Seal Support
Systems
API 682 Seal Plans
Application Guide
Configurable.
Local.
Reliable.
2 Mechanical Seal Support Systems
Contents
What is a Seal Support System? . . . . . . . . . . . . . . . . 3 Between Seal Plans
API 682 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Plan 52 Buffer Fluid Seal Pot . . . . . . . . . . . . . . . . . . . 31
Seal System Design Principles . . . . . . . . . . . . . . . . . 3 Plan 5
3A B
arrier Fluid Seal Pot Pressurized
by Nitrogen . . . . . . . . . . . . . . . . . . . . . . . . . . 35
Swagelok Seal Support Systems . . . . . . . . . . . . . . . 5
Plan 53B B
arrier Fluid Pressurized
Schematic Symbol Definitions . . . . . . . . . . . . . . . . . 6
by Bladder Accumulator . . . . . . . . . . . . . . . . 39
Swagelok Seal Plan Components . . . . . . . . . . . . . . . 7
Plan 53C B
arrier Fluid Pressurized
Process Side Plans by Piston Accumulator . . . . . . . . . . . . . . . . . 43
Plan 54 B
arrier Fluid Pressurized
Plan 11 Flush . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 by External System . . . . . . . . . . . . . . . . . . . . . 47
Plan 12 Flush with Strainer . . . . . . . . . . . . . . . . . . . . . . 13 Plan 55 B
uffer Fluid Circulated
Plan 13 Flush from Chamber to Suction . . . . . . . . . . . . 15 by External System . . . . . . . . . . . . . . . . . . . . . 51
Plan 23 C
ooled Flush, Plan 76 Noncondensing Leakage Collection . . . . . . . . . 67
Recirculated through Seal Chamber . . . . . . . . 23 Plan 72/76 B
uffer Gas and Noncondensing
Plan 31 Flush with Cyclone Separator . . . . . . . . . . . . . . 25 Leakage Collection . . . . . . . . . . . . . . . . . . . 71
Plan 41 Cooled Flush with Cyclone Separator . . . . . . . 29 Plan 51 Quench from Reservoir . . . . . . . . . . . . . . . . . . 75
Glossary
Swagelok Component Literature
Reference . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83
2
Mechanical Seal Support Systems 3
API 682
Guided by API 682: Pumps - Shaft Sealing Systems for Centrifugal and Rotary Pumps,
Swagelok seal support system designs avoid pipe threads and limit the number of
connections wherever possible. Based on the fourth edition, the standard design for
each plan includes the minimum arrangement of components as detailed in API 682.
System maintenance during turnarounds and projects requires seal support systems to be drained for servicing. When taking a
pump out of service, low point drains allow the system to be purged of buffer, barrier, or flush fluids, quickly and safely.
Pressure and temperature measurement devices help plant personnel understand what is happening in the seal chamber and seal
support system. Many Swagelok seal support systems offer additional instrumentation options at points where measuring either
pressure or temperature would assist in troubleshooting an issue or provide other operational benefit.
4 Mechanical Seal Support Systems
Appropriate Flow
Whether the system delivers a flush fluid to the inboard seal or buffer and barrier fluids are circulated between seals in a dual seal
arrangement, maintaining proper flow and circulation through the support system and seal chamber is a requirement for effective
seal operation. A common flow issue is clogged orifices, which can cause a loss of flush fluid to the seal chamber, resulting in seal
failure. Additionally, improper circulation of buffer and barrier fluids can also cause operational issues due to lack of appropriate
system cooling.
When designing seal support systems, it is important to have pressure drop and flow control happen at appropriately engineered
locations, such as orifices and flow control valves. Components such as filters and strainers can become clogged and create
unwanted flow restrictions in seal support systems. These serviceable items should be located in areas that are easy to access and
maintain. Additional options such as bypass loops can be added to the system to ensure a continued supply of flush fluid when a
filter or strainer element is being replaced or cleaned.
In addition to individual system components that will need to be serviced, the design of tubing runs should be considered critical
to the effectiveness of seal support systems. All tubing runs should be sloped, especially those running to and from the seal. A half
inch per foot (40 mm per meter) of slope is recommended. One-half inch (12 mm) OD tubing is acceptable for differential pressure
or pumped flow systems, while three-quarter inch (18 mm) tubing is recommended for systems utilizing a pumping ring or a thermo-
syphon effect. It is best practice to eliminate the use of elbow fittings and to use large-radius bends in the tubing to further assist flow.
System Safety
API 682 recommends specific wall thicknesses for 1/2 inch (12 mm) to 1 inch (25 mm) OD tubing. While thinner-walled tubing, such
as that used in general instrumentation installations, is often sufficient to handle the pressure and temperature of seal support
systems, heavier-wall tubing provides extra rigidity in high-vibration service. Tubing with a heavier wall also creates systems that are
more robust in areas where large pieces of equipment are being maintained and personnel may inadvertently come into contact with
the tubing.
In contrast to larger liquid systems which mainly use 1/2 inch (12 mm) and 3/4 inch (18 mm) tubing, API 682 offers no guidance
regarding tubing wall thickness for systems under 1/2 inch (12 mm). Tubing wall thickness for 1/4 inch (6 mm) and 3/8 inch (8 mm/10
mm) systems can be selected from Swagelok’s Tubing Data Sheet, MS-01-107, based on the pressure and temperature of the
service. These systems are typically nitrogen filtering and regulating systems for gas seal plans. Swagelok recommends these API
gas plans are mounted on a panel with commonly serviced items such as filters and regulators placed with ease of maintenance in
mind.
One final safety consideration when choosing the appropriate design for an API plan is the incorporation of block-and-bleed valves
on all instruments, including gauges. This recommendation by API adds an additional level of safety for items that need to be
calibrated or removed for servicing. Wherever practical, Swagelok seal support systems offer options for including 2-valve manifolds
or other appropriate isolation on instruments.
4
Mechanical Seal Support Systems 5
Due to the simplicity of the arrangement, the following API plans are offered only as a kit of components that are ready for field
installation. These kits include all the necessary components to complete the plan:
• Process side plans: 11, 12, 13, 14, 21, 22, 23, 31, and 41
Seal plan assemblies can be ordered alone or with the associated field installation kit to provide a standard installation for site
personnel. The following plans are offered fully assembled with a corresponding field installation kit also available for connecting the
assembly to the pump:
• Between seal plans 52, 53A, 53B, 53C, 54, 55, 72, 74, 75, 76, and 72/76
When procuring seal plan assemblies for pump installations or retrofits, please contact your authorized Swagelok sales and service
center to ensure the proper amount of tubing and tube support materials are provided for a safe and effective installation.
6 Legend
Mechanical Seal Support Systems
Filter
Check Valve
2-Valve Manifold
PI Pressure Gauge
PT Pressure Transmitter
Quick-connect
LT Level Transmitter
Level Gauge
LS Level Switch
Cooling Coil
TI Thermometer
Heat Exchanger
TT Temperature Transmitter
Gear Pump
6
Mechanical Seal Support Systems 7
API 682, 4th edition supports the use of tubing for mechanical seal support systems.
1
3
2
Integral Orafice Flange Adapter with Tag Integral Orifice Class 300 ANSI Flange Adapter with Tag Ordering Information
D
Dimensions
A Tube Flange Ordering Pressure
F Flat H
OD Size Number A B D E F H J Rating
Dimensions, in. (mm) psig (bar)
E 1.96 4.62 1.56 3.25
J 3/4 SS-810-F12-300-43359
(49.8) (117) 0.90 1.06 (39.6) (82.6)
B 1/2
1.90 3.75 (22.9) 0.125 (26.9) 1.50 2.62
1/2 SS-810-F8-300-43359 720 (49.6)
(48.3) (95.3) (3.2) (38.1) (66.5)
2.04 4.62 0.96 1.50 1.64 3.25
3/4 3/4 SS-1210-F12-300-43359
(51.8) (117) (24.4) (38.1) (41.7) (82.6)
Dimensions, mm (in.) bar (psig)
49.8 117 22.9 3.2 26.9 39.6 82.6
12 3/4 SS-12MO-F12-300-43359 49.6 (720)
(1.96) (4.62) (0.90) (0.125) (1.06) (1.56) (3.25)
2 Thermowell Tee
Thermowell straight
Ax
A
1/2 in. NPSM
Thermowell Tee Ordering Information
1 1/8 in.
