Microtech Engineering Services: Light Gauge Steel Structure

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 18

Microtech Engineering Services

LIGHT GAUGE STEEL STRUCTURE


GROUND FLOOR
Sr. No. Description Covered Area Rate/sft Amount
1 Structure (Light gauge steel structure)
Material Supply,Fabrication, Installation and Transportaion #REF! #REF! #REF!
2 Civil works
Foundation with Plinth beam (9"x9"),Flooring including 3" dry #REF! #REF! #REF!
birck ballast ,3" Thick P.C.C and Finish with Tiles.
3 Insulation
Providing and fixing Glass wool insulation in roof and walls #REF! #REF! #REF!
(50mm thick)
4 Cladding and finishing
#REF! #REF! #REF!
Internal wall cladding with Cement board and Fall ceiling with gypsum board
5 Paint Works
Providing and laying paint on cement board and wall sheet. #REF! #REF! #REF!
6 Doors and Windows
Providing and fixing PVC Panel doors and Aluminnium windows with 5mm thick
white glass. #REF! #REF! #REF!

7 Electrification
Only internal Electric works #REF! #REF! #REF!
8 Public Health Works
Only internal plumbing works #REF! #REF! #REF!
Total Amount without Tax #REF!
I- tax @ 6% #REF!
Total Amount without Tax #REF!
Rate/Sft #REF!

FIRST FLOOR
Sr. No. Description Covered Area Rate/sft Amount
1 Structure (Light gauge steel structure)
Material Supply,Fabrication, Installation, Rain water acceries,
#REF! #REF! #REF!
and Transportaion
2 Civil works
Foundation with Plinth beam (9"x9),Flooring including 2" Thick #REF! #REF! #REF!
P.C.C and Finish with Tiles.
3 Insulation
Providing and fixing Glass wool insulation in roof and walls (50mm thick) #REF! #REF! #REF!
4 Cladding and finishing
#REF! #REF! #REF!
Internal wall cladding with Cement board and Fall ceiling with gypsum board
5 Paint Works
Providing and laying paint on cement board, roof and wall sheet. #REF! #REF! #REF!
6 Doors and Windows
Internal wall Finish with Gyp. Board and preparing surface with paint compete
all respects. #REF! #REF! #REF!
7 Electrification
Points & Connections #REF! #REF! #REF!
8 Public Health Works
Only internal plumbing works #REF! #REF! #REF!
Total Amount without Tax #REF!
I- tax @ 6% #REF!
Total Amount with Tax #REF!
Rate/Sft #REF!
Project : CLOSED SHED (208'-0"X78'-9")
Sr. No. Description Covered Area Rate/sft Amount
1 Material Supply and Fabrication
#REF! #REF! #REF!
I- tax @ 3.5% #REF!
Total Amount with Tax #REF!
Rate/Sft #REF!

Sr. No. Description Covered Area Rate/sft Amount


2 Erection, Painting and Transportation
#REF! #REF! #REF!
I- tax @ 6% #REF!
Total Amount with Tax #REF!
Rate/Sft #REF!
Price Summry
Sr. No. Description Covered Area Rate/sft Amount
1 Material Supply and Fabrication #REF! #REF! #REF!
2 Erection, Painting and Transportation #REF! #REF! #REF!
GRAND TOTAL #REF!

Rate/Sft #REF!

Insullattion and ventilators (Add On)


Sr. No. Description Covered Area Rate/sft Amount
Roof and Wall insullation with 50 mm thick glass
wool, Ridge vantilators and sky lights #REF! #REF!
1 #REF!
I- tax @ 3.5% #REF!
GRAND TOTAL #REF!
Rate/Sft #REF!

Civil works (Add On)


Sr. No. Description Covered Area Rate/sft Amount
2 Civil works
Excavation, R.C.C Columns with Footing
,Periphery brick wall 10'-0" high from F-FL with
foundation,1/2" Thick Plaster on brick wall #REF! #REF! #REF!
(Botth Side, Flooring including 3" Thick P.C.C
(1:4:8) ,3" Thick P.C.C (1:2:4) with 1'-6" back
filling.
Total Amount without Tax #REF!
I- tax @ 6% #REF!
Total Amount with Tax #REF!
Rate/Sft #REF!
Microtech Engineering Services
LIGHT GAUGE STEEL STRUCTURE SCHOOL
Summary
Sr. No. Description Covered Area Rate/sft Price
1 GROUND FLOOR #REF! #REF! #REF!
2 FIRST FLOOR #REF! #REF! #REF!

