APPENDIX I

LIST OF ATTACHED CONCEPTUAL & REFERENCE


DRAWINGS
PTS-20WM319

PTS-20WM319_R1 dated 06 May


2020
APPENDIX I

LIST OF ATTACHED CONCEPTUAL & REFERENCE DRAWINGS

Conceptual Drawings

The conceptual drawings prepared for this project are listed in the drawing
control sheet WT-924148 given in the following page and are included as
attachment to this Scope of Work and Technical Specifications.

PTS-20WM319_R1 dated 06 May 2020


‫الشركة السعودية للكهرباء‬
Saudi Electricity Company
DRAWING CONTROL SHEET
SEC-EHV-E&DD/FACTS PE&DD
PROJECT TITLE PROJECT ENGINEER CONTRACT NO. JOB ORDER NO. DRAFTING OFFICE
Installation of Dynamic Reactive Power Compensation (DRPC) at
Tabuk 380/132/33kV BSP Amitabha Chakrabarti -
Tabuk SAUDI ARABIA
INITIAL REV. FURTHER REV.
DRAWING NO. SHEET NO. DRAWING TITLE REMARKS
NO. NO. DATE
INDEX-A
PTS-20WM319 1 TO 132 0 SCOPE OF WORK & TECHNICAL SPECIFICATIONS
WT-924153 1 0 DRPC COOLING SYSTEM DIAGRAM (TYPICAL)

INDEX-P
WT-924149 1 TO 4 0 CONCEPTUAL SINGLE LINE DIAGRAM FOR DRPC AT TABUK 380/132/33kV BSP 1 2020-05-03
WT-924150 1 0 V & I CHARACTERISTIC +450/-150 MVAR DRPC AT TABUK 380/132/33kV BSP
WT-924151 1 0 DRPC CONTROL BUILDING LAYOUT (TYPICAL)
WT-924152 2 0 GENERAL LAYOUT DIAGRAM FOR DRPC AT TABUK 380/132/33kV BSP

INDEX-X
WT-924148 1 0 DRAWING CONTROL SHEET

Reference Drawing
ET-907744 1 PROJECT SIGNBOARD WITH ELECTRONIC COUNTER
06 May 2020

PROJECT COMPLETION DATE PLANT NO. INDEX DRAWING NO. SHEET NO. REV. NO.
AS BUILT
- - SE0437 WT-924148
BY X 1 OF 1 1
SE0437

OW NER.
01 OF 01 00 WT-924153 A
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO.
1. THIS IS A CONCEPTUAL DRAWING, CONTRACTOR SHALL
DEVELOP DETAILED DESIGN DRAWINGS FOR ENGINEERING
AND CONSTRUCTION PURPOSES BASED ON SCOPE SPECIFIED

TS
IN PTS.

OF I
2. MOTORS TO HAVE RUNNING HOUR METER & SERVICE ALARM.

3. BLEED POINT TO BE ADDED AS REQUIRED.

CONSENT
4. VALVE COOLING SYSTEM REDUNDANCY SHALL BE AS PER
REQUIREMENTS OF PTS-20WM319.

TTEN
THE W RI
QIT PI

M PUMP#1 PIT PIT

TIT TIT

THOUT
QIT PI

M PUMP#2

WI
DOCUMENT
PIT

PI

S
THI
C M F
QIT QIT

C M F

FROM
LS FI FI

LS EXPANSION

NED
HEAT EXCHANGERS VESSEL
SEPARATE

SHALL BE OBTAI
LS FOR EACH
BRANCH OF
(TCR/TSR/
LS TSC/VSC)
C M F

C M F

ION
EXCHANGER

PART
N
I
REFILL REFILL

FULL OR
TANK PUMP

LS

N
I ON
REPRODUCTI
THREE WAY
MIXING VALVE PIT PIT

DPS FIT TIT TIT


REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

NO
DRAWING CONTROL SHEET WT-924148
M
SCOPE OF WORKS AND TECHNICAL SPECIFICATION PTS-20WM319

CO. TY
N.C. N.C.

