SAUDI ELECTRICITY COMPANY ‫الشركة السعودية للكهرباء‬


APP’D
CHK’D

SCOPE OF WORK AND TECHNICAL


DESCRIPTION

SPECIFICATIONS

FOR
NO.

REVISIONS

PREP. BY: HA/GGB/MIR


INSTALLATION OF DYNAMIC REACTIVE POWER
DATE: 27.04.2020 COMPENSATION (DRPC) AT TABOUK 380/132kV BSP
CHK’D BY: NAO

APPROVED

APPENDIX TO PTS-20WM319
Appendix XVIII
NAWAR A. AL OTAIBI (132KV AND 33KV CABLE INSTALLATION FROM TABOUK 380/132/33KV BSP TO THE NEW DRPC STATION)
CERTIFIED

Final

BY: F.A. AMRO

DATE: 27.04.2020

THIS DRAWING IS NOT


TO BE USED FOR
CONSTRUCTION
FOR
OR
ORDERING
(ATTACHMENT TO SCHEDULE "B" OF CONTRACT NO.……/….)
MATERIALS
UNTILCERTIFIED AND
DATED

PTS-20WM319, Dtd: 27.04.2020


SCOPE OF WORK & TECHNICAL SPECIFICATIONS FOR INSTALLATION OF DRPC AT PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
TABOUK 380kV BSP
JOB ORDER NO. (132KV AND 33KV CABLE INSTALLATION FROM TABOUK 380KV BSP TO 1
SE0437 A PTS -20WM319 OF 0
THE NEW DRPC STATION)
Appendix XVIII 11
CERT.
SAUDI ELECTRICITY COMPANY ‫الشركة السعودية للكهرباء‬
APP’D

TABLE OF CONTENTS
CHK’D

SECTION PAGE
DESCRIPTION

I INTRODUCTION

1.01 GENERAL 03
1.02 PROJECT DESCRIPTION 03
1.03 PROJECT SUMMARY 03

II BASIC REQUIREMENTS AND GUIDELINES 04


NO.

REVISIONS III SCOPE OF WORK

3.01 GENERAL 05
3.02 ELECTRICAL WORK AND FACILITIES 05
3.03 CIVIL WORKS 06
PREP. BY: HA/GGB/MIR
3.04 MECHANICAL WORKS 07
DATE: 27.04.2020
3.05 PROJECT DESIGN DOCUMENTS, CALCULATIONS
CHK’D BY: NAO
AND DRAWINGS 07
3.06 STANDARDS, CODES AND SPECIFICATIONS 07
APPROVED
IV DESIGN CRITERIA 08

V EQUIPMENT/MATERIALS AND TECHNICAL SPECIFICATIONS

5.01 GENERAL 09
NAWAR A. AL OTAIBI
5.02 SUBSTATION ELECTRICAL SYSTEM 09
CERTIFIED
VI COMMISSIONING TESTS 10

VII ATTACHMENTS 11

BY: F.A. AMRO

DATE: 27.04.2020

THIS DRAWING IS NOT


TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS
UNTILCERTIFIED AND
DATED

PTS-20WM319, Dtd: 27.04.2020


SCOPE OF WORK & TECHNICAL SPECIFICATIONS FOR INSTALLATION OF DRPC AT PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
TABOUK 380kV BSP
JOB ORDER NO. (132KV AND 33KV CABLE INSTALLATION FROM TABOUK 380KV BSP TO 2
SE0437 A PTS -20WM319 OF 0
THE NEW DRPC STATION)
Appendix XVIII 11
CERT.
SAUDI ELECTRICITY COMPANY ‫الشركة السعودية للكهرباء‬
APP’D

SECTION- I INTRODUCTION
CHK’D

1.01 GENERAL
This Scope of work and Technical Specifications (Appendix-XVIII to PTS-20WM319) and
associated PROJECT Conceptual Drawings, which are Attachment-I to Schedule "B" of
DESCRIPTION

CONTRACT # …………/00, describe the specific scope of work that the CONTRACTOR
is required to carry out on Lump Sum Turnkey (LSTK) basis, until the successful
commissioning and integration of Proposed 132kV underground Cables between 132kV
Disconnector in the DRPC area and to the existing Tabouk BSP 132kV GIS Swichgear
breaker position no. AD08 and 33kV cable installation between the 33kV Swichgear at
existing Tabouk BSP CB and DRPC Station 33kV Swichgear and associated work
involving for the new Cable installation work at the existing Tabouk 380/132/33kV BSP,
NO.

by Saudi Electricity Company (hereafter referred to as COMPANY or SEC).


