Node L/C Hori. Vert. Hori. Moment
N NO.

Fx Mton Fy Mton Fz Mton Mx My Mz

MTon-m MTon-m MTon-m

5 COMBINATION LOAD CASE 5 3.60 236.92 0.73 -1.94 -0.01 -1.69


6 COMBINATION LOAD CASE 6 -17.51 165.10 -0.69 -4.00 -0.55 23.34
7 COMBINATION LOAD CASE 7 24.85 261.25 2.64 0.89 0.52 -26.71
8 COMBINATION LOAD CASE 8 3.07 121.24 -35.68 -52.29 0.41 -0.86
C1 1 9 COMBINATION LOAD CASE 9 4.26 305.12 37.62 49.18 -0.44 -2.52
10 COMBINATION LOAD CASE 10 -13.33 193.71 -0.55 -3.82 -0.44 18.33
11 COMBINATION LOAD CASE 11 20.56 270.63 2.11 0.10 0.42 -21.71
12 COMBINATION LOAD CASE 12 3.14 158.62 -28.54 -42.45 0.33 -1.03
13 COMBINATION LOAD CASE 13 4.09 305.72 30.10 38.73 -0.35 -2.36
5 COMBINATION LOAD CASE 5 5.08 393.58 1.35 -1.57 0.02 -1.72
6 COMBINATION LOAD CASE 6 -6.78 320.88 -0.38 -3.77 -0.09 21.97
7 COMBINATION LOAD CASE 7 18.34 375.20 4.98 2.27 0.20 -26.07
8 COMBINATION LOAD CASE 8 5.67 396.64 -50.01 -60.70 0.63 -2.02
2 9 COMBINATION LOAD CASE 9 5.88 299.44 54.62 59.21 -0.51 -2.09
10 COMBINATION LOAD CASE 10 -4.83 362.75 -0.60 -3.82 -0.09 17.43
11 COMBINATION LOAD CASE 11 15.27 406.20 3.68 1.01 0.14 -21.00
12 COMBINATION LOAD CASE 12 5.14 423.35 -40.31 -49.37 0.48 -1.76
13 COMBINATION LOAD CASE 13 5.30 345.60 43.39 46.56 -0.43 -1.82
5 COMBINATION LOAD CASE 5 5.08 303.06 -14.29 -10.95 0.49 -3.65
6 COMBINATION LOAD CASE 6 -19.22 214.59 -16.22 -13.08 0.53 23.67
7 COMBINATION LOAD CASE 7 29.60 318.64 -13.01 -8.35 0.17 -31.02
8 COMBINATION LOAD CASE 8 5.51 308.08 -44.52 -57.51 0.89 -4.14
3 9 COMBINATION LOAD CASE 9 4.87 225.16 15.30 36.09 -0.19 -3.21
10 COMBINATION LOAD CASE 10 -14.43 254.15 -15.64 -12.80 0.61 18.22
11 COMBINATION LOAD CASE 11 24.63 337.39 -13.07 -9.01 0.32 -25.53
12 COMBINATION LOAD CASE 12 5.36 328.94 -38.28 -48.34 0.89 -4.03
13 COMBINATION LOAD CASE 13 4.85 262.61 9.58 26.53 0.03 -3.29
5 COMBINATION LOAD CASE 5 -4.10 305.50 5.58 -0.37 -0.08 3.16
6 COMBINATION LOAD CASE 6 -33.89 238.17 3.99 -3.01 -0.51 33.62
7 COMBINATION LOAD CASE 7 25.49 313.30 5.84 0.78 0.40 -27.11
8 COMBINATION LOAD CASE 8 -5.12 220.52 -17.64 -56.40 0.35 4.27
4 9 COMBINATION LOAD CASE 9 -3.28 330.95 27.47 54.16 -0.46 2.24
10 COMBINATION LOAD CASE 10 -27.87 269.49 4.71 -2.03 -0.44 27.48
11 COMBINATION LOAD CASE 11 19.63 329.59 6.18 1.00 0.29 -21.11
12 COMBINATION LOAD CASE 12 -4.86 255.37 -12.60 -44.74 0.25 3.99
13 COMBINATION LOAD CASE 13 -3.38 343.71 23.49 43.71 -0.40 2.37
5 COMBINATION LOAD CASE 5 -7.30 411.42 -5.66 -6.74 0.09 6.17
6 COMBINATION LOAD CASE 6 -26.31 284.94 -5.89 -8.62 -0.45 34.30
7 COMBINATION LOAD CASE 7 10.63 391.19 -5.38 -5.62 0.51 -21.19
8 COMBINATION LOAD CASE 8 -8.24 373.65 -26.99 -61.65 -0.01 6.80
C3 5 9 COMBINATION LOAD CASE 9 -7.43 302.48 15.71 47.41 0.07 6.31
10 COMBINATION LOAD CASE 10 -22.19 354.25 -5.86 -8.02 -0.30 28.44

Page 1 of 76
COLUM
Node L/C Hori. Vert. Hori. Moment
N NO.

Fx Mton Fy Mton Fz Mton Mx My Mz

C3 5
MTon-m MTon-m MTon-m

11 COMBINATION LOAD CASE 11 7.37 439.25 -5.45 -5.61 0.46 -15.95


12 COMBINATION LOAD CASE 12 -7.73 425.22 -22.74 -50.44 0.05 6.44
13 COMBINATION LOAD CASE 13 -7.09 368.28 11.42 36.81 0.11 6.05
5 COMBINATION LOAD CASE 5 -0.78 311.95 -2.67 -4.98 -0.29 -0.78
6 COMBINATION LOAD CASE 6 -62.53 133.01 -1.65 -3.30 -0.08 69.22
7 COMBINATION LOAD CASE 7 60.73 404.76 -1.82 -3.27 -0.20 -70.49
8 COMBINATION LOAD CASE 8 1.71 293.29 -10.47 -23.59 -0.45 -2.89
6 9 COMBINATION LOAD CASE 9 -3.51 244.47 7.00 17.02 0.18 1.62
10 COMBINATION LOAD CASE 10 -50.11 194.63 -2.41 -4.65 -0.21 55.13
11 COMBINATION LOAD CASE 11 48.50 412.04 -2.55 -4.63 -0.31 -56.63
12 COMBINATION LOAD CASE 12 1.29 322.86 -9.47 -20.88 -0.51 -2.56
13 COMBINATION LOAD CASE 13 -2.89 283.81 4.51 11.60 -0.01 1.06
5 COMBINATION LOAD CASE 5 -1.45 186.11 -0.56 -4.62 0.21 1.49
6 COMBINATION LOAD CASE 6 -31.24 156.04 -2.55 -8.61 0.47 31.94
7 COMBINATION LOAD CASE 7 28.14 184.34 -0.58 -3.56 0.29 -28.77
8 COMBINATION LOAD CASE 8 -2.53 139.47 -19.77 -61.00 0.70 2.62
7 9 COMBINATION LOAD CASE 9 -0.57 200.91 16.65 48.83 0.07 0.55
10 COMBINATION LOAD CASE 10 -25.22 171.61 -1.55 -6.93 0.32 25.80
11 COMBINATION LOAD CASE 11 22.28 194.24 0.02 -2.89 0.17 -22.77
12 COMBINATION LOAD CASE 12 -2.26 158.35 -15.33 -48.84 0.50 2.34
13 COMBINATION LOAD CASE 13 -0.68 207.50 13.80 39.02 -0.01 0.68

Page 2 of 76
COLUM
Node L/C Hori. Vert. Hori. Moment
N NO.

Fx Mton Fy Mton Fz Mton Mx My Mz

MTon-m MTon-m MTon-m

5 COMBINATION LOAD CASE 5 11.36 253.48 1.78 -4.40 0.20 -5.47


6 COMBINATION LOAD CASE 6 -3.51 296.51 0.41 -6.77 0.50 20.05
7 COMBINATION LOAD CASE 7 26.39 154.32 1.41 -3.78 0.29 -31.02
8 COMBINATION LOAD CASE 8 14.39 233.01 -17.80 -59.77 1.11 -7.33
8 9 COMBINATION LOAD CASE 9 8.49 217.82 19.61 49.22 -0.32 -3.64
10 COMBINATION LOAD CASE 10 -0.59 304.75 1.21 -5.77 0.33 14.96
11 COMBINATION LOAD CASE 11 23.34 190.99 2.00 -3.38 0.15 -25.90
12 COMBINATION LOAD CASE 12 13.73 253.95 -13.36 -48.17 0.82 -6.95
13 COMBINATION LOAD CASE 13 9.02 241.79 16.57 39.02 -0.33 -4.00
5 COMBINATION LOAD CASE 5 -0.33 238.29 -4.29 -4.32 -0.26 -1.14
6 COMBINATION LOAD CASE 6 -46.21 369.73 -2.93 -3.62 -0.11 59.61
7 COMBINATION LOAD CASE 7 46.11 73.60 -4.41 -3.72 0.03 -62.09
8 COMBINATION LOAD CASE 8 2.26 356.57 -33.44 -34.97 -0.32 -3.32
9 9 COMBINATION LOAD CASE 9 -2.35 86.76 26.10 27.62 0.24 0.84
10 COMBINATION LOAD CASE 10 -37.21 353.42 -3.57 -4.15 -0.27 47.52
11 COMBINATION LOAD CASE 11 36.66 116.52 -4.76 -4.23 -0.16 -49.84
12 COMBINATION LOAD CASE 12 1.57 342.89 -27.98 -29.22 -0.44 -2.82
13 COMBINATION LOAD CASE 13 -2.12 127.04 19.65 20.85 0.01 0.50
5 COMBINATION LOAD CASE 5 -1.57 201.88 -7.05 -8.68 0.04 0.75
6 COMBINATION LOAD CASE 6 -26.12 87.09 -4.71 -7.79 -0.31 27.73
7 COMBINATION LOAD CASE 7 22.25 269.13 -6.84 -6.68 -0.07 -25.68
8 COMBINATION LOAD CASE 8 -1.41 83.37 -58.13 -73.24 -0.68 0.71
C5 10 9 COMBINATION LOAD CASE 9 -2.47 272.85 46.58 58.77 0.31 1.35
10 COMBINATION LOAD CASE 10 -21.00 124.31 -5.95 -8.83 -0.10 22.17
11 COMBINATION LOAD CASE 11 17.70 269.94 -7.65 -7.95 0.09 -20.56
12 COMBINATION LOAD CASE 12 -1.22 121.33 -48.68 -61.19 -0.40 0.55
13 COMBINATION LOAD CASE 13 -2.07 272.92 35.08 44.41 0.39 1.06
5 COMBINATION LOAD CASE 5 1.24 310.11 9.96 0.93 -0.18 -0.20
6 COMBINATION LOAD CASE 6 -28.10 326.23 9.60 -2.22 -0.69 29.96
7 COMBINATION LOAD CASE 7 30.10 223.28 6.70 -2.64 0.52 -30.00
8 COMBINATION LOAD CASE 8 0.11 248.00 -14.49 -61.90 0.10 0.95
11 9 COMBINATION LOAD CASE 9 1.89 301.51 30.80 57.04 -0.27 -0.99
10 COMBINATION LOAD CASE 10 -22.09 344.22 10.76 0.43 -0.64 23.82
11 COMBINATION LOAD CASE 11 24.47 261.86 8.44 0.09 0.32 -24.15
12 COMBINATION LOAD CASE 12 0.48 281.63 -8.52 -47.32 -0.01 0.61
13 COMBINATION LOAD CASE 13 1.91 324.44 27.71 47.84 -0.30 -0.94
5 COMBINATION LOAD CASE 5 3.42 354.33 -0.23 -2.97 -0.35 -2.37
6 COMBINATION LOAD CASE 6 -25.73 400.58 2.36 1.42 -0.78 27.49
7 COMBINATION LOAD CASE 7 31.89 196.24 0.80 -0.38 -0.35 -31.72
8 COMBINATION LOAD CASE 8 3.71 301.43 -17.09 -55.26 0.97 -2.49
C6 12 9 COMBINATION LOAD CASE 9 2.45 295.40 20.25 56.29 -2.10 -1.73
10 COMBINATION LOAD CASE 10 -19.69 424.88 0.76 -1.55 -0.57 21.36
11 COMBINATION LOAD CASE 11 26.40 261.41 -0.50 -2.99 -0.23 -26.00

Page 3 of 76
COLUM
Node L/C Hori. Vert. Hori. Moment
N NO.

Fx Mton Fy Mton Fz Mton Mx My Mz


C6 12

MTon-m MTon-m MTon-m

12 COMBINATION LOAD CASE 12 3.86 345.56 -14.80 -46.89 0.84 -2.62


13 COMBINATION LOAD CASE 13 2.85 340.73 15.07 42.35 -1.63 -2.02

Page 4 of 76
COLUM
Node L/C Hori. Vert. Hori. Moment
N NO.

Fx Mton Fy Mton Fz Mton Mx My Mz

MTon-m MTon-m MTon-m

5 COMBINATION LOAD CASE 5 -1.95 367.91 4.95 4.71 -0.28 1.79


6 COMBINATION LOAD CASE 6 -30.21 318.41 1.06 -2.47 -0.15 31.23
7 COMBINATION LOAD CASE 7 26.34 317.38 1.37 -0.87 -0.26 -27.64
8 COMBINATION LOAD CASE 8 -2.86 291.76 -19.20 -61.85 -0.07 2.75
13 9 COMBINATION LOAD CASE 9 -1.02 344.03 21.63 58.51 -0.34 0.84
10 COMBINATION LOAD CASE 10 -24.57 358.32 4.08 2.79 -0.22 25.34
11 COMBINATION LOAD CASE 11 20.67 357.49 4.32 4.07 -0.31 -21.76
12 COMBINATION LOAD CASE 12 -2.68 337.00 -12.13 -44.72 -0.16 2.55
13 COMBINATION LOAD CASE 13 -1.21 378.81 20.53 51.58 -0.37 1.02
5 COMBINATION LOAD CASE 5 0.59 576.21 4.98 5.03 0.01 -0.55
6 COMBINATION LOAD CASE 6 -27.44 497.85 8.08 10.46 0.06 28.59
7 COMBINATION LOAD CASE 7 28.41 487.27 7.55 10.28 -0.13 -29.48
8 COMBINATION LOAD CASE 8 0.38 521.22 -12.69 -49.72 -0.06 -0.36
14 9 COMBINATION LOAD CASE 9 0.59 463.90 28.32 70.46 -0.01 -0.54
10 COMBINATION LOAD CASE 10 -21.77 563.71 5.76 6.17 0.08 22.70
11 COMBINATION LOAD CASE 11 22.91 555.25 5.33 6.03 -0.08 -23.76
12 COMBINATION LOAD CASE 12 0.48 582.41 -10.86 -41.98 -0.02 -0.46
13 COMBINATION LOAD CASE 13 0.65 536.55 21.95 54.17 0.02 -0.60

Page 5 of 76
COLUM
Node L/C Hori. Vert. Hori. Moment
N NO.

Fx Mton Fy Mton Fz Mton Mx My Mz

MTon-m MTon-m MTon-m

5 COMBINATION LOAD CASE 5 -1.19 358.10 5.92 6.16 0.09 1.33


6 COMBINATION LOAD CASE 6 -29.54 304.48 1.83 -0.94 -0.01 30.80
7 COMBINATION LOAD CASE 7 26.95 314.71 2.25 0.10 0.16 -28.00
8 COMBINATION LOAD CASE 8 -2.15 282.07 -18.78 -61.91 0.14 2.29
C7 15 9 COMBINATION LOAD CASE 9 -0.44 337.13 22.86 61.07 0.00 0.52
10 COMBINATION LOAD CASE 10 -23.80 344.30 4.98 4.43 0.02 24.87
11 COMBINATION LOAD CASE 11 21.38 352.49 5.31 5.26 0.15 -22.17
12 COMBINATION LOAD CASE 12 -1.89 326.37 -11.51 -44.34 0.14 2.05
13 COMBINATION LOAD CASE 13 -0.53 370.42 21.80 54.04 0.02 0.64
5 COMBINATION LOAD CASE 5 0.35 576.13 2.00 -0.67 0.27 -0.34
6 COMBINATION LOAD CASE 6 -27.56 486.90 5.05 5.00 0.25 28.70
7 COMBINATION LOAD CASE 7 28.02 496.61 5.37 5.86 0.24 -29.18
8 COMBINATION LOAD CASE 8 0.17 519.44 -15.12 -55.22 0.31 -0.17
16 9 COMBINATION LOAD CASE 9 0.29 464.07 25.53 66.08 0.18 -0.31
10 COMBINATION LOAD CASE 10 -21.91 555.37 2.51 0.21 0.27 22.83
11 COMBINATION LOAD CASE 11 22.56 563.13 2.77 0.90 0.27 -23.48
12 COMBINATION LOAD CASE 12 0.27 581.40 -13.62 -47.97 0.32 -0.27
13 COMBINATION LOAD CASE 13 0.38 537.10 18.90 49.07 0.22 -0.38
5 COMBINATION LOAD CASE 5 -1.62 358.35 5.32 4.62 0.16 1.59
6 COMBINATION LOAD CASE 6 -29.73 314.80 1.54 -1.74 0.07 30.88
7 COMBINATION LOAD CASE 7 26.68 304.94 1.48 -1.87 0.22 -27.84
8 COMBINATION LOAD CASE 8 -2.31 282.32 -19.52 -63.98 0.18 2.34
C8 17 9 COMBINATION LOAD CASE 9 -0.73 337.42 22.54 60.37 0.11 0.71
10 COMBINATION LOAD CASE 10 -24.17 352.60 4.59 3.38 0.10 25.07
11 COMBINATION LOAD CASE 11 20.96 344.71 4.53 3.28 0.22 -21.91
12 COMBINATION LOAD CASE 12 -2.24 326.61 -12.27 -46.41 0.19 2.23
13 COMBINATION LOAD CASE 13 -0.97 370.70 21.38 53.07 0.13 0.92
5 COMBINATION LOAD CASE 5 0.26 573.80 1.47 -2.07 -0.05 -0.27
6 COMBINATION LOAD CASE 6 -27.54 493.99 4.74 4.21 -0.05 28.70
7 COMBINATION LOAD CASE 7 28.02 485.43 4.72 4.14 -0.04 -29.16
8 COMBINATION LOAD CASE 8 0.16 517.35 -15.87 -57.24 0.02 -0.14
18 9 COMBINATION LOAD CASE 9 0.33 462.07 25.33 65.59 -0.11 -0.32
10 COMBINATION LOAD CASE 10 -21.97 560.40 2.13 -0.79 -0.05 22.89
11 COMBINATION LOAD CASE 11 22.48 553.56 2.12 -0.85 -0.04 -23.40
12 COMBINATION LOAD CASE 12 0.19 579.09 -14.36 -49.95 0.01 -0.19
13 COMBINATION LOAD CASE 13 0.32 534.87 18.61 48.31 -0.10 -0.33
5 COMBINATION LOAD CASE 5 -1.15 362.30 3.23 0.40 0.34 1.32
6 COMBINATION LOAD CASE 6 -29.36 311.20 -0.22 -5.02 0.23 30.66
7 COMBINATION LOAD CASE 7 27.03 313.62 -0.84 -6.56 0.38 -28.03
8 COMBINATION LOAD CASE 8 -1.84 284.89 -22.19 -68.76 0.43 2.03
C9 19 9 COMBINATION LOAD CASE 9 -0.48 339.94 21.13 57.18 0.17 0.60
10 COMBINATION LOAD CASE 10 -23.70 351.35 2.73 -0.22 0.27 24.80
11 COMBINATION LOAD CASE 11 21.40 353.29 2.23 -1.46 0.39 -22.16

Page 6 of 76
COLUM
Node L/C Hori. Vert. Hori. Moment
N NO.

Fx Mton Fy Mton Fz Mton Mx My Mz


C9 19

MTon-m MTon-m MTon-m

12 COMBINATION LOAD CASE 12 -1.69 330.30 -14.85 -51.22 0.43 1.89


13 COMBINATION LOAD CASE 13 -0.61 374.34 19.80 49.54 0.22 0.75
5 COMBINATION LOAD CASE 5 0.35 582.46 4.32 2.26 -0.07 -0.28
6 COMBINATION LOAD CASE 6 -27.46 496.35 7.33 8.30 -0.08 28.69
7 COMBINATION LOAD CASE 7 28.06 498.67 7.39 7.90 -0.06 -29.14
8 COMBINATION LOAD CASE 8 0.19 523.93 -13.95 -54.26 0.04 -0.11
20 9 COMBINATION LOAD CASE 9 0.41 471.09 28.67 70.47 -0.17 -0.34
10 COMBINATION LOAD CASE 10 -21.87 564.54 4.91 3.59 -0.08 22.86
11 COMBINATION LOAD CASE 11 22.55 566.39 4.95 3.27 -0.06 -23.40
12 COMBINATION LOAD CASE 12 0.26 586.60 -12.12 -46.47 0.01 -0.18
13 COMBINATION LOAD CASE 13 0.43 544.33 21.98 53.32 -0.16 -0.36
5 COMBINATION LOAD CASE 5 -3.30 255.08 -0.16 -6.12 0.07 2.66
6 COMBINATION LOAD CASE 6 -32.12 137.64 -2.18 -8.79 -0.29 32.37
7 COMBINATION LOAD CASE 7 25.95 304.22 -2.36 -10.39 -0.27 -27.37
8 COMBINATION LOAD CASE 8 -4.05 187.49 -21.33 -67.29 -1.92 3.37
21 9 COMBINATION LOAD CASE 9 -2.11 254.37 16.79 48.11 1.37 1.63
10 COMBINATION LOAD CASE 10 -26.48 181.62 -0.51 -6.17 -0.01 26.53
11 COMBINATION LOAD CASE 11 19.97 314.88 -0.65 -7.45 0.01 -21.27
12 COMBINATION LOAD CASE 12 -4.03 221.50 -15.83 -52.97 -1.31 3.33
13 COMBINATION LOAD CASE 13 -2.48 275.00 14.67 39.35 1.32 1.94

Page 7 of 76
COLUM
Node L/C Hori. Vert. Hori. Moment
N NO.

Fx Mton Fy Mton Fz Mton Mx My Mz

MTon-m MTon-m MTon-m

5 COMBINATION LOAD CASE 5 -2.12 460.23 2.81 -0.04 0.43 1.29


6 COMBINATION LOAD CASE 6 -30.55 314.82 5.31 5.43 0.64 30.64
7 COMBINATION LOAD CASE 7 26.77 476.81 4.18 2.78 0.81 -28.31
8 COMBINATION LOAD CASE 8 -1.81 432.24 -14.05 -53.12 -0.90 1.16
C10 22 9 COMBINATION LOAD CASE 9 -1.97 359.40 23.55 61.33 2.34 1.17
10 COMBINATION LOAD CASE 10 -25.00 382.55 3.65 1.85 0.42 24.85
11 COMBINATION LOAD CASE 11 20.86 512.14 2.75 -0.27 0.56 -22.31
12 COMBINATION LOAD CASE 12 -2.00 476.48 -11.85 -44.99 -0.81 1.27
13 COMBINATION LOAD CASE 13 -2.14 418.21 18.24 46.57 1.78 1.27
5 COMBINATION LOAD CASE 5 -2.34 155.55 -1.20 -6.10 -0.06 2.06
6 COMBINATION LOAD CASE 6 -26.10 265.99 -0.31 -4.23 -0.58 28.59
7 COMBINATION LOAD CASE 7 21.90 17.57 -0.28 -6.09 -0.13 -24.83
8 COMBINATION LOAD CASE 8 -3.15 65.92 -38.76 -60.56 -1.89 2.79
23 9 COMBINATION LOAD CASE 9 -1.06 217.64 38.17 50.23 1.18 0.97
10 COMBINATION LOAD CASE 10 -21.49 252.16 -1.03 -5.17 -0.31 23.39
11 COMBINATION LOAD CASE 11 16.91 53.43 -1.00 -6.66 0.06 -19.35
12 COMBINATION LOAD CASE 12 -3.13 92.11 -31.79 -50.23 -1.35 2.75
13 COMBINATION LOAD CASE 13 -1.45 213.48 29.76 38.40 1.11 1.29
5 COMBINATION LOAD CASE 5 -1.66 271.42 -10.38 -11.03 0.39 1.01
6 COMBINATION LOAD CASE 6 -25.04 363.94 -8.40 -8.44 0.80 27.18
7 COMBINATION LOAD CASE 7 22.40 129.24 -12.32 -12.44 0.52 -25.57
8 COMBINATION LOAD CASE 8 -1.14 314.88 -48.24 -65.44 -0.89 0.75
C11 24 9 COMBINATION LOAD CASE 9 -1.49 178.31 27.52 44.56 2.21 0.86
10 COMBINATION LOAD CASE 10 -20.57 360.34 -8.81 -9.31 0.56 22.07
11 COMBINATION LOAD CASE 11 17.38 172.58 -11.95 -12.51 0.33 -20.13
12 COMBINATION LOAD CASE 12 -1.46 321.09 -40.68 -54.91 -0.79 0.92
13 COMBINATION LOAD CASE 13 -1.73 211.83 19.93 33.09 1.69 1.02
5 COMBINATION LOAD CASE 5 -0.46 165.90 -7.90 -9.87 0.08 0.70
6 COMBINATION LOAD CASE 6 -6.71 162.36 -5.20 -6.92 0.12 18.05
7 COMBINATION LOAD CASE 7 5.46 149.91 -8.84 -10.81 0.02 -16.24
8 COMBINATION LOAD CASE 8 -0.71 162.87 -70.81 -78.98 0.62 1.06
25 9 COMBINATION LOAD CASE 9 -0.54 149.40 56.77 61.25 -0.49 0.75
10 COMBINATION LOAD CASE 10 -5.37 168.92 -6.27 -8.11 0.11 14.45
11 COMBINATION LOAD CASE 11 4.37 158.97 -9.18 -11.22 0.03 -12.98
12 COMBINATION LOAD CASE 12 -0.56 169.33 -58.75 -65.76 0.52 0.86
13 COMBINATION LOAD CASE 13 -0.43 158.56 43.31 46.43 -0.37 0.61

Page 8 of 76
COMBINED SF1

DESIGN OF FOUNDATION
COMBINED STRIP FOUNDATION TYPE: SF1 FOR COLUMN

12.2
0.5 8 0.5
1.6 1.6

1.25

2.8
0.3

1.25

1.85 8.5 1.85

0.85
1.2

0.6 BEAM
0.35 FOUNDATION

Constants :-
Unit Wt Of Soil = 18 kN/m3
Density Of Water = 10 kN/m3
Unit Weight Of Concrete = 25 kN/m3
Comp. strength of concrete fc = 20 N/mm2
Yield strength of steel fy = 500 N/mm2
Coefficient Of Friction m = 0.5
Net SBC = 50 kN/m3

With Buoyancy :
Gross SBC = 50 + (18 - 10) x 1.2
59.6 kN/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 50 + (18 - 10) x 1.2
72.1 kN/m2 --- Where increase in SBC is allowed.
(Wind / EQ 25% increase)
Without Buoyancy :
Gross SBC = 50 + 18 x 1.2
71.6 kN/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 50 + 18 x 1.2
84.1 kN/m2 --- Where increase in SBC is allowed.
Shape Of Foundation :- (Wind / EQ 25% increase)
Length Of Foundation Lf = 12.2 m
Width Of Foundation Wf = 2.8 m
Thickness Of Foundation Tf = 0.35 m
Founding Depth Df = 1.2 m
Length Of Strip beam Lp = 12.2 m
Width Of Strip Wp = 0.5 m
Height Of Strip Beam Hp = 0.6 m --(Support Reaction Considered at Base of footing)

Section Modulus Zxx = 1 / 6 x 12.2 x 2.8 x 2.8


= 15.942 m3
Section Modulus Zzz = 1 / 6 x 2.8 x 12.2 x 12.2
= 69.459 m3

Calculation Of Soil, Fdn & Strip Beam Weights :-


Selfweight Of Foundation = 12.2 x 2.8 x 0.35 x 25
= 298.9 kN
Selfweight Of Soil = 18 x 0.85 x ( 12.2 x 2.8 - 0.5 x 12.2 x 2 )
= 335.99 kN
Selfweight Of Pedestal = 25 x 0.5 x 12.2 x 0.6
= 183 kN
Buoyant Weight = -10 x 12.2 x 2.8 x 1.2
= -409.92 kN

Total weight without buoyancy = 298.9 + 335.99 + 183


= 817.89 kN
Total weight with buoyancy = 298.9 + 335.99 + 183 + -409.92
= 407.97 kN
d

2.8 0.5
d

COMBINED SF1

4.25
8.5

Critical Section = At distance d from face of Strip Beam


Maximum Pressure = 47.939 kN/m2 ---- For without Buoynacy Condition

At Width
Depth 350 mm
Length at critical section = 1150 mm
Width at critical section = 1000 mm
Shear Force = 47.939 x 1.15 x 1
Allowable Shear Stress = 56 kN
456","----Refer Table 21 of IS
without Shear R/f= 0.360 N/mm2 456")
k = 1 ---- Refer clause no. 40.2 of IS 456
tc = 0.36 N/mm2 Designed Shear Stress =
Shear Strength 115.2 kN ok Corresponding Length =

Design Of Foundation
a) Calculation of Reinforcement at Bottom Strip Slab
Maximum Pressure = 71.989 kN/m2 --- Without Buoyancy Load Case
Pre. due to Soil & fdn wt = ( 298.9 + 335.99 ) / ( 12.2 x 2.8 )
= 18.59 kN/m2
Net causing moment = 53.399 kN/m2
Maximum Projection of fdn = 1.15 m
Bending Moment = 53.399 x 1.15 x 1.15 / 2
Design Bending Moment = 52.965 kN.m

Design for area of steel and shear for singly reinforced beam by limit state design method
Calculation of Ast req for beams
Ref IS 456-2000 Cl G-1.1b & G-1.1c For sections without compression reinforcement

fy fck b D Cc Cg of bar d Mu lim pt lim


N/mm2 N/mm2 mm mm mm mm mm kN.m %
500 20 1000 300 50 20 230 140.71 0.75

Mu support Ast req. spt pt req.spt check for depth


kNm mm2 % d req mm d prov mm Result

52.965 564.26 0.25 141.11 230 okay

Reinforcement details provided at support and span of beam


Reinf. details at support Reinf. details at span
Nos. dia Ast support pt support Result Nos. dia Ast span pt span Result
mm mm2 % mm mm2 %
3 12 2 16
942.48 0.41 okay 1005.31 0.44 okay
3 16 3 16

Ast = 942.48 mm2


Min. percentage of re-bar = 0.17 %
Ast = 595 mm2
Area of bar = 942.48 mm2 (for width of 1M)
Spacing = 1000 mm
Provide Spacing = 166.667 mm

Provide 16mm @ 300mm c/c+12mm@ 300 mm c/c

b) Calculation of Reinforcement Strip Beam

The BM is obtaained by using a coefficient of


At Support =WL2/12
At Center =WL2/24
The Max. SF is obtaained by using a coefficient of
At Support =WL/2

CLEAR SPAN "L" 8 m


Width "B" 2.8 m
Length of footing 12.2 m
Area Load = 53.399 kN/m2
Equivalent UDL 224.2758 kN/m
Max. Moment at
At Support, 1196.138 KN-m
At Center 598.0688 KN-m

