02-Feb-17 (1)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
1393
MRT- 7 REV-1 46MONTHS EPC SCHEDULE FOR 18-Feb-16 &11-Dec-19
GUIDEWAY STATION PROJECT-24-26-30 (DONE)(4PM) SUBMIT ULC 11-Dec-19, MRT

General Requirements 1393 18-Feb-16 11-Dec-19 11-Dec-19, Gene

Preliminaries 122 18-Feb-16 18-Jun-16 18-Jun-16, Preliminaries


A100 Financial Closure/ Agreement 0 18-Feb-16 A100.1 Financial Closure/ Agreement
A100.1 Owner Acquired Permits 0 18-Feb-16 A100 A1000 Owner Acquired Permits
A1000 Downpayment 0 18-Feb-16 A100.1 A1005 Downpayment
A1005 Contract Award / Notice To Proceed 0 18-Feb-16 A1000 A1040, A1120, Contract Award / Notice To Proceed
A1069, A1010,
A1030
A1010 Bond and Insurances 30 18-Feb-16 18-Mar-16 A1005 A1020 Bond and Insurances
A1020 Construction Permits and Licences 121 18-Feb-16 17-Jun-16 A1010 A1120, A1420.1 Construction Permits and Licences
A1030 Temporary Facilities and Utilities 122 18-Feb-16 18-Jun-16 A1005 A1040 Temporary Facilities and Utilities
A1040 Mobilization 122 18-Feb-16 18-Jun-16 A1005, A1030 A1069 Mobilization
Milestones 1393 18-Feb-16 11-Dec-19 11-Dec-19, Milestones
A1125 Commencement of site Works 0 08-Dec-16 A1380 Commencement of site Works
A1135 Delivery of Rolling Stock 0 17-Feb-18 A11750 Delivery of Rolling Stock
A1145 First Trial Run or Start Commissioning Test 0 10-Sep-19 A79740 First Trial Run or Start Co
A1155 Project Completion ( Taking-Over ) 0 11-Dec-19 A79740 Project Completi
Utilities Relocation 269 19-Apr-16 13-Jan-17 13-Jan-17, Utilities Relocation
A1420.1 Utilities Relocation Cluster 1 233 19-Apr-16 07-Dec-16 A1020, A1070 A1420.11, A69770 Utilities Relocation Cluster 1
A1420.11 Utilities Relocation Cluster 2 232 19-May-16 05-Jan-17 A1420.1, A1080 A72090 Utilities Relocation Cluster 2
A1420.21 Utilities Relocation Cluster 3 173 18-Jun-16 07-Dec-16 A1090 A69700, A69670 Utilities Relocation Cluster 3
A1420.31 Utilities Relocation Cluster 4 174 18-Jul-16 07-Jan-17 A1100 A71970 Utilities Relocation Cluster 4
A1420.41 Utilities Relocation Cluster 5 239 19-May-16 13-Jan-17 A1110 A38610 Utilities Relocation Cluster 5
Site Access/Possession 151 18-Feb-16 17-Jul-16 17-Jul-16, Site Access/Possession
A1069 100% Site Access for Surveys and Investigations 0 18-Feb-16 A1005, A1040 A11145, A6080, 100% Site Access for Surveys and Investigations
A1070
A1070 100% Site Possesion/ ROW Acquisition Cluster 1 0 18-Apr-16 A1069 A1420.1, A1080 100% Site Possesion/ ROW Acquisition Cluster 1
A1080 100% Site Possesion/ ROW Acquisition Cluster 2 0 18-May-16 A1070 A1420.11, A1090 100% Site Possesion/ ROW Acquisition Cluster 2
A1090 100% Site Possesion/ ROW Acquisition Cluster 3 0 17-Jun-16 A1080 A1420.21, A1100 100% Site Possesion/ ROW Acquisition Cluster 3
A1100 100% Site Possesion/ ROW Acquisition Cluster 4 0 17-Jul-16 A1090 A1420.31, A1110 100% Site Possesion/ ROW Acquisition Cluster 4
A1110 100% Site Possesion/ ROW Acquisition Cluster 5 0 18-May-16 A1100 A1420.41 100% Site Possesion/ ROW Acquisition Cluster 5
1099System
Major Construction Works For Civil Works and Equipment and 08-Dec-16 11-Dec-19 11-Dec-19, Majo
A1380 Elevated Guideway 558 08-Dec-16 18-Jun-18 A69700 A1125 Elevated Guideway
A1390 At-Grade Guideway 500 28-May-17 09-Oct-18 A177135, A177315, At-Grade Guideway
A177499, A178179
A1400 Tunnel Opencut Guideway 620 29-Jan-17 10-Oct-18 A92985 Tunnel Opencut Guideway
A1410 All Stations 673 16-Mar-17 17-Jan-19 A9050 All Stations
A1420 Depot/ITT 640 14-Jan-17 15-Oct-18 A38610 Depot/ITT
A2950 Trackwork 323 03-Feb-18 22-Dec-18 A76330 Trackwork
A2960 Third Rail 334 15-Mar-18 11-Feb-19 A73610 Third Rail
A2970 Power Supply 342 03-Jun-18 10-May-19 A75130 Power Supply
A2980 Signaling 466 17-Nov-17 25-Feb-19 A81990 A2990 Signaling
A2990 Communication 466 17-Nov-17 25-Feb-19 A2980 A3000 Communication
A3000 AFC 466 17-Nov-17 25-Feb-19 A2990 AFC
A3020 Rolling Stock 923 01-Mar-17 09-Sep-19 A11750 Rolling Stock
A3870 Testing 215 11-May-19 11-Dec-19 A79680 Testing
Submittal and Approval of Quality and Management Plans 354 31-Mar-16 20-Mar-17 20-Mar-17, Submittal and Approval of Quality and Management Plans

Date Revision Checked Approved


MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (2)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Civil Works & System 354 31-Mar-16 20-Mar-17 20-Mar-17, Civil Works & System
A6080 Submission of Quality Assurance and Quality 0 01-Jul-16 A1069 A6090, A6140, Submission of Quality Assurance and Quality Control (QA/QC) Plan and Procedures (CW)
Control (QA/QC) Plan and Procedures (CW) A6080.111, A6080.11

A6080.11 Submission of Quality Assurance and Quality Control (QA/QC)


0 Plan and Procedures
25-Nov-16
(CW A6080
& ES) Submission of Quality Assurance and Quality Control (QA/QC) Plan and Procedures (CW & ES)
A6080.111 Approval of Quality Assurance and Quality Control (QA/QC)
176 Plan
02-Jul-16
and Procedures
24-Dec-16 A6080 Approval of Quality Assurance and Quality Control (QA/QC) Plan and Procedures
A6090 Submission of Quality Management Plan (CW) 0 31-Mar-16 A6080 A6090.11, A6100, Submission of Quality Management Plan (CW)
A6090.1
A6090.1 Submission of Quality Management Plan (CW & ES) 0 25-Nov-16 A6090 Submission of Quality Management Plan (CW & ES)
A6090.11 Approval of of Quality Management Plan 267 01-Apr-16 24-Dec-16 A6090 Approval of of Quality Management Plan
A6100 Submission of Design & Engineering 0 17-Aug-16 A6090 A6100.11, A6120, Submission of Design & Engineering Management Plan, including Engineering Design and Drafting Criteria Manual (CW)
Management Plan, including Engineering A6100.1
Design and Drafting Criteria Manual (CW)
A6100.1 Submission of Design & Engineering Management Plan,
0 including Engineering
02-Nov-16
Design andA6100
Drafting Criteria Manual (CW & ES) Submission of Design & Engineering Management Plan, including Engineering Design and Drafting Criteria Manual (CW & ES)
A6100.11 Approval of Design & Engineering Management Plan,106
including
18-Aug-16
Engineering02-Dec-16
Design and Drafting
A6100 Criteria Manual Approval of Design & Engineering Management Plan, including Engineering Design and Drafting Criteria Manual
A6120 Submission of Geotechnical Program 0 20-Jul-16 A6100 A6120.1 Submission of Geotechnical Program
A6120.1 Approval of Geotechnical Program 30 20-Jul-16 19-Aug-16 A6120 Approval of Geotechnical Program
A6130 Submission of Topographic and Utility Surveys 0 25-May-16 A11145, A11230, A6210, A6130.1 Submission of Topographic and Utility Surveys
A11360, A11490,
A11620
A6130.1 Approval of Topographic and Utility Surveys 210 26-May-16 21-Dec-16 A6130 Approval of Topographic and Utility Surveys
A6140 Submission of Environment Management Plan, 0 26-Sep-16 A6080 A6140.11, A6140.12, Submission of Environment Management Plan, including Noise and Vibration Mitigation (CW)
including Noise and Vibration Mitigation (CW) A6140.1
A6140.1 Submission of Environment Management Plan, including
0 Noise and Vibration09-Dec-16
Mitigation (CW
A6140
& ES) Submission of Environment Management Plan, including Noise and Vibration Mitigation (CW & ES)
A6140.11 Approval of Environment Management Plan, including
104
Noise and
27-Sep-16
Vibration Mitigation
08-Jan-17 A6140 Approval of Environment Management Plan, including Noise and Vibration Mitigation
A6140.12 Submission of Traffic Management Plan (CW) 0 28-Sep-16 A6140 A6140.13, A6140.14 Submission of Traffic Management Plan (CW)

A6140.13 Approval of Traffic Management Plan 30 29-Sep-16 28-Oct-16 A6140.12 Approval of Traffic Management Plan
A6140.14 Interface Management Plan (ES) 0 07-Dec-16 A6140.12 A6140.15, A6150 Interface Management Plan (ES)
A6140.15 Approval of Interface Management Plan 30 08-Dec-16 06-Jan-17 A6140.14 Approval of Interface Management Plan
A6150 Integration Management Plan and System Integration0Plan and Procedure (ES)
07-Dec-16 A6140.14 A6160, A6150.1 Integration Management Plan and System Integration Plan and Procedure (ES)
A6150.1 Approval of Integration Management Plan and System
30Integration
09-Dec-16
Plan and 07-Jan-17
Procedure A6150 Approval of Integration Management Plan and System Integration Plan and Procedure
A6160 System Assurance Plan (Reliability, Availability, Maintainability
0 and Safety for 09-Dec-16
System and Sub-System
A6150 (ES) A6170, A6160.1 System Assurance Plan (Reliability, Availability, Maintainability and Safety for System and Sub-System (ES)
A6160.1 Approval of System Assurance Plan (Reliability, Availability,
30 Maintainability
10-Dec-16 and
08-Jan-17
Safety for System
A6160 and Sub-System Approval of System Assurance Plan (Reliability, Availability, Maintainability and Safety for System and Sub-System
A6170 Electro-Magnetic Interference (EMI)/ Electro-Magnetic0Compatibility (EMC) 07-Dec-16
Plan (ES) A6160 A6180, A6170.1 Electro-Magnetic Interference (EMI)/ Electro-Magnetic Compatibility (EMC) Plan (ES)
A6170.1 Approval of Electro-Magnetic Interference (EMI)/ Electro-Magnetic
30 07-Dec-16
Compatibility
06-Jan-17
(EMC) Plan
A6170 Approval of Electro-Magnetic Interference (EMI)/ Electro-Magnetic Compatibility (EMC) Plan
A6180 Submission of Testing and Commissioning Plan 0 07-Dec-16 A6170 A6180.1, A6220, Submission of Testing and Commissioning Plan (ES)
(ES) A6190
A6180.1 Approval of Testing and Commissioning Plan 30 07-Dec-16 06-Jan-17 A6180 Approval of Testing and Commissioning Plan
A6190 Submission of Training Plan (ES) 0 18-Feb-17 A6180 A6200, A6190.1 Submission of Training Plan (ES)
A6190.1 Approval of Training Plan 30 18-Feb-17 20-Mar-17 A6190 Approval of Training Plan
A6200 Submission of Construction Management Plan (ES) 0 15-Dec-16 A6190 A6200.1 Submission of Construction Management Plan (ES)
A6200.1 Approval of Construction Management Plan 30 15-Dec-16 14-Jan-17 A6200 Approval of Construction Management Plan
A6210 Submission of Health and Safety Plan (CW) 0 20-May-16 A6130 A6210.11, A6210.1 Submission of Health and Safety Plan (CW)
A6210.1 Submission of Health and Safety Plan (CW & ES) 0 09-Dec-16 A6210 Submission of Health and Safety Plan (CW & ES)
A6210.11 Approval of Health and Safety Plan 232 20-May-16 07-Jan-17 A6210 Approval of Health and Safety Plan
A6220 Submission of Preliminary Operation Plan (ES) 0 09-Dec-16 A6180 A6230, A6280.1 Submission of Preliminary Operation Plan (ES)
A6230 Approval of Preliminary Operation Plan 30 09-Dec-16 08-Jan-17 A6220 Approval of Preliminary Operation Plan
A6280.1 Submission of Preliminary Maintenance Plan (ES) 0 09-Dec-16 A6220 A6290 Submission of Preliminary Maintenance Plan (ES)
A6290 Approval of of Preliminary Maintenance Plan 30 09-Dec-16 08-Jan-17 A6280.1 Approval of of Preliminary Maintenance Plan
Civil Design Stage 395 18-Feb-16 18-Mar-17 18-Mar-17, Civil Design Stage
A1120 Design Preparation / Design Approval 395 18-Feb-16 18-Mar-17 A1005, A1020 A11130 Design Preparation / Design Approval

Date Revision Checked Approved


MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (3)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Elevated Guideway / Guideway Extension for MRT3 395 18-Feb-16 18-Mar-17 18-Mar-17, Elevated Guideway / Guideway Extension for MRT3
Design stage for Elevated Guideway / Guideway Extension for 395
MRT3 18-Feb-16 18-Mar-17 18-Mar-17, Design stage for Elevated Guideway / Guideway Extension for MRT3
A11130 System Interface Input - For Civil works Design criteria
60and Preliminary
18-Feb-16Design
17-Apr-16 A1120 A11135, A11200 System Interface Input - For Civil works Design criteria and Preliminary Design
A11135 System Interface input- Final 184 17-Jun-16 17-Dec-16 A11130 A11140 System Interface input- Final
A11140 General Review/Planning and Systems Performance 60
Specs 18-Feb-16 17-Apr-16 A11135 A11145 General Review/Planning and Systems Performance Specs
A11145 Topographic and Utility Surveys 90 18-Feb-16 17-May-16 A1069, A11140 A6130, A11150 Topographic and Utility Surveys
A11150 Geotechnical and Geological Survey 90 18-Feb-16 17-May-16 A11145 A11160 Geotechnical and Geological Survey
A11160 Design Criteria 0 18-Mar-16 A11150 A11165 Design Criteria
A11165 Approval Design Criteria 30 19-Mar-16 17-Apr-16 A11160 A11170 Approval Design Criteria
A11170 Preliminary Design 91 19-Mar-16 17-Jun-16 A11165 A11175, A178400 Preliminary Design
A11175 Approval of Preliminary Design 30 18-Jun-16 17-Jul-16 A11170 A11180 Approval of Preliminary Design
A11180 Detailed Design / Final Design 230 02-Jul-16 16-Feb-17 A11175 A11185 Detailed Design / Final Design
A11185 Approval of Detailed Design / Final Design 230 17-Jul-16 03-Mar-17 A11180 A11190 Approval of Detailed Design / Final Design
A11190 Issuance of Construction Drawings (AFC) 230 01-Aug-16 18-Mar-17 A11185 Issuance of Construction Drawings (AFC)
At-Grade Guideway 395 18-Feb-16 18-Mar-17 18-Mar-17, At-Grade Guideway
Design stage for At-Grade Guideway 395 18-Feb-16 18-Mar-17 18-Mar-17, Design stage for At-Grade Guideway
A11200 System Interface Input - For Civil works Design criteria
60and Preliminary
18-Feb-16Design
17-Apr-16 A11130 A11210, A11330 System Interface Input - For Civil works Design criteria and Preliminary Design
A11210 System Interface input- Final 184 17-Jun-16 17-Dec-16 A11200 A11220 System Interface input- Final
A11220 General Review/Planning and Systems Performance 60
Specs 18-Feb-16 17-Apr-16 A11210 A11230 General Review/Planning and Systems Performance Specs
A11230 Topographic and Utility Surveys 90 18-Feb-16 17-May-16 A11220 A6130, A11240 Topographic and Utility Surveys
A11240 Geotechnical and Geological Survey 90 18-Feb-16 17-May-16 A11230 A11260 Geotechnical and Geological Survey
A11260 Design Criteria 0 18-Mar-16 A11240 A11270 Design Criteria
A11270 Approval Design Criteria 30 19-Mar-16 17-Apr-16 A11260 A11280 Approval Design Criteria
A11280 Preliminary Design 91 19-Mar-16 17-Jun-16 A11270 A11290 Preliminary Design
A11290 Approval of Preliminary Design 30 18-Jun-16 17-Jul-16 A11280 A11300 Approval of Preliminary Design
A11300 Detailed Design / Final Design 230 02-Jul-16 16-Feb-17 A11290 A11310 Detailed Design / Final Design
A11310 Approval of Detailed Design / Final Design 230 17-Jul-16 03-Mar-17 A11300 A11320 Approval of Detailed Design / Final Design
A11320 Issuance of Construction Drawings (AFC) 230 01-Aug-16 18-Mar-17 A11310 Issuance of Construction Drawings (AFC)
Tunnel Open Cut Guideway 395 18-Feb-16 18-Mar-17 18-Mar-17, Tunnel Open Cut Guideway
Design stage for Tunnel Open Cut Guideway 395 18-Feb-16 18-Mar-17 18-Mar-17, Design stage for Tunnel Open Cut Guideway
A11330 System Interface Input - For Civil works Design criteria
60and Preliminary
18-Feb-16Design
17-Apr-16 A11200 A11340, A11460 System Interface Input - For Civil works Design criteria and Preliminary Design
A11340 System Interface input- Final 184 17-Jun-16 17-Dec-16 A11330 A11350 System Interface input- Final
A11350 General Review/Planning and Systems Performance 60
Specs 18-Feb-16 17-Apr-16 A11340 A11360 General Review/Planning and Systems Performance Specs
A11360 Topographic and Utility Surveys 90 18-Feb-16 17-May-16 A11350 A6130, A11370 Topographic and Utility Surveys
A11370 Geotechnical and Geological Survey 90 18-Feb-16 17-May-16 A11360 A11390 Geotechnical and Geological Survey
A11390 Design Criteria 0 18-Mar-16 A11370 A11400 Design Criteria
A11400 Approval Design Criteria 30 19-Mar-16 17-Apr-16 A11390 A11410 Approval Design Criteria
A11410 Preliminary Design 91 19-Mar-16 17-Jun-16 A11400 A11420 Preliminary Design
A11420 Approval of Preliminary Design 30 18-Jun-16 17-Jul-16 A11410 A11430 Approval of Preliminary Design
A11430 Detailed Design / Final Design 230 02-Jul-16 16-Feb-17 A11420 A11440 Detailed Design / Final Design
A11440 Approval of Detailed Design / Final Design 230 17-Jul-16 03-Mar-17 A11430 A11450 Approval of Detailed Design / Final Design
A11450 Issuance of Construction Drawings (AFC) 230 01-Aug-16 18-Mar-17 A11440 Issuance of Construction Drawings (AFC)
Depot / Intermodal Transport Terminal (ITT) 395 18-Feb-16 18-Mar-17 18-Mar-17, Depot / Intermodal Transport Terminal (ITT)
Design stage for Depot / Intermodal Transport Terminal (ITT) 395 18-Feb-16 18-Mar-17 18-Mar-17, Design stage for Depot / Intermodal Transport Terminal (ITT)
A11460 System Interface Input - For Civil works Design criteria
60and Preliminary
18-Feb-16Design
17-Apr-16 A11330 A11470, A11590 System Interface Input - For Civil works Design criteria and Preliminary Design
A11470 System Interface input- Final 184 17-Jun-16 17-Dec-16 A11460 A11480 System Interface input- Final
A11480 General Review/Planning and Systems Performance 60
Specs 18-Feb-16 17-Apr-16 A11470 A11490 General Review/Planning and Systems Performance Specs
A11490 Topographic and Utility Surveys 90 18-Feb-16 17-May-16 A11480 A6130, A11500 Topographic and Utility Surveys
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (4)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
A11500 Geotechnical and Geological Survey 90 18-Feb-16 17-May-16 A11490 A11520 Geotechnical and Geological Survey
A11520 Design Criteria 0 18-Mar-16 A11500 A11530 Design Criteria
A11530 Approval Design Criteria 30 19-Mar-16 17-Apr-16 A11520 A11540 Approval Design Criteria
A11540 Preliminary Design 91 19-Mar-16 17-Jun-16 A11530 A11550 Preliminary Design
A11550 Approval of Preliminary Design 30 18-Jun-16 17-Jul-16 A11540 A11560 Approval of Preliminary Design
A11560 Detailed Design / Final Design 230 02-Jul-16 16-Feb-17 A11550 A11570 Detailed Design / Final Design
A11570 Approval of Detailed Design / Final Design 230 17-Jul-16 03-Mar-17 A11560 A11580 Approval of Detailed Design / Final Design
A11580 Issuance of Construction Drawings (AFC) 230 01-Aug-16 18-Mar-17 A11570 Issuance of Construction Drawings (AFC)
Stations 395 18-Feb-16 18-Mar-17 18-Mar-17, Stations
Design stage for Stations 395 18-Feb-16 18-Mar-17 18-Mar-17, Design stage for Stations
A11590 System Interface Input - For Civil works Design criteria
60and Preliminary
18-Feb-16Design
17-Apr-16 A11460 A11600 System Interface Input - For Civil works Design criteria and Preliminary Design
A11600 System Interface input- Final 184 17-Jun-16 17-Dec-16 A11590 A11610 System Interface input- Final
A11610 General Review/Planning and Systems Performance 60
Specs 18-Feb-16 17-Apr-16 A11600 A11620 General Review/Planning and Systems Performance Specs
A11620 Topographic and Utility Surveys 90 18-Feb-16 17-May-16 A11610 A6130, A11630 Topographic and Utility Surveys
A11630 Geotechnical and Geological Survey 90 18-Feb-16 17-May-16 A11620 A11650 Geotechnical and Geological Survey
A11650 Design Criteria 0 18-Mar-16 A11630 A11660 Design Criteria
A11660 Approval Design Criteria 30 19-Mar-16 17-Apr-16 A11650 A11670 Approval Design Criteria
A11670 Preliminary Design 91 19-Mar-16 17-Jun-16 A11660 A11680 Preliminary Design
A11680 Approval of Preliminary Design 30 18-Jun-16 17-Jul-16 A11670 A11690 Approval of Preliminary Design
A11690 Detailed Design / Final Design 230 02-Jul-16 16-Feb-17 A11680 A11700 Detailed Design / Final Design
A11700 Approval of Detailed Design / Final Design 230 17-Jul-16 03-Mar-17 A11690 A11710 Approval of Detailed Design / Final Design
A11710 Issuance of Construction Drawings (AFC) 230 01-Aug-16 18-Mar-17 A11700 Issuance of Construction Drawings (AFC)
Civl Drawing Deliverables 392 17-Jun-16 13-Jul-17 13-Jul-17, Civl Drawing Deliverables
Cluster 1 357 17-Jun-16 08-Jun-17 08-Jun-17, Cluster 1
(Civil) Station 1 - SM North Ave Station 287 17-Jun-16 30-Mar-17 30-Mar-17, (Civil) Station 1 - SM North Ave Station
First Level 287 17-Jun-16 30-Mar-17 30-Mar-17, First Level
A178400 Milestones 0 17-Jun-16 A11170 A178410 Milestones
A178410 Structural Works 57 06-Jan-17 03-Mar-17 A178400 A178420, A178490 Structural Works
A178420 Architectural Works 168 16-Jul-16 30-Dec-16 A178410 A178430, A178500 Architectural Works
A178430 Electrical Works 287 17-Jun-16 30-Mar-17 A178420 A178440, A1170 Electrical Works
A178440 Mechanical Works 287 17-Jun-16 30-Mar-17 A178430 Mechanical Works
Second Level 287 17-Jun-16 30-Mar-17 30-Mar-17, Second Level
A178490 Structural Works 57 06-Jan-17 03-Mar-17 A178410 A178530 Structural Works
A178500 Architectural Works 168 16-Jul-16 30-Dec-16 A178420 A178540, A178510 Architectural Works
A178510 Electrical Works 287 17-Jun-16 30-Mar-17 A178500 A178520 Electrical Works
A178520 Mechanical Works 287 17-Jun-16 30-Mar-17 A178510 Mechanical Works
Third Level 287 17-Jun-16 30-Mar-17 30-Mar-17, Third Level
A178530 Structural Works 57 06-Jan-17 03-Mar-17 A178490 A1165 Structural Works
A178540 Architectural Works 168 16-Jul-16 30-Dec-16 A178500 A178550 Architectural Works
A178550 Electrical Works 287 17-Jun-16 30-Mar-17 A178540 A178560 Electrical Works
A178560 Mechanical Works 287 17-Jun-16 30-Mar-17 A178550 Mechanical Works
(Civil) Station 2 - Quezon Memorial Circle Station 357 17-Jun-16 08-Jun-17 08-Jun-17, (Civil) Station 2 - Quezon Memorial Circle Station
First Level 357 17-Jun-16 08-Jun-17 08-Jun-17, First Level
A1165 Structural Works 64 06-Apr-17 08-Jun-17 A178530 A1200, A1260 Structural Works
A1170 Architectural Works 238 17-Jun-16 09-Feb-17 A178430 A1180 Architectural Works
A1180 Electrical Works 252 17-Jun-16 23-Feb-17 A1170 A1190 Electrical Works

Date Revision Checked Approved


MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (5)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
A1190 Mechanical Works 252 17-Jun-16 23-Feb-17 A1180 A1210 Mechanical Works

Second Level 357 17-Jun-16 08-Jun-17 08-Jun-17, Second Level


A1200 Structural Works 64 06-Apr-17 08-Jun-17 A1165 Structural Works
A1210 Architectural Works 238 17-Jun-16 09-Feb-17 A1190 A1220 Architectural Works
A1220 Electrical Works 252 17-Jun-16 23-Feb-17 A1210 A1230, A1280 Electrical Works
A1230 Mechanical Works 252 17-Jun-16 23-Feb-17 A1220 Mechanical Works
Cluster 2 364 17-Jun-16 15-Jun-17 15-Jun-17, Cluster 2
(Civil) Station 3 - University Ave Station 364 17-Jun-16 15-Jun-17 15-Jun-17, (Civil) Station 3 - University Ave Station
First Level 364 17-Jun-16 15-Jun-17 15-Jun-17, First Level
A1260 Structural Works 108 28-Feb-17 15-Jun-17 A1165 A1270, A1300 Structural Works
A1270 Architectural Works 50 16-Feb-17 06-Apr-17 A1260 A1310 Architectural Works
A1280 Electrical Works 308 17-Jun-16 20-Apr-17 A1220 A1290, A1320 Electrical Works
A1290 Mechanical Works 308 17-Jun-16 20-Apr-17 A1280 A1330 Mechanical Works
Second Level 364 17-Jun-16 15-Jun-17 15-Jun-17, Second Level
A1300 Structural Works 108 28-Feb-17 15-Jun-17 A1260 A1370 Structural Works
A1310 Architectural Works 50 16-Feb-17 06-Apr-17 A1270 A178370 Architectural Works
A1320 Electrical Works 308 17-Jun-16 20-Apr-17 A1280 A178380, A1330 Electrical Works
A1330 Mechanical Works 308 17-Jun-16 20-Apr-17 A1290, A1320 Mechanical Works
(Civil) Station 4 - Tandang Sora Station 294 17-Jun-16 06-Apr-17 06-Apr-17, (Civil) Station 4 - Tandang Sora Station
First Level 294 17-Jun-16 06-Apr-17 06-Apr-17, First Level
A1370 Structural Works 64 02-Feb-17 06-Apr-17 A1300 A1424 Structural Works
A178370 Architectural Works 50 08-Dec-16 26-Jan-17 A1310 A1425 Architectural Works
A178380 Electrical Works 238 17-Jun-16 09-Feb-17 A1320 A178390, A1430 Electrical Works
A178390 Mechanical Works 238 17-Jun-16 09-Feb-17 A178380 Mechanical Works
Second Level 294 17-Jun-16 06-Apr-17 06-Apr-17, Second Level
A1424 Structural Works 64 02-Feb-17 06-Apr-17 A1370 A1470 Structural Works
A1425 Architectural Works 50 08-Dec-16 26-Jan-17 A178370 A1480 Architectural Works
A1430 Electrical Works 238 17-Jun-16 09-Feb-17 A178380 A1440 Electrical Works
A1440 Mechanical Works 238 17-Jun-16 09-Feb-17 A1430 A1490 Mechanical Works
(Civil) Station 5 - Don Antonio Station 301 17-Jun-16 13-Apr-17 13-Apr-17, (Civil) Station 5 - Don Antonio Station
First Level 301 17-Jun-16 13-Apr-17 13-Apr-17, First Level
A1470 Structural Works 64 09-Feb-17 13-Apr-17 A1424 A1570 Structural Works
A1480 Architectural Works 81 27-Sep-16 16-Dec-16 A1425 A1580 Architectural Works
A1490 Electrical Works 245 17-Jun-16 16-Feb-17 A1440 A1500 Electrical Works
A1500 Mechanical Works 245 17-Jun-16 16-Feb-17 A1490 A1510 Mechanical Works
Second Level 245 17-Jun-16 16-Feb-17 16-Feb-17, Second Level
A1510 Structural Works 64 17-Jun-16 19-Aug-16 A1500 A1520 Structural Works
A1520 Architectural Works 81 17-Jun-16 05-Sep-16 A1510 A1530 Architectural Works
A1530 Electrical Works 245 17-Jun-16 16-Feb-17 A1520 A1540, A1590 Electrical Works
A1540 Mechanical Works 245 17-Jun-16 16-Feb-17 A1530 Mechanical Works
(Civil) Station 6 - Batasan Station 315 17-Jun-16 27-Apr-17 27-Apr-17, (Civil) Station 6 - Batasan Station
First Level 315 17-Jun-16 27-Apr-17 27-Apr-17, First Level
A1570 Structural Works 64 23-Feb-17 27-Apr-17 A1470 A1610 Structural Works
A1580 Architectural Works 136 27-Sep-16 09-Feb-17 A1480 A1620 Architectural Works
A1590 Electrical Works 252 17-Jun-16 23-Feb-17 A1530 A1600, A1630 Electrical Works
A1600 Mechanical Works 252 17-Jun-16 23-Feb-17 A1590 Mechanical Works

Date Revision Checked Approved


MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (6)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Second Level 315 17-Jun-16 27-Apr-17 27-Apr-17, Second Level
A1610 Structural Works 64 23-Feb-17 27-Apr-17 A1570 A1650 Structural Works
A1620 Architectural Works 136 27-Sep-16 09-Feb-17 A1580 A1660 Architectural Works
A1630 Electrical Works 252 17-Jun-16 23-Feb-17 A1590 A1640, A1670 Electrical Works
A1640 Mechanical Works 252 17-Jun-16 23-Feb-17 A1630 Mechanical Works
Third Level 315 17-Jun-16 27-Apr-17 27-Apr-17, Third Level
A1650 Structural Works 64 23-Feb-17 27-Apr-17 A1610 A1720 Structural Works
A1660 Architectural Works 136 27-Sep-16 09-Feb-17 A1620 A1730 Architectural Works
A1670 Electrical Works 252 17-Jun-16 23-Feb-17 A1630 A1680, A1740 Electrical Works
A1680 Mechanical Works 252 17-Jun-16 23-Feb-17 A1670 Mechanical Works
Cluster 3 344 17-Jun-16 26-May-17 26-May-17, Cluster 3
(Civil) Station 7 - Manggahan Station 315 17-Jun-16 27-Apr-17 27-Apr-17, (Civil) Station 7 - Manggahan Station
First Level 315 17-Jun-16 27-Apr-17 27-Apr-17, First Level
A1720 Structural Works 64 23-Feb-17 27-Apr-17 A1650 A1760 Structural Works
A1730 Architectural Works 91 18-Nov-16 16-Feb-17 A1660 A1770 Architectural Works
A1740 Electrical Works 259 17-Jun-16 02-Mar-17 A1670 A1750, A1780 Electrical Works
A1750 Mechanical Works 259 17-Jun-16 02-Mar-17 A1740 Mechanical Works
Second Level 315 17-Jun-16 27-Apr-17 27-Apr-17, Second Level
A1760 Structural Works 64 23-Feb-17 27-Apr-17 A1720 A1820 Structural Works
A1770 Architectural Works 91 18-Nov-16 16-Feb-17 A1730 A1830 Architectural Works
A1780 Electrical Works 259 17-Jun-16 02-Mar-17 A1740 A1790, A1840 Electrical Works
A1790 Mechanical Works 259 17-Jun-16 02-Mar-17 A1780 Mechanical Works
(Civil) Station 8 - Doña Carmen Station 322 17-Jun-16 04-May-17 04-May-17, (Civil) Station 8 - Doña Carmen Station
First Level 322 17-Jun-16 04-May-17 04-May-17, First Level
A1820 Structural Works 57 09-Mar-17 04-May-17 A1760 A1860 Structural Works
A1830 Architectural Works 98 18-Nov-16 23-Feb-17 A1770 A1870 Architectural Works
A1840 Electrical Works 266 17-Jun-16 09-Mar-17 A1780 A1850, A1880 Electrical Works
A1850 Mechanical Works 266 17-Jun-16 09-Mar-17 A1840 Mechanical Works
Second Level 322 17-Jun-16 04-May-17 04-May-17, Second Level
A1860 Structural Works 57 09-Mar-17 04-May-17 A1820 A1900 Structural Works
A1870 Architectural Works 98 18-Nov-16 23-Feb-17 A1830 A1910 Architectural Works
A1880 Electrical Works 266 17-Jun-16 09-Mar-17 A1840 A1890, A1920 Electrical Works
A1890 Mechanical Works 266 17-Jun-16 09-Mar-17 A1880 Mechanical Works
Third Level 322 17-Jun-16 04-May-17 04-May-17, Third Level
A1900 Structural Works 57 09-Mar-17 04-May-17 A1860 A1960 Structural Works
A1910 Architectural Works 98 18-Nov-16 23-Feb-17 A1870 A1970 Architectural Works
A1920 Electrical Works 266 17-Jun-16 09-Mar-17 A1880 A1930, A1980 Electrical Works
A1930 Mechanical Works 266 17-Jun-16 09-Mar-17 A1920 Mechanical Works
(Civil) Station 9 - Regalado Ave Station 336 17-Jun-16 18-May-17 18-May-17, (Civil) Station 9 - Regalado Ave Station
First Level 336 17-Jun-16 18-May-17 18-May-17, First Level
A1960 Structural Works 57 23-Mar-17 18-May-17 A1900 A178445 Structural Works
A1970 Architectural Works 112 18-Nov-16 09-Mar-17 A1910 A178450 Architectural Works
A1980 Electrical Works 280 17-Jun-16 23-Mar-17 A1920 A1990, A178460 Electrical Works
A1990 Mechanical Works 280 17-Jun-16 23-Mar-17 A1980 Mechanical Works
Second Level 335 17-Jun-16 17-May-17 17-May-17, Second Level
A178445 Structural Works 56 23-Mar-17 17-May-17 A1960 A178610 Structural Works
A178450 Architectural Works 112 18-Nov-16 09-Mar-17 A1970 A178620 Architectural Works
A178460 Electrical Works 280 17-Jun-16 23-Mar-17 A1980 A2030, A178630 Electrical Works
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (7)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
A2030 Mechanical Works 280 17-Jun-16 23-Mar-17 A178460 Mechanical Works
Third Level 336 17-Jun-16 18-May-17 18-May-17, Third Level
A178610 Structural Works 57 23-Mar-17 18-May-17 A178445 A2100 Structural Works
A178620 Architectural Works 112 18-Nov-16 09-Mar-17 A178450 A2110 Architectural Works
A178630 Electrical Works 280 17-Jun-16 23-Mar-17 A178460 A178640, A2120 Electrical Works
A178640 Mechanical Works 280 17-Jun-16 23-Mar-17 A178630 Mechanical Works
(Civil) Station 10 - Mindanao Ave Station 344 17-Jun-16 26-May-17 26-May-17, (Civil) Station 10 - Mindanao Ave Station
First Level 344 17-Jun-16 26-May-17 26-May-17, First Level
A2100 Structural Works 58 30-Mar-17 26-May-17 A178610 A2140 Structural Works
A2110 Architectural Works 108 11-Oct-16 26-Jan-17 A178620 A2150 Architectural Works
A2120 Electrical Works 238 17-Jun-16 09-Feb-17 A178630 A2130, A2160 Electrical Works
A2130 Mechanical Works 238 17-Jun-16 09-Feb-17 A2120 Mechanical Works
Second Level 344 17-Jun-16 26-May-17 26-May-17, Second Level
A2140 Structural Works 58 30-Mar-17 26-May-17 A2100 A2180 Structural Works
A2150 Architectural Works 108 11-Oct-16 26-Jan-17 A2110 A2190 Architectural Works
A2160 Electrical Works 238 17-Jun-16 09-Feb-17 A2120 A2170, A2200 Electrical Works
A2170 Mechanical Works 238 17-Jun-16 09-Feb-17 A2160 Mechanical Works
Third Level 344 17-Jun-16 26-May-17 26-May-17, Third Level
A2180 Structural Works 58 30-Mar-17 26-May-17 A2140 A2240 Structural Works
A2190 Architectural Works 108 11-Oct-16 26-Jan-17 A2150 A2250 Architectural Works
A2200 Electrical Works 238 17-Jun-16 09-Feb-17 A2160 A2210, A2260 Electrical Works
A2210 Mechanical Works 238 17-Jun-16 09-Feb-17 A2200 Mechanical Works
Cluster 4 385 17-Jun-16 06-Jul-17 06-Jul-17, Cluster 4
(Civil) Station 11 - Quirino Station 371 17-Jun-16 22-Jun-17 22-Jun-17, (Civil) Station 11 - Quirino Station
First Level 371 17-Jun-16 22-Jun-17 22-Jun-17, First Level
A2240 Structural Works 64 20-Apr-17 22-Jun-17 A2180 A178575 Structural Works
A2250 Architectural Works 51 23-Feb-17 14-Apr-17 A2190 A178580 Architectural Works
A2260 Electrical Works 315 17-Jun-16 27-Apr-17 A2200 A2270, A178590 Electrical Works
A2270 Mechanical Works 315 17-Jun-16 27-Apr-17 A2260 Mechanical Works
Second Level 371 17-Jun-16 22-Jun-17 22-Jun-17, Second Level
A178575 Structural Works 64 20-Apr-17 22-Jun-17 A2240 A2320 Structural Works
A178580 Architectural Works 50 23-Feb-17 13-Apr-17 A2250 A2330 Architectural Works
A178590 Electrical Works 315 17-Jun-16 27-Apr-17 A2260 A178600, A2340 Electrical Works
A178600 Mechanical Works 315 17-Jun-16 27-Apr-17 A178590 Mechanical Works
Third Level 371 17-Jun-16 22-Jun-17 22-Jun-17, Third Level
A2320 Structural Works 64 20-Apr-17 22-Jun-17 A178575 A2380 Structural Works
A2330 Architectural Works 50 23-Feb-17 13-Apr-17 A178580 A2390 Architectural Works
A2340 Electrical Works 315 17-Jun-16 27-Apr-17 A178590 A2350, A2400 Electrical Works
A2350 Mechanical Works 315 17-Jun-16 27-Apr-17 A2340 Mechanical Works
(Civil) Station 12 - Sacred Heart Station 378 17-Jun-16 29-Jun-17 29-Jun-17, (Civil) Station 12 - Sacred Heart Station
First Level 378 17-Jun-16 29-Jun-17 29-Jun-17, First Level
A2380 Structural Works 64 27-Apr-17 29-Jun-17 A2320 A2420 Structural Works
A2390 Architectural Works 52 28-Feb-17 20-Apr-17 A2330 A2430 Architectural Works
A2400 Electrical Works 308 17-Jun-16 20-Apr-17 A2340 A2410, A2445 Electrical Works
A2410 Mechanical Works 323 17-Jun-16 05-May-17 A2400 A2440 Mechanical Works
Second Level 378 17-Jun-16 29-Jun-17 29-Jun-17, Second Level
A2420 Structural Works 64 27-Apr-17 29-Jun-17 A2380 A2480 Structural Works
A2430 Architectural Works 52 28-Feb-17 20-Apr-17 A2390 A2490 Architectural Works
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (8)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
A2440 Electrical Works 308 17-Jun-16 20-Apr-17 A2410 A2445, A2500 Electrical Works
A2445 Mechanical Works 323 17-Jun-16 05-May-17 A2440, A2400 Mechanical Works
(Civil) Station 13 - Tala Station 385 17-Jun-16 06-Jul-17 06-Jul-17, (Civil) Station 13 - Tala Station
First Level 385 17-Jun-16 06-Jul-17 06-Jul-17, First Level
A2480 Structural Works 64 04-May-17 06-Jul-17 A2420 A2490, A2520 Structural Works
A2490 Architectural Works 50 09-Mar-17 27-Apr-17 A2480, A2430 A2530 Architectural Works
A2500 Electrical Works 315 17-Jun-16 27-Apr-17 A2440 A2510, A2540 Electrical Works
A2510 Mechanical Works 328 17-Jun-16 10-May-17 A2500 Mechanical Works
Second Level 385 17-Jun-16 06-Jul-17 06-Jul-17, Second Level
A2520 Structural Works 64 04-May-17 06-Jul-17 A2480 A178645 Structural Works
A2530 Architectural Works 50 09-Mar-17 27-Apr-17 A2490 A178650 Architectural Works
A2540 Electrical Works 315 17-Jun-16 27-Apr-17 A2500 A2550, A178660 Electrical Works
A2550 Mechanical Works 328 17-Jun-16 10-May-17 A2540 Mechanical Works
Third Level 385 17-Jun-16 06-Jul-17 06-Jul-17, Third Level
A178645 Structural Works 64 04-May-17 06-Jul-17 A2520 A2620 Structural Works
A178650 Architectural Works 50 09-Mar-17 27-Apr-17 A2530 A2630 Architectural Works
A178660 Electrical Works 315 17-Jun-16 27-Apr-17 A2540 A2590, A2640 Electrical Works
A2590 Mechanical Works 328 17-Jun-16 10-May-17 A178660 Mechanical Works
Cluster 5 392 17-Jun-16 13-Jul-17 13-Jul-17, Cluster 5
(Civil) Station 14 - San Jose Del Monte Station 392 17-Jun-16 13-Jul-17 13-Jul-17, (Civil) Station 14 - San Jose Del Monte Station
First Level 392 17-Jun-16 13-Jul-17 13-Jul-17, First Level
A2620 Structural Works 57 18-May-17 13-Jul-17 A178645 A2630, A2660 Structural Works
A2630 Architectural Works 57 16-Mar-17 11-May-17 A2620, A178650 A2670 Architectural Works
A2640 Electrical Works 343 17-Jun-16 25-May-17 A178660 A2650, A2680 Electrical Works
A2650 Mechanical Works 343 17-Jun-16 25-May-17 A2640 Mechanical Works
Second Level 392 17-Jun-16 13-Jul-17 13-Jul-17, Second Level
A2660 Structural Works 57 18-May-17 13-Jul-17 A2620 Structural Works
A2670 Architectural Works 57 16-Mar-17 11-May-17 A2630 Architectural Works
A2680 Electrical Works 343 17-Jun-16 25-May-17 A2640 A2690 Electrical Works
A2690 Mechanical Works 343 17-Jun-16 25-May-17 A2680 Mechanical Works
EQUIPMENT AND SYSTEM DESIGN STAGE 1154 18-Feb-16 17-Apr-19 17-Apr-19, EQUIPMENT AND SYSTEM
ROLLING STOCK 1096 18-Feb-16 17-Feb-19 17-Feb-19, ROLLING STOCK
DESIGN STAGE FOR ROLLING STOCK 1096 18-Feb-16 17-Feb-19 17-Feb-19, DESIGN STAGE FOR ROLLING STOCK
A5730 Design 330 18-Feb-16 12-Jan-17 A5735, A5770 Design
A5735 Preliminary Design 72 18-Feb-16 29-Apr-16 A5730 A5740 Preliminary Design
A5740 Approval of Preliminary Design 28 30-Apr-16 27-May-16 A5735 A5750 Approval of Preliminary Design
A5750 Detail Design 202 28-May-16 15-Dec-16 A5740 A5760 Detail Design
A5760 Approval of Detail Design 28 16-Dec-16 12-Jan-17 A5750 A11750, A5790 Approval of Detail Design
A5790 Spare & Tools for Train Maintenace (1 batch) 30 07-Jan-18 05-Feb-18 A5760 A5810 Spare & Tools for Train Maintenace (1 batch)
A5810 Spare & Tools for Train Maintenace (2 batch) 29 20-Jan-19 17-Feb-19 A5790 Spare & Tools for Train Maintenace (2 batch)
SYSTEM 1154 18-Feb-16 17-Apr-19 17-Apr-19, SYSTEM
DESIGN STAGE FOR SYSTEM 1154 18-Feb-16 17-Apr-19 17-Apr-19, DESIGN STAGE FOR SYSTEM
A5770 Design 395 18-Feb-16 18-Mar-17 A5730 A5770.01 Design
A5770.01 Civil Interface Input 304 18-Feb-16 17-Dec-16 A5770 A5770.02 Civil Interface Input
A5770.02 Civil Interface - Design Criteria and Preliminary Design
60 18-Feb-16 17-Apr-16 A5770.01 A5770.11 Civil Interface - Design Criteria and Preliminary Design
A5770.11 Civil Interface -final 184 17-Jun-16 17-Dec-16 A5770.02 A5770.12 Civil Interface -final
A5770.12 Design Criteria 0 19-Apr-16 A5770.11 A5770.13 Design Criteria
A5770.13 Approval of Design Criteria 27 19-Apr-16 16-May-16 A5770.12 A5770.21 Approval of Design Criteria
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (9)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
A5770.21 Preliminary Design 31 17-May-16 17-Jun-16 A5770.13 A5770.31, A6700, Preliminary Design
A13220, A13275
A5770.31 Approval of Preliminary Design 28 17-Jun-16 15-Jul-16 A5770.21 A5770.41 Approval of Preliminary Design
A5770.41 Detail Design/ Final Design 275 16-Jul-16 17-Apr-17 A5770.31 A5770.51, A5770.71 Detail Design/ Final Design
A5770.51 Approval of Detailed Design/ Final design 28 17-Apr-17 15-May-17 A5770.41 A5770.71 Approval of Detailed Design/ Final design
A5770.71 Detailed construction drawing 43 17-Apr-17 30-May-17 A5770.51, A5770.41 A5780 Detailed construction drawing
A5780 Approval of Detailed construction drawing 27 30-May-17 26-Jun-17 A5770.71 A6690 Approval of Detailed construction drawing
A6690 Spare, Tools for System Maintenance 59 17-Feb-19 17-Apr-19 A5780 Spare, Tools for System Maintenance
SYSTEM (MRT3) 804 17-May-16 30-Jul-18 30-Jul-18, SYSTEM (MRT3)
Signaling , AFC & PIS for MRT -3 LIne 804 17-May-16 30-Jul-18 30-Jul-18, Signaling , AFC & PIS for MRT -3 LIne
A6700 Preliminary Design 31 17-May-16 17-Jun-16 A5770.21 A6710 Preliminary Design
A6710 Detail Design / Final Design 275 16-Jul-16 17-Apr-17 A6700 A6720 Detail Design / Final Design
A6720 Detailed Construction Drawing 43 17-Apr-17 30-May-17 A6710 A6780 Detailed Construction Drawing
A6780 Procurement / Manufacturing 333 01-Feb-17 31-Dec-17 A6720 A6790, A6780.10 Procurement / Manufacturing
A6780.10 Delivery 150 01-Oct-17 28-Feb-18 A6780 A6790 Delivery
A6790 Installation 118 19-Jan-18 17-May-18 A6780, A6780.10 A6800 Installation
A6800 Subsystem Test 44 17-May-18 30-Jun-18 A6790 A6801 Subsystem Test
A6801 System Integration Test 14 01-Jul-18 15-Jul-18 A6800, A13270, A6811, A6810 System Integration Test
A13320
A6810 Training for O & M Personnel 6 24-Jul-18 30-Jul-18 A6801 Training for O & M Personnel
A6811 Commissioning Test 14 16-Jul-18 30-Jul-18 A6801 Commissioning Test
Catenary for MRT-3 Line 698 17-May-16 15-Apr-18 15-Apr-18, Catenary for MRT-3 Line
A13220 Preliminary Design 31 17-May-16 17-Jun-16 A5770.21 A13230 Preliminary Design
A13230 Detail Design / Final Design 275 16-Jul-16 17-Apr-17 A13220 A13240 Detail Design / Final Design
A13240 Detailed Construction Drawing 43 17-Apr-17 30-May-17 A13230 A13250 Detailed Construction Drawing
A13250 Procurement / Manufacturing 273 01-Feb-17 01-Nov-17 A13240 A13260, A13250.10 Procurement / Manufacturing
A13250.10 Delivery 123 01-Sep-17 02-Jan-18 A13250 A13260 Delivery
A13260 Installation 119 18-Nov-17 17-Mar-18 A13250, A13250.10 A13270 Installation
A13270 Subsystem Test 29 17-Mar-18 15-Apr-18 A13260 A6801 Subsystem Test
Trackwork for MRT-3 Line 640 17-May-16 16-Feb-18 16-Feb-18, Trackwork for MRT-3 Line
A13275 Preliminary Design 31 17-May-16 17-Jun-16 A5770.21 A13280 Preliminary Design
A13280 Detail Design / Final Design 275 16-Jul-16 17-Apr-17 A13275 A13290 Detail Design / Final Design
A13290 Detailed Construction Drawing 43 17-Apr-17 30-May-17 A13280 A13300 Detailed Construction Drawing
A13300 Procurement / Manufacturing 212 01-Feb-17 01-Sep-17 A13290 A13310, A13300.10 Procurement / Manufacturing
A13300.10 Delivery 121 01-Aug-17 30-Nov-17 A13300 A13310 Delivery
A13310 Installation 121 18-Sep-17 17-Jan-18 A13300, A13300.10 A13320 Installation
A13320 Subsystem Test 29 18-Jan-18 16-Feb-18 A13310 A6801 Subsystem Test
Construction Phase 1099 08-Dec-16 11-Dec-19 11-Dec-19, Cons

