CONSTRUCTION DAILY ACTIVITY REPORT

Project Name : REMAINING CIVIL WORK AT ROW AREA Report Number : JTB / CV /2021 / 128 / VI
Location : Bojonegoro Date : 6/6/2021
Rev :0 Sheet Number : VI

Manpower Equipment and Transportation Unit Total


No. Description Man Hours Total No. Description Ea hours Hours
1 Indirect Manpower
PM 1 0 0 1 Transport Pekerja 1 7 7
SM 1 0 0 2 Genset 1 0 0
CM 1 7 7 3 Jack Hammer 1 0 0
PC 1 7 7 4 Gunting Besi 1 7 7
FE 1 7 7 5 Concrete vibrator 1 0 0
6 Gerinda Potong beton 1 0 0
7 Lampu penerangan 3 0 0
8 Concrete Core Drill 1 0 0
9 Tube Scaffolding 171 7 1197

Sub Total 21 Grand Total 1211


2 Direct Manpower
Foreman 1 7 7
Mason 1 7 7 Weather
No. Condition Remarks
Rebarman 1 7 7 Time
Carpenter 1 7 7
Helper 4 7 28 1 C : 07.00 - 08.00 Clear
2 C : 08.01 - 09.00 Clear
3 C : 09.01 - 10.00 Clear
4 C : 10.01 - 11.00 Clear
5 C : 11.01 - 12.00 Clear
6 C : 12.01 - 13.00 Clear
7 C : 13.01 - 14.00 Clear
8 C : 14.01 - 15.00 Clear
9
10

Sub Total 56
Grand Total 77 Note : C = Clear R = Rainy CD= Cloudy W= Windy

No. Work Activity QTY No Work Plan Activity for Next Day

1 Pekerjaan Acces Road STA 5+775 sd 5+790 ruas 1 1 Pekerjaan Acces Road STA 5+775 sd 5+790 ruas 1
ROW ROW
- Pemasangan bekisting ruas 1 m2 5.08 - Gelar Wiremesh
- Gelar Plastic Sheet m2 61.60 - Pasang pipa PVC 1,5 inch
- Pasang triangle wood m1 8.00 - Pasang besi tulangan dowel
- Gelar Wiremesh m2 69.00 - Pasang Joint Filler
- Cor beton Fc 24 semen type 1

Remarks :

No. Item of Concern Corrective Action

Made by, Prepared by, Acknowledged by,


PT USAHA BHAKTI PT RECON SARANA UTAMA PT RECON SARANA UTAMA

Julkarnain Fahmi Ismail Achmad Basuki


SM Project Control Construction Manager
REMAINING CIVIL WORK AT ROW AREA

DAILY PICTURE
Sunday, June 06, 2021

Pekerjaan Acces Road STA 5+775 sd 5+790 ruas 1 Pekerjaan Acces Road STA 5+775 sd 5+790 ruas 1
ROW ROW
- Pemasangan bekisting ruas 1 - Gelar Plastic Sheet

Pekerjaan Acces Road STA 5+775 sd 5+790 ruas 1 Pekerjaan Acces Road STA 5+775 sd 5+790 ruas 1
ROW ROW
- Pasang triangle wood - Gelar Wiremesh
FIELD DAILY REPORT BY SUPERVISOR
Hari / Tanggal : Sunday, 06 June 2021
Report No : VI
Status (√)
No Manpower Qty Manpower Qty No Equipment Qty Remarks
W I S B
I Indirect 1 Excavator PC 200 (W)orking
PM 1 SPV 2 Excavator PC 78 (I)dle
SM 1 QC 3 Vibroroller/ babyroller (S)tandby
CM 1 QC Adm 4 Hand stamper (B)roken
PC 1 HSE Coord 5 Pick Up 1 √
FE 1 HSE SPV 6 Dump Truck
Surveyor MatCon 7 Bar Bending/Cutting
Ast. Surveyor Driver 1 8 Air Compressor
9 Water Tank Truck 2 √
10 Water Pump 1 √
11 Asphalt Cutter
II Direct 12 Portable Genset 1 √
Opt. Exca PC 200 Helper 4 13 Electric Vibrator 1 √
Opt. Exca PC 78 Welder 14 Tube Scaffolding 171 √
Opt. Vibroroller Scaffolder 15 Surveyor Equipment
Foreman 1 Flagman 16 DCP Test
Mason 1 Driver Pickup 1 17 CBR Test
Rebarman 1 Driver DT 18 Sandcone
Carpenter 1 Helper survey 19 Jack Hammer 1 √
20 Gerinda Potong beton 1 √
21 Lampu Penerangan 3 √
22 Concrete Core Drill 1 √
23 Gunting Besi 1 √