Max. Ultimate Shear Force at


At Support, 897.1032 KN

Strip Beam cover 0.06 m


Depth D 0.95 m
Width W 0.5 m
deff deff 0.89 m
Design for area of steel and shear for singly reinforced beam by limit state design method
Calculation of Ast req for beams
Ref IS 456-2000 Cl G-1.1b & G-1.1c For sections without compression reinforcement

fy fck b D Cc Cg of bar d Mu lim pt lim


N/mm2 N/mm2 mm mm mm mm mm kN.m %

500 20 500 950 60 10 880 1029.95 0.75

So the beam is designed as Doubled Reinforced Section

Design for area of steel and shear for doubly reinforced beam by limit state design method
Ref IS 456-2000 Cl G-1.2 For sections with compression reinforcement

fy fck b D clear cover clear cover cg cg d d/


on ten.face on com.face of tension of comp. for tension for comp.
COMBINED SF3

DESIGN OF FOUNDATION
COMBINED STRIP FOUNDATION TYPE: SF2 FOR COLUMN

12.2
0.5 8 0.5
1.6 1.6

0.95

2.2
0.3

0.95

1.85 8.5 1.85

0.85
1.2

0.6 BEAM
0.35 FOUNDATION

Constants :-
Unit Wt Of Soil = 18 kN/m3
Density Of Water = 10 kN/m3
Unit Weight Of Concrete = 25 kN/m3
Comp. strength of concrete fc = 20 N/mm2
Yield strength of steel fy = 500 N/mm2
Coefficient Of Friction m = 0.5
Net SBC = 50 kN/m3

With Buoyancy :
Gross SBC = 50 + (18 - 10) x 1.2
59.6 kN/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 50 + (18 - 10) x 1.2
72.1 kN/m2 --- Where increase in SBC is allowed.
(Wind / EQ 25% increase)
Without Buoyancy :
Gross SBC = 50 + 18 x 1.2
71.6 kN/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 50 + 18 x 1.2
84.1 kN/m2 --- Where increase in SBC is allowed.
Shape Of Foundation :- (Wind / EQ 25% increase)
Length Of Foundation Lf = 12.2 m
Width Of Foundation Wf = 2.2 m
Thickness Of Foundation Tf = 0.35 m
Founding Depth Df = 1.2 m
Length Of Strip beam Lp = 12.2 m
Width Of Strip Wp = 0.5 m
Height Of Strip Beam Hp = 0.6 m --(Support Reaction Considered at Base of footing)

Section Modulus Zxx = 1 / 6 x 12.2 x 2.2 x 2.2


= 9.842 m3
Section Modulus Zzz = 1 / 6 x 2.2 x 12.2 x 12.2
= 54.575 m3

Calculation Of Soil, Fdn & Strip Beam Weights :-


Selfweight Of Foundation = 12.2 x 2.2 x 0.35 x 25
= 234.85 kN
Selfweight Of Soil = 18 x 0.85 x ( 12.2 x 2.2 - 0.5 x 12.2 x 2 )
= 223.99 kN
Selfweight Of Pedestal = 25 x 0.5 x 12.2 x 0.6
= 183 kN
Buoyant Weight = -10 x 12.2 x 2.2 x 1.2
= -322.08 kN

Total weight without buoyancy = 234.85 + 223.99 + 183


= 641.84 kN
Total weight with buoyancy = 234.85 + 223.99 + 183 + -322.08
= 319.76 kN
0.85

2.2 0.5
d

COMBINED SF3

4.25
8.5

Critical Section = At distance d from face of Strip Beam


Maximum Pressure = 37.841 kN/m2 ---- For without Buoynacy Condition

At Width
Depth 350 mm
Length at critical section = 850 mm
Width at critical section = 1000 mm
Shear Force = 37.841 x 0.85 x 1
Allowable Shear Stress = 33 kN
456","----Refer Table 21 of IS
without Shear R/f= 0.360 N/mm2 456")
k = 1 ---- Refer clause no. 40.2 of IS 456
tc = 0.36 N/mm2 Designed Shear Stress =
Shear Strength 115.2 kN ok Corresponding Length =

Design Of Foundation
a) Calculation of Reinforcement at Bottom Strip Slab
Maximum Pressure = 61.891 kN/m2 --- Without Buoyancy Load Case
Pre. due to Soil & fdn wt = ( 234.85 + 223.99 ) / ( 12.2 x 2.2 )
= 17.1 kN/m2
Net causing moment = 44.791 kN/m2
Maximum Projection of fdn = 0.85 m
Bending Moment = 44.791 x 0.85 x 0.85 / 2
Design Bending Moment = 24.27 kN.m

Design for area of steel and shear for singly reinforced beam by limit state design method
Calculation of Ast req for beams
Ref IS 456-2000 Cl G-1.1b & G-1.1c For sections without compression reinforcement

fy fck b D Cc Cg of bar d Mu lim pt lim


N/mm2 N/mm2 mm mm mm mm mm kN.m %
500 20 1000 300 50 20 230 140.71 0.75

Mu support Ast min pt req.spt check for depth


kNm mm2 % d req mm d prov mm Result

24.27 391.00 0.17 95.52 230 okay

Reinforcement details provided at support and span of beam


Reinf. details at support Reinf. details at span
Nos. dia Ast support pt support Result Nos. dia Ast span pt span Result
mm mm2 % mm mm2 %
3 12 2 16
942.48 0.41 okay 1005.31 0.44 okay
3 16 3 16

Ast = 942.48 mm2


Min. percentage of re-bar = 0.17 %
Ast = 595 mm2
Area of bar = 942.48 mm2 (for width of 1M)
Spacing = 1000 mm
Provide Spacing = 166.667 mm

Provide 16mm @ 300mm c/c+12mm@ 300 mm c/c

b) Calculation of Reinforcement Strip Beam

The BM is obtaained by using a coefficient of


At Support =WL2/12
At Center =WL2/24
The Max. SF is obtaained by using a coefficient of
At Support =WL/2

CLEAR SPAN "L" 8 m


Width "B" 2.2 m
Length of footing 12.2 m
Area Load = 44.791 kN/m2
Equivalent UDL 147.8103 kN/m
Max. Moment at
At Support, 788.3216 KN-m
At Center 394.1608 KN-m

Max. Ultimate Shear Force at


At Support, 591.2412 KN

Strip Beam cover 0.06 m


Depth D 0.95 m
Width W 0.5 m
deff deff 0.89 m
Design for area of steel and shear for singly reinforced beam by limit state design method
Calculation of Ast req for beams
Ref IS 456-2000 Cl G-1.1b & G-1.1c For sections without compression reinforcement

fy fck b D Cc Cg of bar d Mu lim pt lim


N/mm2 N/mm2 mm mm mm mm mm kN.m %

500 20 500 950 60 10 880 1029.95 0.75

So the beam is designed as Doubled Reinforced Section

Design for area of steel and shear for doubly reinforced beam by limit state design method
Ref IS 456-2000 Cl G-1.2 For sections with compression reinforcement

fy fck b D clear cover clear cover cg cg d d/


on ten.face on com.face of tension of comp. for tension for comp.
COMBINED SF2 (2)

DESIGN OF FOUNDATION
COMBINED STRIP FOUNDATION TYPE: SF2 FOR COLUMN

12.2
0.5 8 0.5
1.6 1.6

1.1

2.5
0.3

1.1

1.85 8.5 1.85

0.85
1.2

0.6 BEAM
0.35 FOUNDATION

Constants :-
Unit Wt Of Soil = 18 kN/m3
Density Of Water = 10 kN/m3
Unit Weight Of Concrete = 25 kN/m3
Comp. strength of concrete fc = 20 N/mm2
Yield strength of steel fy = 500 N/mm2
Coefficient Of Friction m = 0.5
Net SBC = 50 kN/m3

With Buoyancy :
Gross SBC = 50 + (18 - 10) x 1.2
59.6 kN/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 50 + (18 - 10) x 1.2
72.1 kN/m2 --- Where increase in SBC is allowed.
(Wind / EQ 25% increase)
Without Buoyancy :
Gross SBC = 50 + 18 x 1.2
71.6 kN/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 50 + 18 x 1.2
84.1 kN/m2 --- Where increase in SBC is allowed.
Shape Of Foundation :- (Wind / EQ 25% increase)
Length Of Foundation Lf = 12.2 m
Width Of Foundation Wf = 2.5 m
Thickness Of Foundation Tf = 0.35 m
Founding Depth Df = 1.2 m
Length Of Strip beam Lp = 12.2 m
Width Of Strip Wp = 0.5 m
Height Of Strip Beam Hp = 0.6 m --(Support Reaction Considered at Base of footing)

Section Modulus Zxx = 1 / 6 x 12.2 x 2.5 x 2.5


= 12.709 m3
Section Modulus Zzz = 1 / 6 x 2.5 x 12.2 x 12.2
= 62.017 m3

Calculation Of Soil, Fdn & Strip Beam Weights :-


Selfweight Of Foundation = 12.2 x 2.5 x 0.35 x 25
= 266.88 kN
Selfweight Of Soil = 18 x 0.85 x ( 12.2 x 2.5 - 0.5 x 12.2 x 2 )
= 279.99 kN
Selfweight Of Pedestal = 25 x 0.5 x 12.2 x 0.6
= 183 kN
Buoyant Weight = -10 x 12.2 x 2.5 x 1.2
= -366 kN

Total weight without buoyancy = 266.88 + 279.99 + 183


= 729.87 kN
Total weight with buoyancy = 266.88 + 279.99 + 183 + -366
= 363.87 kN
1

2.5 0.5
d

COMBINED SF2 (2)

4.25
8.5

Critical Section = At distance d from face of Strip Beam


Maximum Pressure = 48.017 kN/m2 ---- For without Buoynacy Condition

At Width
Depth 350 mm
Length at critical section = 1000 mm
Width at critical section = 1000 mm
Shear Force = 48.017 x 1 x 1
Allowable Shear Stress = 49 kN
456","----Refer Table 21 of IS
without Shear R/f= 0.360 N/mm2 456")
k = 1 ---- Refer clause no. 40.2 of IS 456
tc = 0.36 N/mm2 Designed Shear Stress =
Shear Strength 115.2 kN ok Corresponding Length =

Design Of Foundation
a) Calculation of Reinforcement at Bottom Strip Slab
Maximum Pressure = 72.067 kN/m2 --- Without Buoyancy Load Case
Pre. due to Soil & fdn wt = ( 266.88 + 279.99 ) / ( 12.2 x 2.5 )
= 17.93 kN/m2
Net causing moment = 54.137 kN/m2
Maximum Projection of fdn = 1 m
Bending Moment = 54.137 x 1 x 1 / 2
Design Bending Moment = 40.605 kN.m

Design for area of steel and shear for singly reinforced beam by limit state design method
Calculation of Ast req for beams
Ref IS 456-2000 Cl G-1.1b & G-1.1c For sections without compression reinforcement

fy fck b D Cc Cg of bar d Mu lim pt lim


N/mm2 N/mm2 mm mm mm mm mm kN.m %
500 20 1000 300 50 20 230 140.71 0.75

Mu support Ast req. spt pt req.spt check for depth


kNm mm2 % d req mm d prov mm Result

40.605 425.75 0.19 123.55 230 okay

Reinforcement details provided at support and span of beam


Reinf. details at support Reinf. details at span
Nos. dia Ast support pt support Result Nos. dia Ast span pt span Result
mm mm2 % mm mm2 %
3 12 2 16
942.48 0.41 okay 1005.31 0.44 okay
3 16 3 16

Ast = 942.48 mm2


Min. percentage of re-bar = 0.17 %
Ast = 595 mm2
Area of bar = 942.48 mm2 (for width of 1M)
Spacing = 1000 mm
Provide Spacing = 166.667 mm

Provide 16mm @ 300mm c/c+12mm@ 300 mm c/c

b) Calculation of Reinforcement Strip Beam

The BM is obtaained by using a coefficient of


At Support =WL2/12
At Center =WL2/24
The Max. SF is obtaained by using a coefficient of
At Support =WL/2

CLEAR SPAN "L" 8 m


Width "B" 2.5 m
Length of footing 12.2 m
Area Load = 54.137 kN/m2
Equivalent UDL 203.0138 kN/m
Max. Moment at
At Support, 1082.74 KN-m
At Center 541.37 KN-m

Max. Ultimate Shear Force at


At Support, 812.055 KN

Strip Beam cover 0.06 m


Depth D 0.95 m
Width W 0.5 m
deff deff 0.89 m
Design for area of steel and shear for singly reinforced beam by limit state design method
Calculation of Ast req for beams
Ref IS 456-2000 Cl G-1.1b & G-1.1c For sections without compression reinforcement

fy fck b D Cc Cg of bar d Mu lim pt lim


N/mm2 N/mm2 mm mm mm mm mm kN.m %

500 20 500 950 60 10 880 1029.95 0.75

So the beam is designed as Doubled Reinforced Section

Design for area of steel and shear for doubly reinforced beam by limit state design method
Ref IS 456-2000 Cl G-1.2 For sections with compression reinforcement

fy fck b D clear cover clear cover cg cg d d/


on ten.face on com.face of tension of comp. for tension for comp.
JOB NO. BONGAIGAON CRB
JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING FOR COLUMN DATE 21-Jul-09
DESCRIPTION
MUMBAI C29, C30, C40 & C41 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG

DESIGN OF COMBINED FOOTING :- FOR COLUMN C29, C30, C40 & C41

13 Z

z
1.500 0.75 z
C30 C41
0.6 x x
1.5

3 X 6

C29 C40

1.500 3.5

3.000 7 3.000

FGL

1.5
2.5

Unit Wt Of Soil = 1.8 T/m3


Density Of Water = 1 T/m3
Unit Weight Of Concrete = 2.5 T/m3
Comp. strength of concrete fc = 30 N/mm2
Yield strength of steel fy = 500 N/mm2
Coefficient Of Friction m = 0.5
Net SBC = 15 T/m2
Gross SBC = 23.25 T/m2 ------ Where increase in SBC is allowed.

Length Of Foundation Lf = 13 m
Width Of Foundation Wf = 6 m
Thickness Of Foundation Tf = 1 m
Founding Depth Df = 2.5 m `
Length Of Pedestal Lp = 0.75 m
Width Of Pedestal Wp = 0.6 m
Height Of Pedestal Hp = 1.5 m

Selfweight Of Foundation = 13 x 6 x 1 x 2.5


= 195 T
Buoyant selfweight Of Foundation = 13 x 6 x 1 x 1.5
= 117 T
Selfweight Of Soil = 1.8 x 1.5 x ( 13 x 6 - 0.6 x 0.75 x 4 )
= 205.74 T
Buyoant selfweight Of Soil = 0.8 x 1.5 x ( 13 x 6 - 0.6 x 0.75 x 4 )
= 91.44 T
Selfweight Of Pedestal = 2.5 x 0.6 x 0.75 x 1.5 x 4
= 6.75 T
Buoyant selfweight Of Pedestal = 1.5 x 0.6 x 0.75 x 1.5 x 4
= 4.05 T
Total weight without buoyancy = 195 + 205.74 + 6.75
= 407.49 T
Total weight with buoyancy = 117 + 91.44 + 4.05
= 212.49 T

Load On Column A1:- (At Founding Level)

Col. No. Comb No. Load Combination FORCE-X FORCE-Y FORCE-Z MOM-X MOM-Y MOM Z
C30 50 50 1.0(DL+LL+EQUP) 0.207 104.688 -0.728 -1.156 0.05 -0.252
51 51 1.0(DL+EQUP+LL+EQX+0.3EQZ 22.464 116.926 6.355 16.275 1.709 39.646
52 52 1.0(DL+EQUP+LL-EQX-0.3EQZ- -22.085 78.4 -7.611 -18.3 -1.614 -40.076
53 53 1.0(DL+EQUP+EQX+0.3EQZ+0. 22.431 102.876 6.555 16.563 1.704 39.719
54 54 1.0(DL+EQUP-EQX-0.3EQZ-0.3 -22.119 64.35 -7.411 -18.012 -1.618 -40.003
55 55 1.0(DL+EQUP+LL+EQZ+0.3EQX 7.318 105.194 20.513 51.463 1.617 12.562
56 56 1.0(DL+EQUP+LL-EQZ-0.3EQX- -6.939 90.133 -21.769 -53.488 -1.521 -12.993
57 57 1.0(DL+EQUP+EQZ+0.3EQX+0. 7.285 91.144 20.713 51.751 1.612 12.636
58 58 1.0(DL+EQUP-EQZ-0.3EQX-0.3 -6.973 76.082 -21.569 -53.2 -1.526 -12.919
59 59 1.0(DL+EQUP+LL+EQY+0.3EQX 7.039 103.963 5.969 15.312 0.807 12.046
60 60 1.0(DL+EQUP+LL-EQY-0.3EQX- -6.66 91.364 -7.224 -17.337 -0.712 -12.476
61 61 1.0(DL+EQUP+EQY+0.3EQX+0. 7.006 89.913 6.169 15.6 0.802 12.12
62 62 1.0(DL+EQUP-EQY-0.3EQX-0.3 -6.694 77.313 -7.024 -17.049 -0.716 -12.403
63 63 1.0(DL+ EQUP +WIND X) -0.944 84.476 -0.448 -0.774 0.067 1.767
64 64 1.0(DL+ EQUP -WIND X) 1.256 82.75 -0.408 -0.675 0.019 -2.05
65 65 1.0(DL+ EQUP+LL +WIND X) -0.877 112.576 -0.848 -1.349 0.076 1.62
66 66 1.0(DL+ EQUP+LL -WIND X) 1.323 110.851 -0.808 -1.25 0.028 -2.197
67 67 1.0(DL+ EQUP +WIND Z) 0.14 83.722 0.825 2.184 0.059 -0.122
68 68 1.0(DL+ EQUP -WIND Z) 0.172 83.504 -1.681 -3.633 0.027 -0.161
69 69 1.0(DL+ EQUP+LL +WIND Z) 0.207 111.822 0.425 1.609 0.068 -0.27
70 70 1.0(DL+ EQUP+LL -WIND Z) 0.239 111.604 -2.081 -4.208 0.037 -0.308

Load On Column B1:- (At Founding Level)

Col. No. Comb No. Load Combination FORCE-X FORCE-Y FORCE-Z MOM-X MOM-Y MOM Z
C41 50 50 1.0(DL+LL+EQUP) 0.563 75.158 -1.839 -2.155 0.108 -0.63
51 51 1.0(DL+EQUP+LL+EQX+0.3EQZ 16.8 94.95 2.167 8.841 0.981 32.542
52 52 1.0(DL+EQUP+LL-EQX-0.3EQZ- -15.747 48.313 -5.951 -13.006 -0.789 -33.675
53 53 1.0(DL+EQUP+EQX+0.3EQZ+0. 16.726 87.898 2.061 8.986 0.956 32.669
54 54 1.0(DL+EQUP-EQX-0.3EQZ-0.3 -15.821 41.261 -6.057 -12.861 -0.814 -33.548
55 55 1.0(DL+EQUP+LL+EQZ+0.3EQX 6.274 98.948 10.373 31.002 1.799 11.111
56 56 1.0(DL+EQUP+LL-EQZ-0.3EQX- -5.221 44.315 -14.157 -35.166 -1.608 -12.244
57 57 1.0(DL+EQUP+EQZ+0.3EQX+0. 6.2 91.896 10.268 31.147 1.775 11.238
58 58 1.0(DL+EQUP-EQZ-0.3EQX-0.3 -5.295 37.263 -14.263 -35.021 -1.632 -12.117
59 59 1.0(DL+EQUP+LL+EQY+0.3EQX 5.66 83.39 1.933 8.212 0.71 9.874
60 60 1.0(DL+EQUP+LL-EQY-0.3EQX- -4.607 59.873 -5.717 -12.377 -0.519 -11.007
61 61 1.0(DL+EQUP+EQY+0.3EQX+0. 5.586 76.338 1.827 8.357 0.686 10.001
62 62 1.0(DL+EQUP-EQY-0.3EQX-0.3 -4.681 52.821 -5.822 -12.232 -0.543 -10.88
63 63 1.0(DL+ EQUP +WIND X) -0.361 65.551 -2.012 -1.976 0.035 1.187
64 64 1.0(DL+ EQUP -WIND X) 1.266 63.608 -1.983 -1.899 0.107 -2.066
65 65 1.0(DL+ EQUP+LL +WIND X) -0.213 79.655 -1.801 -2.266 0.084 0.933
66 66 1.0(DL+ EQUP+LL -WIND X) 1.413 77.712 -1.772 -2.189 0.156 -2.321
67 67 1.0(DL+ EQUP +WIND Z) 0.476 63.456 -1.258 0.014 0.068 -0.466
68 68 1.0(DL+ EQUP -WIND Z) 0.429 65.703 -2.738 -3.889 0.075 -0.413
69 69 1.0(DL+ EQUP+LL +WIND Z) 0.624 77.56 -1.046 -0.276 0.117 -0.721
70 70 1.0(DL+ EQUP+LL -WIND Z) 0.576 79.807 -2.526 -4.179 0.123 -0.667

Load On Column A2:- (At Founding Level)

Col. No. Comb No. Load Combination FORCE-X FORCE-Y FORCE-Z MOM-X MOM-Y MOM Z
C29 50 50 1.0(DL+LL+EQUP) -1.215 98.241 0.24 -0.395 0.039 0.854
51 51 1.0(DL+EQUP+LL+EQX+0.3EQZ 19.517 134.614 7.981 17.209 2.302 39.691
52 52 1.0(DL+EQUP+LL-EQX-0.3EQZ- -22.093 49.571 -7.64 -17.939 -2.231 -37.827
53 53 1.0(DL+EQUP+EQX+0.3EQZ+0. 19.37 122.317 7.841 17.268 2.294 39.847
54 54 1.0(DL+EQUP-EQX-0.3EQZ-0.3 -22.24 37.274 -7.78 -17.88 -2.239 -37.671
55 55 1.0(DL+EQUP+LL+EQZ+0.3EQX 5.385 134.345 24.183 53.504 1.42 13.371
56 56 1.0(DL+EQUP+LL-EQZ-0.3EQX- -7.961 49.84 -23.842 -54.235 -1.349 -11.507
57 57 1.0(DL+EQUP+EQZ+0.3EQX+0. 5.238 122.048 24.043 53.563 1.412 13.527
58 58 1.0(DL+EQUP-EQZ-0.3EQX-0.3 -8.108 37.543 -23.982 -54.176 -1.357 -11.351
59 59 1.0(DL+EQUP+LL+EQY+0.3EQX 5.13 112.221 7.591 16.29 0.891 12.866
60 60 1.0(DL+EQUP+LL-EQY-0.3EQX- -7.706 71.965 -7.25 -17.02 -0.821 -11.002
61 61 1.0(DL+EQUP+EQY+0.3EQX+0. 4.983 99.923 7.451 16.349 0.884 13.022
62 62 1.0(DL+EQUP-EQY-0.3EQX-0.3 -7.853 59.668 -7.389 -16.961 -0.828 -10.847
63 63 1.0(DL+ EQUP +WIND X) -2.534 78.387 0.028 -0.325 -0.062 3.057
64 64 1.0(DL+ EQUP -WIND X) -0.336 81.204 0.033 -0.288 0.117 -0.882
65 65 1.0(DL+ EQUP+LL +WIND X) -2.24 102.982 0.307 -0.443 -0.047 2.746
66 66 1.0(DL+ EQUP+LL -WIND X) -0.042 105.798 0.312 -0.406 0.132 -1.194
67 67 1.0(DL+ EQUP +WIND Z) -1.451 81.643 1.491 2.826 0.027 1.108
68 68 1.0(DL+ EQUP -WIND Z) -1.419 77.949 -1.43 -3.438 0.028 1.068
69 69 1.0(DL+ EQUP+LL +WIND Z) -1.158 106.237 1.77 2.708 0.042 0.796
70 70 1.0(DL+ EQUP+LL -WIND Z) -1.125 102.543 -1.151 -3.556 0.043 0.756

Load On Column B2:- (At Founding Level)

Col. No. Comb No. Load Combination FORCE-X FORCE-Y FORCE-Z MOM-X MOM-Y MOM Z
C40 50 50 1.0(DL+LL+EQUP) -2.815 99.359 -0.337 -0.612 0.093 1.791
51 51 1.0(DL+EQUP+LL+EQX+0.3EQZ 12.316 139.347 5.129 11.184 1.915 33.929
52 52 1.0(DL+EQUP+LL-EQX-0.3EQZ- -17.785 51.371 -5.75 -12.272 -1.746 -30.391
53 53 1.0(DL+EQUP+EQX+0.3EQZ+0. 12.476 131.347 5.183 11.318 1.898 33.885
54 54 1.0(DL+EQUP-EQX-0.3EQZ-0.3 -17.626 43.37 -5.696 -12.138 -1.763 -30.434
55 55 1.0(DL+EQUP+LL+EQZ+0.3EQX 2.609 165.922 15.966 35.125 1.585 13.143
56 56 1.0(DL+EQUP+LL-EQZ-0.3EQX- -8.078 24.795 -16.586 -36.213 -1.416 -9.605
57 57 1.0(DL+EQUP+EQZ+0.3EQX+0. 2.768 157.922 16.02 35.259 1.568 13.099
58 58 1.0(DL+EQUP-EQZ-0.3EQX-0.3 -7.919 16.795 -16.532 -36.079 -1.433 -9.648
59 59 1.0(DL+EQUP+LL+EQY+0.3EQX 2.02 122.039 4.751 10.504 0.867 11.917
60 60 1.0(DL+EQUP+LL-EQY-0.3EQX- -7.489 68.679 -5.372 -11.593 -0.699 -8.379
61 61 1.0(DL+EQUP+EQY+0.3EQX+0. 2.179 114.039 4.806 10.639 0.85 11.874
62 62 1.0(DL+EQUP-EQY-0.3EQX-0.3 -7.329 60.678 -5.318 -11.458 -0.715 -8.423
63 63 1.0(DL+ EQUP +WIND X) -3.368 86.17 -0.273 -0.432 0.28 3.368
64 64 1.0(DL+ EQUP -WIND X) -1.782 88.547 -0.239 -0.387 -0.145 0.082
65 65 1.0(DL+ EQUP+LL +WIND X) -3.688 102.171 -0.382 -0.702 0.313 3.456
66 66 1.0(DL+ EQUP+LL -WIND X) -2.101 104.547 -0.347 -0.657 -0.111 0.17
67 67 1.0(DL+ EQUP +WIND Z) -2.552 83.66 0.78 1.826 0.187 1.698
68 68 1.0(DL+ EQUP -WIND Z) -2.598 91.057 -1.292 -2.645 -0.052 1.752
69 69 1.0(DL+ EQUP+LL +WIND Z) -2.872 99.66 0.671 1.556 0.221 1.786
70 70 1.0(DL+ EQUP+LL -WIND Z) -2.918 107.058 -1.4 -2.915 -0.019 1.84

Summary Of Loads :- ( At foundation level)

JOINT LOAD FORCE-X FORCE-Y FORCE-Z MOM-X MOM-Y MOM Z


C30 50 0.207 104.688 -0.728 -1.156 0.05 -0.252
51 22.464 116.926 6.355 16.275 1.709 39.646
52 -22.085 78.4 -7.611 -18.3 -1.614 -40.076
53 22.431 102.876 6.555 16.563 1.704 39.719
54 -22.119 64.35 -7.411 -18.012 -1.618 -40.003
55 7.318 105.194 20.513 51.463 1.617 12.562
56 -6.939 90.133 -21.769 -53.488 -1.521 -12.993
57 7.285 91.144 20.713 51.751 1.612 12.636
58 -6.973 76.082 -21.569 -53.2 -1.526 -12.919
59 7.039 103.963 5.969 15.312 0.807 12.046
60 -6.66 91.364 -7.224 -17.337 -0.712 -12.476
61 7.006 89.913 6.169 15.6 0.802 12.12
62 -6.694 77.313 -7.024 -17.049 -0.716 -12.403
63 -0.944 84.476 -0.448 -0.774 0.067 1.767
64 1.256 82.75 -0.408 -0.675 0.019 -2.05
65 -0.877 112.576 -0.848 -1.349 0.076 1.62
66 1.323 110.851 -0.808 -1.25 0.028 -2.197
67 0.14 83.722 0.825 2.184 0.059 -0.122
68 0.172 83.504 -1.681 -3.633 0.027 -0.161
69 0.207 111.822 0.425 1.609 0.068 -0.27
70 0.239 111.604 -2.081 -4.208 0.037 -0.308

C29 50 -1.215 98.241 0.24 -0.395 0.039 0.854


51 19.517 134.614 7.981 17.209 2.302 39.691
52 -22.093 49.571 -7.64 -17.939 -2.231 -37.827
53 19.37 122.317 7.841 17.268 2.294 39.847
54 -22.24 37.274 -7.78 -17.88 -2.239 -37.671
55 5.385 134.345 24.183 53.504 1.42 13.371
56 -7.961 49.84 -23.842 -54.235 -1.349 -11.507
57 5.238 122.048 24.043 53.563 1.412 13.527
58 -8.108 37.543 -23.982 -54.176 -1.357 -11.351
59 5.13 112.221 7.591 16.29 0.891 12.866
60 -7.706 71.965 -7.25 -17.02 -0.821 -11.002
61 4.983 99.923 7.451 16.349 0.884 13.022
62 -7.853 59.668 -7.389 -16.961 -0.828 -10.847
63 -2.534 78.387 0.028 -0.325 -0.062 3.057
64 -0.336 81.204 0.033 -0.288 0.117 -0.882
65 -2.24 102.982 0.307 -0.443 -0.047 2.746
66 -0.042 105.798 0.312 -0.406 0.132 -1.194
67 -1.451 81.643 1.491 2.826 0.027 1.108
68 -1.419 77.949 -1.43 -3.438 0.028 1.068
69 -1.158 106.237 1.77 2.708 0.042 0.796
70 -1.125 102.543 -1.151 -3.556 0.043 0.756

C41 50 0.563 75.158 -1.839 -2.155 0.108 -0.63


51 16.8 94.95 2.167 8.841 0.981 32.542
52 -15.747 48.313 -5.951 -13.006 -0.789 -33.675
53 16.726 87.898 2.061 8.986 0.956 32.669
54 -15.821 41.261 -6.057 -12.861 -0.814 -33.548
55 6.274 98.948 10.373 31.002 1.799 11.111
56 -5.221 44.315 -14.157 -35.166 -1.608 -12.244
57 6.2 91.896 10.268 31.147 1.775 11.238
58 -5.295 37.263 -14.263 -35.021 -1.632 -12.117
59 5.66 83.39 1.933 8.212 0.71 9.874
60 -4.607 59.873 -5.717 -12.377 -0.519 -11.007
61 5.586 76.338 1.827 8.357 0.686 10.001
62 -4.681 52.821 -5.822 -12.232 -0.543 -10.88
63 -0.361 65.551 -2.012 -1.976 0.035 1.187
64 1.266 63.608 -1.983 -1.899 0.107 -2.066
65 -0.213 79.655 -1.801 -2.266 0.084 0.933
66 1.413 77.712 -1.772 -2.189 0.156 -2.321
67 0.476 63.456 -1.258 0.014 0.068 -0.466
68 0.429 65.703 -2.738 -3.889 0.075 -0.413
69 0.624 77.56 -1.046 -0.276 0.117 -0.721
70 0.576 79.807 -2.526 -4.179 0.123 -0.667