GUIDEWAY 884 08-Dec-16 10-May-19 10-May-19, GUIDEWAY


Relocation Of Utilities 56 08-Dec-16 01-Feb-17 01-Feb-17, Relocation Of Utilities
PLDT 56 08-Dec-16 01-Feb-17 01-Feb-17, PLDT
Phase1 of Work 21 08-Dec-16 28-Dec-16 28-Dec-16, Phase1 of Work
A69710 Cutting of Pavement 6 08-Dec-16 13-Dec-16 A69770 A69720 Cutting of Pavement
A69720 Breaking Of Pavement 9 08-Dec-16 16-Dec-16 A69710 A69730 Breaking Of Pavement
A69730 Excavation of Trench 12 08-Dec-16 19-Dec-16 A69720 A69740 Excavation of Trench
A69740 Chipping of Existing Underground conduits then Temporarily
18 hanging
11-Dec-16
and Swaying
28-Dec-16
of Existing
A69730UnderGround Cables
A69750 Chipping of Existing Underground conduits then Temporarily hanging and Swaying of Existing UnderGround Cables
A69750 Backfilling and Compaction 18 11-Dec-16 28-Dec-16 A69740 A69760 Backfilling and Compaction
A69760 Cleaning / Hauling of debris 18 11-Dec-16 28-Dec-16 A69750 Cleaning / Hauling of debris

Date Revision Checked Approved


MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (10)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
A69770 Mobilization / Demobilization 21 08-Dec-16 28-Dec-16 A1420.1 A69710, A69870, Mobilization / Demobilization
A9050
Phase2 of Work 35 29-Dec-16 01-Feb-17 01-Feb-17, Phase2 of Work
A69800 Cutting of Pavement 6 29-Dec-16 03-Jan-17 A69870 A69810 Cutting of Pavement
A69810 Breaking Of Pavement 15 29-Dec-16 12-Jan-17 A69800 A69820 Breaking Of Pavement
A69820 Excavation of Trench 12 29-Dec-16 09-Jan-17 A69810 A69830 Excavation of Trench
A69830 Pipelaying and concreting of with reinforcing bars for final
9 route
04-Jan-17
of underground
12-Jan-17
conduits A69820 A69840 Pipelaying and concreting of with reinforcing bars for final route of underground conduits
A69840 Backfilling and Compaction 21 29-Dec-16 18-Jan-17 A69830 A69850 Backfilling and Compaction
A69850 Restoration of affected concrete pavement (If needed)9 10-Jan-17 18-Jan-17 A69840 A69860 Restoration of affected concrete pavement (If needed)
A69860 Cleaning / Hauling of debris 30 29-Dec-16 27-Jan-17 A69850 Cleaning / Hauling of debris
A69870 Mobilization / Demobilization 35 29-Dec-16 01-Feb-17 A69770 A69800, A71845 Mobilization / Demobilization
CLUSTER 1 802 29-Jan-17 10-Apr-19 10-Apr-19, CLUSTER 1
630Station
CIVIL (STN 1-2) SM North Ave Station to Quezon Memorial Circle 29-Jan-17 20-Oct-18 20-Oct-18, CIVIL (STN 1-2) SM North Ave Station to Que
Test Pit 65 29-Jan-17 03-Apr-17 03-Apr-17, Test Pit
A71845 Setup of Barrier & Board Up 5 29-Jan-17 02-Feb-17 A69870 A71850, A90550 Setup of Barrier & Board Up
A71850 Initial Excavation 20 03-Feb-17 22-Feb-17 A71845 A71860 Initial Excavation
A71860 Cut/ Break existing slab 20 23-Feb-17 14-Mar-17 A71850 A71870 Cut/ Break existing slab
A71870 Excavation for Test fit 20 15-Mar-17 03-Apr-17 A71860 A35020, A92985, Excavation for Test fit
A93315
Elevated Guideway 457 05-Mar-17 04-Jun-18 04-Jun-18, Elevated Guideway
Earthworks 65 05-Mar-17 08-May-17 08-May-17, Earthworks
A35020 Setup of Barrier & Board Up 30 05-Mar-17 03-Apr-17 A71870 A35030, A35050 Setup of Barrier & Board Up
A35030 Clearing and Grubbing 30 10-Mar-17 08-Apr-17 A35020 A35040 Clearing and Grubbing
A35040 Removal of Street Lights 50 10-Mar-17 28-Apr-17 A35030 Removal of Street Lights
A35050 Removal of Existing Pavement, Sidewalks, Curbs, etc.50 07-Mar-17 25-Apr-17 A35020 A35060 Removal of Existing Pavement, Sidewalks, Curbs, etc.
A35060 Removal of Manholes 60 10-Mar-17 08-May-17 A35050 A35070 Removal of Manholes
Guideway Construction 392 09-May-17 04-Jun-18 04-Jun-18, Guideway Construction
100
Bore Pile 1 (sta. 0+00.00) to 50 (sta. 1+441.79), 2500 mm 11 mL 09-May-17 16-Aug-17 16-Aug-17, Bore Pile 1 (sta. 0+00.00) to 50 (sta. 1+441.79), 2500 mm 11 mL
Box Girder Fabrication 182 29-Jul-17 26-Jan-18 26-Jan-18, Box Girder Fabrication
Box Girder Launching 102 28-Oct-17 06-Feb-18 06-Feb-18, Box Girder Launching
Concrete Stich (Deck Slab) 175 20-Nov-17 13-May-18 13-May-18, Concrete Stich (Deck Slab)
Parapet Railings, Span 1 to 42 175 12-Dec-17 04-Jun-18 04-Jun-18, Parapet Railings, Span 1 to 42
Transition 153 21-May-18 20-Oct-18 20-Oct-18, Transition
Earthworks 93 21-May-18 21-Aug-18 21-Aug-18, Earthworks
A55430 Clearing & Grubbing 21 21-May-18 10-Jun-18 A38440 A55440, A55476 Clearing & Grubbing
A55440 Removal of Existing Pavement 21 11-Jun-18 01-Jul-18 A55430 A55450 Removal of Existing Pavement
A55450 Soil Grading 21 02-Jul-18 22-Jul-18 A55440 A55460 Soil Grading
A55460 Subgrade Preparation 15 23-Jul-18 06-Aug-18 A55450 A55470 Subgrade Preparation
A55470 Excavation 15 07-Aug-18 21-Aug-18 A55460 A55480 Excavation
Guideway Construction 112 01-Jul-18 20-Oct-18 20-Oct-18, Guideway Construction
A55476 Submit Plan / Design Documents for Abutment 27 01-Jul-18 27-Jul-18 A55430 A55478, A55486 Submit Plan / Design Documents for Abutment
A55478 Review Plan & Design for Abutment 21 28-Jul-18 17-Aug-18 A55476 Review Plan & Design for Abutment
A55480 Abutment 40 23-Jul-18 31-Aug-18 A55470 A55490 Abutment
A55486 Submit Plan / Design Documents for MSE Wall 27 01-Jul-18 27-Jul-18 A55476 A55488 Submit Plan / Design Documents for MSE Wall
A55488 Review Plan & Design for MSE Wall 21 28-Jul-18 17-Aug-18 A55486 Review Plan & Design for MSE Wall
A55490 MSE Wall 60 23-Jul-18 20-Sep-18 A55480 A55500 MSE Wall
A55500 Embankment 60 02-Aug-18 30-Sep-18 A55490 A55510 Embankment
A55510 Abutment 40 12-Aug-18 20-Sep-18 A55500 A55520 Abutment

Date Revision Checked Approved


MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (11)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
A55520 MSE Wall 60 12-Aug-18 10-Oct-18 A55510 A55530 MSE Wall
A55530 Embankment 60 22-Aug-18 20-Oct-18 A55520 Embankment
Depressed Guideway 620 29-Jan-17 10-Oct-18 10-Oct-18, Depressed Guideway
Earthworks 100 29-Jan-17 08-May-17 08-May-17, Earthworks
A92985 Setup of Barrier & Board Up 50 29-Jan-17 19-Mar-17 A71870 A93050, A92990, Setup of Barrier & Board Up
A1400
A92990 Clearing & Grubbing 60 29-Jan-17 29-Mar-17 A92985 A93000 Clearing & Grubbing
A93000 Removal of Existing Pavement 60 08-Feb-17 08-Apr-17 A92990 A93010 Removal of Existing Pavement
A93010 Soil Grading 80 08-Feb-17 28-Apr-17 A93000 A93020 Soil Grading
A93020 Subgrade Preparation 80 18-Feb-17 08-May-17 A93010 Subgrade Preparation
Guideway Construction 600 18-Feb-17 10-Oct-18 10-Oct-18, Guideway Construction
Open Cut 160 18-Feb-17 27-Jul-17 27-Jul-17, Open Cut
A93050 Diaphragm Wall 120 18-Feb-17 17-Jun-17 A92985 A93060 Diaphragm Wall
A93060 Excavation Stage 1 140 10-Mar-17 27-Jul-17 A93050 A93070 Excavation Stage 1
A93070 Waler / Showing Support1 130 20-Mar-17 27-Jul-17 A93060 A93080 Waler / Showing Support1
Tunnel 501 28-May-17 10-Oct-18 10-Oct-18, Tunnel
A93080 Excavation Stage2 120 28-May-17 24-Sep-17 A93070 A93090 Excavation Stage2
A93090 Waler / Showing Support2 130 17-Jun-17 24-Oct-17 A93080 A93100 Waler / Showing Support2
A93100 Excavation Final Stage 400 28-Jul-17 31-Aug-18 A93090 A93110 Excavation Final Stage
A93110 Tunnel, Bottom Slab 410 28-Jul-17 10-Sep-18 A93100 A93120 Tunnel, Bottom Slab
A93120 Tunnel , Wall 420 28-Jul-17 20-Sep-18 A93110 A93130 Tunnel , Wall
A93130 Tunnel, Top Slab 440 28-Jul-17 10-Oct-18 A93120 A93140 Tunnel, Top Slab
A93140 Waterproofing 239 14-Feb-18 10-Oct-18 A93130 A93150, A75970 Waterproofing
A93150 Backfill 210 15-Mar-18 10-Oct-18 A93140 Backfill
322 Station
SYSTEM (STN 1-2)SM North Ave Station to Quezon Memorial Circle 24-May-18 10-Apr-19 10-Apr-19, SYSTEM (STN 1-2)SM Nort
Trackwork 143 24-May-18 13-Oct-18 13-Oct-18, Trackwor k
A75970 Surveying 28 24-May-18 20-Jun-18 A93140 A75990, A75980, Surveying
A73250, A74830
A75980 Installstion of euroform & Assembly of reinforcing bars53 21-Jun-18 12-Aug-18 A75970 Installstion of euroform & Assembly of reinforcing bars
A75990 Rail welding(CWR) and setting CWR (Elevated) 20 21-Jun-18 10-Jul-18 A75970 A76000, A76070 Rail welding(CWR) and setting CWR (Elevated)
A76000 Assemly of Fastener (Elevated) 20 11-Jul-18 30-Jul-18 A75990 A76030 Assemly of Fastener (Elevated)
A76030 Rail grinding 20 31-Jul-18 19-Aug-18 A76000 A76040, A76080 Rail grinding
A76040 Buffer stop 20 20-Aug-18 08-Sep-18 A76030 A76050 Buffer stop
A76050 Sign post 20 09-Sep-18 28-Sep-18 A76040 A76060 Sign post
A76060 Individual Test 15 29-Sep-18 13-Oct-18 A76050 Individual Test
A76070 Turn out 13 11-Jul-18 23-Jul-18 A75990 Turn out
A76080 IRJ & Boding cable 30 05-Aug-18 03-Sep-18 A76030 IRJ & Boding cable
3rd Rail 150 23-Jul-18 19-Dec-18 19-Dec-18, 3rd Rail
A73250 Surveying 20 23-Jul-18 11-Aug-18 A75970 A73260 Surveying
A73260 Tray in buidling 15 14-Sep-18 28-Sep-18 A73250 A73270 Tray in buidling
A73270 Pre-assembly of insulator and claw 10 29-Sep-18 08-Oct-18 A73260 A73280 Pre-assembly of insulator and claw
A73280 Support 10 09-Oct-18 18-Oct-18 A73270 A73290 Support
A73290 Expansion joint 10 14-Oct-18 23-Oct-18 A73280 A73300 Expansion joint
A73300 Conductor bar 10 19-Oct-18 28-Oct-18 A73290 A73310 Conductor bar
A73310 Rail joint 10 26-Oct-18 04-Nov-18 A73300 A73320, A73360 Rail joint
A73320 Cable terminal 10 31-Oct-18 09-Nov-18 A73310 A73330 Cable terminal
A73330 Feeder Cable 10 10-Nov-18 19-Nov-18 A73320 A73350, A73360 Feeder Cable
A73340 Sign Post 10 20-Nov-18 29-Nov-18 A73360 Sign Post

Date Revision Checked Approved


MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (12)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
A73350 Individual Test 30 20-Nov-18 19-Dec-18 A73330 Individual Test
A73360 DS 8 12-Nov-18 19-Nov-18 A73310, A73330 A73340 DS
Wayside(Signal/Communication/Power) 242 12-Aug-18 10-Apr-19 10-Apr-19, Wayside(Signal/Communicat
A74830 Surveying 30 12-Aug-18 10-Sep-18 A75970 A74840 Surveying
A74840 Point Machine 40 11-Sep-18 20-Oct-18 A74830 A74850 Point Machine
A74850 Installation of tray 30 21-Oct-18 19-Nov-18 A74840 A74860 Installation of tray
A74860 Cable rack 10 20-Nov-18 29-Nov-18 A74850 A74870 Cable rack
A74870 Connection wih wayside equipment 20 30-Nov-18 19-Dec-18 A74860 A74880 Connection wih wayside equipment
A74880 Wayside Equipment 40 20-Dec-18 28-Jan-19 A74870 A74890 Wayside Equipment
A74890 Cabling 20 30-Dec-18 18-Jan-19 A74880 A74910, A74900 Cabling
A74900 Connection with Main equipment 32 19-Jan-19 19-Feb-19 A74890 A74920 Connection with Main equipment
A74910 Sign Post 15 14-Jan-19 28-Jan-19 A74890 A74920 Sign Post
A74920 Individual Test 50 20-Feb-19 10-Apr-19 A74900, A74910 A79680 Individual Test
CIVIL (CATENARY MRT-3) 309 04-Dec-17 08-Oct-18 08-Oct-18, CIVIL (CATENARY MRT-3)
Test Pit 170 04-Dec-17 22-May-18 22-May-18, Test Pit
A90550 Setup of Barrier & Board Up 60 04-Dec-17 01-Feb-18 A71845 A90560 Setup of Barrier & Board Up
A90560 Clearing and Grubbing 80 03-Jan-18 23-Mar-18 A90550 A90570 Clearing and Grubbing
A90570 Removal of Street Lights 80 03-Jan-18 23-Mar-18 A90560 A90580 Removal of Street Lights
A90580 Removal of Existing Pavement, Sidewalks, Curbs, etc.80 30-Jan-18 19-Apr-18 A90570 A90930, A90610 Removal of Existing Pavement, Sidewalks, Curbs, etc.
A90610 Removal of Manholes 90 22-Feb-18 22-May-18 A90580 Removal of Manholes
Elevated Guideway 244 07-Feb-18 08-Oct-18 08-Oct-18, Elevated Guideway
Earthworks 170 07-Feb-18 26-Jul-18 26-Jul-18, Earthworks
A90930 Setup of Barrier & Board Up 60 07-Feb-18 07-Apr-18 A90580 A90940 Setup of Barrier & Board Up
A90940 Clearing and Grubbing 80 09-Mar-18 27-May-18 A90930 A90950 Clearing and Grubbing
A90950 Removal of Street Lights 80 09-Mar-18 27-May-18 A90940 A90960 Removal of Street Lights
A90960 Removal of Existing Pavement, Sidewalks, Curbs, etc.80 05-Apr-18 23-Jun-18 A90950 A90970 Removal of Existing Pavement, Sidewalks, Curbs, etc.
A90970 Removal of Manholes 90 28-Apr-18 26-Jul-18 A90960 A90740 Removal of Manholes
Guideway Construction 74 27-Jul-18 08-Oct-18 08-Oct-18, Guideway Construction
Bore Pile CM1 to CM5, 2500 mm 11 mL 41 27-Jul-18 05-Sep-18 05-Sep-18, Bore Pile CM1 to CM5, 2500 mm 11 mL
Box Girder Fabrication 35 27-Jul-18 30-Aug-18 30-Aug-18, Box Girder Fabrication
Box Girder Launching 12 06-Sep-18 17-Sep-18 17-Sep-18, Box Girder Launching
Concrete Slab Stich (Deck Slab) 21 18-Sep-18 08-Oct-18 08-Oct-18, Concrete Slab Stich (Deck Slab)
Parapet Railings, Span 1 to 5 14 25-Sep-18 08-Oct-18 08-Oct-18, Parapet Railings, Span 1 to 5
SYSTEM ( CATENARY MRT-3) 277 05-Mar-18 06-Dec-18 06-Dec-18, SYSTEM ( CATENARY MRT-3)
Trackwork 150 05-Mar-18 01-Aug-18 01-Aug-18, Trackwork
A91140 Surveying 30 05-Mar-18 03-Apr-18 A90690 A91150, A91240, Surveying
A91020, A91260
A91150 Arrangement of sleeper (At grade) 20 04-Apr-18 23-Apr-18 A91140 A91160, A91230 Arrangement of sleeper (At grade)
A91160 Laying and tamping of ballast (At grade) 15 24-Apr-18 08-May-18 A91150 A91170 Laying and tamping of ballast (At grade)
A91170 Rail welding(CWR) and setting CWR (Elevated) 10 09-May-18 18-May-18 A91160 A91180 Rail welding(CWR) and setting CWR (Elevated)
A91180 Assemly of Fastener (Elevated) 10 19-May-18 28-May-18 A91170 A91200, A91190 Assemly of Fastener (Elevated)
A91190 Rail grinding 10 29-May-18 07-Jun-18 A91180 A91200, A91250 Rail grinding
A91200 Buffer stop 15 08-Jun-18 22-Jun-18 A91180, A91190 A91210 Buffer stop
A91210 Sign post 10 23-Jun-18 02-Jul-18 A91200 A91220 Sign post
A91220 Individual Test 30 03-Jul-18 01-Aug-18 A91210 Individual Test
A91230 Turn out 10 24-Apr-18 03-May-18 A91150 Turn out
A91240 Installstion of euroform & Assembly of reinforcing bars35 04-Apr-18 08-May-18 A91140 Installstion of euroform & Assembly of reinforcing bars
A91250 IRJ & Boding cable 20 03-Jun-18 22-Jun-18 A91190 IRJ & Boding cable

Date Revision Checked Approved


MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (13)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
3rd Rail 148 25-Mar-18 19-Aug-18 19-Aug-18, 3rd Rail
A91020 Surveying 30 25-Mar-18 23-Apr-18 A91140 A91030 Surveying
A91030 Tray in buidling 30 24-Apr-18 23-May-18 A91020 A91040 Tray in buidling
A91040 Pre-assembly of insulator and claw 10 24-May-18 02-Jun-18 A91030 A91050 Pre-assembly of insulator and claw
A91050 Support 10 03-Jun-18 12-Jun-18 A91040 A91060 Support
A91060 Expansion joint 10 08-Jun-18 17-Jun-18 A91050 A91070 Expansion joint
A91070 conductor bar 10 13-Jun-18 22-Jun-18 A91060 A91080 conductor bar
A91080 rail joint 10 20-Jun-18 29-Jun-18 A91070 A91090, A91130 rail joint
A91090 cable terminal 10 25-Jun-18 04-Jul-18 A91080 A91100 cable terminal
A91100 Feeder Cable 10 05-Jul-18 14-Jul-18 A91090 A91120, A91130 Feeder Cable
A91110 Sign Post 10 15-Jul-18 24-Jul-18 A91130 Sign Post
A91120 Individual Test 30 21-Jul-18 19-Aug-18 A91100 Individual Test
A91130 DS 5 10-Jul-18 14-Jul-18 A91080, A91100 A91110 DS
Wayside(Signal/Communication/Power) 177 13-Jun-18 06-Dec-18 06-Dec-18, Wayside(Signal/Communication/Power)
A91260 Surveying 30 13-Jun-18 12-Jul-18 A91140 A91270 Surveying
A91270 Point Machine 15 13-Jul-18 27-Jul-18 A91260 A91280 Point Machine
A91280 Installation of tray 10 02-Aug-18 11-Aug-18 A91270 A91290 Installation of tray
A91290 Cable rack 10 12-Aug-18 21-Aug-18 A91280 A91300 Cable rack
A91300 Connection wih wayside equipment 10 22-Aug-18 31-Aug-18 A91290 A91310 Connection wih wayside equipment
A91310 Wayside Equipment 30 01-Sep-18 30-Sep-18 A91300 A91320 Wayside Equipment
A91320 Cabling 20 11-Sep-18 30-Sep-18 A91310 A91340, A91330 Cabling
A91330 Connection with Main equipment 20 01-Oct-18 20-Oct-18 A91320 A91350 Connection with Main equipment
A91340 Sign Post 30 26-Sep-18 25-Oct-18 A91320 A91350 Sign Post
A91350 Individual Test 30 23-Oct-18 21-Nov-18 A91330, A91340 A91650, A91540 Individual Test
A91540 Training 6 01-Dec-18 06-Dec-18 A91350 Training
A91650 Commissioning test 14 22-Nov-18 05-Dec-18 A91350 Commissioning test
CLUSTER 2 855 06-Jan-17 10-May-19 10-May-19, CLUSTER 2
550
CIVIL (STN 2-3) Quezon Memorial Circle Station to University Avenue 20-May-17
Station 20-Nov-18 20-Nov-18, CIVIL (STN 2-3) Quezon Memorial Circle
Test Pit 65 20-May-17 23-Jul-17 23-Jul-17, Test Pit
A93315 Setup of Barrier & Board Up 5 20-May-17 24-May-17 A71870 A93320, A93155, Setup of Barrier & Board Up
A93505
A93320 Initial Excavation 20 25-May-17 13-Jun-17 A93315 A93330 Initial Excavation
A93330 Cut/ Break existing slab 20 14-Jun-17 03-Jul-17 A93320 A93340 Cut/ Break existing slab
A93340 Excavation for Test fit 20 04-Jul-17 23-Jul-17 A93330 Excavation for Test fit
Depressed Guideway 550 20-May-17 20-Nov-18 20-Nov-18, Depressed Guideway
Earthworks 100 20-May-17 27-Aug-17 27-Aug-17, Earthworks
A93155 Setup of Barrier & Board Up 50 20-May-17 08-Jul-17 A93315 A93210, A93160 Setup of Barrier & Board Up
A93160 Clearing & Grubbing 60 20-May-17 18-Jul-17 A93155 A93170 Clearing & Grubbing
A93170 Removal of Existing Pavement 60 30-May-17 28-Jul-17 A93160 A93180 Removal of Existing Pavement
A93180 Soil Grading 80 30-May-17 17-Aug-17 A93170 A93190 Soil Grading
A93190 Subgrade Preparation 80 09-Jun-17 27-Aug-17 A93180 Subgrade Preparation
Guideway Construction 530 09-Jun-17 20-Nov-18 20-Nov-18, Guideway Construction
Open Cut 380 09-Jun-17 23-Jun-18 23-Jun-18, Open Cut
A93210 Excavation Stage 350 09-Jun-17 24-May-18 A93155 A93220 Excavation Stage
A93220 Wall Trimming 350 19-Jun-17 03-Jun-18 A93210 A93230 Wall Trimming
A93230 Soil Nailing 350 09-Jul-17 23-Jun-18 A93220 A93240 Soil Nailing
Tunnel 480 29-Jul-17 20-Nov-18 20-Nov-18, Tunnel
A93240 Cement Jacketing 350 29-Jul-17 13-Jul-18 A93230 A93250 Cement Jacketing

Date Revision Checked Approved


MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (14)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
A93250 Subgrade 340 28-Aug-17 02-Aug-18 A93240 A93260 Subgrade
A93260 Lean Concrete 310 27-Sep-17 02-Aug-18 A93250 A93270 Lean Concrete
A93270 Tunnel, Bottom Slab 320 27-Sep-17 12-Aug-18 A93260 A93280 Tunnel, Bottom Slab
A93280 Tunnel , Wall 340 27-Sep-17 01-Sep-18 A93270 A93290 Tunnel , Wall
A93290 Tunnel, Top Slab 340 27-Oct-17 01-Oct-18 A93280 A93300 Tunnel, Top Slab
A93300 Waterproofing 245 12-Mar-18 11-Nov-18 A93290 A93310, A76090 Waterproofing
A93310 Backfill 210 25-Apr-18 20-Nov-18 A93300 Backfill
SYSTEM (STN 2-3)Quezon Memorial Circle Station to University284
Avenue10-Jun-18
Station 20-Mar-19 20-Mar-19, SYSTEM (STN 2-3)Quezon M
Trackwork 181 10-Jun-18 07-Dec-18 07-Dec-18, Trackwork
A76090 Surveying 30 10-Jun-18 09-Jul-18 A93300 A76100, A76130, Surveying
A73370, A74930
A76100 Installstion of euroform & Assembly of reinforcing bars30 10-Jul-18 08-Aug-18 A76090 Installstion of euroform & Assembly of reinforcing bars
A76130 Rail welding(CWR) and setting CWR 30 10-Jul-18 08-Aug-18 A76090 A76140, A76190 Rail welding(CWR) and setting CWR
A76140 Assemly of Fastener 20 09-Aug-18 28-Aug-18 A76130 A76160, A76150 Assemly of Fastener
A76150 Rail grinding 20 29-Aug-18 17-Sep-18 A76140 A76160, A76200, Rail grinding
A76170
A76160 Buffer stop 20 18-Sep-18 07-Oct-18 A76140, A76150 A76170 Buffer stop
A76170 Sign post 25 08-Oct-18 01-Nov-18 A76160, A76150 A76180 Sign post
A76180 Individual Test 30 08-Nov-18 07-Dec-18 A76170 Individual Test
A76190 Turn out 10 20-Jul-18 29-Jul-18 A76130 Turn out
A76200 IRJ & Boding cable 10 03-Sep-18 12-Sep-18 A76150 IRJ & Boding cable
3rd Rail 181 20-Jul-18 16-Jan-19 16-Jan-19, 3rd Rail
A73370 Surveying 30 20-Jul-18 18-Aug-18 A76090 A73380 Surveying
A73380 Tray in buidling 30 19-Aug-18 17-Sep-18 A73370 A73390 Tray in buidling
A73390 Pre-assembly of insulator and claw 30 18-Sep-18 17-Oct-18 A73380 A73400 Pre-assembly of insulator and claw
A73400 Support 20 18-Oct-18 06-Nov-18 A73390 A73410 Support
A73410 Expansion joint 20 07-Nov-18 26-Nov-18 A73400 A73420 Expansion joint
A73420 Conductor bar 20 12-Nov-18 01-Dec-18 A73410 A73430 Conductor bar
A73430 Rail joint 20 17-Nov-18 06-Dec-18 A73420 A73440, A73480 Rail joint
A73440 Cable terminal 15 22-Nov-18 06-Dec-18 A73430 A73450 Cable terminal
A73450 Feeder Cable 11 07-Dec-18 17-Dec-18 A73440 A73470, A73480 Feeder Cable
A73460 Sign Post 15 18-Dec-18 01-Jan-19 A73480 Sign Post
A73470 Individual Test 30 18-Dec-18 16-Jan-19 A73450 Individual Test
A73480 DS 5 13-Dec-18 17-Dec-18 A73430, A73450 A73460 DS
Wayside(Signal/Communication/Power) 184 18-Sep-18 20-Mar-19 20-Mar-19, Wayside(Signal/Communication/Power)
A74930 Surveying 30 18-Sep-18 17-Oct-18 A76090 A74940 Surveying
A74940 Conduit on the Track 20 18-Oct-18 06-Nov-18 A74930 A74950 Conduit on the Track
A74950 Installation of tray 20 18-Oct-18 06-Nov-18 A74940 A74960 Installation of tray
A74960 Cable rack 20 07-Nov-18 26-Nov-18 A74950 A74970 Cable rack
A74970 Connection wih wayside equipment 20 27-Nov-18 16-Dec-18 A74960 A74980 Connection wih wayside equipment
A74980 Wayside Equipment 25 17-Dec-18 10-Jan-19 A74970 A74990 Wayside Equipment
A74990 Cabling 25 27-Dec-18 20-Jan-19 A74980 A75010, A75000 Cabling
A75000 Connection with Main equipment 25 25-Jan-19 18-Feb-19 A74990 A75020 Connection with Main equipment
A75010 Sign Post 20 11-Jan-19 30-Jan-19 A74990 A75020 Sign Post
A75020 Individual Test 30 19-Feb-19 20-Mar-19 A75000, A75010 A79680 Individual Test
650
CIVIL (STN 3-4) University Avenue Station to Tandang Sora Station 29-Mar-17 07-Jan-19 07-Jan-19, CIVIL (STN 3-4) University Avenue S
Test Pit 65 29-Mar-17 01-Jun-17 01-Jun-17, Test Pit
A93505 Setup of Barrier & Board Up 5 29-Mar-17 02-Apr-17 A93315 A93510, A93345 Setup of Barrier & Board Up
A93510 Initial Excavation 20 03-Apr-17 22-Apr-17 A93505 A93520 Initial Excavation
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (15)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
A93520 Cut/ Break existing slab 20 23-Apr-17 12-May-17 A93510 A93530 Cut/ Break existing slab
A93530 Excavation for Test fit 20 13-May-17 01-Jun-17 A93520 Excavation for Test fit
Depressed Guideway 650 29-Mar-17 07-Jan-19 07-Jan-19, Depressed Guideway
Earthworks 100 29-Mar-17 06-Jul-17 06-Jul-17, Earthworks
A93345 Setup of Barrier & Board Up 50 29-Mar-17 17-May-17 A93505 A93400, A93350, Setup of Barrier & Board Up
A177135
A93350 Clearing & Grubbing 60 29-Mar-17 27-May-17 A93345 A93360 Clearing & Grubbing
A93360 Removal of Existing Pavement 60 08-Apr-17 06-Jun-17 A93350 A93370 Removal of Existing Pavement
A93370 Soil Grading 80 08-Apr-17 26-Jun-17 A93360 A93380 Soil Grading
A93380 Subgrade Preparation 80 18-Apr-17 06-Jul-17 A93370 Subgrade Preparation
Guideway Construction 640 08-Apr-17 07-Jan-19 07-Jan-19, Guideway Construction
Open Cut 220 08-Apr-17 13-Nov-17 13-Nov-17, Open Cut
A93400 Diaphragm Wall 200 08-Apr-17 24-Oct-17 A93345 A93410 Diaphragm Wall
A93410 Excavation Stage 1 210 18-Apr-17 13-Nov-17 A93400 A93420 Excavation Stage 1
A93420 Waler / Showing Support1 210 18-Apr-17 13-Nov-17 A93410 A93430 Waler / Showing Support1
Tunnel 540 17-Jul-17 07-Jan-19 07-Jan-19, Tunnel
A93430 Excavation Stage2 420 17-Jul-17 09-Sep-18 A93420 A93440 Excavation Stage2
A93440 Waler / Showing Support2 420 06-Aug-17 29-Sep-18 A93430 A93450 Waler / Showing Support2
A93450 Excavation Final Stage 420 15-Sep-17 08-Nov-18 A93440 A93460 Excavation Final Stage
A93460 Tunnel, Bottom Slab 430 15-Sep-17 18-Nov-18 A93450 A93470 Tunnel, Bottom Slab
A93470 Tunnel , Wall 440 15-Sep-17 28-Nov-18 A93460 A93480 Tunnel , Wall
A93480 Tunnel, Top Slab 450 15-Sep-17 08-Dec-18 A93470 A93490 Tunnel, Top Slab
A93490 Waterproofing 265 28-Mar-18 17-Dec-18 A93480 A93500, A76810 Waterproofing
A93500 Backfill 230 23-May-18 07-Jan-19 A93490 Backfill
At Grade Guideway 430 28-May-17 31-Jul-18 31-Jul-18, At Grade Guideway
Earthworks 120 28-May-17 24-Sep-17 24-Sep-17, Earthworks
A177135 Setup of Barrier & Board Up 20 28-May-17 16-Jun-17 A93345 A177140, A1390 Setup of Barrier & Board Up
A177140 Clearing & Grubbing 50 07-Jun-17 26-Jul-17 A177135 A177150 Clearing & Grubbing
A177150 Excavation 50 27-Jun-17 15-Aug-17 A177140 A177160 Excavation
A177160 Backfill 50 17-Jul-17 04-Sep-17 A177150 A177170 Backfill
A177170 Subgrade Preparation 40 06-Aug-17 14-Sep-17 A177160 A177180 Subgrade Preparation
A177180 Removal of Existing Pavement 40 16-Aug-17 24-Sep-17 A177170 A177210 Removal of Existing Pavement
At Grade Construction 340 26-Aug-17 31-Jul-18 31-Jul-18, At Grade Construction
BOTTOM SLAB 182 26-Aug-17 23-Feb-18 23-Feb-18, BOTTOM SLAB
WALL 188 27-Sep-17 02-Apr-18 02-Apr-18, WALL
STRUCTURE BACKFILL 173 04-Nov-17 25-Apr-18 25-Apr-18, STRUCTURE BACKFILL
RETAINING WALL 150 04-Mar-18 31-Jul-18 31-Jul-18, RETAINING WALL
SYSTEM (STN 3-4)University Avenue Station to Tandang Sora 264
Station 15-Jun-18 05-Mar-19 05-Mar-19, SYSTEM (STN 3-4)University A
Trackwork 191 15-Jun-18 22-Dec-18 22-Dec-18, Trackwork
A76810 Surveying 30 15-Jun-18 14-Jul-18 A93490 A76820, A76850, Surveying
A74090, A75530
A76820 Installstion of euroform & Assembly of reinforcing bars50 25-Jul-18 12-Sep-18 A76810 Installstion of euroform & Assembly of reinforcing bars
A76850 Rail welding(CWR) and setting CWR 40 15-Jul-18 23-Aug-18 A76810 A76860 Rail welding(CWR) and setting CWR
A76860 Assemly of Fastener 35 24-Aug-18 27-Sep-18 A76850 A76880, A76870 Assemly of Fastener
A76870 Rail grinding 20 28-Sep-18 17-Oct-18 A76860 A76880, A76920 Rail grinding
A76880 Buffer stop 10 18-Oct-18 27-Oct-18 A76860, A76870 A76890 Buffer stop
A76890 Sign post 10 28-Oct-18 06-Nov-18 A76880 A76900 Sign post
A76900 Individual Test 40 13-Nov-18 22-Dec-18 A76890 Individual Test

Date Revision Checked Approved


MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (16)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
A76920 IRJ & Boding cable 20 28-Sep-18 17-Oct-18 A76870 IRJ & Boding cable
3rd Rail 181 14-Aug-18 10-Feb-19 10-Feb-19, 3rd Rail
A74090 Surveying 30 14-Aug-18 12-Sep-18 A76810 A74100 Surveying
A74100 Tray in buidling 30 23-Sep-18 22-Oct-18 A74090 A74110 Tray in buidling
A74110 Pre-assembly of insulator and claw 20 07-Nov-18 26-Nov-18 A74100 A74120 Pre-assembly of insulator and claw
A74120 Support 20 27-Nov-18 16-Dec-18 A74110 A74130 Support
A74130 Expansion joint 11 12-Dec-18 22-Dec-18 A74120 A74140 Expansion joint
A74140 Conductor bar 11 17-Dec-18 27-Dec-18 A74130 A74150 Conductor bar
A74150 Rail joint 11 24-Dec-18 03-Jan-19 A74140 A74160, A74200 Rail joint
A74160 Cable terminal 5 29-Dec-18 02-Jan-19 A74150 A74170 Cable terminal
A74170 Feeder Cable 10 03-Jan-19 12-Jan-19 A74160 A74190, A74200 Feeder Cable
A74180 Sign Post 15 14-Jan-19 28-Jan-19 A74200 Sign Post
A74190 Individual Test 30 12-Jan-19 10-Feb-19 A74170 Individual Test
A74200 DS 5 09-Jan-19 13-Jan-19 A74150, A74170 A74180 DS
Wayside(Signal/Communication/Power) 184 03-Sep-18 05-Mar-19 05-Mar-19, Wayside(Signal/Communication/Power)
A75530 Surveying 30 03-Sep-18 02-Oct-18 A76810 A75540, A75541 Surveying
A75540 Point Machine 15 28-Oct-18 11-Nov-18 A75530 Point Machine
A75541 Conduit on the track 79 03-Oct-18 20-Dec-18 A75530 A75580, A75550 Conduit on the track
A75550 Installation of tray 10 03-Oct-18 12-Oct-18 A75541 A75560 Installation of tray
A75560 Cable rack 10 13-Oct-18 22-Oct-18 A75550 A75570 Cable rack
A75570 Connection wih wayside equipment 10 23-Oct-18 01-Nov-18 A75560 Connection wih wayside equipment
A75580 Wayside Equipment 45 23-Oct-18 06-Dec-18 A75541 A75590 Wayside Equipment
A75590 Cabling 20 17-Dec-18 05-Jan-19 A75580 A75610, A75600 Cabling
A75600 Connection with Main equipment 30 04-Jan-19 02-Feb-19 A75590 A75620 Connection with Main equipment
A75610 Sign Post 15 11-Jan-19 25-Jan-19 A75590 A75620 Sign Post
A75620 Individual Test 30 04-Feb-19 05-Mar-19 A75600, A75610 A79680 Individual Test
CIVIL (STN 4-5) Tandang Sora Station to Don Antonio Station 642 06-Jan-17 09-Oct-18 09-Oct-18, CIVIL (STN 4-5) Tandang Sora Station to Don
Test Pit 123 06-Jan-17 08-May-17 08-May-17, Test Pit
A72090 Setup of Barrier & Board Up 30 06-Jan-17 04-Feb-17 A1420.11 A72100, A69690 Setup of Barrier & Board Up
A72100 Initial Excavation 60 06-Jan-17 06-Mar-17 A72090 A72110, A91770 Initial Excavation
A72110 Cut/ Break existing slab 60 05-Feb-17 05-Apr-17 A72100 A72190 Cut/ Break existing slab
A72190 Excavation for Test fit 60 10-Mar-17 08-May-17 A72110 A55760 Excavation for Test fit
Elevated Guideway 299 09-May-17 03-Mar-18 03-Mar-18, Elevated Guideway
Earthworks 160 09-May-17 15-Oct-17 15-Oct-17, Earthworks
A55760 Setup of Barrier & Board Up 80 09-May-17 27-Jul-17 A72190 A55770, A177315 Setup of Barrier & Board Up
A55770 Clearing and Grubbing 80 29-May-17 16-Aug-17 A55760 A55780 Clearing and Grubbing
A55780 Removal of Street Lights 80 29-May-17 16-Aug-17 A55770 A55790 Removal of Street Lights
A55790 Removal of Existing Pavement, Sidewalks, Curbs, etc.80 25-Jun-17 12-Sep-17 A55780 A55800 Removal of Existing Pavement, Sidewalks, Curbs, etc.
A55800 Removal of Manholes 80 28-Jul-17 15-Oct-17 A55790 A55810, A91770 Removal of Manholes
Tandang Sora Retrofitting 97 16-Oct-17 20-Jan-18 20-Jan-18, Tandang Sora Retrofitting
A91770 Board Up Protection of Existing 50 16-Oct-17 04-Dec-17 A72100, A55800 A91780 Board Up Protection of Existing
A91780 Retrofitting 50 09-Nov-17 28-Dec-17 A91770 A91790 Retrofitting
A91790 Restoration 50 02-Dec-17 20-Jan-18 A91780 Restoration
Guideway Construction 139 16-Oct-17 03-Mar-18 03-Mar-18, Guideway Construction
Bore Pile 51 (sta. 4+569.88) to 55 (sta. 4+687.88), 2500 mm 1173
mL 16-Oct-17 27-Dec-17 27-Dec-17, Bore Pile 51 (sta. 4+569.88) to 55 (sta. 4+687.88), 2500 mm 11 mL
Box Girder Fabrication 44 29-Nov-17 11-Jan-18 11-Jan-18, Box Girder Fabrication
Box Girder Launching 30 07-Jan-18 05-Feb-18 05-Feb-18, Box Girder Launching
Concrete Stich (Deck Slab) 35 13-Jan-18 16-Feb-18 16-Feb-18, Concrete Stich (Deck Slab)
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (17)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Parapet Railings, Span 1 to 5 35 28-Jan-18 03-Mar-18 03-Mar-18, Parapet Railings, Span 1 to 5
Transition Elevated 206 31-Jan-18 24-Aug-18 24-Aug-18, Transition Elevated
Earthworks 84 31-Jan-18 24-Apr-18 24-Apr-18, Earthworks
A55650 Setup of Barrier & Board Up 21 31-Jan-18 20-Feb-18 A57370 A55655 Setup of Barrier & Board Up
A55655 Clearing & Grubbing1 21 16-Feb-18 08-Mar-18 A55650 A55660 Clearing & Grubbing1
A55660 Removal of Existing Pavement 21 22-Feb-18 14-Mar-18 A55655 A55670 Removal of Existing Pavement
A55670 Soil Grading 21 05-Mar-18 25-Mar-18 A55660 A55680 Soil Grading
A55680 Subgrade Preparation 15 26-Mar-18 09-Apr-18 A55670 A55690 Subgrade Preparation
A55690 Excavation 15 10-Apr-18 24-Apr-18 A55680 A55700 Excavation
Guideway Construction 152 26-Mar-18 24-Aug-18 24-Aug-18, Guideway Construction
A55700 Abutment 60 26-Mar-18 24-May-18 A55690 A55710 Abutment
A55710 MSE Wall 60 11-May-18 09-Jul-18 A55700 A55720 MSE Wall
A55720 Embankment 60 26-Jun-18 24-Aug-18 A55710 Embankment
At Grade Guideway 500 28-May-17 09-Oct-18 09-Oct-18, At Grade Guideway
Earthworks 114 28-May-17 18-Sep-17 18-Sep-17, Earthworks
A177315 Setup of Barrier & Board Up 7 28-May-17 03-Jun-17 A55760 A177320, A177380, Setup of Barrier & Board Up
A1390
A177320 Clearing & Grubbing 21 18-Jun-17 08-Jul-17 A177315 A177330 Clearing & Grubbing
A177330 Excavation 21 09-Jul-17 29-Jul-17 A177320 A177340 Excavation
A177340 Backfill 21 30-Jul-17 19-Aug-17 A177330 A177350 Backfill
A177350 Subgrade Preparation 15 20-Aug-17 03-Sep-17 A177340 A177360 Subgrade Preparation
A177360 Removal of Existing Pavement 15 04-Sep-17 18-Sep-17 A177350 Removal of Existing Pavement
At Grade Construction 500 28-May-17 09-Oct-18 09-Oct-18, At Grade Construction
BOTTOM SLAB 383 28-May-17 14-Jun-18 14-Jun-18, BOTTOM SLAB
WALL 445 11-Jun-17 29-Aug-18 29-Aug-18, WALL
STRUCTURE BACKFILL 437 03-Jul-17 12-Sep-18 12-Sep-18, STRUCTURE BACKFILL
RETAINING WALL 307 07-Dec-17 09-Oct-18 09-Oct-18, RETAINING WALL
356
SYSTEM (STN 4-5)Tandang Sora Station to Don Antonio Station 20-May-18 10-May-19 10-May-19, SYSTEM (STN 4-5)Tand
Trackwork 212 20-May-18 17-Dec-18 17-Dec-18, Trackwork
A76930 Surveying 30 20-May-18 18-Jun-18 A177490 A76950, A76940, Surveying
A74210, A75630
A76940 Installstion of euroform & Assembly of reinforcing bars80 19-Jun-18 06-Sep-18 A76930 Installstion of euroform & Assembly of reinforcing bars
A76950 Rail welding(CWR) and setting CWR (Elevated) 10 19-Jun-18 28-Jun-18 A76930 A76960 Rail welding(CWR) and setting CWR (Elevated)
A76960 Assemly of Fastener (Elevated) 10 29-Jun-18 08-Jul-18 A76950 A76970 Assemly of Fastener (Elevated)
A76970 Arrangement of sleeper (At grade) 37 09-Jul-18 14-Aug-18 A76960 A76980 Arrangement of sleeper (At grade)
A76980 Laying and tamping of ballast (At grade) 37 15-Aug-18 20-Sep-18 A76970 A77000, A76990 Laying and tamping of ballast (At grade)
A76990 Rail grinding 10 21-Sep-18 30-Sep-18 A76980 A77000, A77040 Rail grinding
A77000 Buffer stop 15 01-Oct-18 15-Oct-18 A76980, A76990 A77010 Buffer stop
A77010 Sign post 15 16-Oct-18 30-Oct-18 A77000 A77020 Sign post
A77020 Individual Test 30 18-Nov-18 17-Dec-18 A77010 Individual Test
A77040 IRJ & Boding cable 20 11-Sep-18 30-Sep-18 A76990 IRJ & Boding cable
3rd Rail 211 16-Jul-18 11-Feb-19 11-Feb-19, 3rd Rail
A74210 Surveying 30 16-Jul-18 14-Aug-18 A76930 A74220 Surveying
A74220 Tray in buidling 40 25-Aug-18 03-Oct-18 A74210 A74230 Tray in buidling
A74230 Pre-assembly of insulator and claw 20 04-Sep-18 23-Sep-18 A74220 A74240, A74250 Pre-assembly of insulator and claw
A74240 Support 30 29-Sep-18 28-Oct-18 A74230 Support
A74250 Expansion joint 30 12-Sep-18 11-Oct-18 A74230 A74260 Expansion joint
A74260 Conductor bar 30 17-Sep-18 16-Oct-18 A74250 A74270 Conductor bar