Hex
Dimensions
Tube Ordering Pressure
B Weld
Straight Pattern OD Number A Ax Ay B E Rating
Dimensions, in. (mm) psig (bar)
2.84 1.42 0.28
3/8 SS-TTW-S6
(72.1) (36.1) 2.86 (7.1)
4900 (337)
3.06 1.53 (72.7) 0.41
E 1/2 SS-TTW-S8➀
Port 1 Port 2 Thermowell angle
(77.7) (38.9) (10.4)
1/2 in. NPSM 3.52 1.76 1.76 0.62
3/4 SS-TTW-S12➀ 4600 (316)
(89.4) (44.7) (44.7) (15.7)
1 1/8 in.
Hex Dimensions, mm (in.) bar (psig)
2.50 (63.5) Weld 9.5
B 12 SS-TTW-S12MM➀
77.7 38.9 72.7 (0.73)
337 (4900)
(3.06) (1.53) (2.86) 12.7
16 SS-TTW-S16MM➀
(0.50)
89.4 44.7 75.2 15.0
E 18 SS-TTW-S18MM 316 (4600)
(3.52) (1.76) (2.96) (0.59)
Port 2 Ay
o order an angle-pattern Thermowell Tee, add -A to the ordering number.
➀T
Port 1
Example: SS-TTW-S6-A
Refer to Temperature Measurement Devices, Bimetal Thermometers and Thermowells
Ax
Angle Pattern catalog, MS-02-353, for additional information.
8
Mechanical Seal Support Systems 9
F Flat
Dimensions
Tube NPT Ordering Pressure
E OD Size Number A D E F Rating
Dimensions, in. (mm) psig (bar)
D
A SS-600-1-6-50553 4.00 (102)
3/8 3/8 0.66 (16.8) 0.28 (7.1) 11/16 7500 (516)
SS-600-1-6-49485 6.00 (152)
SS-810-1-8-50553 4.00 (102)
1/2 1/2 0.90 (22.9) 0.41 (10.4) 7/8 6700 (461)
SS-810-1-8-49485 6.00 (152)
SS-1210-1-8-50553 4.00 (102)
1/2 0.47 (11.9)
SS-1210-1-8-49485 6.00 (152)
3/4 0.96 (24.4) 1 1/16 5800 (399)
SS-1210-1-12-50553 4.00 (102)
3/4 0.63 (16.0)
SS-1210-1-12-49485 6.00 (152)
F Flat
Dimensions
E Tube NPT Ordering Pressure
OD Size Number A D E F Rating
D Dimensions, in. (mm) psig (bar)
A
SS-600-1-6-52166 4.00 (102)
3/8
SS-600-1-6-52167 6.00 (152)
3/8 0.66 (16.8) 0.28 (7.1) 11/16 7500 (516)
SS-810-1-6-52166 4.00 (102)
SS-810-1-6-52167 6.00 (152)
1/2
SS-810-1-8-52166 4.00 (102)
1/2 0.90 (22.9) 0.41 (10.4) 7/8 6700 (461)
SS-810-1-8-52167 6.00 (152)
SS-1210-1-8-52166 4.00 (102)
1/2 0.47 (11.9)
SS-1210-1-8-52167 6.00 (152)
3/4 0.96 (24.4) 1 1/16 5800 (399)
SS-1210-1-12-52166 4.00 (102)
3/4 0.63 (16.0)
SS-1210-1-12-52167 6.00 (152)
4 Orifice Union
Easily add an orifice to a flush
From this... ...to this system with the orifice union.
This fitting makes welding bulky
flange assemblies unnecessary.
Tagged for visual identification.
Orifice Adapter
A
2.38 (60.5)
1.19
1.04
(30.2)
1/4 in. (26.4) Dimensions
0.188 Tube Female Ordering Pressure
1/2 in. NPT
(4.8) OD NPT Number A E F Rating
NPT
F Dimensions, in. (mm) psig (bar)
E 1/2 in.
NPT 1/2 SS-8-A-08097 1 5/8
4.00 0.125
1/2 4900 (337)
15º (102) (3.2)
3/4 SS-12-R8-8-08096 1 1/16
Flow
.08 (21)
Gage Plane
Located Here
10
Mechanical Seal Support Systems 11
API PLAN 11
Plan 11
• Removes heat from the seal chamber
• Ensures proper pressure in the seal chamber in order to prevent pumped fluid from vaporizing
PI PI
TI
From Pump
Discharge
Fig. 3 API Plan 11 P&ID
Optional components shown in red.
Build an ordering number by combining the designators in the sequence shown below.
API PLAN 11
Plan 11 Kit
1 2 3 4 5 6 7
SPK11 - C - C 4 1 - C 1 1
1 Primary Tubing Size 5 Pump Discharge Connector Type
C = 1/2 in. C =1/2 in. female NPT
K =12 mm D =3/4 in. female NPT
M =1/2 in. Class 150 ANSI flange
N =1/2 in. Class 300 ANSI flange
2 Seal Connection (Flush) P =3/4 in. Class 150 ANSI flange
B =3/8 in. female NPT Q = 3/4 in. Class 300 ANSI flange
C =1/2 in. female NPT
D =3/4 in. female NPT
6 Pump Discharge Instrumentation
H =G 3/8
J =G 1/2 1 = None
K =G 3/4 2 =Pressure gauge
3 =Pressure transmitter
4 = Thermometer
3 Seal Connector Type (Flush)
5 = Pressure gauge and thermometer
1 =Standard female connector➀ 6 = Pressure transmitter and thermometer
2 =Standard male connector
3 =4 in. extended male connector, hex
4 =6 in. extended male connector, hex 7 Flow Control Orifice
5 =4 in. extended male connector, machined 1 = None
6 =6 in. extended male connector, machined 2 =Tube fitting union
➀ Installation will require use of pipe nipple (included in kit 3 =Integral to flange adapter➀
when female connector selected). 4 = Orifice plate➀
➀
Not compatible with pump discharge instrumentation
4 Seal Connection Instrumentation (Flush) pressure gauge or pressure transmitter. Must select
1 = None an ANSI flange pump discharge connector with this
option.
2 =Pressure gauge
3 =Pressure transmitter
MS-02-482, RevC
12
Mechanical Seal Support Systems 13
API PLAN 12
Plan 12
• Prevents orifice clogging through the addition of a strainer
• Ensures proper pressure in the seal chamber to prevent pumped fluid from vaporizing
• Allows the seal chamber to be self-venting when used with horizontal pumps
Plan 12
PI
PI
PI PI TI
From Pump
Discharge To Seal
Contact your authorized Swagelok sales and service center for information on optional components.
14 Mechanical Seal Support Systems
Build an ordering number by combining the designators in the sequence shown below.
Plan 12 Kit
API PLAN 12
1 2 3 4 5 6 7 8
SPK12 - C - C 4 1 - C 1 B - A
1 Primary Tubing Size 5 Pump Discharge Connector Type
C = 1/2 in. C =1/2 in. female NPT
K =12 mm D =3/4 in. female NPT
M =1/2 in. Class 150 ANSI flange
N =1/2 in. Class 300 ANSI flange
2 Seal Connection (Flush) P =3/4 in. Class 150 ANSI flange
B =3/8 in. female NPT Q = 3/4 in. Class 300 ANSI flange
C =1/2 in. female NPT
D =3/4 in. female NPT
6 Pump Discharge Instrumentation
H =G 3/8
J =G 1/2 1 = None
K =G 3/4 2 =Pressure gauge
3 =Pressure transmitter
4 = Thermometer
3 Seal Connector Type (Flush)
5 = Pressure gauge and thermometer
1 =Standard female connector➀ 6 = Pressure transmitter and thermometer
2 =Standard male connector
3 =4 in. extended male connector, hex
4 =6 in. extended male connector, hex 7 Pump Discharge Orifice
5 =4 in. extended male connector, machined 1 = None
6 =6 in. extended male connector, machined 2 =Tube fitting union
➀ Installation will require use of pipe nipple (included in kit
when female connector selected).