C40 50 -2.815 99.359 -0.337 -0.612 0.093 1.791


51 12.316 139.347 5.129 11.184 1.915 33.929
52 -17.785 51.371 -5.75 -12.272 -1.746 -30.391
53 12.476 131.347 5.183 11.318 1.898 33.885
54 -17.626 43.37 -5.696 -12.138 -1.763 -30.434
55 2.609 165.922 15.966 35.125 1.585 13.143
56 -8.078 24.795 -16.586 -36.213 -1.416 -9.605
57 2.768 157.922 16.02 35.259 1.568 13.099
58 -7.919 16.795 -16.532 -36.079 -1.433 -9.648
59 2.02 122.039 4.751 10.504 0.867 11.917
60 -7.489 68.679 -5.372 -11.593 -0.699 -8.379
61 2.179 114.039 4.806 10.639 0.85 11.874
62 -7.329 60.678 -5.318 -11.458 -0.715 -8.423
63 -3.368 86.17 -0.273 -0.432 0.28 3.368
64 -1.782 88.547 -0.239 -0.387 -0.145 0.082
65 -3.688 102.171 -0.382 -0.702 0.313 3.456
66 -2.101 104.547 -0.347 -0.657 -0.111 0.17
67 -2.552 83.66 0.78 1.826 0.187 1.698
68 -2.598 91.057 -1.292 -2.645 -0.052 1.752
69 -2.872 99.66 0.671 1.556 0.221 1.786
70 -2.918 107.058 -1.4 -2.915 -0.019 1.84

Moment On C.G :
Due to Fy
JOINT LOAD FX FY FZ MX MY MZ
C30 50 0.207 104.688 -0.728 -157.032 - -366.408
51 22.464 116.926 6.355 -175.389 - -409.241
52 -22.085 78.4 -7.611 -117.6 - -274.4
53 22.431 102.876 6.555 -154.314 - -360.066
54 -22.119 64.35 -7.411 -96.525 - -225.225
55 7.318 105.194 20.513 -157.791 - -368.179
56 -6.939 90.133 -21.769 -135.2 - -315.466
57 7.285 91.144 20.713 -136.716 - -319.004
58 -6.973 76.082 -21.569 -114.123 - -266.287
59 7.039 103.963 5.969 -155.945 - -363.871
60 -6.66 91.364 -7.224 -137.046 - -319.774
61 7.006 89.913 6.169 -134.87 - -314.696
62 -6.694 77.313 -7.024 -115.97 - -270.596
63 -0.944 84.476 -0.448 -126.714 - -295.666
64 1.256 82.75 -0.408 -124.125 - -289.625
65 -0.877 112.576 -0.848 -168.864 - -394.016
66 1.323 110.851 -0.808 -166.277 - -387.979
67 0.14 83.722 0.825 -125.583 - -293.027
68 0.172 83.504 -1.681 -125.256 - -292.264
69 0.207 111.822 0.425 -167.733 - -391.377
70 0.239 111.604 -2.081 -167.406 - -390.614

C41 50 0.563 75.158 -1.839 -112.737 - 263.053


51 16.8 94.95 2.167 -142.425 - 332.325
52 -15.747 48.313 -5.951 -72.47 - 169.096
53 16.726 87.898 2.061 -131.847 - 307.643
54 -15.821 41.261 -6.057 -61.892 - 144.414
55 6.274 98.948 10.373 -148.422 - 346.318
56 -5.221 44.315 -14.157 -66.473 - 155.103
57 6.2 91.896 10.268 -137.844 - 321.636
58 -5.295 37.263 -14.263 -55.895 - 130.421
59 5.66 83.39 1.933 -125.085 - 291.865
60 -4.607 59.873 -5.717 -89.81 - 209.556
61 5.586 76.338 1.827 -114.507 - 267.183
62 -4.681 52.821 -5.822 -79.232 - 184.874
63 -0.361 65.551 -2.012 -98.327 - 229.429
64 1.266 63.608 -1.983 -95.412 - 222.628
65 -0.213 79.655 -1.801 -119.483 - 278.793
66 1.413 77.712 -1.772 -116.568 - 271.992
67 0.476 63.456 -1.258 -95.184 - 222.096
68 0.429 65.703 -2.738 -98.555 - 229.961
69 0.624 77.56 -1.046 -116.34 - 271.46
70 0.576 79.807 -2.526 -119.711 - 279.325
C29 50 -1.215 98.241 0.24 147.362 - -343.844
51 19.517 134.614 7.981 201.921 - -471.149
52 -22.093 49.571 -7.64 74.357 - -173.499
53 19.37 122.317 7.841 183.476 - -428.11
54 -22.24 37.274 -7.78 55.911 - -130.459
55 5.385 134.345 24.183 201.518 - -470.208
56 -7.961 49.84 -23.842 74.76 - -174.44
57 5.238 122.048 24.043 183.072 - -427.168
58 -8.108 37.543 -23.982 56.315 - -131.401
59 5.13 112.221 7.591 168.332 - -392.774
60 -7.706 71.965 -7.25 107.948 - -251.878
61 4.983 99.923 7.451 149.885 - -349.731
62 -7.853 59.668 -7.389 89.502 - -208.838
63 -2.534 78.387 0.028 117.581 - -274.355
64 -0.336 81.204 0.033 121.806 - -284.214
65 -2.24 102.982 0.307 154.473 - -360.437
66 -0.042 105.798 0.312 158.697 - -370.293
67 -1.451 81.643 1.491 122.465 - -285.751
68 -1.419 77.949 -1.43 116.924 - -272.822
69 -1.158 106.237 1.77 159.356 - -371.83
70 -1.125 102.543 -1.151 153.815 - -358.901

C40 50 -2.815 99.359 -0.337 149.039 - 347.757


51 12.316 139.347 5.129 209.021 - 487.715
52 -17.785 51.371 -5.75 77.057 - 179.799
53 12.476 131.347 5.183 197.021 - 459.715
54 -17.626 43.37 -5.696 65.055 - 151.795
55 2.609 165.922 15.966 248.883 - 580.727
56 -8.078 24.795 -16.586 37.193 - 86.783
57 2.768 157.922 16.02 236.883 - 552.727
58 -7.919 16.795 -16.532 25.193 - 58.783
59 2.02 122.039 4.751 183.059 - 427.137
60 -7.489 68.679 -5.372 103.019 - 240.377
61 2.179 114.039 4.806 171.059 - 399.137
62 -7.329 60.678 -5.318 91.017 - 212.373
63 -3.368 86.17 -0.273 129.255 - 301.595
64 -1.782 88.547 -0.239 132.821 - 309.915
65 -3.688 102.171 -0.382 153.257 - 357.599
66 -2.101 104.547 -0.347 156.821 - 365.915
67 -2.552 83.66 0.78 125.49 - 292.81
68 -2.598 91.057 -1.292 136.586 - 318.7
69 -2.872 99.66 0.671 149.49 - 348.81
70 -2.918 107.058 -1.4 160.587 - 374.703

Total Reactions On foundation:

TOTAL
LOAD FX FY FZ Mxx1 Mxx2 Mxx Mzz1 Mzz2 Mzz
due to FY External Mxx1+Mxx2 due to FY External Mzz1+Mzz2
50 -3.26 377.446 -2.664 26.632 4.318 30.95 -99.442 1.763 -97.679
51 71.097 485.837 21.632 93.128 -53.509 39.619 -60.35 145.808 85.458
52 -77.71 227.655 -26.952 -38.656 61.517 22.861 -99.004 -141.969 -240.973
53 71.003 444.438 21.64 94.336 -54.135 40.201 -20.818 146.12 125.302
54 -77.806 186.255 -26.944 -37.451 60.891 23.44 -59.475 -141.656 -201.131
55 21.586 504.409 71.035 144.188 -171.094 -26.906 88.658 50.187 138.845
56 -28.199 209.083 -76.354 -89.72 179.102 89.382 -248.02 -46.349 -294.369
57 21.491 463.01 71.044 145.395 -171.72 -26.325 128.191 50.5 178.691
58 -28.295 167.683 -76.346 -88.51 178.476 89.966 -208.484 -46.035 -254.519
59 19.849 421.613 20.244 70.361 -50.318 20.043 -37.643 46.703 9.06
60 -26.462 291.881 -25.563 -15.889 58.327 42.438 -121.719 -42.864 -164.583
61 19.754 380.213 20.253 71.567 -50.945 20.622 1.893 47.017 48.91
62 -26.557 250.48 -25.553 -14.683 57.7 43.017 -82.187 -42.553 -124.74
63 -7.207 314.584 -2.705 21.795 3.507 25.302 -38.997 9.379 -29.618
64 0.404 316.109 -2.597 35.09 3.249 38.339 -41.296 -4.916 -46.212
65 -7.018 397.384 -2.724 19.383 4.76 24.143 -118.061 8.755 -109.306
66 0.593 398.908 -2.615 32.673 4.502 37.175 -120.365 -5.542 -125.907
67 -3.387 312.481 1.838 27.188 -6.85 20.338 -63.872 2.218 -61.654
68 -3.416 318.213 -7.141 29.699 13.605 43.304 -16.425 2.246 -14.179
69 -3.199 395.279 1.82 24.773 -5.597 19.176 -142.937 1.591 -141.346
70 -3.228 401.012 -7.158 27.285 14.858 42.143 -95.487 1.621 -93.866

Check For stability :-


a) Against Overturing :- (Check is done only for with buoyancy case)
It is ensured that all the four corners of foundation are in compression for all the load cases.
This means foundation will not loose contact and safe against overturning.
b) Against Sliding :- (Check is done only for with buoyancy case)

Total Sliding Forces Restoring Forces


Load Fx Fz Resultant External Soil,Fdn, Total 0.5* F.O.S. Result
Load Pedestal Load (1+2)
1 2 1+2
50 -3.26 -2.664 4.21 377.446 212.49 589.936 294.97 70.06 Safe
51 71.097 21.632 74.32 485.837 212.49 698.327 349.17 4.7 Safe
52 -77.71 -26.952 82.25 227.655 212.49 440.145 220.08 2.68 Safe
53 71.003 21.64 74.23 444.438 212.49 656.928 328.47 4.43 Safe
54 -77.806 -26.944 82.34 186.255 212.49 398.745 199.38 2.42 Safe
55 21.586 71.035 74.24 504.409 212.49 716.899 358.45 4.83 Safe
56 -28.199 -76.354 81.39 209.083 212.49 421.573 210.79 2.59 Safe
57 21.491 71.044 74.22 463.01 212.49 675.5 337.75 4.55 Safe
58 -28.295 -76.346 81.42 167.683 212.49 380.173 190.09 2.33 Safe
59 19.849 20.244 28.35 421.613 212.49 634.103 317.06 11.18 Safe
60 -26.462 -25.563 36.79 291.881 212.49 504.371 252.19 6.85 Safe
61 19.754 20.253 28.29 380.213 212.49 592.703 296.36 10.48 Safe
62 -26.557 -25.553 36.85 250.48 212.49 462.97 231.49 6.28 Safe
63 -7.207 -2.705 7.7 314.584 212.49 527.074 263.54 34.23 Safe
64 0.404 -2.597 2.63 316.109 212.49 528.599 264.3 100.49 Safe
65 -7.018 -2.724 7.53 397.384 212.49 609.874 304.94 40.5 Safe
66 0.593 -2.615 2.68 398.908 212.49 611.398 305.7 114.07 Safe
67 -3.387 1.838 3.85 312.481 212.49 524.971 262.49 68.18 Safe
68 -3.416 -7.141 7.92 318.213 212.49 530.703 265.36 33.51 Safe
69 -3.199 1.82 3.68 395.279 212.49 607.769 303.89 82.58 Safe
70 -3.228 -7.158 7.85 401.012 212.49 613.502 306.76 39.08 Safe

Check For Bearing Preasure:

Check For Pressure At All The Corners (With Buoyancy)

Load Fy From Soil+ Fdn Fy Mxx Mzz Fy/A Mxx/Zxx Mzz/Zzz 1+2-3 1+2+3 1-2+3 1-2-3
Load +Ped 1 2 3
50 377.446 212.49 589.936 30.95 -97.679 7.56 0.4 0.58 7.38 8.54 7.74 6.58
51 485.837 212.49 698.327 39.619 85.458 8.95 0.51 0.51 8.95 9.97 8.95 7.93
52 227.655 212.49 440.145 22.861 -240.973 5.64 0.29 1.43 4.5 7.36 6.78 3.92
53 444.438 212.49 656.928 40.201 125.302 8.42 0.52 0.74 8.2 9.68 8.64 7.16
54 186.255 212.49 398.745 23.44 -201.131 5.11 0.3 1.19 4.22 6.6 6 3.62
55 504.409 212.49 716.899 -26.906 138.845 9.19 0.34 0.82 8.71 10.35 9.67 8.03
56 209.083 212.49 421.573 89.382 -294.369 5.4 1.15 1.74 4.81 8.29 5.99 2.51
57 463.01 212.49 675.5 -26.325 178.691 8.66 0.34 1.06 7.94 10.06 9.38 7.26
58 167.683 212.49 380.173 89.966 -254.519 4.87 1.15 1.51 4.51 7.53 5.23 2.21
59 421.613 212.49 634.103 20.043 9.06 8.13 0.26 0.05 8.34 8.44 7.92 7.82
60 291.881 212.49 504.371 42.438 -164.583 6.47 0.54 0.97 6.04 7.98 6.9 4.96
61 380.213 212.49 592.703 20.622 48.91 7.6 0.26 0.29 7.57 8.15 7.63 7.05
62 250.48 212.49 462.97 43.017 -124.74 5.94 0.55 0.74 5.75 7.23 6.13 4.65
63 314.584 212.49 527.074 25.302 -29.618 6.76 0.32 0.18 6.9 7.26 6.62 6.26
64 316.109 212.49 528.599 38.339 -46.212 6.78 0.49 0.27 7 7.54 6.56 6.02
65 397.384 212.49 609.874 24.143 -109.306 7.82 0.31 0.65 7.48 8.78 8.16 6.86
66 398.908 212.49 611.398 37.175 -125.907 7.84 0.48 0.75 7.57 9.07 8.11 6.61
67 312.481 212.49 524.971 20.338 -61.654 6.73 0.26 0.36 6.63 7.35 6.83 6.11
68 318.213 212.49 530.703 43.304 -14.179 6.8 0.56 0.08 7.28 7.44 6.32 6.16
69 395.279 212.49 607.769 19.176 -141.346 7.79 0.25 0.84 7.2 8.88 8.38 6.7
70 401.012 212.49 613.502 42.143 -93.866 7.87 0.54 0.56 7.85 8.97 7.89 6.77

pmax = 10.35 t/sqm


pmin = 2.21 t/sqm

Check For Pressure At All The Corners (With0ut Buoyancy)

Load Fy From Soil+ Fdn Fy Mxx Mzz Fy/A Mxx/Zxx Mzz/Zzz 1+2-3 1+2+3 1-2+3 1-2-3
Load +Ped 1 2 3
50 377.446 407.49 784.936 30.95 -97.679 10.06 0.4 0.58 9.88 11.04 10.24 9.08
51 485.837 407.49 893.327 39.619 85.458 11.45 0.51 0.51 11.45 12.47 11.45 10.43
52 227.655 407.49 635.145 22.861 -240.973 8.14 0.29 1.43 7 9.86 9.28 6.42
53 444.438 407.49 851.928 40.201 125.302 10.92 0.52 0.74 10.7 12.18 11.14 9.66
54 186.255 407.49 593.745 23.44 -201.131 7.61 0.3 1.19 6.72 9.1 8.5 6.12
55 504.409 407.49 911.899 -26.906 138.845 11.69 0.34 0.82 11.21 12.85 12.17 10.53
56 209.083 407.49 616.573 89.382 -294.369 7.9 1.15 1.74 7.31 10.79 8.49 5.01
57 463.01 407.49 870.5 -26.325 178.691 11.16 0.34 1.06 10.44 12.56 11.88 9.76
58 167.683 407.49 575.173 89.966 -254.519 7.37 1.15 1.51 7.01 10.03 7.73 4.71
59 421.613 407.49 829.103 20.043 9.06 10.63 0.26 0.05 10.84 10.94 10.42 10.32
60 291.881 407.49 699.371 42.438 -164.583 8.97 0.54 0.97 8.54 10.48 9.4 7.46
61 380.213 407.49 787.703 20.622 48.91 10.1 0.26 0.29 10.07 10.65 10.13 9.55
62 250.48 407.49 657.97 43.017 -124.74 8.44 0.55 0.74 8.25 9.73 8.63 7.15
63 314.584 407.49 722.074 25.302 -29.618 9.26 0.32 0.18 9.4 9.76 9.12 8.76
64 316.109 407.49 723.599 38.339 -46.212 9.28 0.49 0.27 9.5 10.04 9.06 8.52
65 397.384 407.49 804.874 24.143 -109.306 10.32 0.31 0.65 9.98 11.28 10.66 9.36
66 398.908 407.49 806.398 37.175 -125.907 10.34 0.48 0.75 10.07 11.57 10.61 9.11
67 312.481 407.49 719.971 20.338 -61.654 9.23 0.26 0.36 9.13 9.85 9.33 8.61
68 318.213 407.49 725.703 43.304 -14.179 9.3 0.56 0.08 9.78 9.94 8.82 8.66
69 395.279 407.49 802.769 19.176 -141.346 10.29 0.25 0.84 9.7 11.38 10.88 9.2
70 401.012 407.49 808.502 42.143 -93.866 10.37 0.54 0.56 10.35 11.47 10.39 9.27

pmax = 12.85 t/sqm


pmin = 4.71 t/sqm

Check For Shear


a) Two Way Shear
Limit State Method

d/2
6
d/2

3 3.5
Critical Section = At distance d/2 from face of column
Concrete Grade = 30 N/mm2
Column Details
Length = 750 mm
Width = 600 mm

Foundation Details
Length = 6500 mm
Width = 6000 mm
Effective Depth = 925 mm
Percentage Of Steel = 0.17 %

Punching Load
Maximum Load on Column = 165.922 T
Punching Shear = 165.922 x ( 6.5 x 6 - 1.675 x 1.525 )
6.5 x 6

P= 156 Ton

Shear Resistance Of Concrete (Vc)


= vc x bc x d -----Refer to clause no. 31.6.3.1 of IS 456
where vc = ks x tc
ks = 0.5 + bc -----should not be greater than 1
bc = Short Side Of Column
Long Side Of Column

600
=
750
= 0.8
ks = 1
tc = 1.37 N/mm2

bc = Appropriate perimeter at distance d/2

Length of critical section = 1675 mm

Width of critical section = 1525 mm

Perimeter of critical section = 6400 mm

2340000
Depth Required =
1.37 x6400

= 266.88 mm

Shear Resistance = 1.37 x 6400 x 925 / 10000


811 T
B) One Way Shear 6.5

1.775

d
6
d

1.7 1.3 2.2


3 7

Critical Section = At distance d from face of column


Maximum Pressure = 7.65 T/m2 ---- For without Buoynacy Condition

At Length
Length at critical section = 6000 mm
Width at critical section = 2200 mm
Shear Force = 7.65 x 6 x 2.2
= 101 T
At Width
Length at critical section = 6500 mm
Width at critical section = 1775 mm
Shear Force = 7.65 x 6.5 x 1.775
= 89 T

Designed Shear Stress = 101 T


Corresponding Length = 6000 mm

% Ast = 0.16
Allowable Shear Stress = 0.30 N/mm2 ----Refer Table 19 of IS 456
k= 1 ---- Refer clause no. 40.2 of IS 456
tc = 0.298 N/mm2
Depth Required = 1515000
0.298 x 6000
= 848 mm

Design Of Foundation
a) Calculation of reinforcement at bottom
Maximum Pressure = 12.85 T/m2 --- Without Buoyancy Load Case
Pre. due to pcc & fdn wt = ( 195 + 205.74 ) / ( 13 x 6 )
= 5.14 T/m2
Net causing moment = 7.71 T/m2
Maximum Projection of fdn = 2.625 m
Bending Moment = 7.71 x 2.625 x 2.625 / 2
= 26.56 Tm
Ast = 0.5 x fck x b x d 1- (4.6 x Mu )
fy 1 - fck x b x d2

Ast = 1008.96 mm2


Min. percentage of re-bar = 0.15 %
Ast = 1500 mm2
Use 20 mm dia bars
Area of bar = 314 mm2
Spacing = 200 mm
Provide Spacing = 200
Area Provided = 1570 mm2
Provide 20 mm dia Bars @ 200 mm spacing bothways
b) Calculation of reinforcement at top
Area Load = 7.71 T/m2
Max. Projection of fdn = 7 m
Bending Moment = 7.71 x 7 x 7 / 10
= 37.78 Tm
Ast = 0.5 x fck x b x d 1- (4.6 x Mu )
fy 1 - fck x b x d2
Ast = 1446.81 mm2
Min. percentage of re-bar = 0.12 %
Ast = 1200 mm2
Use 20 mm dia bars
Area of bar = 314 mm2
Spacing = 217 mm
Provide Spacing = 215 mm
Area Provided = 1460.4651 mm2
Provide 20 mm dia Bars @ 215 mm spacing bothways

Summary Of Design :-
Length Of Footing :- 13000 mm
WIdth Of Footing :- 6000 mm
Depth Of Footing :- 1000 mm
Reinforcement :-
At Top :- Provide 20 mm dia Bars @ 215 mm spacing bothways
At Bottom :- Provide 20 mm dia Bars @ 200 mm spacing bothways

CALCULATION FOR LOSS OF CONTACT AREA :


4Cx

Y ex Cx
My

Cy
P
Mx ey
X X B= 6 4Cy

L= 13 m

Depth of foundation below F.G.L 2.5 M


Length of foundation (L) 13 M
Width of foundation (B) 6.00 M
Total vertical load on foundation (P) 31.8 T
Moment about X axis (Mx) 25 T-m
Momoent about Y axis (My) 9 T-m
Area = L x B (A) 78 m2
Zxx = L x B 2 / 6 (Zxx) 78.00 m3
Zyy = B x A 2 / 6 (Zyy) 169.00 m3
ex = My / P ex 0.28 m < L/6= 2.167 m
ey = Mx / P ey 0.79 m < B/6= 1.000 m
ECCENTRICITY IS INSIDE KERN
Cx = (L / 2) - ex Cx 6.22 m
Cy = (B / 2) - ey Cy 2.21 m
P min = (P / A) - (Mx / Zxx) - (My / Zyy) 0.03 T/m2
0.3 N/mm2
FOOTING IS NOT IN TENSION
ex / L 0.02
ey / B 0.13
For corresponding (ex / L) and (ey / B) value of µ = 3.1
Maximum edge pressure = 1.26 T/m2
Safe bearing capacity = 15.0 T/m2
Allowable gross bearing capacity = 15*1.25+1.8*2.5= 23.25 T/m2

Calculation for loss of contact area


24.9
11.9 13

4.23
6

1.77 8.9

2.9

4.98 8.02

% Loss of contact area = 5.66 %


COMBINED FOOTING C10 & C11

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C10 & C11 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG

Design Of Combined Footing FOR COLUMN C10 & C11

Z
0.65
6.1

X
0.75 6.1

1.55 3 1.55

0.3

1.65
2.5

0.85

Constants :-
Unit Wt Of Soil = 1.8 T/m3
Density Of Water = 1 T/m3
Unit Weight Of Concrete = 2.5 T/m3
Comp. strength of concrete fc = 30 N/mm2
Yield strength of steel fy = 500 N/mm2
Coefficient Of Friction m = 0.5
Net SBC = 15 T/m2
With Buoyancy :
Gross SBC = 15 + (1.8 - 1) x 2.5
17 T/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 15 + (1.8 - 1) x 2.5
20.75 T/m2 ------ Where increase in SBC is allowed.(Wind / EQ 25% increase)

Without Buoyancy :
Gross SBC = 15 + 1.8 x 2.5
19.5 T/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 15 + 1.8 x 2.5
23.25 T/m2 ------ Where increase in SBC is allowed.(Wind / EQ 25% increase)

Shape Of Foundation :-
Length Of Foundation Lf = 6.1 m
Width Of Foundation W f = 6.1 m
Thickness Of Foundation Tf = 0.85 m
Founding Depth Df = 2.5 m
Length Of Pedestal Lp = 0.65 m
Width Of Pedestal Wp = 0.75 m
Height Of Pedestal Hp = 0 m (Support Reaction Considered at Base of footing)

Section Modulus Zxx = 1 / 6 x 6.1 x 6.1 x 6.1


= 37.831 m3
Section Modulus Zzz = 1 / 6 x 6.1 x 6.1 x 6.1
= 37.831 m3
Calculation Of Soil, Fdn & Pedestal Weights :-
Selfweight Of Foundation = 6.1 x 6.1 x 0.85 x 2.5
= 79.07 T
Selfweight Of Soil = 1.8 x 1.65 x ( 6.1 x 6.1 - 0.75 x 0.65 x 2 )
= 107.62 T
Selfweight Of Pedestal = 2.5 x 0.75 x 0.65 x 0 x 2
= 0 T
Buoyant Weight = -1 x 6.1 x 6.1 x 2.5
= -93.03 T

Total weight without buoyancy = 79.07 + 107.62 + 0


= 186.69 T
Total weight with buoyancy = 79.07 + 107.62 + 0 + -93.03
= 93.66 T
COMBINED FOOTING C10 & C11

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C10 & C11 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG

Calculation Of Restoring Moment :-

Due to fdn. Weight = 79.07 x 6.1 / 2


= 241.16 Tm
Due to fdn. Soil = 107.62 x 6.1 / 2
= 328.24 Tm
Due to Pedestal = 0 x 0.775 + 0 x 5.325
= 0 Tm
Due to Buoyant weight = -93.03 x 3.05
= -283.74

Total moment without buoyancy = 241.16 + 328.24 + 0


= 569.4 Tm
Total moment with buoyancy = 241.16 + 328.24 + 0 -283.74
= 285.66 Tm

Support Reactions :- ( At foundation level) All Units in Ton - Meter


JOINT LOAD FORCE-X FORCE-Y FORCE-Z MOM-X MOM-Y MOM Z
1010 50 1.0(DL 0.159 119.006 0.683 0.744 0.015 -0.203
51 1.0(DL 26.7 151.079 7.544 17.836 1.138 50.865
52 1.0(DL -26.381 86.934 -6.178 -16.349 -1.108 -51.272
53 1.0(DL 26.504 133.624 7.224 17.465 1.134 51.008
54 1.0(DL -26.576 69.479 -6.499 -16.72 -1.113 -51.129
55 1.0(DL 8.598 129.172 21.448 52.687 1.145 16.026
56 1.0(DL -8.279 108.841 -20.082 -51.2 -1.115 -16.432
57 1.0(DL 8.403 111.717 21.127 52.316 1.141 16.168
58 1.0(DL -8.475 91.386 -20.402 -51.572 -1.119 -16.29
59 1.0(DL 8.371 128.894 7.125 16.838 0.55 15.593
60 1.0(DL -8.053 109.119 -5.758 -15.351 -0.52 -15.999
61 1.0(DL 8.176 111.439 6.804 16.467 0.546 15.735
62 1.0(DL -8.248 91.664 -6.079 -15.723 -0.524 -15.857
63 1.0(DL -1.245 100.586 0.351 0.344 -0.005 2.112
64 1.0(DL 1.173 102.517 0.374 0.401 0.026 -2.234
65 1.0(DL -0.854 135.496 0.992 1.087 0.004 1.828
66 1.0(DL 1.564 137.427 1.015 1.144 0.035 -2.519
67 1.0(DL -0.034 101.547 1.577 3.299 0.013 -0.064
68 1.0(DL -0.038 101.557 -0.852 -2.554 0.009 -0.058
69 1.0(DL 0.357 136.456 2.218 4.042 0.021 -0.348
70 1.0(DL 0.353 136.466 -0.211 -1.811 0.017 -0.342

1011 50 1.0(DL 0.149 74.156 0.69 0.631 0.016 -0.158


51 1.0(DL 26.96 104.572 7.38 17.773 1.071 51.957
52 1.0(DL -26.663 43.74 -6 -16.511 -1.039 -52.272
53 1.0(DL 26.981 92.731 7.105 17.476 1.067 51.932
54 1.0(DL -26.641 31.899 -6.275 -16.808 -1.044 -52.297
55 1.0(DL 8.682 83.867 21.327 53.44 1.445 16.404
56 1.0(DL -8.385 64.446 -19.947 -52.178 -1.412 -16.719
57 1.0(DL 8.703 72.025 21.052 53.142 1.44 16.38
58 1.0(DL -8.363 52.604 -20.222 -52.475 -1.417 -16.744
59 1.0(DL 8.458 83.54 7.086 16.986 0.605 15.964
60 1.0(DL -8.161 64.773 -5.706 -15.724 -0.573 -16.279
61 1.0(DL 8.479 71.698 6.811 16.689 0.6 15.939
62 1.0(DL -8.139 52.931 -5.981 -16.022 -0.578 -16.304
63 1.0(DL -0.97 63.153 0.398 0.29 -0.001 1.881
64 1.0(DL 1.309 61.477 0.432 0.377 0.024 -2.245
65 1.0(DL -1.012 86.836 0.948 0.885 0.008 1.93
66 1.0(DL 1.267 85.16 0.982 0.973 0.033 -2.196
67 1.0(DL 0.172 62.322 1.579 3.17 0.029 -0.185
68 1.0(DL 0.168 62.307 -0.749 -2.502 -0.006 -0.179
69 1.0(DL 0.129 86.005 2.129 3.765 0.039 -0.136
70 1.0(DL 0.125 85.99 -0.199 -1.907 0.003 -0.13
COMBINED FOOTING C10 & C11