Date Revision Checked Approved


MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (18)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
A74270 Rail joint 30 24-Sep-18 23-Oct-18 A74260 A74280, A74320 Rail joint
A74280 Cable terminal 20 29-Sep-18 18-Oct-18 A74270 A74290 Cable terminal
A74290 Connecting between CT and HSCB 40 29-Oct-18 07-Dec-18 A74280 A74310, A74320 Connecting between CT and HSCB
A74300 Sign Post 30 08-Dec-18 06-Jan-19 A74320 Sign Post
A74310 Individual Test 40 03-Jan-19 11-Feb-19 A74290 Individual Test
A74320 DS 10 28-Nov-18 07-Dec-18 A74270, A74290 A74300 DS
Wayside(Signal/Communication/Power) 270 14-Aug-18 10-May-19 10-May-19, Wayside(Signal/Commun
A75630 Surveying 30 14-Aug-18 12-Sep-18 A76930 A75640 Surveying
A75640 Conduit on the track 50 13-Sep-18 01-Nov-18 A75630 A75650, A75680 Conduit on the track
A75650 Installation of tray 40 03-Oct-18 11-Nov-18 A75640 A75660 Installation of tray
A75660 Cable rack 40 12-Nov-18 21-Dec-18 A75650 A75670 Cable rack
A75670 Connection wih wayside equipment 20 22-Dec-18 10-Jan-19 A75660 Connection wih wayside equipment
A75680 Wayside Equipment 70 12-Dec-18 19-Feb-19 A75640 A75690 Wayside Equipment
A75690 Cabling 40 12-Dec-18 20-Jan-19 A75680 A75710, A75700 Cabling
A75700 Connection with Main equipment 60 21-Jan-19 21-Mar-19 A75690 A75720 Connection with Main equipment
A75710 Sign Post 20 27-Dec-18 15-Jan-19 A75690 A75720 Sign Post
A75720 Individual Test 50 22-Mar-19 10-May-19 A75700, A75710 A79680 Individual Test
622
CIVIL (STN 5-6) Don Antonio Station to Batasan Station Guideway 06-Jan-17 19-Sep-18 19-Sep-18, CIVIL (STN 5-6) Don Antonio Station to Batasan
Utilities Relocation 7 06-Jan-17 12-Jan-17 12-Jan-17, Utilities Relocation
A69690 Utilities and Relocation 7 06-Jan-17 12-Jan-17 A72090 A71760, A69880 Utilities and Relocation
Test Pit 127 06-Jan-17 12-May-17 12-May-17, Test Pit
A71760 Setup of Barrier & Board Up 30 06-Jan-17 04-Feb-17 A69690 A71770 Setup of Barrier & Board Up
A71770 Initial Excavation 50 16-Jan-17 06-Mar-17 A71760 A71780 Initial Excavation
A71780 Cut/ Break existing slab 52 15-Feb-17 07-Apr-17 A71770 A71800 Cut/ Break existing slab
A71800 Excavation for Test fit 55 19-Mar-17 12-May-17 A71780 A89320 Excavation for Test fit
Elevated Guideway 295 13-May-17 03-Mar-18 03-Mar-18, Elevated Guideway
Earthworks 161 13-May-17 20-Oct-17 20-Oct-17, Earthworks
A89320 Setup of Barrier & Board Up 50 13-May-17 01-Jul-17 A71800 A89330 Setup of Barrier & Board Up
A89330 Clearing and Grubbing 60 02-Jun-17 31-Jul-17 A89320 A89340 Clearing and Grubbing
A89340 Removal of Street Lights 80 02-Jun-17 20-Aug-17 A89330 A89350 Removal of Street Lights
A89350 Removal of Existing Pavement, Sidewalks, Curbs, etc.80 05-Jul-17 22-Sep-17 A89340 A89360 Removal of Existing Pavement, Sidewalks, Curbs, etc.
A89360 Removal of Manholes 80 02-Aug-17 20-Oct-17 A89350 A1050, A177499 Removal of Manholes
Guideway Construction 134 21-Oct-17 03-Mar-18 03-Mar-18, Guideway Construction
Bore Pile 56 (sta.7+580.55) to 58 (sta.7+638.13), 2500 mm 11 39
mL 21-Oct-17 28-Nov-17 28-Nov-17, Bore Pile 56 (sta.7+580.55) to 58 (sta.7+638.13), 2500 mm 11 mL
Box Girder Fabrication 62 29-Nov-17 29-Jan-18 29-Jan-18, Box Girder Fabrication
Box Girder Launching 18 30-Jan-18 16-Feb-18 16-Feb-18, Box Girder Launching
Concrete Stich (Deck Slab) 14 11-Feb-18 24-Feb-18 24-Feb-18, Concrete Stich (Deck Slab)
Parapet Railings, Span 1 to 3 14 18-Feb-18 03-Mar-18 03-Mar-18, Parapet Railings, Span 1 to 3
Transition to Elevated 224 29-Nov-17 10-Jul-18 10-Jul-18, Transition to Elevated
Earthworks 84 29-Nov-17 20-Feb-18 20-Feb-18, Earthworks
A58489 Setup of Barrier & Board Up 21 29-Nov-17 19-Dec-17 A89420 A58490 Setup of Barrier & Board Up
A58490 Clearing & Grubbing 21 15-Dec-17 04-Jan-18 A58489 A58500 Clearing & Grubbing
A58500 Removal of Existing Pavement 21 21-Dec-17 10-Jan-18 A58490 A58510 Removal of Existing Pavement
A58510 Soil Grading 21 01-Jan-18 21-Jan-18 A58500 A58520 Soil Grading
A58520 Subgrade Preparation 15 22-Jan-18 05-Feb-18 A58510 A58530 Subgrade Preparation
A58530 Excavation 15 06-Feb-18 20-Feb-18 A58520 A58540 Excavation
Guideway Construction 160 01-Feb-18 10-Jul-18 10-Jul-18, Guideway Construction
A58540 Abutment 80 01-Feb-18 21-Apr-18 A58530 A58550 Abutment
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (19)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
A58550 MSE Wall 80 13-Mar-18 31-May-18 A58540 A58560 MSE Wall
A58560 Embankment 80 22-Apr-18 10-Jul-18 A58550 Embankment
At Grade Guideway 480 28-May-17 19-Sep-18 19-Sep-18, At Grade Guideway
Earthworks 120 28-May-17 24-Sep-17 24-Sep-17, Earthworks
A177499 Setup of Barrier & Board Up 20 28-May-17 16-Jun-17 A89360 A177500, A1390 Setup of Barrier & Board Up
A177500 Clearing & Grubbing 50 07-Jun-17 26-Jul-17 A177499 A177510 Clearing & Grubbing
A177510 Excavation 50 27-Jun-17 15-Aug-17 A177500 A177520 Excavation
A177520 Backfill 50 17-Jul-17 04-Sep-17 A177510 A177530 Backfill
A177530 Subgrade Preparation 40 06-Aug-17 14-Sep-17 A177520 A177540 Subgrade Preparation
A177540 Removal of Existing Pavement 40 16-Aug-17 24-Sep-17 A177530 A177560 Removal of Existing Pavement
At Grade Construction 395 21-Aug-17 19-Sep-18 19-Sep-18, At Grade Construction
BOTTOM SLAB 273 21-Aug-17 20-May-18 20-May-18, BOTTOM SLAB
WALL 355 04-Sep-17 24-Aug-18 24-Aug-18, WALL
STRUCTURE BACKFILL 357 26-Sep-17 17-Sep-18 17-Sep-18, STRUCTURE BACKFILL
RETAINING WALL 250 13-Jan-18 19-Sep-18 19-Sep-18, RETAINING WALL
340
SYSTEM (STN 5-6)Don Antonio Station to Batasan Station Guideway 17-May-18 21-Apr-19 21-Apr-19, SYSTEM (STN 5-6)Don An
Trackwork 212 17-May-18 14-Dec-18 14-Dec-18, Trackwork
A72770 Surveying 30 17-May-18 15-Jun-18 A177670 A72790, A72780, Surveying
A72890, A74530
A72780 Installstion of euroform & Assembly of reinforcing bars80 06-Jul-18 23-Sep-18 A72770 Installstion of euroform & Assembly of reinforcing bars
A72790 Arrangement of sleeper (At grade) 15 16-Jun-18 30-Jun-18 A72770 A72800, A72870 Arrangement of sleeper (At grade)
A72800 Laying and tamping of ballast (At grade) 15 06-Jul-18 20-Jul-18 A72790 A72810 Laying and tamping of ballast (At grade)
A72810 Rail welding(CWR) and setting CWR (Elevated) 15 26-Jul-18 09-Aug-18 A72800 A72820 Rail welding(CWR) and setting CWR (Elevated)
A72820 Assemly of Fastener (Elevated) 15 10-Aug-18 24-Aug-18 A72810 A72840, A72830 Assemly of Fastener (Elevated)
A72830 Rail grinding 30 25-Aug-18 23-Sep-18 A72820 A72840, A72880 Rail grinding
A72840 Buffer stop 15 24-Sep-18 08-Oct-18 A72820, A72830 A72850 Buffer stop
A72850 Sign post 15 09-Oct-18 23-Oct-18 A72840 A72860 Sign post
A72860 Individual Test 30 15-Nov-18 14-Dec-18 A72850 Individual Test
A72870 Turn out 10 06-Jul-18 15-Jul-18 A72790 Turn out
A72880 IRJ & Boding cable 10 30-Aug-18 08-Sep-18 A72830 IRJ & Boding cable
3rd Rail 211 16-Jul-18 11-Feb-19 11-Feb-19, 3rd Rail
A72890 Surveying 30 16-Jul-18 14-Aug-18 A72770 A72900 Surveying
A72900 Tray in buidling 30 04-Sep-18 03-Oct-18 A72890 A72910 Tray in buidling
A72910 Pre-assembly of insulator and claw 20 04-Oct-18 23-Oct-18 A72900 A72920 Pre-assembly of insulator and claw
A72920 Support 20 24-Oct-18 12-Nov-18 A72910 A72930 Support
A72930 Expansion joint 20 08-Nov-18 27-Nov-18 A72920 A72940 Expansion joint
A72940 Conductor bar 20 13-Nov-18 02-Dec-18 A72930 A72950 Conductor bar
A72950 Rail joint 20 20-Nov-18 09-Dec-18 A72940 A72960, A73000 Rail joint
A72960 Cable terminal 15 25-Nov-18 09-Dec-18 A72950 A72970 Cable terminal
A72970 Feeder Cable 10 10-Dec-18 19-Dec-18 A72960 A72990, A73000 Feeder Cable
A72980 Sign Post 10 25-Dec-18 03-Jan-19 A73000 Sign Post
A72990 Individual Test 30 13-Jan-19 11-Feb-19 A72970 Individual Test
A73000 DS 10 15-Dec-18 24-Dec-18 A72950, A72970 A72980 DS
Wayside(Signal/Communication/Power) 250 15-Aug-18 21-Apr-19 21-Apr-19, Wayside(Signal/Communica
A74530 Surveying 30 15-Aug-18 13-Sep-18 A72770 A74540 Surveying
A74540 Point Machine 30 14-Sep-18 13-Oct-18 A74530 A74550 Point Machine
A74550 Installation of tray 30 29-Oct-18 27-Nov-18 A74540 A74560 Installation of tray
A74560 Cable rack 30 03-Dec-18 01-Jan-19 A74550 A74570 Cable rack

Date Revision Checked Approved


MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (20)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
A74570 Connection wih wayside equipment 30 02-Jan-19 31-Jan-19 A74560 A74580 Connection wih wayside equipment
A74580 Wayside Equipment 35 01-Feb-19 07-Mar-19 A74570 A74590 Wayside Equipment
A74590 Cabling 20 11-Feb-19 02-Mar-19 A74580 A74610, A74600 Cabling
A74600 Connection with Main equipment 20 03-Mar-19 22-Mar-19 A74590 A74620 Connection with Main equipment
A74610 Sign Post 30 21-Feb-19 22-Mar-19 A74590 A74620 Sign Post
A74620 Individual Test 30 23-Mar-19 21-Apr-19 A74600, A74610 A79680 Individual Test
CLUSTER 3 877 08-Dec-16 03-May-19 03-May-19, CLUSTER 3
CIVIL (STN 6-7) Batasan Station to Manggahan Station 610 10-Jan-17 11-Sep-18 11-Sep-18, CIVIL (STN 6-7) Batasan Station to Manggahan Station
Utilities Relocation 60 10-Jan-17 10-Mar-17 10-Mar-17, Utilities Relocation
A69880 Utilities and Relocation 60 10-Jan-17 10-Mar-17 A69690 A89260, A69670 Utilities and Relocation
Test Pit for Guideway 60 10-Jan-17 10-Mar-17 10-Mar-17, Test Pit for Guideway
A89260 Setup of Barrier & Board Up 20 10-Jan-17 29-Jan-17 A69880 A89270 Setup of Barrier & Board Up
A89270 Initial Excavation 20 10-Jan-17 29-Jan-17 A89260 A89280 Initial Excavation
A89280 Cut/ Break existing slab 20 30-Jan-17 18-Feb-17 A89270 A89290 Cut/ Break existing slab
A89290 Excavation for Test fit 20 19-Feb-17 10-Mar-17 A89280 A83300 Excavation for Test fit
Elevated Guideway 368 11-Mar-17 13-Mar-18 13-Mar-18, Elevated Guideway
Earthworks 175 11-Mar-17 01-Sep-17 01-Sep-17, Earthworks
A83300 Setup of Barrier & Board Up 60 11-Mar-17 09-May-17 A89290 A83310 Setup of Barrier & Board Up
A83310 Clearing and Grubbing 60 15-Apr-17 13-Jun-17 A83300 A83320 Clearing and Grubbing
A83320 Removal of Street Lights 80 15-Apr-17 03-Jul-17 A83310 A83330 Removal of Street Lights
A83330 Removal of Existing Pavement, Sidewalks, Curbs, etc.80 12-May-17 30-Jul-17 A83320 A83340 Removal of Existing Pavement, Sidewalks, Curbs, etc.
A83340 Removal of Manholes 80 14-Jun-17 01-Sep-17 A83330 A83350, A177675 Removal of Manholes
Guideway Construction 193 02-Sep-17 13-Mar-18 13-Mar-18, Guideway Construction
42
Bore Pile 59 (sta.7+663.71) to 65 (sta.7+771.71), 2500 mm 11 mL 02-Sep-17 13-Oct-17 13-Oct-17, Bore Pile 59 (sta.7+663.71) to 65 (sta.7+771.71), 2500 mm 11 mL
Box Girder Fabrication 85 10-Oct-17 02-Jan-18 02-Jan-18, Box Girder Fabrication
Box Girder Launching 18 03-Jan-18 20-Jan-18 20-Jan-18, Box Girder Launching
Concrete Stich (Deck Slab) 28 21-Jan-18 17-Feb-18 17-Feb-18, Concrete Stich (Deck Slab)
Parapet Railings, Span 1 to 3 24 18-Feb-18 13-Mar-18 13-Mar-18, Parapet Railings, Span 1 to 3
Transition Elevated to At-Grade 188 18-Feb-18 24-Aug-18 24-Aug-18, Transition Elevated to At-Grade
Earthworks 48 18-Feb-18 06-Apr-18 06-Apr-18, Earthworks
A58600 Clearing & Grubbing 21 18-Feb-18 10-Mar-18 A83750 A58610 Clearing & Grubbing
A58610 Removal of Existing Pavement 21 24-Feb-18 16-Mar-18 A58600 A58620 Removal of Existing Pavement
A58620 Soil Grading 21 17-Mar-18 06-Apr-18 A58610 A58630 Soil Grading
A58630 Subgrade Preparation 15 23-Mar-18 06-Apr-18 A58620 A58640 Subgrade Preparation
A58640 Excavation 15 23-Mar-18 06-Apr-18 A58630 A58650 Excavation
Guideway Construction Part1 140 07-Apr-18 24-Aug-18 24-Aug-18, Guideway Construction Part1
A58650 Abutment 80 07-Apr-18 25-Jun-18 A58640 A58660 Abutment
A58660 MSE Wall 80 07-May-18 25-Jul-18 A58650 A58670 MSE Wall
A58670 Embankment 80 06-Jun-18 24-Aug-18 A58660 Embankment
At Grade Guideway 380 28-Aug-17 11-Sep-18 11-Sep-18, At Grade Guideway
Earthworks 80 28-Aug-17 15-Nov-17 15-Nov-17, Earthworks
A177675 Setup of Barrier & Board Up 30 28-Aug-17 26-Sep-17 A83340 A177680 Setup of Barrier & Board Up
A177680 Clearing & Grubbing 50 07-Sep-17 26-Oct-17 A177675 A177690 Clearing & Grubbing
A177690 Excavation 50 17-Sep-17 05-Nov-17 A177680 A177700 Excavation
A177700 Backfill 50 27-Sep-17 15-Nov-17 A177690 A177710 Backfill
A177710 Removal of Existing Pavement 40 07-Oct-17 15-Nov-17 A177700 A177730 Removal of Existing Pavement
At Grade Construction 375 02-Sep-17 11-Sep-18 11-Sep-18, At Grade Construction
BOTTOM SLAB 303 02-Sep-17 01-Jul-18 01-Jul-18, BOTTOM SLAB
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (21)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
WALL 345 16-Sep-17 26-Aug-18 26-Aug-18, WALL
STRUCTURE BACKFILL 337 08-Oct-17 09-Sep-18 09-Sep-18, STRUCTURE BACKFILL
RETAINING WALL 230 25-Jan-18 11-Sep-18 11-Sep-18, RETAINING WALL
SYSTEM (STN 6-7)Batasan Station to Manggahan Station 360 01-May-18 25-Apr-19 25-Apr-19, SYSTEM (STN 6-7)Batasa
Trackwork 212 01-May-18 28-Nov-18 28-Nov-18, Trackwork
A75730 Surveying 30 01-May-18 30-May-18 A177840 A75750, A75740, Surveying
A73010, A74630
A75740 Installstion of euroform & Assembly of reinforcing bars50 31-May-18 19-Jul-18 A75730 Installstion of euroform & Assembly of reinforcing bars
A75750 Rail welding(CWR) and setting CWR (Elevated) 20 31-May-18 19-Jun-18 A75730 A75760, A75830 Rail welding(CWR) and setting CWR (Elevated)
A75760 Assemly of Fastener (Elevated) 20 20-Jun-18 09-Jul-18 A75750 A75770 Assemly of Fastener (Elevated)
A75770 Arrangement of sleeper (At grade) 20 10-Jul-18 29-Jul-18 A75760 A75780 Arrangement of sleeper (At grade)
A75780 Laying and tamping of ballast (At grade) 20 30-Jul-18 18-Aug-18 A75770 A75800, A75790 Laying and tamping of ballast (At grade)
A75790 Rail grinding 20 19-Aug-18 07-Sep-18 A75780 A75800, A75840 Rail grinding
A75800 Buffer stop 20 08-Sep-18 27-Sep-18 A75780, A75790 A75810 Buffer stop
A75810 Sign post 20 28-Sep-18 17-Oct-18 A75800 A75820 Sign post
A75820 Individual Test 40 20-Oct-18 28-Nov-18 A75810 Individual Test
A75830 Turn out 10 20-Jun-18 29-Jun-18 A75750 Turn out
A75840 IRJ & Boding cable 20 24-Aug-18 12-Sep-18 A75790 IRJ & Boding cable
3rd Rail 211 20-Jun-18 16-Jan-19 16-Jan-19, 3rd Rail
A73010 Surveying 30 20-Jun-18 19-Jul-18 A75730 A73020 Surveying
A73020 Tray in buidling 30 09-Aug-18 07-Sep-18 A73010 A73030 Tray in buidling
A73030 Pre-assembly of insulator and claw 20 08-Sep-18 27-Sep-18 A73020 A73040 Pre-assembly of insulator and claw
A73040 Support 20 28-Sep-18 17-Oct-18 A73030 A73050 Support
A73050 Expansion joint 20 13-Oct-18 01-Nov-18 A73040 A73060 Expansion joint
A73060 Conductor bar 20 18-Oct-18 06-Nov-18 A73050 A73070 Conductor bar
A73070 Rail joint 20 25-Oct-18 13-Nov-18 A73060 A73080, A73120 Rail joint
A73080 Cable terminal 20 30-Oct-18 18-Nov-18 A73070 A73090 Cable terminal
A73090 Feeder Cable 10 19-Nov-18 28-Nov-18 A73080 A73110 Feeder Cable
A73100 Sign Post 10 29-Nov-18 08-Dec-18 A73120 Sign Post
A73110 Individual Test 30 18-Dec-18 16-Jan-19 A73090 Individual Test
A73120 DS 10 19-Nov-18 28-Nov-18 A73070 A73100 DS
Wayside(Signal/Communication/Power) 260 09-Aug-18 25-Apr-19 25-Apr-19, Wayside(Signal/Communica
A74630 Surveying 30 09-Aug-18 07-Sep-18 A75730 A74640 Surveying
A74640 Point Machine 40 08-Sep-18 17-Oct-18 A74630 A74650 Point Machine
A74650 Installation of tray 40 18-Oct-18 26-Nov-18 A74640 A74660 Installation of tray
A74660 Cable rack 30 27-Nov-18 26-Dec-18 A74650 A74670 Cable rack
A74670 Connection wih wayside equipment 30 27-Dec-18 25-Jan-19 A74660 A74680 Connection wih wayside equipment
A74680 Wayside Equipment 50 26-Jan-19 16-Mar-19 A74670 A74690 Wayside Equipment
A74690 Cabling 30 05-Feb-19 06-Mar-19 A74680 A74710, A74700 Cabling
A74700 Connection with Main equipment 20 07-Mar-19 26-Mar-19 A74690 A74720 Connection with Main equipment
A74710 Sign Post 25 20-Feb-19 16-Mar-19 A74690 A74720 Sign Post
A74720 Individual Test 30 27-Mar-19 25-Apr-19 A74700, A74710 A79680 Individual Test
CIVIL (STN 7-8) Manggahan Station to Do£¿ Carmen Station 610 08-Dec-16 09-Aug-18 09-Aug-18, CIVIL (STN 7-8) Manggahan Station to Do£¿ Carmen Station
Utilities Relocation 80 08-Dec-16 25-Feb-17 25-Feb-17, Utilities Relocation
A69670 Utilities and Relocation 80 08-Dec-16 25-Feb-17 A69880, A1420.21 A71730, A69700 Utilities and Relocation
Test Pit For Guideway 80 08-Dec-16 25-Feb-17 25-Feb-17, Test Pit For Guideway
A71730 Setup of Barrier & Board Up 30 08-Dec-16 06-Jan-17 A69670 A71740 Setup of Barrier & Board Up
A71740 Initial Excavation 60 08-Dec-16 05-Feb-17 A71730 A71750 Initial Excavation

Date Revision Checked Approved


MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (22)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
A71750 Cut/ Break existing slab 60 18-Dec-16 15-Feb-17 A71740 A71790 Cut/ Break existing slab
A71790 Excavation for Test fit 60 28-Dec-16 25-Feb-17 A71750 A4380, A177965 Excavation for Test fit
Elevated Guideway 578 18-Dec-16 18-Jul-18 18-Jul-18, Elevated Guideway
Earthworks 130 18-Dec-16 26-Apr-17 26-Apr-17, Earthworks
A4380 Setup of Barrier & Board Up 80 18-Dec-16 07-Mar-17 A71790 A4390 Setup of Barrier & Board Up
A4390 Clearing and Grubbing 80 02-Jan-17 22-Mar-17 A4380 A4400 Clearing and Grubbing
A4400 Removal of Street Lights 80 02-Jan-17 22-Mar-17 A4390 A4410 Removal of Street Lights
A4410 Removal of Existing Pavement, Sidewalks, Curbs, etc.80 17-Jan-17 06-Apr-17 A4400 A4420 Removal of Existing Pavement, Sidewalks, Curbs, etc.
A4420 Removal of Manholes 80 06-Feb-17 26-Apr-17 A4410 A4430 Removal of Manholes
Guideway Construction 468 07-Apr-17 18-Jul-18 18-Jul-18, Guideway Construction
62mL 07-Apr-17
Bore Pile 66 (sta.10+116.71) to 79 (sta. 10+505.92), 2500 mm 11 07-Jun-17 07-Jun-17, Bore Pile 66 (sta.10+116.71) to 79 (sta. 10+505.92), 2500 mm 11 mL
Box Girder Fabrication 56 06-Jul-17 30-Aug-17 30-Aug-17, Box Girder Fabrication
Box Girder Launching 84 31-Aug-17 22-Nov-17 22-Nov-17, Box Girder Launching
Concrete Stich (Deck Slab) 98 23-Nov-17 28-Feb-18 28-Feb-18, Concrete Stich (Deck Slab)
Parapet Railings, Span 1 to 14 140 01-Mar-18 18-Jul-18 18-Jul-18, Parapet Railings, Span 1 to 14
Transition 133 30-Mar-18 09-Aug-18 09-Aug-18, Transition
Earthworks 48 30-Mar-18 16-May-18 16-May-18, Earthworks
A58880 Clearing & Grubbing 21 30-Mar-18 19-Apr-18 A8390 A58890 Clearing & Grubbing
A58890 Removal of Existing Pavement 21 05-Apr-18 25-Apr-18 A58880 A58900 Removal of Existing Pavement
A58900 Soil Grading 21 26-Apr-18 16-May-18 A58890 A58910 Soil Grading
A58910 Subgrade Preparation 15 02-May-18 16-May-18 A58900 A58920 Subgrade Preparation
A58920 Excavation 15 02-May-18 16-May-18 A58910 A58930 Excavation
Guideway Construction 115 17-Apr-18 09-Aug-18 09-Aug-18, Guideway Construction
A58930 Abutment 60 17-Apr-18 15-Jun-18 A58920 A58940 Abutment
A58940 MSE Wall 60 27-Apr-18 25-Jun-18 A58930 A58950 MSE Wall
A58950 Embankment 60 07-May-18 05-Jul-18 A58940 A58960 Embankment
A58960 Abutment 60 22-May-18 20-Jul-18 A58950 A58970 Abutment
A58970 MSE Wall 60 01-Jun-18 30-Jul-18 A58960 A58980 MSE Wall
A58980 Embankment 60 11-Jun-18 09-Aug-18 A58970 Embankment
At Grade Guideway 380 26-Jul-17 09-Aug-18 09-Aug-18, At Grade Guideway
Earthworks 80 26-Jul-17 13-Oct-17 13-Oct-17, Earthworks
A177965 Setup of Barrier & Board Up 30 26-Jul-17 24-Aug-17 A71790 A177970 Setup of Barrier & Board Up
A177970 Clearing & Grubbing 50 05-Aug-17 23-Sep-17 A177965 A177980 Clearing & Grubbing
A177980 Excavation 50 15-Aug-17 03-Oct-17 A177970 A177990 Excavation
A177990 Backfill 50 25-Aug-17 13-Oct-17 A177980 A178000 Backfill
A178000 Removal of Existing Pavement 40 04-Sep-17 13-Oct-17 A177990 A177850 Removal of Existing Pavement
At Grade Construction 375 31-Jul-17 09-Aug-18 09-Aug-18, At Grade Construction
BOTTOM SLAB 303 31-Jul-17 29-May-18 29-May-18, BOTTOM SLAB
WALL 345 14-Aug-17 24-Jul-18 24-Jul-18, WALL
STRUCTURE BACKFILL 337 05-Sep-17 07-Aug-18 07-Aug-18, STRUCTURE BACKFILL
RETAINING WALL 230 23-Dec-17 09-Aug-18 09-Aug-18, RETAINING WALL
SYSTEM (STN 7-8)Manggahan Station to Dona Carmen Station360 21-Mar-18 15-Mar-19 15-Mar-19, SYSTEM (STN 7-8)Manggaha
Trackwork 233 21-Mar-18 08-Nov-18 08-Nov-18, Trackwork
A72260 Surveying 30 21-Mar-18 19-Apr-18 A177960 A72270, A72261, Surveying
A72340, A72660
A72261 Installstion of euroform & Assembly of reinforcing bars50 20-Apr-18 08-Jun-18 A72260 Installstion of euroform & Assembly of reinforcing bars
A72270 Arrangement of sleeper (At grade) 25 20-Apr-18 14-May-18 A72260 A72280, A72430 Arrangement of sleeper (At grade)
A72280 Laying and tamping of ballast (At grade) 25 15-May-18 08-Jun-18 A72270 A72290 Laying and tamping of ballast (At grade)

Date Revision Checked Approved


MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (23)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
A72290 Rail welding(CWR) and setting CWR (Elevated) 25 09-Jun-18 03-Jul-18 A72280 A72300 Rail welding(CWR) and setting CWR (Elevated)
A72300 Assemly of Fastener (Elevated) 25 04-Jul-18 28-Jul-18 A72290 A72320, A72310 Assemly of Fastener (Elevated)
A72310 Rail grinding 25 29-Jul-18 22-Aug-18 A72300 A72320, A72440 Rail grinding
A72320 Buffer stop 25 23-Aug-18 16-Sep-18 A72300, A72310 A72330 Buffer stop
A72330 Sign post 20 17-Sep-18 06-Oct-18 A72320 A72420 Sign post
A72420 Individual Test 30 10-Oct-18 08-Nov-18 A72330 Individual Test
A72430 Turn out 20 10-May-18 29-May-18 A72270 Turn out
A72440 IRJ & Boding cable 20 03-Aug-18 22-Aug-18 A72310 IRJ & Boding cable
3rd Rail 242 20-May-18 16-Jan-19 16-Jan-19, 3rd Rail
A72340 Surveying 30 20-May-18 18-Jun-18 A72260 A72350 Surveying
A72350 Tray in buidling 40 09-Jul-18 17-Aug-18 A72340 A72360 Tray in buidling
A72360 Pre-assembly of insulator and claw 20 18-Aug-18 06-Sep-18 A72350 A72370 Pre-assembly of insulator and claw
A72370 Support 20 07-Sep-18 26-Sep-18 A72360 A72380 Support
A72380 Expansion joint 20 22-Sep-18 11-Oct-18 A72370 A72390 Expansion joint
A72390 Conductor bar 30 27-Sep-18 26-Oct-18 A72380 A72400 Conductor bar
A72400 Rail joint 20 04-Oct-18 23-Oct-18 A72390 A72410, A72480 Rail joint
A72410 Cable terminal 20 09-Oct-18 28-Oct-18 A72400 A72450 Cable terminal
A72450 Feeder Cable 20 29-Oct-18 17-Nov-18 A72410 A72470, A72480 Feeder Cable
A72460 Sign Post 10 18-Nov-18 27-Nov-18 A72480 Sign Post
A72470 Individual Test 30 18-Dec-18 16-Jan-19 A72450 Individual Test
A72480 DS 5 13-Nov-18 17-Nov-18 A72400, A72450 A72460 DS
Wayside(Signal/Communication/Power) 260 29-Jun-18 15-Mar-19 15-Mar-19, Wayside(Signal/Communication/Power)
A72660 Surveying 30 29-Jun-18 28-Jul-18 A72260 A72670 Surveying
A72670 Point Machine 30 29-Jul-18 27-Aug-18 A72660 A72680 Point Machine
A72680 Installation of tray 20 17-Sep-18 06-Oct-18 A72670 A72700 Installation of tray
A72700 Cable rack 20 07-Oct-18 26-Oct-18 A72680 A72710 Cable rack
A72710 Connection wih wayside equipment 20 27-Oct-18 15-Nov-18 A72700 A72720 Connection wih wayside equipment
A72720 Wayside Equipment 50 16-Nov-18 04-Jan-19 A72710 A72730 Wayside Equipment
A72730 Cabling 20 26-Nov-18 15-Dec-18 A72720 A72750, A72740 Cabling
A72740 Connection with Main equipment 45 16-Dec-18 29-Jan-19 A72730 A72760 Connection with Main equipment
A72750 Sign Post 20 11-Dec-18 30-Dec-18 A72730 A72760 Sign Post
A72760 Individual Test 30 14-Feb-19 15-Mar-19 A72740, A72750 A79680 Individual Test
CIVIL (STN 8-9) Dona Carmen Station to Regalado Station 580 08-Dec-16 10-Jul-18 10-Jul-18, CIVIL (STN 8-9) Dona Carmen Station to Regalado Station
Utilities Relocation 80 08-Dec-16 25-Feb-17 25-Feb-17, Utilities Relocation
A69700 Utilities and Relocation 80 08-Dec-16 25-Feb-17 A69670, A1420.21 A71819, A1380 Utilities and Relocation
Test Pit 100 08-Dec-16 17-Mar-17 17-Mar-17, Test Pit
A71819 Setup of Barrier & Board Up 30 08-Dec-16 06-Jan-17 A69700 A71820, A71940 Setup of Barrier & Board Up
A71820 Initial Excavation 60 28-Dec-16 25-Feb-17 A71819 A71830 Initial Excavation
A71830 Cut/ Break existing slab 60 07-Jan-17 07-Mar-17 A71820 A71840 Cut/ Break existing slab
A71840 Excavation for Test fit 60 17-Jan-17 17-Mar-17 A71830 A6070 Excavation for Test fit
Elevated Guideway 550 07-Jan-17 10-Jul-18 10-Jul-18, Elevated Guideway
Earthworks 143 07-Jan-17 29-May-17 29-May-17, Earthworks
A6070 Setup of Barrier & Board Up 80 07-Jan-17 27-Mar-17 A71840 A6071 Setup of Barrier & Board Up
A6071 Clearing and Grubbing 80 22-Jan-17 11-Apr-17 A6070 A6072 Clearing and Grubbing
A6072 Removal of Street Lights 80 22-Jan-17 11-Apr-17 A6071 A6073 Removal of Street Lights
A6073 Removal of Existing Pavement, Sidewalks, Curbs, etc.80 06-Feb-17 26-Apr-17 A6072 A6075 Removal of Existing Pavement, Sidewalks, Curbs, etc.
A6075 Removal of Manholes 80 11-Mar-17 29-May-17 A6073 A6222 Removal of Manholes
Guideway Construction 442 25-Apr-17 10-Jul-18 10-Jul-18, Guideway Construction
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (24)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Bore Pile 80 (sta.10+534.00) to 125 (sta. 11+716.32), 2500 mm96
11 mL 25-Apr-17 29-Jul-17 29-Jul-17, Bore Pile 80 (sta.10+534.00) to 125 (sta. 11+716.32), 2500 mm 11 mL
Box Girder Fabrication 175 30-Jul-17 20-Jan-18 20-Jan-18, Box Girder Fabrication
Box Girder Launching 160 26-Sep-17 04-Mar-18 04-Mar-18, Box Girder Launching
Concrete Stich (Deck Slab) 161 15-Dec-17 24-May-18 24-May-18, Concrete Stich (Deck Slab)
Parapet Railings, Span 1 to 47 161 31-Jan-18 10-Jul-18 10-Jul-18, Parapet Railings, Span 1 to 47
SYSTEM (STN 8-9)Dona Carmen Station to Regalado Station 380 25-Mar-18 08-Apr-19 08-Apr-19, SYSTEM (STN 8-9)Dona Ca
Trackwork 233 25-Mar-18 12-Nov-18 12-Nov-18, Trackwork
A75850 Surveying 30 25-Mar-18 23-Apr-18 A7710 A75860, A75890, Surveying
A73130, A74730
A75860 Installstion of euroform & Assembly of reinforcing bars50 14-May-18 02-Jul-18 A75850 Installstion of euroform & Assembly of reinforcing bars
A75890 Rail welding(CWR) and setting CWR (Elevated) 40 24-Apr-18 02-Jun-18 A75850 A75900 Rail welding(CWR) and setting CWR (Elevated)
A75900 Assemly of Fastener (Elevated) 30 03-Jun-18 02-Jul-18 A75890 A75920, A75910 Assemly of Fastener (Elevated)
A75910 Rail grinding 15 03-Jul-18 17-Jul-18 A75900 A75920, A75960 Rail grinding
A75920 Buffer stop 15 18-Jul-18 01-Aug-18 A75900, A75910 A75930 Buffer stop
A75930 Sign post 15 02-Aug-18 16-Aug-18 A75920 A75940, A75950 Sign post
A75940 Individual Test 30 14-Oct-18 12-Nov-18 A75930 Individual Test
A75950 Turn out 15 02-Aug-18 16-Aug-18 A75930 Turn out
A75960 IRJ & Boding cable 25 08-Jul-18 01-Aug-18 A75910 IRJ & Boding cable
3rd Rail 242 24-May-18 20-Jan-19 20-Jan-19, 3rd Rail
A73130 Surveying 30 24-May-18 22-Jun-18 A75850 A73140 Surveying
A73140 Tray in buidling 30 13-Jul-18 11-Aug-18 A73130 A73150 Tray in buidling
A73150 Pre-assembly of insulator and claw 30 12-Aug-18 10-Sep-18 A73140 A73160 Pre-assembly of insulator and claw
A73160 Support 30 11-Sep-18 10-Oct-18 A73150 A73170 Support
A73170 Expansion joint 30 06-Oct-18 04-Nov-18 A73160 A73180 Expansion joint
A73180 Conductor bar 20 11-Oct-18 30-Oct-18 A73170 A73190 Conductor bar
A73190 Rail joint 20 18-Oct-18 06-Nov-18 A73180 A73200, A73240 Rail joint
A73200 Cable terminal 15 23-Oct-18 06-Nov-18 A73190 A73210 Cable terminal
A73210 Feeder Cable 20 07-Nov-18 26-Nov-18 A73200 A73230, A73240 Feeder Cable
A73220 Sign Post 30 27-Nov-18 26-Dec-18 A73240 Sign Post
A73230 Individual Test 40 12-Dec-18 20-Jan-19 A73210 Individual Test
A73240 DS 15 12-Nov-18 26-Nov-18 A73190, A73210 A73220 DS
Wayside(Signal/Communication/Power) 260 23-Jul-18 08-Apr-19 08-Apr-19, Wayside(Signal/Communicat
A74730 Surveying 30 23-Jul-18 21-Aug-18 A75850 A74740 Surveying
A74740 Conduit on the track 50 22-Aug-18 10-Oct-18 A74730 A74750 Conduit on the track
A74750 Installation of tray 30 10-Nov-18 09-Dec-18 A74740 A74760, A74780 Installation of tray
A74760 Cable rack 30 10-Dec-18 08-Jan-19 A74750 A74770 Cable rack
A74770 Connection wih wayside equipment 40 30-Dec-18 07-Feb-19 A74760 Connection wih wayside equipment
A74780 Wayside Equipment 70 10-Nov-18 18-Jan-19 A74750 A74790 Wayside Equipment
A74790 Cabling 30 20-Nov-18 19-Dec-18 A74780 A74810, A74800 Cabling
A74800 Connection with Main equipment 50 20-Dec-18 07-Feb-19 A74790 A74820 Connection with Main equipment
A74810 Sign Post 20 05-Dec-18 24-Dec-18 A74790 A74820 Sign Post
A74820 Individual Test 60 08-Feb-19 08-Apr-19 A74800, A74810 A79680 Individual Test
CIVIL (STN 9-10) Regalado Station to Mindanao Station 580 08-Dec-16 10-Jul-18 10-Jul-18, CIVIL (STN 9-10) Regalado Station to Mindanao Station
Test Pit 100 08-Dec-16 17-Mar-17 17-Mar-17, Test Pit
A71940 Setup of Barrier & Board Up 30 08-Dec-16 06-Jan-17 A71819 A71950, A71970 Setup of Barrier & Board Up
A71950 Initial Excavation 60 28-Dec-16 25-Feb-17 A71940 A71960 Initial Excavation
A71960 Cut/ Break existing slab 60 07-Jan-17 07-Mar-17 A71950 A72170 Cut/ Break existing slab
A72170 Excavation for Test pit 60 17-Jan-17 17-Mar-17 A71960 A59680 Excavation for Test pit

Date Revision Checked Approved


MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (25)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Elevated Guideway 510 16-Feb-17 10-Jul-18 10-Jul-18, Elevated Guideway
Earthworks 143 16-Feb-17 08-Jul-17 08-Jul-17, Earthworks
A59680 Setup of Barrier & Board Up 80 16-Feb-17 06-May-17 A72170 A59690 Setup of Barrier & Board Up
A59690 Clearing and Grubbing 80 03-Mar-17 21-May-17 A59680 A59700 Clearing and Grubbing
A59700 Removal of Street Lights 80 03-Mar-17 21-May-17 A59690 A59710 Removal of Street Lights
A59710 Removal of Existing Pavement, Sidewalks, Curbs, etc.80 18-Mar-17 05-Jun-17 A59700 A59720 Removal of Existing Pavement, Sidewalks, Curbs, etc.
A59720 Removal of Manholes 80 20-Apr-17 08-Jul-17 A59710 A59726 Removal of Manholes
Guideway Construction 402 04-Jun-17 10-Jul-18 10-Jul-18, Guideway Construction
156 11 mL
Bore Pile 126 ( sta. 11+758.03) to 240 ( sta. 15+070.81), 2500 mm 04-Jun-17 06-Nov-17 06-Nov-17, Bore Pile 126 ( sta. 11+758.03) to 240 ( sta. 15+070.81), 2500 mm 11 mL
Box Girder Fabrication 231 03-Aug-17 21-Mar-18 21-Mar-18, Box Girder Fabrication
Box Girder Launching 234 10-Oct-17 31-May-18 31-May-18, Box Girder Launching
Concrete Stich (Deck Slab) 252 30-Oct-17 08-Jul-18 08-Jul-18, Concrete Stich (Deck Slab)
Parapet Railings, Span 1 to 115 247 06-Nov-17 10-Jul-18 10-Jul-18, Parapet Railings, Span 1 to 115
SYSTEM (STN 9-10)Regalado Station to Mindanao Station 455 03-Feb-18 03-May-19 03-May-19, SYSTEM (STN 9-10)Reg
Trackwork 233 03-Feb-18 23-Sep-18 23-Sep-18, Trackwork
A76330 Surveying 30 03-Feb-18 04-Mar-18 A68650 A76340, A73610, Surveying
A76370, A75130,
A2950
A76340 Installstion of euroform & Assembly of reinforcing bars70 05-Mar-18 13-May-18 A76330 Installstion of euroform & Assembly of reinforcing bars
A76370 Rail welding(CWR) and setting CWR (Elevated) 40 05-Mar-18 13-Apr-18 A76330 A76380, A76430 Rail welding(CWR) and setting CWR (Elevated)
A76380 Assemly of Fastener (Elevated) 50 14-Apr-18 02-Jun-18 A76370 A76400, A76390 Assemly of Fastener (Elevated)
A76390 Rail grinding 20 03-Jun-18 22-Jun-18 A76380 A76400, A76440 Rail grinding
A76400 Buffer stop 20 23-Jun-18 12-Jul-18 A76380, A76390 A76410 Buffer stop
A76410 Sign post 20 13-Jul-18 01-Aug-18 A76400 A76420 Sign post
A76420 Individual Test 30 25-Aug-18 23-Sep-18 A76410 Individual Test
A76430 Turn out 20 04-Apr-18 23-Apr-18 A76370 Turn out
A76440 IRJ & Boding cable 30 08-Jun-18 07-Jul-18 A76390 IRJ & Boding cable
3rd Rail 242 15-Mar-18 11-Nov-18 11-Nov-18, 3rd Rail
A73610 Surveying 30 15-Mar-18 13-Apr-18 A76330 A73620, A2960 Surveying
A73620 Tray in buidling 30 14-Apr-18 13-May-18 A73610 A73630 Tray in buidling
A73630 Pre-assembly of insulator and claw 40 14-Apr-18 23-May-18 A73620 A73640 Pre-assembly of insulator and claw
A73640 Support 20 24-May-18 12-Jun-18 A73630 A73650 Support
A73650 Expansion joint 20 08-Jun-18 27-Jun-18 A73640 A73660 Expansion joint
A73660 Conductor bar 20 13-Jun-18 02-Jul-18 A73650 A73670 Conductor bar
A73670 Rail joint 20 23-Jul-18 11-Aug-18 A73660 A73680, A73720 Rail joint
A73680 Cable terminal 30 28-Jul-18 26-Aug-18 A73670 A73690 Cable terminal
A73690 Feeder Cable 30 27-Aug-18 25-Sep-18 A73680 A73710, A73720 Feeder Cable
A73700 Sign Post 20 26-Sep-18 15-Oct-18 A73720 Sign Post
A73710 Individual Test 40 03-Oct-18 11-Nov-18 A73690 A79850 Individual Test
A73720 DS 20 06-Sep-18 25-Sep-18 A73670, A73690 A73700 DS
Wayside(Signal/Communication/Power) 335 03-Jun-18 03-May-19 03-May-19, Wayside(Signal/Communi
A75130 Surveying 30 03-Jun-18 02-Jul-18 A76330 A75140, A2970 Surveying
A75140 Point Machine 30 28-Jul-18 26-Aug-18 A75130 A75150, A75141 Point Machine
A75141 Conduit on the track 50 12-Aug-18 30-Sep-18 A75140 Conduit on the track
A75150 Installation of tray 30 01-Sep-18 30-Sep-18 A75140 A75160 Installation of tray
A75160 Cable rack 40 01-Oct-18 09-Nov-18 A75150 A75180 Cable rack
A75180 Wayside Equipment 50 10-Nov-18 29-Dec-18 A75160 A75190 Wayside Equipment
A75190 Cabling 30 10-Nov-18 09-Dec-18 A75180 A75210, A75200 Cabling
A75200 Connection with Main equipment 42 10-Dec-18 20-Jan-19 A75190 A75220 Connection with Main equipment