No Area Aktivitas Unit Quantity

1 ROW Sta 5+775 sd 5+790 Pekerjaan Acces Road STA 5+775 sd 5+790 ruas 1
ROW
- Pemasangan bekisting ruas 1 m2 5.082
- Gelar Plastic Sheet m2 61.6
- Pasang triangle wood m1 8
- Gelar Wiremesh m2 69

Cuaca HSE Concern

1 07.00 - 09.00 C 3 13.00 - 15.00 C


2 09.01 - 11.30 C 4 15.01 - 17.00 C

PERMASALAHAN/PENGHAMBAT
CONSTRUCTION DAILY ACTIVITY REPORT

Project Name : REMAINING CIVIL WORK AT ROW AREA Report Number : #N/A
Location : Bojonegoro Date : 6/7/2021
Rev :0 Sheet Number : #N/A

Manpower Equipment and Transportation Unit Total


No. Description Man Hours Total No. Description Ea hours Hours
1 Indirect Manpower
PM 1 2 2 1 Transport Pekerja 1 8 8
SM 1 8 8 2 Genset 1 8 8
CM 1 8 8 3 Jack Hammer 1 0 0
PC 1 8 8 4 Gunting Besi 1 8 8
FE 1 8 8 5 Concrete vibrator 1 8 8
6 Gerinda Potong beton 1 0 0
7 Lampu penerangan 3 0 0
8 Concrete Core Drill 1 0 0
9 Tube Scaffolding 171 8 1368

Sub Total 34 Grand Total 1400


2 Direct Manpower
Foreman 1 8 8
Mason 1 8 8 Weather
No. Condition Remarks
Rebarman 1 8 8 Time
Carpenter 1 8 8
Helper 4 8 32 1 C : 07.00 - 08.00 Clear
2 C : 08.01 - 09.00 Clear
3 C : 09.01 - 10.00 Clear
4 C : 10.01 - 11.00 Clear
5 C : 11.01 - 12.00 Clear
6 C : 12.01 - 13.00 Clear
7 C : 13.01 - 14.00 Clear
8 C : 14.01 - 15.00 Clear
9 C : 15.01 - 16.00 Clear
10 C : 16.01 - 17.00 Clear

Sub Total 64
Grand Total 98 Note : C = Clear R = Rainy CD= Cloudy W= Windy

No. Work Activity QTY No Work Plan Activity for Next Day

1 Pekerjaan Acces Road STA 5+775 sd 5+790 ruas 1 1 Pekerjaan Acces Road STA 5+775 sd 5+790 ruas 1
ROW ROW
- Gelar Wiremesh m2 81.00 - Curing beton Acces Road Ruas 1
- Pasang pipa PVC 1,5 inch m1 3.15
- Pasang besi tulangan dowel kg 113.00 2
- Pasang Joint Filler m1 8.00
- Cor beton Fc 24 semen type 1 m3 14.50

Remarks :

No. Item of Concern Corrective Action

Made by, Prepared by, Acknowledged by,


PT USAHA BHAKTI PT RECON SARANA UTAMA PT RECON SARANA UTAMA

Julkarnain Fahmi Ismail Achmad Basuki


SM Project Control Construction Manager
REMAINING CIVIL WORK AT ROW AREA

DAILY PICTURE
Monday, June 07, 2021

Pekerjaan Acces Road STA 5+775 sd 5+790 ruas 1 Pekerjaan Acces Road STA 5+775 sd 5+790 ruas 1
ROW ROW
- Pasang besi tulangan dowel

Pekerjaan Acces Road STA 5+775 sd 5+790 ruas 1 Pekerjaan Acces Road STA 5+775 sd 5+790 ruas 1
ROW ROW
- Gelar Wiremesh - Cor beton Fc 24 semen type 1
FIELD DAILY REPORT BY SUPERVISOR
Hari / Tanggal : Monday, 07 June 2021
Report No : #N/A
Status (√)
No Manpower Qty Manpower Qty No Equipment Qty Remarks
W I S B
I Indirect 1 Excavator PC 200 (W)orking
PM 1 SPV 2 Excavator PC 78 (I)dle
SM 1 QC 3 Vibroroller/ babyroller (S)tandby
CM 1 QC Adm 4 Hand stamper (B)roken
PC 1 HSE Coord 5 Pick Up 1 √
FE 1 HSE SPV 6 Dump Truck
Surveyor MatCon 7 Bar Bending/Cutting
Ast. Surveyor Driver 1 8 Air Compressor
9 Water Tank Truck 2 √
10 Water Pump 1 √
11 Asphalt Cutter
II Direct 12 Portable Genset 1 √
Opt. Exca PC 200 Helper 4 13 Electric Vibrator 1 √
Opt. Exca PC 78 Welder 14 Tube Scaffolding 171 √
Opt. Vibroroller Scaffolder 15 Surveyor Equipment
Foreman 1 Flagman 16 DCP Test
Mason 1 Driver Pickup 1 17 CBR Test
Rebarman 1 Driver DT 18 Sandcone
Carpenter 1 Helper survey 19 Jack Hammer 1 √
20 Gerinda Potong beton 1 √
21 Lampu Penerangan 3 √
22 Concrete Core Drill 1 √
23 Gunting Besi 1 √