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C10 & C11 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG
Check For stability :-
a) Against Overturing :- (Check is done only for with buoyancy case)
Total O/T Moment Restoring Moment
Load MOM-Z MOM-X External Soil,Fdn, Total F.O.S. Result
Total
STAAD Due to Fy Load Pedestal
50 1.0( 0.361 67.28 1.375 67.66 521.87 285.66 807.53 11.94 Safe
51 1.0( 102.822 69.76 35.609 176.22 709.98 285.66 995.64 5.65 Safe
52 1.0( 103.544 64.79 32.86 171.52 333.76 285.66 619.42 3.61 Safe
53 1.0( 102.94 61.34 34.941 167.96 629.04 285.66 914.7 5.45 Safe
54 1.0(D 103.426 56.37 33.528 163.28 252.83 285.66 538.49 3.3 Safe
55 1.0( 32.43 67.96 106.127 146.09 581.81 285.66 867.47 5.94 Safe
56 1.0( 33.151 66.59 103.378 143.65 461.93 285.66 747.59 5.2 Safe
57 1.0( 32.548 59.54 105.458 140.01 500.88 285.66 786.54 5.62 Safe
58 1.0(D 33.034 58.17 104.047 138.37 381 285.66 666.66 4.82 Safe
59 1.0( 31.557 68.03 33.824 105.18 579.89 285.66 865.55 8.23 Safe
60 1.0( 32.278 66.52 31.075 103.57 463.85 285.66 749.51 7.24 Safe
61 1.0( 31.674 59.61 33.156 97.12 498.96 285.66 784.62 8.08 Safe
62 1.0(D 32.161 58.1 31.745 95.69 382.92 285.66 668.58 6.99 Safe
63 1.0(D 3.993 56.15 0.634 60.15 443.25 285.66 728.91 12.12 Safe
64 1.0(D 4.479 61.56 0.778 66.05 438.62 285.66 724.28 10.97 Safe
65 1.0( 3.758 72.99 1.972 76.78 605.12 285.66 890.78 11.6 Safe
66 1.0(D 4.715 78.4 2.117 83.15 600.49 285.66 886.15 10.66 Safe
67 1.0(D 0.249 58.84 6.469 59.45 440.96 285.66 726.62 12.22 Safe
68 1.0(D 0.237 58.88 5.056 59.34 440.91 285.66 726.57 12.24 Safe
69 1.0(D 0.484 75.68 7.807 76.57 602.83 285.66 888.49 11.6 Safe
70 1.0(D 0.472 75.71 3.718 76.28 602.78 285.66 888.44 11.65 Safe

b) Against Sliding :- (Check is done only for with buoyancy case)


Total Sliding Forces Restoring Forces
Load Fx Fz Resultant External Soil,Fdn, Total F.O.S. Result
Load Pedestal
50 1.0( 0.308 1.373 1.41 193.16 93.66 143.41 101.71 Safe
51 1.0( 53.66 14.924 55.7 255.65 93.66 174.66 3.14 Safe
52 1.0( 53.044 12.178 54.42 130.67 93.66 112.17 2.06 Safe
53 1.0( 53.485 14.329 55.37 226.36 93.66 160.01 2.89 Safe
54 1.0(D 53.217 12.774 54.73 101.38 93.66 97.52 1.78 Safe
55 1.0( 17.28 42.775 46.13 213.04 93.66 153.35 3.32 Safe
56 1.0( 16.664 40.029 43.36 173.29 93.66 133.48 3.08 Safe
57 1.0( 17.106 42.179 45.52 183.74 93.66 138.7 3.05 Safe
58 1.0(D 16.838 40.624 43.98 143.99 93.66 118.83 2.7 Safe
59 1.0( 16.829 14.211 22.03 212.43 93.66 153.05 6.95 Safe
60 1.0( 16.214 11.464 19.86 173.89 93.66 133.78 6.74 Safe
61 1.0( 16.655 13.615 21.51 183.14 93.66 138.4 6.43 Safe
62 1.0(D 16.387 12.06 20.35 144.6 93.66 119.13 5.85 Safe
63 1.0(D 2.215 0.749 2.34 163.74 93.66 128.7 55 Safe
64 1.0(D 2.482 0.806 2.61 163.99 93.66 128.83 49.36 Safe
65 1.0( 1.866 1.94 2.69 222.33 93.66 158 58.74 Safe
66 1.0(D 2.831 1.997 3.46 222.59 93.66 158.13 45.7 Safe
67 1.0(D 0.206 3.156 3.16 163.87 93.66 128.77 40.75 Safe
68 1.0(D 0.206 1.601 1.61 163.86 93.66 128.76 79.98 Safe
69 1.0(D 0.486 4.347 4.37 222.46 93.66 158.06 36.17 Safe
70 1.0(D 0.478 0.41 0.63 222.46 93.66 158.06 250.89 Safe
COMBINED FOOTING C10 & C11

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C10 & C11 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG
Check For bearing pressure :-
Case 1) Without Buoyancy :-
Total Load
Load MOM-X MOM-Z Soil,Fdn, Total P/A Mxx/Zxx Mzz/Zzz pmax pmin pall Result
Fy
Pedestral Load
50 1.0( 1.375 67.641 193.162 186.69 379.852 10.21 0.037 1.788 12.035 8.385 19.5 Safe
51 1.0( 35.609 172.582 255.651 186.69 442.341 11.89 0.942 4.562 17.394 6.386 19.5 Safe
52 1.0( 32.86 168.334 130.674 186.69 317.364 8.53 0.869 4.45 13.849 3.211 19.5 Safe
53 1.0( 34.941 164.28 226.355 186.69 413.045 11.1 0.924 4.343 16.367 5.833 19.5 Safe
54 1.0(D 33.528 159.796 101.378 186.69 288.068 7.74 0.887 4.224 12.851 2.629 19.5 Safe
55 1.0( 106.127 100.39 213.039 186.69 399.729 10.74 2.806 2.654 16.2 5.28 19.5 Safe
56 1.0( 103.378 99.741 173.287 186.69 359.977 9.67 2.733 2.637 15.04 4.3 19.5 Safe
57 1.0( 105.458 92.088 183.742 186.69 370.432 9.96 2.788 2.435 15.183 4.737 19.5 Safe
58 1.0(D 104.047 91.204 143.99 186.69 330.68 8.89 2.751 2.411 14.052 3.728 19.5 Safe
59 1.0( 33.824 99.587 212.434 186.69 399.124 10.73 0.895 2.633 14.258 7.202 19.5 Safe
60 1.0( 31.075 98.798 173.892 186.69 360.582 9.69 0.822 2.612 13.124 6.256 19.5 Safe
61 1.0( 33.156 91.284 183.137 186.69 369.827 9.94 0.877 2.413 13.23 6.65 19.5 Safe
62 1.0(D 31.745 90.261 144.595 186.69 331.285 8.9 0.84 2.386 12.126 5.674 19.5 Safe
63 1.0(D 0.634 60.143 163.739 186.69 350.429 9.42 0.017 1.59 11.027 7.813 19.5 Safe
64 1.0(D 0.778 66.039 163.994 186.69 350.684 9.42 0.021 1.746 11.187 7.653 19.5 Safe
65 1.0( 1.972 76.748 222.332 186.69 409.022 10.99 0.053 2.029 13.072 8.908 19.5 Safe
66 1.0(D 2.117 83.115 222.587 186.69 409.277 11 0.056 2.198 13.254 8.746 19.5 Safe
67 1.0(D 6.469 59.089 163.869 186.69 350.559 9.42 0.171 1.562 11.153 7.687 19.5 Safe
68 1.0(D 5.056 59.117 163.864 186.69 350.554 9.42 0.134 1.563 11.117 7.723 19.5 Safe
69 1.0(D 7.807 76.164 222.461 186.69 409.151 11 0.207 2.014 13.221 8.779 19.5 Safe
70 1.0(D 3.718 76.182 222.456 186.69 409.146 11 0.099 2.014 13.113 8.887 19.5 Safe

Bearing Pressure for Without Buoyancy Case :- pmax = 17.394 T/sq.M pmin = 11.027 T/sq.M

Case 2) With Buoyancy :-


Total Load
Load MOM-X MOM-Z Soil,Fdn, Total P/A Mxx/Zxx Mzz/Zzz pmax pmin pall Result
Fy
Pedestral Load
50 1.0( 1.375 67.641 193.162 93.66 286.822 7.71 0.037 1.788 9.535 5.885 17 Safe
51 1.0( 35.609 172.582 255.651 93.66 349.311 9.39 0.942 4.562 14.894 3.886 17 Safe
52 1.0( 32.86 168.334 130.674 93.66 224.334 6.03 0.869 4.45 11.349 0.711 17 Safe
53 1.0( 34.941 164.28 226.355 93.66 320.015 8.6 0.924 4.343 13.867 3.333 17 Safe
54 1.0(D 33.528 159.796 101.378 93.66 195.038 5.24 0.887 4.224 10.351 0.129 17 Safe
55 1.0( 106.127 100.39 213.039 93.66 306.699 8.24 2.806 2.654 13.7 2.78 17 Safe
56 1.0( 103.378 99.741 173.287 93.66 266.947 7.17 2.733 2.637 12.54 1.8 17 Safe
57 1.0( 105.458 92.088 183.742 93.66 277.402 7.46 2.788 2.435 12.683 2.237 17 Safe
58 1.0(D 104.047 91.204 143.99 93.66 237.65 6.39 2.751 2.411 11.552 1.228 17 Safe
59 1.0( 33.824 99.587 212.434 93.66 306.094 8.23 0.895 2.633 11.758 4.702 17 Safe
60 1.0( 31.075 98.798 173.892 93.66 267.552 7.19 0.822 2.612 10.624 3.756 17 Safe
61 1.0( 33.156 91.284 183.137 93.66 276.797 7.44 0.877 2.413 10.73 4.15 17 Safe
62 1.0(D 31.745 90.261 144.595 93.66 238.255 6.4 0.84 2.386 9.626 3.174 17 Safe
63 1.0(D 0.634 60.143 163.739 93.66 257.399 6.92 0.017 1.59 8.527 5.313 17 Safe
64 1.0(D 0.778 66.039 163.994 93.66 257.654 6.92 0.021 1.746 8.687 5.153 17 Safe
65 1.0( 1.972 76.748 222.332 93.66 315.992 8.49 0.053 2.029 10.572 6.408 17 Safe
66 1.0(D 2.117 83.115 222.587 93.66 316.247 8.5 0.056 2.198 10.754 6.246 17 Safe
67 1.0(D 6.469 59.089 163.869 93.66 257.529 6.92 0.171 1.562 8.653 5.187 17 Safe
68 1.0(D 5.056 59.117 163.864 93.66 257.524 6.92 0.134 1.563 8.617 5.223 17 Safe
69 1.0(D 7.807 76.164 222.461 93.66 316.121 8.5 0.207 2.014 10.721 6.279 17 Safe
70 1.0(D 3.718 76.182 222.456 93.66 316.116 8.5 0.099 2.014 10.613 6.387 17 Safe

Bearing Pressure for With Buoyancy Case :- pmax = 14.894 T/sq.M pmin = 8.527 T/sq.M
COMBINED FOOTING C10 & C11

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C10 & C11 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG

Check for Pressure at All Four Corners with Buoyancy Case

1-2+3 1+2+3 X
X

1-2-3 1+2-3

Load P/A Mxx/Zxx Mzz/Zzz


1+2+3 1-2+3 1-2-3 1+2-3
1 2 3
50 1.0( 7.71 0.037 1.788 9.535 9.461 5.885 5.959
51 1.0( 9.39 0.942 4.562 14.894 13.01 3.886 5.77
52 1.0( 6.03 0.869 4.45 11.349 9.611 0.711 2.449
53 1.0( 8.6 0.924 4.343 13.867 12.019 3.333 5.181
54 1.0(D 5.24 0.887 4.224 10.351 8.577 0.129 1.903
55 1.0( 8.24 2.806 2.654 13.7 8.088 2.78 8.392
56 1.0( 7.17 2.733 2.637 12.54 7.074 1.8 7.266
57 1.0( 7.46 2.788 2.435 12.683 7.107 2.237 7.813
58 1.0(D 6.39 2.751 2.411 11.552 6.05 1.228 6.73
59 1.0( 8.23 0.895 2.633 11.758 9.968 4.702 6.492
60 1.0( 7.19 0.822 2.612 10.624 8.98 3.756 5.4
61 1.0( 7.44 0.877 2.413 10.73 8.976 4.15 5.904
62 1.0(D 6.4 0.84 2.386 9.626 7.946 3.174 4.854
63 1.0(D 6.92 0.017 1.59 8.527 8.493 5.313 5.347
64 1.0(D 6.92 0.021 1.746 8.687 8.645 5.153 5.195
65 1.0( 8.49 0.053 2.029 10.572 10.466 6.408 6.514
66 1.0(D 8.5 0.056 2.198 10.754 10.642 6.246 6.358
67 1.0(D 6.92 0.171 1.562 8.653 8.311 5.187 5.529
68 1.0(D 6.92 0.134 1.563 8.617 8.349 5.223 5.491
69 1.0(D 8.5 0.207 2.014 10.721 10.307 6.279 6.693
70 1.0(D 8.5 0.099 2.014 10.613 10.415 6.387 6.585

Check for Eccentricity without Buoyancy Case:-

ez = ex < L/6 ez < B/6


Load P Mxx Mzz ex = Mzz/P L/6 B/6
Mxx/P
50 1.0( 379.852 1.375 67.641 0.18 0.01 1.02 1.02 <L/6 <B/6
51 1.0( 442.341 35.609 172.582 0.4 0.09 1.02 1.02 <L/6 <B/6
52 1.0( 317.364 32.86 168.334 0.54 0.11 1.02 1.02 <L/6 <B/6
53 1.0( 413.045 34.941 164.28 0.4 0.09 1.02 1.02 <L/6 <B/6
54 1.0(D 288.068 33.528 159.796 0.56 0.12 1.02 1.02 <L/6 <B/6
55 1.0( 399.729 106.127 100.39 0.26 0.27 1.02 1.02 <L/6 <B/6
56 1.0( 359.977 103.378 99.741 0.28 0.29 1.02 1.02 <L/6 <B/6
57 1.0( 370.432 105.458 92.088 0.25 0.29 1.02 1.02 <L/6 <B/6
58 1.0(D 330.68 104.047 91.204 0.28 0.32 1.02 1.02 <L/6 <B/6
59 1.0( 399.124 33.824 99.587 0.25 0.09 1.02 1.02 <L/6 <B/6
60 1.0( 360.582 31.075 98.798 0.28 0.09 1.02 1.02 <L/6 <B/6
61 1.0( 369.827 33.156 91.284 0.25 0.09 1.02 1.02 <L/6 <B/6
62 1.0(D 331.285 31.745 90.261 0.28 0.1 1.02 1.02 <L/6 <B/6
63 1.0(D 350.429 0.634 60.143 0.18 0.01 1.02 1.02 <L/6 <B/6
64 1.0(D 350.684 0.778 66.039 0.19 0.01 1.02 1.02 <L/6 <B/6
65 1.0( 409.022 1.972 76.748 0.19 0.01 1.02 1.02 <L/6 <B/6
66 1.0(D 409.277 2.117 83.115 0.21 0.01 1.02 1.02 <L/6 <B/6
67 1.0(D 350.559 6.469 59.089 0.17 0.02 1.02 1.02 <L/6 <B/6
68 1.0(D 350.554 5.056 59.117 0.17 0.02 1.02 1.02 <L/6 <B/6
69 1.0(D 409.151 7.807 76.164 0.19 0.02 1.02 1.02 <L/6 <B/6
70 1.0(D 409.146 3.718 76.182 0.19 0.01 1.02 1.02 <L/6 <B/6
COMBINED FOOTING C10 & C11

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C10 & C11 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG

Check For Shear


a) Two Way Shear
Limit State Method

d/2

6.1

d/2

1.55 1.5

Critical Section = At distance d/2 from face of column


Concrete Grade = 30 N/mm2
Column Details
Length = 650 mm
Width = 750 mm

Foundation Details
Length = 3050 mm
Width = 6100 mm
Effective Depth = 775 mm
Percentage Of Steel = 0.27 %

Punching Load
Maximum Load on Column = 151.079 T
Punching Shear = 151.079 x ( 3.05 x 6.1 - 1.425 x 1.525 )
3.05 x 6.1

P= 134 Ton
Shear Resistance Of Concrete (Vc)
= vc x bc x d -----Refer to clause no. 31.6.3.1 of IS 456
where vc = ks x tc
ks = 0.5 + bc -----should not be greater than 1

bc = Short Side Of Column


Long Side Of Column

650
=
750
= 0.867
ks = 1
tc = 1.37 N/mm2
bc = Appropriate perimeter at distance d/2
Length of critical section = 1425 mm
Width of critical section = 1525 mm
Perimeter of critical section = 5900 mm

2010000
Depth Required =
1.37 x5900
= 248.67 mm

Shear Resistance = 1.37 x 5900 x 775 / 10000


626 T
COMBINED FOOTING C10 & C11

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C10 & C11 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG

B) One Way Shear 3.05

1.9

6.1 d

1.55 1.15 0.35


1.55 3

Critical Section = At distance d from face of column


Maximum Pressure = 12.299 T/m2 ---- For without Buoynacy Condition

At Length
Length at critical section = 6100 mm
Width at critical section = 1550 mm
Shear Force = 12.299 x 6.1 x 1.55
= 117 T
At Width
Length at critical section = 3050 mm
Width at critical section = 1900 mm
Shear Force = 12.299 x 3.05 x 1.9
= 72 T

Designed Shear Stress = 117 T


Corresponding Length = 6100 mm

% Ast = 0.28
Allowable Shear Stress = 0.386 N/mm2 ----Refer Table 21 of IS 456 Check Stress
k= 1 ---- Refer clause no. 40.2 of IS 456
tc = 0.3856 N/mm2
Depth Required = 1755000
0.3856 x 6100
= 747 mm

Design Of Foundation
a) Calculation of reinforcement at bottom
Maximum Pressure = 17.394 T/m2 --- Without Buoyancy Load Case
Pre. due to pcc & fdn wt = ( 79.07 + 107.62 ) / ( 6.1 x 6.1 )
= 5.02 T/m2
Net causing moment = 12.374 T/m2
Maximum Projection of fdn = 2.675 m
Bending Moment = 12.374 x 2.675 x 2.675 / 2
= 44.27 Tm
Ast = 0.5 x fck x b x d 1- (4.6 x Mu )
1-
fy fck x b x d2

Ast = 2062.18 mm2


Min. percentage of re-bar = 0.17 %
Ast = 1445 mm2
Use 20 mm dia bars
Area of bar = 314 mm2
Spacing = 150 mm
Provide Spacing = 150 Hence % of Steel = 0.28
Area Provided = 2093.33 mm2
Provide 20 mm dia Bars @ 150 mm spacing bothways
COMBINED FOOTING C10 & C11

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C10 & C11 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG

b) Calculation of reinforcement at top


Area Load = 12.374 T/m2
Max. Projection of fdn = 3 m
Bending Moment = 12.374 x 3 x 3 / 10
= 11.14 Tm
Ast = 0.5 x fck x b x d 1- (4.6 x Mu )
1-
fy fck x b x d2

Ast = 501.31 mm2


Min. percentage of re-bar = 0.17 %
Ast = 1445 mm2
Use 16 mm dia bars
Area of bar = 200.96 mm2
Spacing = 139 mm
Provide Spacing = 135 mm Hence % of Steel = 0.2
Area Provided = 1488.5926 mm2
Provide 16 mm dia Bars @ 135 mm spacing bothways

Summary Of Design :-
Length Of Footing :- 6100 mm
WIdth Of Footing :- 6100 mm
Depth Of Footing :- 850 mm
Reinforcement :-
At Top :- Provide 16 mm dia Bars @ 135 mm spacing bothways
At Bottom :- Provide 20 mm dia Bars @ 150 mm spacing bothways
COMBINED FOOTING C19 & C20

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C19 & C20 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG

Design Of Combined Footing FOR COLUMN C19 & C20

Z
0.65
6.2

X
0.75 6

1.6 3 1.6

0.3

1.45
2.5

1.05

Constants :-
Unit Wt Of Soil = 1.8 T/m3
Density Of Water = 1 T/m3
Unit Weight Of Concrete = 2.5 T/m3
Comp. strength of concrete fc = 30 N/mm2
Yield strength of steel fy = 500 N/mm2
Coefficient Of Friction m = 0.5
Net SBC = 15 T/m2
With Buoyancy :
Gross SBC = 15 + (1.8 - 1) x 2.5
17 T/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 15 + (1.8 - 1) x 2.5
20.75 T/m2 ------ Where increase in SBC is allowed.(Wind / EQ 25% increase)
Without Buoyancy :
Gross SBC = 15 + 1.8 x 2.5
19.5 T/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 15 + 1.8 x 2.5
23.25 T/m2 ------ Where increase in SBC is allowed.(Wind / EQ 25% increase)

Shape Of Foundation :-
Length Of Foundation Lf = 6.2 m
Width Of Foundation Wf = 6 m
Thickness Of Foundation Tf = 1.05 m
Founding Depth Df = 2.5 m
Length Of Pedestal Lp = 0.65 m
Width Of Pedestal Wp = 0.75 m
Height Of Pedestal Hp = 0 m (Support Reaction Considered at Base of footing)

Section Modulus Zxx = 1 / 6 x 6.2 x 6 x 6


= 37.2 m3
Section Modulus Zzz = 1 / 6 x 6 x 6.2 x 6.2
= 38.44 m3

Calculation Of Soil, Fdn & Pedestal Weights :-


Selfweight Of Foundation = 6.2 x 6 x 1.05 x 2.5
= 97.65 T
Selfweight Of Soil = 1.8 x 1.45 x ( 6.2 x 6 - 0.75 x 0.65 x 2 )
= 94.55 T
Selfweight Of Pedestal = 2.5 x 0.75 x 0.65 x 0 x 2
= 0 T
Buoyant Weight = -1 x 6.2 x 6 x 2.5
= -93 T

Total weight without buoyancy = 97.65 + 94.55 + 0


= 192.2 T
Total weight with buoyancy = 97.65 + 94.55 + 0 + -93
= 99.2 T
COMBINED FOOTING C19 & C20

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C19 & C20 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG

Calculation Of Restoring Moment :-

Due to fdn. Weight = 97.65 x 6.2 / 2


= 302.72 Tm
Due to fdn. Soil = 94.55 x 6.2 / 2
= 293.11 Tm
Due to Pedestal = 0 x 0.8 + 0 x 5.4
= 0 Tm
Due to Buoyant weight = -93 x 3.1
= -288.3

Total moment without buoyancy = 302.72 + 293.11 + 0


= 595.83 Tm
Total moment with buoyancy = 302.72 + 293.11 + 0 -288.3
= 307.53 Tm

Support Reactions :- ( At foundation level) All Units in Ton - Meter


JOINT LOAD FORCE-X FORCE-Y FORCE-Z MOM-X MOM-Y MOM Z
1019 50 1.0(DL -0.799 119.293 -1.138 -1.028 0.063 0.758
51 1.0(DL 29.32 172.605 5.578 15.893 1.691 60.975
52 1.0(DL -30.919 65.982 -7.855 -17.95 -1.565 -59.459
53 1.0(DL 29.145 154.763 5.648 15.926 1.682 61.094
54 1.0(DL -31.094 48.14 -7.785 -17.917 -1.574 -59.339
55 1.0(DL 8.659 137.6 19.211 50.484 1.348 19.654
56 1.0(DL -10.258 100.987 -21.487 -52.541 -1.223 -18.138
57 1.0(DL 8.484 119.758 19.281 50.517 1.339 19.773
58 1.0(DL -10.432 83.145 -21.417 -52.508 -1.231 -18.018
59 1.0(DL 8.417 135.978 5.173 14.926 0.755 19.175
60 1.0(DL -10.015 102.609 -7.45 -16.983 -0.63 -17.659
61 1.0(DL 8.242 118.135 5.243 14.959 0.746 19.294
62 1.0(DL -10.19 84.767 -7.38 -16.95 -0.638 -17.539
63 1.0(DL -2.242 99.78 -1.08 -1.023 0.049 3.265
64 1.0(DL 0.294 103.123 -1.057 -0.968 0.059 -1.51
65 1.0(DL -1.893 135.464 -1.219 -1.089 0.067 3.026
66 1.0(DL 0.644 138.807 -1.197 -1.034 0.076 -1.749
67 1.0(DL -0.973 101.316 0.179 2.022 0.054 0.877
68 1.0(DL -0.975 101.587 -2.315 -4.013 0.054 0.877
69 1.0(DL -0.624 137 0.039 1.956 0.072 0.639
70 1.0(DL -0.626 137.271 -2.455 -4.078 0.071 0.639

1020 50 1.0(DL 0.176 115.993 1.758 1.142 0.07 -0.002


51 1.0(DL 32.537 144.53 8.698 18.416 1.673 61.894
52 1.0(DL -32.185 87.455 -5.182 -16.132 -1.533 -61.898
53 1.0(DL 32.588 129.739 8.764 18.445 1.663 61.855
54 1.0(DL -32.134 72.663 -5.115 -16.103 -1.543 -61.937
55 1.0(DL 10.336 125.896 22.958 54.03 1.582 19.417
56 1.0(DL -9.983 106.089 -19.441 -51.746 -1.442 -19.421
57 1.0(DL 10.386 111.105 23.024 54.059 1.572 19.378
58 1.0(DL -9.933 91.297 -19.375 -51.716 -1.452 -19.46
59 1.0(DL 10.078 125.946 8.336 17.547 0.806 18.928
60 1.0(DL -9.725 106.039 -4.82 -15.263 -0.667 -18.931
61 1.0(DL 10.129 111.155 8.403 17.576 0.796 18.888
62 1.0(DL -9.675 91.247 -4.754 -15.234 -0.676 -18.971
63 1.0(DL -1.021 102.085 1.805 1.123 0.081 2.242
64 1.0(DL 1.475 100.317 1.844 1.219 0.039 -2.325
65 1.0(DL -1.122 131.668 1.672 1.065 0.101 2.321
66 1.0(DL 1.374 129.9 1.711 1.161 0.058 -2.246
67 1.0(DL 0.227 101.27 3.069 4.115 0.076 -0.04
68 1.0(DL 0.226 101.131 0.58 -1.772 0.044 -0.042
69 1.0(DL 0.126 130.854 2.937 4.057 0.096 0.038
70 1.0(DL 0.125 130.715 0.447 -1.831 0.063 0.037
COMBINED FOOTING C19 & C20

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C19 & C20 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG
Check For stability :-
a) Against Overturing :- (Check is done only for with buoyancy case)
Total O/T Moment Restoring Moment
Load MOM-Z MOM-X External Soil,Fdn, Total F.O.S. Result
Total
STAAD Due to Fy Load Pedestal
50 1.0(D 0.76 4.95 2.17 6.11 724.44 307.53 1031.97 168.9 Safe
51 1.0( 122.869 42.11 34.309 168.51 941.01 307.53 1248.54 7.41 Safe
52 1.0( 121.357 32.21 34.082 157.31 507.86 307.53 815.39 5.18 Safe
53 1.0( 122.949 37.54 34.371 164.13 844.42 307.53 1151.95 7.02 Safe
54 1.0(D 121.276 36.78 34.02 161.68 411.27 307.53 718.8 4.45 Safe
55 1.0( 39.071 17.56 104.514 118.88 799.28 307.53 1106.81 9.31 Safe
56 1.0( 37.559 7.65 104.287 113.67 649.59 307.53 957.12 8.42 Safe
57 1.0( 39.151 12.98 104.576 116.85 702.7 307.53 1010.23 8.65 Safe
58 1.0(D 37.478 12.23 104.224 115.48 553 307.53 860.53 7.45 Safe
59 1.0( 38.103 15.05 32.473 62.29 796.92 307.53 1104.45 17.73 Safe
60 1.0( 36.59 5.15 32.246 52.75 651.95 307.53 959.48 18.19 Safe
61 1.0( 38.182 10.47 32.535 58.53 700.33 307.53 1007.86 17.22 Safe
62 1.0(D 36.51 9.72 32.184 56.33 555.36 307.53 862.89 15.32 Safe
63 1.0(D 5.507 3.46 2.146 9.23 629.24 307.53 936.77 101.49 Safe
64 1.0(D 3.835 4.21 2.187 8.34 626.46 307.53 933.99 111.99 Safe
65 1.0( 5.347 5.69 2.154 11.25 822.42 307.53 1129.95 100.44 Safe
66 1.0(D 3.995 13.36 2.195 17.5 819.63 307.53 1127.16 64.41 Safe
67 1.0(D 0.917 0.07 6.137 6.22 627.95 307.53 935.48 150.4 Safe
68 1.0(D 0.919 0.68 5.785 6.01 627.74 307.53 935.27 155.62 Safe
69 1.0(D 0.677 9.22 6.013 11.59 821.13 307.53 1128.66 97.38 Safe
70 1.0(D 0.676 9.83 5.909 12.06 820.92 307.53 1128.45 93.57 Safe

b) Against Sliding :- (Check is done only for with buoyancy case)


Total Sliding Forces Restoring Forces
Load Fx Fz Resultant External Soil,Fdn, Total F.O.S. Result
Load Pedestal
50 1.0(D 0.975 2.896 3.06 235.29 99.2 167.25 54.66 Safe
51 1.0( 61.857 14.276 63.48 317.14 99.2 208.17 3.28 Safe
52 1.0( 63.104 13.037 64.44 153.44 99.2 126.32 1.96 Safe
53 1.0( 61.733 14.412 63.39 284.5 99.2 191.85 3.03 Safe
54 1.0(D 63.228 12.9 64.53 120.8 99.2 110 1.7 Safe
55 1.0( 18.995 42.169 46.25 263.5 99.2 181.35 3.92 Safe
56 1.0( 20.241 40.928 45.66 207.08 99.2 153.14 3.35 Safe
57 1.0( 18.87 42.305 46.32 230.86 99.2 165.03 3.56 Safe
58 1.0(D 20.365 40.792 45.59 174.44 99.2 136.82 3 Safe
59 1.0( 18.495 13.509 22.9 261.92 99.2 180.56 7.88 Safe
60 1.0( 19.74 12.27 23.24 208.65 99.2 153.93 6.62 Safe
61 1.0( 18.371 13.646 22.88 229.29 99.2 164.25 7.18 Safe
62 1.0(D 19.865 12.134 23.28 176.01 99.2 137.61 5.91 Safe
63 1.0(D 3.263 2.885 4.36 201.87 99.2 150.54 34.53 Safe
64 1.0(D 1.769 2.901 3.4 203.44 99.2 151.32 44.51 Safe
65 1.0( 3.015 2.891 4.18 267.13 99.2 183.17 43.82 Safe
66 1.0(D 2.018 2.908 3.54 268.71 99.2 183.96 51.97 Safe
67 1.0(D 1.2 3.248 3.46 202.59 99.2 150.9 43.61 Safe
68 1.0(D 1.201 2.895 3.13 202.72 99.2 150.96 48.23 Safe
69 1.0(D 0.75 2.976 3.07 267.85 99.2 183.53 59.78 Safe
70 1.0(D 0.751 2.902 3 267.99 99.2 183.6 61.2 Safe
COMBINED FOOTING C19 & C20