Date Revision Checked Approved


MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (26)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
A75210 Sign Post 25 25-Nov-18 19-Dec-18 A75190 Sign Post
A75220 Individual Test 60 05-Mar-19 03-May-19 A75200 A79680 Individual Test
CLUSTER 4 830 08-Jan-17 17-Apr-19 17-Apr-19, CLUSTER 4
CIVIL (STN 10-11) Mindanao Station to Quirino Station 420 08-Jan-17 03-Mar-18 03-Mar-18, CIVIL (STN 10-11) Mindanao Station to Quirino Station
Test Pit 130 08-Jan-17 17-May-17 17-May-17, Test Pit
A71970 Setup of Barrier & Board Up 30 08-Jan-17 06-Feb-17 A71940, A1420.31 A71980, A72000 Setup of Barrier & Board Up
A71980 Initial Excavation 60 28-Jan-17 28-Mar-17 A71970 A71990 Initial Excavation
A71990 Cut/ Break existing slab 60 17-Feb-17 17-Apr-17 A71980 A72080 Cut/ Break existing slab
A72080 Excavation for Test pit 60 19-Mar-17 17-May-17 A71990 A45950 Excavation for Test pit
Elevated Guideway 379 18-Feb-17 03-Mar-18 03-Mar-18, Elevated Guideway
Earthworks 160 18-Feb-17 27-Jul-17 27-Jul-17, Earthworks
A45950 Setup of Barrier & Board Up 80 18-Feb-17 08-May-17 A72080 A45960 Setup of Barrier & Board Up
A45960 Clearing and Grubbing 80 10-Mar-17 28-May-17 A45950 A45970 Clearing and Grubbing
A45970 Removal of Street Lights 80 10-Mar-17 28-May-17 A45960 A45980 Removal of Street Lights
A45980 Removal of Existing Pavement, Sidewalks, Curbs, etc.80 06-Apr-17 24-Jun-17 A45970 A45990 Removal of Existing Pavement, Sidewalks, Curbs, etc.
A45990 Removal of Manholes 80 09-May-17 27-Jul-17 A45980 A45991 Removal of Manholes
Guideway Construction 239 08-Jul-17 03-Mar-18 03-Mar-18, Guideway Construction
Bore Pile 241 (sta.15+245.53) to 268 (sta.15+878.67), 2500 mm7811 mL 08-Jul-17 23-Sep-17 23-Sep-17, Bore Pile 241 (sta.15+245.53) to 268 (sta.15+878.67), 2500 mm 11 mL
Box Girder Fabrication 112 10-Sep-17 30-Dec-17 30-Dec-17, Box Girder Fabrication
Box Girder Launching 60 11-Nov-17 09-Jan-18 09-Jan-18, Box Girder Launching
Concrete Stich (Deck Slab) 65 11-Dec-17 13-Feb-18 13-Feb-18, Concrete Stich (Deck Slab)
Parapet Railings, Span 1 to 27 65 29-Dec-17 03-Mar-18 03-Mar-18, Parapet Railings, Span 1 to 27
SYSTEM (STN 10-11)Mindanao Station to Quirino Station 390 12-Feb-18 08-Mar-19 08-Mar-19, SYSTEM (STN 10-11)Mindanao
Trackwork 233 12-Feb-18 02-Oct-18 02-Oct-18, Trackwor k
A76450 Surveying 30 12-Feb-18 13-Mar-18 A68680 A76460, A76490, Surveying
A73730, A75230
A76460 Installstion of euroform & Assembly of reinforcing bars50 13-Apr-18 01-Jun-18 A76450 Installstion of euroform & Assembly of reinforcing bars
A76490 Rail welding(CWR) and setting CWR (Elevated) 50 14-Mar-18 02-May-18 A76450 A76500, A76550 Rail welding(CWR) and setting CWR (Elevated)
A76500 Assemly of Fastener (Elevated) 25 03-May-18 27-May-18 A76490 A76520, A76510 Assemly of Fastener (Elevated)
A76510 Rail grinding 20 28-May-18 16-Jun-18 A76500 A76520 Rail grinding
A76520 Buffer stop 20 17-Jun-18 06-Jul-18 A76500, A76510 A76530 Buffer stop
A76530 Sign post 20 07-Jul-18 26-Jul-18 A76520 A76540 Sign post
A76540 Individual Test 40 24-Aug-18 02-Oct-18 A76530 Individual Test
A76550 Turn out 20 03-Apr-18 22-Apr-18 A76490 A76560 Turn out
A76560 IRJ & Boding cable 20 03-Apr-18 22-Apr-18 A76550 IRJ & Boding cable
3rd Rail 242 24-Mar-18 20-Nov-18 20-Nov-18, 3rd Rail
A73730 Surveying 30 24-Mar-18 22-Apr-18 A76450 A73740 Surveying
A73740 Tray in buidling 30 13-May-18 11-Jun-18 A73730 A73750 Tray in buidling
A73750 Pre-assembly of insulator and claw 30 12-Jun-18 11-Jul-18 A73740 A73760 Pre-assembly of insulator and claw
A73760 Support 20 12-Jul-18 31-Jul-18 A73750 A73770 Support
A73770 Expansion joint 20 27-Jul-18 15-Aug-18 A73760 A73780 Expansion joint
A73780 Conductor bar 15 01-Aug-18 15-Aug-18 A73770 A73790 Conductor bar
A73790 Rail joint 15 08-Aug-18 22-Aug-18 A73780 A73800, A73840 Rail joint
A73800 Cable terminal 15 13-Aug-18 27-Aug-18 A73790 A73810 Cable terminal
A73810 Feeder Cable 15 28-Aug-18 11-Sep-18 A73800 A73830, A73840 Feeder Cable
A73820 Sign Post 15 12-Sep-18 26-Sep-18 A73840 Sign Post
A73830 Individual Test 40 12-Oct-18 20-Nov-18 A73810 A79850 Individual Test
A73840 DS 10 02-Sep-18 11-Sep-18 A73790, A73810 A73820 DS

Date Revision Checked Approved


MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (27)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Wayside(Signal/Communication/Power) 270 12-Jun-18 08-Mar-19 08-Mar-19, Wayside(Signal/Communication/Power)
A75230 Surveying 30 12-Jun-18 11-Jul-18 A76450 A75240, A75241 Surveying
A75240 Point Machine 30 12-Jul-18 10-Aug-18 A75230 Point Machine
A75241 Conduit on the track 60 12-Jul-18 09-Sep-18 A75230 A75280, A75250 Conduit on the track
A75250 Installation of tray 40 17-Jul-18 25-Aug-18 A75241 A75260 Installation of tray
A75260 Cable rack 50 26-Aug-18 14-Oct-18 A75250 A75270 Cable rack
A75270 Connection wih wayside equipment 50 15-Oct-18 03-Dec-18 A75260 A75280 Connection wih wayside equipment
A75280 Wayside Equipment 50 04-Dec-18 22-Jan-19 A75270, A75241 A75290 Wayside Equipment
A75290 Cabling 30 09-Dec-18 07-Jan-19 A75280 A75310, A75300 Cabling
A75300 Connection with Main equipment 30 08-Jan-19 06-Feb-19 A75290 A75320 Connection with Main equipment
A75310 Sign Post 30 24-Dec-18 22-Jan-19 A75290 A75320 Sign Post
A75320 Individual Test 30 07-Feb-19 08-Mar-19 A75300, A75310 A79680 Individual Test
CIVIL (STN 11-12) Quirino Station to Sacred Heart Station 590 08-Jan-17 20-Aug-18 20-Aug-18, CIVIL (STN 11-12) Quirino Station to Sacred Heart Station
Test Pit 130 08-Jan-17 17-May-17 17-May-17, Test Pit
A72000 Setup of Barrier & Board Up 30 08-Jan-17 06-Feb-17 A71970 A72010, A72030 Setup of Barrier & Board Up
A72010 Initial Excavation 60 28-Jan-17 28-Mar-17 A72000 A72020 Initial Excavation
A72020 Cut/ Break existing slab 60 17-Feb-17 17-Apr-17 A72010 A72070 Cut/ Break existing slab
A72070 Excavation for Test pit 60 19-Mar-17 17-May-17 A72020 A48510 Excavation for Test pit
Elevated Guideway 462 18-Jan-17 24-Apr-18 24-Apr-18, Elevated Guideway
Earthworks 120 18-Jan-17 17-May-17 17-May-17, Earthworks
A48510 Setup of Barrier & Board Up 80 18-Jan-17 07-Apr-17 A72070 A48520 Setup of Barrier & Board Up
A48520 Clearing and Grubbing 80 28-Jan-17 17-Apr-17 A48510 A48530 Clearing and Grubbing
A48530 Removal of Street Lights 80 28-Jan-17 17-Apr-17 A48520 A48540 Removal of Street Lights
A48540 Removal of Existing Pavement, Sidewalks, Curbs, etc.80 12-Feb-17 02-May-17 A48530 A48550 Removal of Existing Pavement, Sidewalks, Curbs, etc.
A48550 Removal of Manholes 80 27-Feb-17 17-May-17 A48540 A48551, A178009 Removal of Manholes
Guideway Construction 352 08-May-17 24-Apr-18 24-Apr-18, Guideway Construction
140
Bore Pile 268(sta.15+878.67) to 318 (sta.18+094.42), 2500 mm 11 mL08-May-17 24-Sep-17 24-Sep-17, Bore Pile 268(sta.15+878.67) to 318 (sta.18+094.42), 2500 mm 11 mL
Box Girder Fabrication 105 25-Sep-17 07-Jan-18 07-Jan-18, Box Girder Fabrication
Box Girder Launching 102 09-Dec-17 20-Mar-18 20-Mar-18, Box Girder Launching
Concrete Stich (Deck Slab) 99 22-Dec-17 30-Mar-18 30-Mar-18, Concrete Stich (Deck Slab)
Parapet Railings, Span 1 to 50 120 26-Dec-17 24-Apr-18 24-Apr-18, Parapet Railings, Span 1 to 50
Transition 128 26-Mar-18 31-Jul-18 31-Jul-18, Transition
Earthworks 58 26-Mar-18 22-May-18 22-May-18, Earthworks
A59109 Setup of Barrier & Board Up 10 26-Mar-18 04-Apr-18 A69660 A59110 Setup of Barrier & Board Up
A59110 Clearing & Grubbing 21 05-Apr-18 25-Apr-18 A59109 A59120 Clearing & Grubbing
A59120 Removal of Existing Pavement 21 11-Apr-18 01-May-18 A59110 A59130 Removal of Existing Pavement
A59130 Soil Grading 21 02-May-18 22-May-18 A59120 A59140 Soil Grading
A59140 Subgrade Preparation 15 08-May-18 22-May-18 A59130 A59150 Subgrade Preparation
A59150 Excavation 15 08-May-18 22-May-18 A59140 A59160 Excavation
Guideway Construction 100 23-Apr-18 31-Jul-18 31-Jul-18, Guideway Construction
A59160 Diaphragm 20 23-Apr-18 12-May-18 A59150 A59170 Diaphragm
A59170 Excavation Stage1 20 29-Apr-18 18-May-18 A59160 A59180 Excavation Stage1
A59180 Waler / Showing Support1 20 05-May-18 24-May-18 A59170 A59190 Waler / Showing Support1
A59190 Excavation Stage2 20 11-May-18 30-May-18 A59180 A59200 Excavation Stage2
A59200 Waler / Showing Support2 20 17-May-18 05-Jun-18 A59190 A59210 Waler / Showing Support2
A59210 Excavation Final Stage 20 23-May-18 11-Jun-18 A59200 A59220 Excavation Final Stage
A59220 Diaphragm 20 12-Jun-18 01-Jul-18 A59210 A59230 Diaphragm
A59230 Excavation Stage1 20 18-Jun-18 07-Jul-18 A59220 A59240 Excavation Stage1
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (28)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
A59240 Waler / Showing Support1 20 24-Jun-18 13-Jul-18 A59230 A59250 Waler / Showing Support1
A59250 Excavation Stage2 20 30-Jun-18 19-Jul-18 A59240 A59260 Excavation Stage2
A59260 Waler / Showing Support2 20 06-Jul-18 25-Jul-18 A59250 A59270 Waler / Showing Support2
A59270 Excavation Final Stage 20 12-Jul-18 31-Jul-18 A59260 Excavation Final Stage
At Grade Guideway 450 28-May-17 20-Aug-18 20-Aug-18, At Grade Guideway
Earthworks 80 28-May-17 15-Aug-17 15-Aug-17, Earthworks
A178009 Setup of Barrier & Board Up 30 28-May-17 26-Jun-17 A48550 A178010 Setup of Barrier & Board Up
A178010 Clearing & Grubbing 50 07-Jun-17 26-Jul-17 A178009 A178020 Clearing & Grubbing
A178020 Excavation 50 17-Jun-17 05-Aug-17 A178010 A178030 Excavation
A178030 Backfill 50 27-Jun-17 15-Aug-17 A178020 A178040 Backfill
A178040 Removal of Existing Pavement 40 07-Jul-17 15-Aug-17 A178030 A178060 Removal of Existing Pavement
At Grade Construction 375 11-Aug-17 20-Aug-18 20-Aug-18, At Grade Construction
BOTTOM SLAB 303 11-Aug-17 09-Jun-18 09-Jun-18, BOTTOM SLAB
WALL 345 25-Aug-17 04-Aug-18 04-Aug-18, WALL
STRUCTURE BACKFILL 337 16-Sep-17 18-Aug-18 18-Aug-18, STRUCTURE BACKFILL
RETAINING WALL 230 03-Jan-18 20-Aug-18 20-Aug-18, RETAINING WALL
SYSTEM (STN 11-12)Quirino Station to Sacred Heart Station 390 24-Mar-18 17-Apr-19 17-Apr-19, SYSTEM (STN 11-12)Quirin
Trackwork 233 24-Mar-18 11-Nov-18 11-Nov-18, Trackwork
A76570 Surveying 30 24-Mar-18 22-Apr-18 A178170 A76590, A76580, Surveying
A73850, A75330
A76580 Installstion of euroform & Assembly of reinforcing bars50 23-Apr-18 11-Jun-18 A76570 Installstion of euroform & Assembly of reinforcing bars
A76590 Rail welding(CWR) and setting CWR (Elevated) 30 23-Apr-18 22-May-18 A76570 A76600, A76670 Rail welding(CWR) and setting CWR (Elevated)
A76600 Assemly of Fastener (Elevated) 30 23-May-18 21-Jun-18 A76590 A76610 Assemly of Fastener (Elevated)
A76610 Arrangement of sleeper (At grade) 30 22-Jun-18 21-Jul-18 A76600 A76620 Arrangement of sleeper (At grade)
A76620 Laying and tamping of ballast (At grade) 20 22-Jul-18 10-Aug-18 A76610 A76640, A76630 Laying and tamping of ballast (At grade)
A76630 Rail grinding 20 11-Aug-18 30-Aug-18 A76620 A76640, A76680 Rail grinding
A76640 Buffer stop 20 31-Aug-18 19-Sep-18 A76620, A76630 A76650 Buffer stop
A76650 Sign post 20 20-Sep-18 09-Oct-18 A76640 A76660 Sign post
A76660 Individual Test 30 13-Oct-18 11-Nov-18 A76650 Individual Test
A76670 Turn out 20 13-May-18 01-Jun-18 A76590 Turn out
A76680 IRJ & Boding cable 15 16-Aug-18 30-Aug-18 A76630 IRJ & Boding cable
3rd Rail 242 03-May-18 30-Dec-18 30-Dec-18, 3rd Rail
A73850 Surveying 30 03-May-18 01-Jun-18 A76570 A73860 Surveying
A73860 Tray in buidling 30 12-Jun-18 11-Jul-18 A73850 A73870 Tray in buidling
A73870 Pre-assembly of insulator and claw 20 12-Jul-18 31-Jul-18 A73860 A73880 Pre-assembly of insulator and claw
A73880 support 20 01-Aug-18 20-Aug-18 A73870 A73890 support
A73890 expansion joint 20 16-Aug-18 04-Sep-18 A73880 A73900 expansion joint
A73900 conductor bar 30 21-Aug-18 19-Sep-18 A73890 A73910 conductor bar
A73910 rail joint 30 28-Aug-18 26-Sep-18 A73900 A73920, A73960 rail joint
A73920 cable terminal 30 02-Sep-18 01-Oct-18 A73910 A73930 cable terminal
A73930 Feeder Cable 30 02-Oct-18 31-Oct-18 A73920 A73950, A73960 Feeder Cable
A73940 Sign Post 15 01-Nov-18 15-Nov-18 A73960 Sign Post
A73950 Individual Test 40 21-Nov-18 30-Dec-18 A73930 Individual Test
A73960 DS 15 17-Oct-18 31-Oct-18 A73910, A73930 A73940 DS
Wayside(Signal/Communication/Power) 300 22-Jun-18 17-Apr-19 17-Apr-19, Wayside(Signal/Communica
A75330 Surveying 30 22-Jun-18 21-Jul-18 A76570 A75340 Surveying
A75340 Point Machine 30 22-Jul-18 20-Aug-18 A75330 A75350, A75341 Point Machine
A75341 Conduit on the track 50 21-Aug-18 09-Oct-18 A75340 A75380 Conduit on the track

Date Revision Checked Approved


MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (29)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
A75350 Installation of tray 20 10-Sep-18 29-Sep-18 A75340 A75360 Installation of tray
A75360 Cable rack 20 30-Sep-18 19-Oct-18 A75350 A75370 Cable rack
A75370 Connection wih wayside equipment 30 20-Oct-18 18-Nov-18 A75360 A75380 Connection wih wayside equipment
A75380 Wayside Equipment 50 19-Nov-18 07-Jan-19 A75370, A75341 A75390 Wayside Equipment
A75390 Cabling 30 29-Nov-18 28-Dec-18 A75380 A75410, A75400 Cabling
A75400 Connection with Main equipment 50 29-Dec-18 16-Feb-19 A75390 A75420 Connection with Main equipment
A75410 Sign Post 15 14-Dec-18 28-Dec-18 A75390 A75420 Sign Post
A75420 Individual Test 60 17-Feb-19 17-Apr-19 A75400, A75410 A79680 Individual Test
CIVIL (STN 12-13) Sacred Heart Station to Tala Station 590 08-Jan-17 20-Aug-18 20-Aug-18, CIVIL (STN 12-13) Sacred Heart Station to Tala Station
Test Pit 130 08-Jan-17 17-May-17 17-May-17, Test Pit
A72030 Setup of Barrier & Board Up 30 08-Jan-17 06-Feb-17 A72000 A72040, A71910 Setup of Barrier & Board Up
A72040 Initial Excavation 60 28-Jan-17 28-Mar-17 A72030 A72050 Initial Excavation
A72050 Cut/ Break existing slab 60 17-Feb-17 17-Apr-17 A72040 A72060 Cut/ Break existing slab
A72060 Excavation for Test pit 60 19-Mar-17 17-May-17 A72050 A51230 Excavation for Test pit
Elevated Guideway 465 13-Jan-17 22-Apr-18 22-Apr-18, Elevated Guideway
Earthworks 125 13-Jan-17 17-May-17 17-May-17, Earthworks
A51230 Setup of Barrier & Board Up 80 13-Jan-17 02-Apr-17 A72060 A51240 Setup of Barrier & Board Up
A51240 Clearing and Grubbing 80 23-Jan-17 12-Apr-17 A51230 A51250 Clearing and Grubbing
A51250 Removal of Street Lights 80 23-Jan-17 12-Apr-17 A51240 A51260 Removal of Street Lights
A51260 Removal of Existing Pavement, Sidewalks, Curbs, etc.80 07-Feb-17 27-Apr-17 A51250 A51270 Removal of Existing Pavement, Sidewalks, Curbs, etc.
A51270 Removal of Manholes 80 27-Feb-17 17-May-17 A51260 A51275, A178179 Removal of Manholes
Guideway Construction 340 18-May-17 22-Apr-18 22-Apr-18, Guideway Construction
Bore Pile 319 (18+122.53) to 367 (19+589.43), 2500 mm 11 mL93
mL 18-May-17 18-Aug-17 18-Aug-17, Bore Pile 319 (18+122.53) to 367 (19+589.43), 2500 mm 11 mL
Box Girder Fabrication 122 07-Sep-17 06-Jan-18 06-Jan-18, Box Girder Fabrication
Box Girder Launching 102 23-Dec-17 03-Apr-18 03-Apr-18, Box Girder Launching
Concrete Stich (Deck Slab) 96 04-Jan-18 09-Apr-18 09-Apr-18, Concrete Stich (Deck Slab)
Parapet Railings, Span 1 to 48 93 20-Jan-18 22-Apr-18 22-Apr-18, Parapet Railings, Span 1 to 48
Transition 128 04-Mar-18 09-Jul-18 09-Jul-18, Transition
Earthworks 58 04-Mar-18 30-Apr-18 30-Apr-18, Earthworks
A92609 Setup of Barrier & Board Up 10 04-Mar-18 13-Mar-18 A54640 A92610 Setup of Barrier & Board Up
A92610 Clearing & Grubbing 21 14-Mar-18 03-Apr-18 A92609 A92620 Clearing & Grubbing
A92620 Removal of Existing Pavement 21 20-Mar-18 09-Apr-18 A92610 A92630 Removal of Existing Pavement
A92630 Soil Grading 21 10-Apr-18 30-Apr-18 A92620 A92640 Soil Grading
A92640 Subgrade Preparation 15 16-Apr-18 30-Apr-18 A92630 A92650 Subgrade Preparation
A92650 Excavation 15 16-Apr-18 30-Apr-18 A92640 A92490 Excavation
Guideway Construction 100 01-Apr-18 09-Jul-18 09-Jul-18, Guideway Construction
A92490 Diaphragm 20 01-Apr-18 20-Apr-18 A92650 A92500 Diaphragm
A92500 Excavation Stage1 20 07-Apr-18 26-Apr-18 A92490 A92510 Excavation Stage1
A92510 Waler / Showing Support1 20 13-Apr-18 02-May-18 A92500 A92520 Waler / Showing Support1
A92520 Excavation Stage2 20 19-Apr-18 08-May-18 A92510 A92530 Excavation Stage2
A92530 Waler / Showing Support2 20 25-Apr-18 14-May-18 A92520 A92540 Waler / Showing Support2
A92540 Excavation Final Stage 20 01-May-18 20-May-18 A92530 A92550 Excavation Final Stage
A92550 Diaphragm 20 21-May-18 09-Jun-18 A92540 A92560 Diaphragm
A92560 Excavation Stage1 20 27-May-18 15-Jun-18 A92550 A92570 Excavation Stage1
A92570 Waler / Showing Support1 20 02-Jun-18 21-Jun-18 A92560 A92580 Waler / Showing Support1
A92580 Excavation Stage2 20 08-Jun-18 27-Jun-18 A92570 A92590 Excavation Stage2
A92590 Waler / Showing Support2 20 14-Jun-18 03-Jul-18 A92580 A92600 Waler / Showing Support2
A92600 Excavation Final Stage 20 20-Jun-18 09-Jul-18 A92590 Excavation Final Stage
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (30)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
At Grade Guideway 450 28-May-17 20-Aug-18 20-Aug-18, At Grade Guideway
Earthworks 80 28-May-17 15-Aug-17 15-Aug-17, Earthworks
A178179 Setup of Barrier & Board Up 30 28-May-17 26-Jun-17 A51270 A178180, A1390 Setup of Barrier & Board Up
A178180 Clearing & Grubbing 50 07-Jun-17 26-Jul-17 A178179 A178190 Clearing & Grubbing
A178190 Excavation 50 17-Jun-17 05-Aug-17 A178180 A178200 Excavation
A178200 Backfill 50 27-Jun-17 15-Aug-17 A178190 A178210 Backfill
A178210 Removal of Existing Pavement 40 07-Jul-17 15-Aug-17 A178200 A178230 Removal of Existing Pavement
At Grade Construction 375 11-Aug-17 20-Aug-18 20-Aug-18, At Grade Construction
BOTTOM SLAB 303 11-Aug-17 09-Jun-18 09-Jun-18, BOTTOM SLAB
WALL 345 25-Aug-17 04-Aug-18 04-Aug-18, WALL
STRUCTURE BACKFILL 337 16-Sep-17 18-Aug-18 18-Aug-18, STRUCTURE BACKFILL
RETAINING WALL 230 03-Jan-18 20-Aug-18 20-Aug-18, RETAINING WALL
SYSTEM (STN 12-13)Sacred Heart Station to Tala Station 380 12-Feb-18 26-Feb-19 26-Feb-19, SYSTEM (STN 12-13)Sacred He
Trackwork 233 12-Feb-18 02-Oct-18 02-Oct-18, Trackwor k
A76690 Surveying 30 12-Feb-18 13-Mar-18 A178340 A76710, A76700, Surveying
A73970, A75430
A76700 Installstion of euroform & Assembly of reinforcing bars60 14-Mar-18 12-May-18 A76690 Installstion of euroform & Assembly of reinforcing bars
A76710 Arrangement of sleeper (At grade) 33 14-Mar-18 15-Apr-18 A76690 A76720, A76790 Arrangement of sleeper (At grade)
A76720 Laying and tamping of ballast (At grade) 30 16-Apr-18 15-May-18 A76710 A76730 Laying and tamping of ballast (At grade)
A76730 Rail welding(CWR) and setting CWR (Elevated) 30 16-May-18 14-Jun-18 A76720 A76740 Rail welding(CWR) and setting CWR (Elevated)
A76740 Assemly of Fastener (Elevated) 30 15-Jun-18 14-Jul-18 A76730 A76760, A76750 Assemly of Fastener (Elevated)
A76750 Rail grinding 20 15-Jul-18 03-Aug-18 A76740 A76760, A76800 Rail grinding
A76760 Buffer stop 15 04-Aug-18 18-Aug-18 A76740, A76750 A76770 Buffer stop
A76770 Sign post 15 19-Aug-18 02-Sep-18 A76760 A76780 Sign post
A76780 Individual Test 30 03-Sep-18 02-Oct-18 A76770 Individual Test
A76790 Turn out 10 03-Apr-18 12-Apr-18 A76710 Turn out
A76800 IRJ & Boding cable 20 15-Jul-18 03-Aug-18 A76750 IRJ & Boding cable
3rd Rail 242 24-Mar-18 20-Nov-18 20-Nov-18, 3rd Rail
A73970 Surveying 30 24-Mar-18 22-Apr-18 A76690 A73980 Surveying
A73980 Tray in buidling 40 23-Apr-18 01-Jun-18 A73970 A73990 Tray in buidling
A73990 Pre-assembly of insulator and claw 40 02-Jun-18 11-Jul-18 A73980 A74000 Pre-assembly of insulator and claw
A74000 Support 30 12-Jul-18 10-Aug-18 A73990 A74010 Support
A74010 Expansion joint 30 06-Aug-18 04-Sep-18 A74000 A74020 Expansion joint
A74020 Conductor bar 20 11-Aug-18 30-Aug-18 A74010 A74030 Conductor bar
A74030 Rail joint 20 18-Aug-18 06-Sep-18 A74020 A74040, A74080 Rail joint
A74040 Cable terminal 20 23-Aug-18 11-Sep-18 A74030 A74050 Cable terminal
A74050 Feeder Cable 30 12-Sep-18 11-Oct-18 A74040 A74070, A74080 Feeder Cable
A74060 Sign Post 15 12-Oct-18 26-Oct-18 A74080 Sign Post
A74070 Individual Test 30 22-Oct-18 20-Nov-18 A74050 A79850 Individual Test
A74080 DS 10 02-Oct-18 11-Oct-18 A74030, A74050 A74060 DS
Wayside(Signal/Communication/Power) 280 23-May-18 26-Feb-19 26-Feb-19, Wayside(Signal/Communication/Power)
A75430 Surveying 30 23-May-18 21-Jun-18 A76690 A75440 Surveying
A75440 Point Machine 30 02-Jul-18 31-Jul-18 A75430 A75450, A75441 Point Machine
A75441 Conduit on the track 60 01-Aug-18 29-Sep-18 A75440 A75480 Conduit on the track
A75450 Installation of tray 20 31-Aug-18 19-Sep-18 A75440 A75460 Installation of tray
A75460 Cable rack 20 20-Sep-18 09-Oct-18 A75450 A75470 Cable rack
A75470 Connection wih wayside equipment 33 10-Oct-18 11-Nov-18 A75460 Connection wih wayside equipment
A75480 Wayside Equipment 60 30-Sep-18 28-Nov-18 A75441 A75490 Wayside Equipment

Date Revision Checked Approved


MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (31)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
A75490 Cabling 40 15-Oct-18 23-Nov-18 A75480 A75510, A75500 Cabling
A75500 Connection with Main equipment 50 24-Nov-18 12-Jan-19 A75490 A75520 Connection with Main equipment
A75510 Sign Post 20 30-Oct-18 18-Nov-18 A75490 A75520 Sign Post
A75520 Individual Test 45 13-Jan-19 26-Feb-19 A75500, A75510 A79680 Individual Test
CLUSTER 5 763 08-Jan-17 09-Feb-19 09-Feb-19, CLUSTER 5
CIVIL (STN 13- 14) Tala Station to San Jose Station 580 08-Jan-17 10-Aug-18 10-Aug-18, CIVIL (STN 13- 14) Tala Station to San Jose Station
Test Pit 130 08-Jan-17 17-May-17 17-May-17, Test Pit
A71910 Setup of Barrier & Board Up 30 08-Jan-17 06-Feb-17 A72030 A71920, A88910 Setup of Barrier & Board Up
A71920 Initial Excavation 60 28-Jan-17 28-Mar-17 A71910 A71930 Initial Excavation
A71930 Cut/ Break existing slab 60 17-Feb-17 17-Apr-17 A71920 A72180 Cut/ Break existing slab
A72180 Excavation for Test pit 60 19-Mar-17 17-May-17 A71930 A69950, A92660 Excavation for Test pit
Elevated Guideway 380 18-Apr-17 02-May-18 02-May-18, Elevated Guideway
Earthworks 144 18-Apr-17 08-Sep-17 08-Sep-17, Earthworks
A69950 Setup of Barrier & Board Up 80 18-Apr-17 06-Jul-17 A72180 A69960 Setup of Barrier & Board Up
A69960 Clearing and Grubbing 80 02-May-17 20-Jul-17 A69950 A69970 Clearing and Grubbing
A69970 Removal of Street Lights 80 02-May-17 20-Jul-17 A69960 A69980 Removal of Street Lights
A69980 Removal of Existing Pavement, Sidewalks, Curbs, etc.80 19-May-17 06-Aug-17 A69970 A69990 Removal of Existing Pavement, Sidewalks, Curbs, etc.
A69990 Removal of Manholes 80 21-Jun-17 08-Sep-17 A69980 A70000 Removal of Manholes
Guideway Construction 236 09-Sep-17 02-May-18 02-May-18, Guideway Construction
Bore Pile 368 sta.19+756.45 to 390 sta.20+372.45 , 2500 mm 1176mL 09-Sep-17 23-Nov-17 23-Nov-17, Bore Pile 368 sta.19+756.45 to 390 sta.20+372.45 , 2500 mm 11 mL
Box Girder Fabrication 84 23-Oct-17 14-Jan-18 14-Jan-18, Box Girder Fabrication
Box Girder Launching 48 10-Jan-18 26-Feb-18 26-Feb-18, Box Girder Launching
Concrete Stich (Deck Slab) 48 28-Jan-18 16-Mar-18 16-Mar-18, Concrete Stich (Deck Slab)
Parapet Railings, Span 1 to 22 77 15-Feb-18 02-May-18 02-May-18, Parapet Railings, Span 1 to 22
Transition 152 11-Feb-18 12-Jul-18 12-Jul-18, Transition
Earthworks 48 15-Feb-18 03-Apr-18 03-Apr-18, Earthworks
A59280 Clearing & Grubbing 21 15-Feb-18 07-Mar-18 A71500 A59290 Clearing & Grubbing
A59290 Removal of Existing Pavement 21 21-Feb-18 13-Mar-18 A59280 A59300, A59326 Removal of Existing Pavement
A59300 Soil Grading 21 14-Mar-18 03-Apr-18 A59290 A59310 Soil Grading
A59310 Subgrade Preparation 15 20-Mar-18 03-Apr-18 A59300 A59320 Subgrade Preparation
A59320 Excavation 15 20-Mar-18 03-Apr-18 A59310 A59330 Excavation
Guideway Construction 152 11-Feb-18 12-Jul-18 12-Jul-18, Guideway Construction
A59326 Submit Plan / Design Documents for Abutment 27 11-Feb-18 09-Mar-18 A59290 A59328, A59332 Submit Plan / Design Documents for Abutment
A59328 Review Plan & Design for Abutment 21 10-Mar-18 30-Mar-18 A59326 Review Plan & Design for Abutment
A59330 Abutment 50 05-Mar-18 23-Apr-18 A59320 A59340 Abutment
A59332 Submit Plan / Design Documents for MSE Wall 27 21-Feb-18 19-Mar-18 A59326 A59334 Submit Plan / Design Documents for MSE Wall
A59334 Review Plan & Design for MSE Wall 21 20-Mar-18 09-Apr-18 A59332 Review Plan & Design for MSE Wall
A59340 MSE Wall 50 15-Mar-18 03-May-18 A59330 A59350 MSE Wall
A59350 Embankment 50 25-Mar-18 13-May-18 A59340 A59360 Embankment
A59360 Abutment 50 04-Apr-18 23-May-18 A59350 A59370 Abutment
A59370 MSE Wall 50 14-Apr-18 02-Jun-18 A59360 A59380 MSE Wall
A59380 Embankment 50 24-Apr-18 12-Jun-18 A59370 A59390 Embankment
A59390 Abutment 50 04-May-18 22-Jun-18 A59380 A59400 Abutment
A59400 MSE Wall 50 14-May-18 02-Jul-18 A59390 A59410 MSE Wall
A59410 Embankment 50 24-May-18 12-Jul-18 A59400 Embankment
Depressed Guideway 560 28-Jan-17 10-Aug-18 10-Aug-18, Depressed Guideway
Earthworks 245 28-Jan-17 29-Sep-17 29-Sep-17, Earthworks
A92660 Setup of Barrier & Board Up 50 28-Jan-17 18-Mar-17 A72180 A92665 Setup of Barrier & Board Up
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (32)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
A92665 Clearing & Grubbing 70 22-Feb-17 02-May-17 A92660 A92670 Clearing & Grubbing
A92670 Removal of Existing Pavement 80 24-Mar-17 11-Jun-17 A92665 A92680 Removal of Existing Pavement
A92680 Subgrade Preparation 100 03-May-17 10-Aug-17 A92670 A92690 Subgrade Preparation
A92690 Excavation 80 12-Jun-17 30-Aug-17 A92680 A92700 Excavation
A92700 Backfill 80 12-Jul-17 29-Sep-17 A92690 A92720 Backfill
Guideway Construction 395 12-Jul-17 10-Aug-18 10-Aug-18, Guideway Construction
A92720 Diaphragm 150 12-Jul-17 08-Dec-17 A92700 A92730 Diaphragm
A92730 Excavation Stage 1 140 01-Aug-17 18-Dec-17 A92720 A92740 Excavation Stage 1
A92740 Waler / Showing Support1 130 11-Aug-17 18-Dec-17 A92730 A92750 Waler / Showing Support1
A92750 Excavation Stage2 140 10-Sep-17 27-Jan-18 A92740 A92760 Excavation Stage2
A92760 Waler / Showing Support2 130 20-Oct-17 26-Feb-18 A92750 A92770 Waler / Showing Support2
A92770 Excavation Final Stage 140 19-Nov-17 07-Apr-18 A92760 A92780 Excavation Final Stage
A92780 Tunnel, Bottom Slab 130 29-Dec-17 07-May-18 A92770 A92790 Tunnel, Bottom Slab
A92790 Tunnel , Wall (2slides) 120 07-Feb-18 06-Jun-18 A92780 A92800 Tunnel , Wall (2slides)
A92800 Tunnel, Top Slab 120 27-Feb-18 26-Jun-18 A92790 A92810 Tunnel, Top Slab
A92810 Waterproofing 115 19-Mar-18 11-Jul-18 A92800 A92820, A76210 Waterproofing
A92820 Restoration of Existing Pavement 120 13-Apr-18 10-Aug-18 A92810 Restoration of Existing Pavement
SYSTEM (STN 13-14)Tala Station to San Jose Station 332 15-Mar-18 09-Feb-19 09-Feb-19, SYSTEM (STN 13-14)Tala Station
Trackwork 212 15-Mar-18 12-Oct-18 12-Oct-18, Trackwor k
A76210 Surveying 30 15-Mar-18 13-Apr-18 A92810 A76220, A76250, Surveying
A73490, A75030
A76220 Installstion of euroform & Assembly of reinforcing bars80 24-Apr-18 12-Jul-18 A76210 Installstion of euroform & Assembly of reinforcing bars
A76250 Rail welding(CWR) and setting CWR 50 14-Apr-18 02-Jun-18 A76210 A76260, A76310 Rail welding(CWR) and setting CWR
A76260 Assemly of Fastener 50 03-Jun-18 22-Jul-18 A76250 A76280, A76270 Assemly of Fastener
A76270 Rail grinding 20 23-Jul-18 11-Aug-18 A76260 A76280, A76320 Rail grinding
A76280 Buffer stop 20 12-Aug-18 31-Aug-18 A76260, A76270 A76290 Buffer stop
A76290 Sign post 15 01-Sep-18 15-Sep-18 A76280 A76300 Sign post
A76300 Individual Test 30 13-Sep-18 12-Oct-18 A76290 Individual Test
A76310 Turn out 15 19-May-18 02-Jun-18 A76250 Turn out
A76320 IRJ & Boding cable 20 28-Jul-18 16-Aug-18 A76270 IRJ & Boding cable
3rd Rail 212 14-May-18 11-Dec-18 11-Dec-18, 3rd Rail
A73490 Surveying 30 14-May-18 12-Jun-18 A76210 A73500 Surveying
A73500 Tray in buidling 35 13-Jun-18 17-Jul-18 A73490 A73510 Tray in buidling
A73510 Pre-assembly of insulator and claw 35 18-Jul-18 21-Aug-18 A73500 A73520 Pre-assembly of insulator and claw
A73520 support 35 22-Aug-18 25-Sep-18 A73510 A73530 support
A73530 expansion joint 20 21-Sep-18 10-Oct-18 A73520 A73540 expansion joint
A73540 conductor bar 30 26-Sep-18 25-Oct-18 A73530 A73550 conductor bar
A73550 rail joint 15 03-Oct-18 17-Oct-18 A73540 A73560, A73600 rail joint
A73560 cable terminal 15 08-Oct-18 22-Oct-18 A73550 A73570 cable terminal
A73570 Feeder Cable 20 23-Oct-18 11-Nov-18 A73560 A73590, A73600 Feeder Cable
A73580 Sign Post 20 12-Nov-18 01-Dec-18 A73600 Sign Post
A73590 Individual Test 30 12-Nov-18 11-Dec-18 A73570 A79850 Individual Test
A73600 DS 5 07-Nov-18 11-Nov-18 A73550, A73570 A73580 DS
Wayside(Signal/Communication/Power) 212 13-Jul-18 09-Feb-19 09-Feb-19, Wayside(Signal/Communication/Power)
A75030 Surveying 30 13-Jul-18 11-Aug-18 A76210 A75040 Surveying
A75040 Point Machine 20 12-Aug-18 31-Aug-18 A75030 A75050 Point Machine
A75050 Installation of tray 20 01-Sep-18 20-Sep-18 A75040 A75060 Installation of tray
A75060 Cable rack 20 21-Sep-18 10-Oct-18 A75050 A75070 Cable rack

Date Revision Checked Approved


MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (33)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
A75070 Connection wih wayside equipment 30 11-Oct-18 09-Nov-18 A75060 A75080 Connection wih wayside equipment
A75080 Wayside Equipment 30 10-Nov-18 09-Dec-18 A75070 A75090 Wayside Equipment
A75090 Cabling 20 20-Nov-18 09-Dec-18 A75080 A75110, A75100 Cabling
A75100 Connection with Main equipment 20 10-Dec-18 29-Dec-18 A75090 A75120 Connection with Main equipment
A75110 Sign Post 15 05-Dec-18 19-Dec-18 A75090 A75120 Sign Post
A75120 Individual Test 40 01-Jan-19 09-Feb-19 A75100, A75110 A79680 Individual Test
CIVIL (STN 14-DEPOT) San Jose Station - Depot 470 28-Jan-17 12-May-18 12-May-18, CIVIL (STN 14-DEPOT) San Jose Station - Depot
Depressed Guideway 470 28-Jan-17 12-May-18 12-May-18, Depressed Guideway
Earthworks 245 28-Jan-17 29-Sep-17 29-Sep-17, Earthworks
A88910 Setup of Barrier & Board Up 50 28-Jan-17 18-Mar-17 A71910 A88920 Setup of Barrier & Board Up
A88920 Clearing & Grubbing 70 22-Feb-17 02-May-17 A88910 A88930 Clearing & Grubbing
A88930 Removal of Existing Pavement 80 24-Mar-17 11-Jun-17 A88920 A88935 Removal of Existing Pavement
A88935 Subgrade Preparation 100 03-May-17 10-Aug-17 A88930 A88940 Subgrade Preparation
A88940 Excavation 80 12-Jun-17 30-Aug-17 A88935 A88950 Excavation
A88950 Backfill 80 12-Jul-17 29-Sep-17 A88940 A88720 Backfill
Guideway Construction 395 13-Apr-17 12-May-18 12-May-18, Guideway Construction
A88720 Diaphragm 150 13-Apr-17 09-Sep-17 A88950 A88730 Diaphragm
A88730 Excavation Stage 1 140 03-May-17 19-Sep-17 A88720 A88740 Excavation Stage 1
A88740 Waler / Showing Support1 130 13-May-17 19-Sep-17 A88730 A88750 Waler / Showing Support1
A88750 Excavation Stage2 140 12-Jun-17 29-Oct-17 A88740 A88760 Excavation Stage2
A88760 Waler / Showing Support2 130 22-Jul-17 28-Nov-17 A88750 A88770 Waler / Showing Support2
A88770 Excavation Final Stage 140 21-Aug-17 07-Jan-18 A88760 A88780 Excavation Final Stage
A88780 Tunnel, Bottom Slab 130 30-Sep-17 06-Feb-18 A88770 A88790 Tunnel, Bottom Slab
A88790 Tunnel , Wall (2slides) 120 09-Nov-17 08-Mar-18 A88780 A88800 Tunnel , Wall (2slides)
A88800 Tunnel, Top Slab 120 29-Nov-17 28-Mar-18 A88790 A88810 Tunnel, Top Slab
A88810 Waterproofing 115 19-Dec-17 12-Apr-18 A88800 A88820, A91900 Waterproofing
A88820 Restoration of Existing Pavement 120 13-Jan-18 12-May-18 A88810 Restoration of Existing Pavement
SYSTEM (STN 14-DEPOT) San Jose Station - Depot 240 29-Mar-18 23-Nov-18 23-Nov-18, SYSTEM (STN 14-DEPOT) San Jose Sta
Trackwork 127 29-Mar-18 02-Aug-18 02-Aug-18, Trackwork
A91900 Surveying 30 29-Mar-18 27-Apr-18 A88810 A91980, A91910, Surveying
A92000, A91800
A91910 Rail welding(CWR) and setting CWR 20 15-Apr-18 04-May-18 A91900 A91920, A91970 Rail welding(CWR) and setting CWR
A91920 Assemly of Fastener 20 05-May-18 24-May-18 A91910 A91940, A91930 Assemly of Fastener
A91930 Rail grinding 20 25-May-18 13-Jun-18 A91920 A91940, A91990, Rail grinding
A91950
A91940 Buffer stop 20 14-Jun-18 03-Jul-18 A91920, A91930 A91950 Buffer stop
A91950 Sign post 10 04-Jul-18 13-Jul-18 A91940, A91930 A91960 Sign post
A91960 Individual Test 20 14-Jul-18 02-Aug-18 A91950 Individual Test
A91970 Turn out 10 25-Apr-18 04-May-18 A91910 Turn out
A91980 Installstion of euroform & Assembly of reinforcing bars15 28-Apr-18 12-May-18 A91900 Installstion of euroform & Assembly of reinforcing bars
A91990 IRJ & Boding cable 15 30-May-18 13-Jun-18 A91930 IRJ & Boding cable
3rd Rail 120 28-May-18 24-Sep-18 24-Sep-18, 3rd Rail
A92000 Surveying 20 28-May-18 16-Jun-18 A91900 A92010 Surveying
A92010 Tray in buidling 15 12-Jun-18 26-Jun-18 A92000 A92020 Tray in buidling
A92020 Pre-assembly of insulator and claw 20 22-Jun-18 11-Jul-18 A92010 A92030 Pre-assembly of insulator and claw
A92030 Support 20 07-Jul-18 26-Jul-18 A92020 A92040 Support
A92040 Expansion joint 20 22-Jul-18 10-Aug-18 A92030 A92050 Expansion joint
A92050 Conductor bar 10 27-Jul-18 05-Aug-18 A92040 A92060 Conductor bar

