ECS 3-3-10 - 1 - 800871ac

You might also like

Download as pdf
Download as pdf
You are on page 1of 10
SSO EXPLORATION & PRODUCTION CHAD ING. ECS 3-3-10 EQUIPMENT & ‘STRAINERS FOR MECHANICAL Page 1 of 9 Rev. 0S | Oct. 1995 SPECIFICATION APPROVED BY ESSO 7 tun ee Date: Ata. Lie x PREPARED BY: P.BALLAY ff 4 REVIEWED BY: M, HUDSON &- APPROVED BY: M. MENZIE: ESSO EXPLORATION & ECS 3-3-10 PRODUCTION CHAD INC. STRAINERS FOR MECHANICAL Page tof Esso) EQUIPMENT Rev.1 | Oct. 1995 SPECIFICATION TABLE OF CONTENTS SCOPE SUMMARY OF ADDITIONAL REQUIREMENTS ............ 0-0-0002 02 020s DESIGN 2.0... oe eee eee ee cee eee Renata APPLICATION ..- Pea aces 5 PROJECT ADDENDUM ee : 9 LIST OF TABLES AND FIGURES TABLE1 ....... 7 3 TABLE 2 . a tie eee See TABLES 2.2... 7 eee seeeeeeee? FIGURE 1 : eee 8 SSO EXPLORATION & PRODUCTION CHAD INC. ECS 3-3-10 ‘STRAINERS FOR MECHANICAL Esso) EQUIPMENT SPECIFICATION 14 12 13 14 24 22 23 3.1.4 3.1.4 SCOPE This specification covers the design and application of temporary and permanent strainers for the protection of mechanical equipment, This specification does not cover metal screen or porous media filters with openings finer than 150 Fm. An astetisk (*) indicates that additional information is provided by ESSO in an addendum to this specification, ‘A pound sign (#) indicates that ESSO review/approval is required before design is finalized or equipment is purchased ‘SUMMARY OF ADDITIONAL REQUIREMENTS: The design and application of strainers for mechanical equipment not specifically covered by other specifications shall be per the requirements given herein. ‘Strainers shall be located between the inlet flange and the equipment isolation block valve. ‘A valved pressure tap shall be provided both upstream and downstream of strainer to monitor differential pressure across the strainer during plant start-up. DESIGN Common Requirements for Temporary and Permanent Strainers ‘Selection of strainer type and orientation of the strainer element relative to process fiow shall ensure that collected solids of foreign material cannot fall back into the line. Strainers shall be designed and fabricated to prevent their damage due to vibration, differential pressure, pulsating flow or impact of objects. Screen of mesh size 20 of finer shall be reinforced with perforated plate, or heavier screen and stee! bars. Strainer bodies shall be suitable for the line service classification. Material for screen and pertorated plate shall be per par. 4.1. Mesh size of strainers shall be selected to stop all objects that could cause plugging ‘or mechanical damage. ESSO EXPLORATIONS PRODUCTION CHAD INC. ECS 3-3-10 STRAINERS FOR MECHANICAL Page 3 of EQUIPMENT ieee SPECIFICATION Rev.1 | Oct. 1995 3.1.5 On pumps with NPSH margin less that 0.3 m (1 ft.) do not install strainer with a mesh size less that 3 x 3. °3.1.6 Strainer open area shall be not less than two times the inlet pipe cross-sectional area. For suction lines to compressors in air service, this criteria shall be followed unless otherwise specified. 3.1.7. Cone or basket type strainers shall be provided with identification tabs that protrude from the holding pipe flanges. 3.1.8 For "TEE" type strainers, guide rods and shelf rods supporting the strainer element shall be sized per Table 1. TABLE 1 “TEE" Size, NPS, in. Rod Size, mm 26 10 <6 6 Additional Requirements for Temporary Strainers 3.2.1. Temporary strainers shall be used during line flushing and initial operating periods of new and revamped plants, unless: a. Permanent strainers are specified. b. Piping is accessible for internal visual inspection throughout its entire length and is clean and ree of foreign objects. 3.2.2 Temporary strainers shall be in accordance with Figure 1. 3.2.3 Piping layout shall permit insertion and removal of the temporary strainer without disturbing equipment alignment. Pipe fittings such as Tees, wyes or fabricated piping ‘spool pieces are acceptable for this purpose. Permanent Strainers 3.3.1. The design and location of permanent strainers shall permit cleaning without removing the strainer body. ESSO EXPLORATION & = PRODUCTION CHAD ING. ECS 3-3-10 STRAINERS FOR MECHANICAL Page 4 of 9 Esso) EQUIPMENT SPECIFICATION Rev.1 | Oct. 1995 3.3.2. Strainers shall be either Y or a commercial basket type, depending on which is more economical. Fabricated strainers can be used if there is a significant cost or delivery advantage. 