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C19 & C20 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG
Check For bearing pressure :-
Case 1) Without Buoyancy :-
Total Load
Load MOM-X MOM-Z Soil,Fdn, Total P/A Mxx/Zxx Mzz/Zzz pmax pmin pall Result
Fy
Pedestral Load
50 1.0(D 2.17 5.71 235.286 192.2 427.486 11.49 0.059 0.149 11.698 11.282 19.5 Safe
51 1.0( 34.309 164.979 317.135 192.2 509.335 13.69 0.923 4.292 18.905 8.475 19.5 Safe
52 1.0( 34.082 153.567 153.437 192.2 345.637 9.29 0.917 3.995 14.202 4.378 19.5 Safe
53 1.0( 34.371 160.489 284.502 192.2 476.702 12.81 0.924 4.176 17.91 7.71 19.5 Safe
54 1.0(D 34.02 158.056 120.803 192.2 313.003 8.41 0.915 4.112 13.437 3.383 19.5 Safe
55 1.0( 104.514 56.631 263.496 192.2 455.696 12.25 2.81 1.474 16.534 7.966 19.5 Safe
56 1.0( 104.287 45.209 207.076 192.2 399.276 10.73 2.804 1.177 14.711 6.749 19.5 Safe
57 1.0( 104.576 52.131 230.863 192.2 423.063 11.37 2.812 1.357 15.539 7.201 19.5 Safe
58 1.0(D 104.224 49.708 174.442 192.2 366.642 9.86 2.802 1.294 13.956 5.764 19.5 Safe
59 1.0( 32.473 53.153 261.924 192.2 454.124 12.21 0.873 1.383 14.466 9.954 19.5 Safe
60 1.0( 32.246 41.74 208.648 192.2 400.848 10.78 0.867 1.086 12.733 8.827 19.5 Safe
61 1.0( 32.535 48.652 229.29 192.2 421.49 11.33 0.875 1.266 13.471 9.189 19.5 Safe
62 1.0(D 32.184 46.23 176.014 192.2 368.214 9.9 0.866 1.203 11.969 7.831 19.5 Safe
63 1.0(D 2.146 8.967 201.865 192.2 394.065 10.59 0.058 0.234 10.882 10.298 19.5 Safe
64 1.0(D 2.187 8.045 203.44 192.2 395.64 10.64 0.059 0.21 10.909 10.371 19.5 Safe
65 1.0( 2.154 11.037 267.132 192.2 459.332 12.35 0.058 0.288 12.696 12.004 19.5 Safe
66 1.0(D 2.195 17.355 268.707 192.2 460.907 12.39 0.06 0.452 12.902 11.878 19.5 Safe
67 1.0(D 6.137 0.987 202.586 192.2 394.786 10.61 0.165 0.026 10.801 10.419 19.5 Safe
68 1.0(D 5.785 1.599 202.718 192.2 394.918 10.62 0.156 0.042 10.818 10.422 19.5 Safe
69 1.0(D 6.013 9.897 267.854 192.2 460.054 12.37 0.162 0.258 12.79 11.95 19.5 Safe
70 1.0(D 5.909 10.506 267.986 192.2 460.186 12.37 0.159 0.274 12.803 11.937 19.5 Safe

Bearing Pressure for Without Buoyancy Case :- pmax = 18.905 T/sq.M pmin = 10.801 T/sq.M

Case 2) With Buoyancy :-


Total Load
Load MOM-X MOM-Z Soil,Fdn, Total P/A Mxx/Zxx Mzz/Zzz pmax pmin pall Result
Fy
Pedestral Load
50 1.0(D 2.17 5.71 235.286 99.2 334.486 8.99 0.059 0.149 9.198 8.782 17 Safe
51 1.0( 34.309 164.979 317.135 99.2 416.335 11.19 0.923 4.292 16.405 5.975 17 Safe
52 1.0( 34.082 153.567 153.437 99.2 252.637 6.79 0.917 3.995 11.702 1.878 17 Safe
53 1.0( 34.371 160.489 284.502 99.2 383.702 10.31 0.924 4.176 15.41 5.21 17 Safe
54 1.0(D 34.02 158.056 120.803 99.2 220.003 5.91 0.915 4.112 10.937 0.883 17 Safe
55 1.0( 104.514 56.631 263.496 99.2 362.696 9.75 2.81 1.474 14.034 5.466 17 Safe
56 1.0( 104.287 45.209 207.076 99.2 306.276 8.23 2.804 1.177 12.211 4.249 17 Safe
57 1.0( 104.576 52.131 230.863 99.2 330.063 8.87 2.812 1.357 13.039 4.701 17 Safe
58 1.0(D 104.224 49.708 174.442 99.2 273.642 7.36 2.802 1.294 11.456 3.264 17 Safe
59 1.0( 32.473 53.153 261.924 99.2 361.124 9.71 0.873 1.383 11.966 7.454 17 Safe
60 1.0( 32.246 41.74 208.648 99.2 307.848 8.28 0.867 1.086 10.233 6.327 17 Safe
61 1.0( 32.535 48.652 229.29 99.2 328.49 8.83 0.875 1.266 10.971 6.689 17 Safe
62 1.0(D 32.184 46.23 176.014 99.2 275.214 7.4 0.866 1.203 9.469 5.331 17 Safe
63 1.0(D 2.146 8.967 201.865 99.2 301.065 8.09 0.058 0.234 8.382 7.798 17 Safe
64 1.0(D 2.187 8.045 203.44 99.2 302.64 8.14 0.059 0.21 8.409 7.871 17 Safe
65 1.0( 2.154 11.037 267.132 99.2 366.332 9.85 0.058 0.288 10.196 9.504 17 Safe
66 1.0(D 2.195 17.355 268.707 99.2 367.907 9.89 0.06 0.452 10.402 9.378 17 Safe
67 1.0(D 6.137 0.987 202.586 99.2 301.786 8.11 0.165 0.026 8.301 7.919 17 Safe
68 1.0(D 5.785 1.599 202.718 99.2 301.918 8.12 0.156 0.042 8.318 7.922 17 Safe
69 1.0(D 6.013 9.897 267.854 99.2 367.054 9.87 0.162 0.258 10.29 9.45 17 Safe
70 1.0(D 5.909 10.506 267.986 99.2 367.186 9.87 0.159 0.274 10.303 9.437 17 Safe

Bearing Pressure for With Buoyancy Case :- pmax = 16.405 T/sq.M pmin = 8.301 T/sq.M
COMBINED FOOTING C19 & C20

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C19 & C20 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG

Check for Pressure at All Four Corners with Buoyancy Case

1-2+3 1+2+3
X X

1-2-3 1+2-3

Load P/A Mxx/Zxx Mzz/Zzz


1+2+3 1-2+3 1-2-3 1+2-3
1 2 3
50 1.0(D 8.99 0.059 0.149 9.198 9.08 8.782 8.9
51 1.0( 11.19 0.923 4.292 16.405 14.559 5.975 7.821
52 1.0( 6.79 0.917 3.995 11.702 9.868 1.878 3.712
53 1.0( 10.31 0.924 4.176 15.41 13.562 5.21 7.058
54 1.0(D 5.91 0.915 4.112 10.937 9.107 0.883 2.713
55 1.0( 9.75 2.81 1.474 14.034 8.414 5.466 11.086
56 1.0( 8.23 2.804 1.177 12.211 6.603 4.249 9.857
57 1.0( 8.87 2.812 1.357 13.039 7.415 4.701 10.325
58 1.0(D 7.36 2.802 1.294 11.456 5.852 3.264 8.868
59 1.0( 9.71 0.873 1.383 11.966 10.22 7.454 9.2
60 1.0( 8.28 0.867 1.086 10.233 8.499 6.327 8.061
61 1.0( 8.83 0.875 1.266 10.971 9.221 6.689 8.439
62 1.0(D 7.4 0.866 1.203 9.469 7.737 5.331 7.063
63 1.0(D 8.09 0.058 0.234 8.382 8.266 7.798 7.914
64 1.0(D 8.14 0.059 0.21 8.409 8.291 7.871 7.989
65 1.0( 9.85 0.058 0.288 10.196 10.08 9.504 9.62
66 1.0(D 9.89 0.06 0.452 10.402 10.282 9.378 9.498
67 1.0(D 8.11 0.165 0.026 8.301 7.971 7.919 8.249
68 1.0(D 8.12 0.156 0.042 8.318 8.006 7.922 8.234
69 1.0(D 9.87 0.162 0.258 10.29 9.966 9.45 9.774
70 1.0(D 9.87 0.159 0.274 10.303 9.985 9.437 9.755

Check for Eccentricity without Buoyancy Case:-

ez = ex < L/6 ez < B/6


Load P Mxx Mzz ex = Mzz/P L/6 B/6
Mxx/P
50 1.0(D 427.486 2.17 5.71 0.02 0.01 1.04 1 <L/6 <B/6
51 1.0( 509.335 34.309 164.979 0.33 0.07 1.04 1 <L/6 <B/6
52 1.0( 345.637 34.082 153.567 0.45 0.1 1.04 1 <L/6 <B/6
53 1.0( 476.702 34.371 160.489 0.34 0.08 1.04 1 <L/6 <B/6
54 1.0(D 313.003 34.02 158.056 0.51 0.11 1.04 1 <L/6 <B/6
55 1.0( 455.696 104.514 56.631 0.13 0.23 1.04 1 <L/6 <B/6
56 1.0( 399.276 104.287 45.209 0.12 0.27 1.04 1 <L/6 <B/6
57 1.0( 423.063 104.576 52.131 0.13 0.25 1.04 1 <L/6 <B/6
58 1.0(D 366.642 104.224 49.708 0.14 0.29 1.04 1 <L/6 <B/6
59 1.0( 454.124 32.473 53.153 0.12 0.08 1.04 1 <L/6 <B/6
60 1.0( 400.848 32.246 41.74 0.11 0.09 1.04 1 <L/6 <B/6
61 1.0( 421.49 32.535 48.652 0.12 0.08 1.04 1 <L/6 <B/6
62 1.0(D 368.214 32.184 46.23 0.13 0.09 1.04 1 <L/6 <B/6
63 1.0(D 394.065 2.146 8.967 0.03 0.01 1.04 1 <L/6 <B/6
64 1.0(D 395.64 2.187 8.045 0.03 0.01 1.04 1 <L/6 <B/6
65 1.0( 459.332 2.154 11.037 0.03 0.01 1.04 1 <L/6 <B/6
66 1.0(D 460.907 2.195 17.355 0.04 0.01 1.04 1 <L/6 <B/6
67 1.0(D 394.786 6.137 0.987 0.01 0.02 1.04 1 <L/6 <B/6
68 1.0(D 394.918 5.785 1.599 0.01 0.02 1.04 1 <L/6 <B/6
69 1.0(D 460.054 6.013 9.897 0.03 0.02 1.04 1 <L/6 <B/6
70 1.0(D 460.186 5.909 10.506 0.03 0.02 1.04 1 <L/6 <B/6
COMBINED FOOTING C19 & C20

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C19 & C20 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG

Check For Shear


a) Two Way Shear
Limit State Method

d/2

d/2

1.6 1.5

Critical Section = At distance d/2 from face of column


Concrete Grade = 30 N/mm2
Column Details
Length = 650 mm
Width = 750 mm

Foundation Details
Length = 3100 mm
Width = 6000 mm
Effective Depth = 975 mm
Percentage Of Steel = 0.21 %

Punching Load
Maximum Load on Column = 172.605 T
Punching Shear = 172.605 x ( 3.1 x 6 - 1.625 x 1.725 )
3.1 x 6

P= 147 Ton
Shear Resistance Of Concrete (Vc)
= vc x bc x d -----Refer to clause no. 31.6.3.1 of IS 456
where vc = ks x tc
ks = 0.5 + bc -----should not be greater than 1

bc = Short Side Of Column


Long Side Of Column

650
=
750
= 0.867
ks = 1
tc = 1.37 N/mm2
bc = Appropriate perimeter at distance d/2
Length of critical section = 1625 mm
Width of critical section = 1725 mm
Perimeter of critical section = 6700 mm

2205000
Depth Required =
1.37 x6700
= 240.22 mm

Shear Resistance = 1.37 x 6700 x 975 / 10000


894 T
COMBINED FOOTING C19 & C20

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C19 & C20 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG

B) One Way Shear 3.1

1.65

6 d

1.6 1.35 0.15


1.6 3

Critical Section = At distance d from face of column


Maximum Pressure = 13.67 T/m2 ---- For without Buoynacy Condition

At Length
Length at critical section = 6000 mm
Width at critical section = 1600 mm
Shear Force = 13.67 x 6 x 1.6
= 132 T
At Width
Length at critical section = 3100 mm
Width at critical section = 1650 mm
Shear Force = 13.67 x 3.1 x 1.65
= 70 T

Designed Shear Stress = 132 T


Corresponding Length = 6000 mm

% Ast = 0.22
Allowable Shear Stress = 0.346 N/mm2 ----Refer Table 21 of IS 456 Check Stress
k= 1 ---- Refer clause no. 40.2 of IS 456
tc = 0.346 N/mm2
Depth Required = 1980000
0.346 x 6000
= 954 mm

Design Of Foundation
a) Calculation of reinforcement at bottom
Maximum Pressure = 18.905 T/m2 --- Without Buoyancy Load Case
Pre. due to pcc & fdn wt = ( 97.65 + 94.55 ) / ( 6.2 x 6 )
= 5.17 T/m2
Net causing moment = 13.735 T/m2
Maximum Projection of fdn = 2.625 m
Bending Moment = 13.735 x 2.625 x 2.625 / 2
= 47.32 Tm
Ast = 0.5 x fck x b x d 1- (4.6 x Mu )
1-
fy fck x b x d2

Ast = 1725.28 mm2


Min. percentage of re-bar = 0.17 %
Ast = 1785 mm2
Use 20 mm dia bars
Area of bar = 314 mm2
Spacing = 175 mm
Provide Spacing = 150 Hence % of Steel = 0.22
Area Provided = 2093.33 mm2
Provide 20 mm dia Bars @ 150 mm spacing bothways
COMBINED FOOTING C19 & C20

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C19 & C20 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG

b) Calculation of reinforcement at top


Area Load = 13.735 T/m2
Max. Projection of fdn = 3 m
Bending Moment = 13.735 x 3 x 3 / 10
= 12.36 Tm
Ast = 0.5 x fck x b x d 1- (4.6 x Mu )
1-
fy fck x b x d2

Ast = 440.67 mm2


Min. percentage of re-bar = 0.17 %
Ast = 1785 mm2
Use 20 mm dia bars
Area of bar = 314 mm2
Spacing = 175 mm
Provide Spacing = 175 mm Hence % of Steel = 0.19
Area Provided = 1794.2857 mm2
Provide 20 mm dia Bars @ 175 mm spacing bothways

Summary Of Design :-
Length Of Footing :- 6200 mm
WIdth Of Footing :- 6000 mm
Depth Of Footing :- 1050 mm
Reinforcement :-
At Top :- Provide 20 mm dia Bars @ 175 mm spacing bothways
At Bottom :- Provide 20 mm dia Bars @ 150 mm spacing bothways
COMBINED FOOTING C25 & C26

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C25 & C26 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG

Design Of Combined Foundation FOR COLUMN C25 & C26

Z
0.65
9.4

X
0.75 7.4

3.2 3 3.2

0.3

1.3
2.5

1.2

Constants :-
Unit Wt Of Soil = 1.8 T/m3
Density Of Water = 1 T/m3
Unit Weight Of Concrete = 2.5 T/m3
Comp. strength of concrete fc = 30 N/mm2
Yield strength of steel fy = 500 N/mm2
Coefficient Of Friction m = 0.5
Net SBC = 15 T/m2
With Buoyancy :
Gross SBC = 15 + (1.8 - 1) x 2.5
17 T/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 15 + (1.8 - 1) x 2.5
20.75 T/m2 ------ Where increase in SBC is allowed.(Wind / EQ 25% increase)
Without Buoyancy :
Gross SBC = 15 + 1.8 x 2.5
19.5 T/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 15 + 1.8 x 2.5
23.25 T/m2 ------ Where increase in SBC is allowed.(Wind / EQ 25% increase)

Shape Of Foundation :-
Length Of Foundation Lf = 9.4 m
Width Of Foundation Wf = 7.4 m
Thickness Of Foundation Tf = 1.2 m
Founding Depth Df = 2.5 m
Length Of Pedestal Lp = 0.65 m
Width Of Pedestal Wp = 0.75 m
Height Of Pedestal Hp = 0 m (Support Reaction Considered at Base of footing)

Section Modulus Zxx = 1 / 6 x 9.4 x 7.4 x 7.4


= 85.791 m3
Section Modulus Zzz = 1 / 6 x 7.4 x 9.4 x 9.4
= 108.978 m3

Calculation Of Soil, Fdn & Pedestal Weights :-


Selfweight Of Foundation = 9.4 x 7.4 x 1.2 x 2.5
= 208.68 T
Selfweight Of Soil = 1.8 x 1.3 x ( 9.4 x 7.4 - 0.75 x 0.65 x 2 )
= 160.49 T
Selfweight Of Pedestal = 2.5 x 0.75 x 0.65 x 0 x 2
= 0 T
Buoyant Weight = -1 x 9.4 x 7.4 x 2.5
= -173.9 T

Total weight without buoyancy = 208.68 + 160.49 + 0


= 369.17 T
Total weight with buoyancy = 208.68 + 160.49 + 0 + -173.9
= 195.27 T
COMBINED FOOTING C25 & C26

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C25 & C26 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG

Calculation Of Restoring Moment :-

Due to fdn. Weight = 208.68 x 9.4 / 2


= 980.8 Tm
Due to fdn. Soil = 160.49 x 9.4 / 2
= 754.3 Tm
Due to Pedestal = 0 x 1.6 + 0 x 7.8
= 0 Tm
Due to Buoyant weight = -173.9 x 4.7
= -817.33

Total moment without buoyancy = 980.8 + 754.3 + 0


= 1735.1 Tm
Total moment with buoyancy = 980.8 + 754.3 + 0 -817.33
= 917.77 Tm

Support Reactions :- ( At foundation level) All Units in Ton - Meter


JOINT LOAD FORCE-X FORCE-Y FORCE-Z MOM-X MOM-Y MOM Z
1025 50 1.0(DL -1.804 142.257 1.641 1.285 0.002 1.926
51 1.0(DL 28.148 203.049 10.835 24.043 1.946 61.977
52 1.0(DL -31.755 81.466 -7.552 -21.473 -1.943 -58.126
53 1.0(DL 28.205 186.218 10.599 23.859 1.943 61.818
54 1.0(DL -31.698 64.635 -7.788 -21.657 -1.945 -58.285
55 1.0(DL 7.585 163.918 27.023 64.308 2.599 20.719
56 1.0(DL -11.193 120.596 -23.741 -61.738 -2.596 -16.868
57 1.0(DL 7.642 147.087 26.788 64.124 2.596 20.56
58 1.0(DL -11.135 103.765 -23.977 -61.922 -2.599 -17.027
59 1.0(DL 7.358 163.939 9.727 21.339 1.102 20.277
60 1.0(DL -10.965 120.576 -6.445 -18.769 -1.099 -16.426
61 1.0(DL 7.415 147.108 9.491 21.155 1.099 20.118
62 1.0(DL -10.908 103.745 -6.681 -18.953 -1.102 -16.585
63 1.0(DL -2.603 123.846 1.409 1.116 -0.008 3.451
64 1.0(DL -0.89 127.006 1.401 1.086 0.006 0.082
65 1.0(DL -2.717 157.508 1.881 1.484 -0.002 3.769
66 1.0(DL -1.004 160.668 1.873 1.454 0.011 0.4
67 1.0(DL -1.746 125.318 2.757 4.237 0.053 1.769
68 1.0(DL -1.747 125.534 0.054 -2.034 -0.055 1.764
69 1.0(DL -1.86 158.981 3.229 4.605 0.058 2.088
70 1.0(DL -1.862 159.196 0.526 -1.666 -0.049 2.082

1026 50 1.0(DL -1.056 56.956 1.084 -0.13 0.079 1.332


51 1.0(DL 22.026 156.676 5.527 13.475 2.437 56.177
52 1.0(DL -24.137 -42.764 -3.359 -13.734 -2.279 -53.513
53 1.0(DL 22.235 151.167 5.38 13.517 2.425 55.913
54 1.0(DL -23.929 -48.273 -3.506 -13.692 -2.291 -53.776
55 1.0(DL 6.193 99.823 13.992 40.797 2.749 18.498
56 1.0(DL -8.304 14.089 -11.825 -41.056 -2.591 -15.834
57 1.0(DL 6.402 94.314 13.846 40.84 2.737 18.234
58 1.0(DL -8.096 8.579 -11.971 -41.014 -2.603 -16.097
59 1.0(DL 6.011 90.894 5.264 12.919 1.297 18.094
60 1.0(DL -8.123 23.018 -3.097 -13.178 -1.139 -15.43
61 1.0(DL 6.22 85.385 5.118 12.962 1.284 17.831
62 1.0(DL -7.914 17.509 -3.243 -13.136 -1.151 -15.693
63 1.0(DL -1.509 53.934 0.936 -0.078 0.062 2.6
64 1.0(DL -0.185 48.96 0.939 -0.096 0.072 -0.463
65 1.0(DL -1.926 64.952 1.229 -0.163 0.086 3.127
66 1.0(DL -0.602 59.978 1.232 -0.181 0.096 0.064
67 1.0(DL -0.845 52.161 1.746 2.267 0.123 1.071
68 1.0(DL -0.849 50.732 0.128 -2.441 0.01 1.067
69 1.0(DL -1.262 63.18 2.039 2.182 0.147 1.598
70 1.0(DL -1.266 61.75 0.421 -2.526 0.034 1.593
COMBINED FOOTING C25 & C26

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C25 & C26 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG
Check For stability :-
a) Against Overturing :- (Check is done only for with buoyancy case)
Total O/T Moment Restoring Moment
Load MOM-Z MOM-X External Soil,Fdn, Total F.O.S. Result
Total
STAAD Due to Fy Load Pedestal
50 1.0( 3.258 127.95 1.415 131.22 808.35 917.77 1726.12 13.15 Safe
51 1.0( 118.154 69.56 37.518 191.43 1621.15 917.77 2538.92 13.26 Safe
52 1.0( 111.639 186.35 35.207 300.07 -4.45 917.77 913.32 3.04 Safe
53 1.0( 117.731 52.58 37.376 174.37 1533.13 917.77 2450.9 14.06 Safe
54 1.0(D 112.061 169.36 35.349 283.64 -92.46 917.77 825.31 2.91 Safe
55 1.0( 39.217 96.14 105.105 171.38 1143.44 917.77 2061.21 12.03 Safe
56 1.0( 32.702 159.76 102.794 218.2 473.26 917.77 1391.03 6.38 Safe
57 1.0( 38.794 79.16 104.964 157.9 1055.43 917.77 1973.2 12.5 Safe
58 1.0(D 33.124 142.78 102.936 203.81 385.24 917.77 1303.01 6.39 Safe
59 1.0( 38.371 109.57 34.258 151.86 1088.15 917.77 2005.92 13.21 Safe
60 1.0( 31.856 146.34 31.947 181.04 528.55 917.77 1446.32 7.99 Safe
61 1.0( 37.949 92.58 34.117 134.92 1000.13 917.77 1917.9 14.22 Safe
62 1.0(D 32.278 129.35 32.089 164.79 440.54 917.77 1358.31 8.24 Safe
63 1.0(D 6.051 104.87 1.194 110.93 730.7 917.77 1648.47 14.86 Safe
64 1.0(D 0.545 117.07 1.182 117.63 709.97 917.77 1627.74 13.84 Safe
65 1.0( 6.896 138.83 1.647 145.74 906.73 917.77 1824.5 12.52 Safe
66 1.0(D 0.464 151.04 1.635 151.52 886 917.77 1803.77 11.9 Safe
67 1.0(D 2.84 109.74 6.504 112.77 724.42 917.77 1642.19 14.56 Safe
68 1.0(D 2.831 112.2 4.475 115.12 716.25 917.77 1634.02 14.19 Safe
69 1.0(D 3.686 143.7 6.787 147.55 900.46 917.77 1818.23 12.32 Safe
70 1.0(D 3.675 146.17 4.192 149.91 892.28 917.77 1810.05 12.07 Safe

b) Against Sliding :- (Check is done only for with buoyancy case)


Total Sliding Forces Restoring Forces
Load Fx Fz Resultant External Soil,Fdn, Total F.O.S. Result
Load Pedestal
50 1.0( 2.86 2.725 3.95 199.21 195.27 197.24 49.93 Safe
51 1.0( 50.174 16.362 52.77 359.73 195.27 277.5 5.26 Safe
52 1.0( 55.892 10.911 56.95 38.7 195.27 116.99 2.05 Safe
53 1.0( 50.44 15.979 52.91 337.39 195.27 266.33 5.03 Safe
54 1.0(D 55.627 11.294 56.76 16.36 195.27 105.82 1.86 Safe
55 1.0( 13.778 41.015 43.27 263.74 195.27 229.51 5.3 Safe
56 1.0( 19.497 35.566 40.56 134.69 195.27 164.98 4.07 Safe
57 1.0( 14.044 40.634 42.99 241.4 195.27 218.34 5.08 Safe
58 1.0(D 19.231 35.948 40.77 112.34 195.27 153.81 3.77 Safe
59 1.0( 13.369 14.991 20.09 254.83 195.27 225.05 11.2 Safe
60 1.0( 19.088 9.542 21.34 143.59 195.27 169.43 7.94 Safe
61 1.0( 13.635 14.609 19.98 232.49 195.27 213.88 10.7 Safe
62 1.0(D 18.822 9.924 21.28 121.25 195.27 158.26 7.44 Safe
63 1.0(D 4.112 2.345 4.73 177.78 195.27 186.53 39.44 Safe
64 1.0(D 1.075 2.34 2.58 175.97 195.27 185.62 71.95 Safe
65 1.0( 4.643 3.11 5.59 222.46 195.27 208.87 37.36 Safe
66 1.0(D 1.606 3.105 3.5 220.65 195.27 207.96 59.42 Safe
67 1.0(D 2.591 4.503 5.2 177.48 195.27 186.38 35.84 Safe
68 1.0(D 2.596 0.182 2.6 176.27 195.27 185.77 71.45 Safe
69 1.0(D 3.122 5.268 6.12 222.16 195.27 208.72 34.1 Safe
70 1.0(D 3.128 0.947 3.27 220.95 195.27 208.11 63.64 Safe
COMBINED FOOTING C25 & C26

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C25 & C26 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG
Check For bearing pressure :-
Case 1) Without Buoyancy :-
Total Load
Load MOM-X MOM-Z Soil,Fdn, Total P/A Mxx/Zxx Mzz/Zzz pmax pmin pall Result
Fy
Pedestral Load
50 1.0( 1.415 131.208 199.213 369.17 568.383 8.17 0.017 1.204 9.391 6.949 19.5 Safe
51 1.0( 37.518 187.714 359.725 369.17 728.895 10.48 0.438 1.723 12.641 8.319 19.5 Safe
52 1.0( 35.207 297.989 38.702 369.17 407.872 5.86 0.411 2.735 9.006 2.714 19.5 Safe
53 1.0( 37.376 170.311 337.385 369.17 706.555 10.16 0.436 1.563 12.159 8.161 19.5 Safe
54 1.0(D 35.349 281.421 16.362 369.17 385.532 5.54 0.413 2.583 8.536 2.544 19.5 Safe
55 1.0( 105.105 135.357 263.741 369.17 632.911 9.1 1.226 1.243 11.569 6.631 19.5 Safe
56 1.0( 102.794 192.462 134.685 369.17 503.855 7.24 1.199 1.767 10.206 4.274 19.5 Safe
57 1.0( 104.964 117.954 241.401 369.17 610.571 8.78 1.224 1.083 11.087 6.473 19.5 Safe
58 1.0(D 102.936 175.904 112.344 369.17 481.514 6.92 1.2 1.615 9.735 4.105 19.5 Safe
59 1.0( 34.258 147.941 254.833 369.17 624.003 8.97 0.4 1.358 10.728 7.212 19.5 Safe
60 1.0( 31.947 178.196 143.594 369.17 512.764 7.37 0.373 1.636 9.379 5.361 19.5 Safe
61 1.0( 34.117 130.529 232.493 369.17 601.663 8.65 0.398 1.198 10.246 7.054 19.5 Safe
62 1.0(D 32.089 161.628 121.254 369.17 490.424 7.05 0.375 1.484 8.909 5.191 19.5 Safe
63 1.0(D 1.194 110.921 177.78 369.17 546.95 7.86 0.014 1.018 8.892 6.828 19.5 Safe
64 1.0(D 1.182 117.615 175.966 369.17 545.136 7.84 0.014 1.08 8.934 6.746 19.5 Safe
65 1.0( 1.647 145.726 222.46 369.17 591.63 8.51 0.02 1.338 9.868 7.152 19.5 Safe
66 1.0(D 1.635 151.504 220.646 369.17 589.816 8.48 0.02 1.391 9.891 7.069 19.5 Safe
67 1.0(D 6.504 112.58 177.479 369.17 546.649 7.86 0.076 1.034 8.97 6.75 19.5 Safe
68 1.0(D 4.475 115.031 176.266 369.17 545.436 7.84 0.053 1.056 8.949 6.731 19.5 Safe
69 1.0(D 6.787 147.386 222.161 369.17 591.331 8.5 0.08 1.353 9.933 7.067 19.5 Safe
70 1.0(D 4.192 149.845 220.946 369.17 590.116 8.48 0.049 1.376 9.905 7.055 19.5 Safe

Bearing Pressure for Without Buoyancy Case :- pmax = 12.641 T/sq.M pmin = 8.536 T/sq.M

Case 2) With Buoyancy :-


Total Load
Load MOM-X MOM-Z Soil,Fdn, Total P/A Mxx/Zxx Mzz/Zzz pmax pmin pall Result
Fy
Pedestral Load
50 1.0( 1.415 131.208 199.213 195.27 394.483 5.67 0.017 1.204 6.891 4.449 17 Safe
51 1.0( 37.518 187.714 359.725 195.27 554.995 7.98 0.438 1.723 10.141 5.819 17 Safe
52 1.0( 35.207 297.989 38.702 195.27 233.972 3.36 0.411 2.735 6.506 0.214 17 Safe
53 1.0( 37.376 170.311 337.385 195.27 532.655 7.66 0.436 1.563 9.659 5.661 17 Safe
54 1.0(D 35.349 281.421 16.362 195.27 211.632 3.04 0.413 2.583 6.036 0.044 17 Safe
55 1.0( 105.105 135.357 263.741 195.27 459.011 6.6 1.226 1.243 9.069 4.131 17 Safe
56 1.0( 102.794 192.462 134.685 195.27 329.955 4.74 1.199 1.767 7.706 1.774 17 Safe
57 1.0( 104.964 117.954 241.401 195.27 436.671 6.28 1.224 1.083 8.587 3.973 17 Safe
58 1.0(D 102.936 175.904 112.344 195.27 307.614 4.42 1.2 1.615 7.235 1.605 17 Safe
59 1.0( 34.258 147.941 254.833 195.27 450.103 6.47 0.4 1.358 8.228 4.712 17 Safe
60 1.0( 31.947 178.196 143.594 195.27 338.864 4.87 0.373 1.636 6.879 2.861 17 Safe
61 1.0( 34.117 130.529 232.493 195.27 427.763 6.15 0.398 1.198 7.746 4.554 17 Safe
62 1.0(D 32.089 161.628 121.254 195.27 316.524 4.55 0.375 1.484 6.409 2.691 17 Safe
63 1.0(D 1.194 110.921 177.78 195.27 373.05 5.36 0.014 1.018 6.392 4.328 17 Safe
64 1.0(D 1.182 117.615 175.966 195.27 371.236 5.34 0.014 1.08 6.434 4.246 17 Safe
65 1.0( 1.647 145.726 222.46 195.27 417.73 6.01 0.02 1.338 7.368 4.652 17 Safe
66 1.0(D 1.635 151.504 220.646 195.27 415.916 5.98 0.02 1.391 7.391 4.569 17 Safe
67 1.0(D 6.504 112.58 177.479 195.27 372.749 5.36 0.076 1.034 6.47 4.25 17 Safe
68 1.0(D 4.475 115.031 176.266 195.27 371.536 5.34 0.053 1.056 6.449 4.231 17 Safe
69 1.0(D 6.787 147.386 222.161 195.27 417.431 6 0.08 1.353 7.433 4.567 17 Safe
70 1.0(D 4.192 149.845 220.946 195.27 416.216 5.98 0.049 1.376 7.405 4.555 17 Safe

