Plantech A-1735-31

PROJECT: A1735 - KORONE TENDER


SUMMARY OF BILLS
BILL NO DESCRIPTION AMOUNT
I1 CONTRACTOR NAME <Company Name>

B1 PRELIMINARIES AND GENERAL R -

B2 BLOCK C FAN COIL UNITS R -

B3 OUTSIDE AIR SYSTEM R -

B4 EXTRACT AIR SYSTEM R -

B5 CHILLED WATER PUMPS R -

B6 MISCELLANEOUS R -

B7 SPECIALIST SUB-CONTRACTORS R -

8 TOTAL EXCLUDING VAT R -

9 PLUS 15% VAT R -

10 TOTAL TENDER PRICE R -

TENDERER SIGNATURE:

NAME:

TEL/FAX NO'S:

DATE:

Summary
Plantech A-1735-31
PROJECT: A1735 - KORONE TENDER

BILL NO 1: PRELIMINARIES & GENERAL

CONTRACTOR INFO

I1 CONTRACTOR NAME <Company Name>

I2 CONTACT PERSON

I3 CONTACT NUMBER

I4 CONTACT EMAIL

DESCRIPTION SUPPLY RATE AMOUNT

The Tenderer shall allow for all Preliminary and General


costs as set out in Addendum A for the Principal Contract
as well as for his own General costs. Profit and mark-up
shall be priced into the rates

1.0 Fixed Cost R -

2.0 Adjustable with contract amount R -

3.0 Adjustable with Contract Period R -

Note:
The rates in this document will be used during the
negotiations for the projects cost mentioned in the
specifications document. Adjustments will be made for
escalations and items not mentioned in this bill.

BILL 1 TOTAL TO SUMMARY R -

B1 19 of 10
Plantech A-1735-31
PROJECT: A1735 - KORONE TENDER

BILL NO 2: BLOCK C FAN COIL UNIT SUPPLY, COMMISSION & INSTALLATION


DESCRIPTION SUPPLY RATE INSTALLATION RATE AMOUNT
FAN COIL UNITS
1 GROUND FLOOR
1.1 IU.C.0.01 (1 OF 12) R -
1.1.1 Fan Coil Air-Conditioning Unit (incl Valve, Controller, Heater) R - R -
1.1.2 Chilled Water & Condensate Piping connections R - R -
1.1.3 RAG c/w plenum box R - R -
1.1.4 Ducting including transformation piece, insulation, Diffusers R - R -

1.2 IU.C.0.02 (2 OF 12) R -


1.2.1 Fan Coil Air-Conditioning Unit (incl Valve, Controller, Heater) R - R -
1.2.2 Chilled Water & Condensate Piping connections R - R -
1.2.3 RAG c/w plenum box R - R -
1.2.4 Ducting including transformation piece, insulation, Diffusers R - R -

1.3 IU.C.0.03 (3 OF 12) R -


1.3.1 Fan Coil Air-Conditioning Unit (incl Valve, Controller, Heater) R - R -
1.3.2 Chilled Water & Condensate Piping connections R - R -
1.3.3 RAG c/w plenum box R - R -
1.3.4 Ducting including transformation piece, insulation, Diffusers R - R -

1.4 IU.C.0.04 (4 OF 12) R -


1.4.1 Fan Coil Air-Conditioning Unit (incl Valve, Controller, Heater) R - R -
1.4.2 Chilled Water & Condensate Piping connections R - R -
1.4.3 RAG c/w plenum box R - R -
1.4.4 Ducting including transformation piece, insulation, Diffusers R - R -

1.5 IU.C.0.05 (5 OF 12) R -


1.5.1 Fan Coil Air-Conditioning Unit (incl Valve, Controller, Heater) R - R -
1.5.2 Chilled Water & Condensate Piping connections R - R -
1.5.3 RAG c/w plenum box R - R -
1.5.4 Ducting including transformation piece, insulation, Diffusers R - R -

1.6 IU.C.0.06 (6 OF 12) R -


1.6.1 Fan Coil Air-Conditioning Unit (incl Valve, Controller, Heater) R - R -
1.6.2 Chilled Water & Condensate Piping connections R - R -
1.6.3 RAG c/w plenum box R - R -
1.6.4 Ducting including transformation piece, insulation, Diffusers R - R -

1.7 IU.C.0.07 (7 OF 12) R -


1.7.1 Fan Coil Air-Conditioning Unit (incl Valve, Controller, Heater) R - R -
1.7.2 Chilled Water & Condensate Piping connections R - R -
1.7.3 RAG c/w plenum box R - R -
1.7.4 Ducting including transformation piece, insulation, Diffusers R - R -