3.3.3. Arrangement of strainers shall permit cleaning without interrupting the pumping service. For installation equipped with a spare pump this shall be accomplished by providing @ permanent strainer in the suction line of each pump. For pumps without spares, twin strainers or self-cleaning strainers may be used, as applicable. 3.3.4 Positive displacement and turbine meters shall be provided with permanent strainers ‘on the upstream side. 3.3.5 Fuel oil supply lines shail be provided with suitable dual filters installed in parallel in the main supply line or the branch line. 3.3.6 Self-cleaning strainers (i.e., *Y" or "Tee" types) shall be provided with valved blowdown connections. SSO EXPLORATION & PRODUCTION CHAD INC. SPECIFICATION EQUIPMENT STRAINERS FOR MECHANICAL ECS 3-3-10 Page 5 of 9 Rev.1 | Oct. 1995 APPLICATION 4.1 Strainer requirements for specitic equipment and service applications shall be per Table 2: TABLE 2 Equpment ‘serve ‘pe or Flange | Strainer Type | MESH (1) | Matenal for ‘Sze GEMPoy) | Sze or | Staines (ae applicable) | (PERManem) | Opening | Bement NPS. in meri.) Pumps 3 and under ons central Horizontal Sngie Stage, Vera! | Suction 308 TEMP 3x9 NOTE 2} over 12 (12) Horizontal mutisage, Verucal | Suction anduncer | TEMP 20 x20 oopwalt ‘over 5x6 Reciprocating Suction Alszes TEMP 5x5 ‘Conwoled Volume ‘sucton ‘Al sizes PERM Note (@) | Type 304 stainless stool Rotary, Tutine ‘Sucton ‘Al eee Tewp@ | sxsi@ | Nowe @ ‘External Push OF Systems tor | vain Heacer | Al szos PERM 20x20 | Type s0e Mechanical Seals sales steet Compressors Ccentitugal Ni, Suen PERM 3x3 ‘Type 308 stainless stee! Al Sizes Gas, Suction TEMP 5517) | Type 304 o stale stoo! ‘ule, Seal PERM 100 100 | Type so# stalness see! Feng PERM 0x60 | Monet Reciprocating: ‘Ae, Sucion (PERM Fite) Gas, Sucton | Al sizee TEMP 20x20 | Type soa stainlece stool Flushing PERM 0x0 | Monel Rotary Serew: ‘ir, Suton PERM 20x20 | Type a0 sianess ste! Al Sizes ‘Gas, Sucton| TEMP 20x20 | Types0e stainese steel utter, Seal PERM 300x100 | Stoo! ESO EXPLORATION & 7 PRODUCTION GHAD INC. areca STRAINERS FOR MECHANICAL Page 6 of 9 Esso) EQUIPMENT SPECIFICATION fetalise oeeeee ‘aa ‘ir, Suton PERM Screen | 8X5 en Ory Fiter A Sices as, Sucion| TEMP 5x50) _| typea08 ute, Sea Pen “00x00 | Sunes stot wasting PERN 80x80 Turines PERI Screen Gas: Init i A sizes tr | 5x5 Type 208 stainess soo Wasting PERM 20x80 Steam: Note iret Al Sizes PERM 31178) __| Monet Notes: 1. MESH SIZES (or OPENINGS), as listed, are the usual maximums for normal operation, 2, Material for TEMPORARY STRAINER elements shail be suitable for the process fluid being handied. 3. MESH SIZE for CONTROLLED VOLUME PUMPS shall be selected on the basis of the pumped fluid characteristic. 4. MESH SIZE listed for ROTARY and TURBINE PUMPS assumes preliminary operation on low viscosity fluid, 5. Suction service for CENTRIFUGAL COMPRESSORS includes sidestream suetions. 6. An additional strainer element shall be provided for SPECIAL PURPOSE and GENERATOR DRIVE STEAM TURBINES for use during startup. Opening size shall be 1.5 mm, 7. Wire mesh screens for CENTRIFUGAL and AXIAL COMPRESSORS, Gas Suction service, must be reinforced with perforated plate or heavier mesh and steel bars. 8. When permanent strainer is specified in the job specification, mesh size and strainer material shall be selected on the basis of the pumped fluid characteristics. ESSO EXPLORATION & PRODUCTION CHAD INC. ECS 3-3-10 STRAINERS FOR MECHANICAL Page 7 of 8 EQUIPMENT e saeasee Rev.1 | Oct. 1995 TABLE 3 ‘Acceptable Metric Equivalent Dimension Screen Perforated Pipe Size, Plate Opening NPS. Meshes Diameter | Average z (per linear in.) mm Opening mm a ie 100 x 100 0.102 0.15 1.5 3 80 x 80 0.140 0.18 3 6 20 x 20, 0.406 0.85 8 5x5 16 35 3x3 1.6 69 ESSO EXPLORATION PRODUCTION CHAD INC. ECS 3-3-10 STRAINERS FOR MECHANICAL EQUIPMENT Page 8 of 9 SPECIFICATION Rev.1 | Oct 1995 FIGURE 1 Temporary Strainers StRaine® assewaLr FOR Rs J. FLANGE STRAINER aSSeuaLy FOR Rar FLANGES wiemure cera @ S open Le AMY goumunation uf tie a teen 2, Biucns om sa: 18 aaseo com BE SP MeSt SP ate liSet Sinetnae o'r SiRsise Sree Soh POR ie” sites coon Stance A. - 2. these sthainens ane pnovigeD LOR SIRENERE Ten ane ss 3 ates ine stnniner 1s OL ano" Pct "On" Eoune: Net etcn neGutteo® ean Sroucb SE Beekerta 1o"kexove ue gtnatndh andthe Ta. SRR ee "3.16 See Equipment Data Sheet. ESO EXPLORATION & ECS S310 Pee He eae ne ‘STRAINERS FOR MECHANICAL EQUIPMENT Pagooat® wd SPECIFICATION PROJECT ADDENDUM Rev.1 | Oct. 1995 PROJECT ADDENDUM

You might also like