Professional Documents
Culture Documents
Microtech Engineering Services: Light Gauge Steel Structure
Microtech Engineering Services: Light Gauge Steel Structure
Microtech Engineering Services: Light Gauge Steel Structure
7 Electrification
Only internal Electric works #REF! #REF! #REF!
8 Public Health Works
Only internal plumbing works #REF! #REF! #REF!
Total Amount without Tax #REF!
I- tax @ 6% #REF!
Total Amount without Tax #REF!
Rate/Sft #REF!
FIRST FLOOR
Sr. No. Description Covered Area Rate/sft Amount
1 Structure (Light gauge steel structure)
Material Supply,Fabrication, Installation, Rain water acceries,
#REF! #REF! #REF!
and Transportaion
2 Civil works
Foundation with Plinth beam (9"x9),Flooring including 2" Thick #REF! #REF! #REF!
P.C.C and Finish with Tiles.
3 Insulation
Providing and fixing Glass wool insulation in roof and walls (50mm thick) #REF! #REF! #REF!
4 Cladding and finishing
#REF! #REF! #REF!
Internal wall cladding with Cement board and Fall ceiling with gypsum board
5 Paint Works
Providing and laying paint on cement board, roof and wall sheet. #REF! #REF! #REF!
6 Doors and Windows
Internal wall Finish with Gyp. Board and preparing surface with paint compete
all respects. #REF! #REF! #REF!
7 Electrification
Points & Connections #REF! #REF! #REF!
8 Public Health Works
Only internal plumbing works #REF! #REF! #REF!
Total Amount without Tax #REF!
I- tax @ 6% #REF!
Total Amount with Tax #REF!
Rate/Sft #REF!
Project : CLOSED SHED (208'-0"X78'-9")
Sr. No. Description Covered Area Rate/sft Amount
1 Material Supply and Fabrication
#REF! #REF! #REF!
I- tax @ 3.5% #REF!
Total Amount with Tax #REF!
Rate/Sft #REF!
Rate/Sft #REF!
Rates 8 505 11 26 52 64 40 20
Concrete
P.C.C (1:4:8) 100 Cft
Crush
Material Cement Sand (local) (Local) Waistage Labor Form work Over head Prime Profit + Income
Over
Rate Tax
Head
Qty 9.48 47.38 94.77 3% 100 0 0%
Rate 505 11 52 15 20 Rs./Cft 0% 0%
Amount 4786 521 4928 307 1500 0 0 120.421 0.00 0.00
BRICK MASONARY
B-W (1:4) 100 Cft
Cement Bricks Labor/ Form work/ Over head
Material Sand (local) A-Class Waistage Prime Income
(Bags) Cft Sft Profit
Rate Tax
Qty 6 30 1350 0% 100 0 0%
Rate 505 11 8 20 Rs./Cft 0% 0%
Amount 3078 335 10800 0 2000 0 0 162.138 0.0 0.00
PLASTER
Plaster (1:3) 100 Sft 4.00 Cft
Form
Material Cement Sand (local) Waistage Labor/ work/ Misc. Over head
(Bags) Sft Prime Income
Sft Profit
Rate Tax
Qty 1.02 4 3% 100 0 0%
Rate 505 11 12 Rs./Cft 0% 0%
Amount 513 42 1200 0 0 17.5 0.0 0.00
Marble Fixing
Booti seena 100 Sft 4.00 Cft
(fancy 1/2")
Cement Labor/
Material Sand (local) Marble Grinding Misc. Over head Prime Income
(Bags) Sft Profit
Rate Tax
Qty 0.68 4.23 100 100 100 10%
Rate 505 11 60 15 15 Rs./sft 0% 0%
Amount 342 47 6000 1500 1500 939 103.3 0.0 0.00
Bitument
Cement Polythene Over
Material (Bags) Sand (local) Brick tile Earth filling sheet coating Labor Prime Income
20lbs/100sft head
Rate Tax
+Profit
Qty 0.68 1.69 355 2.5 100 100 100
Rate 505 11 10 10 6 10 15 Rs./sft 0% 0%
Amount 342 19 3550 25 600 1000 1500 70.4 0.0 0.00
Rs./Cft
120.42
Final
Rate
Rs./Cft
488.34
Final
Rate
Rs./Sft
148.66
Final
Rate
Rs./Cft
407.34
Final
Rate
Rs./Cft
162.14
Final
Rate
Rs./Cft
161.26
Final
Rate
Rs./Cft
156.62
Final
Rate
Rs./Cft
17.55
Final
Rate
Rs./Cft
16.69
Final
Rate
Rs./Cft
15.89
Final
Rate
Rs./sft
103.27
Final
Rate
Rs./sft
70.36
Final
Rate
Rs./sft
101.23
RATE ANAYLSIS
Material block Cement Sand Sand Sand Crush Crush Brick Form
(Local) (Chenab) (L-Pur) (Local) (Margala) Ballast Work
Rates 8 450 11 26 52 64 40 20
Concrete
P.C.C (1:4:8) 121 Cft
Crush
Material Cement Sand (local) (Local) Waistage Labor Form work Over head Prime Profit + Income Final
Over
Rate Tax Rate
Head
Qty 11.47 57.34 114.67 3% 121 0 5%
Rate 450 11 52 15 20 Rs./Cft 25% 6% Rs./Cft
Amount 5160 631 5963 353 1815 0 696 120.805 30.20 7.25 158.25
BRICK MASONARY
B-W (1:4) 270 Cft
Cement Bricks Labor/ Form work/ Over head
Material Sand (local) A-Class Waistage Prime Income Final
(Bags) Cft Sft Profit
Rate Tax Rate
Qty 16 82 3645 5% 270 0 5%
Rate 450 11 8 20 Rs./Cft 20% 6% Rs./Cft
Amount 7407 905 29160 1874 5400 0 2237 174.01 34.8 10.44 219.25
PLASTER
Plaster (1:3) 100 Sft 4.00 Cft
Form
Material Cement Sand (local) Waistage Labor/ work/ Misc. Over head
(Bags) Sft Prime Income Final
Sft Profit
Rate Tax Rate
Qty 1.02 4 3% 100 0 5%
Rate 450 11 12 Rs./Cft 20% 5% Rs./Cft
Amount 457 42 1200 0 85 17.8 3.6 0.89 22.30
Marble Fixing
Booti seena 100 Sft 4.00 Cft
(fancy 1/2")
Cement Labor/
Material Sand (local) Marble Grinding Misc. Over head Prime Income Final
(Bags) Sft Profit
Rate Tax Rate
Qty 0.68 4.23 100 100 100 10%
Rate 450 11 60 15 15 Rs./sft 20% 6% Rs./sft
Amount 305 47 6000 1500 1500 935 102.9 20.6 6.17 129.61
Bitument
Cement Polythene Over
Material (Bags) Sand (local) Brick tile Earth filling sheet coating Labor Prime Income Final
20lbs/100sft head
Rate Tax Rate
+Profit
Qty 5.09 12.73 2669.6 18.8 752 752 752
Rate 450 11 10 10 6 10 15 Rs./sft 25% 6% Rs./sft
Amount 2292 140 26696 188 4512 7520 11280 70.0 17.5 4.20 91.68