CI
SAUDIELECTRI
LEGEND:

OF
FLANGED CORRUGATED
HEAT EXCHANGER / COOLER FI FLOW INDICATOR

ARE THE SOLE PROPERTY


FLEXIBLE STAINLESS STEEL DRAIN POINT

FLANGED STAINLESS
M STEEL EXPANSION JOINT AUTOMATIC VENT LS LEVEL SWITCH
PUMP WITH MOTOR

VALVE NORMALLY OPEN (N.O.) FILTER / STRAINER


QIT CONDUCTIVITY INDICATOR TRANSMITTER

COOLING FAN WITH MOTOR,


C M F SEPARATE ELECTRONIC CONTACTOR
VALVE NORMALLY CLOSED (N.C.) DIFFERENTIAL PRESSURE SWITCH AS-BUILT BY DATE
DPS PIT PRESSURE INDICATOR TRANSMITTER

CHECK VALVE
MANOMETER VENT SWITCH TIT TEMPERATURE INDICATOR TRANAMITTER

N
HEREI
VALVE WITH INDICATING CONTACTS
SAFETY VALVE 4-20mA SIGNAL EQUIVALENT FIT FLOW INDICATOR TRANSMITTER

NED
M
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
THREE WAY MIXING VALVE NO.

CONTAI
VENT VALVE PI PRESSURE INDICATOR
REGULATION OF WATER TEMPERATURE

ON
NFORMATI
DRAWN BY
RSD CHECKED BY
BCP/MLS
SCALE:

25 FEB 2020 15 APR 2020

THE I
DATE STARTED DATE COMPLETED

OPR’G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

AND
CONSTRUCTION OR FOR ORDERING
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

NG
COOLING SYSTEM DIAGRAM FOR EACH DRPC VALVE BRANCH (TYPICAL)

DRAW I
INSTALLATION OF DYNAMIC REACTIVE POWER COMPENSATION
(DRPC) AT TABUK 380kV BSP
TABUK SAUDI ARABIA

S
THI
JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

A SE0437 WT-924153 01 OF 01 00
SEC-A (2004/10)

SECA00
01 01 OF 04 SE0437 WT-924149 P
NOTES

TS OW NER.
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO.

1.
THIS IS A CONCEPTUAL DRAWING ONLY. CONTRACTOR

TO 33kV SWG AT TABUK SHALL PREPARE DETAILED DRAWING FOR


380/132/33kV BSP TO 132kV GIS AT TABUK 380/132/33kV BSP
TO DPRC FOR DESIGNATED FEEDER REFER TO APPENDIX-XVIII, ENGINEERING AND CONSTRUCTION.
FOR DESIGNATED FEEDER

TTEN CONSENT OF I
TRANSFORMER TERTIARY REFER TO APPENDIX-XVIII, 132kV SLD OF TABUK BSP
13.8kV MV BUS 33kV SLD OF TABUK BSP THE FINAL NUMBER OF SEMI CONDUCTOR CONTROLLED
2.

BRANCHES SHALL BE IN ACCORDANCE WITH THE

REQUIREMENTS IN SECTION 4 OF PTS-20WM319.

132kV XLPE 3.ACDB BUSBARS & CONNECTED EQUIPMENT TO BE


2

13.8kV XLPE 33kV XLPE 2x1Cx2000mm PER PHASE


2
RATED FOR CONTINUOUS & SHORT CIRCUIT RATING
2
1Cx185mm PER PHASE 1Cx185mm PER PHASE
WHICH IS HIGHER OF THE TWO (2) TRANSFORMERS

THOUT THE W RI
(SST-1 & SST-2).

S DOCUM ENT W I
M
LEGEND
132kV, 3150A, 40kA, 1sec, 3PH, 60Hz

M LOAD BREAK SWITCH


13.8kV SWGR IN 33kV SWGR IN
DRPC CONTROL 630A 630A DRPC CONTROL
BLDG SWGR ROOM BLDG SWGR ROOM
DISCONNECT SWITCH

THI
M

NED FROM
XLPE/AIR BUSHING
SF6 SURGE ARRESTER
SF6 SURGE ARRESTER

XLPE/OIL

N PART SHALL BE OBTAI


SST-1 SST-2
1000KVA (min.) 1000KVA (min.) JUMPER
13.8/0.4kV
33/0.4 KV
DYN11
DYN11
NEUTRAL GROUNDING RESISTOR

AIR CORE REACTOR

DRAW-OUT CB
TO 13.8KV
DRPC MAIN TRANSFORMER DRPC SPARE
SWITCHGEAR (SST-1)

N FULL OR I
132/**/13.8kV
TRANSFORMER

132/**/13.8kV CAPACITOR

XLPE CABLE

ON I
CABLE HEAD

NO REPRODUCTI
SURGE CAPACITOR

ACDB, DRPC CTRL. BLDG.

SURGE CAPACITOR REFERENCE DRAWINGS


DRAWING TITLE DRAWING NO.

