1-Ras Abu Aboud Stadium-

SC-C06-CAG-HBK-IRM-ST-01531
TDO-17-TTC-0044
ID SC-C06-CAG-HBK-IRM-ST-01531

Author HBK QAQC - 1 Assigned To HBK QAQC-2

Author's Email raahbkbim2@gmail.com Assigned Email raahbkbim3@gmail.com

Author's Company HBK Contracting Co. W.L.L. Assigned Company HBK Contracting Co. W.L.L.

Author's Phone # <not set> Assignee Phone # <not set>

Responsible Louis Berger Resp. Company


Company Phone #

Date Created 05 Aug 2020 7:06 PM Scheduled For 27 Nov 2020 9:10 AM

Name IRW Status Closed

Description Types
Material Inspection for Hanson/Stud Craft Welding Stud Bolts Other: Architectural

Locations Location Detail


Stadium Steel Yard

Attached Checklists

Custom Properties on ID SC-C06-CAG-HBK-IRM-ST-01531


01 Revision 2
02 Reference Drawing/s
03 Priority High
04 Method of Statement ref:
05 Inspection Test Plan (ITP) ref: SC-C06-CAG-HBK-ITP-AR-00112
06 Inspection Test Plan Item/s 1.5
07 Inspection Activity as described in the ITP
08 Checklist Ref:
09 Material Submittal Ref. SC-C06-CAG-HBK-MAS-AR-00852
10 Material Storage Location
11 Delivery/Packing List
12 Manufacturer Test Certificate
12 Originator Company
13 *
13 IRM Approval References
14 * We confirm that the work to be inspected has been coordinated with all related sub-
contractor and direct contractor
15 Originator Company HBKSF
20 Status Level
22 IRW Comment Category
23 Status Level L3 No Objection
24 CSC Inspector
25 Resubmitted for Closure

Report run on 05 Sep 2021 8:12 AM by HBK SITE1 (raahbkbim8@gmail.com) Page 1 of 4


1-Ras Abu Aboud Stadium-
SC-C06-CAG-HBK-IRM-ST-01531
TDO-17-TTC-0044
ID SC-C06-CAG-HBK-IRM-ST-01531

Signatures for ID SC-C06-CAG-HBK-IRM-ST-01531

16 HBK Site Engineer: HBK QAQC - 1 26 Nov 2020 8:27 AM 17 HBK QA/QC Engineer: HBK QAQC - 1 26 Nov 2020 8:27 AM

18 Project Director/ QAQC Manager: Amol Rajhans 26 Nov 2020


19 CSC
1:16Inspector/Sr.
PM Engineer: Structural - CSC2 RAA 28 Nov 2

20 CSC Sr. Engineer: Aristofanis Chalyvopoulos 30 Nov 2020 4:52


21 CSC
PMLead Engineer/Director: Mohamad Abilmona 01 Dec 20

Report run on 05 Sep 2021 8:12 AM by HBK SITE1 (raahbkbim8@gmail.com) Page 2 of 4


1-Ras Abu Aboud Stadium-
SC-C06-CAG-HBK-IRM-ST-01531
TDO-17-TTC-0044
ID SC-C06-CAG-HBK-IRM-ST-01531

SC-C06-CAG-HBK-MAS-ST-00852-1.pdf Test_certificate.pdf (1 / 8) Test_certificate.pdf (2 / 8)

Test_certificate.pdf (3 / 8) Test_certificate.pdf (4 / 8) Test_certificate.pdf (5 / 8)

Test_certificate.pdf (6 / 8) Test_certificate.pdf (7 / 8) Test_certificate.pdf (8 / 8)

Delivery_Note.pdf

Issues for ID SC-C06-CAG-HBK-IRM-ST-01531


Issue ID Description Type Status Company Date Due Date
Created

Report run on 05 Sep 2021 8:12 AM by HBK SITE1 (raahbkbim8@gmail.com) Page 3 of 4


1-Ras Abu Aboud Stadium-
SC-C06-CAG-HBK-IRM-ST-01531
TDO-17-TTC-0044
ID SC-C06-CAG-HBK-IRM-ST-01531

Issue ID Description Type Status Company Date Due Date


Created
006648 Rev.1 External Open <not set> 30 Aug 2020 null
1. Application shall be as per approved Snaglist
SD only.
2. Signature of PD is from non-authorized
personnel.
Request shall be signed by authorized
personnel only.

Rev.0
1) Material submittal not
approved.==>CLOSED
009359 Signature of PD is from non-authorized External Open Louis Berger 21 Oct 2020 null
personnel. Snaglist
Request shall be signed by authorized
personnel only.
009439 Signatures do not match with the External Open Louis Berger 24 Oct 2020 null
samples. Snaglist

Report run on 05 Sep 2021 8:12 AM by HBK SITE1 (raahbkbim8@gmail.com) Page 4 of 4