NOTE:
· ALL MATERIALS AND WORKMANSHIP TO BE IN ACCORDANCE WITH THE SPECIFICATIONS AND RELEVANT SRI LANKAN AND
BRITISH STANDARDS/ CODES OF PRACTICE
· CHARACTERISTIC CUBE STRENGTH OF CONCRETE TO BE 25N/mm2 (C25) AS PER BS EN 206-1 WITH A MAXIMUM AGGREGATE SIZE
OF NOT GREATER THAN 20mm.
· NO CONCRETE IS TO BE POURED UNTIL THE REINFORCEMENT HAS BEEN INSPECTED AND APPROVED BY THE ENGINEER.
· EXPOSED CONCRETE SURFACES SHOULD BE COVERED WITH DAMP ABSORBENT MATERIAL AFTER PLACING CONCRETE. THEY
SHOULD BE KEPT CONTINUOUSLY WET BY FREQUENT SPRING OF WATER. (MINIMUM PERIOD OF CURING IS 4 DAYS)
· UNLESS INDICATED OTHERWISE, MINIMUM LAP IN REINFORCEMENT MUST NOT BE LESS THAN 50X SMALLER BAR DIAMETER AND
ANCHORAGE LENGTH TO BE 50X BAR DIAMETER.
· THE RETAINING WALLS HAVE BEEN DESIGNED USING THE FOLLOWING PRESUMPTIVE SOIL PROPERTIES BASED ON VISUAL
OBSERVATIONS.
ϕ = 5°
c = 10 N/mm2
qallow = 175 kN/mm2
qsurcharge = 5 kN/mm2
10
β = 22.5°
ρsoil = 18 kN/m2
ρwater = 10 kN/m2
ρsubmerged = 21 kN/m2
· CONTRACTOR MUST TAKE PRECAUTIONS AND PROVIDE AN ADEQUATE STORMWATER DIVERSION SYSTEM DURING
CONSTRUCTION.
· THK - THICKNESS GRANULAR FILL MUST CONSIST OF AGGREGATE BASE COURSE (ABC).
GEO TEXTILE
4" UPVC T1000
weep holes at
6000 (MAX)
600
1:100 SLOPE
600
276
RETAINING WALL DETAIL
827
Main RF: T10-100
Distribution RF: T10-200
OTHER DETAILS
400
100 200 100
200
300
100
T10-150 B/W
R/F DETAIL OF
TYPICAL DRAIN DETAIL
ELEVATIONAL VIEW OF
WEEPHOLE ARRANGEMENT