8 Filtration
4 Seal Connection Instrumentation (Flush) A =Filter only
C =Manual bypass valves
1 = None
D = Inlet/outlet gauges
2 =Pressure gauge
G = Manual bypass valves with inlet/outlet gauges
3 =Pressure transmitter
MS-02-482, RevC
14
Mechanical Seal Support Systems 15
Plan 13
• Removes heat and flushes particulate from the seal chamber
API PLAN 13
• Allows the seal chamber to be self-venting when used with horizontal pumps
• Flange adapters
• Pipe fittings
• Bimetal thermometer
• Tubing
• Pressure transmitter
• Pipe nipple
Fig. 6 API Plan 13
Kit components shown solid and include some optional components. See page 83 for additional information
Plan 13
on individual components.
PI PI
TI
To Pump
From Seal Suction
Contact your authorized Swagelok sales and service center for information on optional components.
16 Mechanical Seal Support Systems
API Plan 13 continued
Ordering Information
Build an ordering number by combining the designators in the sequence shown below.
Plan 13 Kit
API PLAN 13
1 2 3 4 5 6 7
SPK13 - C - C 4 1 - C 1 1
1 Primary Tubing Size 5 Pump Suction Connector Type
C = 1/2 in. C =1/2 in. female NPT
K =12 mm D =3/4 in. female NPT
M =1/2 in. Class 150 ANSI flange
N =1/2 in. Class 300 ANSI flange
2 Seal Connection (Flush) P =3/4 in. Class 150 ANSI flange
B =3/8 in. female NPT Q = 3/4 in. Class 300 ANSI flange
C =1/2 in. female NPT
D =3/4 in. female NPT
6 Pump Suction Instrumentation
H =G 3/8
J =G 1/2 1 = None
K =G 3/4 2 =Pressure gauge
3 =Pressure transmitter
3 Seal Connector Type (Flush)
1 =Standard female connector➀
7 Pump Suction Orifice
2 =Standard male connector
3 =4 in. extended male connector, hex 1 = None
4 =6 in. extended male connector, hex 2 =Tube fitting union
5 =4 in. extended male connector, machined 3 =Integral to flange adapter➀
6 =6 in. extended male connector, machined 4 = Orifice plate➀
➀ Installation will require use of pipe nipple (included in kit ➀N
ot compatible with pump suction instrumentation
when female connector selected). pressure gauge or pressure transmitter. Must select an
ANSI flange pump suction connector with this option.
MS-02-482, RevC
16
Mechanical Seal Support Systems 17
API PLAN 14
Plan 14
• Removes heat and flushes particulate from the seal chamber
• Flange adapters
• Pipe fittings
• Bimetal thermometer
• Tubing
• Pressure transmitter
• Pipe nipple
Plan 14 Fig. 8 API Plan 14
Kit components shown solid and include some optional components. See page 83 for additional
information on individual components.
PI PI
TI TI
Contact your authorized Swagelok sales and service center for information on optional
Seal
components.
Chamber
18 Mechanical Seal Support Systems
Build an ordering number by combining the designators in the sequence shown below.
Plan 14 Kit
API PLAN 14
1 2 3 4 5 6 7 8 9 10 11 12
SPK14 - C - C 4 - C 4 1 - C 1 2 - C 1 2
1 Primary Tubing Size 7 Pump Discharge Connector Type
C = 1/2 in. C =1/2 in. female NPT
K =12 mm D =3/4 in. female NPT
M =1/2 in. Class 150 ANSI flange
N =1/2 in. Class 300 ANSI flange
2 Seal Connection (Flush Inlet) P =3/4 in. Class 150 ANSI flange
B =3/8 in. female NPT Q = 3/4 in. Class 300 ANSI flange
C =1/2 in. female NPT
D =3/4 in. female NPT
8 Pump Discharge Instrumentation
H =G 3/8
J =G 1/2 1 = None
K =G 3/4 2 =Pressure gauge
3 =Pressure transmitter
4 = Thermometer
3 Seal Connector Type (Flush Inlet)
5 = Pressure gauge and thermometer
1 =Standard female connector➀ 6 = Pressure transmitter and thermometer
2 =Standard male connector
3 =4 in. extended male connector, hex
4 =6 in. extended male connector, hex
5 =4 in. extended male connector, machined 9 Flow Control Orifice (from discharge)
6 =6 in. extended male connector, machined 1 = None
➀ Installation will require use of pipe nipple (included in kit 2 =Tube fitting union
when female connector selected). 3 =Integral to flange adapter➀
4 = Orifice plate➀
4 Seal Connection (Flush Outlet) Not compatible with pump suction instrumentation
➀
B =3/8 in. female NPT pressure gauge or pressure transmitter. Must select an
C =1/2 in. female NPT ANSI flange pump suction connector with this option.
D =3/4 in. female NPT
H =G 3/8 10 Pump Suction Connector Type
J =G 1/2 C =1/2 in. female NPT
K =G 3/4 D =3/4 in. female NPT
M =1/2 in. Class 150 ANSI flange
5 Seal Connector Type (Flush Outlet) N =1/2 in. Class 300 ANSI flange
1 =Standard female connector➀ P =3/4 in. Class 150 ANSI flange
2 =Standard male connector Q = 3/4 in. Class 300 ANSI flange
3 =4 in. extended male connector, hex
4 =6 in. extended male connector, hex 11 Pump Suction Instrumentation
5 =4 in. extended male connector, machined
1 = None
6 =6 in. extended male connector, machined
2 =Pressure gauge
➀ Installation will require use of pipe nipple (included in kit
when female connector selected).
3 =Pressure transmitter
4 = Thermometer
6 5 = Pressure gauge and thermometer
Seal Connection Instrumentation (Flush
6 = Pressure transmitter and thermometer
Outlet)
1 = None
2 =Pressure gauge
3 =Pressure transmitter 12 Flow Control Orifice (to suction)
4 = Thermometer 1 = None
5 = Pressure gauge and thermometer 2 =Tube fitting union
6 = Pressure transmitter and thermometer 3 =Integral to flange adapter➀
4 = Orifice plate➀
Not compatible with pump suction instrumentation
➀
pressure gauge or pressure transmitter. Must select an
ANSI flange pump suction connector with this option.
MS-02-482, RevC
18
Mechanical Seal Support Systems 19
Plan 21
API PLAN 21
• Provides cooled flush fluid to the process side of the seal
Plan 21
Fig. 10 API Plan 21
Kit components shown solid and include some optional components.
PI
TI
From Pump
Discharge
Build an ordering number by combining the designators in the sequence shown below.
Plan 21 Kit
API PLAN 21
1 2 3 4 5 6 7
SPK21 - C - C 4 1 - C 1 1
1 Primary Tubing Size 5 Pump Discharge Connector Type
C = 1/2 in. C =1/2 in. female NPT
K =12 mm D =3/4 in. female NPT
M =1/2 in. Class 150 ANSI flange
N =1/2 in. Class 300 ANSI flange
2 Seal Connection (Flush) P =3/4 in. Class 150 ANSI flange
B =3/8 in. female NPT Q = 3/4 in. Class 300 ANSI flange
C =1/2 in. female NPT
D =3/4 in. female NPT
6 Pump Discharge Instrumentation
H =G 3/8
J =G 1/2 1 = None
K =G 3/4 2 =Pressure gauge
3 =Pressure transmitter
4 = Thermometer
3 Seal Connector Type (Flush)
5 = Pressure gauge and thermometer
1 =Standard female connector➀ 6 = Pressure transmitter and thermometer
2 =Standard male connector
3 =4 in. extended male connector, hex
4 =6 in. extended male connector, hex 7 Pump Discharge Orifice
5 =4 in. extended male connector, machined 1 = None
6 =6 in. extended male connector, machined 2 =Tube fitting union
➀ Installation will require use of pipe nipple (included in kit 3 =Integral to flange adapter➀
when female connector selected).
4 = Orifice plate➀
➀N
ot compatible with pump discharge instrumentation
4 Seal Connection Instrumentation (Flush) pressure gauge or pressure transmitter. Must select an
1 = None ANSI flange pump discharge connector with this option.
2 =Pressure gauge
3 =Pressure transmitter
4 = Thermometer
5 = Pressure gauge and thermometer
6 = Pressure transmitter and thermometer
MS-02-482, RevC
20
Mechanical Seal Support Systems 21
API PLAN 22
Plan 22
• Prevents orifice clogging through the addition of a strainer
Plan 22
From Pump
Discharge
PI
Coolant Coolant
TI In Out
To Seal
Drain
22 Mechanical Seal Support Systems
Build an ordering number by combining the designators in the sequence shown below.
