bahan :
- Kran air stainless 3/4" 1.0000 buah 64,135.36 64,135.36
- Seal Tape 0.0250 buah 4,769.56 119.24
Jumlah: 64,254.60
Tenaga :
- Pekerja 0.0100 OH 62,460.94 624.61
- Tukang Pipa 0.4000 OH 74,953.13 29,981.25
- Kepala Tukang Pipa 0.0400 OH 82,701.00 3,308.04
- Mandor Lapangan 0.0050 OH 81,823.32 409.12
Jumlah: 34,323.02
Nilai HSPK: 98,577.62
58 1 Buah Memasang Floor Drain

Bahan :
- Floor drain logam tebal 1.0000 buah 75,805.56 75,805.56
Jumlah: 75,805.56
Tenaga :
- Pekerja 0.0100 OH 62,460.94 624.61
- Tukang Pipa 0.1000 OH 74,953.13 7,495.31
- Kepala Tukang Pipa 0.0100 OH 82,701.00 827.01
- Mandor Lapangan 0.0050 OH 81,823.32 409.12
Jumlah: 9,356.05
Nilai HSPK: 85,161.61
59 1 Buah Memasang Shower Kloset

Bahan :
- Shower kloset biasa 1.0000 buah 85,547.64 85,547.64
- Seal Tape 0.0250 buah 4,769.56 119.24
Jumlah: 85,666.88
Tenaga :
- Pekerja 0.0100 OH 61,550.00 615.50
- Tukang Pipa 0.1000 OH 73,860.00 7,386.00
- Kepala Tukang Pipa 0.0100 OH 81,494.88 814.95
- Mandor Lapangan 0.0050 OH 80,630.00 403.15
Jumlah: 9,219.60
Nilai HSPK: 94,886.48
ANALISA HARGA SATUAN PEKERJAAN

No. Uraian Kegiatan Koef Satuan Harga Satuan Jumlah Harga


1 2 3 4 5 6
60 1 m2 Memasang Dinding Kaca Clear 8mm

Bahan :
- Kaca Clear 8 mm 1.1000 m2 50,232.60 55,255.86
Jumlah: 55,255.86
Tenaga :
- Pekerja 0.0250 OH 62,460.94 1,561.52
- Tukang Kayu 0.2500 OH 77,307.46 19,326.87
- Kepala Tukang kayu 0.0250 OH 84,360.32 2,109.01
- Mandor Lapangan 0.0013 OH 81,823.32 106.37
Jumlah: 23,103.77
Nilai HSPK: 78,359.63
61 1 m2 Pengecatan Tembok baru (1 Lapis Plamir, 1 Lapis Cat dasar, 2 Lapis Cat Penutup)

Bahan :
- Plamur tembok 0.1000 kg 5,358.14 535.81
- Cat tembok biasa 0.1000 kg 27,886.70 2,788.67
- Cat penutup 2x 0.2600 kg 27,886.70 7,250.54
Jumlah: 10,575.03
Tenaga :
- Pekerja 0.0200 OH 62,460.94 1,249.22
- Tukang cat 0.0630 OH 74,953.13 4,722.05
- Kepala tukang cat 0.0063 OH 84,360.32 531.47
- Mandor Lapangan 0.0025 OH 81,823.32 204.56
Jumlah: 6,707.29
Nilai HSPK: 17,282.32
62 1 m2 Memasang Dinding Pemisah Gypsumboard Rangkap, Rangka Galvalum

Bahan :
- Galvalume C-075 0.5417 btg 91,027.56 49,306.60
- Paku skrup 6x2 0.1500 dos 12,431.30 1,864.70
- Gypsumboard (120x240) 9 mm 0.8600 lembar 72,862.64 62,661.87
Jumlah: 113,833.16
Tenaga :
- Pekerja 0.1500 OH 62,460.94 9,369.14
- Tukang Besi 0.4500 OH 77,307.46 34,788.36
- Kepala tukang besi 0.0450 OH 84,360.32 3,796.21
- Mandor lapangan 0.0080 OH 81,823.32 654.59
Jumlah: 48,608.30
Nilai HSPK: 162,441.46
63 1 buah Memasang Lampu Downlibgt LED 18 W

Bahan :
- Lampu Downlight LED 18 W 1.0000 bh 92,854.20 92,854.20
Jumlah: 92,854.20
Tenaga :
- Pekerja 0.2000 OH 62,460.94 12,492.19
- Tukang Listrik 0.0200 OH 84,360.32 1,687.21
- Kepala tukang Listrik 0.0200 OH 97,420.80 1,948.42
Jumlah: 16,127.81
Nilai HSPK: 108,982.01
ANALISA HARGA SATUAN PEKERJAAN