Grand Total #REF! #REF! #REF!


RATE ANAYLSIS
Material block Cement Sand Sand Sand Crush Crush Brick Form
(Local) (Chenab) (L-Pur) (Local) (Margala) Ballast Work

Rates 8 505 11 26 52 64 40 20

Waistage Profit Over head I-T


3%

Concrete
P.C.C (1:4:8) 100 Cft
Crush
Material Cement Sand (local) (Local) Waistage Labor Form work Over head Prime Profit + Income
Over
Rate Tax
Head
Qty 9.48 47.38 94.77 3% 100 0 0%
Rate 505 11 52 15 20 Rs./Cft 0% 0%
Amount 4786 521 4928 307 1500 0 0 120.421 0.00 0.00

R.C.C (1:2:4) 100 Cft


Sand Crush
Material Cement (Chenabl) (Margala) Waistage Labor Form work Over head Prime Income
Profit
Rate Tax
Qty 17.60 44.00 88.00 3% 100 1560 0%
Rate 505 26 64 15 20 Rs./Cft 0% 0%
Amount 8888 1144 5632 470 1500 31200 0 488.339 0.00 0.00

P.C.C (1:2:4) 100 Sft(2" Thick) 100 Cft


Crush Labor/ Form work/
Material Cement Sand (local) (Sargodha) Waistage Over head Prime Income
Sft Sft Profit
Rate Tax
Qty 17.6 44 88 3% 100 0 0%
Rate 505 11 52 5 20 Rs./Sft 0% 0%
Amount 8888 484 4576 418 500 0 0 148.664 0.00 0.00
R.C.C (1:2:4)
100 Cft
FOR Columns
Sand Crush
Material Cement (Chenabl) (Margala) Waistage Labor Form work Over head Prime Income
Profit
Rate Tax
Qty 17.60 44.00 88.00 3% 100 884 0%
Rate 505 26 64 25 25 Rs./Cft 0% 0%
Amount 8888 1144 5632 470 2500 22100 0 407.339 0.00 0.00

BRICK MASONARY
B-W (1:4) 100 Cft
Cement Bricks Labor/ Form work/ Over head
Material Sand (local) A-Class Waistage Prime Income
(Bags) Cft Sft Profit
Rate Tax
Qty 6 30 1350 0% 100 0 0%
Rate 505 11 8 20 Rs./Cft 0% 0%
Amount 3078 335 10800 0 2000 0 0 162.138 0.0 0.00

B-W (1:5) 100 Cft


Cement Bricks Labor/ Form work/
Material Sand (local) A-Class Waistage Over head Prime Income
(Bags) Cft Sft Profit
Rate Tax
Qty 5 32 1350 3% 100 0 0%
Rate 505 11 8 20 Rs./Cft 0% 0%
Amount 2565 349 10800 411 2000 0 0 161.261 0.0 0.00
Block m (1:6) 100 Cft
Cement Bricks Labor/ Form work/
Material Sand (local) A-Class Waistage Over head Prime Income
(Bags) Cft Sft Profit
Rate Tax
Qty 4 33 1350 3% 100 0 0%
Rate 505 20 8 16 Rs./Cft 0% 0%
Amount 2199 653 10800 410 1600 0 0 156.616 0.0 0.00

PLASTER
Plaster (1:3) 100 Sft 4.00 Cft
Form
Material Cement Sand (local) Waistage Labor/ work/ Misc. Over head
(Bags) Sft Prime Income
Sft Profit
Rate Tax
Qty 1.02 4 3% 100 0 0%
Rate 505 11 12 Rs./Cft 0% 0%
Amount 513 42 1200 0 0 17.5 0.0 0.00

Plaster (1:4) 100 sft 4.00 Cft


Form
Cement Labor/
Material Sand (local) Waistage work/ Misc. Over head Prime Income
(Bags) Sft Profit
Sft Rate Tax
Qty 0.81 4.06 3% 100 0 0%
Rate 505 11 12 Rs./sft 0% 0%
Amount 410 45 14 1200 0 0 16.7 0.0 0.00
Plaster (1:5) 100 Sft 4.00 Cft
Form
Cement Labor/
Material Sand (local) Waistage work/ Misc. Over head Prime Income
(Bags) Sft Profit
Sft Rate Tax
Qty 0.68 4.23 3% 100 0 0%
Rate 505 11 12 Rs./Cft 0% 0%
Amount 342 47 1200 0 0 15.9 0.0 0.00