Plan 22 Kit
API PLAN 22
1 2 3 4 5 6 7 8
SPK22 - C - C 4 1 - C 1 2 - C
1 Primary Tubing Size 5 Pump Discharge Connector Type
C = 1/2 in. C =1/2 in. female NPT
K =12 mm D =3/4 in. female NPT
M =1/2 in. Class 150 ANSI flange
N =1/2 in. Class 300 ANSI flange
2 Seal Connection (Flush) P =3/4 in. Class 150 ANSI flange
B =3/8 in. female NPT Q = 3/4 in. Class 300 ANSI flange
C =1/2 in. female NPT
D =3/4 in. female NPT
6 Pump Discharge Instrumentation
H =G 3/8
J =G 1/2 1 = None
K =G 3/4 2 =Pressure gauge
3 =Pressure transmitter
4 = Thermometer
3 Seal Connector Type (Flush)
5 = Pressure gauge and thermometer
1 =Standard female connector➀ 6 = Pressure transmitter and thermometer
2 =Standard male connector
3 =4 in. extended male connector, hex
4 =6 in. extended male connector, hex 7 Pump Discharge Orifice
5 =4 in. extended male connector, machined 1 = None
6 =6 in. extended male connector, machined 2 =Tube fitting union
➀ Installation will require use of pipe nipple (included in kit
when female connector selected).
8 Filtration
4 Seal Connection Instrumentation (Flush)
A =Filter only
1 = None C =Manual bypass valves
2 =Pressure gauge D = Inlet/outlet gauges
3 =Pressure transmitter G = Manual bypass valves with inlet/outlet gauges
4 = Thermometer
5 = Pressure gauge and thermometer
6 = Pressure transmitter and thermometer
22
Mechanical Seal Support Systems 23
API PLAN 23
Plan 23
• Provides an isolated cooled flush fluid in the seal chamber
• Reduces cooler duty due to isolated flush fluid, extending the life of the close-clearance throat bushing
Plan 23
PI
High-point Fig. 15 API Plan 23 P&ID
Vent Optional components shown in red.
TI
Contact your authorized Swagelok sales and service
center for information on optional components.
From Seal
High-point
Vent
PI
Coolant Coolant
TI
In Out
To Seal
Low-point Drain
Drain
24 Mechanical Seal Support Systems
API Plan 23 continued
Ordering Information
Build an ordering number by combining the designators in the sequence shown below.
Plan 23 Kit
API PLAN 23
1 2 3 4 5 6 7 8 9
SPK23 - D - C 4 4 D - C 4 1 B
1 Primary Tubing Size 6 Seal Connection (Flush Outlet)
C = 3/4 in. B =3/8 in. female NPT
K =18 mm C =1/2 in. female NPT
D =3/4 in. female NPT
H =G 3/8
2 Seal Connection (Flush Inlet) J =G 1/2
B =3/8 in. female NPT K =G 3/4
C =1/2 in. female NPT
D =3/4 in. female NPT 7 Seal Connector Type (Flush Outlet)
H =G 3/8
1 =Standard female connector➀
J =G 1/2
2 =Standard male connector
K =G 3/4
3 =4 in. extended male connector, hex
4 =6 in. extended male connector, hex
3 Seal Connector Type (Flush Inlet) 5 =4 in. extended male connector, machined
1 =Standard female connector➀ 6 =6 in. extended male connector, machined
2 =Standard male connector ➀ Installation will require use of pipe nipple (included in kit
3 =4 in. extended male connector, hex when female connector selected).
4 =6 in. extended male connector, hex
5 =4 in. extended male connector, machined
8 eal Connection Instrumentation (Flush
S
6 =6 in. extended male connector, machined
➀ Installation will require use of pipe nipple (included in kit Outlet)
when female connector selected). 1 = None
2 =Pressure gauge
3 =Pressure transmitter
4 Seal Connection Instrumentation (Flush 4 = Thermometer
Inlet) 5 = Pressure gauge and thermometer
1 = None 6 = Pressure transmitter and thermometer
2 =Pressure gauge
3 =Pressure transmitter
9 eal Connection Vents/Drains (Flush
S
4 = Thermometer
5 = Pressure gauge and thermometer Outlet)
6 = Pressure transmitter and thermometer A = None
B =High-point vent
MS-02-482, RevC
24
Mechanical Seal Support Systems 25
API PLAN 31
Plan 31
• Removes heat from the seal chamber
• Ensures proper pressure in the seal chamber in order to prevent pumped fluid from vaporizing
PI
TI
From Pump
Fig. 16 API Plan 31 Discharge
Kit components shown solid and include some optional components.
PI
To Pump
Suction
PI
Build an ordering number by combining the designators in the sequence shown below.
Plan 31 Kit
PLAN 31
1 2 3 4 5 6 7 8
SPK31 - C - C 4 1 - C 1 - C 2
1 Primary Tubing Size 5 Pump Discharge Connector Type
C = 1/2 in. C =1/2 in. female NPT
K =12 mm D =3/4 in. female NPT
M =1/2 in. Class 150 ANSI flange
N =1/2 in. Class 300 ANSI flange
2 Seal Connection (Flush) P =3/4 in. Class 150 ANSI flange
B =3/8 in. female NPT Q = 3/4 in. Class 300 ANSI flange
C =1/2 in. female NPT
D =3/4 in. female NPT
6 Pump Discharge Instrumentation
H =G 3/8
J =G 1/2 1 = None
K =G 3/4 2 =Pressure gauge
3 =Pressure transmitter
4 = Thermometer
3 Seal Connector Type (Flush)
5 = Pressure gauge and thermometer
1 =Standard female connector➀ 6 = Pressure transmitter and thermometer
2 =Standard male connector
3 =4 in. extended male connector, hex
4 =6 in. extended male connector, hex 7 Pump Suction Connector Type
5 =4 in. extended male connector, machined C =1/2 in. female NPT
6 =6 in. extended male connector, machined D =3/4 in. female NPT
➀ Installation will require use of pipe nipple (included in kit M =1/2 in. Class 150 ANSI flange
when female connector selected). N =1/2 in. Class 300 ANSI flange
P =3/4 in. Class 150 ANSI flange
4 Seal Connection Instrumentation (Flush) Q = 3/4 in. Class 300 ANSI flange
1 = None
2 =Pressure gauge 8 Pump Suction Instrumentation
3 =Pressure transmitter
1 = None
4 = Thermometer
2 =Pressure gauge
5 = Pressure gauge and thermometer
3 =Pressure transmitter
6 = Pressure transmitter and thermometer
MS-02-482, RevC
26
Mechanical Seal Support Systems 27
API PLAN 32
Plan 32
• Provides clean flush fluid to the seal chamber when the process fluid is unsuitable to be used as the flush fluid
• Isolates the process fluid from the seal chamber when used with a close-clearance throat bushing
Plan 32 is available as an assembled panel. The associated field installation kit for use in connecting the panel to your system is also
available.
• Bimetal thermometer
PI
TI
FI
To Seal
Build an ordering number by combining the designators in the sequence shown below.
Plan 32 Panel
API PLAN 32
1 2 3 4
SPA32 - C - C 5 - M1
1 Primary Tubing Size 3 Instrumentation Options
C = 1/2 in. 5 =Gauge and thermometer
K =12 mm 6 =Transmitter and thermometer
1 2 3
SPK32 - C - C 4
1 Primary Tubing Size 3 Seal Connector Type
C = 1/2 in. 1 =Standard female connector➀
K =12 mm 2 =Standard male connector
3 =4 in. extended male connector, hex
4 =6 in. extended male connector, hex
2 Seal Connection 5 =4 in. extended male connector, machined
B =3/8 in. female NPT 6 =6 in. extended male connector, machined
C =1/2 in. female NPT ➀ Installation will require use of pipe nipple (included in kit
D =3/4 in. female NPT when female connector selected).
H =G 3/8
J =G 1/2
K =G 3/4
PLAN 41
Plan 41
• Removes solids from the flush fluid
• Ensures proper pressure in the seal chamber in order to prevent pumped fluid from vaporizing
PI
TI
API PLAN 41
Coolant Coolant
To Pump In Out
Suction
Drain
PI
TI
To Seal
Ordering Information
Build an ordering number by combining the designators in the sequence shown below.