3

REVISIONS
1.02 PROJECT DESCRIPTION
The appendix intent is to make provision for constructing one (1),132kV Cable & one (1),
33kV cable circuits between the existing Tabouk 380/132/33kV BSP and the new 132kV
Disconnector and 33kV Switchgear at the DRPC area. This Appendix-XVIII to PTS-
PREP. BY: HA/GGB/MIR 20WM319 covers the specific work to be carried out inside the existing Tabouk BSP.
DATE: 27.04.2020 For the installation of cables, refer to Main PTS.
CHK’D BY: NAO
1.03 PROJECT SUMMARY

APPROVED The CONTRACTOR shall perform on LSTK basis, the design, engineering, material
procurement, quality management, factory inspection/testing, transport and delivery to
site, construction, site inspection, testing and commissioning, associated work and
services until final handing over of the Cable circuits for DRPC project inside the BSP
at Tabouk 380/132/33kV BSP in a satisfactorily working and operating condition to the
complete satisfaction of the COMPANY as specified in this Scope of WORK and
Technical Specifications.
NAWAR A. AL OTAIBI
CERTIFIED **** END OF SECTION I ****

BY: F.A. AMRO

DATE: 27.04.2020

THIS DRAWING IS NOT


TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS
UNTILCERTIFIED AND
DATED

PTS-20WM319, Dtd: 27.04.2020


SCOPE OF WORK & TECHNICAL SPECIFICATIONS FOR INSTALLATION OF DRPC AT PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
TABOUK 380kV BSP
JOB ORDER NO. (132KV AND 33KV CABLE INSTALLATION FROM TABOUK 380KV BSP TO 3
SE0437 A PTS -20WM319 OF 0
THE NEW DRPC STATION)
Appendix XVIII 11
CERT.
SAUDI ELECTRICITY COMPANY ‫الشركة السعودية للكهرباء‬
APP’D

SECTION-II BASIC REQUIREMENTS AND GUIDELINES


CHK’D

For Basic Requirements and Guidelines for the PROJECT, refer to Section II of PTS -
20WM319 (main SOW/TS).
DESCRIPTION

**** END OF SECTION - II ****


NO.

REVISIONS

PREP. BY: HA/GGB/MIR

DATE: 27.04.2020
CHK’D BY: NAO

APPROVED

NAWAR A. AL OTAIBI
CERTIFIED

BY: F.A. AMRO

DATE: 27.04.2020

THIS DRAWING IS NOT


TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS
UNTILCERTIFIED AND
DATED

PTS-20WM319, Dtd: 27.04.2020


SCOPE OF WORK & TECHNICAL SPECIFICATIONS FOR INSTALLATION OF DRPC AT PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
TABOUK 380kV BSP
JOB ORDER NO. (132KV AND 33KV CABLE INSTALLATION FROM TABOUK 380KV BSP TO 4
SE0437 A PTS -20WM319 OF 0
THE NEW DRPC STATION)
Appendix XVIII 11
CERT.
SAUDI ELECTRICITY COMPANY ‫الشركة السعودية للكهرباء‬
APP’D

SECTION - III SCOPE OF WORK


CHK’D

3.01 GENERAL

A. This Appendix is part on Lump Sum Turnkey basis. The CONTRACTOR shall provide
the design, manufacture/procure, supply and deliver all equipment and materials,
DESCRIPTION

construction, commissioning, SITE testing and provide other related services for the
completion of this PROJECT in accordance with the requirements of this Scope of
WORK and Technical Specifications.

B. The Bidder/CONTRACTOR shall visit/survey the sites and make himself aware of the
details of the PROJECT and the entire existing systems/facilities site. The modification
WORK at the associated substation shall be compatible with the existing system
NO.

REVISIONS C. Contractor shall take care of all the existing below ground and above ground facilities
and relocate as necessary after compiling all necessary documentations per SEC
cataloguing requirements. Any damage to existing facility shall be repaired by the
contractor at no additional cost to SEC.

PREP. BY: HA/GGB/MIR 3.02 ELECTRICAL WORK AND FACILITIES


DATE: 27.04.2020
CHK’D BY: NAO
A. The WORK shall include, but not limited to, the following.

1. The design and engineering services of the 132kV and 33kV cable route inside the
APPROVED
BSP.

3. Inspection, checking out (including phasing out), commissioning and SITE testing
of all constructed and installed equipment, and their allied facilities.

4. The whole cables route inside BSP shall thoroughly investigated and surveyed.
All utilities found shall reflected in the design drawings.
NAWAR A. AL OTAIBI
CERTIFIED 5. Re-location/reinstatement of existing utilities and services disturbed during
construction.

6. The CONTRACTOR shall make the provision of the cable laying, i.e to arrange to
confirm that the entire cable route from DRPC boundary to termination point for
132kV GIS and 33kV Switchgear is possible as per standard.