No Area Aktivitas Unit Quantity

1 ROW Sta 5+775 sd 5+790 Pekerjaan Acces Road STA 5+775 sd 5+790 ruas 1
ROW
- Gelar Wiremesh m2 81
- Pasang pipa PVC 1,5 inch m1 3.15
- Pasang besi tulangan dowel kg 113
- Pasang Joint Filler m1 8
- Cor beton Fc 24 semen type 1 m3 14.5

Cuaca HSE Concern

1 07.00 - 09.00 C 3 13.00 - 15.00 C


2 09.01 - 11.30 C 4 15.01 - 17.00 C

PERMASALAHAN/PENGHAMBAT
CONSTRUCTION DAILY ACTIVITY REPORT

Project Name : REMAINING CIVIL WORK AT ROW AREA Report Number : JTB / CV /2021 / 130 / VI
Location : Bojonegoro Date : 6/8/2021
Rev :0 Sheet Number : VI

Manpower Equipment and Transportation Unit Total


No. Description Man Hours Total No. Description Ea hours Hours
1 Indirect Manpower
PM 1 2 2 1 Transport Pekerja 1 8 8
SM 1 8 8 2 Genset 1 8 8
CM 1 8 8 3 Jack Hammer 1 0 0
PC 1 8 8 4 Gunting Besi 1 8 8
FE 1 8 8 5 Concrete vibrator 1 0 0
6 Gerinda Potong beton 1 0 0
7 Lampu penerangan 3 0 0
8 Concrete Core Drill 1 0 0
9 Tube Scaffolding 171 8 1368

Sub Total 34 Grand Total 1392


2 Direct Manpower
Foreman 1 8 8
Mason 1 8 8 Weather
No. Condition Remarks
Rebarman 1 8 8 Time
Carpenter 1 8 8
Helper 4 8 32 1 C : 07.00 - 08.00 Clear
2 C : 08.01 - 09.00 Clear
3 C : 09.01 - 10.00 Clear
4 C : 10.01 - 11.00 Clear
5 C : 11.01 - 12.00 Clear
6 C : 12.01 - 13.00 Clear
7 C : 13.01 - 14.00 Clear
8 C : 14.01 - 15.00 Clear
9 C : 15.01 - 16.00 Clear
10 C : 16.01 - 17.00 Clear
Sub Total 64
Grand Total 98 Note : C = Clear R = Rainy CD= Cloudy W= Windy

No. Work Activity QTY No Work Plan Activity for Next Day

1 Pekerjaan Acces Road STA 5+775 sd 5+790 ruas 1 1 Pekerjaan Guard House
ROW - Fabrikasi dan pemasangan bekisting lisplank
- Curing beton Acces Road Ruas 1
2 Pekerjaan Security Post
2 Pekerjaan Guard House - Fabrikasi dan pemasangan bekisting balok dan Slab
- Fabrikasi dan pemasangan besi tulangan listplank kg 3.60
- Fabrikasi dan pemasangan bekisting lisplank m2 5.18

Remarks :

No. Item of Concern Corrective Action

Made by, Prepared by, Acknowledged by,


PT USAHA BHAKTI PT RECON SARANA UTAMA PT RECON SARANA UTAMA

Julkarnain Fahmi Ismail Achmad Basuki


SM Project Control Construction Manager
REMAINING CIVIL WORK AT ROW AREA

DAILY PICTURE
Tuesday, June 08, 2021

Pekerjaan Acces Road STA 5+775 sd 5+790 ruas 1 Pekerjaan Guard House
ROW - Fabrikasi dan pemasangan besi tulangan listplank
- Curing beton Acces Road Ruas 1

Pekerjaan Guard House


- Fabrikasi dan pemasangan bekisting lisplank
FIELD DAILY REPORT BY SUPERVISOR
Hari / Tanggal : Tuesday, 08 June 2021
Report No : VI
Status (√)
No Manpower Qty Manpower Qty No Equipment Qty Remarks
W I S B
I Indirect 1 Excavator PC 200 (W)orking
PM 1 SPV 2 Excavator PC 78 (I)dle
SM 1 QC 3 Vibroroller/ babyroller (S)tandby
CM 1 QC Adm 4 Hand stamper (B)roken
PC 1 HSE Coord 5 Pick Up 1 √
FE 1 HSE SPV 6 Dump Truck
Surveyor MatCon 7 Bar Bending/Cutting
Ast. Surveyor Driver 1 8 Air Compressor
9 Water Tank Truck 2 √
10 Water Pump 1 √
11 Asphalt Cutter
II Direct 12 Portable Genset 1 √
Opt. Exca PC 200 Helper 4 13 Electric Vibrator 1 √
Opt. Exca PC 78 Welder 14 Tube Scaffolding 171 √
Opt. Vibroroller Scaffolder 15 Surveyor Equipment
Foreman 1 Flagman 16 DCP Test
Mason 1 Driver Pickup 1 17 CBR Test
Rebarman 1 Driver DT 18 Sandcone
Carpenter 1 Helper survey 19 Jack Hammer 1 √
20 Gerinda Potong beton 1 √
21 Lampu Penerangan 3 √
22 Concrete Core Drill 1 √
23 Gunting Besi 1 √