**kV DRPC MV BUS DRAWING CONTROL SHEET WT-924148

SCOPE OF WORK AND TEHNICAL SPECIFICATION PTS-20WM319

CI
ELECTRI TY CO.
M M M M M M M

SAUDI N ARE THE SOLE PROPERTY OF


AS-BUILT BY DATE

NED HEREI
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

ON CONTAI
NFORM ATI
RSD AAA/AMT
DRAWN BY CHECKED BY SCALE:

25 FEB 2020 3 MAY 2020


DATE STARTED DATE COMPLETED

OPR’G. DEPT. ENG. DEPT.


GROUNDING

NG AND THE I
TRANSFORMER CERTIFIED
THIS DRAWING IS NOT TO BE USED FOR
CONSTRUCTION OR FOR ORDERING
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

SINGLE LINE DIAGRAM


TSC-1 TCR-1 TSC-2 INSTALLATION OF DYNAMIC REACTIVE POWER COMPENSATION

S DRAW I
TCR-2
(DRPC) AT TABUK 380kV BSP
DTF-1 DTF-2

TABUK SAUDI ARABIA

THI
JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

P SE0437 WT-924149 01 OF 04 01

SEC-A (2004/10)

SECA00
01 02 OF 04 SE0437 WT-924149 P
NOTES

TS OW NER.
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO.

1.
THIS IS A CONCEPTUAL DRAWING ONLY. CONTRACTOR

SHALL PREPARE DETAILED DRAWING FOR

ENGINEERING AND CONSTRUCTION.

TTEN CONSENT OF I
TO 132kV GIS AT TABUK 380/132/33kV BSP
TO 33kV SWG AT TABUK FOR DESIGNATED FEEDER REFER TO APPENDIX-XVIII, THE FINAL NUMBER OF SEMI CONDUCTOR CONTROLLED
2.
380/132/33kV BSP 132kV SLD OF TABUK BSP
FOR DESIGNATED FEEDER BRANCHES SHALL BE IN ACCORDANCE WITH THE
REFER TO APPENDIX-XVIII,
REQUIREMENTS IN SECTION 4 OF PTS-20WM319.
33kV SLD OF TABUK BSP

3.ACDB BUSBARS & CONNECTED EQUIPMENT TO BE

132kV XLPE RATED FOR CONTINUOUS & SHORT CIRCUIT RATING


2

2x1Cx2000mm PER PHASE


WHICH IS HIGHER OF THE TWO (2) TRANSFORMERS

THOUT THE W RI
(SST-1 & SST-2).

13.8kV M

630A/25kA (Isc)

S DOCUM ENT W I
LEGEND
M

630A 132kV, 3150A, 40kA, 1sec, 3PH, 60Hz

M LOAD BREAK SWITCH

DISCONNECT SWITCH

THI
M

DRPC CTRL BLDG


SWGR ROOM

NED FROM
XLPE/AIR BUSHING

SURGE ARRESTER
SURGE ARRESTER XLPE/OIL

N PART SHALL BE OBTAI


JUMPER

SST-2
NEUTRAL GROUNDING RESISTOR
1000KVA (min.)
13.8/0.4kV
DYN11
AIR CORE REACTOR

TO SST-1

DRAW-OUT CB

N FULL OR I
DRPC MAIN TRANSFORMER DRPC SPARE
CAPACITOR
132/**kV TRANSFORMER

132/**kV

XLPE CABLE

ON I
CABLE HEAD

NO REPRODUCTI
SURGE CAPACITOR
SURGE CAPACITOR
REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.
ACDB
**kV DRPC MV BUS DRAWING CONTROL SHEET WT-924148

SCOPE OF WORK AND TEHNICAL SPECIFICATION PTS-20WM319

CI
ELECTRI TY CO.
M M M M M M M

SAUDI
XXkV
SWITCHGEAR
DRPC
CTRL BLDG

N ARE THE SOLE PROPERTY OF


AS-BUILT BY DATE

SST-1
1000KVA (min.)
XX/0.4 KV
DYN11

NED HEREI
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

ON CONTAI
TO ACDB

NFORM ATI
RSD AAA/AMT
DRAWN BY CHECKED BY SCALE:

25 FEB 2020 3 MAY 2020


DATE STARTED DATE COMPLETED

OPR’G. DEPT. ENG. DEPT.