No. Uraian Kegiatan Koef Satuan Harga Satuan Jumlah Harga


1 2 3 4 5 6
64 1 buah Memasang Saklar Tunggal

Bahan :
- Saklar tunggal 1.0000 bh 12,000.00 12,000.00
- Kabel NYM 2 x 2,5 mm 10.0000 m' 9,640.60
- Pipa Listrik 12.0000 m' 14,825.00
Jumlah: 12,000.00
Tenaga :
- Pekerja 0.4000 OH 62,460.94 24,984.38
- Tukang Listrik 0.0400 OH 84,360.32 3,374.41
- Kepala tukang Listrik 0.0400 OH 97,420.80 3,896.83
Jumlah: 32,255.62
Nilai HSPK: 44,255.62
65 1 buah Memasang Saklar Ganda

Bahan :
- Saklar ganda 1.0000 bh 16,100.00 16,100.00
- Kabel NYM 2 x 2,5 mm 10.0000 m' 9,640.60
- Pipa Listrik 12.0000 m' 14,825.00
Jumlah: 16,100.00
Tenaga :
- Pekerja 0.4000 OH 62,460.94 24,984.38
- Tukang Listrik 0.0400 OH 84,360.32 3,374.41
- Kepala tukang Listrik 0.0400 OH 97,420.80 3,896.83
Jumlah: 32,255.62
Nilai HSPK: 48,355.62
66 1 Titik Pemasangan Instalasi Lampu

Bahan :
- Kabel NYM 2 x 2,5 mm 9.0000 m' 9,640.60 86,765.40
- Pipa konduit 20mm 8.0000 m' 2,537.00 20,296.00
- Flexible konduit 20mm 1.0000 m' 6,393.24 6,393.24
Jumlah: 113,454.64
Tenaga :
- Pekerja 0.2000 OH 62,460.94 12,492.19
- Tukang listrik 0.1750 OH 84,360.32 14,763.06
- Kepala Tukang Listrik 0.0750 OH 97,420.80 7,306.56
- Mandor lapangan 0.0250 OH 81,823.32 2,045.58
Jumlah: 36,607.39
Peralatan :
- 15% x bahan 1.0000 ls 18,570.84 18,570.84
Jumlah: 18,570.84
Nilai HSPK: 168,632.87
ANALISA HARGA SATUAN PEKERJAAN

No. Uraian Kegiatan Koef Satuan Harga Satuan Jumlah Harga


1 2 3 4 5 6
67 1 Titik Pemasangan Instalasi Stop Kontak

Bahan :
- KABEL NYM 2 x 2,5 mm 10.0000 m' 9,640.60 96,406.00
- PIPA KONDUIT 20MM 6.0000 m' 2,537.00 15,222.00
- FLEXIBLE KONDUIT 20MM 1.0000 m' 6,393.24 6,393.24
Jumlah: 118,021.24
Tenaga :
- Pekerja 0.2000 OH 62,460.94 12,492.19
- Tukang listrik 0.1750 OH 84,360.32 14,763.06
- Kepala Tukang Listrik 0.0750 OH 97,420.80 7,306.56
- Mandor lapangan 0.0250 OH 81,823.32 2,045.58
Jumlah: 36,607.39
Peralatan :
- 15% x bahan 1.0000 ls 18,570.84 18,570.84
Jumlah: 18,570.84
Nilai HSPK: 173,199.47
68 1 Liter Lapis Perekat/Tack Coat

Bahan :
- Aspal Curah 0.8880 kg 16,845.68 14,958.96
- Minyak Tanah 0.2530 liter 12,887.96 3,260.65
Jumlah: 18,219.62
Tenaga :
- Pekerja 0.0300 OH 62,460.94 1,873.83
- Mandor lapangan 0.0060 OH 81,823.32 490.94
Jumlah: 2,364.77
Peralatan :
- Sewa Aspal Sprayer 0.0030 jam 73,410.48 220.23
- Compressor 400 - 600 L/M 0.0030 jam 196,998.17 590.99
- Dump Truck 8 - 10 m3 0.0030 jam 565,120.61 1,695.36
Jumlah: 2,506.59
Nilai HSPK: 23,090.97
69 1 m2 Hot Rolled Sheet
0.25
Bahan : 1.625
- Aspal Panas AC 60/70 5.3200 kg 16,845.68 89,619.02
- Agregat Klas A 0.0120 m3 166,995.49 2,003.95
- Agregat Klas B 0.0230 m3 198,007.78 4,554.18
Jumlah: 96,177.14
Tenaga :
- Pekerja 0.0400 OH 62,460.94 2,498.44
- Pembantu Operator 0.0133 OH 71,827.54 955.31
- Operator 0.0133 OH 97,420.80 1,295.70
- Mandor lapangan 0.0040 OH 81,823.32 327.29
Jumlah: 5,076.73
Peralatan :
- Sewa AMP 10 T 0.0019 jam 8,088,697.24 15,368.52
- 0.0019 jam 992,586.94 1,885.92
- Sewa Dump Truck 3,5 T 0.0114 jam 298,201.82 3,399.50
- Sewa Pneumatic Tire Roller 0.0019 jam 483,143.87 917.97
- Sewa Tandem Roller 0.0019 jam 513,269.53 975.21
- Sewa Wheel Loader 0.0007 jam 390,519.08 273.36
ANALISA HARGA SATUAN PEKERJAAN