No Area Aktivitas Unit Quantity

1 ROW Sta 5+775 sd 5+790 Pekerjaan Acces Road STA 5+775 sd 5+790 ruas 1
ROW
- Curing beton Acces Road Ruas 1

2 ROW Sta 4+775 Pekerjaan Guard House


- Fabrikasi dan pemasangan besi tulangan listplank kg 3.6
- Fabrikasi dan pemasangan bekisting lisplank m2 5.18

Cuaca HSE Concern

1 07.00 - 09.00 C 3 13.00 - 15.00 C


2 09.01 - 11.30 C 4 15.01 - 17.00 C

PERMASALAHAN/PENGHAMBAT
CONSTRUCTION DAILY ACTIVITY REPORT

Project Name : REMAINING CIVIL WORK AT ROW AREA Report Number : JTB / CV /2021 / 131 / VI
Location : Bojonegoro Date : 6/9/2021
Rev :0 Sheet Number : VI

Manpower Equipment and Transportation Unit Total


No. Description Man Hours Total No. Description Ea hours Hours
1 Indirect Manpower
PM 1 2 2 1 Transport Pekerja 1 12 12
SM 1 8 8 2 Genset 1 12 12
CM 1 8 8 3 Jack Hammer 1 0 0
PC 1 8 8 4 Gunting Besi 1 12 12
FE 1 8 8 5 Concrete vibrator 1 0 0
6 Gerinda Potong beton 1 0 0
7 Lampu penerangan 3 4 12
8 Concrete Core Drill 1 0 0
9 Tube Scaffolding 171 8 1368

Sub Total 34 Grand Total 1416


2 Direct Manpower
Foreman 1 12 12
Mason 1 12 12 Weather
No. Condition Remarks
Rebarman 1 12 12 Time
Carpenter 1 12 12
Helper 4 12 48 1 C : 07.00 - 08.00 Clear
2 C : 08.01 - 09.00 Clear
3 C : 09.01 - 10.00 Clear
4 C : 10.01 - 11.00 Clear
5 C : 11.01 - 12.00 Clear
6 C : 12.01 - 13.00 Clear
7 C : 13.01 - 14.00 Clear
8 C : 14.01 - 15.00 Clear
9 C : 15.01 - 16.00 Clear
10 C : 16.01 - 17.00 Clear
11 C : 17.01 - 18.00 Clear
12 C : 18.01 - 19.00 Clear
13 C : 19.01 - 20.00 Clear
14 H : 20.01 - 21.00 Clear
15 H : 21.01 - 22.00 Clear
Sub Total 96
Grand Total 130 Note : C = Clear R = Rainy CD= Cloudy W= Windy

No. Work Activity QTY No Work Plan Activity for Next Day

1 Pekerjaan Guard House 1 Pekerjaan Guard House


- Fabrikasi dan pemasangan bekisting lisplank m2 13.50 - Fabrikasi dan pemasangan bekisting lisplank

2 Pekerjaan Security Post 2 Pekerjaan Security Post


- Fabrikasi dan pemasangan bekisting balok dan Slab m2 2.30 - Fabrikasi dan pemasangan bekisting slab

Remarks :