GROUNDING

NG AND THE I
TRANSFORMER CERTIFIED
THIS DRAWING IS NOT TO BE USED FOR
CONSTRUCTION OR FOR ORDERING
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

SINGLE LINE DIAGRAM


TSC-1 TCR-1 TSC-2 INSTALLATION OF DYNAMIC REACTIVE POWER COMPENSATION

S DRAW I
TCR-2
(DRPC) AT TABUK 380kV BSP
DTF-1 DTF-2

TABUK SAUDI ARABIA

THI
JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

P SE0437 WT-924149 02 OF 04 01

SEC-A (2004/10)

SECA00
01 03 OF 04 SE0437 WT-924149 P
NOTES

TS OW NER.
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO.

1.THIS IS A CONCEPTUAL DRAWING ONLY CONTRACTOR

TO 33kV SWG AT TABUK SHALL PREPARE DETAILED DRAWINGS FOR ENGINEERING


TO 132kV GIS AT TABUK 380/132/33kV BSP
380/132/33kV BSP
TO DPRC FOR DESIGNATED FEEDER REFER TO APPENDIX-XVIII, AND CONSTRUCTION.
FOR DESIGNATED FEEDER

TTEN CONSENT OF I
TRANSFORMER TERTIARY 132kV SLD OF TABUK BSP
REFER TO APPENDIX-XVIII,
13.8kV MV BUS 2.TSC AND TSR BRANCHES ARE OPTIONAL EQUIPMENT
33kV SLD OF TABUK BSP
FOR THE HYBRID SVC

3.THE FINAL NUMBER OF SEMI CONDUCTOR CONTROLLED


BRANCHES SHALL BE IN ACCORDANCE WITH THE
132kV XLPE REQUIREMENTS IN SECTION 4 OF PTS-20WM319
2

13.8kV XLPE 33kV XLPE 2x1Cx2000mm PER PHASE


4.
ACDB BUSBARS & CONNECTED EQUIPMENT TO BE
2 2
1Cx185mm PER PHASE 1Cx185mm PER PHASE RATED FOR CONTINUOUS & SHORT CIRCUIT RATING

THOUT THE W RI
WHICH IS HIGHER OF THE SECONDARIES OF THE
TWO (2) TRANSFORMERS (SST-1 & SST-2).

S DOCUM ENT W I
M
LEGEND
132kV, 3150A, 40kA, 1sec, 3PH, 60Hz

M LOAD BREAK SWITCH


13.8kV SWGR IN 33kV SWGR IN
DRPC CONTROL 630A 630A DRPC CONTROL
BLDG SWGR ROOM BLDG SWGR ROOM
DISCONNECT SWITCH

THI
M

NED FROM
XLPE/AIR BUSHING
SURGE ARRESTER
SURGE ARRESTER

XLPE/OIL

N PART SHALL BE OBTAI


SST-1 SST-2
1000KVA (min.) 1000KVA (min.) JUMPER
13.8/0.4kV
33/0.4 KV
DYN11
DYN11 NEUTRAL GROUNDING RESISTOR

AIR CORE REACTOR

DRAW-OUT CB
TO 13.8KV
DRPC MAIN TRANSFORMER DRPC SPARE
SWITCHGEAR (SST-1)

N FULL OR I
132/**/13.8kV
TRANSFORMER

132/**/13.8kV CAPACITOR

XLPE CABLE

ON I
CABLE HEAD

NO REPRODUCTI
SURGE CAPACITOR

ACDB, DRPC CTRL. BLDG.

SURGE CAPACITOR REFERENCE DRAWINGS


DRAWING TITLE DRAWING NO.

**kV DRPC MV BUS


DRAWING CONTROL SHEET WT-924148

SCOPE OF WORK AND TEHNICAL SPECIFICATION PTS-20WM319

CI
ELECTRI TY CO.
M M M M M

SAUDI N ARE THE SOLE PROPERTY OF


AS-BUILT BY DATE

NED HEREI
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

ON CONTAI
VSC VSC

NFORM ATI
RSD AAA/AMT
DRAWN BY CHECKED BY SCALE:

VSC-1 VSC-2 25 FEB 2020 3 MAY 2020


DATE STARTED DATE COMPLETED

OPR’G. DEPT. ENG. DEPT.


GROUNDING

NG AND THE I
TRANSFORMER CERTIFIED
THIS DRAWING IS NOT TO BE USED FOR
CONSTRUCTION OR FOR ORDERING
TSC TSR
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

SINGLE LINE DIAGRAM


INSTALLATION OF DYNAMIC REACTIVE POWER COMPENSATION

S DRAW I
(DRPC) AT TABUK 380kV BSP

REFER TO NOTE 2
TABUK SAUDI ARABIA

THI
JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

P SE0437 WT-924149 03 OF 04 01

SEC-A (2004/10)

SECA00
01 04 OF 04 WT-924149 SE0437 P
NOTES

TS OW NER.
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO.