No. Uraian Kegiatan Koef Satuan Harga Satuan Jumlah Harga


1 2 3 4 5 6
Jumlah: 22,820.49
Nilai HSPK: 124,074.37
ANALISA HARGA SATUAN PEKERJAAN

No. Uraian Kegiatan Koef Satuan Harga Satuan Jumlah Harga


1 2 3 4 5 6
70 1 m2 Pasangan Tegel Trotoar

Bahan :
- Pasir Pasang 0.0100 m3 137,280.11 1,372.80
- Semen PC 50 kg 0.0730 zak 69,615.28 5,081.92
- Kapur Pasang 0.0120 m3 105,539.20
- Tegel Trotoar 1.0000 m2 59,568.76 59,568.76
Jumlah: 66,023.48
Tenaga :
- Pekerja 0.5000 OH 62,460.94 31,230.47
- Tukang 0.2500 OH 77,307.46 19,326.87
- Kepala Tukang 0.0250 OH 84,360.32 2,109.01
- Mandor lapangan 0.0250 OH 81,823.32 2,045.58
Jumlah: 54,711.93
Nilai HSPK: 120,735.40
71 1 m2 Pasangan Paving Stone (Blok) Tbl. 8cm

Bahan :
- Paving Stone Abu-abu Tbl. 8cm 1.0000 m2 64,845.72 64,845.72
Jumlah: 64,845.72
Tenaga :
- Pekerja 0.5000 OH 62,460.94 31,230.47
- Tukang 0.2500 OH 77,307.46 19,326.87
- Kepala Tukang 0.0250 OH 84,360.32 2,109.01
- Mandor lapangan 0.0250 OH 81,823.32 2,045.58
Jumlah: 54,711.93
Nilai HSPK: 119,557.65
72 1 m' Pasangan Kanstin BDCM 21.5

Bahan :
- Semen PC 50 kg 0.0450 zak 69,615.28 3,132.69
- Pasir Pasang 0.0054 m3 137,280.11 741.31
- Kanstin BDCM 21.5 5.0000 bh 12,177.60 60,888.00
Jumlah: 64,762.00
Tenaga :
- Pekerja 0.5000 OH 62,460.94 31,230.47
- Tukang 0.2500 OH 77,307.46 19,326.87
- Kepala Tukang 0.0250 OH 84,360.32 2,109.01
- Mandor lapangan 0.0250 OH 81,823.32 2,045.58
Jumlah: 54,711.93
Nilai HSPK: 119,473.93
73 1 m' Pasangan Stopper / Uskup tebal 8 cm Warna

Bahan :
- Pasir Pasang 0.0010 m3 137,280.11 137.28
- Stopper / Uskup tebal 8 cm Warna 3.3400 bh 5,276.96 17,625.05
Jumlah: 17,762.33
Tenaga :
- Pekerja 0.5000 OH 62,460.94 31,230.47
- Tukang 0.2500 OH 77,307.46 19,326.87
- Kepala Tukang 0.0250 OH 84,360.32 2,109.01
- Mandor lapangan 0.0250 OH 81,823.32 2,045.58
Jumlah: 54,711.93
ANALISA HARGA SATUAN PEKERJAAN

No. Uraian Kegiatan Koef Satuan Harga Satuan Jumlah Harga


1 2 3 4 5 6
Nilai HSPK: 72,474.25
RENCANA ANGGARAN BIAYA
PEMBANGUNAN GAPURO PRABU SILIWANGI
BANDUNG

NO DESKRIPSI PEKERJAAN SAT VOLUME HARSAT JUMLAH HARGA

BAB I PEKERJAAN PERSIAPAN


1 Mobilisasi dan Demobilisasi ls 1.00 20,000,000.00 20,000,000.00
2 Pekerjaan Pembersihan area bangunan m2 357.67 10,337.26 3,697,314.93
3 Setting out dan bouwplank m' 143.15 114,802.60 16,433,991.85