Plan 41 Kit
1 2 3 4 5 6 7 8
SPK41 - C - C 4 1 - C 1 - C 2
1 Primary Tubing Size 5 Pump Discharge Connector Type
C = 1/2 in. C =1/2 in. female NPT
K =12 mm D =3/4 in. female NPT
M =1/2 in. Class 150 ANSI flange
N =1/2 in. Class 300 ANSI flange
2 Seal Connection (Flush)
P =3/4 in. Class 150 ANSI flange
B =3/8 in. female NPT Q = 3/4 in. Class 300 ANSI flange
C =1/2 in. female NPT
D =3/4 in. female NPT
6 Pump Discharge Instrumentation
H =G 3/8
J =G 1/2 1 = None
K =G 3/4 2 =Pressure gauge
3 =Pressure transmitter
3 Seal Connector Type (Flush) 4 = Thermometer
5 = Pressure gauge and thermometer
1 =Standard female connector➀
6 = Pressure transmitter and thermometer
2 =Standard male connector
3 =4 in. extended male connector, hex
4 =6 in. extended male connector, hex 7 Pump Suction Connector Type
5 =4 in. extended male connector, machined C =1/2 in. female NPT
6 =6 in. extended male connector, machined D =3/4 in. female NPT
➀ Installation will require use of pipe nipple (included in kit M =1/2 in. Class 150 ANSI flange
when female connector selected). N =1/2 in. Class 300 ANSI flange
P =3/4 in. Class 150 ANSI flange
4 Seal Connection Instrumentation (Flush) Q = 3/4 in. Class 300 ANSI flange
1 = None
2 =Pressure gauge 8 Pump Suction Instrumentation
3 =Pressure transmitter 1 = None
4 = Thermometer 2 =Pressure gauge
5 = Pressure gauge and thermometer 3 =Pressure transmitter
6 = Pressure transmitter and thermometer
MS-02-482, RevC
30
Mechanical Seal Support Systems 31
API PLAN 52
length of tubing runs. Plan 52 is commonly used with light hydrocarbons or fluids with a high vapor pressure. The buffer fluid must be
compatible with process fluid as inboard seal leakage will eventually mix with the buffer fluid.
Plan 52
• Provides additional heat removal from the inboard seal when required
Plan 52 is available as a seal pot assembly. The associated field installation kit for use in connecting the seal pot assembly to your
system is also available.
To Collection System
PT PI
LSH LT
LSL
TI Buffer
Fluid
Make-up
From Seal
To Seal
Coolant In Coolant Out
TI
Low-point
Drain
Contact your authorized Swagelok sales and service center for information on optional components.
32
Mechanical Seal Support Systems 33
Build an ordering number by combining the designators in the sequence shown below.
API PLAN 52
1 2 3 4 5 6 7 8
SPA52 - D - 20 U S D 1 D 7
1 Primary Tubing Size 5 Seal Pot Basic Construction
D = 3/4 in. A =Dished bottom, without cooling coil
L =18 mm B =Dished bottom, with cooling coil
C =Flanged bottom, without cooling coil
D =Flanged bottom, with cooling coil
2 Seal Pot Capacity
12 =12 liters (3 gallons)
20 =20 liters (5 gallons) 6 Seal Pot Inlet/Outlet Connections
30 =30 liters (8 gallons) 1 =Flanged, inlet/outlet on left
38 =38 liters (10 gallons) 2 =Flanged, inlet/outlet on right
3 =Swagelok tube fittings, inlet/outlet on left
4 = Swagelok tube fittings, inlet/outlet on right
3 Seal Pot Code
N = None
P =Pressure Equipment Directive (PED) 7 Seal Pot Level Measurement
U = ASME A = None
B =Sight gauge only
4 Seal Pot Material C =Sight gauge with level switches
D =Sight gauge with level transmitter
S =Carbon steel (painted)
E =Level switches only
4 =304 stainless steel
F = Level transmitter only
6 =316 stainless steel
Build an ordering number by combining the designators in the sequence shown below.
The field installation kit contains tube fittings and tubing and may contain optional bimetal thermometer, TTW series thermowell tee,
and pipe nipple.
1 2 3 4 5 6 7 8 9
SPK52 - D - C 4 4 B - C 4 4 - D
1 Primary Tubing Size 4 Seal Connection Instrumentation (Buffer
D = 3/4 in. Inlet)
L =18 mm 1 = None
4 = Thermometer
Plan 53A
• Provides additional heat removal from inboard seal when required
• Is used with a dual seal arrangement when process leakage to atmosphere cannot occur
Plan 53A is available as a seal pot assembly. The associated field installation kit for use in connecting the assembly to your system is
also available.
From External
Pressure Source
API PLAN 53A
PT PI
LSH LT
LSL
TI
Barrier
Fluid
Make-up
From Seal
To Seal
Coolant In Coolant Out
TI
Low-point
Drain
Contact your authorized Swagelok sales and service center for information on optional components.
36
Mechanical Seal Support Systems 37
Build an ordering number by combining the designators in the sequence shown below.
Build an ordering number by combining the designators in the sequence shown below.
The field installation kit contains tube fittings and tubing and may contain optional bimetal thermometer, TTW series thermowell
tee, and pipe nipple.
1 2 3 4 5 6 7 8 9
SPK53A - D - C 4 4 B - C 4 4 - D
1 Primary Tubing Size 4 Seal Connection Instrumentation (Barrier
D = 3/4 in. Inlet)
L =18 mm 1 = None
4 = Thermometer
38
Mechanical Seal Support Systems 39
Plan 53B
• Attains a higher barrier fluid pressure with the use of a pressurized bladder accumulator
Plan 53B is available as an assembly. The associated field installation kit for use in connecting the assembly to your system is also
available.
PI
High-point
Vent
TI
From Seal
High-point
Vent
Bladder Charge
TI PI
Drain
PI
Drain
TI
Low-point
Drain
Fig. 30 Plan 53B P&ID
Optional components shown in red.
Contact your authorized Swagelok sales and service center for information on optional components.
MS-02-482, RevC
40
Mechanical Seal Support Systems 41
Build an ordering number by combining the designators in the sequence shown below.
Build an ordering number by combining the designators in the sequence shown below.
The field installation kit contains tube fittings and tubing and may contain optional bimetal thermometer, TTW series thermowell tee, V
series 2-valve manifold, PGI series gauges, 63 series ball valves, 1 series needle valve, pressure transmitters, and pipe nipples.
1 2 3 4 5 6 7 8 9
SPK53B - D - C 4 4 D - C 4 1 B
1 Primary Tubing Size 4 Seal Connection Instrumentation (Barrier
D = 3/4 in. Inlet)
L =18 mm 1 = None
2 = Pressure gauge
3 = Pressure transmitter
2 Seal Connection (Barrier Inlet) 4 = Thermometer
B =3/8 in. female NPT 5 = Pressure gauge and thermometer
C =1/2 in. female NPT 6 = Pressure transmitter and thermometer
D =3/4 in. female NPT
H =G 3/8 5 Seal Connection Drain/Vent (Barrier Inlet)
J =G 1/2
A = None
K =G 3/4
B = High point vent
C =Low point drain
3 Seal Connector Type (Barrier Inlet)
D = High point vent and low point drain
1 =Standard female connector➀
2 =Standard male connector
3 =4 in. extended male connector, hex 6 Seal Connection (Barrier Outlet)
4 =6 in. extended male connector, hex B =3/8 in. female NPT
5 =4 in. extended male connector, machined C =1/2 in. female NPT
6 =6 in. extended male connector, machined D =3/4 in. female NPT
➀ Installation will require use of pipe nipple (included in kit H =G 3/8
when female connector selected). J =G 1/2
K =G 3/4
42
Mechanical Seal Support Systems 43
Plan 53C
• Provides additional heat removal from inboard seal when required
• Is used when the seal chamber pressure can vary during pump operation
Plan 53C is available as an assembly. The associated field installation kit for use in connecting the assembly to your system is also
available.
• Level transmitter
• Level switches
• Level indicator
• Piston accumulator
To Vent
API PLAN 53C
Differential
Pressure PDIT LT
Transmitter
Piston
Accumulator
Seal Chamber
PI
High-point
Vent
TI
From Seal
High-point
Vent
Drain
PI
TI
Barrier Fluid
To Seal Make-up
Low-point
Drain
Contact your authorized Swagelok sales and service center for information on optional components.