1.THIS IS A CONCEPTUAL DRAWING ONLY CONTRACTOR

SHALL PREPARE DETAILED DRAWINGS FOR ENGINEERING


TO 132kV GIS AT TABUK 380/132/33kV BSP
TO 33kV SWG AT TABUK FOR DESIGNATED FEEDER REFER TO APPENDIX-XVIII, AND CONSTRUCTION.

TTEN CONSENT OF I
380/132/33kV BSP 132kV SLD OF TABUK BSP
2.TSC AND TSR BRANCHES ARE OPTIONAL EQUIPMENT
FOR DESIGNATED FEEDER
REFER TO APPENDIX-XVIII, FOR THE HYBRID SVC
33kV SLD OF TABUK BSP
3.THE FINAL NUMBER OF SEMI CONDUCTOR CONTROLLED
BRANCHES SHALL BE IN ACCORDANCE WITH THE
132kV XLPE REQUIREMENTS IN SECTION 4 OF PTS-20WM319
2

2x1Cx2000mm PER PHASE


4.
ACDB BUSBARS & CONNECTED EQUIPMENT TO BE
RATED FOR CONTINUOUS & SHORT CIRCUIT RATING

THOUT THE W RI
WHICH IS HIGHER OF THE SECONDARIES OF THE
TWO (2) TRANSFORMERS (SST-1 & SST-2).

13.8kV M

630A/25kA (Isc)

S DOCUM ENT W I
M
LEGEND
630A 132kV, 3150A, 40kA, 1sec, 3PH, 60Hz

M LOAD BREAK SWITCH

DRPC CTRL BLDG


SWGR ROOM DISCONNECT SWITCH

THI
M

NED FROM
XLPE/AIR BUSHING
SURGE ARRESTER
SURGE ARRESTER

XLPE/OIL

N PART SHALL BE OBTAI


JUMPER
SST-2
1000KVA (min.)
13.8/0.4kV NEUTRAL GROUNDING RESISTOR
DYN11

AIR CORE REACTOR


TO SST-1

DRAW-OUT CB

DRPC MAIN TRANSFORMER DRPC SPARE

N FULL OR I
132/**kV TRANSFORMER

132/**kV CAPACITOR

XLPE CABLE

ON I
CABLE HEAD

NO REPRODUCTI
SURGE CAPACITOR
SURGE CAPACITOR

ACDB REFERENCE DRAWINGS


DRAWING TITLE DRAWING NO.

**kV DRPC MV BUS


DRAWING CONTROL SHEET WT-924148

SCOPE OF WORK AND TEHNICAL SPECIFICATION PTS-20WM319

CI
ELECTRI TY CO.
M M M M M

SAUDI
XXkV
SWITCHGEAR
DRPC
CTRL BLDG

N ARE THE SOLE PROPERTY OF


AS-BUILT BY DATE

SST-1
1000KVA (min.)
XX/0.4 KV
DYN11

NED HEREI
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

ON CONTAI
VSC VSC
TO ACDB

NFORM ATI
RSD AAA/AMT
DRAWN BY CHECKED BY SCALE:

VSC-1 VSC-2 25 FEB 2020 3 MAY 2020


DATE STARTED DATE COMPLETED

OPR’G. DEPT. ENG. DEPT.


GROUNDING

NG AND THE I
TRANSFORMER CERTIFIED
THIS DRAWING IS NOT TO BE USED FOR
CONSTRUCTION OR FOR ORDERING
TSC TSR
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

SINGLE LINE DIAGRAM


INSTALLATION OF DYNAMIC REACTIVE POWER COMPENSATION

S DRAW I
(DRPC) AT TABUK 380kV BSP

REFER TO NOTE 2
TABUK SAUDI ARABIA

THI
JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

P SE0437 WT-924149 04 OF 04 01

SEC-A (2004/10)

SECA00
OW NER.
00 01 OF 01 SE0437 WT-924150 P
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO.

1.POINT A-THE NOMINAL CAPACITIVE REACTIVE POWER

TS
OUTPUT OF THE SVC SHALL BE 4.5 p.u. AT 1.0 p.u.

OF I
AC BUS VOLTAGE.

