DETERGENT PG-91 DOSING (INJECTION) (0.282 USGPM NORMAL CAPACITY RANGE @ 100.4 ˚F) AND ASSOCIATED MOTORS, PER PUMP DATA SHEET PE-G7XXX2,SH.001- 002,REV.A. AND 31-SAMSS-009
1.3 Two (2) POSITIVE DISPLACEMENT PUMP, FOR DCA
DETERGENT PG-95 DOSING (INJECTION) (0.282 USGPM NORMAL CAPACITY RANGE@ 100.4 ˚F) AND ASSOCIATED MOTORS, PER PUMP DATA SHEET PE-G7XXX3,SH.001- 002,REV.A. AND 31-SAMSS-009
1.4 PULSATION DAMPERS.
1.5 VENDOR SHALL PROVIDE INSTRUMENTATION AS
SPECIFIED ON P & ID DRAWINGS BUT NOT LIMITED TO, SAUDI ARAMCO MATERIAL SYSTEM SPECIFICATION (SAMSS), SAUDI ARAMCO ENGINEERING STANDARDS (SAES) AND ENGINEERING ATTACHED APPLICABLE SAUDI ARAMCO LIBRARY DRAWINGS LISTED IN SECTION 2. VENDOR SHALL PROVIDE ALL THE INSTRUMENTS MATERIAL RELATED TO SKID SHALL BE NEMA 4X.
1.6 LEVEL INDICATING TRANSMITTER WITH REMOTE
ELECTRONIC INDICATOR MOUNTED AT THE SKID GRADE LEVEL SHALL BE CONNECTED TO SKID JUNCTION BOX. THE GUIDED WAVE RADAR (GWR) LEVEL TRANSMITTER’S PROBE SHALL BE SUITABLE FOR USE IN OIL SOLUBLE INHIBITOR AND SHALL BE REMOVABLE WITHOUT DRAINING THE TANK. THE LEVEL TRANSMITTER SHALL BE PRE-WIRED TO THE SKID’S INHIBITOR CONTROL PANEL TO TRIP THE ASSOCIATED MOTORS BASED ON LOW LEVEL SET POINT. LEVEL TRANSMITTER SHALL BE PROVIDED WITH ASSOCIATED LEVEL GAUGE IN ACCORDANCE WITH SAES-J-100.
1.7 PRESSURE INDICATION ON THE DISCHARGE OF
CHEMICAL INJECTION PUMPS SHALL BE IN ACCORDANCE WITH ANSI B40.1. ALL PRESSURE GAUGES (SEAL DIAPHRAGM) PROVIDED WITH CHEMICAL INJECTION SHALL HAVE DUAL SCALES IN PSIG AND KPA (GA). PRESSURE TRANSMITTERS SHALL BE PROVIDED FOR THE PUMPS. SET POINTS TO BE DEFINED BY VENDOR.
1.8 VENDOR SHALL PROVIDE FLOW TRANSMITTER and
SWITCH ON COMMON LINE TO STOP PUMPS ON LOW FLOW. FLOWMETER SHALL BE SUITABLE FOR INJECTION REQUIREMENTS.
1.9 INSPECTION SHALL BE CARRIED OUT PER SAUDI
ARAMCO FORM A-175 (CODE NO. 340200 AND 341900). VENDOR SHALL PROVIDE DOCUMENTS AS SPECIFIED IN ATTACHED NMR-7907, NMR-7908 AND NMR-7918.