BY: F.A. AMRO 7. Relocate all underground facilities as required and handover all dismantled
materials/equipment if any to COMPANY designated warehouse.
DATE: 27.04.2020

8. The CONTRACTOR shall coordinate with other agencies if any of which any
existing facilities is to be remove or relocated.
THIS DRAWING IS NOT
TO BE USED FOR
CONSTRUCTION OR B. 132kV & 33kV Cables:
FOR ORDERING
MATERIALS
UNTILCERTIFIED AND
DATED
As in main PTS

PTS-20WM319, Dtd: 27.04.2020


SCOPE OF WORK & TECHNICAL SPECIFICATIONS FOR INSTALLATION OF DRPC AT PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
TABOUK 380kV BSP
JOB ORDER NO. (132KV AND 33KV CABLE INSTALLATION FROM TABOUK 380KV BSP TO 5
SE0437 A PTS -20WM319 OF 0
THE NEW DRPC STATION)
Appendix XVIII 11
CERT.
SAUDI ELECTRICITY COMPANY ‫الشركة السعودية للكهرباء‬
APP’D

3.03 CIVIL WORKS


CHK’D

a. Provide and install concrete encased duct bank and manhole from the existing
132kV GIS buiding up to 1.5m outside boundary wall at the north side to route the
new 132kV cables as shown in drawing WT-924153 “Proposed 132kV Cable
Ductbank from 132kV GIS to DRPC”. (Note: Beyond the DRPC boundary wall the
DESCRIPTION

DRPC contractor shall provide the cable duct bank/cable trench up to the DRPC
equipment).
b. CONTRACTOR shall determine the exact layout of the cable ductbank and shall
size them for the ultimate configuration, taking into consideration the following
aspects: space for maintenance and operations at manholes.
c. The proposed cable ductbank shall be designed in flat formation to accommodate
the required number of cable ducts for the ultimate configuration.
NO.

REVISIONS d. Ductbanks shall be provided with pull wire ropes in all spare conduits.
e. Ductbanks shall be designed to meet the heavy wheel loads and to ensure complete
mechanical protection of the cables to avoid the possible damages.
f. CONTRACTOR shall perform the wall coring at existing 132kV GIS basement to
connect the proposed ductbank. The connection shall be made waterproofed.
PREP. BY: HA/GGB/MIR

DATE: 27.04.2020 g. Provide steel supports/cable trays/cleats/clamps, etc, as necessary to install the
CHK’D BY: NAO
cables.
h. All existing facilities affected and get damaged during the construction shall be
reinstated by the CONTRACTOR in accordance to SEC Standards.
APPROVED
i. CONTRACTOR shall revise all existing drawings affected by the proposed scope of
work.
j. All removed and dismantled materials designated by the COMPANY to be
transported to SEC/COMPANY warehouse shall be transported by the
CONTRACTOR to a SEC/COMPANY designated location/warehouse.
SEC/COMPANY designated location/warehouse will be specified by SEC during
NAWAR A. AL OTAIBI the construction stage. All other removed, disposed and dismantled materials shall
CERTIFIED be transported by the CONTRACTOR to one of the approved Municipality
disposable sites. CONTRACTOR shall borne all the required fees. CONTRACTOR
shall remove the hazardous waste materials, if any, (for example fuels, lubricants,
oils, rags and absorption materials contaminated with fuels and oils, etc.) shall not
be stored on-site for more than three (3) months.
k. All polices of COMPANY (5-Star) Safety and Health Management System shall be
implemented in this project.
BY: F.A. AMRO
l. Safety signs shall be installed as per the requirements of COMPANY Safety Signs
DATE: 27.04.2020 and Warning Devices Special Manual No. 65-110.
m. It is the responsibility of the CONTRACTOR to visit the WORKSITE and to satisfy
himself as to the extent of WORK location and all the condition under which the
THIS DRAWING IS NOT
WORK will be carried out. No claims based on the lack of any such knowledge shall
TO BE USED FOR
CONSTRUCTION OR
be entertained.
FOR ORDERING
MATERIALS n. All other items that are not mentioned but are required to finish the project shall be
UNTILCERTIFIED AND
DATED
provided by the CONTRACTOR at no additional cost and time to the project.

PTS-20WM319, Dtd: 27.04.2020


SCOPE OF WORK & TECHNICAL SPECIFICATIONS FOR INSTALLATION OF DRPC AT PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
TABOUK 380kV BSP
JOB ORDER NO. (132KV AND 33KV CABLE INSTALLATION FROM TABOUK 380KV BSP TO 6
SE0437 A PTS -20WM319 OF 0
THE NEW DRPC STATION)
Appendix XVIII 11
CERT.
SAUDI ELECTRICITY COMPANY ‫الشركة السعودية للكهرباء‬
APP’D

Geotechnical Investigation Report of Tabouk BSP is provided in this PTS for


CHK’D

CONTRACTOR’s reference.