2.POINT B-THE NOMINAL INDUCTIVE REACTIVE POWER


OUTPUT OF THE SVC SHALL BE 1.5 p.u. AT 1.0 p.u.

CONSENT
AC BUS VOLTAGE.

3.POINT C-REACTIVE POWER FOR 10 SECONDS AT 0.3 p.u.


MINIMUM VALVE OPERATING VOLTAGE.

4.POINT D-SHORT TIME INDUCTIVE REACTIVE RATING AT

TTEN
1.3 p.u. FOR 3 SECONDS

THE W RI
5.POINT E-MAXIMUM CAPACITIVE CONTINOUS OPERATING

V (p.u.) DRPC VI TEMPORARY OVER POWER AT 1.06 p.u. AC BUS VOLTAGE AND 4.5 pu

CURRENT

VOLTAGE OPERATION 6.POINT F-MAXIMUM INDUCTIVE CONTINOUS

OPERATING POWER AT 1.087 pu VOLTAGE.

THOUT
7.POINT G-SHORT TIME CAPACITIVE OUTPUT:

1.60 MAXIMUM TSC BLOCKING VOLTAGE

WI
POINT G 8.POINT H-MINIMUM 30 SEC.OPERATING VOLTAGE

OF SVC AUXILIARY EQUIPMENT INCLUDING COOLING

DOCUMENT
POINT K FANS AND PUMPS

1.50 9.POINT I-MINIMUM VOLTAGE SETTING (0.95PU)

10.POINT J-MAXIMUM VOLTAGE SETTING (1.07 PU)

11.POINT K-SHORT TIME INDUCTIVE RATING AT 1.5

S
p.u. FOR 1 SECOND

THI
1.40 12.POINT L-TCR CURRENT LIMIT TO BE SET TO

THE TCR RATED CURRENT.

FROM
POINT D
1.30

NED
SHALL BE OBTAI
POINT J POINT F
120 POINT E
POINT L
1.10

PART
CONTINUOUS

N
I
1.00 OPERATION

FULL OR
30 sec POINT B
0.90 Operation

N
I
30 sec

ON
Operation

REPRODUCTI
POINT I
0.80
REFERENCE DRAWINGS
POINT A DRAWING TITLE DRAWING NO.
0.70

NO
DRAWING CONTROL SHEET WT-924148

SCOPE OF WORKS AND TECHNICAL SPECIFICATION PTS-20WM319

CO.
POINT H
0.60

CI
SAUDIELECTRI TY
0.50

10 sec
0.40

OF
Operation
from 0.3 p.u. to 0.8 p.u.

ARE THE SOLE PROPERTY


0.30
POINT C
0.20
AS-BUILT BY DATE

0.10

N
HEREI
0.00

NED
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

CONTAI
4.5 0.00 1.5

ON
CAPACITIVE I (HV p.u.) INDUCTIVE

NFORMATI
DRAWN BY
RSD CHECKED BY
AAA/AMT
SCALE:

25 FEB 2020 15 APR 2020

THE I
DATE STARTED DATE COMPLETED

OPR’G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

AND
S = 100 MVA CONSTRUCTION OR FOR ORDERING
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

BASE

NG
V/I CHARACTERISTIC +450/-150 MVAR

DRAW I
INSTALLATION OF DYNAMIC REACTIVE POWER COMPENSATION
(DRPC) AT TABUK 380kV BSP

S
TABUK SAUDI ARABIA

THI
JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

P SE0437 WT-924150 01 OF 01 00
SEC-A (2004/10)

SECA00
OW NER.
00 01 OF 01 SE0437 WT-924151 P
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO.
1. THIS IS A CONCEPTUAL DRAWING, CONTRACTOR SHALL
DEVELOP DETAILED DESIGN DRAWINGS FOR ENGINEERING
AND CONSTRUCTION PURPOSES BASED ON SCOPE SPECIFIED

TS
IN PTS.

OF I
2. CABLE BASEMENTS AND RAISE FLOORING SHALL BE
AS PER PTS REQUIREMENTS.

CONSENT
3. FALSE CEILING SHALL BE PROVIDED FOR CONTROL &
RELAY ROOM INCLUDING CORRIDOR, ENTRANCE, OFFICE
AND TOILET.

4. ADDITIONAL VALVE ROOMS SHALL BE ADDED AS NECESSARY.

TTEN
5. CORRIDORS SHALL HAVE A MINIMUM WIDTH OF 2.6 METERS.

