1-Ras Abu Aboud Stadium-

SC-C06-CAG-HBK-IRW-AR-22518
TDO-17-TTC-0044
ID SC-C06-CAG-HBK-IRW-AR-22518

Author HBK QAQC - 1 Assigned To Ahmad Nadeem

Author's Email raahbkbim2@gmail.com Assigned Email raahbkbim1@gmail.com

Author's Company HBK Contracting Co. W.L.L. Assigned Company HBK Contracting Co. W.L.L.

Author's Phone # <not set> Assignee Phone # <not set>

Responsible Louis Berger Resp. Company


Company Phone #

Date Created 10 Feb 2021 2:04 PM Scheduled For 30 Jun 2021 6:10 PM

Name IRW Status New

Description Types
Inspection request for Installation of Steel Framings (MTW Steel Other: Architectural
Framing works) @ Zone-05/Level-00, as Highlighted in the
attached drawing.

Locations Location Detail


Stadium Zone 5 (Level-00)

Attached Checklists

Custom Properties on ID SC-C06-CAG-HBK-IRW-AR-22518


01 Revision 1
02 Reference Drawing/s As Attached
03 Priority High
04 Method of Statement ref: SC-C06-CAG-HBK-MST-AR-00171
05 Inspection Test Plan (ITP) ref: SC-C06-CAG-HBK-ITP-AR-00133
06 Inspection Test Plan Item/s 3.2
07 Inspection Activity as described in the ITP
08 Checklist Ref: SC‐C06‐CAG‐HBK‐CKL‐AR‐00142
09 Material Submittal Ref.
10 Material Storage Location
11 Delivery/Packing List
12 Manufacturer Test Certificate
12 Originator Company
13 *
13 IRM Approval References
14 * We confirm that the work to be inspected has been coordinated with all related sub-
contractor and direct contractor
15 Originator Company HBKSF
20 Status Level
22 IRW Comment Category
23 Status Level L2 No objection with Comment
24 CSC Inspector Leo

Report run on 08 Sep 2021 7:41 AM by HBK SITE1 (raahbkbim8@gmail.com) Page 1 of 2


1-Ras Abu Aboud Stadium-
SC-C06-CAG-HBK-IRW-AR-22518
TDO-17-TTC-0044
ID SC-C06-CAG-HBK-IRW-AR-22518

25 Resubmitted for Closure

Signatures for ID SC-C06-CAG-HBK-IRW-AR-22518

16 HBK Site Engineer: HBK QAQC - 1 10 Feb 2021 2:04 PM 17 HBK QA/QC Engineer: HBK QAQC - 1 10 Feb 2021 2:04 PM

18 Project Director/ QAQC Manager: Amol Rajhans 29 Jun 2021


193:17
CSCPM
Inspector/Sr. Engineer: Survey - CSC4 RAA 12 Jul 2021

20 CSC Sr. Engineer: Kumar Seri Kiran 12 Jul 2021 5:34 PM 21 CSC Lead Engineer/Director: Bhikesh Rajyagor 13 Jul 2021 1

Issues for ID SC-C06-CAG-HBK-IRW-AR-22518


Issue ID Description Type Status Company Date Due Date
Created
018183 - Verified actual plumb/alignment of External Open Louis Berger 11 Feb 2021 null
installed MTW steel framing "out of Snaglist
tolerance" as per QCS-2014, Section-
17;Part-6 for Metalwork installation
tolerances. (see attached survey report)
- Contractor to rectify and resubmit IRW
once ready for inspection.
- Attach approved shop drawing that
include section details of MTW framing.

031215 Rev.2 External Open Louis Berger 12 Jul 2021 null


- MTW framing already installed with Snaglist
corrugated panel during time of
inspection.
- Line-2 panel has vertical plumbness
error of 6-mm. and actual alignment of
envelope cladding not as per design
setting-out line, contractor to incorporate
in as-built drawing. (see attached survey
report)
- Attach approved shop drawings with
level-3 status.