Marble Fixing
Booti seena 100 Sft 4.00 Cft
(fancy 1/2")
Cement Labor/
Material Sand (local) Marble Grinding Misc. Over head Prime Income
(Bags) Sft Profit
Rate Tax
Qty 0.68 4.23 100 100 100 10%
Rate 505 11 60 15 15 Rs./sft 0% 0%
Amount 342 47 6000 1500 1500 939 103.3 0.0 0.00

100 Sft(4.5"x9") 2.00 Cft(1:2)


Roof Treatment

Bitument
Cement Polythene Over
Material (Bags) Sand (local) Brick tile Earth filling sheet coating Labor Prime Income
20lbs/100sft head
Rate Tax
+Profit
Qty 0.68 1.69 355 2.5 100 100 100
Rate 505 11 10 10 6 10 15 Rs./sft 0% 0%
Amount 342 19 3550 25 600 1000 1500 70.4 0.0 0.00

Ceramics tiles 100 Sft(10"x20") 4.00 Cft(1:6)


Cement Over
Material Sand (local) tile Labor Over head Prime Income
(Bags) head
Rate Tax
Qty 0.58 4.35 100 100 5% +Profit
Rate 505 11 68 25 6 10 15 Rs./sft 6300% 0%
Amount 293 48 6800 2500 482 0 0 101.2

Wiring for light


and fan point
3.0.29 x 1.5mm2
Black
Green
Main line
Red
Black
Pipe
Fan box
Light box
2 way box
3 way box
1 way box
Switch box
Switch plates
Final
Rate

Rs./Cft
120.42

Final
Rate

Rs./Cft
488.34

Final
Rate

Rs./Sft
148.66
Final
Rate

Rs./Cft
407.34

Final
Rate

Rs./Cft
162.14

Final
Rate

Rs./Cft
161.26
Final
Rate

Rs./Cft
156.62

Final
Rate

Rs./Cft
17.55

Final
Rate

Rs./Cft
16.69
Final
Rate

Rs./Cft
15.89

Final
Rate

Rs./sft
103.27

Final
Rate

Rs./sft
70.36

Final
Rate
Rs./sft
101.23
RATE ANAYLSIS
Material block Cement Sand Sand Sand Crush Crush Brick Form
(Local) (Chenab) (L-Pur) (Local) (Margala) Ballast Work

Rates 8 450 11 26 52 64 40 20

Waistage Profit Over head I-T


3% 20% 5% 6%

Concrete
P.C.C (1:4:8) 121 Cft
Crush
Material Cement Sand (local) (Local) Waistage Labor Form work Over head Prime Profit + Income Final
Over
Rate Tax Rate
Head
Qty 11.47 57.34 114.67 3% 121 0 5%
Rate 450 11 52 15 20 Rs./Cft 25% 6% Rs./Cft
Amount 5160 631 5963 353 1815 0 696 120.805 30.20 7.25 158.25

R.C.C (1:2:4) 5168.98 Cft


Sand Crush
Material Cement (Chenabl) (Margala) Waistage Labor Form work Over head Prime Income Final
Profit
Rate Tax Rate
Qty 909.74 2274.35 4548.70 3% 5168.98 1560 5%
Rate 450 26 64 15 20 Rs./Cft 20% 6% Rs./Cft
Amount 409383 59133 291117 22789 77535 31200 44558 181.025 36.21 10.86 228.09

P.C.C (1:2:4) 100 Sft(3" Thick) 17 Cft


Crush Labor/ Form work/
Material Cement Sand (local) (Sargodha) Waistage Over head Prime Income Final
Sft Sft Profit
Rate Tax Rate
Qty 3 7 15 3% 100 0 5%
Rate 450 11 52 5 20 Rs./Sft 20% 6% Rs./Sft
Amount 1346 82 778 66 500 0 139 29.1144 5.82 1.75 36.68
R.C.C (1:2:4)
100 Cft
FOR Columns
Sand Crush
Material Cement (Chenabl) (Margala) Waistage Labor Form work Over head Prime Income Final
Profit
Rate Tax Rate
Qty 17.60 44.00 88.00 3% 100 884 5%
Rate 450 26 64 25 25 Rs./Cft 20% 6% Rs./Cft
Amount 7920 1144 5632 441 2500 22100 1987 417.237 83.45 25.03 525.72