3.04. MECHANICAL WORKS

Relocation of any existing fire water piping, mechanical equipment, ventilation fans, etc., is not
DESCRIPTION

recommended. Contractor shall survey and select route to avoid / minimise any modification of
existing services. In case modification is inevitable, detailed proposal shall be submitted by
contractor SEC review and approval.

3.05. PROJECT DESIGN DOCUMENTS, CALCULATIONS AND DRAWINGS

CONTRACTOR shall refer to Table 3.01 of PTS-20WM319 main SOW/TS.


NO.

REVISIONS

3.06 STANDARDS, CODES AND SPECIFICATIONS

All WORK equipment and material covered by this document shall conform to the latest
edition of the SEC’S Material Standard Specifications supplemented with latest
PREP. BY: HA/GGB/MIR applicable industry Standards, Codes and Specifications. The latest edition of each
DATE: 27.04.2020 Standard and Specification shall mean the latest edition specified hereunder.
CHK’D BY: NAO
The CONTRACTOR shall strictly comply with the following Standards, Codes and
Specifications, and no deviation shall be accepted unless otherwise accepted by a
APPROVED written waiver from SEC. The CONTRACTOR may propose "equivalent" Standards and
Specifications if such standards and specifications are equal to or better than those
specified herein, and shall be subject to prior approval of the SEC.

01-TMSS-01 General Requirements for All Equipment/Materials


(Rev. 03)
NAWAR A. AL OTAIBI
CERTIFIED 23-TMSS-01 PVC Conduits and Fittings for Underground Cables
(Rev.01)

23-TMSS-02 Duct Sealing Unit


(Rev. 0)

BY: F.A. AMRO **** END OF SECTION - III ****


DATE: 27.04.2020

THIS DRAWING IS NOT


TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS
UNTILCERTIFIED AND
DATED

PTS-20WM319, Dtd: 27.04.2020


SCOPE OF WORK & TECHNICAL SPECIFICATIONS FOR INSTALLATION OF DRPC AT PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
TABOUK 380kV BSP
JOB ORDER NO. (132KV AND 33KV CABLE INSTALLATION FROM TABOUK 380KV BSP TO 7
SE0437 A PTS -20WM319 OF 0
THE NEW DRPC STATION)
Appendix XVIII 11
CERT.
SAUDI ELECTRICITY COMPANY ‫الشركة السعودية للكهرباء‬
APP’D

SECTION IV - DESIGN CRITERIA


CHK’D

For design criteria, refer to PTS-20WM319 (main SOW/TS).


DESCRIPTION

**** END OF SECTION IV ****


NO.

REVISIONS

PREP. BY: HA/GGB/MIR

DATE: 27.04.2020
CHK’D BY: NAO

APPROVED

NAWAR A. AL OTAIBI
CERTIFIED

BY: F.A. AMRO

DATE: 27.04.2020

THIS DRAWING IS NOT


TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS
UNTILCERTIFIED AND
DATED

PTS-20WM319, Dtd: 27.04.2020


SCOPE OF WORK & TECHNICAL SPECIFICATIONS FOR INSTALLATION OF DRPC AT PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
TABOUK 380kV BSP
JOB ORDER NO. (132KV AND 33KV CABLE INSTALLATION FROM TABOUK 380KV BSP TO 8
SE0437 A PTS -20WM319 OF 0
THE NEW DRPC STATION)
Appendix XVIII 11
CERT.
SAUDI ELECTRICITY COMPANY ‫الشركة السعودية للكهرباء‬
APP’D

SECTION V - EQUIPMENT/MATERIALS AND TECHNICAL SPECIFICATIONS


CHK’D

5.01 GENERAL

This Section outlines broadly the technical specifications of the cables required for the
complete installation of the PROJECT. The specifications outlined herein shall be read in
DESCRIPTION

conjunction with the main PTS and attached PROJECT drawings, the COMPANY
Material Standard Specifications and the associated International Standards and Codes.
The ratings and specific requirements of various electrical equipment shall be as indicated
in Data Schedule of COMPANY Material Standard Specifications, and the
CONTRACTOR shall ensure full conformity with the same.

All material/equipment to be used for this project shall be procured from the
NO.

SEC/National Grid SA list of pre-qualified/approved manufacturers, factories (countries),


REVISIONS
make & type only.

5.02 SUBSTATION ELECTRICAL SYSTEM

All equipment/material shall conform to the related COMPANY standards and other
PREP. BY: HA/GGB/MIR applicable standards in accordance with the tabulation hereunder:
DATE: 27.04.2020
CHK’D BY: NAO The CONTRACTOR shall strictly comply with these Standards, and Specifications, and
no deviation shall be accepted unless otherwise accepted by a written waiver from
COMPANY. The CONTRACTOR may propose "equivalent" Standards and
APPROVED Specifications if such standards and specifications are equal to or better than those
specified herein, and shall be subject to prior approval of the COMPANY.