44
Mechanical Seal Support Systems 45
Build an ordering number by combining the designators in the sequence shown below.
MS-02-482, RevC
46 Mechanical Seal Support Systems
Build an ordering number by combining the designators in the sequence shown below.
Plan 53C Field Installation Kit
The field installation kit contains tube fittings and tubing and may contain an optional bimetal thermometer, TTW series thermowell
API PLAN 53C
tee, V series 2-valve manifold, PGI series gauges, 63 series ball valves, 1 series needle valve, QTM series quick-connect, pressure
transmitters, and pipe nipples.
1 2 3 4 5 6 7 8 9 10 11
SPK53C - D - C 4 4 D - C 4 1 B - C 2
1 Primary Tubing Size 4
eal Connection Instrumentation (Barrier
S 7 Seal Connector Type (Barrier
D = 3/4 in. Inlet) Outlet)
L =18 mm 1 = None 1 =Standard female connector➀
2 = Pressure gauge 2 =Standard male connector
3 = Pressure transmitter 3 =4 in. extended male connector, hex
2 Seal Connection (Barrier Inlet) 4 = Thermometer 4 =6 in. extended male connector, hex
B =3/8 in. female NPT 5 = Pressure gauge and thermometer 5 =4 in. extended male connector,
C =1/2 in. female NPT 6 = Pressure transmitter and thermometer machined
D =3/4 in. female NPT 6 =6 in. extended male connector,
H =G 3/8 5 Seal Connection Drain/Vent (Barrier Inlet) machined
J =G 1/2 ➀ Installation will require use of pipe nipple
A = None
K =G 3/4 (included in kit when female connector selected).
B = High point vent
C =Low point drain
3 Seal Connector Type (Barrier Inlet) 8 Seal Connection Instrumentation
D = High point vent and low point drain
1 =Standard female connector➀ (Barrier Outlet)
2 =Standard male connector 1 = None
3 =4 in. extended male connector, hex 6 Seal Connection (Barrier Outlet) 2 = Pressure gauge
4 =6 in. extended male connector, hex B =3/8 in. female NPT 3 = Pressure transmitter
5 =4 in. extended male connector, machined C =1/2 in. female NPT 4 = Thermometer
6 =6 in. extended male connector, machined D =3/4 in. female NPT 5 = Pressure gauge and thermometer
➀ Installation will require use of pipe nipple (included in kit H =G 3/8 6 = Pressure transmitter and
when female connector selected). J =G 1/2 thermometer
K =G 3/4
9 Seal Connection Vent (Barrier
Outlet)
A = None
B = High point vent
API PLAN 54
Plan 54 provides a cool, clean, pressurized barrier fluid to a dual pressurized seal.
Plan 54 is available as a seal skid assembly. The associated field installation kit for use in connecting the assembly to your system is
also available.
• Bimetal thermometer
• Thermowell
• Hydraulic reservoir
• Pump/coupling/motor
• Diaphragm accumulator
• Filter heads/elements
PI
CW In CW Out
TI
T
C
DPI DPI
Vent C Vent
PI
Reservoir
Baffle
TI
Drain
Contact your authorized Swagelok sales and service center for information on optional components.
48
Mechanical Seal Support Systems 49
Build an ordering number by combining the designators in the sequence shown below.
Plan 54 Assembly
API PLAN 54
1 2 3 4 5 6 7 8
SPA54 - D - 05 A 2 K - 4 B 4
1 Primary Tubing Size 5 Filtration
D = 3/4 in. K =Dual filters with switching valves and DP
L =18 mm gauges
MS-02-482, RevC
50 Mechanical Seal Support Systems
Build an ordering number by combining the designators in the sequence shown below.
tee, V series 2-valve manifold, PGI series gauges, 63 series ball valves, pressure transmitters, and pipe nipples.
1 2 3 4 5 6 7 8
SPK54 - D - C 4 1 B - C 4 1
1 Primary Tubing Size 5 Seal Connection Drain (Barrier Inlet)
D = 3/4 in. A = None
L =18 mm C =Low point drain
3 Seal Connector Type (Barrier Inlet) 7 Seal Connector Type (Barrier Outlet)
1 =Standard female connector➀ 1 =Standard female connector➀
2 =Standard male connector 2 =Standard male connector
3 =4 in. extended male connector, hex 3 =4 in. extended male connector, hex
4 =6 in. extended male connector, hex 4 =6 in. extended male connector, hex
5 =4 in. extended male connector, machined 5 =4 in. extended male connector, machined
6 =6 in. extended male connector, machined 6 =6 in. extended male connector, machined
➀ Installation will require use of pipe nipple (included in kit ➀ Installation will require use of pipe nipple (included in kit
when female connector selected). when female connector selected).
API PLAN 55
Plan 55 provides a cool, clean, unpressurized buffer fluid to a dual pressurized seal.
Plan 55 is available as a seal skid assembly. The associated field installation kit for use in connecting the assembly to your system is
also available.
• Bimetal thermometer
• Thermowell
• Hydraulic reservoir
• Pump/coupling/motor
• Diaphragm accumulator
• Filter heads/elements
PI
CW In CW Out
TI
T
C
DPI DPI
Vent C Vent
PI
Reservoir
TI Baffle
Drain
Contact your authorized Swagelok sales and service center for information on optional components.
52
Mechanical Seal Support Systems 53
Build an ordering number by combining the designators in the sequence shown below.
Plan 55 Assembly
API PLAN 55
1 2 3 4 5 6 7 8
SPA55 - D - 05 A 2 K - 4 B 4
1 Primary Tubing Size 5 Filtration
D = 3/4 in. K =Dual filters with switching valves and DP
L =18 mm gauges
MS-02-482, RevC
54 Mechanical Seal Support Systems
Build an ordering number by combining the designators in the sequence shown below.
The field installation kit contains tube fittings and tubing and may contain an optional bimetal thermometer, TTW series thermowell
tee, V series 2-valve manifold, PGI series gauges, 63 series ball valves, pressure transmitters, and pipe nipples.
1 2 3 4 5 6 7 8
SPK55 - D - C 4 1 B - C 4 1
1 Primary Tubing Size 5 Seal Connection Drain (Barrier Inlet)
D = 3/4 in. A = None
L =18 mm C =Low point drain
3 Seal Connector Type (Barrier Inlet) 7 Seal Connector Type (Barrier Outlet)
1 =Standard female connector➀ 1 =Standard female connector➀
2 =Standard male connector 2 =Standard male connector
3 =4 in. extended male connector, hex 3 =4 in. extended male connector, hex
4 =6 in. extended male connector, hex 4 =6 in. extended male connector, hex
5 =4 in. extended male connector, machined 5 =4 in. extended male connector, machined
6 =6 in. extended male connector, machined 6 =6 in. extended male connector, machined
➀ Installation will require use of pipe nipple (included in kit
➀ Installation will require use of pipe nipple (included in kit
when female connector selected).
when female connector selected).
4 Seal Connection Instrumentation (Barrier 8 Seal Connection Instrumentation (Barrier
Inlet) Outlet)
1 = None 1 = None
2 = Pressure gauge 2 = Pressure gauge
3 = Pressure transmitter 3 = Pressure transmitter
4 = Thermometer 4 = Thermometer
5 = Pressure gauge and thermometer 5 = Pressure gauge and thermometer
6 = Pressure transmitter and thermometer 6 = Pressure transmitter and thermometer
API PLAN 72
leakage, a Plan 76 would be used for the collection of primary seal leakage. A pressure regulator on the panel regulates the nitrogen
prior to entering the seal chamber. Nitrogen pressure should not be more than 10 psi (0.68 bar) and is typically regulated to the alarm
point on the leakage collection system, or at least 5 psi (0.34 bar) above the regular pressure of the flare line.
Plan 72
• Supplies the gas seal with a clean, dry buffer gas, typically nitrogen
Plan 72 is available as an assembled panel. The associated field installation kit for use in connecting the panel to your system is also
available.
• FC series filter
• Pressure transmitter
• Pressure switch
• Mounting panel
• Brackets/miscellaneous hardware
Optional 2nd
Stream
PI
PS
FI FI
PI
To Seal
Gas Supply
Coalescing
Filter Drain
Plan 72
Fig. 42 Plan 72 P&ID
Optional components shown in red.
