Professional Documents
Culture Documents
ECS-16-11-1 Page 1 of 10 Neutral Earthing Resistor: Revision No. Date Prepared by Reviewed by Approved by 0 1 2 3
ECS-16-11-1 Page 1 of 10 Neutral Earthing Resistor: Revision No. Date Prepared by Reviewed by Approved by 0 1 2 3
ECS-16-11-1 Page 1 of 10 Neutral Earthing Resistor: Revision No. Date Prepared by Reviewed by Approved by 0 1 2 3
TABLE OF CONTENTS
1.0 GENERAL.......................................................................................................................... 3
1.1 Scope ................................................................................................................................ 3
1.2 Definitions.......................................................................................................................... 3
1.3 Site conditions ................................................................................................................... 3
2.0 CODES AND STANDARDS .............................................................................................. 3
3.0 REFERENCE DOCUMENTS ............................................................................................. 3
4.0 DOCUMENT PRECEDENCE............................................................................................. 4
5.0 DEVIATIONS ..................................................................................................................... 4
6.0 QUALITY ASSURANCE/QUALITY CONTROL ................................................................ 4
7.0 DOCUMENTATION ........................................................................................................... 5
7.1 General.............................................................................................................................. 5
7.2 Deliverables ....................................................................................................................... 5
8.0 SUB-SUPPLIER ................................................................................................................ 6
8.1 Scope of equipment supplied ............................................................................................ 7
9.0 DESIGN ............................................................................................................................. 7
9.1 Rating And Performance ................................................................................................... 7
9.2 Ratings Plate ..................................................................................................................... 7
9.3 Connection Plate ............................................................................................................... 8
9.4 Anti-Condensation Heaters................................................................................................ 8
9.5 Painting.............................................................................................................................. 8
10.0 MATERIALS ...................................................................................................................... 8
10.1 Resistors............................................................................................................................ 8
10.2 Terminations ...................................................................................................................... 9
10.3 Enclosure........................................................................................................................... 9
10.4 Cable ................................................................................................................................. 9
11.0 TOOLS............................................................................................................................. 10
12.0 TESTING.......................................................................................................................... 10
13.0 GUARANTEES AND PERFORMANCE .......................................................................... 10
Revision 3 Memo
1.0 GENERAL
1.1 Scope
This specification describes the minimum requirements for design, manufacturing,
testing and supply of Neutral Earthing Resistors (NER).
The Neutral Earthing Resistors are intended to limit earth-fault-current magnitudes
to reduce damage during earth faults. The magnitude of the resistance is selected
to allow sufficient current for earth-fault relays to clear the faulted circuit. The NER
shall be supplied by the transformer manufacturer.
1.2 Definitions
COMPANY: Esso Exploration & Production Chad Inc.
PURCHASER: KBC.
MANUFACTURER/SUPPLIER: The party that manufactures and/or supplies
equipment, technical documents/drawings and services to perform the duties
specified by COMPANY/PURCHASER.
SUB-SUPPLIER: The party(s) which carry(s) out all or part of the design,
procurement, installation and testing of the system(s) as specified by the
SUPPLIER.
PROJECT: The Chad Development Project.
SHALL: Indicates a mandatory requirement.
5.0 DEVIATIONS
The SUPPLIER shall clearly identify any deviations from this specification. If such
are not submitted in writing, it is assumed that the SUPPLIER complies with all
specified requirements. Any deviations from the specifications, made without prior
written approval of the PURCHASER, shall be corrected to meet the specifications
at the SUPPLIER’s expense.
SUPPLIER may offer alternative proposals for price and technical advantage if he
wishes, but such proposals shall form a supplement to the main proposal and
subject to COMPANY and PURCHASER review/approval.
SUPPLIER shall submit certified reports of production tests as soon as the tests are
completed satisfactorily.
The COMPANY/PURCHASER reserves the right to inspect materials and
workmanship at all stages of manufacture and to witness any or all tests and to those
of SUB-SUPPLIERS. SUPPLIER shall provide a copy of its Manufacturing and
Inspection Plan for review and inclusion of any mandatory COMPANY/PURCHASER
witness points after an award.
7.0 DOCUMENTATION
7.1 General
SUPPLIER shall submit the type and quantity of drawings and documentation for
PURCHASER's approval or information as listed in the individual Supplier Data
Requirement List (SDRL) and Purchase Order.
Comments made by PURCHASER on drawing submittal shall not relieve SUPPLIER
or SUB-SUPPLIER of any responsibility in meeting the requirements of the
specifications. Such comments shall not be construed as permission to deviate from
requirements of the Purchase Order unless specific and mutual agreement is
reached and confirmed in writing.
Each drawing shall be provided with a block in the bottom right-hand corner
incorporating the following information:
a. Official trade name of the SUPPLIER.
b. SUPPLIER'S Drawing Number.
c. Drawing title giving the description of contents whereby the drawing can be
identified.
d. A symbol or letter indicating the latest issue or revision.
e. PO number and item tag numbers.