No. Item of Concern Corrective Action

Made by, Prepared by, Acknowledged by,


PT USAHA BHAKTI PT RECON SARANA UTAMA PT RECON SARANA UTAMA

Julkarnain Fahmi Ismail Achmad Basuki


SM Project Control Construction Manager
REMAINING CIVIL WORK AT ROW AREA

DAILY PICTURE
Wednesday, June 09, 2021

Pekerjaan Guard House Pekerjaan Security Post


- Fabrikasi dan pemasangan bekisting lisplank - Fabrikasi dan pemasangan bekisting balok dan Slab
FIELD DAILY REPORT BY SUPERVISOR
Hari / Tanggal : Wednesday, 09 June 2021
Report No : VI
Status (√)
No Manpower Qty Manpower Qty No Equipment Qty Remarks
W I S B
I Indirect 1 Excavator PC 200 (W)orking
PM 1 SPV 2 Excavator PC 78 (I)dle
SM 1 QC 3 Vibroroller/ babyroller (S)tandby
CM 1 QC Adm 4 Hand stamper (B)roken
PC 1 HSE Coord 5 Pick Up 1 √
FE 1 HSE SPV 6 Dump Truck
Surveyor MatCon 7 Bar Bending/Cutting
Ast. Surveyor Driver 1 8 Air Compressor
9 Water Tank Truck 2 √
10 Water Pump 1 √
11 Asphalt Cutter
II Direct 12 Portable Genset 1 √
Opt. Exca PC 200 Helper 4 13 Electric Vibrator 1 √
Opt. Exca PC 78 Welder 14 Tube Scaffolding 171 √
Opt. Vibroroller Scaffolder 15 Surveyor Equipment
Foreman 1 Flagman 16 DCP Test
Mason 1 Driver Pickup 1 17 CBR Test
Rebarman 1 Driver DT 18 Sandcone
Carpenter 1 Helper survey 19 Jack Hammer 1 √
20 Gerinda Potong beton 1 √
21 Lampu Penerangan 3 √
22 Concrete Core Drill 1 √
23 Gunting Besi 1 √

No Area Aktivitas Unit Quantity

1 ROW Sta 4+775 Pekerjaan Guard House


- Fabrikasi dan pemasangan bekisting lisplank m2 5.18

2 ROW Sta 4+810 Pekerjaan Security Post


- Fabrikasi dan pemasangan bekisting balok dan Slab m2 2.3

Cuaca HSE Concern

1 07.00 - 09.00 C 3 13.00 - 15.00 R


2 09.01 - 11.30 C 4 15.01 - 17.00 C

PERMASALAHAN/PENGHAMBAT
CONSTRUCTION DAILY ACTIVITY REPORT

Project Name : REMAINING CIVIL WORK AT ROW AREA Report Number : JTB / CV /2021 / 132 / VI
Location : Bojonegoro Date : 6/10/2021
Rev :0 Sheet Number : VI

Manpower Equipment and Transportation Unit Total


No. Description Man Hours Total No. Description Ea hours Hours
1 Indirect Manpower
PM 1 2 2 1 Transport Pekerja 1 8 8
SM 1 8 8 2 Genset 1 8 8
CM 1 8 8 3 Jack Hammer 1 0 0
PC 1 8 8 4 Gunting Besi 1 8 8
FE 1 8 8 5 Concrete vibrator 1 0 0
6 Gerinda Potong beton 1 0 0
7 Lampu penerangan 3 0 0
8 Concrete Core Drill 1 0 0
9 Tube Scaffolding 171 8 1368

Sub Total 34 Grand Total 1392


2 Direct Manpower
Foreman 1 8 8
Mason 1 8 8 Weather
No. Condition Remarks
Rebarman 1 8 8 Time
Carpenter 1 8 8
Helper 4 8 32 1 C : 07.00 - 08.00 Clear
2 C : 08.01 - 09.00 Clear
3 C : 09.01 - 10.00 Clear
4 C : 10.01 - 11.00 Clear
5 C : 11.01 - 12.00 Clear
6 C : 12.01 - 13.00 Clear
7 C : 13.01 - 14.00 Clear
8 C : 14.01 - 15.00 Clear
9 C : 15.01 - 16.00 Clear
10 C : 16.01 - 17.00 Clear

Sub Total 64
Grand Total 98 Note : C = Clear R = Rainy CD= Cloudy W= Windy

No. Work Activity QTY No Work Plan Activity for Next Day

1 Pekerjaan Guard House 1 Pekerjaan Guard House


- Fabrikasi dan pemasangan bekisting lisplank m2 20.17 - Cor beton Fc 34 semen type 1 Balok dan Slab Atap

2 Pekerjaan Security Post


- Fabrikasi dan pemasangan bekisting slab m2 6.80

Remarks :

No. Item of Concern Corrective Action

Made by, Prepared by, Acknowledged by,


PT USAHA BHAKTI PT RECON SARANA UTAMA PT RECON SARANA UTAMA

Julkarnain Fahmi Ismail Achmad Basuki


SM Project Control Construction Manager
REMAINING CIVIL WORK AT ROW AREA

DAILY PICTURE
Thursday, June 10, 2021

Pekerjaan Guard House Pekerjaan Security Post


- Fabrikasi dan pemasangan bekisting lisplank - Fabrikasi dan pemasangan bekisting slab

