A B C D E E' A B C D E E'

10mmØ STRAIGHT
BAR, S.P. @ 300mm
O.C; BOTH WAYS
15.00 2.54

5.08 3.93 2.85 1.35 1.80 15.00 2.54


5.08 3.93 2.85 3.15
FTB FTB FTB FTB B-2 B-2 B-2 B-2
1 1 1 1

FTB

1.80
B-2
1.98

1.98
STAIRWELL
S-2

B-2
F2-C1 F2-C1 F2-C1 F2-C1

FTB
2 2 2 S-2
2

B-1

B-1
FTB

FTB
F3-C1-C1 S-2

6.2

6.2
B-2
5.66

5.66
FTB B-2

FT

B-

0
0
5.19 5.19

1
S-2

3.86
FTB B-2
3.68

F1-C1
4.01 4.01
FTB B-2
F1-C1
2.91 17.92 2.91
F1-C1 FTB B-1
1.3
2' 17.92 8
4.43 F2-C1 2' 2' 5.81 2'

A A
B B
C C
D D
E E
E' E'
FOUNDATION PLAN 2ND FLOOR FRAMING PLAN
SCALE: 1:100 MTR. SCALE: 1:100 MTR.

2.00m
A B C D E E' 50mm concrete cover
8 - 16mmØ BASE BARS S.P. @ 0.15m
O.C. EACH WAY

1.20m
8 - 16mmØ BASE BARS S.P. @ 0.15m
O.C. EACH WAY
0.30m6 - 16mmØ MAIN
VERTICAL BARS

0.25m
LAT. TIES:10mmØ RSB;
SP. 1 @ 0.05m; 4 @ 0.10m;
15.00 2.54 REST @ 0.20m O.C.
40mm concrete cover
5.08 3.93 2.85 3.15
RB RB RB RB
PLAN (F3-C1-C1) C1
1 1 LAT. TIES:10mmØ RSB; LAT. TIES:10mmØ RSB;

1.80
SP. 1 @ 0.05m; 4 @ 0.10m; SP. 1 @ 0.05m; 4 @ 0.10m;
1.98

RB

REST @ 0.20m O.C. REST @ 0.20m O.C.


RB

2 2
RB

RB

6.2

5.66
RB finished ground floor line
RB

5.19
nat. grd. lineTB FOOTING TIE BEAM TB
3.86

RB natural grade line


4.01
RB
17.92 2.91 6 - 16mmØ MAIN 6 - 16mmØ MAIN
RB

1.20m
1.50m
VERTICAL BARS VERTICAL BARS
2' 5.81 2'
8 - 16mmØ BASE BARS;
EACH WAY
A 8 - 16mmØ BASE BARS;

0.30m
EACH WAY

B 100mm concrete cover


150mm gravel base
C
D SECTION (F3-C1-C1)
E
E'
ROOF BEAM FRAMING PLAN FOOTING & COLUMN DETAIL
SCALE: 1:100 MTR. SCALE: 1:30 MTR.

PREPARED FROM THE OFFICE OF: CIVIL / STRUCTURAL ENGINEER:


PRC NO. 27582 PROJECT TITLE: OWNER: DESIGN BY: SHEET CONTENT: SHEET NO.
PTR NO. 0905293 R.ANG M.BAUTISTA
A TWO - STOREY MIXED-USE BLDG. FOUNDATION PLAN
DATE ISSUED:
01-13-2017
K.EPISCOPE
COMMERCIAL - RESIDENTIAL MARY GRACE R. CALIMLIMW.TAMANI
RENATO ANG SECOND FLOOR FRAMING PLAN S01
ROOF BEAM FRAMING PLAN
ENGR. RENATO A. ANG FOOTING & COLUMN DETAIL 4
PLACE ISSUED:
DAGUPAN CITY ADDRESS: NALSIAN, CALASIAO, PANGASINAN
PROJECT:(OCTOBER 2017)
DATE: OCTOBER 2017