1-Ras Abu Aboud Stadium-TDO-17-TTC-0044 ID SC-C06-CAG-HBK-IRW-AR-22518 SC-C06-CAG-HBK-IRW-AR-22518
1-Ras Abu Aboud Stadium-TDO-17-TTC-0044 ID SC-C06-CAG-HBK-IRW-AR-22518 SC-C06-CAG-HBK-IRW-AR-22518
SC-C06-CAG-HBK-IRW-AR-22518
TDO-17-TTC-0044
ID SC-C06-CAG-HBK-IRW-AR-22518
Author's Company HBK Contracting Co. W.L.L. Assigned Company HBK Contracting Co. W.L.L.
Date Created 10 Feb 2021 2:04 PM Scheduled For 30 Jun 2021 6:10 PM
Description Types
Inspection request for Installation of Steel Framings (MTW Steel Other: Architectural
Framing works) @ Zone-05/Level-00, as Highlighted in the
attached drawing.
Attached Checklists
16 HBK Site Engineer: HBK QAQC - 1 10 Feb 2021 2:04 PM 17 HBK QA/QC Engineer: HBK QAQC - 1 10 Feb 2021 2:04 PM
20 CSC Sr. Engineer: Kumar Seri Kiran 12 Jul 2021 5:34 PM 21 CSC Lead Engineer/Director: Bhikesh Rajyagor 13 Jul 2021 1