This document provides a general checklist for coating and wrapping inspection. It lists inspection items such as reviewing approved coating and wrapping procedures, material certificates, calibration certificates, surface preparation, chloride testing, coating application time monitoring, visual inspections, holiday testing, repairs, production sample testing, approved tape usage for wrapping, exposed metal protection, primer application before wrapping, and proper coated pipe wrapping and storage. The checklist ensures coated and wrapped items meet specifications at each step of the process.
Original Description:
Original Title
General Check list for Coating and Wrapping Inspection
This document provides a general checklist for coating and wrapping inspection. It lists inspection items such as reviewing approved coating and wrapping procedures, material certificates, calibration certificates, surface preparation, chloride testing, coating application time monitoring, visual inspections, holiday testing, repairs, production sample testing, approved tape usage for wrapping, exposed metal protection, primer application before wrapping, and proper coated pipe wrapping and storage. The checklist ensures coated and wrapped items meet specifications at each step of the process.
This document provides a general checklist for coating and wrapping inspection. It lists inspection items such as reviewing approved coating and wrapping procedures, material certificates, calibration certificates, surface preparation, chloride testing, coating application time monitoring, visual inspections, holiday testing, repairs, production sample testing, approved tape usage for wrapping, exposed metal protection, primer application before wrapping, and proper coated pipe wrapping and storage. The checklist ensures coated and wrapped items meet specifications at each step of the process.
General Checklist for Coating and Wrapping Inspection
Doc No : Item Inspection Checklist Ok No
Reviewed approved Coating and Wrapping Procedure
Reviewed Approved Material tect certificates
Reviewed all the calibration certificates (wherever applicable) for the equipments for coating and wrapping application and as well as inspection Material Handling (Storage location monitoring) Surface preparation to be checked Surface proflie to be checked Chloride test to be performed Time duration to be monitored between the coating layers (as per the data sheet) 100% visual inspection to be carried out Holdiay Test to be performed If any repairs with the coating shall be repaired as per the approved procedure All the tests (as per contract) over the producton sample to be carried out Approved Tape to be utulized for Wrapping Exposed metal to be protected Appliaction of approved quick drying primer prior to wrapping Coated pipes to be wrapped and placed properly, without damaging the coating (Monitor the storage loaction & conditions) nspection