THE W RI
1000kVA 1000kVA
13.8kV/0.4kV AUX 33kV/0.4kV AUX

THOUT
PACU PACU

WI
DOCUMENT
S
THI
FROM
PART
N
I
FULL OR
N
I ON
REPRODUCTI NED
SHALL BE OBTAI
MV SWITCHGEAR
TOILET FM200 BATTERY ROOM CONTROL & PROTECTION ROOM AC/DC AUXILIARY ROOM
ROOM

REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

NO
DRAWING CONTROL SHEET WT-924148

SCOPE OF WORKS AND TECHNICAL SPECIFICATION PTS-20WM319

CO. CI
SAUDIELECTRI
OF TY
RELAY SCADA/
THYRISTOR/IGBT THYRISTOR/IGBT THYRISTOR/IGBT THYRISTOR/IGBT

ARE THE SOLE PROPERTY


TESTING COMMUNICATION STORAGE ROOM
VALVE ROOM VALVE ROOM VALVE ROOM VALVE ROOM
ROOM ROOM

AS-BUILT BY DATE

N
HEREINED
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

CONTAI ON
NFORMATI
DRAWN BY
RSD CHECKED BY
AAA/AMT
SCALE:

25 FEB 2020 15 APR 2020

THE I
DATE STARTED DATE COMPLETED

OPR’G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

AND
CONSTRUCTION OR FOR ORDERING
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

NG
DRPC BUILDING LAYOUT (TYPICAL)

DRAW I
INSTALLATION OF DYNAMIC REACTIVE POWER COMPENSATION
(DRPC) AT TABUK 380kV BSP
TABUK SAUDI ARABIA

S
THI
JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

P SE0437 WT-924151 01 OF 01 00
SEC-A (2004/10)

SECA00
OW NER.
00 01 of 01 WT-924152 P SE0437
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO.

1. THIS IS CONCEPTUAL DRAWING. CONTRACTOR SHALL PREPARE


DETAILED DESIGN DRAWINGS FOR ENGINEERING AND

TS
CONSTRUCTION PURPOSES, BASED ON SCOPE SPECIFIED IN

375 METERS

OF I
PTS.

2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE


NOTED.

CONSENT
PACU PACU
(APPROX. (APPROX.
12.5m x 12.5m x 3. AFFECTED OUTDOOR LIGHTING POLES WITH ACCESSORIES
SST-1 SST-2
10m) 10m)
SHALL BE RELOCATED/REINSTATED IF AFFECTED BY SCOPE.

TTEN
MV SWGR

THE W RI
ROOM
VALVE VALVE
COOLERS
(APPROX.
SINGLE STOREY DRPC BUILDING COOLERS
(APPROX.
14m x 12m) 14m x 12m)
(APPROX. 90m x 20m)

THOUT
WI
DOCUMENT
DRPC
375 M ETERS

S
THI
EQUIPMENT
SEE ENLARGE DRAWING FILTERS AREA

FROM
AREA
(APPROX. 60m x 60m)

NED
PACU
(APPROX.
PACU
(APPROX.
(APPROX.

SHALL BE OBTAI
12.5m x 12.5m x
SST-1 SST-2
10m) 10m)

MV SWGR
ROOM
50m x 40m)
VALVE VALVE
COOLERS
(APPROX.
SINGLE STOREY DRPC BUILDING COOLERS
(APPROX.
14m x 12m) 14m x 12m)
(APPROX. 90m x 20m)

DRPC

PART
EQUIPMENT
FILTERS AREA
AREA
(APPROX. 60m x 60m)
(APPROX. DRPC TRANSFORMER AREA

N
50m x 40m)

I
CONSIDERING HV & MV

FULL OR
DRPC TRANSFORMER AREA BUSBARS & CLEARANCES
CONSIDERING HV & MV
BUSBARS & CLEARANCES (APPROX. 60m X 30m)

N
I
(APPROX. 60m X 30m)
DISCONNECTOR DISCONNECTOR

ON
SWITCH

SWITCH

REPRODUCTI
REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

NO
DRAWING CONTROL SHEET WT-924148

SCOPE OF WORK & PTS PTS-20WM319

CO. CI
SAUDIELECTRI TY
EXISTING TABUK 380/132/33kV BSP

OF
ARE THE SOLE PROPERTY
AS-BUILT BY DATE

132kV GIS 33kV SWGR SCADA PANEL

N
HEREINED
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

CONTAI
INTERFACE CABLES
(POWER/AUX/CONTROL/COMS)
BETWEEN EXISTING BSP & DRPC

ON
NFORMATI
RSD AAA/AMT
DRAWN BY CHECKED BY SCALE:

25 FEB 2020 15 APR 2020

THE I
DATE STARTED DATE COMPLETED

OPR’G. DEPT. ENG. DEPT.