Bearing Pressure for With Buoyancy Case :- pmax = 10.141 T/sq.M pmin = 6.036 T/sq.M
COMBINED FOOTING C25 & C26

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C25 & C26 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG

Check for Pressure at All Four Corners with Buoyancy Case

1-2+3 1+2+3
X X

1-2-3 1+2-3

Load P/A Mxx/Zxx Mzz/Zzz


1+2+3 1-2+3 1-2-3 1+2-3
1 2 3
50 1.0( 5.67 0.017 1.204 6.891 6.857 4.449 4.483
51 1.0( 7.98 0.438 1.723 10.141 9.265 5.819 6.695
52 1.0( 3.36 0.411 2.735 6.506 5.684 0.214 1.036
53 1.0( 7.66 0.436 1.563 9.659 8.787 5.661 6.533
54 1.0(D 3.04 0.413 2.583 6.036 5.21 0.044 0.87
55 1.0( 6.6 1.226 1.243 9.069 6.617 4.131 6.583
56 1.0( 4.74 1.199 1.767 7.706 5.308 1.774 4.172
57 1.0( 6.28 1.224 1.083 8.587 6.139 3.973 6.421
58 1.0(D 4.42 1.2 1.615 7.235 4.835 1.605 4.005
59 1.0( 6.47 0.4 1.358 8.228 7.428 4.712 5.512
60 1.0( 4.87 0.373 1.636 6.879 6.133 2.861 3.607
61 1.0( 6.15 0.398 1.198 7.746 6.95 4.554 5.35
62 1.0(D 4.55 0.375 1.484 6.409 5.659 2.691 3.441
63 1.0(D 5.36 0.014 1.018 6.392 6.364 4.328 4.356
64 1.0(D 5.34 0.014 1.08 6.434 6.406 4.246 4.274
65 1.0( 6.01 0.02 1.338 7.368 7.328 4.652 4.692
66 1.0(D 5.98 0.02 1.391 7.391 7.351 4.569 4.609
67 1.0(D 5.36 0.076 1.034 6.47 6.318 4.25 4.402
68 1.0(D 5.34 0.053 1.056 6.449 6.343 4.231 4.337
69 1.0(D 6 0.08 1.353 7.433 7.273 4.567 4.727
70 1.0(D 5.98 0.049 1.376 7.405 7.307 4.555 4.653

Check for Eccentricity without Buoyancy Case:-

ez = ex < L/6 ez < B/6


Load P Mxx Mzz ex = Mzz/P L/6 B/6
Mxx/P
50 1.0( 568.383 1.415 131.208 0.24 0.01 1.57 1.24 <L/6 <B/6
51 1.0( 728.895 37.518 187.714 0.26 0.06 1.57 1.24 <L/6 <B/6
52 1.0( 407.872 35.207 297.989 0.74 0.09 1.57 1.24 <L/6 <B/6
53 1.0( 706.555 37.376 170.311 0.25 0.06 1.57 1.24 <L/6 <B/6
54 1.0(D 385.532 35.349 281.421 0.73 0.1 1.57 1.24 <L/6 <B/6
55 1.0( 632.911 105.105 135.357 0.22 0.17 1.57 1.24 <L/6 <B/6
56 1.0( 503.855 102.794 192.462 0.39 0.21 1.57 1.24 <L/6 <B/6
57 1.0( 610.571 104.964 117.954 0.2 0.18 1.57 1.24 <L/6 <B/6
58 1.0(D 481.514 102.936 175.904 0.37 0.22 1.57 1.24 <L/6 <B/6
59 1.0( 624.003 34.258 147.941 0.24 0.06 1.57 1.24 <L/6 <B/6
60 1.0( 512.764 31.947 178.196 0.35 0.07 1.57 1.24 <L/6 <B/6
61 1.0( 601.663 34.117 130.529 0.22 0.06 1.57 1.24 <L/6 <B/6
62 1.0(D 490.424 32.089 161.628 0.33 0.07 1.57 1.24 <L/6 <B/6
63 1.0(D 546.95 1.194 110.921 0.21 0.01 1.57 1.24 <L/6 <B/6
64 1.0(D 545.136 1.182 117.615 0.22 0.01 1.57 1.24 <L/6 <B/6
65 1.0( 591.63 1.647 145.726 0.25 0.01 1.57 1.24 <L/6 <B/6
66 1.0(D 589.816 1.635 151.504 0.26 0.01 1.57 1.24 <L/6 <B/6
67 1.0(D 546.649 6.504 112.58 0.21 0.02 1.57 1.24 <L/6 <B/6
68 1.0(D 545.436 4.475 115.031 0.22 0.01 1.57 1.24 <L/6 <B/6
69 1.0(D 591.331 6.787 147.386 0.25 0.02 1.57 1.24 <L/6 <B/6
70 1.0(D 590.116 4.192 149.845 0.26 0.01 1.57 1.24 <L/6 <B/6
COMBINED FOOTING C25 & C26

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C25 & C26 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG

Check For Shear


a) Two Way Shear
Limit State Method

d/2

7.4

d/2

3.2 1.5

Critical Section = At distance d/2 from face of column


Concrete Grade = 30 N/mm2
Column Details
Length = 650 mm
Width = 750 mm

Foundation Details
Length = 4700 mm
Width = 7400 mm
Effective Depth = 1125 mm
Percentage Of Steel = 0.19 %

Punching Load
Maximum Load on Column = 203.049 T
Punching Shear = 203.049 x ( 4.7 x 7.4 - 1.775 x 1.875 )
4.7 x 7.4

P= 184 Ton
Shear Resistance Of Concrete (Vc)
= vc x bc x d -----Refer to clause no. 31.6.3.1 of IS 456
where vc = ks x tc
ks = 0.5 + bc -----should not be greater than 1

bc = Short Side Of Column


Long Side Of Column

650
=
750
= 0.867
ks = 1
tc = 1.37 N/mm2
bc = Appropriate perimeter at distance d/2
Length of critical section = 1775 mm
Width of critical section = 1875 mm
Perimeter of critical section = 7300 mm

2760000
Depth Required =
1.37 x7300
= 275.97 mm

Shear Resistance = 1.37 x 7300 x 1125 / 10000


1125 T
COMBINED FOOTING C25 & C26

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C25 & C26 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG

B) One Way Shear 4.7

2.2

7.4 d

3.2 1.5 0
3.2 3

Critical Section = At distance d from face of column


Maximum Pressure = 7.301 T/m2 ---- For without Buoynacy Condition

At Length
Length at critical section = 7400 mm
Width at critical section = 3200 mm
Shear Force = 7.301 x 7.4 x 3.2
= 173 T
At Width
Length at critical section = 4700 mm
Width at critical section = 2200 mm
Shear Force = 7.301 x 4.7 x 2.2
= 76 T

Designed Shear Stress = 173 T


Corresponding Length = 7400 mm

% Ast = 0.19
Allowable Shear Stress = 0.322 N/mm2 ----Refer Table 21 of IS 456 Check Stress
k= 1 ---- Refer clause no. 40.2 of IS 456
tc = 0.322 N/mm2
Depth Required = 2595000
0.322 x 7400
= 1090 mm

Design Of Foundation
a) Calculation of reinforcement at bottom
Maximum Pressure = 12.641 T/m2 --- Without Buoyancy Load Case
Pre. due to pcc & fdn wt = ( 208.68 + 160.49 ) / ( 9.4 x 7.4 )
= 5.31 T/m2
Net causing moment = 7.331 T/m2
Maximum Projection of fdn = 3.325 m
Bending Moment = 7.331 x 3.325 x 3.325 / 2
= 40.52 Tm
Ast = 0.5 x fck x b x d 1- (4.6 x Mu )
1-
fy fck x b x d2

Ast = 1266.37 mm2


Min. percentage of re-bar = 0.17 %
Ast = 2040 mm2
Use 20 mm dia bars
Area of bar = 314 mm2
Spacing = 150 mm
Provide Spacing = 150 Hence % of Steel = 0.19
Area Provided = 2093.33 mm2
Provide 20 mm dia Bars @ 150 mm spacing bothways
COMBINED FOOTING C25 & C26

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C25 & C26 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG

b) Calculation of reinforcement at top


Area Load = 7.331 T/m2
Max. Projection of fdn = 3 m
Bending Moment = 7.331 x 3 x 3 / 10
= 6.6 Tm
Ast = 0.5 x fck x b x d 1- (4.6 x Mu )
1-
fy fck x b x d2

Ast = 203.01 mm2


Min. percentage of re-bar = 0.17 %
Ast = 2040 mm2
Use 20 mm dia bars
Area of bar = 314 mm2
Spacing = 153 mm
Provide Spacing = 150 mm Hence % of Steel = 0.19
Area Provided = 2093.3333 mm2
Provide 20 mm dia Bars @ 150 mm spacing bothways

Summary Of Design :-
Length Of Footing :- 9400 mm
WIdth Of Footing :- 7400 mm
Depth Of Footing :- 1200 mm
Reinforcement :-
At Top :- Provide 20 mm dia Bars @ 150 mm spacing bothways
At Bottom :- Provide 20 mm dia Bars @ 150 mm spacing bothways
COMBINED FOOTING C35 & C36

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C35 & C36 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG

Design Of Combined Footing FOR COLUMN C35 & C36

Z
0.65
7.8

X
0.75 6.2

2.4 3 2.4

0.3

1.3
2.5

1.2

Constants :-
Unit Wt Of Soil = 1.8 T/m3
Density Of Water = 1 T/m3
Unit Weight Of Concrete = 2.5 T/m3
Comp. strength of concrete fc = 30 N/mm2
Yield strength of steel fy = 500 N/mm2
Coefficient Of Friction m = 0.5
Net SBC = 15 T/m2
With Buoyancy :
Gross SBC = 15 + (1.8 - 1) x 2.5
17 T/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 15 + (1.8 - 1) x 2.5
20.75 T/m2 ------ Where increase in SBC is allowed.(Wind / EQ 25% increase)
Without Buoyancy :
Gross SBC = 15 + 1.8 x 2.5
19.5 T/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 15 + 1.8 x 2.5
23.25 T/m2 ------ Where increase in SBC is allowed.(Wind / EQ 25% increase)

Shape Of Foundation :-
Length Of Foundation Lf = 7.8 m
Width Of Foundation Wf = 6.2 m
Thickness Of Foundation Tf = 1.2 m
Founding Depth Df = 2.5 m
Length Of Pedestal Lp = 0.65 m
Width Of Pedestal Wp = 0.75 m
Height Of Pedestal Hp = 0 m (Support Reaction Considered at Base of footing)

Section Modulus Zxx = 1 / 6 x 7.8 x 6.2 x 6.2


= 49.972 m3
Section Modulus Zzz = 1 / 6 x 6.2 x 7.8 x 7.8
= 62.868 m3

Calculation Of Soil, Fdn & Pedestal Weights :-


Selfweight Of Foundation = 7.8 x 6.2 x 1.2 x 2.5
= 145.08 T
Selfweight Of Soil = 1.8 x 1.3 x ( 7.8 x 6.2 - 0.75 x 0.65 x 2 )
= 110.88 T
Selfweight Of Pedestal = 2.5 x 0.75 x 0.65 x 0 x 2
= 0 T
Buoyant Weight = -1 x 7.8 x 6.2 x 2.5
= -120.9 T

Total weight without buoyancy = 145.08 + 110.88 + 0


= 255.96 T
Total weight with buoyancy = 145.08 + 110.88 + 0 + -120.9
= 135.06 T
COMBINED FOOTING C35 & C36

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C35 & C36 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG

Calculation Of Restoring Moment :-

Due to fdn. Weight = 145.08 x 7.8 / 2


= 565.81 Tm
Due to fdn. Soil = 110.88 x 7.8 / 2
= 432.43 Tm
Due to Pedestal = 0 x 1.2 + 0 x 6.6
= 0 Tm
Due to Buoyant weight = -120.9 x 3.9
= -471.51

Total moment without buoyancy = 565.81 + 432.43 + 0


= 998.24 Tm
Total moment with buoyancy = 565.81 + 432.43 + 0 -471.51
= 526.73 Tm

Support Reactions :- ( At foundation level) All Units in Ton - Meter


JOINT LOAD FORCE-X FORCE-Y FORCE-Z MOM-X MOM-Y MOM Z
1035 50 1.0(DL -0.701 121.52 -1.01 -1.139 0.004 0.915
51 1.0(DL 19.848 169.443 7.696 19.987 2.165 38.357
52 1.0(DL -21.251 73.596 -9.716 -22.266 -2.158 -36.527
53 1.0(DL 19.961 153.296 8.059 20.384 2.164 38.187
54 1.0(DL -21.138 57.45 -9.352 -21.869 -2.158 -36.697
55 1.0(DL 5.852 136.916 22.874 57.209 3.482 12.861
56 1.0(DL -7.255 106.124 -24.894 -59.487 -3.475 -11.031
57 1.0(DL 5.965 120.769 23.238 57.606 3.481 12.691
58 1.0(DL -7.143 89.977 -24.531 -59.091 -3.476 -11.201
59 1.0(DL 5.612 136.888 6.669 17.45 1.354 12.418
60 1.0(DL -7.014 106.151 -8.689 -19.729 -1.347 -10.588
61 1.0(DL 5.724 120.741 7.032 17.847 1.354 12.248
62 1.0(DL -6.902 90.005 -8.325 -19.332 -1.348 -10.758
63 1.0(DL -1.409 103.5 -0.638 -0.724 0.007 2.221
64 1.0(DL 0.231 107.246 -0.655 -0.76 -0.002 -0.731
65 1.0(DL -1.633 135.794 -1.365 -1.518 0.009 2.561
66 1.0(DL 0.006 139.539 -1.382 -1.554 0 -0.391
67 1.0(DL -0.596 105.354 0.756 2.399 0.066 0.755
68 1.0(DL -0.582 105.393 -2.049 -3.884 -0.06 0.734
69 1.0(DL -0.82 137.647 0.029 1.606 0.068 1.096
70 1.0(DL -0.807 137.686 -2.776 -4.678 -0.059 1.075

1036 50 1.0(DL -1.011 56.851 -0.247 -1.084 -0.009 1.4


51 1.0(DL 16.789 122.273 5.693 13.798 2.574 42.573
52 1.0(DL -18.812 -8.571 -6.187 -15.965 -2.592 -39.772
53 1.0(DL 16.943 117.44 6.007 14.207 2.574 42.315
54 1.0(DL -18.658 -13.403 -5.873 -15.555 -2.591 -40.031
55 1.0(DL 4.665 82.27 17.431 43.682 2.324 14.535
56 1.0(DL -6.687 31.432 -17.925 -45.849 -2.342 -11.734
57 1.0(DL 4.819 77.438 17.745 44.091 2.324 14.276
58 1.0(DL -6.533 26.599 -17.611 -45.44 -2.341 -11.992
59 1.0(DL 4.46 78.023 5.442 13.178 1.154 14.051
60 1.0(DL -6.482 35.679 -5.936 -15.346 -1.171 -11.25
61 1.0(DL 4.614 73.19 5.756 13.588 1.154 13.793
62 1.0(DL -6.328 30.847 -5.622 -14.936 -1.171 -11.509
63 1.0(DL -1.565 54.592 0.068 -0.665 0.004 2.754
64 1.0(DL -0.149 49.444 0.066 -0.683 -0.021 -0.47
65 1.0(DL -1.873 64.258 -0.56 -1.484 0.004 3.271
66 1.0(DL -0.457 59.11 -0.562 -1.502 -0.022 0.047
67 1.0(DL -0.864 51.799 1.148 1.93 0.059 1.154
68 1.0(DL -0.85 52.238 -1.014 -3.278 -0.076 1.13
69 1.0(DL -1.172 61.465 0.52 1.111 0.058 1.671
70 1.0(DL -1.158 61.903 -1.642 -4.097 -0.076 1.647
COMBINED FOOTING C35 & C36

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C35 & C36 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG
Check For stability :-
a) Against Overturing :- (Check is done only for with buoyancy case)
Total O/T Moment Restoring Moment
Load MOM-Z MOM-X External Soil,Fdn, Total F.O.S. Result
Total
STAAD Due to Fy Load Pedestal
50 1.0( 2.315 97 2.223 99.34 598.64 526.73 1125.37 11.33 Safe
51 1.0( 80.93 70.76 33.785 155.41 1066.94 526.73 1593.67 10.25 Safe
52 1.0( 76.299 123.25 38.231 203.18 130.35 526.73 657.08 3.23 Safe
53 1.0( 80.502 53.78 34.591 138.67 1002.09 526.73 1528.82 11.02 Safe
54 1.0(D 76.728 106.28 37.424 186.8 65.5 526.73 592.23 3.17 Safe
55 1.0( 27.396 81.97 100.891 148.8 772.86 526.73 1299.59 8.73 Safe
56 1.0( 22.765 112.04 105.336 171.08 424.43 526.73 951.16 5.56 Safe
57 1.0( 26.967 65 101.697 137.12 708.01 526.73 1234.74 9 Safe
58 1.0(D 23.193 95.07 104.531 157.84 359.58 526.73 886.31 5.62 Safe
59 1.0( 26.469 88.3 30.628 118.79 749.86 526.73 1276.59 10.75 Safe
60 1.0( 21.838 105.71 35.075 132.29 447.43 526.73 974.16 7.36 Safe
61 1.0( 26.041 71.33 31.435 102.32 685 526.73 1211.73 11.84 Safe
62 1.0(D 22.267 88.74 34.268 116.18 382.59 526.73 909.32 7.83 Safe
63 1.0(D 4.975 73.36 1.389 78.35 543.2 526.73 1069.93 13.66 Safe
64 1.0(D 1.201 86.7 1.443 87.92 524.39 526.73 1051.12 11.96 Safe
65 1.0( 5.832 107.3 3.002 113.18 672.9 526.73 1199.63 10.6 Safe
66 1.0(D 0.438 120.64 3.056 121.12 654.09 526.73 1180.82 9.75 Safe
67 1.0(D 1.909 80.33 4.329 82.36 532.56 526.73 1059.29 12.86 Safe
68 1.0(D 1.864 79.73 7.162 81.91 535.03 526.73 1061.76 12.96 Safe
69 1.0(D 2.767 114.27 2.717 117.07 662.26 526.73 1188.99 10.16 Safe
70 1.0(D 2.722 113.67 8.775 116.73 664.72 526.73 1191.45 10.21 Safe

b) Against Sliding :- (Check is done only for with buoyancy case)


Total Sliding Forces Restoring Forces
Load Fx Fz Resultant External Soil,Fdn, Total F.O.S. Result
Load Pedestal
50 1.0( 1.712 1.257 2.12 178.37 135.06 156.72 73.92 Safe
51 1.0( 36.637 13.389 39.01 291.72 135.06 213.39 5.47 Safe
52 1.0( 40.063 15.903 43.1 65.03 135.06 100.05 2.32 Safe
53 1.0( 36.904 14.066 39.49 270.74 135.06 202.9 5.14 Safe
54 1.0(D 39.796 15.225 42.61 44.05 135.06 89.56 2.1 Safe
55 1.0( 10.517 40.305 41.65 219.19 135.06 177.13 4.25 Safe
56 1.0( 13.942 42.819 45.03 137.56 135.06 136.31 3.03 Safe
57 1.0( 10.784 40.983 42.38 198.21 135.06 166.64 3.93 Safe
58 1.0(D 13.676 42.142 44.31 116.58 135.06 125.82 2.84 Safe
59 1.0( 10.072 12.111 15.75 214.91 135.06 174.99 11.11 Safe
60 1.0( 13.496 14.625 19.9 141.83 135.06 138.45 6.96 Safe
61 1.0( 10.338 12.788 16.44 193.93 135.06 164.5 10.01 Safe
62 1.0(D 13.23 13.947 19.22 120.85 135.06 127.96 6.66 Safe
63 1.0(D 2.974 0.706 3.06 158.09 135.06 146.58 47.9 Safe
64 1.0(D 0.38 0.721 0.82 156.69 135.06 145.88 177.9 Safe
65 1.0( 3.506 1.925 4 200.05 135.06 167.56 41.89 Safe
66 1.0(D 0.463 1.944 2 198.65 135.06 166.86 83.43 Safe
67 1.0(D 1.46 1.904 2.4 157.15 135.06 146.11 60.88 Safe
68 1.0(D 1.432 3.063 3.38 157.63 135.06 146.35 43.3 Safe
69 1.0(D 1.992 0.549 2.07 199.11 135.06 167.09 80.72 Safe
70 1.0(D 1.965 4.418 4.84 199.59 135.06 167.33 34.57 Safe
COMBINED FOOTING C35 & C36

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C35 & C36 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG
Check For bearing pressure :-
Case 1) Without Buoyancy :-
Total Load
Load MOM-X MOM-Z Soil,Fdn, Total P/A Mxx/Zxx Mzz/Zzz pmax pmin pall Result
Fy
Pedestral Load
50 1.0( 2.223 99.315 178.371 255.96 434.331 8.98 0.045 1.58 10.605 7.355 19.5 Safe
51 1.0( 33.785 151.69 291.716 255.96 547.676 11.32 0.677 2.413 14.41 8.23 19.5 Safe
52 1.0( 38.231 199.549 65.025 255.96 320.985 6.64 0.766 3.175 10.581 2.699 19.5 Safe
53 1.0( 34.591 134.282 270.736 255.96 526.696 10.89 0.693 2.136 13.719 8.061 19.5 Safe
54 1.0(D 37.424 183.008 44.047 255.96 300.007 6.2 0.749 2.911 9.86 2.54 19.5 Safe
55 1.0( 100.891 109.366 219.186 255.96 475.146 9.83 2.019 1.74 13.589 6.071 19.5 Safe
56 1.0( 105.336 134.805 137.556 255.96 393.516 8.14 2.108 2.145 12.393 3.887 19.5 Safe
57 1.0( 101.697 91.967 198.207 255.96 454.167 9.39 2.036 1.463 12.889 5.891 19.5 Safe
58 1.0(D 104.531 118.263 116.576 255.96 372.536 7.7 2.092 1.882 11.674 3.726 19.5 Safe
59 1.0( 30.628 114.769 214.911 255.96 470.871 9.74 0.613 1.826 12.179 7.301 19.5 Safe
60 1.0( 35.075 127.548 141.83 255.96 397.79 8.23 0.702 2.029 10.961 5.499 19.5 Safe
61 1.0( 31.435 97.371 193.931 255.96 449.891 9.3 0.63 1.549 11.479 7.121 19.5 Safe
62 1.0(D 34.268 111.007 120.852 255.96 376.812 7.79 0.686 1.766 10.242 5.338 19.5 Safe
63 1.0(D 1.389 78.335 158.092 255.96 414.052 8.56 0.028 1.247 9.835 7.285 19.5 Safe
64 1.0(D 1.443 87.901 156.69 255.96 412.65 8.53 0.029 1.399 9.958 7.102 19.5 Safe
65 1.0( 3.002 113.132 200.052 255.96 456.012 9.43 0.061 1.8 11.291 7.569 19.5 Safe
66 1.0(D 3.056 121.078 198.649 255.96 454.609 9.4 0.062 1.926 11.388 7.412 19.5 Safe
67 1.0(D 4.329 82.239 157.153 255.96 413.113 8.54 0.087 1.309 9.936 7.144 19.5 Safe
68 1.0(D 7.162 81.594 157.631 255.96 413.591 8.55 0.144 1.298 9.992 7.108 19.5 Safe
69 1.0(D 2.717 117.037 199.112 255.96 455.072 9.41 0.055 1.862 11.327 7.493 19.5 Safe
70 1.0(D 8.775 116.392 199.589 255.96 455.549 9.42 0.176 1.852 11.448 7.392 19.5 Safe

Bearing Pressure for Without Buoyancy Case :- pmax = 14.41 T/sq.M pmin = 9.835 T/sq.M

Case 2) With Buoyancy :-


Total Load
Load MOM-X MOM-Z Soil,Fdn, Total P/A Mxx/Zxx Mzz/Zzz pmax pmin pall Result
Fy
Pedestral Load
50 1.0( 2.223 99.315 178.371 135.06 313.431 6.48 0.045 1.58 8.105 4.855 17 Safe
51 1.0( 33.785 151.69 291.716 135.06 426.776 8.82 0.677 2.413 11.91 5.73 17 Safe
52 1.0( 38.231 199.549 65.025 135.06 200.085 4.14 0.766 3.175 8.081 0.199 17 Safe
53 1.0( 34.591 134.282 270.736 135.06 405.796 8.39 0.693 2.136 11.219 5.561 17 Safe
54 1.0(D 37.424 183.008 44.047 135.06 179.107 3.7 0.749 2.911 7.36 0.04 17 Safe
55 1.0( 100.891 109.366 219.186 135.06 354.246 7.33 2.019 1.74 11.089 3.571 17 Safe
56 1.0( 105.336 134.805 137.556 135.06 272.616 5.64 2.108 2.145 9.893 1.387 17 Safe
57 1.0( 101.697 91.967 198.207 135.06 333.267 6.89 2.036 1.463 10.389 3.391 17 Safe
58 1.0(D 104.531 118.263 116.576 135.06 251.636 5.2 2.092 1.882 9.174 1.226 17 Safe
59 1.0( 30.628 114.769 214.911 135.06 349.971 7.24 0.613 1.826 9.679 4.801 17 Safe
60 1.0( 35.075 127.548 141.83 135.06 276.89 5.73 0.702 2.029 8.461 2.999 17 Safe
61 1.0( 31.435 97.371 193.931 135.06 328.991 6.8 0.63 1.549 8.979 4.621 17 Safe
62 1.0(D 34.268 111.007 120.852 135.06 255.912 5.29 0.686 1.766 7.742 2.838 17 Safe
63 1.0(D 1.389 78.335 158.092 135.06 293.152 6.06 0.028 1.247 7.335 4.785 17 Safe
64 1.0(D 1.443 87.901 156.69 135.06 291.75 6.03 0.029 1.399 7.458 4.602 17 Safe
65 1.0( 3.002 113.132 200.052 135.06 335.112 6.93 0.061 1.8 8.791 5.069 17 Safe
66 1.0(D 3.056 121.078 198.649 135.06 333.709 6.9 0.062 1.926 8.888 4.912 17 Safe
67 1.0(D 4.329 82.239 157.153 135.06 292.213 6.04 0.087 1.309 7.436 4.644 17 Safe
68 1.0(D 7.162 81.594 157.631 135.06 292.691 6.05 0.144 1.298 7.492 4.608 17 Safe
69 1.0(D 2.717 117.037 199.112 135.06 334.172 6.91 0.055 1.862 8.827 4.993 17 Safe
70 1.0(D 8.775 116.392 199.589 135.06 334.649 6.92 0.176 1.852 8.948 4.892 17 Safe

Bearing Pressure for With Buoyancy Case :- pmax = 11.91 T/sq.M pmin = 7.335 T/sq.M
COMBINED FOOTING C35 & C36

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C35 & C36 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG

Check for Pressure at All Four Corners with Buoyancy Case

1-2+3 1+2+3
X X

1-2-3 1+2-3

Load P/A Mxx/Zxx Mzz/Zzz


1+2+3 1-2+3 1-2-3 1+2-3
1 2 3
50 1.0( 6.48 0.045 1.58 8.105 8.015 4.855 4.945
51 1.0( 8.82 0.677 2.413 11.91 10.556 5.73 7.084
52 1.0( 4.14 0.766 3.175 8.081 6.549 0.199 1.731
53 1.0( 8.39 0.693 2.136 11.219 9.833 5.561 6.947
54 1.0(D 3.7 0.749 2.911 7.36 5.862 0.04 1.538
55 1.0( 7.33 2.019 1.74 11.089 7.051 3.571 7.609
56 1.0( 5.64 2.108 2.145 9.893 5.677 1.387 5.603
57 1.0( 6.89 2.036 1.463 10.389 6.317 3.391 7.463
58 1.0(D 5.2 2.092 1.882 9.174 4.99 1.226 5.41
59 1.0( 7.24 0.613 1.826 9.679 8.453 4.801 6.027
60 1.0( 5.73 0.702 2.029 8.461 7.057 2.999 4.403
61 1.0( 6.8 0.63 1.549 8.979 7.719 4.621 5.881
62 1.0(D 5.29 0.686 1.766 7.742 6.37 2.838 4.21
63 1.0(D 6.06 0.028 1.247 7.335 7.279 4.785 4.841
64 1.0(D 6.03 0.029 1.399 7.458 7.4 4.602 4.66
65 1.0( 6.93 0.061 1.8 8.791 8.669 5.069 5.191
66 1.0(D 6.9 0.062 1.926 8.888 8.764 4.912 5.036
67 1.0(D 6.04 0.087 1.309 7.436 7.262 4.644 4.818
68 1.0(D 6.05 0.144 1.298 7.492 7.204 4.608 4.896
69 1.0(D 6.91 0.055 1.862 8.827 8.717 4.993 5.103
70 1.0(D 6.92 0.176 1.852 8.948 8.596 4.892 5.244

Check for Eccentricity without Buoyancy Case:-

ez = ex < L/6 ez < B/6


Load P Mxx Mzz ex = Mzz/P L/6 B/6
Mxx/P
50 1.0( 434.331 2.223 99.315 0.23 0.01 1.3 1.04 <L/6 <B/6
51 1.0( 547.676 33.785 151.69 0.28 0.07 1.3 1.04 <L/6 <B/6
52 1.0( 320.985 38.231 199.549 0.63 0.12 1.3 1.04 <L/6 <B/6
53 1.0( 526.696 34.591 134.282 0.26 0.07 1.3 1.04 <L/6 <B/6
54 1.0(D 300.007 37.424 183.008 0.62 0.13 1.3 1.04 <L/6 <B/6
55 1.0( 475.146 100.891 109.366 0.24 0.22 1.3 1.04 <L/6 <B/6
56 1.0( 393.516 105.336 134.805 0.35 0.27 1.3 1.04 <L/6 <B/6
57 1.0( 454.167 101.697 91.967 0.21 0.23 1.3 1.04 <L/6 <B/6
58 1.0(D 372.536 104.531 118.263 0.32 0.29 1.3 1.04 <L/6 <B/6
59 1.0( 470.871 30.628 114.769 0.25 0.07 1.3 1.04 <L/6 <B/6
60 1.0( 397.79 35.075 127.548 0.33 0.09 1.3 1.04 <L/6 <B/6
61 1.0( 449.891 31.435 97.371 0.22 0.07 1.3 1.04 <L/6 <B/6
62 1.0(D 376.812 34.268 111.007 0.3 0.1 1.3 1.04 <L/6 <B/6
63 1.0(D 414.052 1.389 78.335 0.19 0.01 1.3 1.04 <L/6 <B/6
64 1.0(D 412.65 1.443 87.901 0.22 0.01 1.3 1.04 <L/6 <B/6
65 1.0( 456.012 3.002 113.132 0.25 0.01 1.3 1.04 <L/6 <B/6
66 1.0(D 454.609 3.056 121.078 0.27 0.01 1.3 1.04 <L/6 <B/6
67 1.0(D 413.113 4.329 82.239 0.2 0.02 1.3 1.04 <L/6 <B/6
68 1.0(D 413.591 7.162 81.594 0.2 0.02 1.3 1.04 <L/6 <B/6
69 1.0(D 455.072 2.717 117.037 0.26 0.01 1.3 1.04 <L/6 <B/6
70 1.0(D 455.549 8.775 116.392 0.26 0.02 1.3 1.04 <L/6 <B/6
COMBINED FOOTING C35 & C36