TOTAL BAB I 40,131,306.78


BAB II PEKERJAAN STANDAR
A PEKERJAAN STRUKTUR
A.1 Pekerjaan Struktur Bawah dan Plat lantai
1 Pekerjaan Pondasi Strous
a. Pekerjaan Galian tanah keras untuk Pondasi m3 10.17 80,425.67 818,218.61
c. Pekerjaan Beton K-300 m3 10.17 1,161,727.37 11,818,949.59
d. Pekerjaan besi (rasio = 150kg/m3) kg 1,526.04 11,744.74 17,922,943.19
e. Pekerjaan bekisting (batako, rasio = 9,6 m2/m3) m2 97.67 166,664.22 16,277,520.72
2 Pekerjaan Pier Head
a. Pekerjaan Beton K-300 m3 3.46 1,161,727.37 4,014,929.80
b. Pekerjaan besi (rasio = 185kg/m3) kg 639.36 11,744.74 7,509,117.03
c. Pekerjaan bekisting (multiplek, rasio = 13,33 m2/m3) m2 46.07 349,847.71 16,116,952.37
3 Pekerjaan Sloof
a. Pekerjaan Beton K-300 m3 8.10 1,161,727.37 9,409,991.72
b. Pekerjaan besi (rasio = 200kg/m3) kg 1,620.00 11,744.74 19,026,478.97
c. Pekerjaan bekisting (batako, rasio = 10 m2/m3) m2 81.00 179,729.77 14,558,111.10
4 Pekerjaan Lantai Kerja
a. Pekerjaan Beton K-225 m3 1.90 1,138,267.37 2,161,000.61
5 Pekerjaan Lantai
a. Pekerjaan urugan tanah peninggian lantai m3 107.55 134,944.50 14,513,281.13
(tanah dari lokasi) + pemadatan
b. Pekerjaan plastik cor m2 64.00 9,485.73 607,086.81
c. Pekerjaan Beton K-275 m3 3.20 1,149,997.37 3,679,991.59
d. Pekerjaan besi wiremesh M8 kg 348.80 17,982.03 6,272,132.20
6 Pekerjaan Pondasi Batu Belah
a. Pekerjaan lantai kerja m3 0.70 87,943.85 61,560.70
b. Pekerjaan batu belah m3 7.28 618,885.85 4,505,489.01
c. Pekerjaan batu kosong (anstamping) m3 2.80 286,515.86 802,244.41
7 Pekerjaan Dinding Penahan Tanah
b. Pekerjaan batu belah m3 30.38 618,885.85 18,801,442.77
c. Pekerjaan batu kosong (anstamping) m3 11.94 286,515.86 3,422,145.45

A.2 Pekerjaan Struktur Atas


1 Pekerjaan Kolom Baja (Pipa sch 40 - 8") kg 3,031.20 26,619.70 80,689,621.78
2 Pekerjaan Balok Baja (Pipa sch 40 - 8") kg 2,020.80 26,619.70 53,793,081.18
3 Pekerjaan Balok Baja (Pipa sch 40 - 6") kg 960.00 26,619.70 25,554,907.93
4 Pekerjaan Kolom praktis m' 42.00 76,014.06 3,192,590.52
5 Pekerjaan plat deck tebal 12 cm m3 0.96 6,175,502.37 5,928,482.28
6 Pekerjaan Ring Balok 15x20cm m3 1.35 6,598,142.26 8,907,492.05

A.3 Pekerjaan Struktur Atap


1 Pekerjaan Rangka Atap bangunan kg 536.80 26,619.70 14,289,452.68
2 Pekerjaan penutup atap bangunan m2 322.70 113,129.82 36,506,993.82

B PEKERJAAN ARSITEKTUR
B.1 PEKERJAAN DINDING & PLESTERAN
1 Pasangan dinding 1/2 bata ringan m2 106.50 146,765.84 15,630,562.28
2 Pekerjaan plester bata ringan m2 213.00 64,239.42 13,682,997.07
3 Pekerjaan acian bata ringan m2 213.00 32,820.91 6,990,854.70
4 Pekerjaan keramik dinding 20x25cm (Toilet) m2 10.50 207,790.17 2,181,796.76
5 Pekerjaan aluminium rangka dinding kaca clear 8mm m' 88.80 252,419.18 22,414,823.48
6 Pekerjaan dinding kaca clear 8mm m2 41.48 78,359.63 3,250,357.37
7 Pekerjaan dinding double gypsum (partisi) m2 40.50 162,441.46 6,578,879.19
8 Pekerjaan dinding display m2 16.56 78,359.63 1,297,635.44
RENCANA ANGGARAN BIAYA
PEMBANGUNAN GAPURO PRABU SILIWANGI
BANDUNG