Contact your authorized Swagelok sales and service center for information on optional components.
56
Mechanical Seal Support Systems 57
Build an ordering number by combining the designators in the sequence shown below.
Plan 72 Panel
API PLAN 72
1 2 3 4 5 6
SPA72 - A - A 2 B 1 - M1
1 Primary Tubing Size 4 Flowmeter Options
A = 1/4 in. A =G2 series variable area flowmeter
G =6 mm C =M1 series variable area flowmeter
E =M2 series variable area flowmeter
2 Filtration Options
5 Number of Streams
A =No options (filter only)
B = Shut-off valves 1 =One stream
C = Manual bypass valves 2 = Two streams
MS-02-482, RevC
58 Mechanical Seal Support Systems
Build an ordering number by combining the designators in the sequence shown below.
The field installation kit contains tube fittings and tubing and may contain optional PGI series gauges, V series 2-valve manifolds,
pipe fittings, pressure transmitters, and pipe nipples.
1 2 3 4
SPK72 - C - C 4 2
1 Primary Tubing Size 3 Seal Connector Type (Gas Buffer Inlet)
C = 1/2 in. 1 =Standard female connector➀
K =12 mm 2 =Standard male connector
3 =4 in. extended male connector, hex
4 =6 in. extended male connector, hex
2 Seal Connection (Gas Buffer Inlet) 5 =4 in. extended male connector, machined
B =3/8 in. female NPT 6 =6 in. extended male connector, machined
C =1/2 in. female NPT ➀ Installation will require use of pipe nipple (included in kit
D =3/4 in. female NPT when female connector selected).
H =G 3/8
J =G 1/2 4 Seal Connection Instrumentation (Gas Buffer Inlet)
K =G 3/4 1 = None
2 =Pressure gauge
3 = Pressure transmitter
58
Mechanical Seal Support Systems 59
API PLAN 74
tolerated, the system is designed to allow a small amount of nitrogen to leak into the process fluid. Any leakage past the outboard
seal will be pure nitrogen. An optional flow transmitter located on the gas supply panel monitors excessive leakage in the event of a
seal failure.
Plan 74
• Supplies the gas seal with a clean, dry buffer gas, typically nitrogen
• Prevents process leakage to atmosphere in the event of a inboard or outboard seal failure
Plan 74 is available as an assembled panel. The associated field installation kit for use in connecting the panel to your system is also
available.
• FC series filter
• Pressure transmitter
• Pressure switch
• Mounting panel
• Brackets/miscellaneous hardware
Optional 2nd
API PLAN 74
Stream
PI
FI FI
PS
FI FI
PI
To Seal
Gas Supply
Coalescing
Filter Drain
Contact your authorized Swagelok sales and service center for information on optional components.
60
Mechanical Seal Support Systems 61
Build an ordering number by combining the designators in the sequence shown below.
Plan 74 Panel
API PLAN 74
1 2 3 4 5 6
SPA74 - A - A 2 B 1 - M1
1 Primary Tubing Size 4 Flowmeter Options
A = 1/4 in. B =Dual G2 series variable area flowmeters
G =6 mm D =Dual M1 series variable area flowmeters
F =Dual M2 series variable area flowmeters
2 Filtration Options
5 Number of Streams
A =No options (filter only)
B = Shut-off valves 1 =One stream
C = Manual bypass valves 2 = Two streams
3 Instrumentation Options 6
Additional Options
2 =Pressure gauge M1 =Alloy 400 outlet(s)
3 =Pressure transmitter R =Relief valve
7 =Pressure switch Blank = None
8 = Pressure gauge and switch
MS-02-482, RevC
62 Mechanical Seal Support Systems
Build an ordering number by combining the designators in the sequence shown below.
The field installation kit contains tube fittings and tubing and may contain optional PGI series gauges, V series 2-valve manifolds,
pipe fittings, pressure transmitters, and pipe nipples.
1 2 3 4
SPK74 - C - C 4 2
1 Primary Tubing Size 3 Seal Connector Type (Gas Barrier Inlet)
C = 1/2 in. 1 =Standard female connector➀
K =12 mm 2 =Standard male connector
3 =4 in. extended male connector, hex
4 =6 in. extended male connector, hex
2 Seal Connection (Gas Barrier Inlet) 5 =4 in. extended male connector, machined
B =3/8 in. female NPT 6 =6 in. extended male connector, machined
C =1/2 in. female NPT ➀ Installation will require use of pipe nipple (included in kit
D =3/4 in. female NPT when female connector selected).
H =G 3/8
J =G 1/2 4 Seal Connection Instrumentation (Gas Barrier Inlet)
K =G 3/4 1 = None
2 =Pressure gauge
3 = Pressure transmitter
62
Mechanical Seal Support Systems 63
API PLAN 75
to an orifice on the tubing connected to the flare. A visual level indicator on the reservoir indicates when the reservoir needs to be
drained.
Plan 75
• Collects and monitors inboard seal leakage that condenses at ambient temperatures
Plan 75 is available as an assembled collection vessel. The associated field installation kit for use in connecting the collection vessel
to your system is also available.
• Pressure transmitter
• Level transmitter
• Level gauge
• Collection reservoir
To Vapor
Collection
TI System
From
Containment
Seal Drain
PI
LT
To Liquid
Collection
System
Contact your authorized Swagelok sales and service center for information on optional components.
64
Mechanical Seal Support Systems 65
Build an ordering number by combining the designators in the sequence shown below.
API PLAN 75
1 2 3 4 5 6 7
SPA75 - C - 15 U 4 D 3 C
1 Primary Tubing Size 5 Reservoir Level Measurement
C = 1/2 in. D =Sight gauge with level transmitter
K =12 mm
4 Reservoir Material
S =Carbon steel (painted)
4 =304 stainless steel
6 =316 stainless steel
MS-02-482, RevC
66 Mechanical Seal Support Systems
Build an ordering number by combining the designators in the sequence shown below.
The field installation kit contains tube fittings and tubing and may contain an optional bimetal thermometer, TTW series
thermowell tee, and pipe nipple.
Plan 75 Kit
1 2 3 4
SPK75 - C - C 4 1
1 Primary Tubing Size 3 Seal Connector Type (Drain)
C = 1/2 in. 1 =Standard female connector➀
K =12 mm 2 =Standard male connector
3 =4 in. extended male connector, hex
4 =6 in. extended male connector, hex
2 Seal Connection (Drain) 5 =4 in. extended male connector, machined
B =3/8 in. female NPT 6 =6 in. extended male connector, machined
C =1/2 in. female NPT ➀ Installation will require use of pipe nipple (included in kit
D =3/4 in. female NPT when female connector selected).
H =G 3/8
J =G 1/2 4 Seal Connection Instrumentation (Drain)
K =G 3/4
1 = None
4 = Thermometer
API PLAN 76
Plan 76
• Monitors inboard seal leakage that does not condense at ambient temperatures
Plan 76 is available as an assembled panel. The associated field installation kit for use in connecting the panel to your system is also
available.
• Pressure transmitter
• Pressure switch
• Mounting panel
• Brackets/miscellaneous hardware
To Vapor
Recovery
System
PI PI
TI
From
Containment
Seal Vent
To Drain
Contact your authorized Swagelok sales and service center for information on optional components.
68
Mechanical Seal Support Systems 69
Build an ordering number by combining the designators in the sequence shown below.
Plan 76 Panel
API PLAN 76
1 2 3 4
SPA76 - C - 2 A - M1
1 Primary Tubing Size 3 Orifice
C = 1/2 in. A = None
K =12 mm B =Swagelok tube fitting union
MS-02-482, RevC
70 Mechanical Seal Support Systems
Build an ordering number by combining the designators in the sequence shown below.
The field installation kit contains tube fittings and tubing and may contain an optional bimetal thermometer, TTW series
thermowell tee, and pipe nipple.
Plan 76 Kit
1 2 3 4
SPK76 - C - C 4 1
1 Primary Tubing Size 3 Seal Connector Type (Vent)
C = 1/2 in. 1 =Standard female connector➀
K =12 mm 2 =Standard male connector
3 =4 in. extended male connector, hex
4 =6 in. extended male connector, hex
2 Seal Connection (Vent) 5 =4 in. extended male connector, machined
B =3/8 in. female NPT 6 =6 in. extended male connector, machined
C =1/2 in. female NPT ➀ Installation will require use of pipe nipple (included in kit
D =3/4 in. female NPT when female connector selected).