BRICK MASONARY
B-W (1:4) 270 Cft
Cement Bricks Labor/ Form work/ Over head
Material Sand (local) A-Class Waistage Prime Income Final
(Bags) Cft Sft Profit
Rate Tax Rate
Qty 16 82 3645 5% 270 0 5%
Rate 450 11 8 20 Rs./Cft 20% 6% Rs./Cft
Amount 7407 905 29160 1874 5400 0 2237 174.01 34.8 10.44 219.25

B-W (1:5) 270 Cft


Cement Bricks Labor/ Form work/
Material Sand (local) A-Class Waistage Over head Prime Income Final
(Bags) Cft Sft Profit
Rate Tax Rate
Qty 14 86 3645 3% 270 0 5%
Rate 450 11 8 20 Rs./Cft 20% 6% Rs./Cft
Amount 6172 943 29160 1088 5400 0 2138 166.302 33.3 9.98 209.54
Block m (1:6) 100 Cft
Cement Bricks Labor/ Form work/
Material Sand (local) A-Class Waistage Over head Prime Income Final
(Bags) Cft Sft Profit
Rate Tax Rate
Qty 4 33 1350 3% 100 0 5%
Rate 450 20 8 16 Rs./Cft 20% 6% Rs./Cft
Amount 1959 653 10800 402 1600 0 771 161.857 32.4 9.71 203.94

PLASTER
Plaster (1:3) 100 Sft 4.00 Cft
Form
Material Cement Sand (local) Waistage Labor/ work/ Misc. Over head
(Bags) Sft Prime Income Final
Sft Profit
Rate Tax Rate
Qty 1.02 4 3% 100 0 5%
Rate 450 11 12 Rs./Cft 20% 5% Rs./Cft
Amount 457 42 1200 0 85 17.8 3.6 0.89 22.30

Plaster (1:4) 2502.5 sft 100.10 Cft


Form
Cement Labor/
Material Sand (local) Waistage work/ Misc. Over head Prime Income Final
(Bags) Sft Profit
Sft Rate Tax Rate
Qty 20.34 101.70 3% 2502.5 0 5%
Rate 450 11 10 Rs./sft 20% 6% Rs./Cft
Amount 9153 1119 308 25025 0 1780 14.9 3.0 0.90 18.82
Plaster (1:5) 100 Sft 4.00 Cft
Form
Cement Labor/
Material Sand (local) Waistage work/ Misc. Over head Prime Income Final
(Bags) Sft Profit
Sft Rate Tax Rate
Qty 0.68 4.23 3% 100 0 5%
Rate 450 11 12 Rs./Cft 20% 6% Rs./Cft
Amount 305 47 1200 0 78 16.3 3.3 0.98 20.52

Marble Fixing
Booti seena 100 Sft 4.00 Cft
(fancy 1/2")
Cement Labor/
Material Sand (local) Marble Grinding Misc. Over head Prime Income Final
(Bags) Sft Profit
Rate Tax Rate
Qty 0.68 4.23 100 100 100 10%
Rate 450 11 60 15 15 Rs./sft 20% 6% Rs./sft
Amount 305 47 6000 1500 1500 935 102.9 20.6 6.17 129.61

752 Sft(4.5"x9") 15.04 Cft(1:2)


Roof Treatment

Bitument
Cement Polythene Over
Material (Bags) Sand (local) Brick tile Earth filling sheet coating Labor Prime Income Final
20lbs/100sft head
Rate Tax Rate
+Profit
Qty 5.09 12.73 2669.6 18.8 752 752 752
Rate 450 11 10 10 6 10 15 Rs./sft 25% 6% Rs./sft
Amount 2292 140 26696 188 4512 7520 11280 70.0 17.5 4.20 91.68

Ceramics tiles 309 Sft(6"x6") 12.36 Cft(1:6)


Cement Over
Material Sand (local) tile Labor Over head Prime Income Final
(Bags) head
Rate Tax Rate
Qty 1.79 13.45 309 309 5% +Profit
Rate 450 11 70 30 6 10 15 Rs./sft 6300% 0% Rs./sft
Amount 807 148 21630 9270 1593 0 0 108.2 6819.5 0.00 6927.75

Wiring for light


and fan point
3.0.29 x 1.5mm2
Black
Green
Main line
Red
Black
Pipe
Fan box
Light box
2 way box
3 way box
1 way box
Switch box
Switch plates