Saudi Aramco: Company General Use

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

OPERATING TEMPERATURE, DCA DETERGENT LIQUID

STORED AS PER TANK DATA SHEET PE-D7XXX1,


SH.001-002, REV.A. AND 32-SAMSS-030

1.2 Two (2) POSITIVE DISPLACEMENT PUMP, FOR DCA


DETERGENT PG-91 DOSING (INJECTION) (0.282 USGPM
NORMAL CAPACITY RANGE @ 100.4 ˚F) AND ASSOCIATED
MOTORS, PER PUMP DATA SHEET PE-G7XXX2,SH.001-
002,REV.A. AND 31-SAMSS-009

1.3 Two (2) POSITIVE DISPLACEMENT PUMP, FOR DCA


DETERGENT PG-95 DOSING (INJECTION) (0.282 USGPM
NORMAL CAPACITY RANGE@ 100.4 ˚F) AND ASSOCIATED
MOTORS, PER PUMP DATA SHEET PE-G7XXX3,SH.001-
002,REV.A. AND 31-SAMSS-009

1.4 PULSATION DAMPERS.

1.5 VENDOR SHALL PROVIDE INSTRUMENTATION AS


SPECIFIED ON P & ID DRAWINGS BUT NOT LIMITED TO,
SAUDI ARAMCO MATERIAL SYSTEM SPECIFICATION
(SAMSS), SAUDI ARAMCO ENGINEERING STANDARDS
(SAES) AND ENGINEERING ATTACHED APPLICABLE SAUDI
ARAMCO LIBRARY DRAWINGS LISTED IN SECTION 2.
VENDOR SHALL PROVIDE ALL THE INSTRUMENTS
MATERIAL RELATED TO SKID SHALL BE NEMA 4X.

1.6 LEVEL INDICATING TRANSMITTER WITH REMOTE


ELECTRONIC INDICATOR MOUNTED AT THE SKID GRADE
LEVEL SHALL BE CONNECTED TO SKID JUNCTION BOX.
THE GUIDED WAVE RADAR (GWR) LEVEL TRANSMITTER’S
PROBE SHALL BE SUITABLE FOR USE IN OIL SOLUBLE
INHIBITOR AND SHALL BE REMOVABLE WITHOUT
DRAINING THE TANK. THE LEVEL TRANSMITTER SHALL BE
PRE-WIRED TO THE SKID’S INHIBITOR CONTROL PANEL
TO TRIP THE ASSOCIATED MOTORS BASED ON LOW LEVEL
SET POINT. LEVEL TRANSMITTER SHALL BE PROVIDED
WITH ASSOCIATED LEVEL GAUGE IN ACCORDANCE WITH
SAES-J-100.

1.7 PRESSURE INDICATION ON THE DISCHARGE OF


CHEMICAL INJECTION PUMPS SHALL BE IN ACCORDANCE
WITH ANSI B40.1. ALL PRESSURE GAUGES (SEAL
DIAPHRAGM) PROVIDED WITH CHEMICAL INJECTION
SHALL HAVE DUAL SCALES IN PSIG AND KPA (GA).
PRESSURE TRANSMITTERS SHALL BE PROVIDED FOR THE
PUMPS. SET POINTS TO BE DEFINED BY VENDOR.

1.8 VENDOR SHALL PROVIDE FLOW TRANSMITTER and


SWITCH ON COMMON LINE TO STOP PUMPS ON LOW
FLOW. FLOWMETER SHALL BE SUITABLE FOR INJECTION
REQUIREMENTS.

1.9 INSPECTION SHALL BE CARRIED OUT PER SAUDI


ARAMCO FORM A-175 (CODE NO. 340200 AND 341900).
VENDOR SHALL PROVIDE DOCUMENTS AS SPECIFIED IN
ATTACHED NMR-7907, NMR-7908 AND NMR-7918.

1.10 ALL ELECTRICAL AND INSTRUMENTATION JUNCTION


BOX SHALL BE NEMA 4X RATED.

1.11 SKID STRUCTURAL & SUPPORTS FOR EACH


EQUIPMENT WITHIN THE SKIDS.

Saudi Aramco: Company General Use

You might also like