-
-
FIELD DAILY REPORT BY SUPERVISOR
Hari / Tanggal : Thursday, 10 June 2021
Report No : VI
Status (√)
No Manpower Qty Manpower Qty No Equipment Qty Remarks
W I S B
I Indirect 1 Excavator PC 200 (W)orking
PM 1 SPV 2 Excavator PC 78 (I)dle
SM 1 QC 3 Vibroroller/ babyroller (S)tandby
CM 1 QC Adm 4 Hand stamper (B)roken
PC 1 HSE Coord 5 Pick Up 1 √
FE 1 HSE SPV 6 Dump Truck
Surveyor MatCon 7 Bar Bending/Cutting
Ast. Surveyor Driver 1 8 Air Compressor
9 Water Tank Truck 2 √
10 Water Pump 1 √
11 Asphalt Cutter
II Direct 12 Portable Genset 1 √
Opt. Exca PC 200 Helper 4 13 Electric Vibrator 1 √
Opt. Exca PC 78 Welder 14 Tube Scaffolding 171 √
Opt. Vibroroller Scaffolder 15 Surveyor Equipment
Foreman 1 Flagman 16 DCP Test
Mason 1 Driver Pickup 1 17 CBR Test
Rebarman 1 Driver DT 18 Sandcone
Carpenter 1 Helper survey 19 Jack Hammer 1 √
20 Gerinda Potong beton 1 √
21 Lampu Penerangan 3 √
22 Concrete Core Drill 1 √
23 Gunting Besi 1 √

No Area Aktivitas Unit Quantity

1 ROW Sta 4+775 Pekerjaan Guard House


- Fabrikasi dan pemasangan bekisting lisplank m2 20.17

2 ROW Sta 4+810 Pekerjaan Security Post


- Fabrikasi dan pemasangan bekisting slab m2 6.80

Cuaca HSE Concern

1 07.00 - 09.00 C 3 13.00 - 15.00 C


2 09.01 - 11.30 C 4 15.01 - 17.00 C

PERMASALAHAN/PENGHAMBAT
CONSTRUCTION DAILY ACTIVITY REPORT

Project Name : REMAINING CIVIL WORK AT ROW AREA Report Number : JTB / CV /2021 / 133 / VI
Location : Bojonegoro Date : 6/11/2021
Rev :0 Sheet Number : VI

Manpower Equipment and Transportation Unit Total


No. Description Man Hours Total No. Description Ea hours Hours
1 Indirect Manpower
PM 1 2 2 1 Transport Pekerja 1 12 12
SM 1 8 8 2 Genset 1 12 12
CM 1 8 8 3 Jack Hammer 1 0 0
PC 1 8 8 4 Gunting Besi 1 12 12
FE 1 8 8 5 Concrete vibrator 1 12 12
6 Gerinda Potong beton 1 0 0
7 Lampu penerangan 3 4 12
8 Concrete Core Drill 1 0 0
9 Tube Scaffolding 171 8 1368

Sub Total 34 Grand Total 1428


2 Direct Manpower
Foreman 1 12 12
Mason 1 12 12 Weather
No. Condition Remarks
Rebarman 1 12 12 Time
Carpenter 1 12 12
Helper 4 12 48 1 C : 07.00 - 08.00 Clear
2 C : 08.01 - 09.00 Clear
3 C : 09.01 - 10.00 Clear
4 C : 10.01 - 11.00 Clear
5 C : 11.01 - 12.00 Clear
6 C : 12.01 - 13.00 Clear
7 R : 13.01 - 14.00 Clear
8 R : 14.01 - 15.00 Clear
9 C : 15.01 - 16.00 Clear
10 C : 16.01 - 17.00 Clear
11 C : 17.01 - 18.00 Clear
12 C : 18.01 - 19.00 Clear
13 C : 19.01 - 20.00 Clear
14 H : 20.01 - 21.00 Clear
15 H : 21.01 - 22.00 Clear
Sub Total 96
Grand Total 130 Note : C = Clear R = Rainy CD= Cloudy W= Windy

No. Work Activity QTY No Work Plan Activity for Next Day

1 Pekerjaan Guard House 1 Pekerjaan Security Post


- Cor beton Fc 34 semen type 1 Balok dan Slab Atap m3 8.50 - Fabrikasi dan pemasangan besi tulangan slab

Remarks :