AND
THIS DRAWING IS NOT TO BE USED FOR CERTIFIED
CONSTRUCTION OR FOR ORDERING
BY DATE

(CONVENTIONAL DRPC)
MATERIAL UNTIL CERTIFIED AND DATED

NG
GENERAL LAYOUT DIAGRAM

DRAW I
INSTALLATION OF DYNAMIC REACTIVE POWER COMPENSATION

(REFER TO APPENDIX-XVIII FOR DETAILS OF CONNECTION) (DRPC) AT TABUK 380kV BSP


SAUDI ARABIA

S
TABUK

THI
JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

P SE0437 WT-924152 01 of 02 00
SEC-ERB CAD-A (2002/04)

Cada03
OW NER.
00 02 of 02
P SE0437 WT-924152
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO.

1. THIS IS CONCEPTUAL DRAWING. CONTRACTOR SHALL PREPARE


DETAILED DESIGN DRAWINGS FOR ENGINEERING AND

TS
CONSTRUCTION PURPOSES, BASED ON SCOPE SPECIFIED IN

OF I
PTS.

375 METERS 2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE


NOTED.

CONSENT
PACU PACU
(APPROX. (APPROX.
3. AFFECTED OUTDOOR LIGHTING POLES WITH ACCESSORIES
12.5m x 12.5m x
SST-1 SST-2 SHALL BE RELOCATED/REINSTATED IF AFFECTED BY SCOPE.
10m) 10m)

TTEN
THE W RI
MV SWGR
ROOM

VALVE VALVE
COOLERS COOLERS LEGEND
SINGLE STOREY DRPC BUILDING

THOUT
(APPROX. (APPROX.
14m x 12m) 14m x 12m)
(APPROX. 60m x 20m)

WI
DOCUMENT
375 M ETERS

S
THI
DRPC EQUIPMENT AREA

FROM
SEE ENLARGE DRAWING
(APPROX. 60m x 35m)

NED
PACU PACU

SHALL BE OBTAI
(APPROX. (APPROX.
12.5m x 12.5m x
10m) 10m) SST-1 SST-2

MV SWGR
ROOM

VALVE VALVE
COOLERS COOLERS
(APPROX. SINGLE STOREY DRPC BUILDING (APPROX.
14m x 12m) 14m x 12m)
(APPROX. 60m x 20m)

PART
DRPC EQUIPMENT AREA
DRPC TRANSFORMER AREA
(APPROX. 60m x 35m)

CONSIDERING HV & MV

N
I
FULL OR
DRPC TRANSFORMER AREA
BUSBARS & CLEARANCES
CONSIDERING HV & MV
BUSBARS & CLEARANCES (APPROX. 60m X 30m)

N
I
(APPROX. 60m X 30m)

ON
DISCONNECTOR DISCONNECTOR

REPRODUCTI
SWITCH

SWITCH

REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

NO
DRAWING CONTROL SHEET WT-924148

SCOPE OF WORK & PTS PTS-20WM319

CO.
-

CITY
-

SAUDIELECTRI
-

-
EXISTING TABUK 380/132/33kV BSP

OF
ARE THE SOLE PROPERTY
AS-BUILT BY DATE

132kV GIS 33kV SWGR SCADA PANEL

N
HEREINED
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

CONTAI
INTERFACE CABLES
(POWER/AUX/CONTROL/COMS)
BETWEEN EXISTING BSP & DRPC

ON
NFORMATI
RSD AAA/AMT
DRAWN BY CHECKED BY SCALE:

25 FEB 2020 15 APR 2020

THE I
DATE STARTED DATE COMPLETED

OPR’G. DEPT. ENG. DEPT.

AND
THIS DRAWING IS NOT TO BE USED FOR CERTIFIED
CONSTRUCTION OR FOR ORDERING

(HYBRID DRPC)
BY DATE
MATERIAL UNTIL CERTIFIED AND DATED

NG
GENERAL LAYOUT DIAGRAM

DRAW I
INSTALLATION OF DYNAMIC REACTIVE POWER COMPENSATION

(REFER TO APPENDIX-XVIII FOR DETAILS OF CONNECTION) (DRPC) AT TABUK 380kV BSP


TABUK SAUDI ARABIA

S
THI
JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

P SE0437 WT-924152 02 of 02 00
SEC-ERB CAD-A (2002/04)