Following is the list of applicable COMPANY Standards, Specificatons, Drawings of


latest revision. However CONTRACTOR shall follow the latest revision of all applicable
Standards, Specifications, Drawings & Codes, even if these are not enlisted here under:
Table 5.01
NAWAR A. AL OTAIBI S COMPANY Notes
EQUIPMENT/MATERIAL
CERTIFIED erial Standards/
No. Other Standards
1. Grounding System TES-P-119.10, Rev.01
Cable Trays/Ducts/Duct Sealing Unit/ TES-P-104.04, Rev.01
Conduits/ Trenches TES-P-119.20
23-TMSS-01, Rev.01,
2.
24- TMSS-1, Rev.01
BY: F.A. AMRO
23-TMSS-02.
DATE: 27.04.2020

THIS DRAWING IS NOT


*** END OF SECTION V ****
TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS
UNTILCERTIFIED AND
DATED

PTS-20WM319, Dtd: 27.04.2020


SCOPE OF WORK & TECHNICAL SPECIFICATIONS FOR INSTALLATION OF DRPC AT PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
TABOUK 380kV BSP
JOB ORDER NO. (132KV AND 33KV CABLE INSTALLATION FROM TABOUK 380KV BSP TO 9
SE0437 A PTS -20WM319 OF 0
THE NEW DRPC STATION)
Appendix XVIII 11
CERT.
SAUDI ELECTRICITY COMPANY ‫الشركة السعودية للكهرباء‬
APP’D

SECTION VI - COMMISSIONING TESTS


CHK’D

For Commissioning Tests, refer to Section VI of PTS-20WM319 (main SOW/TS).


DESCRIPTION

**** END OF SECTION VI & SOW/TS ****


NO.

REVISIONS

PREP. BY: HA/GGB/MIR

DATE: 27.04.2020
CHK’D BY: NAO

APPROVED

NAWAR A. AL OTAIBI
CERTIFIED

BY: F.A. AMRO

DATE: 27.04.2020

THIS DRAWING IS NOT


TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS
UNTILCERTIFIED AND
DATED

PTS-20WM319, Dtd: 27.04.2020


SCOPE OF WORK & TECHNICAL SPECIFICATIONS FOR INSTALLATION OF DRPC AT PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
TABOUK 380kV BSP
JOB ORDER NO. (132KV AND 33KV CABLE INSTALLATION FROM TABOUK 380KV BSP TO 10
SE0437 A PTS -20WM319 OF 0
THE NEW DRPC STATION)
Appendix XVIII 11
CERT.
SAUDI ELECTRICITY COMPANY ‫الشركة السعودية للكهرباء‬
APP’D

SECTION VII - ATTACHMENTS


CHK’D

 Drawing WT-924148, Drawing Control Sheet.


 Drawing WT-924153, SUBSTATION LAYOUT TABOUK 380/132/33kV BSP.
 Drawing WT-924154, 132kV ONE LINE DIAGRAM TABOUK 380/132/33kV BSP.
DESCRIPTION

 Drawing WT-924155. 33kV ONE LINE TABOUK 380/132/33kV BSP.


 Geotechnical Investigation Report of Tabouk BSP.
NO.

REVISIONS

PREP. BY: HA/GGB/MIR

DATE: 27.04.2020
CHK’D BY: NAO

APPROVED

NAWAR A. AL OTAIBI
CERTIFIED

BY: F.A. AMRO

DATE: 27.04.2020

THIS DRAWING IS NOT


TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS
UNTILCERTIFIED AND
DATED

PTS-20WM319, Dtd: 27.04.2020


SCOPE OF WORK & TECHNICAL SPECIFICATIONS FOR INSTALLATION OF DRPC AT PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
TABOUK 380kV BSP
JOB ORDER NO. (132KV AND 33KV CABLE INSTALLATION FROM TABOUK 380KV BSP TO 11
SE0437 A PTS -20WM319 OF 0
THE NEW DRPC STATION)
Appendix XVIII 11
‫الشركة السعودية للكهرباء‬
Saudi Electricity Company
DRAWING CONTROL SHEET
SEC-EHV-E&DD/FACTS PE&DD
PROJECT TITLE PROJECT ENGINEER CONTRACT NO. JOB ORDER NO. DRAFTING OFFICE
Installation of STATIC VAR COMPENSATOR (SVC) at Tabuk
380/132/33kV BSP Amitabha Chakrabarti -
Tabuk SAUDI ARABIA
INITIAL REV. FURTHER REV.
DRAWING NO. SHEET NO. DRAWING TITLE REMARKS
NO. NO. DATE
INDEX-A
PTS-20WM319 1 TO 11 0 SCOPE OF WORK & TECHNICAL SPECIFICATIONS
WT-924153 1 0 DRPC COOLING SYSTEM DIAGRAM (TYPICAL)