NO DESKRIPSI PEKERJAAN SAT VOLUME HARSAT JUMLAH HARGA

B.2 PEKERJAAN LANTAI


1 Pekerjaan lantai HT 60x60 cm m2 31.00 279,443.93 8,662,761.96
2 Pekerjaan Keramik 60x60cm (anti slip) m2 12.76 475,300.33 6,064,832.27

B.3 PEKERJAAN PENGECATAN


1 Pekerjaan pengecatan dinding m2 213.00 17,282.32 3,681,134.60
2 Pekerjaan pengecatan Partisi m2 81.00 17,282.32 1,399,868.09

B.4 PEK. KUSEN PINTU & JENDELA


1 Pasang Kusen+Pintu single Unit 6.00 2,100,000.00 12,600,000.00
2 Pasang Kusen+Pintu toilet Unit 2.00 1,381,790.66 2,763,581.32

B.5 PEKERJAAN SANITARY


1 Closet Duduk bh 2.00 1,639,927.75 3,279,855.50
2 Jet Washer bh 2.00 94,886.48 189,772.96
3 Kran air bh 4.00 98,577.62 394,310.47
4 Bak Air Fiberglass Vol. 1 m3 bh 2.00 1,356,110.15 2,712,220.30
5 Floor drained bh 2.00 85,161.61 170,323.22
6 Safety bar closed bh 2.00 425,000.00 850,000.00

C PEKERJAAN MEP
C.1 PEKERJAAN INSTALASI AIR BERSIH
1 Pompa air kedalaman 30 m unit 1.00 2,898,000.00 2,898,000.00
2 Bak air (tandon) stainless 1100 m3 unit 1.00 3,898,440.00 3,898,440.00
3 Pemipaan air bersih utama
Instalasi pipa utama air bersih (riser) dengan PPR80 - PN10
termasuk gantungan/hanger, support, fitting dan aksesories :
• dia. 32 mm m 28.84 132,259.32 3,814,358.78
Air Vent
• dia. 25 mm bh 2.00 1,350,000.00 2,700,000.00
Foot Valve
WLC lengkap dengan pengkabelan lot 1.00 1,180,000.00 1,180,000.00
4 Pipa air bersih dalam bangunan
Instalasi pipa utama air bersih (riser) dengan PPR80 - PN10
termasuk gantungan/hanger, support, fitting dan aksesories :
• dia. 25 mm m 4.00 35,759.45 143,037.80
Gate Valve class 10 K :
• dia. 25 mm bh 1.00 1,350,000.00 1,350,000.00
5 Testing & Commisioning ls 1.00 2,000,000.00 2,000,000.00

C.2 PEKERJAAN INSTALASI AIR KOTOR


1 Septic Tank Biotech
• Septic Tank Konvensional 5m3 unit 1.00 8,000,000.00 8,000,000.00
2 Pipa air kotor dalam bangunan
Instalasi Air Kotor Cabang dan toilet dengan Pipa PVC kelas AW
termasuk gantungan/hanger, support, fitting dan aksesories :
• dia. 50 mm m 23.74 56,487.65 1,341,016.90
Instalasi Air Bekas cabang dan toilet dengan Pipa PVC kelas AW
termasuk gantungan/hanger, support, fitting dan aksesories :
• dia. 32 mm m 23.84 132,259.32 3,153,538.31
Instalasi Vent cabang dan toilet dengan pipa PVC AW 10 kg/cm2
termasuk gantungan/hanger, support, fitting dan aksesories :
• dia. 50 mm m 2.00 56,487.65 112,975.31
Floor Drain
• dia. 50 mm bh 2.00 85,161.61 170,323.22
Clean out
• dia. 50 mm bh 2.00 33,300.00 66,600.00
3 Testing & Commisioning ls 1.00 2,000,000.00 2,000,000.00
RENCANA ANGGARAN BIAYA
PEMBANGUNAN GAPURO PRABU SILIWANGI
BANDUNG