H =G 3/8
J =G 1/2 4 Seal Connection Instrumentation (Vent)
K =G 3/4 1 = None
2 = Pressure gauge
3 = Pressure transmitter
4 = Thermometer
5 = Pressure gauge and thermometer
6 = Pressure transmitter and thermometer
Plan 72/76
• Supplies the gas seal with a clean, dry buffer gas, typically nitrogen
• Monitors inner seal leakage that does not condense at ambient temperatures
Plan 72/76 is available as an assembled panel. The associated field installation kit for use in connecting the panel to your system is
also available.
• FC series filter
• Pressure transmitter
• Pressure switch
• Mounting panel
• Brackets/miscellaneous hardware
Fig. 53 API Plan 72/76 Panel See page 83 for additional information
Panel shown with some optional components. on individual components.
72 Mechanical Seal Support Systems
To Vapor To Vapor
PI
Recovery Recovery
TI PI System System
From
Containment
Seal Vent
PS PI
PI
FI FI
PI
To Seal
Gas
Supply To Drain To Drain
Coalescing
Plan 72/76
Filter Drain
Contact your authorized Swagelok sales and service center for information on optional components.
72
Mechanical Seal Support Systems 73
Build an ordering number by combining the designators in the sequence shown below.
5 Number of Streams
1 =One stream
2 = Two streams
MS-02-482, RevC
74 Mechanical Seal Support Systems
Build an ordering number by combining the designators in the sequence shown below.
Plan 72/76 Field Installation Kit
API PLAN 72/76
The field installation kit contains tube fittings and tubing and may contain optional PGI series gauges, V series 2-valve manifolds,
pipe fittings, pressure transmitters, and pipe nipples.
1 2 3 4 5 6 7
SPK726 - C - C 4 2 - C 4 2
1 Primary Tubing Size 4 Instrumentation (Gas Buffer Inlet) 7 Instrumentation (Vent)
C = 1/2 in. 1 = None 1 = None
K =12 mm 2 = Pressure gauge 2 = Pressure gauge
3 = Pressure transmitter 3 = Pressure transmitter
4 = Thermometer
2 Seal Connection (Gas Buffer Inlet) 5 = Pressure gauge and
5 Seal Connection (Vent)
B =3/8 in. female NPT thermometer
B =3/8 in. female NPT 6 = Pressure transmitter and
C =1/2 in. female NPT
C =1/2 in. female NPT thermometer
D =3/4 in. female NPT
D =3/4 in. female NPT
H =G 3/8
H =G 3/8
J =G 1/2
J =G 1/2
K =G 3/4
K =G 3/4
3 Seal Connector Type (Gas Buffer Inlet) 6 Seal Connector Type (Vent)
1 =Standard female connector➀ 1 =Standard female connector➀
2 =Standard male connector 2 =Standard male connector
3 =4 in. extended male connector, hex 3 =4 in. extended male connector, hex
4 =6 in. extended male connector, hex 4 =6 in. extended male connector, hex
5 =4 in. extended male connector, machined 5 =4 in. extended male connector, machined
6 =6 in. extended male connector, machined 6 =6 in. extended male connector, machined
➀ Installation will require use of pipe nipple (included in kit ➀ Installation will require use of pipe nipple (included in kit
when female connector selected). when female connector selected).
API PLAN 51
Plan 51
• Prevents icing on the atmospheric side of the seal
• Pressure transmitter
• Flange gasket
• Pipe nipple
Build an ordering number by combining the designators in the sequence shown below.
Plan 51 Kit
API PLAN 51
1 2 3 4 5 6 7 8 9 10
SPK51 - C - C 4 1 B - 12 N 4 3 B
1 Primary Tubing Size 6 Reservoir Capacity
C = 1/2 in. 12 =12 liters (3 gallons)
K =12 mm 20 = 20 liters (5 gallons)
30 = 30 liters (8 gallons)
38 = 38 liters (10 gallons)
2 Seal Connection (Quench)
B =3/8 in. female NPT
7 Reservoir Code
C =1/2 in. female NPT
H =G 3/8 N = None
J =G 1/2 P =Pressure Equipment Directive
U = ASME
76
Mechanical Seal Support Systems 77
API PLAN 62
Plan 62 prevents the formation of, or clears, solids from the atmospheric side of the seal faces.
• Bimetal thermometer
• Steam trap
• Pipe nipple
Steam or
Other Quench
PI Fluid
TI
To Seal
T Condensate
Contact your authorized Swagelok sales and service center for information on optional components.
78 Mechanical Seal Support Systems
Build an ordering number by combining the designators in the sequence shown below.
Plan 62 Kit
API PLAN 62
1 2 3 4 5 6 7
SPK62 - C - C 4 2 - C 4 - S
1 Primary Tubing Size 5 Seal Connection (Drain)
C = 1/2 in. B =3/8 in. female NPT
K =12 mm C =1/2 in. female NPT
D =3/4 in. female NPT
H =G 3/8
2 Seal Connection (Quench Inlet) J =G 1/2
B =3/8 in. female NPT K =G 3/4
C =1/2 in. female NPT
H =G 3/8
6 Seal Connector Type (Drain)
J =G 1/2
1 =Standard female connector➀
2 =Standard male connector
3 Seal Connector Type (Quench Inlet) 3 =4 in. extended male connector, hex
1 =Standard female connector➀ 4 =6 in. extended male connector, hex
2 =Standard male connector 5 =4 in. extended male connector, machined
3 =4 in. extended male connector, hex 6 =6 in. extended male connector, machined
4 =6 in. extended male connector, hex ➀ Installation will require use of pipe nipple (included in kit
5 =4 in. extended male connector, machined when female connector selected).
6 =6 in. extended male connector, machined
➀ Installation will require use of pipe nipple (included in kit 7 Quench Fluid
when female connector selected). S
= Steam
None = other
4 Seal Connection Instrumentation (Quench
Inlet)
1 = None
2 = Pressure gauge
3 = Pressure transmitter
4 = Thermometer
5 = Pressure gauge and thermometer
6 = Pressure transmitter and thermometer
MS-02-482, RevC
78
Mechanical Seal Support Systems 79
• Pipe nipple
• Collection reservoir
• Reservoir stand
• Level transmitter
Plan 65A
LT
From Seal
Build an ordering number by combining the designators in the sequence shown below.
1 2 3 4 5 6 7 8
SPK65A - C - C 4 - 03 N 4 F B
1 Primary Tubing Size 5 Reservoir Code
C = 1/2 in. N = None
K =12 mm P =Pressure Equipment Directive
U = ASME
4 Reservoir Capacity
03 =3 liters (0.75 gallons)
MS-02-482, RevC
80
Mechanical Seal Support Systems 81
• Pipe nipple
• Collection reservoir
• Reservoir stand
• Level transmitter
See page 83 for additional
information on individual components.
Plan 65B
LT
From Seal
Fig. 63 Plan 65B P&ID
To Liquid Optional components shown in red.
Collection Contact your authorized Swagelok sales and
System service center for information on optional
components.
82 Mechanical Seal Support Systems
Build an ordering number by combining the designators in the sequence shown below.
1 2 3 4 5 6 7
SPK65B - C - C 4 - 03 N 4 F
1 Primary Tubing Size 4 Reservoir Capacity
C = 1/2 in. 03 =3 liters (0.75 gallons)
K =12 mm
5 Reservoir Code
2 Seal Connection (Drain) N = None
B =3/8 in. female NPT P =Pressure Equipment Directive
C =1/2 in. female NPT U = ASME
D =3/4 in. female NPT
H =G 3/8
6 Reservoir Material
J =G 1/2
K =G 3/4 S =Carbon steel (painted)
4 =304 stainless steel
6 =316 stainless steel
3 Seal Connector Type (Drain)
1 =Standard female connector➀
2 =Standard male connector 7 Reservoir Level
3 =4 in. extended male connector, hex A = None
4 =6 in. extended male connector, hex F = Transmitter
5 =4 in. extended male connector, machined
6 =6 in. extended male connector, machined
➀ Installation will require use of pipe nipple (included in kit
when female connector selected).
MS-02-482, RevC
82
Mechanical Seal Support Systems 83
Glossary
Swagelok Component Literature Reference