Date Revision Checked Approved


MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (34)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
A92060 Rail joint 10 03-Aug-18 12-Aug-18 A92050 A92070, A92110 Rail joint
A92070 Cable terminal 8 08-Aug-18 15-Aug-18 A92060 A92080 Cable terminal
A92080 Feeder Cable 10 16-Aug-18 25-Aug-18 A92070 A92100, A92110 Feeder Cable
A92090 Sign Post 15 26-Aug-18 09-Sep-18 A92110 Sign Post
A92100 Individual Test 30 26-Aug-18 24-Sep-18 A92080 Individual Test
A92110 DS 5 21-Aug-18 25-Aug-18 A92060, A92080 A92090 DS
Wayside(Signal/Communication/Power) 120 27-Jul-18 23-Nov-18 23-Nov-18, Wayside(Signal/Communication/Power)
A91800 Surveying 30 27-Jul-18 25-Aug-18 A91900 A91810 Surveying
A91810 Conduit on the Track 40 06-Aug-18 14-Sep-18 A91800 A91820 Conduit on the Track
A91820 Installation of tray 30 06-Aug-18 04-Sep-18 A91810 A91830 Installation of tray
A91830 Cable rack 20 16-Aug-18 04-Sep-18 A91820 A91840 Cable rack
A91840 Connection wih wayside equipment 20 16-Aug-18 04-Sep-18 A91830 A91850 Connection wih wayside equipment
A91850 Wayside Equipment 30 16-Aug-18 14-Sep-18 A91840 A91860 Wayside Equipment
A91860 Cabling 30 16-Aug-18 14-Sep-18 A91850 A91880, A91870 Cabling
A91870 Connection with Main equipment 40 16-Aug-18 24-Sep-18 A91860 A91890 Connection with Main equipment
A91880 Sign Post 15 31-Aug-18 14-Sep-18 A91860 A91890 Sign Post
A91890 Individual Test 70 15-Sep-18 23-Nov-18 A91870, A91880 Individual Test
STATIONS 777 14-Jan-17 01-Mar-19 01-Mar-19, STATIONS
CLUSTER 1 712 16-Mar-17 25-Feb-19 25-Feb-19, CLUSTER 1
CIVIL (STATION 1) SM North Ave Station 285 16-Mar-17 25-Dec-17 25-Dec-17, CIVIL (STATION 1) SM North Ave Station
FIRST LEVEL 230 16-Mar-17 31-Oct-17 31-Oct-17, FIRST LEVEL
Civil Works 77 16-Mar-17 31-May-17 31-May-17, Civil Works
Earthworks 77 16-Mar-17 31-May-17 31-May-17, Earthworks
Structural Works 125 15-Apr-17 17-Aug-17 17-Aug-17, Structural Works
Bore Pile for Stations 1000 mm 15 mL 50 15-Apr-17 03-Jun-17 03-Jun-17, Bore Pile for Stations 1000 mm 15 mL
Pile Dynamic Test 3 04-Jun-17 06-Jun-17 06-Jun-17, Pile Dynamic Test
Ultrasonic Test 3 04-Jun-17 06-Jun-17 06-Jun-17, Ultrasonic Test
Foundation / Pile Cap 49 21-May-17 08-Jul-17 08-Jul-17, Foundation / Pile Cap
Tie Beam 49 04-Jun-17 22-Jul-17 22-Jul-17, Tie Beam
Lean Concrete 14 01-Jun-17 14-Jun-17 14-Jun-17, Lean Concrete
Ground Slab 35 15-Jun-17 19-Jul-17 19-Jul-17, Ground Slab
Column (1st Level) 38 29-Jun-17 05-Aug-17 05-Aug-17, Column (1st Level)
Stairs (1st Level) 36 13-Jul-17 17-Aug-17 17-Aug-17, Stairs (1st Level)
Elevator (1st Level) 30 19-Jul-17 17-Aug-17 17-Aug-17, Elevator (1st Level)
Architectural Works 109 15-May-17 31-Aug-17 31-Aug-17, Architectural Works
Thermal and Moisture Protection 14 15-May-17 28-May-17 28-May-17, Thermal and Moisture Protection
Metal Works 14 18-Aug-17 31-Aug-17 31-Aug-17, Metal Works
Finishes 42 29-May-17 09-Jul-17 09-Jul-17, Finishes
Electrical Works 56 14-Jun-17 08-Aug-17 08-Aug-17, Electrical Works
Outdoor Electric Equipment Work 21 14-Jun-17 04-Jul-17 04-Jul-17, Outdoor Electric Equipment Work
Electric Substation Work 21 21-Jun-17 11-Jul-17 11-Jul-17, Electric Substation Work
Lighting Work 21 12-Jul-17 01-Aug-17 01-Aug-17, Lighting Work
Earthing and Lighting Protection 14 26-Jul-17 08-Aug-17 08-Aug-17, Earthing and Lighting Protection
Mechanical Works 110 14-Jul-17 31-Oct-17 31-Oct-17, Mechanical Works
Mechanical/ HVAC Works 55 14-Jul-17 06-Sep-17 06-Sep-17, Mechanical/ HVAC Works
Plumbing Works 49 13-Aug-17 30-Sep-17 30-Sep-17, Plumbing Works
Fire Protection Works 35 12-Sep-17 16-Oct-17 16-Oct-17, Fire Protection Works
Elevator 50 12-Sep-17 31-Oct-17 31-Oct-17, Elevator
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (35)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Escalator 50 12-Sep-17 31-Oct-17 31-Oct-17, Escalator
SECOND LEVEL 186 15-May-17 16-Nov-17 16-Nov-17, SECOND LEVEL
Structural Works 170 15-May-17 31-Oct-17 31-Oct-17, Structural Works
Column (2nd Level) 45 15-May-17 28-Jun-17 28-Jun-17, Column (2nd Level)
Stairs (2nd Level) 50 29-May-17 17-Jul-17 17-Jul-17, Stairs (2nd Level)
Elevator 50 12-Sep-17 31-Oct-17 31-Oct-17, Elevator
Beam/Girder 63 29-May-17 30-Jul-17 30-Jul-17, Beam/Girder
Elevated Slab/ Metal Deck 42 12-Jun-17 23-Jul-17 23-Jul-17, Elevated Slab/ Metal Deck
Architectural Works 112 28-Jul-17 16-Nov-17 16-Nov-17, Architectural Works
Masonry 21 28-Jul-17 17-Aug-17 17-Aug-17, Masonry
Metal Works 28 18-Aug-17 14-Sep-17 14-Sep-17, Metal Works
Thermal and Moisture Protection 14 08-Sep-17 21-Sep-17 21-Sep-17, Thermal and Moisture Protection
Doors and Windows 21 11-Aug-17 31-Aug-17 31-Aug-17, Doors and Windows
Finishes 70 01-Sep-17 09-Nov-17 09-Nov-17, Finishes
Specialties 28 15-Sep-17 12-Oct-17 12-Oct-17, Specialties
Furnishing & Office Equipment 7 13-Oct-17 19-Oct-17 19-Oct-17, Furnishing & Office Equipment
Miscellaneous 28 20-Oct-17 16-Nov-17 16-Nov-17, Miscellaneous
Electrical Works 49 01-Jul-17 18-Aug-17 18-Aug-17, Electrical Works
Outdoor Electric Equipment Work 28 01-Jul-17 28-Jul-17 28-Jul-17, Outdoor Electric Equipment Work
Electric Substation Work 28 08-Jul-17 04-Aug-17 04-Aug-17, Electric Substation Work
Lighting Work 14 05-Aug-17 18-Aug-17 18-Aug-17, Lighting Work
Earthing and Lighting Protection 21 01-Jul-17 21-Jul-17 21-Jul-17, Earthing and Lighting Protection
Mechanical Works 95 14-Jul-17 16-Oct-17 16-Oct-17, Mechanical Works
Mechanical/ HVAC Works 55 14-Jul-17 06-Sep-17 06-Sep-17, Mechanical/ HVAC Works
Plumbing Works 52 13-Aug-17 03-Oct-17 03-Oct-17, Plumbing Works
Fire Protection Works 35 12-Sep-17 16-Oct-17 16-Oct-17, Fire Protection Works
Elevator 35 12-Sep-17 16-Oct-17 16-Oct-17, Elevator
Escalator 35 12-Sep-17 16-Oct-17 16-Oct-17, Escalator
THIRD LEVEL 165 14-Jul-17 25-Dec-17 25-Dec-17, THIRD LEVEL
Structural Works 90 03-Aug-17 31-Oct-17 31-Oct-17, Structural Works
Column (3rd Level) 45 03-Aug-17 16-Sep-17 16-Sep-17, Column (3rd Level)
Stairs (3rd Level) 50 17-Aug-17 05-Oct-17 05-Oct-17, Stairs (3rd Level)
Elevator 50 12-Sep-17 31-Oct-17 31-Oct-17, Elevator
Beam/Girder 63 17-Aug-17 18-Oct-17 18-Oct-17, Beam/Girder
Elevated Slab/ Metal Deck 42 31-Aug-17 11-Oct-17 11-Oct-17, Elevated Slab/ Metal Deck
Architectural Works 111 06-Sep-17 25-Dec-17 25-Dec-17, Architectural Works
Masonry 21 06-Sep-17 26-Sep-17 26-Sep-17, Masonry
Metal Works 28 27-Sep-17 24-Oct-17 24-Oct-17, Metal Works
Thermal and Moisture Protection 14 18-Oct-17 31-Oct-17 31-Oct-17, Thermal and Moisture Protection
Doors and Windows 21 20-Sep-17 10-Oct-17 10-Oct-17, Doors and Windows
Finishes 70 11-Oct-17 19-Dec-17 19-Dec-17, Finishes
Specialties 28 25-Oct-17 21-Nov-17 21-Nov-17, Specialties
Furnishing & Office Equipment 7 22-Nov-17 28-Nov-17 28-Nov-17, Furnishing & Office Equipment
Miscellaneous 27 29-Nov-17 25-Dec-17 25-Dec-17, Miscellaneous
Electrical Works 49 03-Sep-17 21-Oct-17 21-Oct-17, Electrical Works
Outdoor Electric Equipment Work 28 03-Sep-17 30-Sep-17 30-Sep-17, Outdoor Electric Equipment Work
Electric Substation Work 28 10-Sep-17 07-Oct-17 07-Oct-17, Electric Substation Work
Lighting Work 14 08-Oct-17 21-Oct-17 21-Oct-17, Lighting Work
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (36)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Earthing and Lighting Protection 21 03-Sep-17 23-Sep-17 23-Sep-17, Earthing and Lighting Protection
Mechanical Works 95 14-Jul-17 16-Oct-17 16-Oct-17, Mechanical Works
Mechanical/ HVAC Works 55 14-Jul-17 06-Sep-17 06-Sep-17, Mechanical/ HVAC Works
Plumbing Works 52 13-Aug-17 03-Oct-17 03-Oct-17, Plumbing Works
Fire Protection Works 14 12-Sep-17 25-Sep-17 25-Sep-17, Fire Protection Works
Elevator 35 12-Sep-17 16-Oct-17 16-Oct-17, Elevator
Escalator 35 12-Sep-17 16-Oct-17 16-Oct-17, Escalator
SYSTEM (STATION 1)SM North Ave Station 208 17-Sep-17 12-Apr-18 12-Apr-18, SYSTEM (STATION 1)SM North Ave Station
TPSS/ER 147 17-Sep-17 10-Feb-18 10-Feb-18, TPSS/ER
A78010 Surveying 15 17-Sep-17 01-Oct-17 A90450 A78020, A81990 Surveying
A78020 Installation of tray 20 02-Oct-17 21-Oct-17 A78010 A78030 Installation of tray
A78030 Cable rack 20 22-Oct-17 10-Nov-17 A78020 A78040, A78050 Cable rack
A78040 Cable contaminent 20 27-Oct-17 15-Nov-17 A78030 Cable contaminent
A78050 System installation 15 11-Nov-17 25-Nov-17 A78030 A78060 System installation
A78060 Cabling 20 26-Nov-17 15-Dec-17 A78050 A78070 Cabling
A78070 Connection of terminal 20 16-Dec-17 04-Jan-18 A78060 A78080 Connection of terminal
A78080 Individual Test 30 12-Jan-18 10-Feb-18 A78070 Individual Test
Signal/Comm./AFC 147 17-Nov-17 12-Apr-18 12-Apr-18, Signal/Comm./AFC
A81990 Surveying 20 17-Nov-17 06-Dec-17 A78010 A82000, A2980 Surveying
A82000 Machine Installation 47 07-Dec-17 22-Jan-18 A81990 A82010 Machine Installation
A82010 Cabling 40 23-Jan-18 03-Mar-18 A82000 A82020 Cabling
A82020 Individual Test 40 04-Mar-18 12-Apr-18 A82010 A79680 Individual Test
CIVIL (STATION 2) Quezon Memorial Circle Station 380 30-Oct-17 13-Nov-18 13-Nov-18, CIVIL (STATION 2) Quezon Memorial Circle Station
FIRST LEVEL 306 30-Oct-17 31-Aug-18 31-Aug-18, FIRST LEVEL
Civil works 80 30-Oct-17 17-Jan-18 17-Jan-18, Civil works
Earthworks 80 30-Oct-17 17-Jan-18 17-Jan-18, Earthworks
Structural Works 122 03-Apr-18 02-Aug-18 02-Aug-18, Structural Works
Ground Slab 56 17-Apr-18 11-Jun-18 11-Jun-18, Ground Slab
Lean Concrete 14 03-Apr-18 16-Apr-18 16-Apr-18, Lean Concrete
Column (1st Level) 38 05-Jun-18 12-Jul-18 12-Jul-18, Column (1st Level)
Stairs (1st Level) 38 26-Jun-18 02-Aug-18 02-Aug-18, Stairs (1st Level)
RC Wall 35 05-Jun-18 09-Jul-18 09-Jul-18, RC Wall
Elevator (1st Level) 30 26-Jun-18 25-Jul-18 25-Jul-18, Elevator (1st Level)
Architectural Works 119 04-May-18 30-Aug-18 30-Aug-18, Architectural Works
Masonry 21 04-May-18 24-May-18 24-May-18, Masonry
Metal Works 28 25-May-18 21-Jun-18 21-Jun-18, Metal Works
Doors 14 25-May-18 07-Jun-18 07-Jun-18, Doors
Thermal and Moisture Protection 14 22-Jun-18 05-Jul-18 05-Jul-18, Thermal and Moisture Protection
Finishes 42 06-Jul-18 16-Aug-18 16-Aug-18, Finishes
Miscellaneous 14 17-Aug-18 30-Aug-18 30-Aug-18, Miscellaneous
Electrical Works 105 19-May-18 31-Aug-18 31-Aug-18, Electrical Works
Outdoor Electric Equipment Work 21 19-May-18 08-Jun-18 08-Jun-18, Outdoor Electric Equipment Work
Electric Substation Work 21 26-May-18 15-Jun-18 15-Jun-18, Electric Substation Work
Power Feeder Work 28 02-Jun-18 29-Jun-18 29-Jun-18, Power Feeder Work
Power Equipment Work 28 02-Jun-18 29-Jun-18 29-Jun-18, Power Equipment Work
Power Outlet Fixtures 21 23-Jun-18 13-Jul-18 13-Jul-18, Power Outlet Fixtures
Lighting Work 21 23-Jun-18 13-Jul-18 13-Jul-18, Lighting Work
Earthing and Lighting Protection 28 07-Jul-18 03-Aug-18 03-Aug-18, Earthing and Lighting Protection
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (37)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Electrical Fire Equipment Work 28 28-Jul-18 24-Aug-18 24-Aug-18, Electrical Fire Equipment Work
Wires and Cables 14 18-Aug-18 31-Aug-18 31-Aug-18, Wires and Cables
Mechanical Works 65 18-Jun-18 21-Aug-18 21-Aug-18, Mechanical Works
Mechanical/ HVAC Works 55 18-Jun-18 11-Aug-18 11-Aug-18, Mechanical/ HVAC Works
Plumbing Works 49 23-Jun-18 10-Aug-18 10-Aug-18, Plumbing Works
Fire Protection Works 35 03-Jul-18 06-Aug-18 06-Aug-18, Fire Protection Works
Elevator 50 03-Jul-18 21-Aug-18 21-Aug-18, Elevator
Escalator 50 03-Jul-18 21-Aug-18 21-Aug-18, Escalator
SECOND LEVEL 149 18-Jun-18 13-Nov-18 13-Nov-18, SECOND LEVEL
Structural Works 84 23-Jun-18 14-Sep-18 14-Sep-18, Structural Works
Column (2nd Level) 45 23-Jun-18 06-Aug-18 06-Aug-18, Column (2nd Level)
Stairs (2nd Level) 50 07-Jul-18 25-Aug-18 25-Aug-18, Stairs (2nd Level)
Elevated Slab/ Metal Deck 42 04-Aug-18 14-Sep-18 14-Sep-18, Elevated Slab/ Metal Deck
Architectural Works 115 22-Jul-18 13-Nov-18 13-Nov-18, Architectural Works
Masonry 21 22-Jul-18 11-Aug-18 11-Aug-18, Masonry
Metal Works 28 12-Aug-18 08-Sep-18 08-Sep-18, Metal Works
Thermal and Moisture Protection 14 02-Sep-18 15-Sep-18 15-Sep-18, Thermal and Moisture Protection
Doors and Windows 21 05-Aug-18 25-Aug-18 25-Aug-18, Doors and Windows
Finishes 70 26-Aug-18 03-Nov-18 03-Nov-18, Finishes
Specialties 35 09-Sep-18 13-Oct-18 13-Oct-18, Specialties
Furnishing & Office Equipment 7 14-Oct-18 20-Oct-18 20-Oct-18, Furnishing & Office Equipment
Miscellaneous 24 21-Oct-18 13-Nov-18 13-Nov-18, Miscellaneous
Electrical Works 70 10-Aug-18 18-Oct-18 18-Oct-18, Electrical Works
Power Outlet Fixtures 21 10-Aug-18 30-Aug-18 30-Aug-18, Power Outlet Fixtures
Lighting Works 21 17-Aug-18 06-Sep-18 06-Sep-18, Lighting Works
Electrical Fire Equipment Work 35 31-Aug-18 04-Oct-18 04-Oct-18, Electrical Fire Equipment Work
Access Control System 7 28-Sep-18 04-Oct-18 04-Oct-18, Access Control System
Wires and Cables 30 10-Aug-18 08-Sep-18 08-Sep-18, Wires and Cables
Roughing-ins 14 05-Oct-18 18-Oct-18 18-Oct-18, Roughing-ins
Mechanical Works 66 18-Jun-18 22-Aug-18 22-Aug-18, Mechanical Works
Mechanical/ HVAC Works 55 18-Jun-18 11-Aug-18 11-Aug-18, Mechanical/ HVAC Works
Plumbing Works 61 23-Jun-18 22-Aug-18 22-Aug-18, Plumbing Works
Fire Protection Works 14 03-Jul-18 16-Jul-18 16-Jul-18, Fire Protection Works
Elevator 50 03-Jul-18 21-Aug-18 21-Aug-18, Elevator
Escalator 50 03-Jul-18 21-Aug-18 21-Aug-18, Escalator
SYSTEM (STATION 2)Quezon Memorial Circle Station 180 30-Aug-18 25-Feb-19 25-Feb-19, SYSTEM (STATION 2)Quezon M
TPSS/ER 120 30-Aug-18 27-Dec-18 27-Dec-18, TPSS/ER
A77370 Surveying 20 30-Aug-18 18-Sep-18 A20520 A77380, A82190 Surveying
A77380 Installation of tray 15 19-Sep-18 03-Oct-18 A77370 A77390 Installation of tray
A77390 Cable rack 15 04-Oct-18 18-Oct-18 A77380 A77400, A77410 Cable rack
A77400 Cable contaminent 20 09-Oct-18 28-Oct-18 A77390 Cable contaminent
A77410 System installation 15 19-Oct-18 02-Nov-18 A77390 A77420 System installation
A77420 Cabling 15 03-Nov-18 17-Nov-18 A77410 A77430 Cabling
A77430 Connection of terminal 10 18-Nov-18 27-Nov-18 A77420 A77440 Connection of terminal
A77440 Individual Test 30 28-Nov-18 27-Dec-18 A77430 Individual Test
Signal/Comm./AFC 120 29-Oct-18 25-Feb-19 25-Feb-19, Signal/Comm./AFC
A82190 Surveying 20 29-Oct-18 17-Nov-18 A77370 A82200 Surveying
A82200 Machine Installation 30 18-Nov-18 17-Dec-18 A82190 A82210 Machine Installation
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (38)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
A82210 Cabling 40 18-Dec-18 26-Jan-19 A82200 A82220 Cabling
A82220 Individual Test 30 27-Jan-19 25-Feb-19 A82210 A79680 Individual Test
CLUSTER 2 657 14-May-17 01-Mar-19 01-Mar-19, CLUSTER 2
CIVIL (STATION 3) University Avenue Station 270 20-Mar-18 14-Dec-18 14-Dec-18, CIVIL (STATION 3) University Avenue Station
FIRST LEVEL 236 20-Mar-18 10-Nov-18 10-Nov-18, FIRST LEVEL
Civil works 117 20-Mar-18 14-Jul-18 14-Jul-18, Civil works
Earthworks 117 20-Mar-18 14-Jul-18 14-Jul-18, Earthworks
Structural Works 122 26-May-18 24-Sep-18 24-Sep-18, Structural Works
Ground Slab 56 09-Jun-18 03-Aug-18 03-Aug-18, Ground Slab
Lean Concrete 14 26-May-18 08-Jun-18 08-Jun-18, Lean Concrete
Column (1st Level) 38 28-Jul-18 03-Sep-18 03-Sep-18, Column (1st Level)
Stairs (1st Level) 38 18-Aug-18 24-Sep-18 24-Sep-18, Stairs (1st Level)
RC Wall 35 28-Jul-18 31-Aug-18 31-Aug-18, RC Wall
Elevator (1st Level) 30 18-Aug-18 16-Sep-18 16-Sep-18, Elevator (1st Level)
Architectural Works 119 08-Jun-18 04-Oct-18 04-Oct-18, Architectural Works
Masonry 21 08-Jun-18 28-Jun-18 28-Jun-18, Masonry
Metal Works 28 29-Jun-18 26-Jul-18 26-Jul-18, Metal Works
Doors 14 29-Jun-18 12-Jul-18 12-Jul-18, Doors
Thermal and Moisture Protection 14 27-Jul-18 09-Aug-18 09-Aug-18, Thermal and Moisture Protection
Finishes 42 10-Aug-18 20-Sep-18 20-Sep-18, Finishes
Miscellaneous 14 21-Sep-18 04-Oct-18 04-Oct-18, Miscellaneous
Electrical Works 105 10-Jul-18 22-Oct-18 22-Oct-18, Electrical Works
Outdoor Electric Equipment Work 21 10-Jul-18 30-Jul-18 30-Jul-18, Outdoor Electric Equipment Work
Electric Substation Work 21 17-Jul-18 06-Aug-18 06-Aug-18, Electric Substation Work
Power Feeder Work 28 24-Jul-18 20-Aug-18 20-Aug-18, Power Feeder Work
Power Equipment Work 28 24-Jul-18 20-Aug-18 20-Aug-18, Power Equipment Work
Power Outlet Fixtures 21 14-Aug-18 03-Sep-18 03-Sep-18, Power Outlet Fixtures
Lighting Work 21 14-Aug-18 03-Sep-18 03-Sep-18, Lighting Work
Earthing and Lighting Protection 28 28-Aug-18 24-Sep-18 24-Sep-18, Earthing and Lighting Protection
Electrical Fire Equipment Work 28 18-Sep-18 15-Oct-18 15-Oct-18, Electrical Fire Equipment Work
Wires and Cables 14 09-Oct-18 22-Oct-18 22-Oct-18, Wires and Cables
Mechanical Works 109 25-Jul-18 10-Nov-18 10-Nov-18, Mechanical Works
Mechanical/ HVAC Works 55 25-Jul-18 17-Sep-18 17-Sep-18, Mechanical/ HVAC Works
Plumbing Works 49 03-Sep-18 21-Oct-18 21-Oct-18, Plumbing Works
Fire Protection Works 35 22-Sep-18 26-Oct-18 26-Oct-18, Fire Protection Works
Elevator 50 22-Sep-18 10-Nov-18 10-Nov-18, Elevator
Escalator 50 22-Sep-18 10-Nov-18 10-Nov-18, Escalator
SECOND LEVEL 163 05-Jul-18 14-Dec-18 14-Dec-18, SECOND LEVEL
Structural Works 84 05-Jul-18 26-Sep-18 26-Sep-18, Structural Works
Column (2nd Level) 45 05-Jul-18 18-Aug-18 18-Aug-18, Column (2nd Level)
Stairs (2nd Level) 50 19-Jul-18 06-Sep-18 06-Sep-18, Stairs (2nd Level)
Elevated Slab/ Metal Deck 42 16-Aug-18 26-Sep-18 26-Sep-18, Elevated Slab/ Metal Deck
Architectural Works 115 23-Jul-18 14-Nov-18 14-Nov-18, Architectural Works
Masonry 21 23-Jul-18 12-Aug-18 12-Aug-18, Masonry
Metal Works 28 13-Aug-18 09-Sep-18 09-Sep-18, Metal Works
Thermal and Moisture Protection 14 03-Sep-18 16-Sep-18 16-Sep-18, Thermal and Moisture Protection
Doors and Windows 21 06-Aug-18 26-Aug-18 26-Aug-18, Doors and Windows
Finishes 70 27-Aug-18 04-Nov-18 04-Nov-18, Finishes
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (39)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Specialties 35 10-Sep-18 14-Oct-18 14-Oct-18, Specialties
Furnishing & Office Equipment 7 15-Oct-18 21-Oct-18 21-Oct-18, Furnishing & Office Equipment
Miscellaneous 24 22-Oct-18 14-Nov-18 14-Nov-18, Miscellaneous
Electrical Works 70 29-Aug-18 06-Nov-18 06-Nov-18, Electrical Works
Power Outlet Fixtures 21 29-Aug-18 18-Sep-18 18-Sep-18, Power Outlet Fixtures
Lighting Works 21 05-Sep-18 25-Sep-18 25-Sep-18, Lighting Works
Electrical Fire Equipment Work 35 19-Sep-18 23-Oct-18 23-Oct-18, Electrical Fire Equipment Work
Access Control System 7 17-Oct-18 23-Oct-18 23-Oct-18, Access Control System
Wires and Cables 30 29-Aug-18 27-Sep-18 27-Sep-18, Wires and Cables
Roughing-ins 14 24-Oct-18 06-Nov-18 06-Nov-18, Roughing-ins
Mechanical Works 143 25-Jul-18 14-Dec-18 14-Dec-18, Mechanical Works
Mechanical/ HVAC Works 55 25-Jul-18 17-Sep-18 17-Sep-18, Mechanical/ HVAC Works
Plumbing Works 61 03-Sep-18 02-Nov-18 02-Nov-18, Plumbing Works
Fire Protection Works 14 22-Sep-18 05-Oct-18 05-Oct-18, Fire Protection Works
Elevator 50 22-Sep-18 10-Nov-18 10-Nov-18, Elevator
Escalator 50 22-Sep-18 10-Nov-18 10-Nov-18, Escalator
Miscellaneous Works 34 11-Nov-18 14-Dec-18 14-Dec-18, Miscellaneous Works
SYSTEM (STATION 3)University Avenue Station 183 31-Aug-18 01-Mar-19 01-Mar-19, SYSTEM (STATION 3)University
TPSS/ER 123 31-Aug-18 31-Dec-18 31-Dec-18, TPSS/ER
A77450 Surveying 20 31-Aug-18 19-Sep-18 A21970 A77460, A82230 Surveying
A77460 Installation of tray 20 20-Sep-18 09-Oct-18 A77450 A77470 Installation of tray
A77470 Cable rack 15 10-Oct-18 24-Oct-18 A77460 A77480, A77490 Cable rack
A77480 Cable contaminent 20 15-Oct-18 03-Nov-18 A77470 Cable contaminent
A77490 System installation 15 25-Oct-18 08-Nov-18 A77470 A77500 System installation
A77500 Cabling 15 09-Nov-18 23-Nov-18 A77490 A77510 Cabling
A77510 Connection of terminal 10 24-Nov-18 03-Dec-18 A77500 A77520 Connection of terminal
A77520 Individual Test 30 02-Dec-18 31-Dec-18 A77510 Individual Test
Signal/Comm./AFC 123 30-Oct-18 01-Mar-19 01-Mar-19, Signal/Comm./AFC
A82230 Surveying 20 30-Oct-18 18-Nov-18 A77450 A82240 Surveying
A82240 Machine Installation 30 19-Nov-18 18-Dec-18 A82230 A82250 Machine Installation
A82250 Cabling 40 19-Dec-18 27-Jan-19 A82240 A82260 Cabling
A82260 Individual Test 33 28-Jan-19 01-Mar-19 A82250 A79680 Individual Test
CIVIL (STATION 4) Tandang Sora Station 270 14-May-17 07-Feb-18 07-Feb-18, CIVIL (STATION 4) Tandang Sora Station
FIRST LEVEL 270 14-May-17 07-Feb-18 07-Feb-18, FIRST LEVEL
Civil works 77 14-May-17 29-Jul-17 29-Jul-17, Civil works
Earthworks 77 14-May-17 29-Jul-17 29-Jul-17, Earthworks
Structural Works 125 13-Jun-17 15-Oct-17 15-Oct-17, Structural Works
Bore Pile for Stations TS 1-7, 1000 mm £¿ 15 mL 62 13-Jun-17 13-Aug-17 13-Aug-17, Bore Pile for Stations TS 1-7, 1000 mm £¿ 15 mL
Pile Dynamic Test 3 26-Jul-17 28-Jul-17 28-Jul-17, Pile Dynamic Test
Ultrasonic Test 3 26-Jul-17 28-Jul-17 28-Jul-17, Ultrasonic Test
Foundation / Pile Cap 49 19-Jul-17 05-Sep-17 05-Sep-17, Foundation / Pile Cap
Tie Beam 49 02-Aug-17 19-Sep-17 19-Sep-17, Tie Beam
Lean Concrete 14 30-Jul-17 12-Aug-17 12-Aug-17, Lean Concrete
Ground Slab 35 13-Aug-17 16-Sep-17 16-Sep-17, Ground Slab
Column (1st Level) 38 27-Aug-17 03-Oct-17 03-Oct-17, Column (1st Level)
Stairs (1st Level) 34 10-Sep-17 13-Oct-17 13-Oct-17, Stairs (1st Level)
Elevator (1st Level) 30 16-Sep-17 15-Oct-17 15-Oct-17, Elevator (1st Level)
Architectural Works 63 14-Jul-17 14-Sep-17 14-Sep-17, Architectural Works
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (40)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Thermal and Moisture Protection 14 14-Jul-17 27-Jul-17 27-Jul-17, Thermal and Moisture Protection
Metal Works 21 28-Jul-17 17-Aug-17 17-Aug-17, Metal Works
Finishes 49 28-Jul-17 14-Sep-17 14-Sep-17, Finishes
Electrical Works 70 14-Aug-17 22-Oct-17 22-Oct-17, Electrical Works
Outdoor Electric Equipment Work 21 14-Aug-17 03-Sep-17 03-Sep-17, Outdoor Electric Equipment Work
Electric Substation Work 21 21-Aug-17 10-Sep-17 10-Sep-17, Electric Substation Work
Lighting Work 21 11-Sep-17 01-Oct-17 01-Oct-17, Lighting Work
Earthing and Lighting Protection 28 25-Sep-17 22-Oct-17 22-Oct-17, Earthing and Lighting Protection
Mechanical Works 150 11-Sep-17 07-Feb-18 07-Feb-18, Mechanical Works
Mechanical/ HVAC Works 55 11-Sep-17 04-Nov-17 04-Nov-17, Mechanical/ HVAC Works
Plumbing Works 49 21-Oct-17 08-Dec-17 08-Dec-17, Plumbing Works
Fire Protection Works 35 20-Nov-17 24-Dec-17 24-Dec-17, Fire Protection Works
Elevator 50 20-Dec-17 07-Feb-18 07-Feb-18, Elevator
Escalator 50 20-Dec-17 07-Feb-18 07-Feb-18, Escalator
SECOND LEVEL 209 14-Jul-17 07-Feb-18 07-Feb-18, SECOND LEVEL
Structural Works 209 14-Jul-17 07-Feb-18 07-Feb-18, Structural Works
Column (2nd Level) 45 14-Jul-17 27-Aug-17 27-Aug-17, Column (2nd Level)
Stairs (2nd Level) 50 28-Jul-17 15-Sep-17 15-Sep-17, Stairs (2nd Level)
Elevator 50 20-Dec-17 07-Feb-18 07-Feb-18, Elevator
Beam/Girder 63 28-Jul-17 28-Sep-17 28-Sep-17, Beam/Girder
Elevated Slab/ Metal Deck 42 11-Aug-17 21-Sep-17 21-Sep-17, Elevated Slab/ Metal Deck
Architectural Works 112 25-Aug-17 14-Dec-17 14-Dec-17, Architectural Works
Masonry 21 25-Aug-17 14-Sep-17 14-Sep-17, Masonry
Metal Works 28 15-Sep-17 12-Oct-17 12-Oct-17, Metal Works
Thermal and Moisture Protection 14 06-Oct-17 19-Oct-17 19-Oct-17, Thermal and Moisture Protection
Doors and Windows 21 08-Sep-17 28-Sep-17 28-Sep-17, Doors and Windows
Finishes 70 29-Sep-17 07-Dec-17 07-Dec-17, Finishes
Specialties 28 13-Oct-17 09-Nov-17 09-Nov-17, Specialties
Furnishing & Office Equipment 7 10-Nov-17 16-Nov-17 16-Nov-17, Furnishing & Office Equipment
Miscellaneous 28 17-Nov-17 14-Dec-17 14-Dec-17, Miscellaneous
Electrical Works 49 18-Sep-17 05-Nov-17 05-Nov-17, Electrical Works
Outdoor Electric Equipment Work 28 18-Sep-17 15-Oct-17 15-Oct-17, Outdoor Electric Equipment Work
Electric Substation Work 28 25-Sep-17 22-Oct-17 22-Oct-17, Electric Substation Work
Lighting Work 14 23-Oct-17 05-Nov-17 05-Nov-17, Lighting Work
Earthing and Lighting Protection 21 18-Sep-17 08-Oct-17 08-Oct-17, Earthing and Lighting Protection
Mechanical Works 128 18-Sep-17 23-Jan-18 23-Jan-18, Mechanical Works
Mechanical/ HVAC Works 55 18-Sep-17 11-Nov-17 11-Nov-17, Mechanical/ HVAC Works
Plumbing Works 52 18-Oct-17 08-Dec-17 08-Dec-17, Plumbing Works
Fire Protection Works 14 17-Nov-17 30-Nov-17 30-Nov-17, Fire Protection Works
Elevator 35 20-Dec-17 23-Jan-18 23-Jan-18, Elevator
Escalator 35 20-Dec-17 23-Jan-18 23-Jan-18, Escalator
SYSTEM (STATION 4)Tandang Sora Station 207 02-Oct-17 26-Apr-18 26-Apr-18, SYSTEM (STATION 4)Tandang Sora Station
TPSS/ER 147 02-Oct-17 25-Feb-18 25-Feb-18, TPSS/ER
A77690 Surveying 20 02-Oct-17 21-Oct-17 A27430 A77700, A82350 Surveying
A77700 Installation of tray 20 22-Oct-17 10-Nov-17 A77690 A77710 Installation of tray
A77710 Cable rack 18 11-Nov-17 28-Nov-17 A77700 A77720, A77730 Cable rack
A77720 Cable contaminent 10 16-Nov-17 25-Nov-17 A77710 Cable contaminent
A77730 System installation 20 29-Nov-17 18-Dec-17 A77710 A77740 System installation
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (41)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
A77740 Cabling 20 19-Dec-17 07-Jan-18 A77730 A77750 Cabling
A77750 Connection of terminal 15 08-Jan-18 22-Jan-18 A77740 A77760 Connection of terminal
A77760 Individual Test 30 27-Jan-18 25-Feb-18 A77750 Individual Test
Signal/Comm./AFC 147 01-Dec-17 26-Apr-18 26-Apr-18, Signal/Comm./AFC
A82350 Surveying 20 01-Dec-17 20-Dec-17 A77690 A82360 Surveying
A82360 Machine Installation 45 21-Dec-17 03-Feb-18 A82350 A82370 Machine Installation
A82370 Cabling 42 04-Feb-18 17-Mar-18 A82360 A82380 Cabling
A82380 Individual Test 40 18-Mar-18 26-Apr-18 A82370 A79680 Individual Test
CIVIL (STATION 5) Don Antonio Station 314 01-Oct-17 10-Aug-18 10-Aug-18, CIVIL (STATION 5) Don Antonio Station
FIRST LEVEL 279 01-Oct-17 06-Jul-18 06-Jul-18, FIRST LEVEL
Civil works 109 01-Oct-17 17-Jan-18 17-Jan-18, Civil works
Earthworks 109 01-Oct-17 17-Jan-18 17-Jan-18, Earthworks
Structural Works 122 19-Dec-17 19-Apr-18 19-Apr-18, Structural Works
Lean Concrete 14 19-Dec-17 01-Jan-18 01-Jan-18, Lean Concrete
Ground Slab 56 02-Jan-18 26-Feb-18 26-Feb-18, Ground Slab
Column (1st Level) 38 20-Feb-18 29-Mar-18 29-Mar-18, Column (1st Level)
Stairs (1st Level) 38 13-Mar-18 19-Apr-18 19-Apr-18, Stairs (1st Level)
Elevator (1st Level) 30 13-Mar-18 11-Apr-18 11-Apr-18, Elevator (1st Level)
Architectural Works 119 18-Jan-18 16-May-18 16-May-18, Architectural Works
Masonry 21 18-Jan-18 07-Feb-18 07-Feb-18, Masonry
Metal Works 28 08-Feb-18 07-Mar-18 07-Mar-18, Metal Works
Thermal and Moisture Protection 14 08-Mar-18 21-Mar-18 21-Mar-18, Thermal and Moisture Protection
Finishes 42 22-Mar-18 02-May-18 02-May-18, Finishes
Miscellaneous 14 03-May-18 16-May-18 16-May-18, Miscellaneous
Electrical Works 105 17-Feb-18 01-Jun-18 01-Jun-18, Electrical Works
Outdoor Electric Equipment Work 21 17-Feb-18 09-Mar-18 09-Mar-18, Outdoor Electric Equipment Work
Electric Substation Work 21 24-Feb-18 16-Mar-18 16-Mar-18, Electric Substation Work
Power Feeder Work 28 03-Mar-18 30-Mar-18 30-Mar-18, Power Feeder Work
Power Equipment Work 28 03-Mar-18 30-Mar-18 30-Mar-18, Power Equipment Work
Power Outlet Fixtures 21 24-Mar-18 13-Apr-18 13-Apr-18, Power Outlet Fixtures
Lighting Work 21 24-Mar-18 13-Apr-18 13-Apr-18, Lighting Work
Earthing and Lighting Protection 28 07-Apr-18 04-May-18 04-May-18, Earthing and Lighting Protection
Electrical Fire Equipment Work 28 28-Apr-18 25-May-18 25-May-18, Electrical Fire Equipment Work
Wires and Cables 14 19-May-18 01-Jun-18 01-Jun-18, Wires and Cables
Mechanical Works 110 19-Mar-18 06-Jul-18 06-Jul-18, Mechanical Works
Mechanical/ HVAC Works 55 19-Mar-18 12-May-18 12-May-18, Mechanical/ HVAC Works
Plumbing Works 49 18-Apr-18 05-Jun-18 05-Jun-18, Plumbing Works
Fire Protection Works 35 18-May-18 21-Jun-18 21-Jun-18, Fire Protection Works
Elevator 50 18-May-18 06-Jul-18 06-Jul-18, Elevator
Escalator 50 18-May-18 06-Jul-18 06-Jul-18, Escalator
SECOND LEVEL 185 07-Feb-18 10-Aug-18 10-Aug-18, SECOND LEVEL
Structural Works 84 07-Feb-18 01-May-18 01-May-18, Structural Works
Column (2nd Level) 45 07-Feb-18 23-Mar-18 23-Mar-18, Column (2nd Level)
Stairs (2nd Level) 50 21-Feb-18 11-Apr-18 11-Apr-18, Stairs (2nd Level)
Elevated Slab/ Metal Deck 42 21-Mar-18 01-May-18 01-May-18, Elevated Slab/ Metal Deck
Architectural Works 115 17-Feb-18 11-Jun-18 11-Jun-18, Architectural Works
Masonry 21 17-Feb-18 09-Mar-18 09-Mar-18, Masonry
Metal Works 28 10-Mar-18 06-Apr-18 06-Apr-18, Metal Works
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (42)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Thermal and Moisture Protection 14 31-Mar-18 13-Apr-18 13-Apr-18, Thermal and Moisture Protection
Doors and Windows 21 03-Mar-18 23-Mar-18 23-Mar-18, Doors and Windows
Finishes 70 24-Mar-18 01-Jun-18 01-Jun-18, Finishes
Specialties 35 07-Apr-18 11-May-18 11-May-18, Specialties
Furnishing & Office Equipment 7 12-May-18 18-May-18 18-May-18, Furnishing & Office Equipment
Miscellaneous 24 19-May-18 11-Jun-18 11-Jun-18, Miscellaneous
Electrical Works 70 03-May-18 11-Jul-18 11-Jul-18, Electrical Works
Power Outlet Fixtures 21 03-May-18 23-May-18 23-May-18, Power Outlet Fixtures
Lighting Works 21 10-May-18 30-May-18 30-May-18, Lighting Works
Electrical Fire Equipment Work 35 24-May-18 27-Jun-18 27-Jun-18, Electrical Fire Equipment Work
Access Control System 7 21-Jun-18 27-Jun-18 27-Jun-18, Access Control System
Wires and Cables 30 03-May-18 01-Jun-18 01-Jun-18, Wires and Cables
Roughing-ins 14 28-Jun-18 11-Jul-18 11-Jul-18, Roughing-ins
Mechanical Works 145 19-Mar-18 10-Aug-18 10-Aug-18, Mechanical Works
Mechanical/ HVAC Works 55 19-Mar-18 12-May-18 12-May-18, Mechanical/ HVAC Works
Plumbing Works 61 18-Apr-18 17-Jun-18 17-Jun-18, Plumbing Works
Fire Protection Works 14 18-May-18 31-May-18 31-May-18, Fire Protection Works
Elevator 50 18-May-18 06-Jul-18 06-Jul-18, Elevator
Escalator 50 18-May-18 06-Jul-18 06-Jul-18, Escalator
Miscellaneous Works 35 07-Jul-18 10-Aug-18 10-Aug-18, Miscellaneous Works
SYSTEM (STATION 5)Don Antonio Station 180 14-Mar-18 09-Sep-18 09-Sep-18, SYSTEM (STATION 5)Don Antonio Station
TPSS/ER 120 14-Mar-18 11-Jul-18 11-Jul-18, TPSS/ER
A74340 Surveying 20 14-Mar-18 02-Apr-18 A90090 A74350, A81950 Surveying
A74350 Installation of tray 10 03-Apr-18 12-Apr-18 A74340 A74360 Installation of tray
A74360 cable rack 10 13-Apr-18 22-Apr-18 A74350 A74370, A74380 cable rack
A74370 cable contaminent 10 18-Apr-18 27-Apr-18 A74360 cable contaminent
A74380 System installation 20 23-Apr-18 12-May-18 A74360 A74390 System installation
A74390 Cabling 20 13-May-18 01-Jun-18 A74380 A74400 Cabling
A74400 Connection of terminal 10 02-Jun-18 11-Jun-18 A74390 A74410 Connection of terminal
A74410 Individual Test 30 12-Jun-18 11-Jul-18 A74400 Individual Test
Signal/Comm./AFC 120 13-May-18 09-Sep-18 09-Sep-18, Signal/Comm./AFC
A81950 Surveying 20 13-May-18 01-Jun-18 A74340 A81960 Surveying
A81960 Machine Installation 30 02-Jun-18 01-Jul-18 A81950 A81970 Machine Installation
A81970 Cabling 40 02-Jul-18 10-Aug-18 A81960 A81980 Cabling
A81980 Individual Test 30 11-Aug-18 09-Sep-18 A81970 A79680 Individual Test
CIVIL (STATION 6) Batasan Station 325 18-Feb-18 08-Jan-19 08-Jan-19, CIVIL (STATION 6) Batasan Station
FIRST LEVEL 284 18-Feb-18 28-Nov-18 28-Nov-18, FIRST LEVEL
Civil works 116 18-Feb-18 13-Jun-18 13-Jun-18, Civil works
Earthworks 116 18-Feb-18 13-Jun-18 13-Jun-18, Earthworks
Structural Works 140 13-Apr-18 30-Aug-18 30-Aug-18, Structural Works
Bore Pile for Stations BS 1-7, 1000 mm £¿ 15 mL 62 13-Apr-18 13-Jun-18 13-Jun-18, Bore Pile for Stations BS 1-7, 1000 mm £¿ 15 mL
Pile Dynamic Test 3 26-May-18 28-May-18 28-May-18, Pile Dynamic Test
Ultrasonic Test 3 26-May-18 28-May-18 28-May-18, Ultrasonic Test
Foundation / Pile Cap 49 19-May-18 06-Jul-18 06-Jul-18, Foundation / Pile Cap
Tie Beam 49 02-Jun-18 20-Jul-18 20-Jul-18, Tie Beam
Lean Concrete 14 14-Jun-18 27-Jun-18 27-Jun-18, Lean Concrete
Ground Slab 35 28-Jun-18 01-Aug-18 01-Aug-18, Ground Slab
Column (1st Level) 38 12-Jul-18 18-Aug-18 18-Aug-18, Column (1st Level)
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (43)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Stairs (1st Level) 34 26-Jul-18 28-Aug-18 28-Aug-18, Stairs (1st Level)
Elevator (1st Level) 30 01-Aug-18 30-Aug-18 30-Aug-18, Elevator (1st Level)
Architectural Works 100 12-Jun-18 19-Sep-18 19-Sep-18, Architectural Works
Thermal and Moisture Protection 33 12-Jun-18 14-Jul-18 14-Jul-18, Thermal and Moisture Protection
Metal Works 20 31-Aug-18 19-Sep-18 19-Sep-18, Metal Works
Finishes 49 15-Jul-18 01-Sep-18 01-Sep-18, Finishes
Electrical Works 70 12-Jul-18 19-Sep-18 19-Sep-18, Electrical Works
Outdoor Electric Equipment Work 21 12-Jul-18 01-Aug-18 01-Aug-18, Outdoor Electric Equipment Work
Electric Substation Work 21 19-Jul-18 08-Aug-18 08-Aug-18, Electric Substation Work
Lighting Work 21 09-Aug-18 29-Aug-18 29-Aug-18, Lighting Work
Earthing and Lighting Protection 28 23-Aug-18 19-Sep-18 19-Sep-18, Earthing and Lighting Protection
Mechanical Works 110 11-Aug-18 28-Nov-18 28-Nov-18, Mechanical Works
Mechanical/ HVAC Works 55 11-Aug-18 04-Oct-18 04-Oct-18, Mechanical/ HVAC Works
Plumbing Works 49 11-Aug-18 28-Sep-18 28-Sep-18, Plumbing Works
Fire Protection Works 35 10-Sep-18 14-Oct-18 14-Oct-18, Fire Protection Works
Elevator 50 10-Oct-18 28-Nov-18 28-Nov-18, Elevator
Escalator 50 10-Oct-18 28-Nov-18 28-Nov-18, Escalator
SECOND LEVEL 185 28-May-18 28-Nov-18 28-Nov-18, SECOND LEVEL
Structural Works 185 28-May-18 28-Nov-18 28-Nov-18, Structural Works
Column (2nd Level) 45 28-May-18 11-Jul-18 11-Jul-18, Column (2nd Level)
Stairs (2nd Level) 50 11-Jun-18 30-Jul-18 30-Jul-18, Stairs (2nd Level)
Elevator 50 10-Oct-18 28-Nov-18 28-Nov-18, Elevator
Beam/Girder 63 11-Jun-18 12-Aug-18 12-Aug-18, Beam/Girder
Elevated Slab/ Metal Deck 42 25-Jun-18 05-Aug-18 05-Aug-18, Elevated Slab/ Metal Deck
Architectural Works 112 12-Jul-18 31-Oct-18 31-Oct-18, Architectural Works
Masonry 21 12-Jul-18 01-Aug-18 01-Aug-18, Masonry
Metal Works 28 02-Aug-18 29-Aug-18 29-Aug-18, Metal Works
Thermal and Moisture Protection 14 23-Aug-18 05-Sep-18 05-Sep-18, Thermal and Moisture Protection
Doors and Windows 21 26-Jul-18 15-Aug-18 15-Aug-18, Doors and Windows
Finishes 70 16-Aug-18 24-Oct-18 24-Oct-18, Finishes
Specialties 28 30-Aug-18 26-Sep-18 26-Sep-18, Specialties
Furnishing & Office Equipment 7 27-Sep-18 03-Oct-18 03-Oct-18, Furnishing & Office Equipment
Miscellaneous 28 04-Oct-18 31-Oct-18 31-Oct-18, Miscellaneous
Electrical Works 49 11-Aug-18 28-Sep-18 28-Sep-18, Electrical Works
Outdoor Electric Equipment Work 28 11-Aug-18 07-Sep-18 07-Sep-18, Outdoor Electric Equipment Work
Electric Substation Work 28 18-Aug-18 14-Sep-18 14-Sep-18, Electric Substation Work
Lighting Work 14 15-Sep-18 28-Sep-18 28-Sep-18, Lighting Work
Earthing and Lighting Protection 21 11-Aug-18 31-Aug-18 31-Aug-18, Earthing and Lighting Protection
Mechanical Works 95 11-Aug-18 13-Nov-18 13-Nov-18, Mechanical Works
Mechanical/ HVAC Works 55 11-Aug-18 04-Oct-18 04-Oct-18, Mechanical/ HVAC Works
Plumbing Works 52 11-Aug-18 01-Oct-18 01-Oct-18, Plumbing Works
Fire Protection Works 14 10-Sep-18 23-Sep-18 23-Sep-18, Fire Protection Works
Elevator 35 10-Oct-18 13-Nov-18 13-Nov-18, Elevator
Escalator 35 10-Oct-18 13-Nov-18 13-Nov-18, Escalator
THIRD LEVEL 206 17-Jun-18 08-Jan-19 08-Jan-19, THIRD LEVEL
Structural Works 165 17-Jun-18 28-Nov-18 28-Nov-18, Structural Works
Column (3rd Level) 45 17-Jun-18 31-Jul-18 31-Jul-18, Column (3rd Level)
Stairs (3rd Level) 50 01-Jul-18 19-Aug-18 19-Aug-18, Stairs (3rd Level)
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (44)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Elevator 50 10-Oct-18 28-Nov-18 28-Nov-18, Elevator
Beam/Girder 63 01-Jul-18 01-Sep-18 01-Sep-18, Beam/Girder