NO DESKRIPSI PEKERJAAN SAT VOLUME HARSAT JUMLAH HARGA

C.3 PEKERJAAN ELEKTRIKAL


C.3.1 PEKERJAAN PANEL
1 Panel Instalasi Listrik
Incoming :
• MCCB 3P, 40A, 30 kA (ABB, Schneider) bh 1.00 772,200.00 772,200.00
Outgoing :
• MCB 1P, 10A (ABB, Schneider) bh 3.00 249,500.00 748,500.00
Indikator Lamp + Fuse (ABB, Schneider) bh 3.00 117,800.00 353,400.00
Ampere meter bh 3.00 1,039,500.00 3,118,500.00
Volt meter bh 1.00 1,039,500.00 1,039,500.00
Box Panel (Standar PUIL) bh 1.00 1,108,800.00 1,108,800.00
Busbar 40A set 1.00 1,524,600.00 1,524,600.00
Wiring Connection lot 1.00 1,386,000.00 1,386,000.00

C.3.2 PEKERJAAN KABEL FEEDER


1 Kabel Feeder
• Kabel dari Gedung1 & Gedung2 Ke Panel Instalasi Listrik NYM 3 x 2,5 mm² m 212.76 13,200.00 2,808,489.42
2 Tiang Listrik Beton unit 2.00 3,000,000.00 6,000,000.00
3 Testing & Commisioning ls 1.00 2,000,000.00 2,000,000.00

C.3.3 PEKERJAAN LAMPU & STOP KONTAK


1 Area Kantor
• Lampu Downlight LED 18 W bh 6.00 108,982.01 653,892.06
• Stop Kontak Dinding 1 ph, 200 W bh 1.00 173,199.47 173,199.47
• Saklar Tunggal bh 1.00 44,255.62 44,255.62
• Saklar Ganda bh 2.00 48,355.62 96,711.24
• Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC ttk 6.00 217,800.00 1,306,800.00
• Titik nyala Stop kontak NYM 3 x 2,5 mm² didalam conduit PVC HI 20 mm ttk 1.00 207,900.00 207,900.00
2 Area Ruang Informasi
• Lampu Downlight LED 18 W bh 4.00 108,982.01 435,928.04
• Stop Kontak Dinding 1 ph, 200 W bh 1.00 173,199.47 173,199.47
• Saklar Ganda bh 2.00 48,355.62 96,711.24
• Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC ttk 4.00 217,800.00 871,200.00
• Titik nyala Stop kontak NYM 3 x 2,5 mm² didalam conduit PVC HI 20 mm ttk 1.00 207,900.00 207,900.00
3 Area Pos Satpam
• Lampu Downlight LED 18 W bh 2.00 108,982.01 217,964.02
• Stop Kontak Dinding 1 ph, 200 W bh 1.00 173,199.47 173,199.47
• Saklar Ganda bh 2.00 48,355.62 96,711.24
• Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC ttk 2.00 217,800.00 435,600.00
• Titik nyala Stop kontak NYM 3 x 2,5 mm² didalam conduit PVC HI 20 mm ttk 1.00 207,900.00 207,900.00
4 Area Ruang Tiket
• Lampu Downlight LED 18 W bh 2.00 108,982.01 217,964.02
• Stop Kontak Dinding 1 ph, 200 W bh 1.00 173,199.47 173,199.47
• Saklar Ganda bh 2.00 48,355.62 96,711.24
• Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC ttk 2.00 217,800.00 435,600.00
• Titik nyala Stop kontak NYM 3 x 2,5 mm² didalam conduit PVC HI 20 mm ttk 1.00 207,900.00 207,900.00
5 Area Gudang
• Lampu Downlight LED 18W bh 2.00 108,982.01 217,964.02
• Stop Kontak Dinding 1 ph, 200 W bh 2.00 173,199.47 346,398.94
• Saklar Ganda bh 2.00 48,355.62
• Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC ttk 2.00 217,800.00 435,600.00
• Titik nyala Stop kontak NYM 3 x 2,5 mm² didalam conduit PVC HI 20 mm ttk 2.00 207,900.00 415,800.00
6 Area KM/WC
• Lampu Downlight LED 18 W bh 2.00 108,982.01 217,964.02
• Stop Kontak Dinding 1 ph, 200 W bh 2.00 173,199.47 346,398.94
• Saklar Ganda bh 2.00 48,355.62 96,711.24
• Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC titik 2.00 217,800.00 435,600.00
• Titik nyala Stop kontak NYM 3 x 2,5 mm² didalam conduit PVC HI 20 mm titik 2.00 207,900.00 415,800.00
7 Area Teras Gerbang
• Lampu Downlight LED 18 W bh 12.00 108,982.01 1,307,784.13
• Saklar Tunggal bh 8.00 44,255.62 354,044.97
• Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC ttk 12.00 217,800.00 2,613,600.00
RENCANA ANGGARAN BIAYA
PEMBANGUNAN GAPURO PRABU SILIWANGI
BANDUNG