INDEX-P
WT-924149 1 TO 2 0 CONCEPTUAL SINGLE LINE DIAGRAM FOR DRPC AT TABUK 380/132/33kV BSP
WT-924150 1 0 V & I CHARACTERISTIC +450/-150 MVAR DRPC AT TABUK 380/132/33kV BSP
WT-924151 1 0 DRPC CONTROL BUILDING LAYOUT (TYPICAL)
WT-924152 1 0 GENERAL LAYOUT DIAGRAM FOR DRPC AT TABUK 380/132/33kV BSP
WT-924154 1 OF 1 0 SUBSTATION LAYOUT TABOUK 380/132/33KV BSP
WT-924155 1 TO 2 0 132KV ONE LINE DIAGRAM TABOUK 380/132/33KV BSP
WT-924156 1 TO 2 0 33KV ONE LINE TABOUK 380/132/33KV BSP
INDEX-X
WT-924148 1 0 DRAWING CONTROL SHEET

Reference Drawing
ET-907744 1 PROJECT SIGNBOARD WITH ELECTRONIC COUNTER

PROJECT COMPLETION DATE PLANT NO. INDEX DRAWING NO. SHEET NO. REV. NO.
AS BUILT
- - SE0437 WT-924148
BY X 1 OF 1 0
OW NER.
00 01 P SE0437 WT-924154
of
01 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO.
1. THIS IS CONCEPTUAL DRAWING. CONTRACTOR SHALL PREPARE
DETAILED DESIGN DRAWINGS FOR ENGINEERING AND

TS
CONSTRUCTION PURPOSES, BASED ON SCOPE SPECIFIED IN

OF I
PTS.
2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE
SPECIFIED.
3. 132KV CABLE DUCT BANK SIZE IS MINIMUM REQUIREMENT,

CONSENT
LARGER SIZE SHALL BE PROVIDED IF REQUIRED DURING DETAIL
DESIGN STAGE.

THOUT
WI TTEN
THE W RI
DOCUMENT
S
THI
FROM
LEGEND

NED
SHALL BE OBTAI
SCOPE OF WORK UNDER PTS-20WM319

PROPOSED 132KV DUCT BANK FROM 132KV GIS TO DRPC

33KV SW GR.BLDG.

PART
N
I
FULL OR
DRPC

N
I
132KV GIS

ON
REPRODUCTI
AD01AD02 AD03 AD04 AD05 AD06 AD07 AD08 AD09 AD10 AD11 AD12 AD13 AD14 AD15 AD16 AD17 AD18 AD19 AD20 AD21 AD22 AD23 AD24 AD25 AD26 AD27 AD28 AD29 AD30 AD31

REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

NO
DRAWING CONTROL SHEET WT- 924148

SCOPE OF WORK AND TECHNICAL SPECIFICATIONS PTS- 20WM319

CO.
-

TY
-

CI
-

SAUDIELECTRI
-

OF
ARE THE SOLE PROPERTY
GRAPHIC SCALE:
0 5 10 20 30 40 50 60 70 80m

SCALE : 1 : 800

AS-BUILT BY DATE

N
HEREINED
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

CONTAI ON
NFORMATI
MAHMOOD AS SHOWN
DRAWN BY CHECKED BYNAWAR A. ALOTAIBISCALE:

16/03/2020 27/04/2020

THE I
DATE STARTED DATE COMPLETED

OPR'G. DEPT. ENG. DEPT. NAO

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

AND
CONSTRUCTION OR FOR ORDERING
FAA
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

NG
SUBSTATION LAYOUT

DRAW I
PROPOSED 132KV DUCT BANK FROM 132KV
GIS TO DRPC AT EXISTING TABOUK BSP

S
TABOUK SAUDI ARABIA

THI
JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

01
P SE0437 WT-924154 of
01
00
SEC-A (2004/10)

DMS VECTOR SECA00


OW NER.
00 01 P SE0437 WT-924154
of
01 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO.
1. THIS IS CONCEPTUAL DRAWING. CONTRACTOR SHALL PREPARE
DETAILED DESIGN DRAWINGS FOR ENGINEERING AND

TS
CONSTRUCTION PURPOSES, BASED ON SCOPE SPECIFIED IN

OF I
PTS.
2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE
SPECIFIED.
3. 132KV CABLE DUCT BANK SIZE IS MINIMUM REQUIREMENT,

CONSENT
LARGER SIZE SHALL BE PROVIDED IF REQUIRED DURING DETAIL
DESIGN STAGE.