Elevated Slab/ Metal Deck 42 15-Jul-18 25-Aug-18 25-Aug-18, Elevated Slab/ Metal Deck
Architectural Works 111 11-Aug-18 29-Nov-18 29-Nov-18, Architectural Works
Masonry 21 11-Aug-18 31-Aug-18 31-Aug-18, Masonry
Metal Works 28 01-Sep-18 28-Sep-18 28-Sep-18, Metal Works
Thermal and Moisture Protection 14 22-Sep-18 05-Oct-18 05-Oct-18, Thermal and Moisture Protection
Doors and Windows 21 25-Aug-18 14-Sep-18 14-Sep-18, Doors and Windows
Finishes 70 15-Sep-18 23-Nov-18 23-Nov-18, Finishes
Specialties 28 29-Sep-18 26-Oct-18 26-Oct-18, Specialties
Furnishing & Office Equipment 7 27-Oct-18 02-Nov-18 02-Nov-18, Furnishing & Office Equipment
Miscellaneous 27 03-Nov-18 29-Nov-18 29-Nov-18, Miscellaneous
Electrical Works 48 30-Sep-18 16-Nov-18 16-Nov-18, Electrical Works
Outdoor Electric Equipment Work 28 30-Sep-18 27-Oct-18 27-Oct-18, Outdoor Electric Equipment Work
Electric Substation Work 28 07-Oct-18 03-Nov-18 03-Nov-18, Electric Substation Work
Lighting Work 13 04-Nov-18 16-Nov-18 16-Nov-18, Lighting Work
Earthing and Lighting Protection 21 30-Sep-18 20-Oct-18 20-Oct-18, Earthing and Lighting Protection
Mechanical Works 151 11-Aug-18 08-Jan-19 08-Jan-19, Mechanical Works
Mechanical/ HVAC Works 55 11-Aug-18 04-Oct-18 04-Oct-18, Mechanical/ HVAC Works
Plumbing Works 52 11-Aug-18 01-Oct-18 01-Oct-18, Plumbing Works
Fire Protection Works 14 10-Sep-18 23-Sep-18 23-Sep-18, Fire Protection Works
Elevator 35 10-Oct-18 13-Nov-18 13-Nov-18, Elevator
Escalator 35 10-Oct-18 13-Nov-18 13-Nov-18, Escalator
Miscellaneous Works 56 14-Nov-18 08-Jan-19 08-Jan-19, Miscellaneous Works
SYSTEM (STATION 6) Batasan Station 180 29-Aug-18 24-Feb-19 24-Feb-19, SYSTEM (STATION 6) Batasan Station
TPSS/ER 120 29-Aug-18 26-Dec-18 26-Dec-18, TPSS/ER
A77050 Surveying 20 29-Aug-18 17-Sep-18 A10840 A77060, A82030 Surveying
A77060 Installation of tray 10 18-Sep-18 27-Sep-18 A77050 A77070 Installation of tray
A77070 cable rack 10 28-Sep-18 07-Oct-18 A77060 A77080, A77090 cable rack
A77080 cable contaminent 10 03-Oct-18 12-Oct-18 A77070 cable contaminent
A77090 System installation 20 08-Oct-18 27-Oct-18 A77070 A77100 System installation
A77100 cabling 20 28-Oct-18 16-Nov-18 A77090 A77110 cabling
A77110 connection of terminal 10 17-Nov-18 26-Nov-18 A77100 A77120 connection of terminal
A77120 Individual Test 30 27-Nov-18 26-Dec-18 A77110 Individual Test
Signal/Comm./AFC 120 28-Oct-18 24-Feb-19 24-Feb-19, Signal/Comm./AFC
A82030 Surveying 20 28-Oct-18 16-Nov-18 A77050 A82040 Surveying
A82040 AFC Machine Installation 30 17-Nov-18 16-Dec-18 A82030 A82050 AFC Machine Installation
A82050 Cabling 40 17-Dec-18 25-Jan-19 A82040 A82060 Cabling
A82060 Individual Test 30 26-Jan-19 24-Feb-19 A82050 A79680 Individual Test
CLUSTER 3 572 13-Jul-17 04-Feb-19 04-Feb-19, CLUSTER 3
CIVIL (STATION 7) Manggahan Station 296 11-Mar-18 31-Dec-18 31-Dec-18, CIVIL (STATION 7) Manggahan Station
FIRST LEVEL 220 11-Mar-18 16-Oct-18 16-Oct-18, FIRST LEVEL
Civil works 42 11-Mar-18 21-Apr-18 21-Apr-18, Civil works
Earthworks 42 11-Mar-18 21-Apr-18 21-Apr-18, Earthworks
Structural Works 122 10-Apr-18 09-Aug-18 09-Aug-18, Structural Works
Lean Concrete 14 10-Apr-18 23-Apr-18 23-Apr-18, Lean Concrete
Ground Slab 56 24-Apr-18 18-Jun-18 18-Jun-18, Ground Slab
Column (1st Level) 38 12-Jun-18 19-Jul-18 19-Jul-18, Column (1st Level)
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (45)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Stairs (1st Level) 38 03-Jul-18 09-Aug-18 09-Aug-18, Stairs (1st Level)
Elevator (1st Level) 30 10-Jul-18 08-Aug-18 08-Aug-18, Elevator (1st Level)
Architectural Works 119 06-May-18 01-Sep-18 01-Sep-18, Architectural Works
Masonry 21 06-May-18 26-May-18 26-May-18, Masonry
Metal Works 28 27-May-18 23-Jun-18 23-Jun-18, Metal Works
Thermal and Moisture Protection 14 24-Jun-18 07-Jul-18 07-Jul-18, Thermal and Moisture Protection
Finishes 42 08-Jul-18 18-Aug-18 18-Aug-18, Finishes
Miscellaneous 14 19-Aug-18 01-Sep-18 01-Sep-18, Miscellaneous
Electrical Works 105 19-Jun-18 01-Oct-18 01-Oct-18, Electrical Works
Outdoor Electric Equipment Work 21 19-Jun-18 09-Jul-18 09-Jul-18, Outdoor Electric Equipment Work
Electric Substation Work 21 26-Jun-18 16-Jul-18 16-Jul-18, Electric Substation Work
Power Feeder Work 28 03-Jul-18 30-Jul-18 30-Jul-18, Power Feeder Work
Power Equipment Work 28 03-Jul-18 30-Jul-18 30-Jul-18, Power Equipment Work
Power Outlet Fixtures 21 24-Jul-18 13-Aug-18 13-Aug-18, Power Outlet Fixtures
Lighting Work 21 24-Jul-18 13-Aug-18 13-Aug-18, Lighting Work
Earthing and Lighting Protection 28 07-Aug-18 03-Sep-18 03-Sep-18, Earthing and Lighting Protection
Electrical Fire Equipment Work 28 28-Aug-18 24-Sep-18 24-Sep-18, Electrical Fire Equipment Work
Wires and Cables 14 18-Sep-18 01-Oct-18 01-Oct-18, Wires and Cables
Mechanical Works 90 19-Jul-18 16-Oct-18 16-Oct-18, Mechanical Works
Mechanical/ HVAC Works 55 19-Jul-18 11-Sep-18 11-Sep-18, Mechanical/ HVAC Works
Plumbing Works 49 19-Jul-18 05-Sep-18 05-Sep-18, Plumbing Works
Fire Protection Works 35 28-Aug-18 01-Oct-18 01-Oct-18, Fire Protection Works
Elevator 50 28-Aug-18 16-Oct-18 16-Oct-18, Elevator
Escalator 50 28-Aug-18 16-Oct-18 16-Oct-18, Escalator
SECOND LEVEL 216 30-May-18 31-Dec-18 31-Dec-18, SECOND LEVEL
Structural Works 84 30-May-18 21-Aug-18 21-Aug-18, Structural Works
Column (2nd Level) 45 30-May-18 13-Jul-18 13-Jul-18, Column (2nd Level)
Stairs (2nd Level) 50 13-Jun-18 01-Aug-18 01-Aug-18, Stairs (2nd Level)
Elevated Slab/ Metal Deck 42 11-Jul-18 21-Aug-18 21-Aug-18, Elevated Slab/ Metal Deck
Architectural Works 124 25-Jun-18 26-Oct-18 26-Oct-18, Architectural Works
Masonry 21 25-Jun-18 15-Jul-18 15-Jul-18, Masonry
Metal Works 28 16-Jul-18 12-Aug-18 12-Aug-18, Metal Works
Thermal and Moisture Protection 14 06-Aug-18 19-Aug-18 19-Aug-18, Thermal and Moisture Protection
Doors and Windows 21 09-Jul-18 29-Jul-18 29-Jul-18, Doors and Windows
Finishes 70 30-Jul-18 07-Oct-18 07-Oct-18, Finishes
Specialties 35 13-Aug-18 16-Sep-18 16-Sep-18, Specialties
Furnishing & Office Equipment 7 17-Sep-18 23-Sep-18 23-Sep-18, Furnishing & Office Equipment
Miscellaneous 33 24-Sep-18 26-Oct-18 26-Oct-18, Miscellaneous
Electrical Works 136 18-Aug-18 31-Dec-18 31-Dec-18, Electrical Works
Power Outlet Fixtures 28 18-Aug-18 14-Sep-18 14-Sep-18, Power Outlet Fixtures
Lighting Works 28 01-Sep-18 28-Sep-18 28-Sep-18, Lighting Works
Electrical Fire Equipment Work 42 22-Sep-18 02-Nov-18 02-Nov-18, Electrical Fire Equipment Work
Access Control System 45 27-Oct-18 10-Dec-18 10-Dec-18, Access Control System
Wires and Cables 30 18-Aug-18 16-Sep-18 16-Sep-18, Wires and Cables
Roughing-ins 21 11-Dec-18 31-Dec-18 31-Dec-18, Roughing-ins
Mechanical Works 75 19-Jul-18 01-Oct-18 01-Oct-18, Mechanical Works
Mechanical/ HVAC Works 55 19-Jul-18 11-Sep-18 11-Sep-18, Mechanical/ HVAC Works
Plumbing Works 52 19-Jul-18 08-Sep-18 08-Sep-18, Plumbing Works
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (46)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Fire Protection Works 14 28-Aug-18 10-Sep-18 10-Sep-18, Fire Protection Works
Elevator 35 28-Aug-18 01-Oct-18 01-Oct-18, Elevator
Escalator 35 28-Aug-18 01-Oct-18 01-Oct-18, Escalator
SYSTEM (STATION 7)Manggahan Station 183 06-Aug-18 04-Feb-19 04-Feb-19, SYSTEM (STATION 7)Manggahan Station
TPSS/ER 123 06-Aug-18 06-Dec-18 06-Dec-18, TPSS/ER
A77130 Surveying 20 06-Aug-18 25-Aug-18 A3540 A77140, A82070 Surveying
A77140 Installation of tray 15 26-Aug-18 09-Sep-18 A77130 A77150 Installation of tray
A77150 cable rack 15 10-Sep-18 24-Sep-18 A77140 A77160, A77170 cable rack
A77160 cable contaminent 10 15-Sep-18 24-Sep-18 A77150 cable contaminent
A77170 System installation 20 25-Sep-18 14-Oct-18 A77150 A77180 System installation
A77180 cabling 20 15-Oct-18 03-Nov-18 A77170 A77190 cabling
A77190 connection of terminal 13 04-Nov-18 16-Nov-18 A77180 A77200 connection of terminal
A77200 Individual Test 20 17-Nov-18 06-Dec-18 A77190 Individual Test
Signal/Comm./AFC 123 05-Oct-18 04-Feb-19 04-Feb-19, Signal/Comm./AFC
A82070 Surveying 20 05-Oct-18 24-Oct-18 A77130 A82080 Surveying
A82080 AFC Machine Installation 30 25-Oct-18 23-Nov-18 A82070 A82090 AFC Machine Installation
A82090 Cabling 40 24-Nov-18 02-Jan-19 A82080 A82100 Cabling
A82100 Individual Test 33 03-Jan-19 04-Feb-19 A82090 A79680 Individual Test
CIVIL (STATION 8) Do£¿ Carmen Station 300 20-Dec-17 15-Oct-18 15-Oct-18, CIVIL (STATION 8) Do£¿ Carmen Station
FIRST LEVEL 239 20-Dec-17 15-Aug-18 15-Aug-18, FIRST LEVEL
Civil works 86 20-Dec-17 15-Mar-18 15-Mar-18, Civil works
Earthworks 86 20-Dec-17 15-Mar-18 15-Mar-18, Earthworks
Structural Works 120 02-Feb-18 01-Jun-18 01-Jun-18, Structural Works
Bore Pile for Stations DC 1-7, 1000 mm £¿ 15 mL 62 02-Feb-18 04-Apr-18 04-Apr-18, Bore Pile for Stations DC 1-7, 1000 mm £¿ 15 mL
Pile Dynamic Test 3 17-Mar-18 19-Mar-18 19-Mar-18, Pile Dynamic Test
Ultrasonic Test 3 17-Mar-18 19-Mar-18 19-Mar-18, Ultrasonic Test
Foundation / Pile Cap 49 10-Mar-18 27-Apr-18 27-Apr-18, Foundation / Pile Cap
Tie Beam 49 24-Mar-18 11-May-18 11-May-18, Tie Beam
Lean Concrete 14 16-Mar-18 29-Mar-18 29-Mar-18, Lean Concrete
Ground Slab 35 30-Mar-18 03-May-18 03-May-18, Ground Slab
Column (1st Level) 38 13-Apr-18 20-May-18 20-May-18, Column (1st Level)
Stairs (1st Level) 34 27-Apr-18 30-May-18 30-May-18, Stairs (1st Level)
Elevator (1st Level) 30 03-May-18 01-Jun-18 01-Jun-18, Elevator (1st Level)
Architectural Works 63 27-Feb-18 30-Apr-18 30-Apr-18, Architectural Works
Thermal and Moisture Protection 14 27-Feb-18 12-Mar-18 12-Mar-18, Thermal and Moisture Protection
Metal Works 21 13-Mar-18 02-Apr-18 02-Apr-18, Metal Works
Finishes 49 13-Mar-18 30-Apr-18 30-Apr-18, Finishes
Electrical Works 70 29-Mar-18 06-Jun-18 06-Jun-18, Electrical Works
Outdoor Electric Equipment Work 21 29-Mar-18 18-Apr-18 18-Apr-18, Outdoor Electric Equipment Work
Electric Substation Work 21 05-Apr-18 25-Apr-18 25-Apr-18, Electric Substation Work
Lighting Work 21 26-Apr-18 16-May-18 16-May-18, Lighting Work
Earthing and Lighting Protection 28 10-May-18 06-Jun-18 06-Jun-18, Earthing and Lighting Protection
Mechanical Works 110 28-Apr-18 15-Aug-18 15-Aug-18, Mechanical Works
Mechanical/ HVAC Works 55 28-Apr-18 21-Jun-18 21-Jun-18, Mechanical/ HVAC Works
Plumbing Works 49 28-May-18 15-Jul-18 15-Jul-18, Plumbing Works
Fire Protection Works 35 27-Jun-18 31-Jul-18 31-Jul-18, Fire Protection Works
Elevator 50 27-Jun-18 15-Aug-18 15-Aug-18, Elevator
Escalator 50 27-Jun-18 15-Aug-18 15-Aug-18, Escalator
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (47)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
SECOND LEVEL 170 27-Feb-18 15-Aug-18 15-Aug-18, SECOND LEVEL
Structural Works 170 27-Feb-18 15-Aug-18 15-Aug-18, Structural Works
Column (2nd Level) 45 27-Feb-18 12-Apr-18 12-Apr-18, Column (2nd Level)
Stairs (2nd Level) 50 13-Mar-18 01-May-18 01-May-18, Stairs (2nd Level)
Elevator 50 27-Jun-18 15-Aug-18 15-Aug-18, Elevator
Beam/Girder 63 13-Mar-18 14-May-18 14-May-18, Beam/Girder
Elevated Slab/ Metal Deck 42 27-Mar-18 07-May-18 07-May-18, Elevated Slab/ Metal Deck
Architectural Works 112 29-Mar-18 18-Jul-18 18-Jul-18, Architectural Works
Masonry 21 29-Mar-18 18-Apr-18 18-Apr-18, Masonry
Metal Works 28 19-Apr-18 16-May-18 16-May-18, Metal Works
Thermal and Moisture Protection 14 10-May-18 23-May-18 23-May-18, Thermal and Moisture Protection
Doors and Windows 21 12-Apr-18 02-May-18 02-May-18, Doors and Windows
Finishes 70 03-May-18 11-Jul-18 11-Jul-18, Finishes
Specialties 28 17-May-18 13-Jun-18 13-Jun-18, Specialties
Furnishing & Office Equipment 7 14-Jun-18 20-Jun-18 20-Jun-18, Furnishing & Office Equipment
Miscellaneous 28 21-Jun-18 18-Jul-18 18-Jul-18, Miscellaneous
Electrical Works 49 28-Apr-18 15-Jun-18 15-Jun-18, Electrical Works
Outdoor Electric Equipment Work 28 28-Apr-18 25-May-18 25-May-18, Outdoor Electric Equipment Work
Electric Substation Work 28 05-May-18 01-Jun-18 01-Jun-18, Electric Substation Work
Lighting Work 14 02-Jun-18 15-Jun-18 15-Jun-18, Lighting Work
Earthing and Lighting Protection 21 28-Apr-18 18-May-18 18-May-18, Earthing and Lighting Protection
Mechanical Works 95 28-Apr-18 31-Jul-18 31-Jul-18, Mechanical Works
Mechanical/ HVAC Works 55 28-Apr-18 21-Jun-18 21-Jun-18, Mechanical/ HVAC Works
Plumbing Works 52 28-May-18 18-Jul-18 18-Jul-18, Plumbing Works
Fire Protection Works 14 27-Jun-18 10-Jul-18 10-Jul-18, Fire Protection Works
Elevator 35 27-Jun-18 31-Jul-18 31-Jul-18, Elevator
Escalator 35 27-Jun-18 31-Jul-18 31-Jul-18, Escalator
THIRD LEVEL 201 29-Mar-18 15-Oct-18 15-Oct-18, THIRD LEVEL
Structural Works 140 29-Mar-18 15-Aug-18 15-Aug-18, Structural Works
Column (3rd Level) 45 29-Mar-18 12-May-18 12-May-18, Column (3rd Level)
Stairs (3rd Level) 50 12-Apr-18 31-May-18 31-May-18, Stairs (3rd Level)
Elevator 50 27-Jun-18 15-Aug-18 15-Aug-18, Elevator
Beam/Girder 63 12-Apr-18 13-Jun-18 13-Jun-18, Beam/Girder
Elevated Slab/ Metal Deck 42 26-Apr-18 06-Jun-18 06-Jun-18, Elevated Slab/ Metal Deck
Architectural Works 111 28-Apr-18 16-Aug-18 16-Aug-18, Architectural Works
Masonry 21 28-Apr-18 18-May-18 18-May-18, Masonry
Metal Works 28 19-May-18 15-Jun-18 15-Jun-18, Metal Works
Thermal and Moisture Protection 14 09-Jun-18 22-Jun-18 22-Jun-18, Thermal and Moisture Protection
Doors and Windows 21 12-May-18 01-Jun-18 01-Jun-18, Doors and Windows
Finishes 70 02-Jun-18 10-Aug-18 10-Aug-18, Finishes
Specialties 28 16-Jun-18 13-Jul-18 13-Jul-18, Specialties
Furnishing & Office Equipment 7 14-Jul-18 20-Jul-18 20-Jul-18, Furnishing & Office Equipment
Miscellaneous 27 21-Jul-18 16-Aug-18 16-Aug-18, Miscellaneous
Electrical Works 48 28-May-18 14-Jul-18 14-Jul-18, Electrical Works
Outdoor Electric Equipment Work 28 28-May-18 24-Jun-18 24-Jun-18, Outdoor Electric Equipment Work
Electric Substation Work 28 04-Jun-18 01-Jul-18 01-Jul-18, Electric Substation Work
Lighting Work 13 02-Jul-18 14-Jul-18 14-Jul-18, Lighting Work
Earthing and Lighting Protection 21 28-May-18 17-Jun-18 17-Jun-18, Earthing and Lighting Protection
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (48)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Mechanical Works 171 28-Apr-18 15-Oct-18 15-Oct-18, Mechanical Works
Mechanical/ HVAC Works 55 28-Apr-18 21-Jun-18 21-Jun-18, Mechanical/ HVAC Works
Plumbing Works 52 28-May-18 18-Jul-18 18-Jul-18, Plumbing Works
Fire Protection Works 14 27-Jun-18 10-Jul-18 10-Jul-18, Fire Protection Works
Elevator 35 27-Jun-18 31-Jul-18 31-Jul-18, Elevator
Escalator 35 27-Jun-18 31-Jul-18 31-Jul-18, Escalator
Miscellaneous Works 76 01-Aug-18 15-Oct-18 15-Oct-18, Miscellaneous Works
SYSTEM (STATION 8)Dona Carmen Station 180 16-May-18 11-Nov-18 11-Nov-18, SYSTEM (STATION 8)Dona Carmen Station
TPSS/ER 120 16-May-18 12-Sep-18 12-Sep-18, TPSS/ER
A77210 Surveying 20 16-May-18 04-Jun-18 A16450 A77220, A82110 Surveying
A77220 Installation of tray 15 05-Jun-18 19-Jun-18 A77210 A77230 Installation of tray
A77230 Cable rack 15 20-Jun-18 04-Jul-18 A77220 A77240, A77250 Cable rack
A77240 Cable contaminent 10 25-Jun-18 04-Jul-18 A77230 Cable contaminent
A77250 System installation 15 05-Jul-18 19-Jul-18 A77230 A77260 System installation
A77260 Cabling 15 20-Jul-18 03-Aug-18 A77250 A77270 Cabling
A77270 Connection of terminal 10 04-Aug-18 13-Aug-18 A77260 A77280 Connection of terminal
A77280 Individual Test 30 14-Aug-18 12-Sep-18 A77270 Individual Test
Signal/Comm./AFC 120 15-Jul-18 11-Nov-18 11-Nov-18, Signal/Comm./AFC
A82110 Surveying 20 15-Jul-18 03-Aug-18 A77210 A82120 Surveying
A82120 Machine Installation 30 04-Aug-18 02-Sep-18 A82110 A82130 Machine Installation
A82130 Cabling 40 03-Sep-18 12-Oct-18 A82120 A82140 Cabling
A82140 Individual Test 30 13-Oct-18 11-Nov-18 A82130 A79680 Individual Test
CIVIL (STATION 9) Regalado Station 284 13-Jul-17 22-Apr-18 22-Apr-18, CIVIL (STATION 9) Regalado Station
FIRST LEVEL 249 13-Jul-17 18-Mar-18 18-Mar-18, FIRST LEVEL
Civil works 96 13-Jul-17 16-Oct-17 16-Oct-17, Civil works
Earthworks 96 13-Jul-17 16-Oct-17 16-Oct-17, Earthworks
Structural Works 125 31-Aug-17 02-Jan-18 02-Jan-18, Structural Works
Bore Pile for Stations RS 1-7, 1000 mm £¿ 15 mL 62 31-Aug-17 31-Oct-17 31-Oct-17, Bore Pile for Stations RS 1-7, 1000 mm £¿ 15 mL
Pile Dynamic Test 3 13-Oct-17 15-Oct-17 15-Oct-17, Pile Dynamic Test
Ultrasonic Test 3 13-Oct-17 15-Oct-17 15-Oct-17, Ultrasonic Test
Foundation / Pile Cap 49 06-Oct-17 23-Nov-17 23-Nov-17, Foundation / Pile Cap
Tie Beam 49 20-Oct-17 07-Dec-17 07-Dec-17, Tie Beam
Lean Concrete 14 17-Oct-17 30-Oct-17 30-Oct-17, Lean Concrete
Ground Slab 35 31-Oct-17 04-Dec-17 04-Dec-17, Ground Slab
Column (1st Level) 38 14-Nov-17 21-Dec-17 21-Dec-17, Column (1st Level)
Stairs (1st Level) 34 28-Nov-17 31-Dec-17 31-Dec-17, Stairs (1st Level)
Elevator (1st Level) 30 04-Dec-17 02-Jan-18 02-Jan-18, Elevator (1st Level)
Architectural Works 63 30-Sep-17 01-Dec-17 01-Dec-17, Architectural Works
Thermal and Moisture Protection 14 30-Sep-17 13-Oct-17 13-Oct-17, Thermal and Moisture Protection
Metal Works 21 14-Oct-17 03-Nov-17 03-Nov-17, Metal Works
Finishes 49 14-Oct-17 01-Dec-17 01-Dec-17, Finishes
Electrical Works 70 30-Oct-17 07-Jan-18 07-Jan-18, Electrical Works
Outdoor Electric Equipment Work 21 30-Oct-17 19-Nov-17 19-Nov-17, Outdoor Electric Equipment Work
Electric Substation Work 21 06-Nov-17 26-Nov-17 26-Nov-17, Electric Substation Work
Lighting Work 21 27-Nov-17 17-Dec-17 17-Dec-17, Lighting Work
Earthing and Lighting Protection 28 11-Dec-17 07-Jan-18 07-Jan-18, Earthing and Lighting Protection
Mechanical Works 110 29-Nov-17 18-Mar-18 18-Mar-18, Mechanical Works
Mechanical/ HVAC Works 55 29-Nov-17 22-Jan-18 22-Jan-18, Mechanical/ HVAC Works
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (49)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Plumbing Works 49 29-Dec-17 15-Feb-18 15-Feb-18, Plumbing Works
Fire Protection Works 35 28-Jan-18 03-Mar-18 03-Mar-18, Fire Protection Works
Elevator 50 28-Jan-18 18-Mar-18 18-Mar-18, Elevator
Escalator 50 28-Jan-18 18-Mar-18 18-Mar-18, Escalator
SECOND LEVEL 170 30-Sep-17 18-Mar-18 18-Mar-18, SECOND LEVEL
Structural Works 170 30-Sep-17 18-Mar-18 18-Mar-18, Structural Works
Column (2nd Level) 45 30-Sep-17 13-Nov-17 13-Nov-17, Column (2nd Level)
Stairs (2nd Level) 50 14-Oct-17 02-Dec-17 02-Dec-17, Stairs (2nd Level)
Elevator 50 28-Jan-18 18-Mar-18 18-Mar-18, Elevator
Beam/Girder 63 14-Oct-17 15-Dec-17 15-Dec-17, Beam/Girder
Elevated Slab/ Metal Deck 42 28-Oct-17 08-Dec-17 08-Dec-17, Elevated Slab/ Metal Deck
Architectural Works 112 30-Oct-17 18-Feb-18 18-Feb-18, Architectural Works
Masonry 21 30-Oct-17 19-Nov-17 19-Nov-17, Masonry
Metal Works 28 20-Nov-17 17-Dec-17 17-Dec-17, Metal Works
Thermal and Moisture Protection 14 11-Dec-17 24-Dec-17 24-Dec-17, Thermal and Moisture Protection
Doors and Windows 21 13-Nov-17 03-Dec-17 03-Dec-17, Doors and Windows
Finishes 70 04-Dec-17 11-Feb-18 11-Feb-18, Finishes
Specialties 28 18-Dec-17 14-Jan-18 14-Jan-18, Specialties
Furnishing & Office Equipment 7 15-Jan-18 21-Jan-18 21-Jan-18, Furnishing & Office Equipment
Miscellaneous 28 22-Jan-18 18-Feb-18 18-Feb-18, Miscellaneous
Electrical Works 49 19-Dec-17 05-Feb-18 05-Feb-18, Electrical Works
Outdoor Electric Equipment Work 28 19-Dec-17 15-Jan-18 15-Jan-18, Outdoor Electric Equipment Work
Electric Substation Work 28 26-Dec-17 22-Jan-18 22-Jan-18, Electric Substation Work
Lighting Work 14 23-Jan-18 05-Feb-18 05-Feb-18, Lighting Work
Earthing and Lighting Protection 21 19-Dec-17 08-Jan-18 08-Jan-18, Earthing and Lighting Protection
Mechanical Works 95 29-Nov-17 03-Mar-18 03-Mar-18, Mechanical Works
Mechanical/ HVAC Works 55 29-Nov-17 22-Jan-18 22-Jan-18, Mechanical/ HVAC Works
Plumbing Works 52 29-Dec-17 18-Feb-18 18-Feb-18, Plumbing Works
Fire Protection Works 14 28-Jan-18 10-Feb-18 10-Feb-18, Fire Protection Works
Elevator 35 28-Jan-18 03-Mar-18 03-Mar-18, Elevator
Escalator 35 28-Jan-18 03-Mar-18 03-Mar-18, Escalator
THIRD LEVEL 175 30-Oct-17 22-Apr-18 22-Apr-18, THIRD LEVEL
Structural Works 140 30-Oct-17 18-Mar-18 18-Mar-18, Structural Works
Column (3rd Level) 45 30-Oct-17 13-Dec-17 13-Dec-17, Column (3rd Level)
Stairs (3rd Level) 50 13-Nov-17 01-Jan-18 01-Jan-18, Stairs (3rd Level)
Elevator 50 28-Jan-18 18-Mar-18 18-Mar-18, Elevator
Beam/Girder 63 13-Nov-17 14-Jan-18 14-Jan-18, Beam/Girder
Elevated Slab/ Metal Deck 42 27-Nov-17 07-Jan-18 07-Jan-18, Elevated Slab/ Metal Deck
Architectural Works 111 29-Nov-17 19-Mar-18 19-Mar-18, Architectural Works
Masonry 21 29-Nov-17 19-Dec-17 19-Dec-17, Masonry
Metal Works 28 20-Dec-17 16-Jan-18 16-Jan-18, Metal Works
Thermal and Moisture Protection 14 10-Jan-18 23-Jan-18 23-Jan-18, Thermal and Moisture Protection
Doors and Windows 21 13-Dec-17 02-Jan-18 02-Jan-18, Doors and Windows
Finishes 70 03-Jan-18 13-Mar-18 13-Mar-18, Finishes
Specialties 28 17-Jan-18 13-Feb-18 13-Feb-18, Specialties
Furnishing & Office Equipment 7 14-Feb-18 20-Feb-18 20-Feb-18, Furnishing & Office Equipment
Miscellaneous 27 21-Feb-18 19-Mar-18 19-Mar-18, Miscellaneous
Electrical Works 48 18-Jan-18 06-Mar-18 06-Mar-18, Electrical Works
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (50)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Outdoor Electric Equipment Work 28 18-Jan-18 14-Feb-18 14-Feb-18, Outdoor Electric Equipment Work
Electric Substation Work 28 25-Jan-18 21-Feb-18 21-Feb-18, Electric Substation Work
Lighting Work 13 22-Feb-18 06-Mar-18 06-Mar-18, Lighting Work
Earthing and Lighting Protection 21 18-Jan-18 07-Feb-18 07-Feb-18, Earthing and Lighting Protection
Mechanical Works 145 29-Nov-17 22-Apr-18 22-Apr-18, Mechanical Works
Mechanical/ HVAC Works 55 29-Nov-17 22-Jan-18 22-Jan-18, Mechanical/ HVAC Works
Plumbing Works 52 29-Dec-17 18-Feb-18 18-Feb-18, Plumbing Works
Fire Protection Works 14 28-Jan-18 10-Feb-18 10-Feb-18, Fire Protection Works
Elevator 35 28-Jan-18 03-Mar-18 03-Mar-18, Elevator
Escalator 35 28-Jan-18 03-Mar-18 03-Mar-18, Escalator
Miscellaneous Works 50 04-Mar-18 22-Apr-18 22-Apr-18, Miscellaneous Works
SYSTEM (STATION 9)Regalado Station 207 17-Dec-17 11-Jul-18 11-Jul-18, SYSTEM (STATION 9)Regalado Station
TPSS/ER 147 17-Dec-17 12-May-18 12-May-18, TPSS/ER
A77290 Surveying 20 17-Dec-17 05-Jan-18 A18850 A77300, A82150 Surveying
A77300 Installation of tray 20 06-Jan-18 25-Jan-18 A77290 A77310 Installation of tray
A77310 Cable rack 20 26-Jan-18 14-Feb-18 A77300 A77320, A77330 Cable rack
A77320 Cable contaminent 20 31-Jan-18 19-Feb-18 A77310 Cable contaminent
A77330 System installation 20 15-Feb-18 06-Mar-18 A77310 A77340 System installation
A77340 Cabling 20 07-Mar-18 26-Mar-18 A77330 A77350 Cabling
A77350 Connection of terminal 10 27-Mar-18 05-Apr-18 A77340 A77360 Connection of terminal
A77360 Individual Test 30 13-Apr-18 12-May-18 A77350 A79850 Individual Test
Signal/Comm./AFC 147 15-Feb-18 11-Jul-18 11-Jul-18, Signal/Comm./AFC
A82150 Surveying 20 15-Feb-18 06-Mar-18 A77290 A82160 Surveying
A82160 Machine Installation 40 07-Mar-18 15-Apr-18 A82150 A82170 Machine Installation
A82170 Cabling 47 16-Apr-18 01-Jun-18 A82160 A82180 Cabling
A82180 Individual Test 40 02-Jun-18 11-Jul-18 A82170 A79680 Individual Test
CIVIL (STATION 10) Mindanao Avenue Station 300 19-Jan-18 14-Nov-18 14-Nov-18, CIVIL (STATION 10) Mindanao Avenue Station
FIRST LEVEL 230 19-Jan-18 05-Sep-18 05-Sep-18, FIRST LEVEL
Civil works 77 19-Jan-18 05-Apr-18 05-Apr-18, Civil works
Earthworks 77 19-Jan-18 05-Apr-18 05-Apr-18, Earthworks
Structural Works 99 16-Mar-18 22-Jun-18 22-Jun-18, Structural Works
Bore Pile for Stations TS 1-7, 1000 mm £¿ 15 mL 62 16-Mar-18 16-May-18 16-May-18, Bore Pile for Stations TS 1-7, 1000 mm £¿ 15 mL
Pile Dynamic Test 3 28-Apr-18 30-Apr-18 30-Apr-18, Pile Dynamic Test
Ultrasonic Test 3 28-Apr-18 30-Apr-18 30-Apr-18, Ultrasonic Test
Foundation / Pile Cap 49 21-Apr-18 08-Jun-18 08-Jun-18, Foundation / Pile Cap
Tie Beam 49 05-May-18 22-Jun-18 22-Jun-18, Tie Beam
Lean Concrete 14 06-Apr-18 19-Apr-18 19-Apr-18, Lean Concrete
Ground Slab 35 20-Apr-18 24-May-18 24-May-18, Ground Slab
Column (1st Level) 38 04-May-18 10-Jun-18 10-Jun-18, Column (1st Level)
Stairs (1st Level) 34 18-May-18 20-Jun-18 20-Jun-18, Stairs (1st Level)
Elevator (1st Level) 30 24-May-18 22-Jun-18 22-Jun-18, Elevator (1st Level)
Architectural Works 63 12-Apr-18 13-Jun-18 13-Jun-18, Architectural Works
Thermal and Moisture Protection 14 12-Apr-18 25-Apr-18 25-Apr-18, Thermal and Moisture Protection
Metal Works 21 26-Apr-18 16-May-18 16-May-18, Metal Works
Finishes 49 26-Apr-18 13-Jun-18 13-Jun-18, Finishes
Electrical Works 70 19-Apr-18 27-Jun-18 27-Jun-18, Electrical Works
Outdoor Electric Equipment Work 21 19-Apr-18 09-May-18 09-May-18, Outdoor Electric Equipment Work
Electric Substation Work 21 26-Apr-18 16-May-18 16-May-18, Electric Substation Work
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (51)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Lighting Work 21 17-May-18 06-Jun-18 06-Jun-18, Lighting Work
Earthing and Lighting Protection 28 31-May-18 27-Jun-18 27-Jun-18, Earthing and Lighting Protection
Mechanical Works 110 19-May-18 05-Sep-18 05-Sep-18, Mechanical Works
Mechanical/ HVAC Works 55 19-May-18 12-Jul-18 12-Jul-18, Mechanical/ HVAC Works
Plumbing Works 49 18-Jun-18 05-Aug-18 05-Aug-18, Plumbing Works
Fire Protection Works 35 18-Jul-18 21-Aug-18 21-Aug-18, Fire Protection Works
Elevator 50 18-Jul-18 05-Sep-18 05-Sep-18, Elevator
Escalator 50 18-Jul-18 05-Sep-18 05-Sep-18, Escalator
SECOND LEVEL 150 09-Apr-18 05-Sep-18 05-Sep-18, SECOND LEVEL
Structural Works 150 09-Apr-18 05-Sep-18 05-Sep-18, Structural Works
Column (2nd Level) 45 09-Apr-18 23-May-18 23-May-18, Column (2nd Level)
Stairs (2nd Level) 50 23-Apr-18 11-Jun-18 11-Jun-18, Stairs (2nd Level)
Elevator 50 18-Jul-18 05-Sep-18 05-Sep-18, Elevator
Beam/Girder 63 23-Apr-18 24-Jun-18 24-Jun-18, Beam/Girder
Elevated Slab/ Metal Deck 42 07-May-18 17-Jun-18 17-Jun-18, Elevated Slab/ Metal Deck
Architectural Works 112 12-May-18 31-Aug-18 31-Aug-18, Architectural Works
Masonry 21 12-May-18 01-Jun-18 01-Jun-18, Masonry
Metal Works 28 02-Jun-18 29-Jun-18 29-Jun-18, Metal Works
Thermal and Moisture Protection 14 23-Jun-18 06-Jul-18 06-Jul-18, Thermal and Moisture Protection
Doors and Windows 21 26-May-18 15-Jun-18 15-Jun-18, Doors and Windows
Finishes 70 16-Jun-18 24-Aug-18 24-Aug-18, Finishes
Specialties 28 30-Jun-18 27-Jul-18 27-Jul-18, Specialties
Furnishing & Office Equipment 7 28-Jul-18 03-Aug-18 03-Aug-18, Furnishing & Office Equipment
Miscellaneous 28 04-Aug-18 31-Aug-18 31-Aug-18, Miscellaneous
Electrical Works 49 19-May-18 06-Jul-18 06-Jul-18, Electrical Works
Outdoor Electric Equipment Work 28 19-May-18 15-Jun-18 15-Jun-18, Outdoor Electric Equipment Work
Electric Substation Work 28 26-May-18 22-Jun-18 22-Jun-18, Electric Substation Work
Lighting Work 14 23-Jun-18 06-Jul-18 06-Jul-18, Lighting Work
Earthing and Lighting Protection 21 19-May-18 08-Jun-18 08-Jun-18, Earthing and Lighting Protection
Mechanical Works 95 19-May-18 21-Aug-18 21-Aug-18, Mechanical Works
Mechanical/ HVAC Works 55 19-May-18 12-Jul-18 12-Jul-18, Mechanical/ HVAC Works
Plumbing Works 52 18-Jun-18 08-Aug-18 08-Aug-18, Plumbing Works
Fire Protection Works 14 18-Jul-18 31-Jul-18 31-Jul-18, Fire Protection Works
Elevator 35 18-Jul-18 21-Aug-18 21-Aug-18, Elevator
Escalator 35 18-Jul-18 21-Aug-18 21-Aug-18, Escalator
THIRD LEVEL 190 09-May-18 14-Nov-18 14-Nov-18, THIRD LEVEL
Structural Works 120 09-May-18 05-Sep-18 05-Sep-18, Structural Works
Column (3rd Level) 45 09-May-18 22-Jun-18 22-Jun-18, Column (3rd Level)
Stairs (3rd Level) 50 23-May-18 11-Jul-18 11-Jul-18, Stairs (3rd Level)
Elevator 50 18-Jul-18 05-Sep-18 05-Sep-18, Elevator
Beam/Girder 63 23-May-18 24-Jul-18 24-Jul-18, Beam/Girder
Elevated Slab/ Metal Deck 42 06-Jun-18 17-Jul-18 17-Jul-18, Elevated Slab/ Metal Deck
Architectural Works 111 21-Jun-18 09-Oct-18 09-Oct-18, Architectural Works
Masonry 21 21-Jun-18 11-Jul-18 11-Jul-18, Masonry
Metal Works 28 12-Jul-18 08-Aug-18 08-Aug-18, Metal Works
Thermal and Moisture Protection 14 02-Aug-18 15-Aug-18 15-Aug-18, Thermal and Moisture Protection
Doors and Windows 21 05-Jul-18 25-Jul-18 25-Jul-18, Doors and Windows
Finishes 70 26-Jul-18 03-Oct-18 03-Oct-18, Finishes
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (52)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Specialties 28 09-Aug-18 05-Sep-18 05-Sep-18, Specialties
Furnishing & Office Equipment 7 06-Sep-18 12-Sep-18 12-Sep-18, Furnishing & Office Equipment
Miscellaneous 27 13-Sep-18 09-Oct-18 09-Oct-18, Miscellaneous
Electrical Works 48 18-Jun-18 04-Aug-18 04-Aug-18, Electrical Works
Outdoor Electric Equipment Work 28 18-Jun-18 15-Jul-18 15-Jul-18, Outdoor Electric Equipment Work
Electric Substation Work 28 25-Jun-18 22-Jul-18 22-Jul-18, Electric Substation Work
Lighting Work 13 23-Jul-18 04-Aug-18 04-Aug-18, Lighting Work
Earthing and Lighting Protection 21 18-Jun-18 08-Jul-18 08-Jul-18, Earthing and Lighting Protection
Mechanical Works 180 19-May-18 14-Nov-18 14-Nov-18, Mechanical Works
Mechanical/ HVAC Works 55 19-May-18 12-Jul-18 12-Jul-18, Mechanical/ HVAC Works
Plumbing Works 52 18-Jun-18 08-Aug-18 08-Aug-18, Plumbing Works
Fire Protection Works 14 18-Jul-18 31-Jul-18 31-Jul-18, Fire Protection Works
Elevator 35 18-Jul-18 21-Aug-18 21-Aug-18, Elevator
Escalator 35 18-Jul-18 21-Aug-18 21-Aug-18, Escalator
Miscellaneous Works 85 22-Aug-18 14-Nov-18 14-Nov-18, Miscellaneous Works
SYSTEM (STATION 10)Mindanao Avenue Station 183 02-Jul-18 31-Dec-18 31-Dec-18, SYSTEM (STATION 10)Mindanao Ave
TPSS/ER 123 02-Jul-18 01-Nov-18 01-Nov-18, TPSS/ER
A77770 Surveying 20 02-Jul-18 21-Jul-18 A30390 A77780, A82390 Surveying
A77780 Installation of tray 15 22-Jul-18 05-Aug-18 A77770 A77790 Installation of tray
A77790 Cable rack 15 06-Aug-18 20-Aug-18 A77780 A77800, A77810 Cable rack
A77800 Cable contaminent 15 16-Aug-18 30-Aug-18 A77790 Cable contaminent
A77810 System installation 15 21-Aug-18 04-Sep-18 A77790 A77820 System installation
A77820 Cabling 15 05-Sep-18 19-Sep-18 A77810 A77830 Cabling
A77830 Connection of terminal 10 20-Sep-18 29-Sep-18 A77820 A77840 Connection of terminal
A77840 Individual Test 30 03-Oct-18 01-Nov-18 A77830 A79850 Individual Test
Signal/Comm./AFC 123 31-Aug-18 31-Dec-18 31-Dec-18, Signal/Comm./AFC
A82390 Surveying 20 31-Aug-18 19-Sep-18 A77770 A82400 Surveying
A82400 Machine Installation 30 20-Sep-18 19-Oct-18 A82390 A82410 Machine Installation
A82410 Cabling 40 20-Oct-18 28-Nov-18 A82400 A82420 Cabling
A82420 Individual Test 33 29-Nov-18 31-Dec-18 A82410 A79680 Individual Test
CLUSTER 4 382 29-Jan-18 14-Feb-19 14-Feb-19, CLUSTER 4
CIVIL (STATION 11) Quirino Station 275 04-Mar-18 03-Dec-18 03-Dec-18, CIVIL (STATION 11) Quirino Station
FIRST LEVEL 242 04-Mar-18 31-Oct-18 31-Oct-18, FIRST LEVEL
Civil works 77 04-Mar-18 19-May-18 19-May-18, Civil works
Earthworks 77 04-Mar-18 19-May-18 19-May-18, Earthworks
Structural Works 157 14-Mar-18 17-Aug-18 17-Aug-18, Structural Works
Bore Pile for Stations TS 1-7, 1000 mm £¿ 15 mL 62 14-Mar-18 14-May-18 14-May-18, Bore Pile for Stations TS 1-7, 1000 mm £¿ 15 mL
Pile Dynamic Test 3 26-Apr-18 28-Apr-18 28-Apr-18, Pile Dynamic Test
Ultrasonic Test 3 26-Apr-18 28-Apr-18 28-Apr-18, Ultrasonic Test
Foundation / Pile Cap 49 19-Apr-18 06-Jun-18 06-Jun-18, Foundation / Pile Cap
Tie Beam 49 03-May-18 20-Jun-18 20-Jun-18, Tie Beam
Lean Concrete 14 20-May-18 02-Jun-18 02-Jun-18, Lean Concrete
Ground Slab 35 15-Jun-18 19-Jul-18 19-Jul-18, Ground Slab
Column (1st Level) 38 29-Jun-18 05-Aug-18 05-Aug-18, Column (1st Level)
Stairs (1st Level) 34 13-Jul-18 15-Aug-18 15-Aug-18, Stairs (1st Level)
Elevator (1st Level) 30 19-Jul-18 17-Aug-18 17-Aug-18, Elevator (1st Level)
Architectural Works 63 05-Apr-18 06-Jun-18 06-Jun-18, Architectural Works
Thermal and Moisture Protection 14 05-Apr-18 18-Apr-18 18-Apr-18, Thermal and Moisture Protection
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (53)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Metal Works 21 19-Apr-18 09-May-18 09-May-18, Metal Works
Finishes 49 19-Apr-18 06-Jun-18 06-Jun-18, Finishes
Electrical Works 70 19-Jun-18 27-Aug-18 27-Aug-18, Electrical Works
Outdoor Electric Equipment Work 21 19-Jun-18 09-Jul-18 09-Jul-18, Outdoor Electric Equipment Work
Electric Substation Work 21 26-Jun-18 16-Jul-18 16-Jul-18, Electric Substation Work
Lighting Work 21 17-Jul-18 06-Aug-18 06-Aug-18, Lighting Work
Earthing and Lighting Protection 28 31-Jul-18 27-Aug-18 27-Aug-18, Earthing and Lighting Protection
Mechanical Works 110 14-Jul-18 31-Oct-18 31-Oct-18, Mechanical Works
Mechanical/ HVAC Works 55 14-Jul-18 06-Sep-18 06-Sep-18, Mechanical/ HVAC Works
Plumbing Works 49 13-Aug-18 30-Sep-18 30-Sep-18, Plumbing Works
Fire Protection Works 35 12-Sep-18 16-Oct-18 16-Oct-18, Fire Protection Works
Elevator 50 12-Sep-18 31-Oct-18 31-Oct-18, Elevator
Escalator 50 12-Sep-18 31-Oct-18 31-Oct-18, Escalator
SECOND LEVEL 162 04-Jun-18 12-Nov-18 12-Nov-18, SECOND LEVEL
Structural Works 150 04-Jun-18 31-Oct-18 31-Oct-18, Structural Works
Column (2nd Level) 45 04-Jun-18 18-Jul-18 18-Jul-18, Column (2nd Level)
Stairs (2nd Level) 50 18-Jun-18 06-Aug-18 06-Aug-18, Stairs (2nd Level)
Elevator 50 12-Sep-18 31-Oct-18 31-Oct-18, Elevator
Beam/Girder 63 18-Jun-18 19-Aug-18 19-Aug-18, Beam/Girder
Elevated Slab/ Metal Deck 42 02-Jul-18 12-Aug-18 12-Aug-18, Elevated Slab/ Metal Deck
Architectural Works 112 26-Jun-18 15-Oct-18 15-Oct-18, Architectural Works
Masonry 21 26-Jun-18 16-Jul-18 16-Jul-18, Masonry
Metal Works 28 17-Jul-18 13-Aug-18 13-Aug-18, Metal Works
Thermal and Moisture Protection 14 07-Aug-18 20-Aug-18 20-Aug-18, Thermal and Moisture Protection
Doors and Windows 21 10-Jul-18 30-Jul-18 30-Jul-18, Doors and Windows
Finishes 70 31-Jul-18 08-Oct-18 08-Oct-18, Finishes
Specialties 28 14-Aug-18 10-Sep-18 10-Sep-18, Specialties
Furnishing & Office Equipment 7 11-Sep-18 17-Sep-18 17-Sep-18, Furnishing & Office Equipment
Miscellaneous 28 18-Sep-18 15-Oct-18 15-Oct-18, Miscellaneous
Electrical Works 49 28-Aug-18 15-Oct-18 15-Oct-18, Electrical Works
Outdoor Electric Equipment Work 28 28-Aug-18 24-Sep-18 24-Sep-18, Outdoor Electric Equipment Work
Electric Substation Work 28 04-Sep-18 01-Oct-18 01-Oct-18, Electric Substation Work
Lighting Work 14 02-Oct-18 15-Oct-18 15-Oct-18, Lighting Work
Earthing and Lighting Protection 21 28-Aug-18 17-Sep-18 17-Sep-18, Earthing and Lighting Protection
Mechanical Works 82 23-Aug-18 12-Nov-18 12-Nov-18, Mechanical Works
Mechanical/ HVAC Works 55 23-Aug-18 16-Oct-18 16-Oct-18, Mechanical/ HVAC Works
Plumbing Works 52 22-Sep-18 12-Nov-18 12-Nov-18, Plumbing Works
Fire Protection Works 14 22-Oct-18 04-Nov-18 04-Nov-18, Fire Protection Works
Elevator 35 12-Sep-18 16-Oct-18 16-Oct-18, Elevator
Escalator 35 12-Sep-18 16-Oct-18 16-Oct-18, Escalator
THIRD LEVEL 153 04-Jul-18 03-Dec-18 03-Dec-18, THIRD LEVEL
Structural Works 120 04-Jul-18 31-Oct-18 31-Oct-18, Structural Works
Column (3rd Level) 45 04-Jul-18 17-Aug-18 17-Aug-18, Column (3rd Level)
Stairs (3rd Level) 50 18-Jul-18 05-Sep-18 05-Sep-18, Stairs (3rd Level)
Elevator 50 12-Sep-18 31-Oct-18 31-Oct-18, Elevator
Beam/Girder 63 18-Jul-18 18-Sep-18 18-Sep-18, Beam/Girder
Elevated Slab/ Metal Deck 42 01-Aug-18 11-Sep-18 11-Sep-18, Elevated Slab/ Metal Deck
Architectural Works 111 05-Aug-18 23-Nov-18 23-Nov-18, Architectural Works
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (54)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Masonry 21 05-Aug-18 25-Aug-18 25-Aug-18, Masonry
Metal Works 28 26-Aug-18 22-Sep-18 22-Sep-18, Metal Works
Thermal and Moisture Protection 14 16-Sep-18 29-Sep-18 29-Sep-18, Thermal and Moisture Protection
Doors and Windows 21 19-Aug-18 08-Sep-18 08-Sep-18, Doors and Windows
Finishes 70 09-Sep-18 17-Nov-18 17-Nov-18, Finishes
Specialties 28 23-Sep-18 20-Oct-18 20-Oct-18, Specialties
Furnishing & Office Equipment 7 21-Oct-18 27-Oct-18 27-Oct-18, Furnishing & Office Equipment
