Professional Documents
Culture Documents
A2121-31 Sars Brooklyn Hvac Installation Block C Boq 2021-06-30
A2121-31 Sars Brooklyn Hvac Installation Block C Boq 2021-06-30
A2121-31 Sars Brooklyn Hvac Installation Block C Boq 2021-06-30
B6 MISCELLANEOUS R -
B7 SPECIALIST SUB-CONTRACTORS R -
TENDERER SIGNATURE:
NAME:
TEL/FAX NO'S:
DATE:
Summary
Plantech A-1735-31
PROJECT: A1735 - KORONE TENDER
CONTRACTOR INFO
I2 CONTACT PERSON
I3 CONTACT NUMBER
I4 CONTACT EMAIL
Note:
The rates in this document will be used during the
negotiations for the projects cost mentioned in the
specifications document. Adjustments will be made for
escalations and items not mentioned in this bill.
B1 19 of 10
Plantech A-1735-31
PROJECT: A1735 - KORONE TENDER
B2 19 of 10
Plantech A-1735-31
PROJECT: A1735 - KORONE TENDER
B2 20 of 10
Plantech A-1735-31
PROJECT: A1735 - KORONE TENDER
B2 21 of 10
Plantech A-1735-31
PROJECT: A1735 - KORONE TENDER
B3 19 of 10
Plantech A-1735-31
PROJECT: A1735 - KORONE TENDER
B4 19 of 10
Plantech A-1735-31
PROJECT: A1735 - KORONE TENDER
B5 19 of 10
Plantech A-1735-31
PROJECT: A1735 - KORONE TENDER
BILL NO 6: MISCELLANEOUS
SUPPLY AMOUNT
DESCRIPTION RATE
2.0 All items that were not included in the BOQ but is required to ensure
that all systems function properly and without fault. As well as all items
specified in the tender spec that is not listed in the BOQ. R - R -
Note:
Please list all additional items on this Bill below
-
-
-
-
-
-
-
-
-
-
-
B6 19 of 10
Plantech A-1735-31
PROJECT: A1735 - KORONE TENDER
R -
R - R - R -
R - R - R -
R -
R - R - R -
R - R - R -
R -
R - R - R -
R - R - R -
R - R - R -
R - R - R -
R - R - R -
R -
R - R - R -
R - R - R -
R - R - R -
R - R - R -
R -
R - R - R -
R - R - R -
R -
R - R - R -
B7 19 of 10