NO DESKRIPSI PEKERJAAN SAT VOLUME HARSAT JUMLAH HARGA


RENCANA ANGGARAN BIAYA
PEMBANGUNAN GAPURO PRABU SILIWANGI
BANDUNG

NO DESKRIPSI PEKERJAAN SAT VOLUME HARSAT JUMLAH HARGA

C.3.4 PEKERJAAN TATA UDARA


1 Area Kantor
• Exhaust fan type axial, Kap. 100 CFM unit 3.00 574,200.00 1,722,600.00
• Kipas Angin KDK WZ-56P unit 2.00 778,400.00 1,556,800.00
2 Area Ruang Informasi
• Exhaust fan type axial, Kap. 100 CFM unit 2.00 574,200.00 1,148,400.00
• Kipas Angin KDK WZ-56P unit 1.00 778,400.00 778,400.00
3 Area Pos Satpam
• Exhaust fan type axial, Kap. 100 CFM unit 1.00 574,200.00 574,200.00
• Kipas Angin KDK WZ-56P unit 1.00 778,400.00 778,400.00
4 Area Ruang Tiket
• Exhaust fan type axial, Kap. 360 CFM unit 2.00 574,200.00 1,148,400.00
• Kipas Angin dinding 18inch unit 1.00 605,000.00 605,000.00
5 Area Gudang
• Exhaust fan type ceiling, Kap. 100 CFM unit 1.00 574,200.00 574,200.00
6 Area KM/WC
• Exhaust fan type ceiling, Kap. 100 CFM unit 1.00 574,200.00 574,200.00
7 Testing & Commisioning ls 1.00 2,000,000.00 2,000,000.00

TOTAL BAB II 594,841,769.57


BAB III PEKERJAAN JALAN
A PEKERJAAN PELEBARAN JALAN MASUK
1 Pekerjaan Urugan Tanah Padas m3 210.00 118,150.37 24,811,578.39
2 Pekerjaan Urugan Sirtu Klas C m3 168.00 218,055.40 36,633,307.82
3 Perkerasan Lantai Kerja (t = 50 mm) m2 280.00 87,943.85 24,624,278.22
4 Perkerasan Pengaspalan (t = 100 mm) m2 280.00 124,074.37 34,740,822.40
5 Pekerjaan RCP D100
• Pipa Gorong-gorong Beton Bertulang, 1 Ø 100cm m' 12.00 700,000.00 8,400,000.00
• Pekerjaan besi kg 780.37 11,744.74 9,165,211.70
• Pekerjaan Beton K-275 m3 9.03 1,149,997.37 10,380,336.28
6 Marka Jalan, tipe 1 m2 14.25 115,000.00 1,638,750.00

B PEKERJAAN PELEBARAN JALAN MASUK


1 Pekerjaan Urugan Tanah Padas m3 75.00 118,150.37 8,861,278.00
2 Pekerjaan Urugan Sirtu Klas C m3 60.00 218,055.40 13,083,324.22
3 Perkerasan Lantai Kerja (t = 50 mm) m2 97.00 87,943.85 8,530,553.53
4 Pasangan Kanstin BDCM 21.5 m' 27.80 119,473.93 3,321,375.18
5 Pasangan Paving Stone (Blok) Tbl. 8cm m2 85.50 119,557.65 10,222,178.84
6 Pasangan Stopper / Uskup tebal 8 cm Warna m' 30.00 72,474.25 2,174,227.61
7 Pasangan Tegel Trotoar m2 21.00 120,735.40 2,535,443.48

C PEKERJAAN TAMAN
1 Pekerjaan tanam bunga m2 18.00 250,000.00 4,500,000.00
2 Pekerjaan pembuatan landsekap taman m2 27.30 390,592.02 10,663,162.22
3 Pekerjaan garden lamp LED 18W bh 6.00 486,000.00 2,916,000.00

D PEKERJAAN KABEL FEEDER


1 Kabel Feeder
• Kabel dari Penerangan Luar Ke Panel Instalasi Listrik NYFBGY 4 x 4 mm² m 116.41 32,230.00 3,751,990.99
RENCANA ANGGARAN BIAYA
PEMBANGUNAN GAPURO PRABU SILIWANGI
BANDUNG