1.8 IU.C.0.08 (8 OF 12) R -


1.8.1 Fan Coil Air-Conditioning Unit (incl Valve, Controller, Heater) R - R -
1.8.2 Chilled Water & Condensate Piping connections R - R -
1.8.3 RAG c/w plenum box R - R -
1.8.4 Ducting including transformation piece, insulation, Diffusers R - R -

1.9 IU.C.0.09 (9 OF 12) R -


1.9.1 Fan Coil Air-Conditioning Unit (incl Valve, Controller, Heater) R - R -
1.9.2 Chilled Water & Condensate Piping connections R - R -
1.9.3 RAG c/w plenum box R - R -
1.9.4 Ducting including transformation piece, insulation, Diffusers R - R -

1.10 IU.C.0.10 (10 OF 12) R -


1.10.1 Fan Coil Air-Conditioning Unit (incl Valve, Controller, Heater) R - R -
1.10.2 Chilled Water & Condensate Piping connections R - R -
1.10.3 RAG c/w plenum box R - R -
1.10.4 Ducting including transformation piece, insulation, Diffusers R - R -

1.11 IU.C.0.11 (11 OF 12) R -


1.11.1 Fan Coil Air-Conditioning Unit (incl Valve, Controller, Heater) R - R -
1.11.2 Chilled Water & Condensate Piping connections R - R -
1.11.3 RAG c/w plenum box R - R -
1.11.4 Ducting including transformation piece, insulation, Diffusers R - R -

1.12 IU.C.0.12 (12 OF 12) R -


1.12.1 Fan Coil Air-Conditioning Unit (incl Valve, Controller, Heater) R - R -
1.12.2 Chilled Water & Condensate Piping connections R - R -
1.12.3 RAG c/w plenum box R - R -
1.12.4 Ducting including transformation piece, insulation, Diffusers R - R -

1.13 Drain Piping R -


1.13.1 UPVC Drain piping c/w all bends, P-traps and outlets R - R -
SUB TOTAL ITEM 1 R -

B2 19 of 10
Plantech A-1735-31
PROJECT: A1735 - KORONE TENDER

DESCRIPTION SUPPLY RATE INSTALLATION RATE AMOUNT


2 FIRST FLOOR
2.1 IU.C.1.01 (1 OF 18) R -
2.1.1 Fan Coil Air-Conditioning Unit (incl Valve, Controller, Heater) R - R -
2.1.2 Chilled Water & Condensate Piping connections R - R -
2.1.3 RAG c/w plenum box R - R -
2.1.4 Ducting including transformation piece, insulation, Diffusers R - R -

2.2 IU.C.1.02 (2 OF 18) R -


2.2.1 Fan Coil Air-Conditioning Unit (incl Valve, Controller, Heater) R - R -
2.2.2 Chilled Water & Condensate Piping connections R - R -
2.2.3 RAG c/w plenum box R - R -
2.2.4 Ducting including transformation piece, insulation, Diffusers R - R -

2.3 IU.C.1.03 (3 OF 18) R -


2.3.1 Fan Coil Air-Conditioning Unit (incl Valve, Controller, Heater) R - R -
2.3.2 Chilled Water & Condensate Piping connections R - R -
2.3.3 RAG c/w plenum box R - R -
2.3.4 Ducting including transformation piece, insulation, Diffusers R - R -

2.4 IU.C.1.04 (4 OF 18) R -


2.4.1 Fan Coil Air-Conditioning Unit (incl Valve, Controller, Heater) R - R -
2.4.2 Chilled Water & Condensate Piping connections R - R -
2.4.3 RAG c/w plenum box R - R -
2.4.4 Ducting including transformation piece, insulation, Diffusers R - R -

2.5 IU.C.1.05 (5 OF 18) R -


2.5.1 Fan Coil Air-Conditioning Unit (incl Valve, Controller, Heater) R - R -
2.5.2 Chilled Water & Condensate Piping connections R - R -
2.5.3 RAG c/w plenum box R - R -
2.5.4 Ducting including transformation piece, insulation, Diffusers R - R -

2.6 IU.C.1.06 (6 OF 18) R -


2.6.1 Fan Coil Air-Conditioning Unit (incl Valve, Controller, Heater) R - R -
2.6.2 Chilled Water & Condensate Piping connections R - R -
2.6.3 RAG c/w plenum box R - R -
2.6.4 Ducting including transformation piece, insulation, Diffusers R - R -

2.7 IU.C.1.07 (7 OF 18) R -


2.7.1 Fan Coil Air-Conditioning Unit (incl Valve, Controller, Heater) R - R -
2.7.2 Chilled Water & Condensate Piping connections R - R -
2.7.3 RAG c/w plenum box R - R -
2.7.4 Ducting including transformation piece, insulation, Diffusers R - R -