THOUT
WI TTEN
THE W RI
DOCUMENT
S
THI
FROM
LEGEND

NED
SHALL BE OBTAI
SCOPE OF WORK UNDER PTS-20WM319

PROPOSED 132KV DUCT BANK FROM 132KV GIS TO DRPC

33KV SW GR.BLDG.

PART
N
I
FULL OR
DRPC

N
I
132KV GIS

ON
REPRODUCTI
AD01AD02 AD03 AD04 AD05 AD06 AD07 AD08 AD09 AD10 AD11 AD12 AD13 AD14 AD15 AD16 AD17 AD18 AD19 AD20 AD21 AD22 AD23 AD24 AD25 AD26 AD27 AD28 AD29 AD30 AD31

REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

NO
DRAWING CONTROL SHEET WT- 924148

SCOPE OF WORK AND TECHNICAL SPECIFICATIONS PTS- 20WM319

CO.
-

TY
-

CI
-

SAUDIELECTRI
-

OF
ARE THE SOLE PROPERTY
GRAPHIC SCALE:
0 5 10 20 30 40 50 60 70 80m

SCALE : 1 : 800

AS-BUILT BY DATE

N
HEREINED
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

CONTAI ON
NFORMATI
MAHMOOD AS SHOWN
DRAWN BY CHECKED BYNAWAR A. ALOTAIBISCALE:

16/03/2020 27/04/2020

THE I
DATE STARTED DATE COMPLETED

OPR'G. DEPT. ENG. DEPT. NAO

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

AND
CONSTRUCTION OR FOR ORDERING
FAA
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

NG
SUBSTATION LAYOUT

DRAW I
PROPOSED 132KV DUCT BANK FROM 132KV
GIS TO DRPC AT EXISTING TABOUK BSP

S
TABOUK SAUDI ARABIA

THI
JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

01
P SE0437 WT-924154 of
01
00
SEC-A (2004/10)

DMS VECTOR SECA00


OW NER.
00 02 P SE0437 WT-924155
of
01 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO.
1. THIS IS CONCEPTUAL DRAWING. CONTRACTOR SHALL PREPARE
DETAILED DESIGN DRAWINGS FOR ENGINEERING AND

TS
CONSTRUCTION PURPOSES, BASED ON SCOPE SPECIFIED IN

OF I
PTS.

CONSENTTTEN
THE W RI
THOUT
LEGEND

WI
DOCUMENT
SCOPE OF WORK UNDER PTS-20WM319

N
I S
THI
FROM
FULL OR
N
I ON
REPRODUCTI NED
SHALL BE OBTAI
PART
REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

NO
DRAWING CONTROL SHEET WT- 924148

SCOPE OF WORK AND TECHNICAL SPECIFICATIONS PTS- 20WM319

CO.
-

TY
-

CI
-

SAUDIELECTRI
-

OF
ARE THE SOLE PROPERTY
AS-BUILT BY DATE

N
HEREINED
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

CONTAI
DRPC
MLC CKT-1
+450/-150

ON
NFORMATI
MAHMOOD AS SHOWN
DRAWN BY CHECKED BYNAWAR A. ALOTAIBISCALE:

16/03/2020 27/04/2020

THE I
DATE STARTED DATE COMPLETED

OPR'G. DEPT. ENG. DEPT. NAO

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

AND
CONSTRUCTION OR FOR ORDERING
FAA
S/S#4 MATERIAL UNTIL CERTIFIED AND DATED BY DATE
CKT-1
CKT-1

NG
132KV ONE LINE DIAGRAM

DRAW I
PROPOSED 132KV DUCT BANK FROM 132KV
GIS TO DRPC AT EXISTING TABOUK BSP
S/S#11

S
TABOUK SAUDI ARABIA

THI
CKT-1
JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

01
P SE0437 WT-924155 of
02
00
SEC-A (2004/10)

DMS VECTOR SECA00


OW NER.
00 02 P SE0437 WT-924155
of
02 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO.
1. THIS IS CONCEPTUAL DRAWING. CONTRACTOR SHALL PREPARE
DETAILED DESIGN DRAWINGS FOR ENGINEERING AND

TS
CONSTRUCTION PURPOSES, BASED ON SCOPE SPECIFIED IN

OF I
PTS.

