Otp (Environment)
Otp (Environment)
Otp (Environment)
100% Compliance Rate for Proper management and segregation of waste generated by the
4. Waste Generation (Recyclable and Residual) Land / Water Pollution #DIV/0!
company by identifying details/types of WASTE
Leo Tanlimco
Engineering
Substitution
In-charge Status
Elimination
Needed
Admin.
PPE
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.
c. turn off lights during day shift on identified areas with natural sunlight Facilities
Continous
✘ and Budget
(reference WEM conducted last March 2021) Maintenance
Monitoring
PCO,
3 Installation of Solar Power System Management and Budget Installed
Facilties
Leo Tanlimco
Status
Continous
Monitoring
Continous
Monitoring
Continous
Monitoring
Continous
Monitoring
Installed
Engineering
Substitution
Elimination
Program Activities
Admin.
In-charge Resources Needed Status
PPE
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep Oct. Nov. Dec.
Continous
1 Check and clean comfort rooms and sink to avoid accumulation of dirt and waste. Janitor Manpower Monitoring
✘
Facilities
Continous
2 Grease trap waste cleaning at pantry areas. ✘ and Manpower Monitoring
Maintenance
All Employees
Continous
3 Proper disposal of hazardous and food waste at hazardous waste area. ✘ and Manpower Monitoring
Facilities and Maint.
Monthly monitoring of wastewater discharge thru result of laboratory analysis (ROLA) from ✘ Continous
4 accredited laboratory of CIP 2 PCO/SO Manpower Monitoring
ZERO DISCHARGE /DID NOT REACH
SAMPLING QUANTITY
Oil
Month and
Target
(mg/L)
Result Month BOD
Target
(mg/L)
Result OIL and GREASE BOD
Grease
Engineering
Substitution
Resources
Elimination
Program Activities In-charge Status
Admin.
Needed
PPE
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.
To be included
4 Ambient air test from accredited laboratory. ✘ PCO/SO Budget
on 2021 Plan
PCO/SO
To be included
5 Greenhouse project inside company. and Budget
on 2021 Plan
✘
All Employees
PCO/SO To be
6 Tree planting activities in a community. ✘
and Budget announced after
All Employees pandemic
Reviewed by:
Proper management for the spillage of oil/chemical and zero occurrence of major Ferdie Bonifacio
Objective As per RA 6969 (DAO 29) Standard
chemical/spillage.
Approved by:
Leo Tanlimco
Heirarchy of Controls Program Monitoring and Status
Engineering
Substitution
Resources
Elimination
Program Activities In-charge Status
Admin.
Needed
PPE
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.
PCO/SO
Monitor and check condition of equipments, vehicles, and
Safety Continous
1 chemical area and hazardous area for possible oil leaks ✘ Manpower Monitoring
and spillage during safety audit. Committee
PCO/SO To be included
✘
Refresher training and drill on chemical to employees and and Mapower on 2020
3 Program
chemical handling team Chemical Budget
Handling Team
August
April
February
May
July
January
March
September
November
December
October
November 0 0
December 0 0
Legend: Plan Actual
Reviewed by:
Hazardous Waste and Chemical Management Ferdie Bonifacio
Objective Proper monitoring and management of hazardous waste generated. Act (RA 6969/DAO 2013-22) Standard
Approved by:
Leo Tanlimco
Heirarchy of Controls Program Monitoring and Status
Engineering
Substitution
Resources
Elimination
Program Activities In-charge Status
Admin.
Needed
PPE
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.