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C35 & C36 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG

Check For Shear


a) Two Way Shear
Limit State Method

d/2

6.2

d/2

2.4 1.5

Critical Section = At distance d/2 from face of column


Concrete Grade = 30 N/mm2
Column Details
Length = 650 mm
Width = 750 mm

Foundation Details
Length = 3900 mm
Width = 6200 mm
Effective Depth = 1125 mm
Percentage Of Steel = 0.19 %

Punching Load
Maximum Load on Column = 169.443 T
Punching Shear = 169.443 x ( 3.9 x 6.2 - 1.775 x 1.875 )
3.9 x 6.2

P= 147 Ton
Shear Resistance Of Concrete (Vc)
= vc x bc x d -----Refer to clause no. 31.6.3.1 of IS 456
where vc = ks x tc
ks = 0.5 + bc -----should not be greater than 1

bc = Short Side Of Column


Long Side Of Column

650
=
750
= 0.867
ks = 1
tc = 1.37 N/mm2
bc = Appropriate perimeter at distance d/2
Length of critical section = 1775 mm
Width of critical section = 1875 mm
Perimeter of critical section = 7300 mm

2205000
Depth Required =
1.37 x7300
= 220.48 mm

Shear Resistance = 1.37 x 7300 x 1125 / 10000


1125 T
COMBINED FOOTING C35 & C36

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C35 & C36 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG

B) One Way Shear 3.9

1.6

6.2 d

2.4 1.5 0
2.4 3

Critical Section = At distance d from face of column


Maximum Pressure = 9.07 T/m2 ---- For without Buoynacy Condition

At Length
Length at critical section = 6200 mm
Width at critical section = 2400 mm
Shear Force = 9.07 x 6.2 x 2.4
= 135 T
At Width
Length at critical section = 3900 mm
Width at critical section = 1600 mm
Shear Force = 9.07 x 3.9 x 1.6
= 57 T

Designed Shear Stress = 135 T


Corresponding Length = 6200 mm

% Ast = 0.19
Allowable Shear Stress = 0.322 N/mm2 ----Refer Table 21 of IS 456 Check Stress
k= 1 ---- Refer clause no. 40.2 of IS 456
tc = 0.322 N/mm2
Depth Required = 2025000
0.322 x 6200
= 1015 mm

Design Of Foundation
a) Calculation of reinforcement at bottom
Maximum Pressure = 14.41 T/m2 --- Without Buoyancy Load Case
Pre. due to pcc & fdn wt = ( 145.08 + 110.88 ) / ( 7.8 x 6.2 )
= 5.29 T/m2
Net causing moment = 9.12 T/m2
Maximum Projection of fdn = 2.725 m
Bending Moment = 9.12 x 2.725 x 2.725 / 2
= 33.86 Tm
Ast = 0.5 x fck x b x d 1- (4.6 x Mu )
1-
fy fck x b x d2

Ast = 1054.86 mm2


Min. percentage of re-bar = 0.17 %
Ast = 2040 mm2
Use 20 mm dia bars
Area of bar = 314 mm2
Spacing = 150 mm
Provide Spacing = 150 Hence % of Steel = 0.19
Area Provided = 2093.33 mm2
Provide 20 mm dia Bars @ 150 mm spacing bothways
COMBINED FOOTING C35 & C36

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C35 & C36 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG

b) Calculation of reinforcement at top


Area Load = 9.12 T/m2
Max. Projection of fdn = 3 m
Bending Moment = 9.12 x 3 x 3 / 10
= 8.21 Tm
Ast = 0.5 x fck x b x d 1- (4.6 x Mu )
1-
fy fck x b x d2

Ast = 252.72 mm2


Min. percentage of re-bar = 0.17 %
Ast = 2040 mm2
Use 20 mm dia bars
Area of bar = 314 mm2
Spacing = 153 mm
Provide Spacing = 150 mm Hence % of Steel = 0.19
Area Provided = 2093.3333 mm2
Provide 20 mm dia Bars @ 150 mm spacing bothways

Summary Of Design :-
Length Of Footing :- 7800 mm
WIdth Of Footing :- 6200 mm
Depth Of Footing :- 1200 mm
Reinforcement :-
At Top :- Provide 20 mm dia Bars @ 150 mm spacing bothways
At Bottom :- Provide 20 mm dia Bars @ 150 mm spacing bothways
COMBINED SF2

DESIGN OF FOUNDATION
COMBINED STRIP FOUNDATION TYPE: SF2 FOR COLUMN

12.2
0.5 8 0.5
1.6 1.6

1.1

2.5
0.3

1.1

1.85 8.5 1.85

0.85
1.2

0.6 BEAM
0.35 FOUNDATION

Constants :-
Unit Wt Of Soil = 18 kN/m3
Density Of Water = 10 kN/m3
Unit Weight Of Concrete = 25 kN/m3
Comp. strength of concrete fc = 20 N/mm2
Yield strength of steel fy = 500 N/mm2
Coefficient Of Friction m = 0.5
Net SBC = 50 kN/m3

With Buoyancy :
Gross SBC = 50 + (18 - 10) x 1.2
59.6 kN/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 50 + (18 - 10) x 1.2
72.1 kN/m2 --- Where increase in SBC is allowed.
(Wind / EQ 25% increase)
Without Buoyancy :
Gross SBC = 50 + 18 x 1.2
71.6 kN/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 50 + 18 x 1.2
84.1 kN/m2 --- Where increase in SBC is allowed.
Shape Of Foundation :- (Wind / EQ 25% increase)
Length Of Foundation Lf = 12.2 m
Width Of Foundation Wf = 2.5 m
Thickness Of Foundation Tf = 0.35 m
Founding Depth Df = 1.2 m
Length Of Strip beam Lp = 12.2 m
Width Of Strip Wp = 0.5 m
Height Of Strip Beam Hp = 0.6 m --(Support Reaction Considered at Base of footing)

Section Modulus Zxx = 1 / 6 x 12.2 x 2.5 x 2.5


= 12.709 m3
Section Modulus Zzz = 1 / 6 x 2.5 x 12.2 x 12.2
= 62.017 m3

Calculation Of Soil, Fdn & Strip Beam Weights :-


Selfweight Of Foundation = 12.2 x 2.5 x 0.35 x 25
= 266.88 kN
Selfweight Of Soil = 18 x 0.85 x ( 12.2 x 2.5 - 0.5 x 12.2 x 2 )
= 279.99 kN
Selfweight Of Pedestal = 25 x 0.5 x 12.2 x 0.6
= 183 kN
Buoyant Weight = -10 x 12.2 x 2.5 x 1.2
= -366 kN

Total weight without buoyancy = 266.88 + 279.99 + 183


= 729.87 kN
Total weight with buoyancy = 266.88 + 279.99 + 183 + -366
= 363.87 kN
1

2.5 0.5
d

COMBINED SF2

4.25
8.5

Critical Section = At distance d from face of Strip Beam


Maximum Pressure = 48.017 kN/m2 ---- For without Buoynacy Condition

At Width
Depth 350 mm
Length at critical section = 1000 mm
Width at critical section = 1000 mm
Shear Force = 48.017 x 1 x 1
Allowable Shear Stress = 49 kN
456","----Refer Table 21 of IS
without Shear R/f= 0.360 N/mm2 456")
k = 1 ---- Refer clause no. 40.2 of IS 456
tc = 0.36 N/mm2 Designed Shear Stress =
Shear Strength 115.2 kN ok Corresponding Length =

Design Of Foundation
a) Calculation of Reinforcement at Bottom Strip Slab
Maximum Pressure = 72.067 kN/m2 --- Without Buoyancy Load Case
Pre. due to Soil & fdn wt = ( 266.88 + 279.99 ) / ( 12.2 x 2.5 )
= 17.93 kN/m2
Net causing moment = 54.137 kN/m2
Maximum Projection of fdn = 1 m
Bending Moment = 54.137 x 1 x 1 / 2
Design Bending Moment = 40.605 kN.m

Design for area of steel and shear for singly reinforced beam by limit state design method
Calculation of Ast req for beams
Ref IS 456-2000 Cl G-1.1b & G-1.1c For sections without compression reinforcement

fy fck b D Cc Cg of bar d Mu lim pt lim


N/mm2 N/mm2 mm mm mm mm mm kN.m %
500 20 1000 300 50 20 230 140.71 0.75

Mu support Ast req. spt pt req.spt check for depth


kNm mm2 % d req mm d prov mm Result

40.605 425.75 0.19 123.55 230 okay

Reinforcement details provided at support and span of beam


Reinf. details at support Reinf. details at span
Nos. dia Ast support pt support Result Nos. dia Ast span pt span Result
mm mm2 % mm mm2 %
3 12 2 16
942.48 0.41 okay 1005.31 0.44 okay
3 16 3 16

Ast = 942.48 mm2


Min. percentage of re-bar = 0.17 %
Ast = 595 mm2
Area of bar = 942.48 mm2 (for width of 1M)
Spacing = 1000 mm
Provide Spacing = 166.667 mm

Provide 16mm @ 300mm c/c+12mm@ 300 mm c/c

b) Calculation of Reinforcement Strip Beam

The BM is obtaained by using a coefficient of


At Support =WL2/12
At Center =WL2/24
The Max. SF is obtaained by using a coefficient of
At Support =WL/2

CLEAR SPAN "L" 8 m


Width "B" 2.5 m
Length of footing 12.2 m
Area Load = 54.137 kN/m2
Equivalent UDL 203.0138 kN/m
Max. Moment at
At Support, 1082.74 KN-m
At Center 541.37 KN-m

Max. Ultimate Shear Force at


At Support, 812.055 KN

Strip Beam cover 0.06 m


Depth D 0.95 m
Width W 0.5 m
deff deff 0.89 m
Design for area of steel and shear for singly reinforced beam by limit state design method
Calculation of Ast req for beams
Ref IS 456-2000 Cl G-1.1b & G-1.1c For sections without compression reinforcement

fy fck b D Cc Cg of bar d Mu lim pt lim


N/mm2 N/mm2 mm mm mm mm mm kN.m %

500 20 500 950 60 10 880 1029.95 0.75

So the beam is designed as Doubled Reinforced Section

Design for area of steel and shear for doubly reinforced beam by limit state design method
Ref IS 456-2000 Cl G-1.2 For sections with compression reinforcement

fy fck b D clear cover clear cover cg cg d d/


on ten.face on com.face of tension of comp. for tension for comp.
COMBINED FOOTING C46 & C47

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C46 & C47 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG

Design Of Combined Footing FOR COLUMN C46 & C47

Z
0.75
6.6

X
0.6 6.2

1.8 3 1.8

0.3

1.5
2.5

Constants :-
Unit Wt Of Soil = 1.8 T/m3
Density Of Water = 1 T/m3
Unit Weight Of Concrete = 2.5 T/m3
Comp. strength of concrete fc = 30 N/mm2
Yield strength of steel fy = 500 N/mm2
Coefficient Of Friction m = 0.5
Net SBC = 15 T/m2
With Buoyancy :
Gross SBC = 15 + (1.8 - 1) x 2.5
17 T/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 15 + (1.8 - 1) x 2.5
20.75 T/m2 ------ Where increase in SBC is allowed.(Wind / EQ 25% increase)
Without Buoyancy :
Gross SBC = 15 + 1.8 x 2.5
19.5 T/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 15 + 1.8 x 2.5
23.25 T/m2 ------ Where increase in SBC is allowed.(Wind / EQ 25% increase)

Shape Of Foundation :-
Length Of Foundation Lf = 6.6 m
Width Of Foundation Wf = 6.2 m
Thickness Of Foundation Tf = 1 m
Founding Depth Df = 2.5 m
Length Of Pedestal Lp = 0.75 m
Width Of Pedestal Wp = 0.6 m
Height Of Pedestal Hp = 0 m (Support Reaction Considered at Base of footing)

Section Modulus Zxx = 1 / 6 x 6.6 x 6.2 x 6.2


= 42.284 m3
Section Modulus Zzz = 1 / 6 x 6.2 x 6.6 x 6.6
= 45.012 m3

Calculation Of Soil, Fdn & Pedestal Weights :-


Selfweight Of Foundation = 6.6 x 6.2 x 1 x 2.5
= 102.3 T
Selfweight Of Soil = 1.8 x 1.5 x ( 6.6 x 6.2 - 0.6 x 0.75 x 2 )
= 108.05 T
Selfweight Of Pedestal = 2.5 x 0.6 x 0.75 x 0 x 2
= 0 T
Buoyant Weight = -1 x 6.6 x 6.2 x 2.5
= -102.3 T

Total weight without buoyancy = 102.3 + 108.05 + 0


= 210.35 T
Total weight with buoyancy = 102.3 + 108.05 + 0 + -102.3
= 108.05 T
COMBINED FOOTING C46 & C47

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C46 & C47 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG

Calculation Of Restoring Moment :-

Due to fdn. Weight = 102.3 x 6.6 / 2


= 337.59 Tm
Due to fdn. Soil = 108.05 x 6.6 / 2
= 356.57 Tm
Due to Pedestal = 0 x 0.9 + 0 x 5.7
= 0 Tm
Due to Buoyant weight = -102.3 x 3.3
= -337.59

Total moment without buoyancy = 337.59 + 356.57 + 0


= 694.16 Tm
Total moment with buoyancy = 337.59 + 356.57 + 0 -337.59
= 356.57 Tm

Support Reactions :- ( At foundation level) All Units in Ton - Meter


JOINT LOAD FORCE-X FORCE-Y FORCE-Z MOM-X MOM-Y MOM Z
1046 50 1.0(DL -1.285 76.769 -1.737 -1.969 -0.052 1.08
51 1.0(DL 13.082 100.048 3.392 11.375 1.582 30.852
52 1.0(DL -15.652 53.489 -6.865 -15.313 -1.685 -28.691
53 1.0(DL 13.118 92.658 3.242 11.491 1.601 30.803
54 1.0(DL -15.616 46.098 -7.015 -15.197 -1.666 -28.741
55 1.0(DL 3.619 101.704 12.292 34.882 2.593 11.284
56 1.0(DL -6.189 51.833 -15.765 -38.82 -2.697 -9.124
57 1.0(DL 3.655 94.314 12.142 34.998 2.612 11.235
58 1.0(DL -6.154 44.442 -15.915 -38.704 -2.678 -9.173
59 1.0(DL 3.209 87.986 2.742 9.755 0.967 10.402
60 1.0(DL -5.779 65.551 -6.215 -13.693 -1.071 -8.241
61 1.0(DL 3.244 80.595 2.592 9.871 0.986 10.352
62 1.0(DL -5.743 58.161 -6.365 -13.577 -1.052 -8.29
63 1.0(DL -1.918 68.578 -1.881 -1.841 -0.018 2.412
64 1.0(DL -0.581 70.178 -1.893 -1.866 -0.048 -0.349
65 1.0(DL -1.989 83.359 -1.581 -2.072 -0.055 2.51
66 1.0(DL -0.653 84.96 -1.592 -2.097 -0.086 -0.251
67 1.0(DL -1.238 68.531 -1.01 0.32 0.059 1.012
68 1.0(DL -1.261 70.225 -2.764 -4.026 -0.125 1.05
69 1.0(DL -1.309 83.313 -0.71 0.089 0.021 1.111
70 1.0(DL -1.333 85.006 -2.463 -4.258 -0.163 1.149

1047 50 1.0(DL -0.673 28.736 -2.204 -2.333 -0.026 0.672


51 1.0(DL 10.216 62.092 1.143 6.473 1.404 27.98
52 1.0(DL -11.562 -4.621 -5.551 -11.139 -1.456 -26.635
53 1.0(DL 10.286 60.772 1.178 6.637 1.428 27.901
54 1.0(DL -11.492 -5.942 -5.517 -10.976 -1.432 -26.714
55 1.0(DL 3.042 48.868 7.422 24.051 2.226 10.026
56 1.0(DL -4.388 8.603 -11.83 -28.717 -2.278 -8.682
57 1.0(DL 3.112 47.548 7.457 24.214 2.25 9.947
58 1.0(DL -4.318 7.282 -11.795 -28.554 -2.254 -8.761
59 1.0(DL 2.733 41.198 0.934 6.083 0.871 9.221
60 1.0(DL -4.079 16.273 -5.342 -10.749 -0.923 -7.876
61 1.0(DL 2.803 39.878 0.969 6.246 0.895 9.142
62 1.0(DL -4.009 14.952 -5.308 -10.585 -0.899 -7.955
63 1.0(DL -1.102 28.857 -2.173 -2.167 0.011 1.853
64 1.0(DL -0.104 25.973 -2.166 -2.172 -0.015 -0.666
65 1.0(DL -1.242 31.498 -2.242 -2.494 -0.037 2.011
66 1.0(DL -0.244 28.614 -2.235 -2.5 -0.063 -0.508
67 1.0(DL -0.593 26.788 -1.553 -0.578 0.098 0.575
68 1.0(DL -0.613 28.042 -2.786 -3.761 -0.101 0.612
69 1.0(DL -0.733 29.429 -1.622 -0.905 0.05 0.733
70 1.0(DL -0.753 30.683 -2.855 -4.089 -0.149 0.769
COMBINED FOOTING C46 & C47

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C46 & C47 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG
Check For stability :-
a) Against Overturing :- (Check is done only for with buoyancy case)
Total O/T Moment Restoring Moment
Load MOM-Z MOM-X External Soil,Fdn, Total F.O.S. Result
Total
STAAD Due to Fy Load Pedestal
50 1.0( 1.752 72.05 4.302 73.93 276.12 356.57 632.69 8.56 Safe
51 1.0( 58.832 56.93 17.848 117.13 478.13 356.57 834.7 7.13 Safe
52 1.0( 55.326 87.17 26.452 144.94 74.1 356.57 430.67 2.97 Safe
53 1.0( 58.704 47.83 18.128 108.07 458.49 356.57 815.06 7.54 Safe
54 1.0(D 55.455 78.06 26.173 136.06 54.45 356.57 411.02 3.02 Safe
55 1.0( 21.31 79.25 58.933 116.56 417.63 356.57 774.2 6.64 Safe
56 1.0( 17.806 64.85 67.537 106.74 134.59 356.57 491.16 4.6 Safe
57 1.0( 21.182 70.15 59.212 108.85 398 356.57 754.57 6.93 Safe
58 1.0(D 17.934 55.74 67.258 99.76 114.95 356.57 471.52 4.73 Safe
59 1.0( 19.623 70.18 15.838 91.19 356.13 356.57 712.7 7.82 Safe
60 1.0( 16.117 73.92 24.442 93.3 196.1 356.57 552.67 5.92 Safe
61 1.0( 19.494 61.08 16.117 82.18 336.49 356.57 693.06 8.43 Safe
62 1.0(D 16.245 64.81 24.162 84.58 176.46 356.57 533.03 6.3 Safe
63 1.0(D 4.265 59.58 4.008 63.98 261.95 356.57 618.52 9.67 Safe
64 1.0(D 1.015 66.31 4.038 67.45 250.99 356.57 607.56 9.01 Safe
65 1.0( 4.521 77.79 4.566 82.44 301.24 356.57 657.81 7.98 Safe
66 1.0(D 0.759 84.52 4.597 85.41 290.28 356.57 646.85 7.57 Safe
67 1.0(D 1.587 62.61 0.898 64.21 251.94 356.57 608.51 9.48 Safe
68 1.0(D 1.662 63.27 7.787 65.4 261.01 356.57 617.58 9.44 Safe
69 1.0(D 1.844 80.83 0.994 82.68 291.22 356.57 647.79 7.83 Safe
70 1.0(D 1.918 81.48 8.347 83.82 300.29 356.57 656.86 7.84 Safe

b) Against Sliding :- (Check is done only for with buoyancy case)


Total Sliding Forces Restoring Forces
Load Fx Fz Resultant External Soil,Fdn, Total F.O.S. Result
Load Pedestal
50 1.0( 1.958 3.941 4.4 105.51 108.05 106.78 24.27 Safe
51 1.0( 23.298 4.535 23.74 162.14 108.05 135.1 5.69 Safe
52 1.0( 27.214 12.416 29.91 48.87 108.05 78.46 2.62 Safe
53 1.0( 23.404 4.42 23.82 153.43 108.05 130.74 5.49 Safe
54 1.0(D 27.108 12.532 29.86 40.16 108.05 74.11 2.48 Safe
55 1.0( 6.661 19.714 20.81 150.57 108.05 129.31 6.21 Safe
56 1.0( 10.577 27.595 29.55 60.44 108.05 84.25 2.85 Safe
57 1.0( 6.767 19.599 20.73 141.86 108.05 124.96 6.03 Safe
58 1.0(D 10.472 27.71 29.62 51.72 108.05 79.89 2.7 Safe
59 1.0( 5.942 3.676 6.99 129.18 108.05 118.62 16.97 Safe
60 1.0( 9.858 11.557 15.19 81.82 108.05 94.94 6.25 Safe
61 1.0( 6.047 3.561 7.02 120.47 108.05 114.26 16.28 Safe
62 1.0(D 9.752 11.673 15.21 73.11 108.05 90.58 5.96 Safe
63 1.0(D 3.02 4.054 5.06 97.44 108.05 102.75 20.31 Safe
64 1.0(D 0.685 4.059 4.12 96.15 108.05 102.1 24.78 Safe
65 1.0( 3.231 3.823 5.01 114.86 108.05 111.46 22.25 Safe
66 1.0(D 0.897 3.827 3.93 113.57 108.05 110.81 28.2 Safe
67 1.0(D 1.831 2.563 3.15 95.32 108.05 101.69 32.28 Safe
68 1.0(D 1.874 5.55 5.86 98.27 108.05 103.16 17.6 Safe
69 1.0(D 2.042 2.332 3.1 112.74 108.05 110.4 35.61 Safe
70 1.0(D 2.086 5.318 5.71 115.69 108.05 111.87 19.59 Safe
COMBINED FOOTING C46 & C47

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C46 & C47 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG
Check For bearing pressure :-
Case 1) Without Buoyancy :-
Total Load
Load MOM-X MOM-Z Soil,Fdn, Total P/A Mxx/Zxx Mzz/Zzz pmax pmin pall Result
Fy
Pedestral Load
50 1.0( 4.302 73.802 105.505 210.35 315.855 7.72 0.102 1.64 9.462 5.978 19.5 Safe
51 1.0( 17.848 115.762 162.14 210.35 372.49 9.1 0.423 2.572 12.095 6.105 19.5 Safe
52 1.0( 26.452 142.496 48.868 210.35 259.218 6.33 0.626 3.166 10.122 2.538 19.5 Safe
53 1.0( 18.128 106.534 153.43 210.35 363.78 8.89 0.429 2.367 11.686 6.094 19.5 Safe
54 1.0(D 26.173 133.515 40.156 210.35 250.506 6.12 0.619 2.967 9.706 2.534 19.5 Safe
55 1.0( 58.933 100.56 150.572 210.35 360.922 8.82 1.394 2.235 12.449 5.191 19.5 Safe
56 1.0( 67.537 82.656 60.436 210.35 270.786 6.62 1.598 1.837 10.055 3.185 19.5 Safe
57 1.0( 59.212 91.332 141.862 210.35 352.212 8.61 1.401 2.03 12.041 5.179 19.5 Safe
58 1.0(D 67.258 73.674 51.724 210.35 262.074 6.4 1.591 1.637 9.628 3.172 19.5 Safe
59 1.0( 15.838 89.803 129.184 210.35 339.534 8.3 0.375 1.996 10.671 5.929 19.5 Safe
60 1.0( 24.442 90.037 81.824 210.35 292.174 7.14 0.579 2.001 9.72 4.56 19.5 Safe
61 1.0( 16.117 80.574 120.473 210.35 330.823 8.08 0.382 1.791 10.253 5.907 19.5 Safe
62 1.0(D 24.162 81.055 73.113 210.35 283.463 6.93 0.572 1.801 9.303 4.557 19.5 Safe
63 1.0(D 4.008 63.845 97.435 210.35 307.785 7.52 0.095 1.419 9.034 6.006 19.5 Safe
64 1.0(D 4.038 67.325 96.151 210.35 306.501 7.49 0.096 1.496 9.082 5.898 19.5 Safe
65 1.0( 4.566 82.311 114.857 210.35 325.207 7.95 0.108 1.829 9.887 6.013 19.5 Safe
66 1.0(D 4.597 85.279 113.574 210.35 323.924 7.92 0.109 1.895 9.924 5.916 19.5 Safe
67 1.0(D 0.898 64.197 95.319 210.35 305.669 7.47 0.022 1.427 8.919 6.021 19.5 Safe
68 1.0(D 7.787 64.932 98.267 210.35 308.617 7.54 0.185 1.443 9.168 5.912 19.5 Safe
69 1.0(D 0.994 82.674 112.742 210.35 323.092 7.9 0.024 1.837 9.761 6.039 19.5 Safe
70 1.0(D 8.347 83.398 115.689 210.35 326.039 7.97 0.198 1.853 10.021 5.919 19.5 Safe

Bearing Pressure for Without Buoyancy Case :- pmax = 12.449 T/sq.M pmin = 8.919 T/sq.M

Case 2) With Buoyancy :-


Total Load
Load MOM-X MOM-Z Soil,Fdn, Total P/A Mxx/Zxx Mzz/Zzz pmax pmin pall Result
Fy
Pedestral Load
50 1.0( 4.302 73.802 105.505 108.05 213.555 5.22 0.102 1.64 6.962 3.478 17 Safe
51 1.0( 17.848 115.762 162.14 108.05 270.19 6.6 0.423 2.572 9.595 3.605 17 Safe
52 1.0( 26.452 142.496 48.868 108.05 156.918 3.83 0.626 3.166 7.622 0.038 17 Safe
53 1.0( 18.128 106.534 153.43 108.05 261.48 6.39 0.429 2.367 9.186 3.594 17 Safe
54 1.0(D 26.173 133.515 40.156 108.05 148.206 3.62 0.619 2.967 7.206 0.034 17 Safe
55 1.0( 58.933 100.56 150.572 108.05 258.622 6.32 1.394 2.235 9.949 2.691 17 Safe
56 1.0( 67.537 82.656 60.436 108.05 168.486 4.12 1.598 1.837 7.555 0.685 17 Safe
57 1.0( 59.212 91.332 141.862 108.05 249.912 6.11 1.401 2.03 9.541 2.679 17 Safe
58 1.0(D 67.258 73.674 51.724 108.05 159.774 3.9 1.591 1.637 7.128 0.672 17 Safe
59 1.0( 15.838 89.803 129.184 108.05 237.234 5.8 0.375 1.996 8.171 3.429 17 Safe
60 1.0( 24.442 90.037 81.824 108.05 189.874 4.64 0.579 2.001 7.22 2.06 17 Safe
61 1.0( 16.117 80.574 120.473 108.05 228.523 5.58 0.382 1.791 7.753 3.407 17 Safe
62 1.0(D 24.162 81.055 73.113 108.05 181.163 4.43 0.572 1.801 6.803 2.057 17 Safe
63 1.0(D 4.008 63.845 97.435 108.05 205.485 5.02 0.095 1.419 6.534 3.506 17 Safe
64 1.0(D 4.038 67.325 96.151 108.05 204.201 4.99 0.096 1.496 6.582 3.398 17 Safe
65 1.0( 4.566 82.311 114.857 108.05 222.907 5.45 0.108 1.829 7.387 3.513 17 Safe
66 1.0(D 4.597 85.279 113.574 108.05 221.624 5.42 0.109 1.895 7.424 3.416 17 Safe
67 1.0(D 0.898 64.197 95.319 108.05 203.369 4.97 0.022 1.427 6.419 3.521 17 Safe
68 1.0(D 7.787 64.932 98.267 108.05 206.317 5.04 0.185 1.443 6.668 3.412 17 Safe
69 1.0(D 0.994 82.674 112.742 108.05 220.792 5.4 0.024 1.837 7.261 3.539 17 Safe
70 1.0(D 8.347 83.398 115.689 108.05 223.739 5.47 0.198 1.853 7.521 3.419 17 Safe

Bearing Pressure for With Buoyancy Case :- pmax = 9.949 T/sq.M pmin = 6.419 T/sq.M
COMBINED FOOTING C46 & C47

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C46 & C47 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG

Check for Pressure at All Four Corners with Buoyancy Case

1-2+3 1+2+3
X X

1-2-3 1+2-3

Load P/A Mxx/Zxx Mzz/Zzz


1+2+3 1-2+3 1-2-3 1+2-3
1 2 3
50 1.0( 5.22 0.102 1.64 6.962 6.758 3.478 3.682
51 1.0( 6.6 0.423 2.572 9.595 8.749 3.605 4.451
52 1.0( 3.83 0.626 3.166 7.622 6.37 0.038 1.29
53 1.0( 6.39 0.429 2.367 9.186 8.328 3.594 4.452
54 1.0(D 3.62 0.619 2.967 7.206 5.968 0.034 1.272
55 1.0( 6.32 1.394 2.235 9.949 7.161 2.691 5.479
56 1.0( 4.12 1.598 1.837 7.555 4.359 0.685 3.881
57 1.0( 6.11 1.401 2.03 9.541 6.739 2.679 5.481
58 1.0(D 3.9 1.591 1.637 7.128 3.946 0.672 3.854
59 1.0( 5.8 0.375 1.996 8.171 7.421 3.429 4.179
60 1.0( 4.64 0.579 2.001 7.22 6.062 2.06 3.218
61 1.0( 5.58 0.382 1.791 7.753 6.989 3.407 4.171
62 1.0(D 4.43 0.572 1.801 6.803 5.659 2.057 3.201
63 1.0(D 5.02 0.095 1.419 6.534 6.344 3.506 3.696
64 1.0(D 4.99 0.096 1.496 6.582 6.39 3.398 3.59
65 1.0( 5.45 0.108 1.829 7.387 7.171 3.513 3.729
66 1.0(D 5.42 0.109 1.895 7.424 7.206 3.416 3.634
67 1.0(D 4.97 0.022 1.427 6.419 6.375 3.521 3.565
68 1.0(D 5.04 0.185 1.443 6.668 6.298 3.412 3.782
69 1.0(D 5.4 0.024 1.837 7.261 7.213 3.539 3.587
70 1.0(D 5.47 0.198 1.853 7.521 7.125 3.419 3.815

