CONTENTS Page
OBJECTIVE 4
SCOPE 4
RESPONSIBILITIES 4
PROCEDURAL STEPS 5
2. Review Team 5
RECORDS 7
Doc. Number Rev/Issue Date
ASMI-OSHMS-PR-15 00/02 22.12.2020
Page 4 of 8
OBJECTIVE:
This procedure defines the ASMI management review process as committed through the
OSHMS and SRA & OSHAD SF v3.1 Mar 2017-element 9 compliance and management review
that needs periodic review to ensure that it meets the requirements in respect of policies,
objectives, suitability & effectiveness, resources, planning and is kept up to date. Management
Review Meetings shall be held annually at a minimum to discuss any problem / areas of
improvement with the top management and relevant personnel and minutes of meetings shall
be recorded.
SCOPE:
Management review procedures and its scope covers the operations and review of company
OSHMS fully and annual intervals or as and when necessary.
RESPONSIBILITY:
Top management; is responsible to ensure management review are conducted and continual
improvement is achieved of the company OSHMS, ensures participation in review along with the
team identified by MR, ensure necessary resources are allocated to complete the action required
from the meeting.
Description
Records Procedural Steps Resp.
GM
1. Annual Review- General:
Top management, MR and review team shall conduct Management MR, & review
review annually at a minimum and shall address all relevant parts of the team
Company OSHMS:
2. Review team:
MR
MR shall identify and form review team which shall contain employees
from different process areas and department heads, GM shall also be
participating in the review process.
MR shall prepare the final review reports and action required shall be
completed by the responsible persons identified in the management
review report action plan.