PCO/SO
Continous
1 Collection, segregation and proper labeling of hazardous waste. ✘ Chemical Manpower Monitoring
Handler
PCO/SO
Manpower Continous
2 Monitoring and checking of hazardous waste area. ✘ Chemical
Budget Monitoring
Handler
PCO/SO
✘ ✘ Manpower Plan
3 Disposal and hauling of hazardous waste by accredited DENR waste hauler and treater. Chemical
(June 2020)
Budget
Handler
Manpower Quarterly
4 Submission of Semi-Annual Report (SMR) on-line to DENR for hazardous waste generated by plant. ✘
PCO/SO
Budget Submission
14 15 15
Manpower Semi-Annual
5 Submission of Compliance Monitoring Report (CMR) on-line to DENR to update status of the plant. ✘
PCO/SO
Budget Submission
14 15
Data Information
Waste
Oil Electrical and
Used Oil Contaminated Paint Empty Grease Trap Pathological Electronic BFL Used Battery
Month (I101) Materials (F699) Containers Waste Waste Equipment (D407) (D406)
(I104) (J201) (H802) (M501) (M506)
February 2021 0.025 0.009 0.015 0.01 0.035 0.011 0.05 0.011 0.0210
March 2021 0.029 0.01 0.018 0.015 0.038 0.011 0.05 0.018 0.0250
April 2021 0.236 0.021 0.019 0.017 0.041 0.014 0.1 0.021 0.031
May 2021 0.258 0.029 0.019 0.018 0.043 0.015 0.15 0.028 0.037
June 2021 0.431 0.045 0.023 0.029 0.058 0.016 0.21 0.038 0.049
July 2021 0.435 0.049 0.025 0.041 0.059 0.018 0.22 0.038 0.051 UPDATED AS OF SEPTEMBER 2021
August 2021 0.451 0.053 0.028 0.044 0.061 0.022 0.24 0.04 0.052
September 2021 0.455 0.054 0.028 0.044 0.062 0.029 0.24 0.04 0.53
October 2021
November 2021
December 2021
Proper management and segregation of waste generated by the company by identifying details/types of waste. Reviewed by:
Ecological Solid Waste Management (RA Ferdinand Bonifacio
Objective Improve ratio of residual waste to RM usage from 1.93% (Y2020) to 1.8% to Y2021.
9003) Approved by:
Leo Tanlimco
Program Activities
Engineering
Substitution
Elimination
Admin.
Resources
PPE
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec. In-charge Status
Needed
Continous
1 Monitoring and checking of central waste area for proper segregation of waste thru safety audit. PCO/SO Manpower
Monitoring
✘
✘ PCO/SO
Continous
3 Monitoring of disposal of waste by accredited hauler. Waste Mngt. Manpower
Monitoring
Committee
Total
(Jan. Jul.)
619.8 0 0 306 231 318 0 0 0 0 13,668.00 1,015,661.93 1.35 1.8
Rodeth L Marquez
Reviewed by:
As per required by Ecological Solid Waste Ferdie Bonifacio
Objective Reduce plastic scrap thru GTN improvement and reduction of reject. Limit Plastic waste to 33% or material recovery of 67%
Management Act (RA 9003)
Approved by:
Leo Tanlimco
Heirarchy of Controls Program Monitoring and Status
Substitution
Engineering
Resources
Elimination
Program Activities In-charge Status
Admin.
PPE
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec. Needed
PCO
Continous
1 Checking of plastic scrap area to monitor proper segregation of plastic scrap thru safety audit. Waste Mgt Manpower
Monitoring
✘ Committee
PCO
✘ Continous
2 Coordination to plastic scrap hauler for identification of plastic scrap with value. Waste Mgt Manpower
Monitoring
Committee
Manpower Continous
3 Monitor Problem Solving Team (PST) Activities related to 70% improvement and reduction of reject to 3%. ✘ Finance
Monitoring
Raw PP Trimmings
Plastic APET PS Trimmings STATRITE/
Month Materials Plastic Waste Target APET Trimmings (Natural- PP Trimmings PS Trimmings PS Trimmings PVC Trimmings
Scrap Trimmings (White and PETG ALLOY PP Board
Usage (%) (%) (Clear) Translucent (Colored) (Black) (Colored) (Clear)
(kg.) ( Colored) Natural) Trimmings
(kg) White
July
TOTAL
(Jan. - Jul) - - #DIV/0! #DIV/0! 20,508 - 97 - - 9,447 - - - 594
August
September
October
November
December
TOTAL
(Aug. - Dec.) - - - - - - - - - - - - - -