NO DESKRIPSI PEKERJAAN SAT VOLUME HARSAT JUMLAH HARGA

E PEKERJAAN PENERANGAN LUAR


1 Area Gerbang dan Taman
• Street Light LED 80 W bh 6.00 702,000.00 4,212,000.00
• Garden Lamp LED 18W bh 2.00 486,000.00 972,000.00
• Pole 7 meter bh 6.00 2,000,000.00 12,000,000.00
• Pondasi Untuk Pole bh 6.00 700,000.00 4,200,000.00
• Kabel Nyfgby 4 x 4mm2 Berikut Galian m' 102.00 108,000.00 11,016,000.00
2 Standing letter
• Standing Letter tinggi 30 cm unit 1.00 2,400,000.00 2,400,000.00
• Lampu sorot 400watt philips/setara & accessories bh 3.00 1,750,000.00 5,250,000.00
3 CCTV
• Pengadaan 4 Camera CCTV HD AVTECH 2MP atau Setara unit 2.00 5,585,000.00 11,170,000.00
• Pemasangan 4 Camera CCTV HD AVTECH 2MP atau Setara unit 2.00 1,117,000.00 2,234,000.00

F PEKERJAAN FIRE HYDRANT


1 Fire Extingusher type Clean Agent kapasitas 5 kg bh 2.00 1,174,030.00 2,348,060.00

G PEKERJAAN LAIN-LAIN
1 Deep well kedalaman 15m
• Pengeboran deep well m' 15.00 450,000.00 6,750,000.00
• Pipa casing PVC m' 15.00 220,000.00 3,300,000.00
• Pipa suction pompa m' 15.00 208,800.00 3,132,000.00
2 Pekerjaan bak kontrol unit 1.00 512,662.21 512,662.21
3 Pekerjaan Tower Water Tank Kapasitas 1 m3 (besi siku 50x50x5) ls 1.00 7,000,000.00 7,000,000.00
4 Penyambungan Daya PLN ls 1.00 8,000,000.00 8,000,000.00
5 Keset Foam Bath Mat 53 x 86 cm set 6.00 115,000.00 690,000.00
6 Tempat sampah Oval 3 in 1 Triple Pilah bahan Fiber set 2.00 900,000.00 1,800,000.00

TOTAL BAB III 307,940,541.09

JUMLAH TOTAL 942,913,617.45


PPN 10% 94,291,361.74
JUMLAH SETELAH PPN 1,037,204,979.19
DIBULATKAN 990,000,000.00
TERBILANG : SEMBILAN RATUS SEMBILAN PULUH JUTA RUPIAH
TUGAS
BUAT KURVA -S NYA
1. WAKTU 6 BULAN PELAKSANAAN
2. HARGA DI MASING-MASING KAB./KOTA YG TERBARU TH. 2021
3. DIKUMPULKAN MG DEPAN TGL 27 SEPTEMBER 2021, JAM 06.30 PALING LAMBAT.

Data Inflasi Tahun 2021


Bulan Persen
Januari 1.55% RATA - RATA
februari 1.38% 11.84% = 1.48%
Maret 1.37% 8
April 1.42%
Mei 1.68%
Juni 1.33%
Juli 1.52%
Agustus 1.59%
No. Judul Gambar Skala
1 Site Plan Gapura Pulo Merah 1 : 100
2 Denah Gapura Pulo Merah 1 : 100
3 Tampak A-A dan B-B Gapura 1 : 100
4 Tampak C-C Gapura 1 : 100
5 Tampak D-D, E-E dan F-F Gapura 1 : 100
6 Potongan A-A dan B-B Gapura 1 : 100
7 Potongan C-C dan D-D Gapura 1 : 100
8 Denah Pasangan Dinding 1 : 100
9 Denah Rangka Atap 1 : 100
10 Denah Pola Lantai 1 : 100
11 Denah Plafond 1 : 100
12 Denah Kusen 1 : 100
13 Denah Pondasi & Denah Sloof 1 : 100
14 Denah kolom 1 : 100
15 Denah Balok & Plat Dack 1 : 100
16 Detail Pondasi 1 : 50
17 Detail Tulangan dan dinding Pen 1 : 10
18 Denah Instalasi Air Bersih 1 : 100
19 Denah Instalasi Air Kotor 1 : 100
20 Denah Instalasi Air Bekas 1 : 100
21 Denah Septictank & Bak Kontrol 1 : 40
22 Denah Titik Lampu 1 : 100
23 Denah Instalasi Listrik 1 : 100
24 Denah Penerangan Luar 1 : 1000
25 Diagram Daya Panel & Instalasi NTS
26 Detail Kusen 1 : 50
27 Tampak Depan Dinding Kaca 1 : 50
28 Detail Tower Tandon 1 : 25
29 Denah Dinding Penahan Tanah 1 : 100
30 Detail Sambungan Baja 1 1 : 10
31 Detail Sambungan Baja 2 1 : 10