2.8 IU.C.1.08 (8 OF 18) R -


2.8.1 Fan Coil Air-Conditioning Unit (incl Valve, Controller, Heater) R - R -
2.8.2 Chilled Water & Condensate Piping connections R - R -
2.8.3 RAG c/w plenum box R - R -
2.8.4 Ducting including transformation piece, insulation, Diffusers R - R -

2.9 IU.C.1.09 (9 OF 18) R -


2.9.1 Fan Coil Air-Conditioning Unit (incl Valve, Controller, Heater) R - R -
2.9.2 Chilled Water & Condensate Piping connections R - R -
2.9.3 RAG c/w plenum box R - R -
2.9.4 Ducting including transformation piece, insulation, Diffusers R - R -

2.10 IU.C.1.10 (10 OF 18) R -


2.10.1 Fan Coil Air-Conditioning Unit (incl Valve, Controller, Heater) R - R -
2.10.2 Chilled Water & Condensate Piping connections R - R -
2.10.3 RAG c/w plenum box R - R -
2.10.4 Ducting including transformation piece, insulation, Diffusers R - R -

2.11 IU.C.1.11 (11 OF 18) R -


2.11.1 Fan Coil Air-Conditioning Unit (incl Valve, Controller, Heater) R - R -
2.11.2 Chilled Water & Condensate Piping connections R - R -
2.11.3 RAG c/w plenum box R - R -
2.11.4 Ducting including transformation piece, insulation, Diffusers R - R -

2.12 IU.C.1.12 (12 OF 18) R -


2.12.1 Fan Coil Air-Conditioning Unit (incl Valve, Controller, Heater) R - R -
2.12.2 Chilled Water & Condensate Piping connections R - R -
2.12.3 RAG c/w plenum box R - R -
2.12.4 Ducting including transformation piece, insulation, Diffusers R - R -

2.13 IU.C.1.13 (13 OF 18) R -


2.13.1 Fan Coil Air-Conditioning Unit (incl Valve, Controller, Heater) R - R -
2.13.2 Chilled Water & Condensate Piping connections R - R -
2.13.3 RAG c/w plenum box R - R -
2.13.4 Ducting including transformation piece, insulation, Diffusers R - R -

2.14 IU.C.1.14 (14 OF 18) R -


2.14.1 Fan Coil Air-Conditioning Unit (incl Valve, Controller, Heater) R - R -
2.14.2 Chilled Water & Condensate Piping connections R - R -
2.14.3 RAG c/w plenum box R - R -
2.14.4 Ducting including transformation piece, insulation, Diffusers R - R -

B2 20 of 10
Plantech A-1735-31
PROJECT: A1735 - KORONE TENDER

DESCRIPTION SUPPLY RATE INSTALLATION RATE AMOUNT


2.15 IU.C.1.15 (15 OF 18) R -
2.15.1 Fan Coil Air-Conditioning Unit (incl Valve, Controller, Heater) R - R -
2.15.2 Chilled Water & Condensate Piping connections R - R -
2.15.3 RAG c/w plenum box R - R -
2.15.4 Ducting including transformation piece, insulation, Diffusers R - R -

2.16 IU.C.1.16 (16 OF 18) R -


2.16.1 Fan Coil Air-Conditioning Unit (incl Valve, Controller, Heater) R - R -
2.16.2 Chilled Water & Condensate Piping connections R - R -
2.16.3 RAG c/w plenum box R - R -
2.16.4 Ducting including transformation piece, insulation, Diffusers R - R -

217 IU.C.1.17 (17 OF 18) R -


2.17.1 Fan Coil Air-Conditioning Unit (incl Valve, Controller, Heater) R - R -
2.17.2 Chilled Water & Condensate Piping connections R - R -
2.17.3 RAG c/w plenum box R - R -
2.17.4 Ducting including transformation piece, insulation, Diffusers R - R -

2.18 IU.C.1.18 (18 OF 18) R -


2.18.1 Fan Coil Air-Conditioning Unit (incl Valve, Controller, Heater) R - R -
2.18.2 Chilled Water & Condensate Piping connections R - R -
2.18.3 RAG c/w plenum box R - R -
2.18.4 Ducting including transformation piece, insulation, Diffusers R - R -

2.19 Drain Piping R -


2.19.1 UPVC Drain piping c/w all bends, P-traps and outlets R - R -
SUB TOTAL ITEM 2 R -
SUB TOTAL ITEMS 1,2 R -

B2 21 of 10
Plantech A-1735-31
PROJECT: A1735 - KORONE TENDER

BILL NO 3: BLOCK C FRESH AIR SUPPLY SYSTEMS


INSTALLATION
DESCRIPTION SUPPLY RATE AMOUNT
RATE
5 Fresh air supply System C1
5.1 Fan (FAN-FAF-A-1) 500 l/s @ 280 Pa Static R - R - R -
5.2 VSD R - R - R -
5.3 2 off 1D Attenuators, and Weather louvre R - R - R -
5.4 Ducting connection un-insulated to existing ducting R - R - R -
5.5 Flexible collars R - R - R -
5.6 Filter Box c/w Primary Pleated Filters R - R - R -
5.7 250mm Stand c/w anti-vibration Pads R - R - R -
5.8 Pressure Sensors, Dirty Filter Indicator Light R - R - R -
5.9 Annual Seasonal Timer R - R - R -