Revisions to drawing shall be identified with symbols adjacent to the alterations, a
brief description in tabular form of each revision shall be given, and if applicable, the
authority and date of the revision shall be listed. The term " Latest Revision " shall not
be used.
7.2 Deliverables
R1 Unless otherwise stated in the inquiry/order documents, the MANUFACTURER
shall at least supply the following documents. All drawings and catalog information
to be included in Operating Manual shall be in English. All other drawings shall be
provided in English.
SUPPLIER shall also provide all documents in an electronic format suitable for
Esso Electronic Document Management Systems which is defined in
Requirements for Electronic Submission of SUPPLIER data.
ESSO EXPLORATION & ECS-16-11-1
PRODUCTION CHAD INC. NEUTRAL EARTHING RESISTOR
Page 6 of 10
8.0 SUB-SUPPLIER
The SUPPLIER shall assume unit responsibility and overall guarantee for the
equipment package and associated equipment.
The SUPPLIER shall transmit all relevant purchase order documents including
specifications to his SUB-SUPPLIER.
It is the SUPPLIER’S responsibility to enforce all Purchase Order and Specification
requirements on his SUB-SUPPLIER.
ESSO EXPLORATION & ECS-16-11-1
PRODUCTION CHAD INC. NEUTRAL EARTHING RESISTOR
Page 7 of 10
The SUPPLIER shall submit all relevant SUB-SUPPLIER drawings and engineering
data to the PURCHASER.
The SUPPLIER shall obtain and transmit all SUB-SUPPLIER warranties to the
PURCHASER/COMPANY, in addition to the system warranty.
9.0 DESIGN
j. Temperature rise
k. Design ambient temperature
l. Enclosure class
m. Equipment tag number
Power to the heater shall be supplied from an external 120V, 60Hz single phase
source and terminated in a separate terminal box fitted with a gland plate and
warning label printed in French and English. Voltage levels shall be as stated on
the data sheets.
9.5 Painting
The Neutral Earthing Resistors assembly shall be painted in accordance with the
MANUFACTURER’S standard paint specification.
10.0 MATERIALS
10.1 Resistors
The resistors shall be of the metal grid type and of robust construction.
The resistance elements shall be stainless steel, Type 300 or Type 400 series.
The use of a cast iron is not acceptable. Insulation shall be sufficiently robust and
proven in a desert environment
The resistor material shall be uniform in section and free from any flaw likely to
cause local heating. The grids shall be insulated with nonhygroscopic material and
shall be arranged in tiers on a rigid steel framework allowing adequate air
circulation between the grids.
ESSO EXPLORATION & ECS-16-11-1
PRODUCTION CHAD INC. NEUTRAL EARTHING RESISTOR
Page 9 of 10
10.2 Terminations
Termination shall be bushing type complete with tinned copper cable lugs of a size
suitable for the cable sizes specified in data sheets. Terminal boxes for connection
to generator or transformer neutral shall be adequately sized to accommodate
cable stress relieving device and in addition a protection C.T. (if specified in data
sheets). The terminal box for connection to earth shall be suitable for 240 mm2
cable, unless specified otherwise in the data-sheet. An undrilled non-magnetic
gland plate shall be provided on each terminal box.
10.3 Enclosure
10.3.1 Earthed enclosure is required for earthing resistors. (Designs requiring insulation
of enclosure from earth are unacceptable)
10.3.2 The resistors shall be enclosed in sheet steel enclosures of at least 2 mm thick
steel. The enclosure shall be vermin proof. Louvers, if provided, shall be covered
with fine galvanized steel wire mesh.
10.3.3 Enclosures for neutral earthing resistors shall be appropriate for the specified
environmental exposure. Openings in sides of enclosure shall not exceed 40mm
across. There shall be no openings on tops of enclosures.
10.3.4 The resistor enclosures shall provide a degree of protection equal to, or better
than IP 54.
10.3.5 Each enclosure shall be provided with lifting lugs for lifting, handling and erection.
10.3.7 The equipment shall be designed for floor mounting or on top of the transformer or
per MANUFACTURER’s standard.
10.4 Cable
The SUPPLIER shall provide the cable for connection between the transformer
neutral and the NER. The SUPPLIER shall provide cable gland, cable support and
all other devices necessary for a complete installation.
ESSO EXPLORATION & ECS-16-11-1
PRODUCTION CHAD INC. NEUTRAL EARTHING RESISTOR
Page 10 of 10
10.0 TOOLS
All special tools required for erection, commissions and maintenance of the unit
shall be provided by the SUPPLIER.
11.0 TESTING
Inspection and tests shall be carried out on the completely assembled equipment.
SUPPLIER shall notify the PURCHASER at least 15 working days prior to
commencement of the testing. The following tests shall be conducted at the
MANUFACTURERS works in accordance with the Standards and Codes specified
in Section 2.0 of this specification and witnessed by the COMPANY or
PURCHASER’s representative:
a. Dielectric test
b. Insulation resistance test
c. Cold resistance measurement
d. Temperature rise test, one unit of each rating
e. Temperature against resistance over full operating range
A copy of the type test certificate form shall be included in the quotation.