No. Item of Concern Corrective Action

Made by, Prepared by, Acknowledged by,


PT USAHA BHAKTI PT RECON SARANA UTAMA PT RECON SARANA UTAMA

Julkarnain Fahmi Ismail Achmad Basuki


SM Project Control Construction Manager
REMAINING CIVIL WORK AT ROW AREA

DAILY PICTURE
Friday, June 11, 2021

Pekerjaan Guard House Pekerjaan Guard House


- Cor beton Fc 34 semen type 1 Balok dan Slab Atap - Cor beton Fc 34 semen type 1 Balok dan Slab Atap
FIELD DAILY REPORT BY SUPERVISOR
Hari / Tanggal : Friday, 11 June 2021
Report No : VI
Status (√)
No Manpower Qty Manpower Qty No Equipment Qty Remarks
W I S B
I Indirect 1 Excavator PC 200 (W)orking
PM 1 SPV 2 Excavator PC 78 (I)dle
SM 1 QC 3 Vibroroller/ babyroller (S)tandby
CM 1 QC Adm 4 Hand stamper (B)roken
PC 1 HSE Coord 5 Pick Up 1 √
FE 1 HSE SPV 6 Dump Truck
Surveyor MatCon 7 Bar Bending/Cutting
Ast. Surveyor Driver 1 8 Air Compressor
9 Water Tank Truck 2 √
10 Water Pump 1 √
11 Asphalt Cutter
II Direct 12 Portable Genset 1 √
Opt. Exca PC 200 Helper 4 13 Electric Vibrator 1 √
Opt. Exca PC 78 Welder 14 Tube Scaffolding 171 √
Opt. Vibroroller Scaffolder 15 Surveyor Equipment
Foreman 1 Flagman 16 DCP Test
Mason 1 Driver Pickup 1 17 CBR Test
Rebarman 1 Driver DT 18 Sandcone
Carpenter 1 Helper survey 19 Jack Hammer 1 √
20 Gerinda Potong beton 1 √
21 Lampu Penerangan 3 √
22 Concrete Core Drill 1 √
23 Gunting Besi 1 √

No Area Aktivitas Unit Quantity

1 ROW Sta 4+775 Pekerjaan Guard House


- Cor beton Fc 34 semen type 1 Balok dan Slab Atap m3 8.50

Cuaca HSE Concern

1 07.00 - 09.00 C 3 13.00 - 15.00 C


2 09.01 - 11.30 C 4 15.01 - 17.00 C

PERMASALAHAN/PENGHAMBAT
CONSTRUCTION DAILY ACTIVITY REPORT

Project Name : REMAINING CIVIL WORK AT ROW AREA Report Number : JTB / CV /2021 / 134 / VI
Location : Bojonegoro Date : 6/12/2021
Rev :0 Sheet Number : VI

Manpower Equipment and Transportation Unit Total


No. Description Man Hours Total No. Description Ea hours Hours
1 Indirect Manpower
PM 1 2 2 1 Transport Pekerja 1 8 8
SM 1 8 8 2 Genset 1 8 8
CM 1 8 8 3 Jack Hammer 1 0 0
PC 1 8 8 4 Gunting Besi 1 8 8
FE 1 7 7 5 Concrete vibrator 1 0 0
6 Gerinda Potong beton 1 0 0
7 Lampu penerangan 3 0 0
8 Concrete Core Drill 1 0 0
9 Tube Scaffolding 171 8 1368

Sub Total 33 Grand Total 1392


2 Direct Manpower
Foreman 1 8 8
Mason 1 8 8 Weather
No. Condition Remarks
Rebarman 1 8 8 Time
Carpenter 1 8 8
Helper 4 8 32 1 C : 07.00 - 08.00 Clear
2 C : 08.01 - 09.00 Clear
3 C : 09.01 - 10.00 Clear
4 C : 10.01 - 11.00 Clear
5 C : 11.01 - 12.00 Clear
6 C : 12.01 - 13.00 Clear
7 C : 13.01 - 14.00 Clear
8 C : 14.01 - 15.00 Clear
9 C : 15.01 - 16.00 Clear
10
11
12
13
14
15
Sub Total 64
Grand Total 97 Note : C = Clear R = Rainy CD= Cloudy W= Windy

No. Work Activity QTY No Work Plan Activity for Next Day

1 Pekerjaan Security Post 1 Pekerjaan Security Post


- Fabrikasi dan pemasangan besi tulangan slab kg 45.00 - Fabrikasi dan pemasangan besi tulangan slab
- Fabrikasi dan pemasangan besi tulangan listplank

Remarks :