6 Fresh air supply System C2


2.1 Fan (FAN-FAF-A-2) 500 l/s @ 280 Pa Static R - R - R -
2.2 VSD R - R - R -
2.3 2 off 1D Attenuators, and Weather louvre R - R - R -
2.4 Ducting connection un-insulated to existing ducting R - R - R -
2.5 Flexible collars R - R - R -
2.6 Filter Box c/w Primary Pleated Filters R - R - R -
2.7 250mm Stand c/w anti-vibration Pads R - R - R -
2.8 Pressure Sensors, Dirty Filter Indicator Light R - R - R -
2.9 Annual Seasonal Timer R - R - R -
BILL 11 TOTAL TO SUMMARY R -

B3 19 of 10
Plantech A-1735-31
PROJECT: A1735 - KORONE TENDER

BILL NO 4: BLOCK C TOILET EXTRACT SYSTEMS


DESCRIPTION SUPPLY RATE INSTALLATION AMOUNT
RATE
5 Toilet Extract System Block C1
5.1 Fan (FAN-TEX-A-1) 300 l/s @ 200Pa Static R- R- R-
5.2 VSD R- R- R-
5.3 2off 1D Attenuators and Cowl R- R- R-
5.4 Uninsulated galvanised ducting transformation pieces R- R- R-
5.5 Balancing Dampers R- R- R-
5.6 250mm stand c/w anti vibration pads R- R- R-
5.7 Annual Timer R- R- R-
5.8 250mm stand c/w anti vibration pads R - R - R -

6 Toilet Extract System Block C2


6.1 Fan (FAN-TEX-A-1) 300 l/s @ 200Pa Static R- R- R-
6.2 VSD R- R- R-
6.3 2off 1D Attenuators and Cowl R- R- R-
6.4 Uninsulated galvanised ducting transformation pieces R- R- R-
6.5 Balancing Dampers R- R- R-
6.6 250mm stand c/w anti vibration pads R- R- R-
6.7 Annual Timer R- R- R-
6.8 250mm stand c/w anti vibration pads R - R - R -
BILL 12 TOTAL TO SUMMARY R -

B4 19 of 10
Plantech A-1735-31
PROJECT: A1735 - KORONE TENDER

BILL NO 5: BLOCK C CHILLED WATER PUMP SUPPLY, COMMISSION & INSTALLATION


DESCRIPTION SUPPLY RATE INSTALLATION RATE AMOUNT
CHILLED WATER PUMPS
1.1 Pump Type R -
1.1 2 off Pump including VSD's, Motors (7.5kW) Flow 600 m3/h, 100m
Head, Isolators, Controls, Flexible Connections, Shut-off valves R - R -
SUB TOTAL ITEMS 1 R -

B5 19 of 10
Plantech A-1735-31
PROJECT: A1735 - KORONE TENDER

BILL NO 6: MISCELLANEOUS

SUPPLY AMOUNT
DESCRIPTION RATE

1.0 General Items


1.1 Safety File R - R -

1.2 On Site Storage R - R -

1.3 As Built Drawings R - R -

1.4 O & M Manuals R - R -

1.5 Testing and Commissioning of Full HVAC Systems R - R -

1.6 Maintenance Guarantee (12 Month) R - R -

2.0 All items that were not included in the BOQ but is required to ensure
that all systems function properly and without fault. As well as all items
specified in the tender spec that is not listed in the BOQ. R - R -

Note:
Please list all additional items on this Bill below

-
-
-
-
-
-
-
-
-
-
-

BILL 6 TOTAL TO SUMMARY R -

B6 19 of 10
Plantech A-1735-31
PROJECT: A1735 - KORONE TENDER

BILL NO 7: SPECIALIST SUB-CONTRACTORS

SUPPLY INSTALLATION AMOUNT


DESCRIPTION RATE RATE

R -
R - R - R -
R - R - R -

R -
R - R - R -
R - R - R -

R -
R - R - R -
R - R - R -
R - R - R -
R - R - R -
R - R - R -

R -
R - R - R -
R - R - R -
R - R - R -
R - R - R -

R -
R - R - R -
R - R - R -

R -
R - R - R -

SUB TOTAL ITEM 1 R -