Miscellaneous 27 28-Oct-18 23-Nov-18 23-Nov-18, Miscellaneous
Electrical Works 48 17-Oct-18 03-Dec-18 03-Dec-18, Electrical Works
Outdoor Electric Equipment Work 28 17-Oct-18 13-Nov-18 13-Nov-18, Outdoor Electric Equipment Work
Electric Substation Work 28 24-Oct-18 20-Nov-18 20-Nov-18, Electric Substation Work
Lighting Work 13 21-Nov-18 03-Dec-18 03-Dec-18, Lighting Work
Earthing and Lighting Protection 21 17-Oct-18 06-Nov-18 06-Nov-18, Earthing and Lighting Protection
Mechanical Works 82 23-Aug-18 12-Nov-18 12-Nov-18, Mechanical Works
Mechanical/ HVAC Works 55 23-Aug-18 16-Oct-18 16-Oct-18, Mechanical/ HVAC Works
Plumbing Works 52 22-Sep-18 12-Nov-18 12-Nov-18, Plumbing Works
Fire Protection Works 14 22-Oct-18 04-Nov-18 04-Nov-18, Fire Protection Works
Elevator 35 12-Sep-18 16-Oct-18 16-Oct-18, Elevator
Escalator 35 12-Sep-18 16-Oct-18 16-Oct-18, Escalator
SYSTEM (STATION 11)Quirino Station 183 16-Aug-18 14-Feb-19 14-Feb-19, SYSTEM (STATION 11)Quirino Station
TPSS/ER 123 16-Aug-18 16-Dec-18 16-Dec-18, TPSS/ER
A77850 Surveying 20 16-Aug-18 04-Sep-18 A32840 A77860, A82430 Surveying
A77860 Installation of tray 15 05-Sep-18 19-Sep-18 A77850 A77870 Installation of tray
A77870 Cable rack 15 20-Sep-18 04-Oct-18 A77860 A77880, A77890 Cable rack
A77880 Cable contaminent 15 25-Sep-18 09-Oct-18 A77870 Cable contaminent
A77890 System installation 15 05-Oct-18 19-Oct-18 A77870 A77900 System installation
A77900 Cabling 15 19-Oct-18 02-Nov-18 A77890 A77910 Cabling
A77910 Connection of terminal 15 02-Nov-18 16-Nov-18 A77900 A77920 Connection of terminal
A77920 Individual Test 30 17-Nov-18 16-Dec-18 A77910 A79850 Individual Test
Signal/Comm./AFC 123 15-Oct-18 14-Feb-19 14-Feb-19, Signal/Comm./AFC
A82430 Surveying 20 15-Oct-18 03-Nov-18 A77850 A82440 Surveying
A82440 AFC Machine Installation 30 04-Nov-18 03-Dec-18 A82430 A82450 AFC Machine Installation
A82450 Cabling 40 04-Dec-18 12-Jan-19 A82440 A82460 Cabling
A82460 Individual Test 33 13-Jan-19 14-Feb-19 A82450 A79680 Individual Test
CIVIL (STATION 12) Sacred Heart Station 300 23-Mar-18 16-Jan-19 16-Jan-19, CIVIL (STATION 12) Sacred Heart Station
FIRST LEVEL 250 23-Mar-18 27-Nov-18 27-Nov-18, FIRST LEVEL
Civil works 77 23-Mar-18 07-Jun-18 07-Jun-18, Civil works
Earthworks 77 23-Mar-18 07-Jun-18 07-Jun-18, Earthworks
Structural Works 120 27-Apr-18 24-Aug-18 24-Aug-18, Structural Works
Bore Pile for Stations TS 1-7, 1000 mm £¿ 15 mL 62 27-Apr-18 27-Jun-18 27-Jun-18, Bore Pile for Stations TS 1-7, 1000 mm £¿ 15 mL
Pile Dynamic Test 3 09-Jun-18 11-Jun-18 11-Jun-18, Pile Dynamic Test
Ultrasonic Test 3 09-Jun-18 11-Jun-18 11-Jun-18, Ultrasonic Test
Foundation / Pile Cap 49 02-Jun-18 20-Jul-18 20-Jul-18, Foundation / Pile Cap
Tie Beam 49 16-Jun-18 03-Aug-18 03-Aug-18, Tie Beam
Lean Concrete 14 08-Jun-18 21-Jun-18 21-Jun-18, Lean Concrete
Ground Slab 35 22-Jun-18 26-Jul-18 26-Jul-18, Ground Slab
Column (1st Level) 38 06-Jul-18 12-Aug-18 12-Aug-18, Column (1st Level)
Stairs (1st Level) 34 20-Jul-18 22-Aug-18 22-Aug-18, Stairs (1st Level)
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (55)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Elevator (1st Level) 30 26-Jul-18 24-Aug-18 24-Aug-18, Elevator (1st Level)
Architectural Works 63 08-May-18 09-Jul-18 09-Jul-18, Architectural Works
Thermal and Moisture Protection 14 08-May-18 21-May-18 21-May-18, Thermal and Moisture Protection
Metal Works 21 22-May-18 11-Jun-18 11-Jun-18, Metal Works
Finishes 49 22-May-18 09-Jul-18 09-Jul-18, Finishes
Electrical Works 70 21-Jun-18 29-Aug-18 29-Aug-18, Electrical Works
Outdoor Electric Equipment Work 21 21-Jun-18 11-Jul-18 11-Jul-18, Outdoor Electric Equipment Work
Electric Substation Work 21 28-Jun-18 18-Jul-18 18-Jul-18, Electric Substation Work
Lighting Work 21 19-Jul-18 08-Aug-18 08-Aug-18, Lighting Work
Earthing and Lighting Protection 28 02-Aug-18 29-Aug-18 29-Aug-18, Earthing and Lighting Protection
Mechanical Works 110 10-Aug-18 27-Nov-18 27-Nov-18, Mechanical Works
Mechanical/ HVAC Works 55 10-Aug-18 03-Oct-18 03-Oct-18, Mechanical/ HVAC Works
Plumbing Works 49 09-Sep-18 27-Oct-18 27-Oct-18, Plumbing Works
Fire Protection Works 35 09-Oct-18 12-Nov-18 12-Nov-18, Fire Protection Works
Elevator 50 09-Oct-18 27-Nov-18 27-Nov-18, Elevator
Escalator 50 09-Oct-18 27-Nov-18 27-Nov-18, Escalator
SECOND LEVEL 220 11-Jun-18 16-Jan-19 16-Jan-19, SECOND LEVEL
Structural Works 179 11-Jun-18 06-Dec-18 06-Dec-18, Structural Works
Column (2nd Level) 45 11-Jun-18 25-Jul-18 25-Jul-18, Column (2nd Level)
Stairs (2nd Level) 50 25-Jun-18 13-Aug-18 13-Aug-18, Stairs (2nd Level)
Elevator 59 09-Oct-18 06-Dec-18 06-Dec-18, Elevator
Beam/Girder 63 25-Jun-18 26-Aug-18 26-Aug-18, Beam/Girder
Elevated Slab/ Metal Deck 42 09-Jul-18 19-Aug-18 19-Aug-18, Elevated Slab/ Metal Deck
Architectural Works 112 17-Jun-18 06-Oct-18 06-Oct-18, Architectural Works
Masonry 21 17-Jun-18 07-Jul-18 07-Jul-18, Masonry
Metal Works 28 08-Jul-18 04-Aug-18 04-Aug-18, Metal Works
Thermal and Moisture Protection 14 29-Jul-18 11-Aug-18 11-Aug-18, Thermal and Moisture Protection
Doors and Windows 21 01-Jul-18 21-Jul-18 21-Jul-18, Doors and Windows
Finishes 70 22-Jul-18 29-Sep-18 29-Sep-18, Finishes
Specialties 28 05-Aug-18 01-Sep-18 01-Sep-18, Specialties
Furnishing & Office Equipment 7 02-Sep-18 08-Sep-18 08-Sep-18, Furnishing & Office Equipment
Miscellaneous 28 09-Sep-18 06-Oct-18 06-Oct-18, Miscellaneous
Electrical Works 49 10-Aug-18 27-Sep-18 27-Sep-18, Electrical Works
Outdoor Electric Equipment Work 28 10-Aug-18 06-Sep-18 06-Sep-18, Outdoor Electric Equipment Work
Electric Substation Work 28 17-Aug-18 13-Sep-18 13-Sep-18, Electric Substation Work
Lighting Work 14 14-Sep-18 27-Sep-18 27-Sep-18, Lighting Work
Earthing and Lighting Protection 21 10-Aug-18 30-Aug-18 30-Aug-18, Earthing and Lighting Protection
Mechanical Works 160 10-Aug-18 16-Jan-19 16-Jan-19, Mechanical Works
Mechanical/ HVAC Works 55 10-Aug-18 03-Oct-18 03-Oct-18, Mechanical/ HVAC Works
Plumbing Works 52 09-Sep-18 30-Oct-18 30-Oct-18, Plumbing Works
Fire Protection Works 14 09-Oct-18 22-Oct-18 22-Oct-18, Fire Protection Works
Elevator 35 09-Oct-18 12-Nov-18 12-Nov-18, Elevator
Escalator 35 09-Oct-18 12-Nov-18 12-Nov-18, Escalator
Miscellaneous Works 65 13-Nov-18 16-Jan-19 16-Jan-19, Miscellaneous Works
SYSTEM (STATION 12)Sacred Heart Station 183 25-Jul-18 23-Jan-19 23-Jan-19, SYSTEM (STATION 12)Sacred Heart Station
TPSS/ER 123 25-Jul-18 24-Nov-18 24-Nov-18, TPSS/ER
A77930 Surveying 20 25-Jul-18 13-Aug-18 A34620 A77940, A82470 Surveying
A77940 Installation of tray 15 14-Aug-18 28-Aug-18 A77930 A77950 Installation of tray
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (56)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
A77950 Cable rack 15 29-Aug-18 12-Sep-18 A77940 A77960, A77970 Cable rack
A77960 Cable contaminent 15 29-Aug-18 12-Sep-18 A77950 Cable contaminent
A77970 System installation 18 13-Sep-18 30-Sep-18 A77950 A77980 System installation
A77980 Cabling 15 01-Oct-18 15-Oct-18 A77970 A77990 Cabling
A77990 Connection of terminal 10 16-Oct-18 25-Oct-18 A77980 A78000 Connection of terminal
A78000 Individual Test 30 26-Oct-18 24-Nov-18 A77990 A79850 Individual Test
Signal/Comm./AFC 123 23-Sep-18 23-Jan-19 23-Jan-19, Signal/Comm./AFC
A82470 Surveying 20 23-Sep-18 12-Oct-18 A77930 A82480 Surveying
A82480 AFC Machine Installation 30 13-Oct-18 11-Nov-18 A82470 A82490 AFC Machine Installation
A82490 Cabling 40 12-Nov-18 21-Dec-18 A82480 A82500 Cabling
A82500 Individual Test 33 22-Dec-18 23-Jan-19 A82490 A79680 Individual Test
CIVIL (STATION 13) Tala Station 300 29-Jan-18 24-Nov-18 24-Nov-18, CIVIL (STATION 13) Tala Station
FIRST LEVEL 215 29-Jan-18 31-Aug-18 31-Aug-18, FIRST LEVEL
Civil works 62 29-Jan-18 31-Mar-18 31-Mar-18, Civil works
Earthworks 62 29-Jan-18 31-Mar-18 31-Mar-18, Earthworks
Structural Works 110 28-Feb-18 17-Jun-18 17-Jun-18, Structural Works
Bore Pile for Stations TS 1-7, 1000 mm £¿ 15 mL 62 28-Feb-18 30-Apr-18 30-Apr-18, Bore Pile for Stations TS 1-7, 1000 mm £¿ 15 mL
Pile Dynamic Test 3 12-Apr-18 14-Apr-18 14-Apr-18, Pile Dynamic Test
Ultrasonic Test 3 12-Apr-18 14-Apr-18 14-Apr-18, Ultrasonic Test
Foundation / Pile Cap 49 05-Apr-18 23-May-18 23-May-18, Foundation / Pile Cap
Tie Beam 49 19-Apr-18 06-Jun-18 06-Jun-18, Tie Beam
Lean Concrete 14 01-Apr-18 14-Apr-18 14-Apr-18, Lean Concrete
Ground Slab 35 15-Apr-18 19-May-18 19-May-18, Ground Slab
Column (1st Level) 38 29-Apr-18 05-Jun-18 05-Jun-18, Column (1st Level)
Stairs (1st Level) 34 13-May-18 15-Jun-18 15-Jun-18, Stairs (1st Level)
Elevator (1st Level) 30 19-May-18 17-Jun-18 17-Jun-18, Elevator (1st Level)
Architectural Works 63 15-Mar-18 16-May-18 16-May-18, Architectural Works
Thermal and Moisture Protection 14 15-Mar-18 28-Mar-18 28-Mar-18, Thermal and Moisture Protection
Metal Works 21 29-Mar-18 18-Apr-18 18-Apr-18, Metal Works
Finishes 49 29-Mar-18 16-May-18 16-May-18, Finishes
Electrical Works 70 14-Apr-18 22-Jun-18 22-Jun-18, Electrical Works
Outdoor Electric Equipment Work 21 14-Apr-18 04-May-18 04-May-18, Outdoor Electric Equipment Work
Electric Substation Work 21 21-Apr-18 11-May-18 11-May-18, Electric Substation Work
Lighting Work 21 12-May-18 01-Jun-18 01-Jun-18, Lighting Work
Earthing and Lighting Protection 28 26-May-18 22-Jun-18 22-Jun-18, Earthing and Lighting Protection
Mechanical Works 110 14-May-18 31-Aug-18 31-Aug-18, Mechanical Works
Mechanical/ HVAC Works 55 14-May-18 07-Jul-18 07-Jul-18, Mechanical/ HVAC Works
Plumbing Works 49 13-Jun-18 31-Jul-18 31-Jul-18, Plumbing Works
Fire Protection Works 35 13-Jul-18 16-Aug-18 16-Aug-18, Fire Protection Works
Elevator 50 13-Jul-18 31-Aug-18 31-Aug-18, Elevator
Escalator 50 13-Jul-18 31-Aug-18 31-Aug-18, Escalator
SECOND LEVEL 152 08-Apr-18 06-Sep-18 06-Sep-18, SECOND LEVEL
Structural Works 146 08-Apr-18 31-Aug-18 31-Aug-18, Structural Works
Column (2nd Level) 45 08-Apr-18 22-May-18 22-May-18, Column (2nd Level)
Stairs (2nd Level) 50 22-Apr-18 10-Jun-18 10-Jun-18, Stairs (2nd Level)
Elevator 50 13-Jul-18 31-Aug-18 31-Aug-18, Elevator
Beam/Girder 63 22-Apr-18 23-Jun-18 23-Jun-18, Beam/Girder
Elevated Slab/ Metal Deck 42 06-May-18 16-Jun-18 16-Jun-18, Elevated Slab/ Metal Deck
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (57)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Architectural Works 112 18-May-18 06-Sep-18 06-Sep-18, Architectural Works
Masonry 21 18-May-18 07-Jun-18 07-Jun-18, Masonry
Metal Works 28 08-Jun-18 05-Jul-18 05-Jul-18, Metal Works
Thermal and Moisture Protection 14 29-Jun-18 12-Jul-18 12-Jul-18, Thermal and Moisture Protection
Doors and Windows 21 01-Jun-18 21-Jun-18 21-Jun-18, Doors and Windows
Finishes 70 22-Jun-18 30-Aug-18 30-Aug-18, Finishes
Specialties 28 06-Jul-18 02-Aug-18 02-Aug-18, Specialties
Furnishing & Office Equipment 7 03-Aug-18 09-Aug-18 09-Aug-18, Furnishing & Office Equipment
Miscellaneous 28 10-Aug-18 06-Sep-18 06-Sep-18, Miscellaneous
Electrical Works 49 07-Jun-18 25-Jul-18 25-Jul-18, Electrical Works
Outdoor Electric Equipment Work 28 07-Jun-18 04-Jul-18 04-Jul-18, Outdoor Electric Equipment Work
Electric Substation Work 28 14-Jun-18 11-Jul-18 11-Jul-18, Electric Substation Work
Lighting Work 14 12-Jul-18 25-Jul-18 25-Jul-18, Lighting Work
Earthing and Lighting Protection 21 07-Jun-18 27-Jun-18 27-Jun-18, Earthing and Lighting Protection
Mechanical Works 82 07-Jun-18 27-Aug-18 27-Aug-18, Mechanical Works
Mechanical/ HVAC Works 55 07-Jun-18 31-Jul-18 31-Jul-18, Mechanical/ HVAC Works
Plumbing Works 52 07-Jul-18 27-Aug-18 27-Aug-18, Plumbing Works
Fire Protection Works 14 06-Aug-18 19-Aug-18 19-Aug-18, Fire Protection Works
Elevator 35 13-Jul-18 16-Aug-18 16-Aug-18, Elevator
Escalator 35 13-Jul-18 16-Aug-18 16-Aug-18, Escalator
THIRD LEVEL 201 08-May-18 24-Nov-18 24-Nov-18, THIRD LEVEL
Structural Works 116 08-May-18 31-Aug-18 31-Aug-18, Structural Works
Column (3rd Level) 45 08-May-18 21-Jun-18 21-Jun-18, Column (3rd Level)
Stairs (3rd Level) 50 22-May-18 10-Jul-18 10-Jul-18, Stairs (3rd Level)
Elevator 50 13-Jul-18 31-Aug-18 31-Aug-18, Elevator
Beam/Girder 63 22-May-18 23-Jul-18 23-Jul-18, Beam/Girder
Elevated Slab/ Metal Deck 42 05-Jun-18 16-Jul-18 16-Jul-18, Elevated Slab/ Metal Deck
Architectural Works 111 17-Jun-18 05-Oct-18 05-Oct-18, Architectural Works
Masonry 21 17-Jun-18 07-Jul-18 07-Jul-18, Masonry
Metal Works 28 08-Jul-18 04-Aug-18 04-Aug-18, Metal Works
Thermal and Moisture Protection 14 29-Jul-18 11-Aug-18 11-Aug-18, Thermal and Moisture Protection
Doors and Windows 21 01-Jul-18 21-Jul-18 21-Jul-18, Doors and Windows
Finishes 70 22-Jul-18 29-Sep-18 29-Sep-18, Finishes
Specialties 28 05-Aug-18 01-Sep-18 01-Sep-18, Specialties
Furnishing & Office Equipment 7 02-Sep-18 08-Sep-18 08-Sep-18, Furnishing & Office Equipment
Miscellaneous 27 09-Sep-18 05-Oct-18 05-Oct-18, Miscellaneous
Electrical Works 48 07-Jul-18 23-Aug-18 23-Aug-18, Electrical Works
Outdoor Electric Equipment Work 28 07-Jul-18 03-Aug-18 03-Aug-18, Outdoor Electric Equipment Work
Electric Substation Work 28 14-Jul-18 10-Aug-18 10-Aug-18, Electric Substation Work
Lighting Work 13 11-Aug-18 23-Aug-18 23-Aug-18, Lighting Work
Earthing and Lighting Protection 21 07-Jul-18 27-Jul-18 27-Jul-18, Earthing and Lighting Protection
Mechanical Works 171 07-Jun-18 24-Nov-18 24-Nov-18, Mechanical Works
Mechanical/ HVAC Works 55 07-Jun-18 31-Jul-18 31-Jul-18, Mechanical/ HVAC Works
Plumbing Works 52 07-Jul-18 27-Aug-18 27-Aug-18, Plumbing Works
Fire Protection Works 14 06-Aug-18 19-Aug-18 19-Aug-18, Fire Protection Works
Elevator 35 13-Jul-18 16-Aug-18 16-Aug-18, Elevator
Escalator 35 13-Jul-18 16-Aug-18 16-Aug-18, Escalator
Miscellaneous Works 100 17-Aug-18 24-Nov-18 24-Nov-18, Miscellaneous Works
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (58)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
SYSTEM (STATION 13)Tala Station 180 05-Jul-18 31-Dec-18 31-Dec-18, SYSTEM (STATION 13)Tala Station
TPSS/ER 120 05-Jul-18 01-Nov-18 01-Nov-18, TPSS/ER
A77530 Surveying 20 05-Jul-18 24-Jul-18 A24150 A77540, A82270 Surveying
A77540 Installation of tray 15 25-Jul-18 08-Aug-18 A77530 A77550 Installation of tray
A77550 Cable rack 15 09-Aug-18 23-Aug-18 A77540 A77560, A77570 Cable rack
A77560 Cable contaminent 10 14-Aug-18 23-Aug-18 A77550 Cable contaminent
A77570 System installation 15 24-Aug-18 07-Sep-18 A77550 A77580 System installation
A77580 Cabling 15 08-Sep-18 22-Sep-18 A77570 A77590 Cabling
A77590 Connection of terminal 10 23-Sep-18 02-Oct-18 A77580 A77600 Connection of terminal
A77600 Individual Test 30 03-Oct-18 01-Nov-18 A77590 A79850 Individual Test
Signal/Comm./AFC 120 03-Sep-18 31-Dec-18 31-Dec-18, Signal/Comm./AFC
A82270 Surveying 20 03-Sep-18 22-Sep-18 A77530 A82280 Surveying
A82280 AFC Machine Installation 30 23-Sep-18 22-Oct-18 A82270 A82290 AFC Machine Installation
A82290 Cabling 40 23-Oct-18 01-Dec-18 A82280 A82300 Cabling
A82300 Individual Test 30 02-Dec-18 31-Dec-18 A82290 A79680 Individual Test
CLUSTER 5 733 14-Jan-17 16-Jan-19 16-Jan-19, CLUSTER 5
CIVIL (STATION 14 ) San Jose Del Monte Station 387 13-Jul-17 03-Aug-18 03-Aug-18, CIVIL (STATION 14 ) San Jose Del Monte Station
FIRST LEVEL 367 13-Jul-17 14-Jul-18 14-Jul-18, FIRST LEVEL
Civil works 130 13-Jul-17 19-Nov-17 19-Nov-17, Civil works
Earthworks 130 13-Jul-17 19-Nov-17 19-Nov-17, Earthworks
Structural Works 122 06-Jan-18 07-May-18 07-May-18, Structural Works
Lean Concrete 14 06-Jan-18 19-Jan-18 19-Jan-18, Lean Concrete
Ground Slab 56 20-Jan-18 16-Mar-18 16-Mar-18, Ground Slab
Column (1st Level) 38 10-Mar-18 16-Apr-18 16-Apr-18, Column (1st Level)
Stairs (1st Level) 38 31-Mar-18 07-May-18 07-May-18, Stairs (1st Level)
RC Wall 35 10-Mar-18 13-Apr-18 13-Apr-18, RC Wall
Elevator (1st Level) 30 31-Mar-18 29-Apr-18 29-Apr-18, Elevator (1st Level)
Architectural Works 119 26-Jan-18 24-May-18 24-May-18, Architectural Works
Masonry 21 26-Jan-18 15-Feb-18 15-Feb-18, Masonry
Metal Works 28 16-Feb-18 15-Mar-18 15-Mar-18, Metal Works
Doors 14 16-Feb-18 01-Mar-18 01-Mar-18, Doors
Thermal and Moisture Protection 14 16-Mar-18 29-Mar-18 29-Mar-18, Thermal and Moisture Protection
Finishes 42 30-Mar-18 10-May-18 10-May-18, Finishes
Miscellaneous 14 11-May-18 24-May-18 24-May-18, Miscellaneous
Electrical Works 105 25-Feb-18 09-Jun-18 09-Jun-18, Electrical Works
Outdoor Electric Equipment Work 21 25-Feb-18 17-Mar-18 17-Mar-18, Outdoor Electric Equipment Work
Electric Substation Work 21 04-Mar-18 24-Mar-18 24-Mar-18, Electric Substation Work
Power Feeder Work 28 11-Mar-18 07-Apr-18 07-Apr-18, Power Feeder Work
Power Equipment Work 28 11-Mar-18 07-Apr-18 07-Apr-18, Power Equipment Work
Power Outlet Fixtures 21 01-Apr-18 21-Apr-18 21-Apr-18, Power Outlet Fixtures
Lighting Work 21 01-Apr-18 21-Apr-18 21-Apr-18, Lighting Work
Earthing and Lighting Protection 28 15-Apr-18 12-May-18 12-May-18, Earthing and Lighting Protection
Electrical Fire Equipment Work 28 06-May-18 02-Jun-18 02-Jun-18, Electrical Fire Equipment Work
Wires and Cables 14 27-May-18 09-Jun-18 09-Jun-18, Wires and Cables
Mechanical Works 110 27-Mar-18 14-Jul-18 14-Jul-18, Mechanical Works
Mechanical/ HVAC Works 55 27-Mar-18 20-May-18 20-May-18, Mechanical/ HVAC Works
Plumbing Works 49 26-Apr-18 13-Jun-18 13-Jun-18, Plumbing Works
Fire Protection Works 35 26-May-18 29-Jun-18 29-Jun-18, Fire Protection Works
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (59)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Elevator 50 26-May-18 14-Jul-18 14-Jul-18, Elevator
Escalator 50 26-May-18 14-Jul-18 14-Jul-18, Escalator
SECOND LEVEL 180 05-Feb-18 03-Aug-18 03-Aug-18, SECOND LEVEL
Structural Works 84 05-Feb-18 29-Apr-18 29-Apr-18, Structural Works
Column (2nd Level) 45 05-Feb-18 21-Mar-18 21-Mar-18, Column (2nd Level)
Stairs (2nd Level) 50 19-Feb-18 09-Apr-18 09-Apr-18, Stairs (2nd Level)
Elevated Slab/ Metal Deck 42 19-Mar-18 29-Apr-18 29-Apr-18, Elevated Slab/ Metal Deck
Architectural Works 115 25-Feb-18 19-Jun-18 19-Jun-18, Architectural Works
Masonry 21 25-Feb-18 17-Mar-18 17-Mar-18, Masonry
Metal Works 28 18-Mar-18 14-Apr-18 14-Apr-18, Metal Works
Thermal and Moisture Protection 14 08-Apr-18 21-Apr-18 21-Apr-18, Thermal and Moisture Protection
Doors and Windows 21 11-Mar-18 31-Mar-18 31-Mar-18, Doors and Windows
Finishes 70 01-Apr-18 09-Jun-18 09-Jun-18, Finishes
Specialties 35 15-Apr-18 19-May-18 19-May-18, Specialties
Furnishing & Office Equipment 7 20-May-18 26-May-18 26-May-18, Furnishing & Office Equipment
Miscellaneous 24 27-May-18 19-Jun-18 19-Jun-18, Miscellaneous
Electrical Works 70 26-Apr-18 04-Jul-18 04-Jul-18, Electrical Works
Power Outlet Fixtures 21 26-Apr-18 16-May-18 16-May-18, Power Outlet Fixtures
Lighting Works 21 03-May-18 23-May-18 23-May-18, Lighting Works
Electrical Fire Equipment Work 35 17-May-18 20-Jun-18 20-Jun-18, Electrical Fire Equipment Work
Access Control System 7 14-Jun-18 20-Jun-18 20-Jun-18, Access Control System
Wires and Cables 30 26-Apr-18 25-May-18 25-May-18, Wires and Cables
Roughing-ins 14 21-Jun-18 04-Jul-18 04-Jul-18, Roughing-ins
Mechanical Works 130 27-Mar-18 03-Aug-18 03-Aug-18, Mechanical Works
Mechanical/ HVAC Works 55 27-Mar-18 20-May-18 20-May-18, Mechanical/ HVAC Works
Plumbing Works 61 26-Apr-18 25-Jun-18 25-Jun-18, Plumbing Works
Fire Protection Works 14 26-May-18 08-Jun-18 08-Jun-18, Fire Protection Works
Elevator 50 26-May-18 14-Jul-18 14-Jul-18, Elevator
Escalator 50 26-May-18 14-Jul-18 14-Jul-18, Escalator
Miscellaneous Works 20 15-Jul-18 03-Aug-18 03-Aug-18, Miscellaneous Works
SYSTEM (STATION 14)San Jose Del Monte Station 180 05-Apr-18 01-Oct-18 01-Oct-18, SYSTEM (STATION 14)San Jose Del Monte Station
TPSS/ER 120 05-Apr-18 02-Aug-18 02-Aug-18, TPSS/ER
A77610 Surveying 30 05-Apr-18 04-May-18 A26000 A77620, A82310 Surveying
A77620 Installation of tray 10 05-May-18 14-May-18 A77610 A77630 Installation of tray
A77630 Cable rack 10 15-May-18 24-May-18 A77620 A77640, A77650 Cable rack
A77640 Cable contaminent 10 20-May-18 29-May-18 A77630 Cable contaminent
A77650 System installation 15 25-May-18 08-Jun-18 A77630 A77660 System installation
A77660 Cabling 15 09-Jun-18 23-Jun-18 A77650 A77670 Cabling
A77670 Connection of terminal 10 24-Jun-18 03-Jul-18 A77660 A77680 Connection of terminal
A77680 Individual Test 30 04-Jul-18 02-Aug-18 A77670 A79850 Individual Test
Signal/Comm./AFC 120 04-Jun-18 01-Oct-18 01-Oct-18, Signal/Comm./AFC
A82310 Surveying 20 04-Jun-18 23-Jun-18 A77610 A82320 Surveying
A82320 AFC Machine Installation 30 24-Jun-18 23-Jul-18 A82310 A82330 AFC Machine Installation
A82330 Cabling 40 24-Jul-18 01-Sep-18 A82320 A82340 Cabling
A82340 Individual Test 30 02-Sep-18 01-Oct-18 A82330 A79680 Individual Test
CIVIL - Depot 640 14-Jan-17 15-Oct-18 15-Oct-18, CIVIL - Depot
Site Works 624 14-Jan-17 29-Sep-18 29-Sep-18, Site Works
Civil Works 624 14-Jan-17 29-Sep-18 29-Sep-18, Civil Works
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (60)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Site Development 608 14-Jan-17 13-Sep-18 13-Sep-18, Site Development
Drainage and Slope Protection 260 25-Sep-17 11-Jun-18 11-Jun-18, Drainage and Slope Protection
Retaining Wall 300 27-Jul-17 22-May-18 22-May-18, Retaining Wall
Subbase and Basecourse 220 24-Nov-17 01-Jul-18 01-Jul-18, Subbase and Basecourse
Surface Courses 250 23-Jan-18 29-Sep-18 29-Sep-18, Surface Courses
Electrical Works 60 02-Jul-18 30-Aug-18 30-Aug-18, Electrical Works
Grounding System 56 02-Jul-18 26-Aug-18 26-Aug-18, Grounding System
Fire Protection System 11 20-Aug-18 30-Aug-18 30-Aug-18, Fire Protection System
UCLC Building 215 10-Nov-17 12-Jun-18 12-Jun-18, UCLC Building
Civil Works 180 10-Nov-17 08-May-18 08-May-18, Civil Works
Earthworks 180 10-Nov-17 08-May-18 08-May-18, Earthworks
Architectural Works 90 28-Feb-18 28-May-18 28-May-18, Architectural Works
Metal Works 14 21-Mar-18 03-Apr-18 03-Apr-18, Metal Works
Masonry 21 28-Feb-18 20-Mar-18 20-Mar-18, Masonry
Thermal and Moisture Protection 35 21-Mar-18 24-Apr-18 24-Apr-18, Thermal and Moisture Protection
Doors 14 21-Mar-18 03-Apr-18 03-Apr-18, Doors
Finishes 42 21-Mar-18 01-May-18 01-May-18, Finishes
Specialties 14 02-May-18 15-May-18 15-May-18, Specialties
Furnishings 7 16-May-18 22-May-18 22-May-18, Furnishings
Miscellaneous 7 22-May-18 28-May-18 28-May-18, Miscellaneous
Structural Works 65 09-Apr-18 12-Jun-18 12-Jun-18, Structural Works
Installation / Fabrication 65 09-Apr-18 12-Jun-18 12-Jun-18, Installation / Fabrication
Electrical Works 70 20-Mar-18 28-May-18 28-May-18, Electrical Works
Grounding System 49 20-Mar-18 07-May-18 07-May-18, Grounding System
Panel Board 42 20-Mar-18 30-Apr-18 30-Apr-18, Panel Board
Lighting System 14 20-Mar-18 02-Apr-18 02-Apr-18, Lighting System
Fire Alarm System 14 03-Apr-18 16-Apr-18 16-Apr-18, Fire Alarm System
Access Control System 14 17-Apr-18 30-Apr-18 30-Apr-18, Access Control System
Wires and Cables 7 01-May-18 07-May-18 07-May-18, Wires and Cables
Roughing ins 21 08-May-18 28-May-18 28-May-18, Roughing ins
Mechanical Works 60 02-Apr-18 31-May-18 31-May-18, Mechanical Works
Mechanical/ HVAC Works 21 02-Apr-18 22-Apr-18 22-Apr-18, Mechanical/ HVAC Works
Plumbing Works 60 02-Apr-18 31-May-18 31-May-18, Plumbing Works
Fire Protection Works 60 02-Apr-18 31-May-18 31-May-18, Fire Protection Works
Auxiliary 230 12-Dec-17 29-Jul-18 29-Jul-18, Auxiliary
Civil Works 180 12-Dec-17 09-Jun-18 09-Jun-18, Civil Works
Earthworks 180 12-Dec-17 09-Jun-18 09-Jun-18, Earthworks
Structural Works 70 21-May-18 29-Jul-18 29-Jul-18, Structural Works
Installation / Fabrication 70 21-May-18 29-Jul-18 29-Jul-18, Installation / Fabrication
Architectural Works 120 02-Mar-18 29-Jun-18 29-Jun-18, Architectural Works
Masonry 14 02-Mar-18 15-Mar-18 15-Mar-18, Masonry
Thermal and Moisture Protection 14 16-Mar-18 29-Mar-18 29-Mar-18, Thermal and Moisture Protection
Doors 14 16-Mar-18 29-Mar-18 29-Mar-18, Doors
Finishes 77 16-Mar-18 31-May-18 31-May-18, Finishes
Specialties 7 01-Jun-18 07-Jun-18 07-Jun-18, Specialties
Miscellaneous 15 15-Jun-18 29-Jun-18 29-Jun-18, Miscellaneous
Furnishings 7 08-Jun-18 14-Jun-18 14-Jun-18, Furnishings
Electrical Works 60 01-May-18 29-Jun-18 29-Jun-18, Electrical Works
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (61)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Grounding System 21 01-May-18 21-May-18 21-May-18, Grounding System
Lighting System 14 22-May-18 04-Jun-18 04-Jun-18, Lighting System
Panel Board 21 05-Jun-18 25-Jun-18 25-Jun-18, Panel Board
Access Control System 7 22-May-18 28-May-18 28-May-18, Access Control System
Wires and Cables 7 29-May-18 04-Jun-18 04-Jun-18, Wires and Cables
Roughing ins 25 05-Jun-18 29-Jun-18 29-Jun-18, Roughing ins
Mechanical Works 60 01-May-18 29-Jun-18 29-Jun-18, Mechanical Works
Mechanical/ HVAC Works 21 01-May-18 21-May-18 21-May-18, Mechanical/ HVAC Works
Plumbing Works 60 01-May-18 29-Jun-18 29-Jun-18, Plumbing Works
Fire Protection Works 60 01-May-18 29-Jun-18 29-Jun-18, Fire Protection Works
Operation and Maintenance Building 201 17-Aug-17 05-Mar-18 05-Mar-18, Operation and Maintenance Building
Light Operation and Maintenance Building 201 17-Aug-17 05-Mar-18 05-Mar-18, Light Operation and Maintenance Building
Civil Works 110 17-Aug-17 04-Dec-17 04-Dec-17, Civil Works
Structural Works 56 15-Nov-17 09-Jan-18 09-Jan-18, Structural Works
Architectural Works 100 25-Nov-17 04-Mar-18 04-Mar-18, Architectural Works
Electrical Works 81 15-Dec-17 05-Mar-18 05-Mar-18, Electrical Works
Mechanical Works 65 30-Dec-17 04-Mar-18 04-Mar-18, Mechanical Works
Heavy Operation and Maintenance Building-1 201 17-Aug-17 05-Mar-18 05-Mar-18, Heavy Operation and Maintenance Building-1
Civil Works 110 17-Aug-17 04-Dec-17 04-Dec-17, Civil Works
Structural Works 56 15-Nov-17 09-Jan-18 09-Jan-18, Structural Works
Architectural Works 100 25-Nov-17 04-Mar-18 04-Mar-18, Architectural Works
Electrical Works 81 15-Dec-17 05-Mar-18 05-Mar-18, Electrical Works
Mechanical Works 65 30-Dec-17 04-Mar-18 04-Mar-18, Mechanical Works
Substation 170 17-Aug-17 02-Feb-18 02-Feb-18, Substation
Civil Works 100 17-Aug-17 24-Nov-17 24-Nov-17, Civil Works
Earthworks 100 17-Aug-17 24-Nov-17 24-Nov-17, Earthworks
Architectural Works 80 15-Nov-17 02-Feb-18 02-Feb-18, Architectural Works
Masonry 14 15-Nov-17 28-Nov-17 28-Nov-17, Masonry
Metal Works 7 29-Nov-17 05-Dec-17 05-Dec-17, Metal Works
Thermal and Moisture Protection 7 29-Nov-17 05-Dec-17 05-Dec-17, Thermal and Moisture Protection
Doors & Windows 14 29-Nov-17 12-Dec-17 12-Dec-17, Doors & Windows
Finishes 42 29-Nov-17 09-Jan-18 09-Jan-18, Finishes
Specialties 7 10-Jan-18 16-Jan-18 16-Jan-18, Specialties
Miscellaneous 17 17-Jan-18 02-Feb-18 02-Feb-18, Miscellaneous
Furnishings 7 10-Jan-18 16-Jan-18 16-Jan-18, Furnishings
Structural Works 56 25-Nov-17 19-Jan-18 19-Jan-18, Structural Works
Installation / Fabrication 56 25-Nov-17 19-Jan-18 19-Jan-18, Installation / Fabrication
Electrical Works 60 05-Dec-17 02-Feb-18 02-Feb-18, Electrical Works
Grounding System 28 05-Dec-17 01-Jan-18 01-Jan-18, Grounding System
Lighting System 14 02-Jan-18 15-Jan-18 15-Jan-18, Lighting System
Fire Alarm System 14 16-Jan-18 29-Jan-18 29-Jan-18, Fire Alarm System
Panel Board 14 16-Jan-18 29-Jan-18 29-Jan-18, Panel Board
Access Control System 14 16-Jan-18 29-Jan-18 29-Jan-18, Access Control System
Wires and Cables 7 23-Jan-18 29-Jan-18 29-Jan-18, Wires and Cables
Roughing ins 18 16-Jan-18 02-Feb-18 02-Feb-18, Roughing ins
Mechanical Works 50 15-Dec-17 02-Feb-18 02-Feb-18, Mechanical Works
Mechanical/ HVAC Works 50 15-Dec-17 02-Feb-18 02-Feb-18, Mechanical/ HVAC Works
Plumbing Works 50 15-Dec-17 02-Feb-18 02-Feb-18, Plumbing Works
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (62)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Fire Protection Works 50 15-Dec-17 02-Feb-18 02-Feb-18, Fire Protection Works
Guardhouse 216 15-Nov-17 18-Jun-18 18-Jun-18, Guardhouse
Civil Works 100 14-Jan-18 23-Apr-18 23-Apr-18, Civil Works
Earthworks 100 14-Jan-18 23-Apr-18 23-Apr-18, Earthworks
Structural Works 56 24-Apr-18 18-Jun-18 18-Jun-18, Structural Works
Installation / Fabrication 56 24-Apr-18 18-Jun-18 18-Jun-18, Installation / Fabrication
Architectural Works 80 15-Nov-17 02-Feb-18 02-Feb-18, Architectural Works
Masonry 14 15-Nov-17 28-Nov-17 28-Nov-17, Masonry
Thermal and Moisture Protection 7 29-Nov-17 05-Dec-17 05-Dec-17, Thermal and Moisture Protection
Doors & Windows 14 29-Nov-17 12-Dec-17 12-Dec-17, Doors & Windows
Finishes 28 06-Dec-17 02-Jan-18 02-Jan-18, Finishes
Specialties 10 27-Dec-17 05-Jan-18 05-Jan-18, Specialties
Furnishings 14 06-Jan-18 19-Jan-18 19-Jan-18, Furnishings
Miscellaneous 14 20-Jan-18 02-Feb-18 02-Feb-18, Miscellaneous
Electrical Works 60 05-Dec-17 02-Feb-18 02-Feb-18, Electrical Works
Grounding System 28 05-Dec-17 01-Jan-18 01-Jan-18, Grounding System
Lighting System 14 02-Jan-18 15-Jan-18 15-Jan-18, Lighting System
Fire Alarm System 14 16-Jan-18 29-Jan-18 29-Jan-18, Fire Alarm System
Panel Board 14 02-Jan-18 15-Jan-18 15-Jan-18, Panel Board
Access Control System 14 16-Jan-18 29-Jan-18 29-Jan-18, Access Control System
Wires and Cables 7 02-Jan-18 08-Jan-18 08-Jan-18, Wires and Cables
Roughing ins 25 09-Jan-18 02-Feb-18 02-Feb-18, Roughing ins
Mechanical Works 50 15-Dec-17 02-Feb-18 02-Feb-18, Mechanical Works
Mechanical/ HVAC Works 50 15-Dec-17 02-Feb-18 02-Feb-18, Mechanical/ HVAC Works
Plumbing Works 50 15-Dec-17 02-Feb-18 02-Feb-18, Plumbing Works
Fire Protection Works 50 15-Dec-17 02-Feb-18 02-Feb-18, Fire Protection Works
Pumphouse 100 27-Jun-18 04-Oct-18 04-Oct-18, Pumphouse
Civil Works 99 28-Jun-18 04-Oct-18 04-Oct-18, Civil Works
Earthworks 99 28-Jun-18 04-Oct-18 04-Oct-18, Earthworks
Structural Works 56 27-Jun-18 21-Aug-18 21-Aug-18, Structural Works
Installation / Fabrication 56 27-Jun-18 21-Aug-18 21-Aug-18, Installation / Fabrication
Architectural Works 30 23-Jul-18 21-Aug-18 21-Aug-18, Architectural Works
Masonry 21 23-Jul-18 12-Aug-18 12-Aug-18, Masonry
Metal Works 28 25-Jul-18 21-Aug-18 21-Aug-18, Metal Works
Thermal and Moisture Protection 14 08-Aug-18 21-Aug-18 21-Aug-18, Thermal and Moisture Protection
Doors & Windows 14 08-Aug-18 21-Aug-18 21-Aug-18, Doors & Windows
Finishes 18 04-Aug-18 21-Aug-18 21-Aug-18, Finishes
Specialties 7 15-Aug-18 21-Aug-18 21-Aug-18, Specialties
Miscellaneous 8 14-Aug-18 21-Aug-18 21-Aug-18, Miscellaneous
Furnishings 8 14-Aug-18 21-Aug-18 21-Aug-18, Furnishings
Electrical Works 30 01-Aug-18 30-Aug-18 30-Aug-18, Electrical Works
Grounding System 21 01-Aug-18 21-Aug-18 21-Aug-18, Grounding System
Lighting System 7 22-Aug-18 28-Aug-18 28-Aug-18, Lighting System
Access Control System 21 01-Aug-18 21-Aug-18 21-Aug-18, Access Control System
Wires and Cables 7 08-Aug-18 14-Aug-18 14-Aug-18, Wires and Cables
Roughing ins 16 15-Aug-18 30-Aug-18 30-Aug-18, Roughing ins
Mechanical Works 20 02-Aug-18 21-Aug-18 21-Aug-18, Mechanical Works
Mechanical/ HVAC Works 20 02-Aug-18 21-Aug-18 21-Aug-18, Mechanical/ HVAC Works
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (63)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Plumbing Works 20 02-Aug-18 21-Aug-18 21-Aug-18, Plumbing Works
Fire Protection Works 20 02-Aug-18 21-Aug-18 21-Aug-18, Fire Protection Works
Motorpool 100 08-Jul-18 15-Oct-18 15-Oct-18, Motorpool
Civil Works 99 09-Jul-18 15-Oct-18 15-Oct-18, Civil Works
Earthworks 99 09-Jul-18 15-Oct-18 15-Oct-18, Earthworks
Structural Works 56 08-Jul-18 01-Sep-18 01-Sep-18, Structural Works
Installation & Fabrication 56 08-Jul-18 01-Sep-18 01-Sep-18, Installation & Fabrication
Architectural Works 30 03-Aug-18 01-Sep-18 01-Sep-18, Architectural Works
Masonry 21 03-Aug-18 23-Aug-18 23-Aug-18, Masonry
Metal Works 28 05-Aug-18 01-Sep-18 01-Sep-18, Metal Works
Thermal and Moisture Protection 14 19-Aug-18 01-Sep-18 01-Sep-18, Thermal and Moisture Protection
Doors & Windows 14 19-Aug-18 01-Sep-18 01-Sep-18, Doors & Windows
Finishes 18 15-Aug-18 01-Sep-18 01-Sep-18, Finishes
Specialties 7 26-Aug-18 01-Sep-18 01-Sep-18, Specialties
Furnishings 8 25-Aug-18 01-Sep-18 01-Sep-18, Furnishings
Miscellaneous 8 25-Aug-18 01-Sep-18 01-Sep-18, Miscellaneous
Electrical Works 30 12-Aug-18 10-Sep-18 10-Sep-18, Electrical Works
Grounding System 21 12-Aug-18 01-Sep-18 01-Sep-18, Grounding System
Lighting System 7 02-Sep-18 08-Sep-18 08-Sep-18, Lighting System
Access Control System 21 12-Aug-18 01-Sep-18 01-Sep-18, Access Control System
Wires and Cables 7 19-Aug-18 25-Aug-18 25-Aug-18, Wires and Cables
Roughing ins 16 26-Aug-18 10-Sep-18 10-Sep-18, Roughing ins
Mechanical Works 20 13-Aug-18 01-Sep-18 01-Sep-18, Mechanical Works
Mechanical/ HVAC Works 20 13-Aug-18 01-Sep-18 01-Sep-18, Mechanical/ HVAC Works
Plumbing Works 20 13-Aug-18 01-Sep-18 01-Sep-18, Plumbing Works
Fire Protection Works 20 13-Aug-18 01-Sep-18 01-Sep-18, Fire Protection Works
SYSTEM- Depot 335 16-Feb-18 16-Jan-19 16-Jan-19, SYSTEM- Depot
Site Works 334 16-Feb-18 15-Jan-19 15-Jan-19, Site Works
Trackwork 150 16-Feb-18 15-Jul-18 15-Jul-18, Trackwork
A81550 Surveying 20 16-Feb-18 07-Mar-18 A38640 A81560, A81570, Surveying
A81590, A81650,
A81500, A81770,
A91720
A81560 Sleeper & Rail & Fastner 40 08-Mar-18 16-Apr-18 A81550 A81580 Sleeper & Rail & Fastner
A81570 Ballast 50 08-Mar-18 26-Apr-18 A81550 A81600 Ballast
A81580 Turnout 40 17-Apr-18 26-May-18 A81560 Turnout
A81590 IRJ & Boding cable 40 08-Mar-18 16-Apr-18 A81550 IRJ & Boding cable
A81600 Damping & Lifting 20 27-Apr-18 16-May-18 A81570 A81610, A81620 Damping & Lifting
A81610 Buffer stop 20 17-May-18 05-Jun-18 A81600 A81630 Buffer stop
A81620 Washing & worksop 30 17-May-18 15-Jun-18 A81600 Washing & worksop
A81630 Sign Post 10 06-Jun-18 15-Jun-18 A81610 A81640 Sign Post
A81640 Individual Test & Adjustment 30 16-Jun-18 15-Jul-18 A81630 Individual Test & Adjustment
3rd Rail 153 16-Apr-18 15-Sep-18 15-Sep-18, 3rd Rail
A81650 Surveying 20 16-Apr-18 05-May-18 A81550 A81670 Surveying
A81670 Pre-assembly of insulator and claw 20 16-May-18 04-Jun-18 A81650 A81680, A81690 Pre-assembly of insulator and claw
A81680 Support 15 05-Jun-18 19-Jun-18 A81670 Support
A81690 Expansion joint 15 16-May-18 30-May-18 A81670 A81700 Expansion joint
A81700 Conductor bar 15 21-May-18 04-Jun-18 A81690 A81710 Conductor bar
A81710 Rail joint 15 10-Jun-18 24-Jun-18 A81700 A81711 Rail joint
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (64)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
A81711 Stinger 15 25-Jun-18 09-Jul-18 A81710 A81760 Stinger
A81720 Installation of cable terminal 15 05-Jul-18 19-Jul-18 A81760 A81730 Installation of cable terminal
A81730 Feeder Cable 20 20-Jul-18 08-Aug-18 A81720 A81750, A81740 Feeder Cable
A81740 Sign Post 10 09-Aug-18 18-Aug-18 A81730 Sign Post
A81750 Individual Test 30 17-Aug-18 15-Sep-18 A81730 Individual Test
A81760 DS 10 25-Jun-18 04-Jul-18 A81711 A81720 DS
Waiside(Signal/Communication/Power) 122 16-Sep-18 15-Jan-19 15-Jan-19, Waiside(Signal/Communication/Power)
A81770 Surveying 30 16-Sep-18 15-Oct-18 A81550 A81780, A81771 Surveying
A81771 Foundation 20 16-Oct-18 04-Nov-18 A81770 A81772 Foundation
A81772 Point Machine 20 05-Nov-18 24-Nov-18 A81771 Point Machine
A81780 Conduit on the track 25 16-Oct-18 09-Nov-18 A81770 A81820 Conduit on the track
A81820 Wayside Equipment 30 10-Nov-18 09-Dec-18 A81780 A81830 Wayside Equipment
A81830 Cabling 20 10-Nov-18 29-Nov-18 A81820 A81840 Cabling
A81840 Connection with Main equipment 15 30-Nov-18 14-Dec-18 A81830 A81850 Connection with Main equipment
A81850 Sign Post 20 26-Nov-18 15-Dec-18 A81840 A81860 Sign Post
A81860 Individual Test 30 17-Dec-18 15-Jan-19 A81850 Individual Test
Operation and Maintenance Building 243 16-Feb-18 16-Oct-18 16-Oct-18, Operation and Maintenance Building
Depot Equipment 213 16-Feb-18 16-Sep-18 16-Sep-18, Depot Equipment
A81500 Surveying 15 16-Feb-18 02-Mar-18 A81550 A81510, A82510, Surveying
A81870