Check for Eccentricity without Buoyancy Case:-

ez = ex < L/6 ez < B/6


Load P Mxx Mzz ex = Mzz/P L/6 B/6
Mxx/P
50 1.0( 315.855 4.302 73.802 0.24 0.02 1.1 1.04 <L/6 <B/6
51 1.0( 372.49 17.848 115.762 0.32 0.05 1.1 1.04 <L/6 <B/6
52 1.0( 259.218 26.452 142.496 0.55 0.11 1.1 1.04 <L/6 <B/6
53 1.0( 363.78 18.128 106.534 0.3 0.05 1.1 1.04 <L/6 <B/6
54 1.0(D 250.506 26.173 133.515 0.54 0.11 1.1 1.04 <L/6 <B/6
55 1.0( 360.922 58.933 100.56 0.28 0.17 1.1 1.04 <L/6 <B/6
56 1.0( 270.786 67.537 82.656 0.31 0.25 1.1 1.04 <L/6 <B/6
57 1.0( 352.212 59.212 91.332 0.26 0.17 1.1 1.04 <L/6 <B/6
58 1.0(D 262.074 67.258 73.674 0.29 0.26 1.1 1.04 <L/6 <B/6
59 1.0( 339.534 15.838 89.803 0.27 0.05 1.1 1.04 <L/6 <B/6
60 1.0( 292.174 24.442 90.037 0.31 0.09 1.1 1.04 <L/6 <B/6
61 1.0( 330.823 16.117 80.574 0.25 0.05 1.1 1.04 <L/6 <B/6
62 1.0(D 283.463 24.162 81.055 0.29 0.09 1.1 1.04 <L/6 <B/6
63 1.0(D 307.785 4.008 63.845 0.21 0.02 1.1 1.04 <L/6 <B/6
64 1.0(D 306.501 4.038 67.325 0.22 0.02 1.1 1.04 <L/6 <B/6
65 1.0( 325.207 4.566 82.311 0.26 0.02 1.1 1.04 <L/6 <B/6
66 1.0(D 323.924 4.597 85.279 0.27 0.02 1.1 1.04 <L/6 <B/6
67 1.0(D 305.669 0.898 64.197 0.22 0.01 1.1 1.04 <L/6 <B/6
68 1.0(D 308.617 7.787 64.932 0.22 0.03 1.1 1.04 <L/6 <B/6
69 1.0(D 323.092 0.994 82.674 0.26 0.01 1.1 1.04 <L/6 <B/6
70 1.0(D 326.039 8.347 83.398 0.26 0.03 1.1 1.04 <L/6 <B/6
COMBINED FOOTING C46 & C47

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C46 & C47 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG

Check For Shear


a) Two Way Shear
Limit State Method

d/2

6.2

d/2

1.8 1.5

Critical Section = At distance d/2 from face of column


Concrete Grade = 30 N/mm2
Column Details
Length = 750 mm
Width = 600 mm

Foundation Details
Length = 3300 mm
Width = 6200 mm
Effective Depth = 925 mm
Percentage Of Steel = 0.19 %

Punching Load
Maximum Load on Column = 101.704 T
Punching Shear = 101.704 x ( 3.3 x 6.2 - 1.675 x 1.525 )
3.3 x 6.2

P= 90 Ton
Shear Resistance Of Concrete (Vc)
= vc x bc x d -----Refer to clause no. 31.6.3.1 of IS 456
where vc = ks x tc
ks = 0.5 + bc -----should not be greater than 1

bc = Short Side Of Column


Long Side Of Column

600
=
750
= 0.8
ks = 1
tc = 1.37 N/mm2
bc = Appropriate perimeter at distance d/2
Length of critical section = 1675 mm
Width of critical section = 1525 mm
Perimeter of critical section = 6400 mm

1350000
Depth Required =
1.37 x6400
= 153.97 mm

Shear Resistance = 1.37 x 6400 x 925 / 10000


811 T
COMBINED FOOTING C46 & C47

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C46 & C47 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG

B) One Way Shear 3.3

1.875

6.2 d

1.8 1.23 0.27


1.8 3

Critical Section = At distance d from face of column


Maximum Pressure = 7.249 T/m2 ---- For without Buoynacy Condition

At Length
Length at critical section = 6200 mm
Width at critical section = 1800 mm
Shear Force = 7.249 x 6.2 x 1.8
= 81 T
At Width
Length at critical section = 3300 mm
Width at critical section = 1875 mm
Shear Force = 7.249 x 3.3 x 1.875
= 45 T

Designed Shear Stress = 81 T


Corresponding Length = 6200 mm

% Ast = 0.2
Allowable Shear Stress = 0.330 N/mm2 ----Refer Table 21 of IS 456 Check Stress
k= 1 ---- Refer clause no. 40.2 of IS 456
tc = 0.33 N/mm2
Depth Required = 1215000
0.33 x 6200
= 594 mm

Design Of Foundation
a) Calculation of reinforcement at bottom
Maximum Pressure = 12.449 T/m2 --- Without Buoyancy Load Case
Pre. due to pcc & fdn wt = ( 102.3 + 108.05 ) / ( 6.6 x 6.2 )
= 5.14 T/m2
Net causing moment = 7.309 T/m2
Maximum Projection of fdn = 2.8 m
Bending Moment = 7.309 x 2.8 x 2.8 / 2
= 28.65 Tm
Ast = 0.5 x fck x b x d 1- (4.6 x Mu )
1-
fy fck x b x d2

Ast = 1089.97 mm2


Min. percentage of re-bar = 0.17 %
Ast = 1700 mm2
Use 20 mm dia bars
Area of bar = 314 mm2
Spacing = 175 mm
Provide Spacing = 175 Hence % of Steel = 0.2
Area Provided = 1794.29 mm2
Provide 20 mm dia Bars @ 175 mm spacing bothways
COMBINED FOOTING C46 & C47

JOB NO. BONGAIGAON CRB


JYOTI STRUCTURE LTD. DESIGN OF COMBINED FOOTING DATE 21-Jul-09
DESCRIPTION
MUMBAI FOR COLUMN C46 & C47 DESIGNED PCK
CUSTOMER NTPC INDIA CHECKED SAG

b) Calculation of reinforcement at top


Area Load = 7.309 T/m2
Max. Projection of fdn = 3 m
Bending Moment = 7.309 x 3 x 3 / 10
= 6.58 Tm
Ast = 0.5 x fck x b x d 1- (4.6 x Mu )
1-
fy fck x b x d2

Ast = 246.51 mm2


Min. percentage of re-bar = 0.17 %
Ast = 1700 mm2
Use 20 mm dia bars
Area of bar = 314 mm2
Spacing = 184 mm
Provide Spacing = 180 mm Hence % of Steel = 0.19
Area Provided = 1744.4444 mm2
Provide 20 mm dia Bars @ 180 mm spacing bothways

Summary Of Design :-
Length Of Footing :- 6600 mm
WIdth Of Footing :- 6200 mm
Depth Of Footing :- 1000 mm
Reinforcement :-
At Top :- Provide 20 mm dia Bars @ 180 mm spacing bothways
At Bottom :- Provide 20 mm dia Bars @ 175 mm spacing bothways
DESIGN SHEAR STRENGTH OF CONCRETE Tc N/mm2
% pt M15 M20 M25 M30 M35 M40 & ABOVE
0 15 20 25 30 35 40
0.15 0.280 0.280 0.290 0.290 0.290 0.300
0.16 0.287 0.288 0.297 0.298 0.298 0.308
0.17 0.294 0.296 0.304 0.306 0.306 0.316
0.18 0.301 0.304 0.311 0.314 0.314 0.324
0.19 0.308 0.312 0.318 0.322 0.322 0.332
0.2 0.315 0.320 0.325 0.330 0.330 0.340
0.21 0.322 0.328 0.332 0.338 0.338 0.348
0.22 0.329 0.336 0.339 0.346 0.346 0.356
0.23 0.336 0.344 0.346 0.354 0.354 0.364
0.24 0.343 0.352 0.353 0.362 0.362 0.372
0.25 0.350 0.360 0.360 0.370 0.370 0.380
0.26 0.354 0.365 0.365 0.375 0.375 0.385
0.27 0.359 0.370 0.370 0.380 0.380 0.390
0.28 0.363 0.374 0.376 0.386 0.386 0.396
0.29 0.368 0.379 0.381 0.391 0.391 0.401
0.3 0.372 0.384 0.386 0.396 0.396 0.406
0.31 0.376 0.389 0.391 0.401 0.401 0.411
0.32 0.381 0.394 0.396 0.406 0.406 0.416
0.33 0.385 0.398 0.402 0.412 0.412 0.422
0.34 0.390 0.403 0.407 0.417 0.417 0.427
0.35 0.394 0.408 0.412 0.422 0.422 0.432
0.36 0.398 0.413 0.417 0.427 0.427 0.437
0.37 0.403 0.418 0.422 0.432 0.432 0.442
0.38 0.407 0.422 0.428 0.438 0.438 0.448
0.39 0.412 0.427 0.433 0.443 0.443 0.453
0.4 0.416 0.432 0.438 0.448 0.448 0.458
0.41 0.420 0.437 0.443 0.453 0.453 0.463
0.42 0.425 0.442 0.448 0.458 0.458 0.468
0.43 0.429 0.446 0.454 0.464 0.464 0.474
0.44 0.434 0.451 0.459 0.469 0.469 0.479
0.45 0.438 0.456 0.464 0.474 0.474 0.484
0.46 0.442 0.461 0.469 0.479 0.479 0.489
0.47 0.447 0.466 0.474 0.484 0.484 0.494
0.48 0.451 0.470 0.480 0.490 0.490 0.500
0.49 0.456 0.475 0.485 0.495 0.495 0.505
0.5 0.460 0.480 0.490 0.500 0.500 0.510
0.51 0.463 0.483 0.493 0.504 0.504 0.514
0.52 0.466 0.486 0.496 0.507 0.507 0.517
0.53 0.470 0.490 0.500 0.511 0.511 0.521
0.54 0.473 0.493 0.503 0.514 0.514 0.524
0.55 0.476 0.496 0.506 0.518 0.518 0.528
0.56 0.479 0.499 0.509 0.522 0.522 0.532
0.57 0.482 0.502 0.512 0.525 0.525 0.535
0.58 0.486 0.506 0.516 0.529 0.529 0.539
0.59 0.489 0.509 0.519 0.532 0.532 0.542
0.6 0.492 0.512 0.522 0.536 0.536 0.546
0.61 0.495 0.515 0.525 0.540 0.540 0.550
0.62 0.498 0.518 0.528 0.543 0.543 0.553
0.63 0.502 0.522 0.532 0.547 0.547 0.557
0.64 0.505 0.525 0.535 0.550 0.550 0.560
0.65 0.508 0.528 0.538 0.554 0.554 0.564
0.66 0.511 0.531 0.541 0.558 0.558 0.568
0.67 0.514 0.534 0.544 0.561 0.561 0.571
0.68 0.518 0.538 0.548 0.565 0.565 0.575
0.69 0.521 0.541 0.551 0.568 0.568 0.578
0.7 0.524 0.544 0.554 0.572 0.572 0.582
0.71 0.527 0.547 0.557 0.576 0.576 0.586
0.72 0.530 0.550 0.560 0.579 0.579 0.589
0.73 0.534 0.554 0.564 0.583 0.583 0.593
0.74 0.537 0.557 0.567 0.586 0.586 0.596
0.75 0.540 0.560 0.570 0.590 0.590 0.600
0.76 0.542 0.562 0.573 0.593 0.593 0.603
0.77 0.545 0.565 0.576 0.596 0.596 0.606
0.78 0.547 0.567 0.578 0.598 0.600 0.610
0.79 0.550 0.570 0.581 0.601 0.603 0.613
0.8 0.552 0.572 0.584 0.604 0.606 0.616
0.81 0.554 0.574 0.587 0.607 0.609 0.619
0.82 0.557 0.577 0.590 0.610 0.612 0.622
0.83 0.559 0.579 0.592 0.612 0.616 0.626
0.84 0.562 0.582 0.595 0.615 0.619 0.629
0.85 0.564 0.584 0.598 0.618 0.622 0.632
0.86 0.566 0.586 0.601 0.621 0.625 0.635
0.87 0.569 0.589 0.604 0.624 0.628 0.638
0.88 0.571 0.591 0.606 0.626 0.632 0.642
0.89 0.574 0.594 0.609 0.629 0.635 0.645
0.9 0.576 0.596 0.612 0.632 0.638 0.648
0.91 0.578 0.598 0.615 0.635 0.641 0.651
0.92 0.581 0.601 0.618 0.638 0.644 0.654
0.93 0.583 0.603 0.620 0.640 0.648 0.658
0.94 0.586 0.606 0.623 0.643 0.651 0.661
0.95 0.588 0.608 0.626 0.646 0.654 0.664
0.96 0.590 0.610 0.629 0.649 0.657 0.667
0.97 0.593 0.613 0.632 0.652 0.660 0.670
0.98 0.595 0.615 0.634 0.654 0.664 0.674
0.99 0.598 0.618 0.637 0.657 0.667 0.677
1 0.600 0.620 0.640 0.660 0.670 0.680
1.01 0.602 0.622 0.642 0.662 0.672 0.682
1.02 0.603 0.624 0.645 0.664 0.675 0.685
1.03 0.605 0.626 0.647 0.666 0.677 0.687
1.04 0.606 0.628 0.650 0.668 0.680 0.690
1.05 0.608 0.630 0.652 0.670 0.682 0.692
1.06 0.610 0.632 0.654 0.672 0.684 0.694
1.07 0.611 0.634 0.657 0.674 0.687 0.697
1.08 0.613 0.636 0.659 0.676 0.689 0.699
1.09 0.614 0.638 0.662 0.678 0.692 0.702
1.1 0.616 0.640 0.664 0.680 0.694 0.704
1.11 0.618 0.642 0.666 0.682 0.696 0.706
1.12 0.619 0.644 0.669 0.684 0.699 0.709
1.13 0.621 0.646 0.671 0.686 0.701 0.711
1.14 0.622 0.648 0.674 0.688 0.704 0.714
1.15 0.624 0.650 0.676 0.690 0.706 0.716
1.16 0.626 0.652 0.678 0.692 0.708 0.718
1.17 0.627 0.654 0.681 0.694 0.711 0.721
1.18 0.629 0.656 0.683 0.696 0.713 0.723
1.19 0.630 0.658 0.686 0.698 0.716 0.726
1.2 0.632 0.660 0.688 0.700 0.718 0.728
1.21 0.634 0.662 0.690 0.702 0.720 0.730
1.22 0.635 0.664 0.693 0.704 0.723 0.733
1.23 0.637 0.666 0.695 0.706 0.725 0.735
1.24 0.638 0.668 0.698 0.708 0.728 0.738
1.25 0.640 0.670 0.700 0.710 0.730 0.740
1.26 0.642 0.672 0.702 0.712 0.732 0.742
1.27 0.643 0.674 0.703 0.714 0.734 0.744
1.28 0.645 0.676 0.705 0.716 0.736 0.746
1.29 0.646 0.678 0.706 0.718 0.738 0.748
1.3 0.648 0.680 0.708 0.720 0.740 0.750
1.31 0.650 0.682 0.710 0.722 0.742 0.752
1.32 0.651 0.684 0.711 0.724 0.744 0.754
1.33 0.653 0.686 0.713 0.726 0.746 0.756
1.34 0.654 0.688 0.714 0.728 0.748 0.758
1.35 0.656 0.690 0.716 0.730 0.750 0.760
1.36 0.658 0.692 0.718 0.732 0.752 0.762
1.37 0.659 0.694 0.719 0.734 0.754 0.764
1.38 0.661 0.696 0.721 0.736 0.756 0.766
1.39 0.662 0.698 0.722 0.738 0.758 0.768
1.4 0.664 0.700 0.724 0.740 0.760 0.770
1.41 0.666 0.702 0.726 0.742 0.762 0.772
1.42 0.667 0.704 0.727 0.744 0.764 0.774
1.43 0.669 0.706 0.729 0.746 0.766 0.776
1.44 0.670 0.708 0.730 0.748 0.768 0.778
1.45 0.672 0.710 0.732 0.750 0.770 0.780
1.46 0.674 0.712 0.734 0.752 0.772 0.782
1.47 0.675 0.714 0.735 0.754 0.774 0.784
1.48 0.677 0.716 0.737 0.756 0.776 0.786
1.49 0.678 0.718 0.738 0.758 0.778 0.788
1.5 0.680 0.720 0.740 0.760 0.780 0.790
1.51 0.681 0.721 0.742 0.762 0.782 0.792
1.52 0.682 0.722 0.743 0.763 0.783 0.794
1.53 0.684 0.724 0.745 0.765 0.785 0.796
1.54 0.685 0.725 0.746 0.766 0.786 0.798
1.55 0.686 0.726 0.748 0.768 0.788 0.800
1.56 0.687 0.727 0.750 0.770 0.790 0.802
1.57 0.688 0.728 0.751 0.771 0.791 0.804
1.58 0.690 0.730 0.753 0.773 0.793 0.806
1.59 0.691 0.731 0.754 0.774 0.794 0.808
1.6 0.692 0.732 0.756 0.776 0.796 0.810
1.61 0.693 0.733 0.758 0.778 0.798 0.812
1.62 0.694 0.734 0.759 0.779 0.799 0.814
1.63 0.696 0.736 0.761 0.781 0.801 0.816
1.64 0.697 0.737 0.762 0.782 0.802 0.818
1.65 0.698 0.738 0.764 0.784 0.804 0.820
1.66 0.699 0.739 0.766 0.786 0.806 0.822
1.67 0.700 0.740 0.767 0.787 0.807 0.824
1.68 0.702 0.742 0.769 0.789 0.809 0.826
1.69 0.703 0.743 0.770 0.790 0.810 0.828
1.7 0.704 0.744 0.772 0.792 0.812 0.830
1.71 0.705 0.745 0.774 0.794 0.814 0.832
1.72 0.706 0.746 0.775 0.795 0.815 0.834
1.73 0.708 0.748 0.777 0.797 0.817 0.836
1.74 0.709 0.749 0.778 0.798 0.818 0.838
1.75 0.710 0.750 0.780 0.800 0.820 0.840
1.76 0.710 0.752 0.782 0.802 0.822 0.842
1.77 0.710 0.753 0.783 0.803 0.823 0.843
1.78 0.710 0.755 0.785 0.805 0.825 0.845
1.79 0.710 0.756 0.786 0.806 0.826 0.846
1.8 0.710 0.758 0.788 0.808 0.828 0.848
1.81 0.710 0.760 0.790 0.810 0.830 0.850
1.82 0.710 0.761 0.791 0.811 0.831 0.851
1.83 0.710 0.763 0.793 0.813 0.833 0.853
1.84 0.710 0.764 0.794 0.814 0.834 0.854
1.85 0.710 0.766 0.796 0.816 0.836 0.856
1.86 0.710 0.768 0.798 0.818 0.838 0.858
1.87 0.710 0.769 0.799 0.819 0.839 0.859
1.88 0.710 0.771 0.801 0.821 0.841 0.861
1.89 0.710 0.772 0.802 0.822 0.842 0.862
1.9 0.710 0.774 0.804 0.824 0.844 0.864
1.91 0.710 0.776 0.806 0.826 0.846 0.866
1.92 0.710 0.777 0.807 0.827 0.847 0.867
1.93 0.710 0.779 0.809 0.829 0.849 0.869
1.94 0.710 0.780 0.810 0.830 0.850 0.870
1.95 0.710 0.782 0.812 0.832 0.852 0.872
1.96 0.710 0.784 0.814 0.834 0.854 0.874
1.97 0.710 0.785 0.815 0.835 0.855 0.875
1.98 0.710 0.787 0.817 0.837 0.857 0.877
1.99 0.710 0.788 0.818 0.838 0.858 0.878
2 0.710 0.790 0.820 0.840 0.860 0.880
2.01 0.710 0.791 0.821 0.842 0.862 0.882
2.02 0.710 0.792 0.822 0.843 0.863 0.883
2.03 0.710 0.792 0.824 0.845 0.865 0.885
2.04 0.710 0.793 0.825 0.846 0.866 0.886
2.05 0.710 0.794 0.826 0.848 0.868 0.888
2.06 0.710 0.795 0.827 0.850 0.870 0.890
2.07 0.710 0.796 0.828 0.851 0.871 0.891
2.08 0.710 0.796 0.830 0.853 0.873 0.893
2.09 0.710 0.797 0.831 0.854 0.874 0.894
2.1 0.710 0.798 0.832 0.856 0.876 0.896
2.11 0.710 0.799 0.833 0.858 0.878 0.898
2.12 0.710 0.800 0.834 0.859 0.879 0.899
2.13 0.710 0.800 0.836 0.861 0.881 0.901
2.14 0.710 0.801 0.837 0.862 0.882 0.902
2.15 0.710 0.802 0.838 0.864 0.884 0.904
2.16 0.710 0.803 0.839 0.866 0.886 0.906
2.17 0.710 0.804 0.840 0.867 0.887 0.907
2.18 0.710 0.804 0.842 0.869 0.889 0.909
2.19 0.710 0.805 0.843 0.870 0.890 0.910
2.2 0.710 0.806 0.844 0.872 0.892 0.912
2.21 0.710 0.807 0.845 0.874 0.894 0.914
2.22 0.710 0.808 0.846 0.875 0.895 0.915
2.23 0.710 0.808 0.848 0.877 0.897 0.917
2.24 0.710 0.809 0.849 0.878 0.898 0.918
2.25 0.710 0.810 0.850 0.880 0.900 0.920
2.26 0.710 0.810 0.851 0.881 0.901 0.921
2.27 0.710 0.811 0.852 0.882 0.902 0.922
2.28 0.710 0.811 0.854 0.884 0.904 0.924
2.29 0.710 0.812 0.855 0.885 0.905 0.925
2.3 0.710 0.812 0.856 0.886 0.906 0.926
2.31 0.710 0.812 0.857 0.887 0.907 0.927
2.32 0.710 0.813 0.858 0.888 0.908 0.928
2.33 0.710 0.813 0.860 0.890 0.910 0.930
2.34 0.710 0.814 0.861 0.891 0.911 0.931
2.35 0.710 0.814 0.862 0.892 0.912 0.932
2.36 0.710 0.814 0.863 0.893 0.913 0.933
2.37 0.710 0.815 0.864 0.894 0.914 0.934
2.38 0.710 0.815 0.866 0.896 0.916 0.936
2.39 0.710 0.816 0.867 0.897 0.917 0.937
2.4 0.710 0.816 0.868 0.898 0.918 0.938
2.41 0.710 0.816 0.869 0.899 0.919 0.939
2.42 0.710 0.817 0.870 0.900 0.920 0.940
2.43 0.710 0.817 0.872 0.902 0.922 0.942
2.44 0.710 0.818 0.873 0.903 0.923 0.943
2.45 0.710 0.818 0.874 0.904 0.924 0.944
2.46 0.710 0.818 0.875 0.905 0.925 0.945
2.47 0.710 0.819 0.876 0.906 0.926 0.946
2.48 0.710 0.819 0.878 0.908 0.928 0.948
2.49 0.710 0.820 0.879 0.909 0.929 0.949
2.5 0.710 0.820 0.880 0.910 0.930 0.950
2.51 0.710 0.820 0.881 0.911 0.931 0.951
2.52 0.710 0.820 0.882 0.912 0.932 0.952
2.53 0.710 0.820 0.882 0.914 0.934 0.954
2.54 0.710 0.820 0.883 0.915 0.935 0.955
2.55 0.710 0.820 0.884 0.916 0.936 0.956
2.56 0.710 0.820 0.885 0.917 0.937 0.957
2.57 0.710 0.820 0.886 0.918 0.938 0.958
2.58 0.710 0.820 0.886 0.920 0.940 0.960
2.59 0.710 0.820 0.887 0.921 0.941 0.961
2.6 0.710 0.820 0.888 0.922 0.942 0.962
2.61 0.710 0.820 0.889 0.923 0.943 0.963
2.62 0.710 0.820 0.890 0.924 0.944 0.964
2.63 0.710 0.820 0.890 0.926 0.946 0.966
2.64 0.710 0.820 0.891 0.927 0.947 0.967
2.65 0.710 0.820 0.892 0.928 0.948 0.968
2.66 0.710 0.820 0.893 0.929 0.949 0.969
2.67 0.710 0.820 0.894 0.930 0.950 0.970
2.68 0.710 0.820 0.894 0.932 0.952 0.972
2.69 0.710 0.820 0.895 0.933 0.953 0.973
2.7 0.710 0.820 0.896 0.934 0.954 0.974
2.71 0.710 0.820 0.897 0.935 0.955 0.975
2.72 0.710 0.820 0.898 0.936 0.956 0.976
2.73 0.710 0.820 0.898 0.938 0.958 0.978
2.74 0.710 0.820 0.899 0.939 0.959 0.979
2.75 0.710 0.820 0.900 0.940 0.960 0.980
2.76 0.710 0.820 0.901 0.941 0.961 0.981
2.77 0.710 0.820 0.902 0.942 0.962 0.982
2.78 0.710 0.820 0.902 0.942 0.964 0.984
2.79 0.710 0.820 0.903 0.943 0.965 0.985
2.8 0.710 0.820 0.904 0.944 0.966 0.986
2.81 0.710 0.820 0.905 0.945 0.967 0.987
2.82 0.710 0.820 0.906 0.946 0.968 0.988
2.83 0.710 0.820 0.906 0.946 0.970 0.990
2.84 0.710 0.820 0.907 0.947 0.971 0.991
2.85 0.710 0.820 0.908 0.948 0.972 0.992
2.86 0.710 0.820 0.909 0.949 0.973 0.993
2.87 0.710 0.820 0.910 0.950 0.974 0.994
2.88 0.710 0.820 0.910 0.950 0.976 0.996
2.89 0.710 0.820 0.911 0.951 0.977 0.997
2.9 0.710 0.820 0.912 0.952 0.978 0.998
2.91 0.710 0.820 0.913 0.953 0.979 0.999
2.92 0.710 0.820 0.914 0.954 0.980 1.000
2.93 0.710 0.820 0.914 0.954 0.982 1.002
2.94 0.710 0.820 0.915 0.955 0.983 1.003
2.95 0.710 0.820 0.916 0.956 0.984 1.004
2.96 0.710 0.820 0.917 0.957 0.985 1.005
2.97 0.710 0.820 0.918 0.958 0.986 1.006
2.98 0.710 0.820 0.918 0.958 0.988 1.008
2.99 0.710 0.820 0.919 0.959 0.989 1.009
3 0.710 0.820 0.920 0.960 0.990 1.010
Fck = 30 % pt = 0.2 Tc = 0.33

Fck = 30 % pt = 0.19 Tc = 0.322

Fck = 30 % pt = 0.28 Tc = 0.3856

Fck = 30 % pt = 0.14 Tc = 30
DESIGN SHEAR STRENGTH OF CONCRETE Tc N/mm2
% pt M15 M20 M25 M30 M35 M40 & ABOVE
15 20 25 30 35 40
0.15 0.280 0.280 0.290 0.290 0.290 0.300
0.25 0.350 0.360 0.360 0.370 0.370 0.380
0.5 0.460 0.480 0.490 0.500 0.500 0.510
0.75 0.540 0.560 0.570 0.590 0.590 0.600
1 0.600 0.620 0.640 0.660 0.670 0.680
1.25 0.640 0.670 0.700 0.710 0.730 0.740
1.5 0.680 0.720 0.740 0.760 0.780 0.790
1.75 0.710 0.750 0.780 0.800 0.820 0.840
2 0.710 0.790 0.820 0.840 0.860 0.880
2.25 0.710 0.810 0.850 0.880 0.900 0.920
2.5 0.710 0.820 0.880 0.910 0.930 0.950
2.75 0.710 0.820 0.900 0.940 0.960 0.980
3 0.710 0.820 0.920 0.960 0.990 1.010
ex/L
0 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 0.22 0.24 0.26 0.28 0.30 0.32 0.34
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
0 1.00 1.12 1.24 1.36 1.48 1.60 1.72 1.84 1.96 2.08 2.22 2.38 2.56 2.78 3.03 3.33 3.70 4.17
0.02 1.12 1.24 1.36 1.48 1.60 1.72 1.84 1.96 2.08 2.21 2.36 2.53 2.72 2.95 3.22 3.54 3.93 4.42
0.04 1.24 1.36 1.48 1.60 1.72 1.84 1.96 2.08 2.21 2.35 2.50 2.68 2.88 3.13 3.41 3.75 4.17 4.69
0.06 1.36 1.48 1.60 1.72 1.84 1.96 2.08 2.21 2.34 2.49 2.66 2.84 3.06 3.32 3.62 3.98 4.43 4.98
0.08 1.48 1.60 1.72 1.84 1.96 2.08 2.21 2.34 2.48 2.64 2.82 3.02 3.25 3.52 3.84 4.23 4.70 5.28
0.10 1.60 1.72 1.84 1.96 2.08 2.20 2.34 2.48 2.63 2.80 2.99 3.20 3.46 3.74 4.08 4.49 4.99 5.62
0.12 1.72 1.84 1.96 2.08 2.21 2.34 2.48 2.63 2.80 2.98 3.18 3.41 3.68 3.98 4.35 4.78 5.31 5.97
eY/B 0.14 1.84 1.96 2.08 2.21 2.34 2.48 2.63 2.79 2.97 3.17 3.39 3.64 3.92 4.24 4.63 5.09 5.66
0.16 1.96 2.08 2.21 2.34 2.48 2.63 2.80 2.97 3.17 3.38 3.62 3.88 4.18 4.53 4.94 5.43 6.04
0.18 2.08 2.21 2.35 2.49 2.64 2.80 2.98 3.17 3.38 3.61 3.86 4.15 4.47 4.84 5.28 5.81 6.46
0.20 2.22 2.36 2.50 2.66 2.82 2.99 3.18 3.39 3.62 3.86 4.14 4.44 4.79 5.19 5.66 6.23
0.22 2.38 2.53 2.68 2.84 3.02 3.20 3.41 3.64 3.88 4.15 4.44 4.77 5.15 5.57 6.08 6.69
0.24 2.56 2.72 2.88 3.06 3.25 3.46 3.68 3.92 4.18 4.47 4.79 5.15 5.55 6.01 6.56
0.26 2.78 2.95 3.13 3.32 3.52 3.74 3.98 4.24 4.53 4.84 5.19 5.57 6.01 6.51
0.28 3.03 3.22 3.41 3.62 3.84 4.08 4.35 4.63 4.94 5.28 5.66 6.08 6.56
0.30 3.33 3.54 3.75 3.98 4.23 4.49 4.78 5.09 5.43 5.81 6.23 6.69
0.32 3.70 3.93 4.17 4.43 4.70 4.99 5.31 5.66 6.04 6.46
0.34 4.17 4.42 4.69 4.98 5.28 5.62 5.97
Values indicates resultant inside the kern
Values provide a minimum factor of safety of 1.5 against over-turning.
FOR ex/L
0.13

0.00 1.720
0.02 1.840
0.04 1.960
0.06 2.080
0.08 2.210
0.10 2.340
FOR eY/B 0.12 2.480
0.15 0.14 2.630
µ= 0.16 2.800
2.630 0.18 2.980
0.20 3.180
0.22 3.410
0.24 3.680
0.26 3.980
0.28 4.350
0.30 4.780
0.32 5.310
0.34 5.970

You might also like