No. Item of Concern Corrective Action

Made by, Prepared by, Acknowledged by,


PT USAHA BHAKTI PT RECON SARANA UTAMA PT RECON SARANA UTAMA

Julkarnain Fahmi Ismail Achmad Basuki


SM Project Control Construction Manager
REMAINING CIVIL WORK AT ROW AREA

DAILY PICTURE
Saturday, June 12, 2021

Pekerjaan Security Post


- Fabrikasi dan pemasangan besi tulangan slab
FIELD DAILY REPORT BY SUPERVISOR
Hari / Tanggal : Saturday, 12 June 2021
Report No : VI
Status (√)
No Manpower Qty Manpower Qty No Equipment Qty Remarks
W I S B
I Indirect 1 Excavator PC 200 (W)orking
PM 1 SPV 2 Excavator PC 78 (I)dle
SM 1 QC 3 Vibroroller/ babyroller (S)tandby
CM 1 QC Adm 4 Hand stamper (B)roken
PC 1 HSE Coord 5 Pick Up 1 √
FE 1 HSE SPV 6 Dump Truck
Surveyor MatCon 7 Bar Bending/Cutting
Ast. Surveyor Driver 1 8 Air Compressor
9 Water Tank Truck 2 √
10 Water Pump 1 √
11 Asphalt Cutter
II Direct 12 Portable Genset 1 √
Opt. Exca PC 200 Helper 4 13 Electric Vibrator 1 √
Opt. Exca PC 78 Welder 14 Tube Scaffolding 171 √
Opt. Vibroroller Scaffolder 15 Surveyor Equipment
Foreman 1 Flagman 16 DCP Test
Mason 1 Driver Pickup 1 17 CBR Test
Rebarman 1 Driver DT 18 Sandcone
Carpenter 1 Helper survey 19 Jack Hammer 1 √
20 Gerinda Potong beton 1 √
21 Lampu Penerangan 3 √
22 Concrete Core Drill 1 √
23 Gunting Besi 1 √

No Area Aktivitas Unit Quantity

2 ROW Sta 4+810 Pekerjaan Security Post


- Fabrikasi dan pemasangan besi tulangan slab kg 45.00

Cuaca HSE Concern

1 07.00 - 09.00 C 3 13.00 - 15.00 C


2 09.01 - 11.30 C 4 15.01 - 17.00 C

PERMASALAHAN/PENGHAMBAT
Maret April Mei
3/1/2021 31 III 4/1/2021 62 IV 5/1/2021
3/2/2021 32 III 4/2/2021 63 IV 5/2/2021
3/3/2021 33 III 4/3/2021 64 IV 5/3/2021
3/4/2021 34 III 4/4/2021 65 IV 5/4/2021
3/5/2021 35 III 4/5/2021 66 IV 5/5/2021
3/6/2021 36 III 4/6/2021 67 IV 5/6/2021
3/7/2021 37 III 4/7/2021 68 IV 5/7/2021
3/8/2021 38 III 4/8/2021 69 IV 5/8/2021
3/9/2021 39 III 4/9/2021 70 IV 5/9/2021
3/10/2021 40 III 4/10/2021 71 IV 5/10/2021
3/11/2021 41 III 4/11/2021 72 IV 5/11/2021
3/12/2021 42 III 4/12/2021 73 IV 5/12/2021
3/13/2021 43 III 4/13/2021 74 IV 5/13/2021
3/14/2021 44 III 4/14/2021 75 IV 5/14/2021
3/15/2021 45 III 4/15/2021 76 IV 5/15/2021
3/16/2021 46 III 4/16/2021 77 IV 5/16/2021
3/17/2021 47 III 4/17/2021 78 IV 5/17/2021
3/18/2021 48 III 4/18/2021 79 IV 5/18/2021
3/19/2021 49 III 4/19/2021 80 IV 5/19/2021
3/20/2021 50 III 4/20/2021 81 IV 5/20/2021
3/21/2021 51 III 4/21/2021 82 IV 5/21/2021
3/22/2021 52 III 4/22/2021 83 IV 5/22/2021
3/23/2021 53 III 4/23/2021 84 IV 5/23/2021
3/24/2021 54 III 4/24/2021 85 IV 5/24/2021
3/25/2021 55 III 4/25/2021 86 IV 5/25/2021
3/26/2021 56 III 4/26/2021 87 IV 5/26/2021
3/27/2021 57 III 4/27/2021 88 IV 5/27/2021
3/28/2021 58 III 4/28/2021 89 IV 5/28/2021
3/29/2021 59 III 4/29/2021 90 IV 5/29/2021
3/30/2021 60 III 4/30/2021 91 IV 5/30/2021
3/31/2021 61 III 5/31/2021
Juni
92 V 6/1/2021 VI 123
93 V 6/2/2021 VI 124
94 V 6/3/2021 VI 125
95 V 6/4/2021 VI 126
96 V 6/5/2021 VI 127
97 V 6/6/2021 VI 128
98 V 6/7/2021 VI 129
99 V 6/8/2021 VI 130
100 V 6/9/2021 VI 131
101 V 6/10/2021 VI 132
102 V 6/11/2021 VI 133
103 V 6/12/2021 VI 134
104 V 6/13/2021 VI 135
105 V 6/14/2021 VI 136
106 V 6/15/2021 VI 137
107 V 6/16/2021 VI 138
108 V 6/17/2021 VI 139
109 V 6/18/2021 VI 140
110 V 6/19/2021 VI 141
111 V 6/20/2021 VI 142
112 V 6/21/2021 VI 143
113 V 6/22/2021 VI 144
114 V 6/23/2021 VI 145
115 V 6/24/2021 VI 146
116 V 6/25/2021 VI 147
117 V 6/26/2021 VI 148
118 V 6/27/2021 VI 149
119 V 6/28/2021 VI 150
120 V 6/29/2021 VI 151
121 V 6/30/2021 VI 152
122 V