CONSENTTTEN
THE W RI THOUT
LEGEND

S DOCUMENT W I
SCOPE OF WORK UNDER PTS-20WM319

THI
FROM
I N
FULL OR I
N ON
REPRODUCTI NED
SHALL BE OBTAI
PART
REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

NO
DRAWING CONTROL SHEET WT- 924148

SCOPE OF WORK AND TECHNICAL SPECIFICATIONS PTS- 20WM319

CO.
-

TY
-

CI
-

SAUDIELECTRI
-

OF
ARE THE SOLE PROPERTY
AS-BUILT BY DATE

N
HEREINED
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

CONTAI
TABUK UNIV. MLC
CKT-2 CKT-2

ON
NFORMATI
MAHMOOD AS SHOWN
DRAWN BY CHECKED BYNAWAR A. ALOTAIBISCALE:

16/03/2020 27/04/2020

THE I
DATE STARTED DATE COMPLETED

OPR'G. DEPT. ENG. DEPT. NAO

S/S#4 S/S#11 CERTIFIED


THIS DRAWING IS NOT TO BE USED FOR

AND
CKT-2 CKT-2 CONSTRUCTION OR FOR ORDERING
FAA
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

NG
132KV ONE LINE DIAGRAM

DRAW I
PROPOSED 132KV DUCT BANK FROM 132KV
GIS TO DRPC AT EXISTING TABOUK BSP

S
TABOUK SAUDI ARABIA

THI
JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

02
P SE0437 WT-924155 of
02
00
SEC-A (2004/10)

DMS VECTOR SECA00


TS OW NER.
00 02 P SE0437 WT-924156
of
01 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO.
1. THIS IS CONCEPTUAL DRAWING. CONTRACTOR SHALL PREPARE
DETAILED DESIGN DRAWINGS FOR ENGINEERING AND
CONSTRUCTION PURPOSES, BASED ON SCOPE SPECIFIED IN

CONSENT OF I
PTS.

S DOCUMENT W I
THI TTEN
THOUT THE W RI NED FROM
LEGEND

N PART SHALL BE OBTAI


SCOPE OF WORK UNDER PTS-20WM319

N FULL OR I
I ON
REPRODUCTI
REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

NO
DRAWING CONTROL SHEET WT- 924148

SCOPE OF WORK AND TECHNICAL SPECIFICATIONS PTS- 20WM319

CO.
-

TY
-

CI
-

SAUDIELECTRI
DRPC AUX. -
BACKUP SUPPLY
-

OF N ARE THE SOLE PROPERTY


AS-BUILT BY DATE

NED HEREI
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

CONTAI ON
NFORMATI
MAHMOOD AS SHOWN
DRAWN BY CHECKED BYNAWAR A. ALOTAIBISCALE:

16/03/2020 27/04/2020

THE I
DATE STARTED DATE COMPLETED

OPR'G. DEPT. ENG. DEPT. NAO

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

AND
CONSTRUCTION OR FOR ORDERING
FAA
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

NG
33KV ONE LINE DIAGRAM

S DRAW I
PROPOSED 132KV DUCT BANK FROM 132KV
GIS TO DRPC AT EXISTING TABOUK BSP
TABOUK SAUDI ARABIA

THI
JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

01
P SE0437 WT-924156 of
02
00
SEC-A (2004/10)

DMS VECTOR SECA00


OW NER.
00 02 P SE0437 WT-924156
of
02 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO.
1. THIS IS CONCEPTUAL DRAWING. CONTRACTOR SHALL PREPARE
DETAILED DESIGN DRAWINGS FOR ENGINEERING AND

TS
CONSTRUCTION PURPOSES, BASED ON SCOPE SPECIFIED IN

OF I
PTS.

CONSENT
WI TTEN
THE W RI
THOUT
DOCUMENT
S
THI
FROM
LEGEND

NED
SHALL BE OBTAI
SCOPE OF WORK UNDER PTS-20WM319

PART
N
I N
FULL OR ION
REPRODUCTI
REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

NO
DRAWING CONTROL SHEET WT- 924148

SCOPE OF WORK AND TECHNICAL SPECIFICATIONS PTS- 20WM319

CO.
-

TY
-

CI
-

SAUDIELECTRI
-

OF
ARE THE SOLE PROPERTY
AS-BUILT BY DATE

N
HEREINED
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

CONTAI ON
NFORMATI
MAHMOOD AS SHOWN
DRAWN BY CHECKED BYNAWAR A. ALOTAIBISCALE:

16/03/2020 27/04/2020

THE I
DATE STARTED DATE COMPLETED

OPR'G. DEPT. ENG. DEPT. NAO

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

AND
CONSTRUCTION OR FOR ORDERING
FAA
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

NG
33KV ONE LINE DIAGRAM

DRAW I
PROPOSED 132KV DUCT BANK FROM 132KV
GIS TO DRPC AT EXISTING TABOUK BSP

S
TABOUK SAUDI ARABIA

THI
JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

02
P SE0437 WT-924156 of
02
00
SEC-A (2004/10)

DMS VECTOR SECA00