Professional Documents
Culture Documents
Regional Wireless - 2014 EFY - BSC Plan - WND - Mobile Rollot (Individual)
Regional Wireless - 2014 EFY - BSC Plan - WND - Mobile Rollot (Individual)
Objective
Perspective
Corporate
Customer (12)
Ehance Brand Equity
Improve Accessibility
Total
Network--Department--Operation & Maintenance--Work Place-----MW----ID----- Postion---
upervisor )--- -Division-Wireless Network--Work Place-------ID----- Postion---
Objective
Division
Cost Optimization
Total
enance--Work Place-----MW----ID----- Postion---
Work Place-------ID----- Postion---
---ID--- Position--
Perform /supervise site survey within the given time and standard % 3
100
100
100
8.5 8.5
<0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002
<2 <2 <2
8.5 8.5
100
100
100
100
100
100
100
100
100
100
100
100
100
100
8 2 2
100 50
1
8.5 8.5
75 75
4 1
100 100
100 25 50
100
100 8.5
n
KPI Description Formula
Mar-22 Apr-22 May-22 Jun-22
8.5
<0.002 <0.002 <0.002 <0.002
<2 <2
8.5
2 2
100 100
100 100
100
8.5
75
1
100
75 100
8.5
measured utilization against the planned budget and also
against the delivery
division risk
will be set by Div