A81510 Cable contaminent 20 08-Mar-18 27-Mar-18 A81500 A81520 Cable contaminent


A81520 Installation of Maintenance Equipment 120 28-Mar-18 25-Jul-18 A81510 A81530 Installation of Maintenance Equipment
A81530 Cabling 20 26-Jul-18 14-Aug-18 A81520 A81540 Cabling
A81540 Individual Test 30 18-Aug-18 16-Sep-18 A81530 Individual Test
Signal/Comm. 154 16-May-18 16-Oct-18 16-Oct-18, Signal/Comm.
A82510 Surveying 30 16-May-18 14-Jun-18 A81500 A82520 Surveying
A82520 Cable contaminent 30 15-Jun-18 14-Jul-18 A82510 A82530 Cable contaminent
A82530 System installation 34 15-Jul-18 17-Aug-18 A82520 A82540 System installation
A82540 cabling 30 18-Aug-18 16-Sep-18 A82530 A82550 cabling
A82550 Individual Test 30 17-Sep-18 16-Oct-18 A82540 Individual Test
Substation 182 16-Feb-18 16-Aug-18 16-Aug-18, Substation
TPSS/ER 182 16-Feb-18 16-Aug-18 16-Aug-18, TPSS/ER
A81870 Surveying 20 16-Feb-18 07-Mar-18 A81500 A81880 Surveying
A81880 Installation of tray 20 08-Mar-18 27-Mar-18 A81870 A81890 Installation of tray
A81890 Cable rack 25 28-Mar-18 21-Apr-18 A81880 A81900, A81910 Cable rack
A81900 Cable contaminent 25 02-Apr-18 26-Apr-18 A81890 Cable contaminent
A81910 System installation 30 22-Apr-18 21-May-18 A81890 A81920 System installation
A81920 Cabling 30 22-May-18 20-Jun-18 A81910 A81930 Cabling
A81930 Connection of terminal 30 21-Jun-18 20-Jul-18 A81920 A81940 Connection of terminal
A81940 Individual Test 30 18-Jul-18 16-Aug-18 A81930 Individual Test
OCC Room 335 16-Feb-18 16-Jan-19 16-Jan-19, OCC Room
A91720 Surveying 30 16-Feb-18 17-Mar-18 A81550 A91730 Surveying
A91730 Cable contaminent 60 28-Mar-18 26-May-18 A91720 A91740 Cable contaminent
A91740 System installation 80 06-Jun-18 24-Aug-18 A91730 A91750 System installation
A91750 Cabling 60 04-Sep-18 02-Nov-18 A91740 A91760 Cabling
A91760 Individual Test 60 18-Nov-18 16-Jan-19 A91750 Individual Test
CIVIL - ITT ( Intermodal Transport Terminal ) 532 14-Jan-17 29-Jun-18 29-Jun-18, CIVIL - ITT ( Intermodal Transport Terminal )
Civil Works 462 14-Jan-17 20-Apr-18 20-Apr-18, Civil Works

Date Revision Checked Approved


MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (65)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Site Development 328 14-Jan-17 07-Dec-17 07-Dec-17, Site Development
A38890 Clearing and Grubbing 270 14-Jan-17 10-Oct-17 A38610 A38900 Clearing and Grubbing
A38900 Excavation 200 15-Feb-17 02-Sep-17 A38890 A38910 Excavation
A38910 Backfilling ( Disposal ) 200 19-Mar-17 04-Oct-17 A38900 A38920 Backfilling ( Disposal )
A38920 Embankment from excavated soil 200 20-Apr-17 05-Nov-17 A38910 A39060, A39640 Embankment from excavated soil
A39060 Soil Treatment 200 22-May-17 07-Dec-17 A38920 A38930, A39080 Soil Treatment
Drainage and Slope Protection 180 21-Jun-17 17-Dec-17 17-Dec-17, Drainage and Slope Protection
A38930 Installation of Geogrid Slope Protection 60 21-Jun-17 19-Aug-17 A39060 A38940, A39000 Installation of Geogrid Slope Protection
A38940 Installation of Open Channel 60 20-Aug-17 18-Oct-17 A38930 A38950 Installation of Open Channel
A38950 Installation of Single Box Culvert 60 20-Aug-17 18-Oct-17 A38940 A38960 Installation of Single Box Culvert
A38960 Installation of Double Box Culvert 60 20-Aug-17 18-Oct-17 A38950 A38970 Installation of Double Box Culvert
A38970 Installation of Dissipation Pond 60 19-Oct-17 17-Dec-17 A38960 Installation of Dissipation Pond
Subbase and Basecourse 230 04-Aug-17 21-Mar-18 21-Mar-18, Subbase and Basecourse
A39000 Application of Aggregate Subbase Course 120 04-Aug-17 01-Dec-17 A38930 A39010, A39020, Application of Aggregate Subbase Course
A39070
A39010 Application of Aggregate Base Course 110 02-Dec-17 21-Mar-18 A39000 Application of Aggregate Base Course
Surface Courses 230 03-Sep-17 20-Apr-18 20-Apr-18, Surface Courses
A39020 Application of Bituminous Prime Coat MC Cut-back Asphalt
80 03-Sep-17 21-Nov-17 A39000 A39030 Application of Bituminous Prime Coat MC Cut-back Asphalt
A39030 Application of Bituminous Tack Coat Emulsified Asphalty
60 22-Nov-17 20-Jan-18 A39020 A39040 Application of Bituminous Tack Coat Emulsified Asphalty
A39040 Application of Bituminous Binder Course 50 21-Jan-18 11-Mar-18 A39030 A39050 Application of Bituminous Binder Course
A39050 Application of Bituminous Surface Wearing Course 40 12-Mar-18 20-Apr-18 A39040 Application of Bituminous Surface Wearing Course
Perimeter Fence 60 04-Aug-17 02-Oct-17 02-Oct-17, Perimeter Fence
A39070 Installation of Perimeter Fence 60 04-Aug-17 02-Oct-17 A39000 Installation of Perimeter Fence
Structural Works 84 08-Dec-17 01-Mar-18 01-Mar-18, Structural Works
Site Works 84 08-Dec-17 01-Mar-18 01-Mar-18, Site Works
A39080 Gravel Bedding 21 08-Dec-17 28-Dec-17 A39060 A39090, A39140 Gravel Bedding
A39090 Installation of Vapor Barrier 14 29-Dec-17 11-Jan-18 A39080 A39100 Installation of Vapor Barrier
A39100 Installation of Reinforcement 14 12-Jan-18 25-Jan-18 A39090 A39110 Installation of Reinforcement
A39110 Installation of Formworks 14 26-Jan-18 08-Feb-18 A39100 A39120 Installation of Formworks
A39120 Pouring of Concrete 7 09-Feb-18 15-Feb-18 A39110 A39130 Pouring of Concrete
A39130 Installation of Structural Steel 14 16-Feb-18 01-Mar-18 A39120 Installation of Structural Steel
Architectural Works 123 26-Jan-18 28-May-18 28-May-18, Architectural Works
Metal Works 21 25-Feb-18 17-Mar-18 17-Mar-18, Metal Works
A39150 Installation of Stainless Steel Handrail 21 25-Feb-18 17-Mar-18 A39140 A39160 Installation of Stainless Steel Handrail
A39160 Installation of Stair Nosing 21 25-Feb-18 17-Mar-18 A39150 Installation of Stair Nosing
Masonry 30 26-Jan-18 24-Feb-18 24-Feb-18, Masonry
A39140 Installation of CHB Wall 30 26-Jan-18 24-Feb-18 A39080 A39150, A39170, Installation of CHB Wall
A39190, A39210
Thermal and Moisture Protection 51 26-Jan-18 17-Mar-18 17-Mar-18, Thermal and Moisture Protection
A39170 Application of Waterproofing 21 26-Jan-18 15-Feb-18 A39140 A39180 Application of Waterproofing
A39180 Installation of Roofing 30 16-Feb-18 17-Mar-18 A39170 Installation of Roofing
Doors 14 25-Feb-18 10-Mar-18 10-Mar-18, Doors
A39190 Installation of Doors 7 25-Feb-18 03-Mar-18 A39140 A39200 Installation of Doors
A39200 Installation of Door Hardwares 7 04-Mar-18 10-Mar-18 A39190 Installation of Door Hardwares
Finishes 93 25-Feb-18 28-May-18 28-May-18, Finishes
Floor Finishes 30 25-Feb-18 26-Mar-18 26-Mar-18, Floor Finishes
Wall Finishes 21 27-Mar-18 16-Apr-18 16-Apr-18, Wall Finishes
Ceiling Finishes 21 17-Apr-18 07-May-18 07-May-18, Ceiling Finishes

Date Revision Checked Approved


MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (66)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Painting Works 42 17-Apr-18 28-May-18 28-May-18, Painting Works
Specialties 21 17-Apr-18 07-May-18 07-May-18, Specialties
A39270 Installation of Curtain Wall 21 17-Apr-18 07-May-18 A39240 A39280 Installation of Curtain Wall
A39280 Installation of Partition 21 17-Apr-18 07-May-18 A39270 A39290 Installation of Partition
A39290 Installation of Informative Signages 21 17-Apr-18 07-May-18 A39280 A39300 Installation of Informative Signages
Furnishings 21 08-May-18 28-May-18 28-May-18, Furnishings
A39300 Installation of Chairs 21 08-May-18 28-May-18 A39290 A39310 Installation of Chairs
A39310 Installation of Sofa 21 08-May-18 28-May-18 A39300 A39320 Installation of Sofa
A39320 Installation of Cabinets 21 08-May-18 28-May-18 A39310 A39330 Installation of Cabinets
A39330 Installation of Office Table 21 08-May-18 28-May-18 A39320 Installation of Office Table
Electrical Works 105 17-Mar-18 29-Jun-18 29-Jun-18, Electrical Works
Acces Control System 80 17-Mar-18 04-Jun-18 04-Jun-18, Acces Control System
A39340 Installation of Control Panel 40 17-Mar-18 25-Apr-18 A39210 A39350, A39360, Installation of Control Panel
A39380
A39350 Installation of Workstation Server 40 26-Apr-18 04-Jun-18 A39340 Installation of Workstation Server
Wires and Cables 40 17-Mar-18 25-Apr-18 25-Apr-18, Wires and Cables
A39360 Installation of Wires and Cables 40 17-Mar-18 25-Apr-18 A39340 A39370 Installation of Wires and Cables
Roughing ins 40 26-Apr-18 04-Jun-18 04-Jun-18, Roughing ins
A39370 Installation of Roughing Ins 40 26-Apr-18 04-Jun-18 A39360 Installation of Roughing Ins
Outdoor Electric Equipment Work 70 17-Mar-18 25-May-18 25-May-18, Outdoor Electric Equipment Work
A39380 Excavation 21 17-Mar-18 06-Apr-18 A39340 A39390, A39460 Excavation
A39390 Backfilling 21 07-Apr-18 27-Apr-18 A39380 A39400 Backfilling
A39400 Installation of Ground Electric Wire 14 28-Apr-18 11-May-18 A39390 A39410 Installation of Ground Electric Wire
A39410 Installation of Street Light Pole 14 12-May-18 25-May-18 A39400 A39420 Installation of Street Light Pole
A39420 Installation of Handhole 14 12-May-18 25-May-18 A39410 A39430 Installation of Handhole
A39430 Installation of Ground Rod 14 12-May-18 25-May-18 A39420 A39440 Installation of Ground Rod
A39440 Installation of Street Light Panel 14 12-May-18 25-May-18 A39430 A39450 Installation of Street Light Panel
A39450 Installatin of Lighting Tower 14 12-May-18 25-May-18 A39440 Installatin of Lighting Tower
Terminal Ligthing Fixtures 90 01-Apr-18 29-Jun-18 29-Jun-18, Terminal Ligthing Fixtures
A39460 Installation of Rigid Steel Conduit 21 01-Apr-18 21-Apr-18 A39380 A39470, A39510 Installation of Rigid Steel Conduit
A39470 Installation of Electric Wire 21 22-Apr-18 12-May-18 A39460 A39480 Installation of Electric Wire
A39480 Installation of ACF Cable 17 13-May-18 29-May-18 A39470 A39490 Installation of ACF Cable
A39490 Installation of Lighting Fixtures 17 30-May-18 15-Jun-18 A39480 A39500 Installation of Lighting Fixtures
A39500 Installation of Boxes 14 16-Jun-18 29-Jun-18 A39490 Installation of Boxes
Terminal Receptalcles 59 01-Apr-18 29-May-18 29-May-18, Terminal Receptalcles
A39510 Installation of Rigid Steel Conduit 21 01-Apr-18 21-Apr-18 A39460 A39520, A39540 Installation of Rigid Steel Conduit
A39520 Installation of Cables 21 22-Apr-18 12-May-18 A39510 A39530 Installation of Cables
A39530 Installtion of Boxes 17 13-May-18 29-May-18 A39520 Installtion of Boxes
Power Feeder 90 01-Apr-18 29-Jun-18 29-Jun-18, Power Feeder
A39540 Installation of main Distribution Work 21 01-Apr-18 21-Apr-18 A39510 A39550, A39590 Installation of main Distribution Work
A39550 Installation of XLPE Wires 21 22-Apr-18 12-May-18 A39540 A39560 Installation of XLPE Wires
A39560 Installation of Rigid Steel Conduit 17 13-May-18 29-May-18 A39550 A39570 Installation of Rigid Steel Conduit
A39570 Installation of Transformer 17 30-May-18 15-Jun-18 A39560 A39580 Installation of Transformer
A39580 Installation of Standby Generator 14 16-Jun-18 29-Jun-18 A39570 Installation of Standby Generator
Terminal Fire Fighting 59 01-Apr-18 29-May-18 29-May-18, Terminal Fire Fighting
A39590 Installtion of Rigid Steel Conduit 21 01-Apr-18 21-Apr-18 A39540 A39600, A39620 Installtion of Rigid Steel Conduit
A39600 Installation of Outlet Boxes 21 22-Apr-18 12-May-18 A39590 A39610 Installation of Outlet Boxes
A39610 Installtion of Fire Detectors 17 13-May-18 29-May-18 A39600 Installtion of Fire Detectors

Date Revision Checked Approved


MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (67)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
Mechanical Works 60 01-May-18 29-Jun-18 29-Jun-18, Mechanical Works
Mechanical HVAC Works 60 01-May-18 29-Jun-18 29-Jun-18, Mechanical HVAC Works
A39620 ITT Ticketing Office 30 01-May-18 30-May-18 A39590 A39630 ITT Ticketing Office
A39630 ITT Admin Office 30 31-May-18 29-Jun-18 A39620 ITT Admin Office
SYSTEM 1016 01-Mar-17 11-Dec-19 11-Dec-19, SYSTEM
ROLLING STOCK 923 01-Mar-17 09-Sep-19 09-Sep-19, ROLLING STOCK
MANUFACTURING 584 01-Mar-17 05-Oct-18 05-Oct-18, MANUFACTURING
A11750 Train # 1 245 01-Mar-17 31-Oct-17 A5760 A11760, A1135, Train # 1
A13380, A3020
A11760 Train # 2 - 5 252 10-Apr-17 17-Dec-17 A11750 A11770 Train # 2 - 5
A11770 Train # 6 - 9 219 01-Aug-17 07-Mar-18 A11760 A11780 Train # 6 - 9
A11780 Train # 10 - 13 217 01-Sep-17 05-Apr-18 A11770 A11790 Train # 10 - 13
A11790 Train # 14 - 17 217 01-Oct-17 05-May-18 A11780 A11800 Train # 14 - 17
A11800 Train # 18 - 21 217 01-Nov-17 05-Jun-18 A11790 A11810 Train # 18 - 21
A11810 Train # 22 - 25 217 01-Dec-17 05-Jul-18 A11800 A11820 Train # 22 - 25
A11820 Train # 26 - 29 216 02-Jan-18 05-Aug-18 A11810 A11830 Train # 26 - 29
A11830 Train # 30- -33 217 01-Feb-18 05-Sep-18 A11820 A11840 Train # 30- -33
A11840 Train # 34- 36 217 03-Mar-18 05-Oct-18 A11830 Train # 34- 36
FACTORY TEST 441 01-Nov-17 15-Jan-19 15-Jan-19, FACTORY TEST
A13380 Train # 1 69 01-Nov-17 08-Jan-18 A11750 A13390, A79750 Train # 1
A13390 Train # 2 - 5 134 18-Dec-17 30-Apr-18 A13380 A13400 Train # 2 - 5
A13400 Train # 6 - 9 99 08-Mar-18 14-Jun-18 A13390 A13410 Train # 6 - 9
A13410 Train # 10 - 13 92 18-Apr-18 18-Jul-18 A13400 A13420 Train # 10 - 13
A13420 Train # 14 - 17 94 16-May-18 17-Aug-18 A13410 A13430 Train # 14 - 17
A13430 Train # 18 - 21 96 15-Jun-18 18-Sep-18 A13420 A13440 Train # 18 - 21
A13440 Train # 22 - 25 95 19-Jul-18 21-Oct-18 A13430 A13450 Train # 22 - 25
A13450 Train # 26 - 29 95 14-Aug-18 16-Nov-18 A13440 A13460 Train # 26 - 29
A13460 Train # 30- -33 95 17-Sep-18 20-Dec-18 A13450 A13470 Train # 30- -33
A13470 Train # 34- 36 92 16-Oct-18 15-Jan-19 A13460 Train # 34- 36
DELIVERY ONSITE 377 06-Feb-18 18-Feb-19 18-Feb-19, DELIVERY ONSITE
A79750 Train # 1 0 06-Feb-18 A13380 A79760, A79751 Train # 1
A79751 Static Test 80 07-Feb-18 27-Apr-18 A79750 Static Test
A79760 Train # 2~5 30 06-May-18 04-Jun-18 A79750 A79770 Train # 2~5
A79770 Train # 6~9 29 20-Jun-18 18-Jul-18 A79760 A79780 Train # 6~9
A79780 Train # 10~13 30 24-Jul-18 22-Aug-18 A79770 A79790 Train # 10~13
A79790 Train # 14~17 30 23-Aug-18 21-Sep-18 A79780 A79800 Train # 14~17
A79800 Train # 18~21 28 24-Sep-18 21-Oct-18 A79790 A79810 Train # 18~21
A79810 Train # 22~25 29 27-Oct-18 24-Nov-18 A79800 A79820 Train # 22~25
A79820 Train # 26~29 28 22-Nov-18 19-Dec-18 A79810 A79830 Train # 26~29
A79830 Train # 30~33 30 26-Dec-18 24-Jan-19 A79820 A79840 Train # 30~33
A79840 Train # 34~36 29 21-Jan-19 18-Feb-19 A79830 Train # 34~36
DYNAMIC TEST 327 18-Oct-18 09-Sep-19 09-Sep-19, DYNAMIC TEST
Train# 1 75 18-Oct-18 31-Dec-18 31-Dec-18, Train# 1
A79850 Mainline Test of Brake System at Train Level 15 18-Oct-18 01-Nov-18 A77360, A77840, A79860, A79851 Mainline Test of Brake System at Train Level
A77920, A78000,
A77600, A77680,
A73590, A74070,
A73710, A73830

A79851 Mainline Test of Traction Performance at Train Level 14 18-Oct-18 31-Oct-18 A79850 A79860 Mainline Test of Traction Performance at Train Level

Date Revision Checked Approved


MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (68)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
A79860 Mainline Test of PA-PIS System at Train Level 10 02-Nov-18 11-Nov-18 A79850, A79851 A79870 Mainline Test of PA-PIS System at Train Level
A79870 Mainline Test of EMC for Completed Train 10 12-Nov-18 21-Nov-18 A79860 A79880 Mainline Test of EMC for Completed Train
A79880 Mainline Test of Riding Quality 10 22-Nov-18 01-Dec-18 A79870 A79890 Mainline Test of Riding Quality
A79890 Mainline Test of Noise & Vibration 10 02-Dec-18 11-Dec-18 A79880 A79910 Mainline Test of Noise & Vibration
A79910 Mainline Test of Coupling and Uncoupling at Train Level
5 12-Dec-18 16-Dec-18 A79890 A79920 Mainline Test of Coupling and Uncoupling at Train Level
A79920 Mainline Test of Onboard ATP System at Train Level 10 17-Dec-18 26-Dec-18 A79910 A81660 Mainline Test of Onboard ATP System at Train Level
A81660 Mainline Test of Compressor Duty Cycle at TrainLevel5 27-Dec-18 31-Dec-18 A79920 A79930 Mainline Test of Compressor Duty Cycle at TrainLevel
Train# 2~3 14 01-Jan-19 14-Jan-19 14-Jan-19, Train# 2~3
A79930 Mainline Test of Brake System at Train Level 6 01-Jan-19 06-Jan-19 A81660 A79940 Mainline Test of Brake System at Train Level
A79940 Mainline Test of Traction Performance at Train Level 6 01-Jan-19 06-Jan-19 A79930 A79950 Mainline Test of Traction Performance at Train Level
A79950 Mainline Test of PA-PIS System at Train Level 4 07-Jan-19 10-Jan-19 A79940 A79960 Mainline Test of PA-PIS System at Train Level
A79960 Mainline Test of Onboard ATP System at Train Level 4 11-Jan-19 14-Jan-19 A79950 A82620 Mainline Test of Onboard ATP System at Train Level
Train# 4~5 14 15-Jan-19 28-Jan-19 28-Jan-19, Train# 4~5
A82620 Mainline Test of Brake System at Train Level 6 15-Jan-19 20-Jan-19 A79960 A82630 Mainline Test of Brake System at Train Level
A82630 Mainline Test of Traction Performance at Train Level 6 15-Jan-19 20-Jan-19 A82620 A82640 Mainline Test of Traction Performance at Train Level
A82640 Mainline Test of PA-PIS System at Train Level 4 21-Jan-19 24-Jan-19 A82630 A82650 Mainline Test of PA-PIS System at Train Level
A82650 Mainline Test of Onboard ATP System at Train Level 4 25-Jan-19 28-Jan-19 A82640 A82660 Mainline Test of Onboard ATP System at Train Level
Train# 6~7 14 29-Jan-19 11-Feb-19 11-Feb-19, Train# 6~7
A82660 Mainline Test of Brake System at Train Level 6 29-Jan-19 03-Feb-19 A82650 A82670 Mainline Test of Brake System at Train Level
A82670 Mainline Test of Traction Performance at Train Level 6 29-Jan-19 03-Feb-19 A82660 A82680 Mainline Test of Traction Performance at Train Level
A82680 Mainline Test of PA-PIS System at Train Level 4 04-Feb-19 07-Feb-19 A82670 A82690 Mainline Test of PA-PIS System at Train Level
A82690 Mainline Test of Onboard ATP System at Train Level 4 08-Feb-19 11-Feb-19 A82680 A82700 Mainline Test of Onboard ATP System at Train Level
Train# 8~9 14 12-Feb-19 25-Feb-19 25-Feb-19, Train# 8~9
A82700 Mainline Test of Brake System at Train Level 6 12-Feb-19 17-Feb-19 A82690 A82710 Mainline Test of Brake System at Train Level
A82710 Mainline Test of Traction Performance at Train Level 6 12-Feb-19 17-Feb-19 A82700 A82720 Mainline Test of Traction Performance at Train Level
A82720 Mainline Test of PA-PIS System at Train Level 4 18-Feb-19 21-Feb-19 A82710 A82730 Mainline Test of PA-PIS System at Train Level
A82730 Mainline Test of Onboard ATP System at Train Level 4 22-Feb-19 25-Feb-19 A82720 A82740 Mainline Test of Onboard ATP System at Train Level
Train# 10~11 14 26-Feb-19 11-Mar-19 11-Mar-19, Train# 10~11
A82740 Mainline Test of Brake System at Train Level 6 26-Feb-19 03-Mar-19 A82730 A82750 Mainline Test of Brake System at Train Level
A82750 Mainline Test of Traction Performance at Train Level 6 26-Feb-19 03-Mar-19 A82740 A82760 Mainline Test of Traction Performance at Train Level
A82760 Mainline Test of PA-PIS System at Train Level 4 04-Mar-19 07-Mar-19 A82750 A82770 Mainline Test of PA-PIS System at Train Level
A82770 Mainline Test of Onboard ATP System at Train Level 4 08-Mar-19 11-Mar-19 A82760 A82780 Mainline Test of Onboard ATP System at Train Level
Train# 12~13 14 12-Mar-19 25-Mar-19 25-Mar-19, Train# 12~13
A82780 Mainline Test of Brake System at Train Level 6 12-Mar-19 17-Mar-19 A82770 A82790 Mainline Test of Brake System at Train Level
A82790 Mainline Test of Traction Performance at Train Level 6 12-Mar-19 17-Mar-19 A82780 A82800 Mainline Test of Traction Performance at Train Level
A82800 Mainline Test of PA-PIS System at Train Level 4 18-Mar-19 21-Mar-19 A82790 A82810 Mainline Test of PA-PIS System at Train Level
A82810 Mainline Test of Onboard ATP System at Train Level 4 22-Mar-19 25-Mar-19 A82800 A82820 Mainline Test of Onboard ATP System at Train Level
Train# 14~15 14 26-Mar-19 08-Apr-19 08-Apr-19, Train# 14~15
A82820 Mainline Test of Brake System at Train Level 6 26-Mar-19 31-Mar-19 A82810 A82830 Mainline Test of Brake System at Train Level
A82830 Mainline Test of Traction Performance at Train Level 6 26-Mar-19 31-Mar-19 A82820 A82840 Mainline Test of Traction Performance at
A82840 Mainline Test of PA-PIS System at Train Level 4 01-Apr-19 04-Apr-19 A82830 A82850 Mainline Test of PA-PIS System at Train Level
A82850 Mainline Test of Onboard ATP System at Train Level 4 05-Apr-19 08-Apr-19 A82840 A82860 Mainline Test of Onboard ATP System at
Train# 16~17 14 09-Apr-19 22-Apr-19 22-Apr-19, Train# 16~17
A82860 Mainline Test of Brake System at Train Level 6 09-Apr-19 14-Apr-19 A82850 A82870 Mainline Test of Brake System at Train Level
A82870 Mainline Test of Traction Performance at Train Level 6 09-Apr-19 14-Apr-19 A82860 A82880 Mainline Test of Traction Performance a
A82880 Mainline Test of PA-PIS System at Train Level 4 15-Apr-19 18-Apr-19 A82870 A82890 Mainline Test of PA-PIS System at Train Level
A82890 Mainline Test of Onboard ATP System at Train Level 4 19-Apr-19 22-Apr-19 A82880 A82900 Mainline Test of Onboard ATP System a
Train# 18~19 14 23-Apr-19 06-May-19 06-May-19, Train# 18~19
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (69)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
A82900 Mainline Test of Brake System at Train Level 6 23-Apr-19 28-Apr-19 A82890 A82910 Mainline Test of Brake System at Train Level
A82910 Mainline Test of Traction Performance at Train Level 6 23-Apr-19 28-Apr-19 A82900 A82920 Mainline Test of Traction Performance
A82920 Mainline Test of PA-PIS System at Train Level 4 29-Apr-19 02-May-19 A82910 A82930 Mainline Test of PA-PIS System at Train Level
A82930 Mainline Test of Onboard ATP System at Train Level 4 03-May-19 06-May-19 A82920 A82940 Mainline Test of Onboard ATP System
Train# 20~21 14 07-May-19 20-May-19 20-May-19, Train# 20~21
A82940 Mainline Test of Brake System at Train Level 6 07-May-19 12-May-19 A82930 A82950 Mainline Test of Brake System at Train Level
A82950 Mainline Test of Traction Performance at Train Level 6 07-May-19 12-May-19 A82940 A82960 Mainline Test of Traction Performance
A82960 Mainline Test of PA-PIS System at Train Level 4 13-May-19 16-May-19 A82950 A82970 Mainline Test of PA-PIS System at Train Level
A82970 Mainline Test of Onboard ATP System at Train Level 4 17-May-19 20-May-19 A82960 A82980 Mainline Test of Onboard ATP System
Train# 22~23 14 21-May-19 03-Jun-19 03-Jun-19, Train# 22~23
A82980 Mainline Test of Brake System at Train Level 6 21-May-19 26-May-19 A82970 A82990 Mainline Test of Brake System at Train Level
A82990 Mainline Test of Traction Performance at Train Level 6 21-May-19 26-May-19 A82980 A83000 Mainline Test of Traction Performan
A83000 Mainline Test of PA-PIS System at Train Level 4 27-May-19 30-May-19 A82990 A83010 Mainline Test of PA-PIS System at T
A83010 Mainline Test of Onboard ATP System at Train Level 4 31-May-19 03-Jun-19 A83000 A83020 Mainline Test of Onboard ATP Syste
Train# 24~25 14 04-Jun-19 17-Jun-19 17-Jun-19, Train# 24~25
A83020 Mainline Test of Brake System at Train Level 6 04-Jun-19 09-Jun-19 A83010 A83030 Mainline Test of Brake System at Train Level
A83030 Mainline Test of Traction Performance at Train Level 6 04-Jun-19 09-Jun-19 A83020 A83040 Mainline Test of Traction Performa
A83040 Mainline Test of PA-PIS System at Train Level 4 10-Jun-19 13-Jun-19 A83030 A83050 Mainline Test of PA-PIS System at
A83050 Mainline Test of Onboard ATP System at Train Level 4 14-Jun-19 17-Jun-19 A83040 A83060 Mainline Test of Onboard ATP Sys
Train# 26~27 14 18-Jun-19 01-Jul-19 01-Jul-19, Train# 26~27
A83060 Mainline Test of Brake System at Train Level 6 18-Jun-19 23-Jun-19 A83050 A83070 Mainline Test of Brake System at
A83070 Mainline Test of Traction Performance at Train Level 6 18-Jun-19 23-Jun-19 A83060 A83080 Mainline Test of Traction Perform
A83080 Mainline Test of PA-PIS System at Train Level 4 24-Jun-19 27-Jun-19 A83070 A83090 Mainline Test of PA-PIS System a
A83090 Mainline Test of Onboard ATP System at Train Level 4 28-Jun-19 01-Jul-19 A83080 A83100 Mainline Test of Onboard ATP Sy
Train# 28~29 14 02-Jul-19 15-Jul-19 15-Jul-19, Train# 28~29
A83100 Mainline Test of Brake System at Train Level 6 02-Jul-19 07-Jul-19 A83090 A83110 Mainline Test of Brake System a
A83110 Mainline Test of Traction Performance at Train Level 6 02-Jul-19 07-Jul-19 A83100 A83120 Mainline Test of Traction Perform
A83120 Mainline Test of PA-PIS System at Train Level 4 08-Jul-19 11-Jul-19 A83110 A83130 Mainline Test of PA-PIS System
A83130 Mainline Test of Onboard ATP System at Train Level 4 12-Jul-19 15-Jul-19 A83120 A83140 Mainline Test of Onboard ATP S
Train# 30~31 14 16-Jul-19 29-Jul-19 29-Jul-19, Train# 30~31
A83140 Mainline Test of Brake System at Train Level 6 16-Jul-19 21-Jul-19 A83130 A83150 Mainline Test of Brake System
A83150 Mainline Test of Traction Performance at Train Level 6 16-Jul-19 21-Jul-19 A83140 A83160 Mainline Test of Traction Perfo
A83160 Mainline Test of PA-PIS System at Train Level 4 22-Jul-19 25-Jul-19 A83150 A83170 Mainline Test of PA-PIS System
A83170 Mainline Test of Onboard ATP System at Train Level 4 26-Jul-19 29-Jul-19 A83160 A83180 Mainline Test of Onboard ATP
Train# 32~33 14 30-Jul-19 12-Aug-19 12-Aug-19, Train# 32~33
A83180 Mainline Test of Brake System at Train Level 6 30-Jul-19 04-Aug-19 A83170 A83190 Mainline Test of Brake System
A83190 Mainline Test of Traction Performance at Train Level 6 30-Jul-19 04-Aug-19 A83180 A83200 Mainline Test of Traction Perf
A83200 Mainline Test of PA-PIS System at Train Level 4 05-Aug-19 08-Aug-19 A83190 A83210 Mainline Test of PA-PIS Syste
A83210 Mainline Test of Onboard ATP System at Train Level 4 09-Aug-19 12-Aug-19 A83200 A83220 Mainline Test of Onboard AT
Train# 34~35 14 13-Aug-19 26-Aug-19 26-Aug-19, Train# 34~35
A83220 Mainline Test of Brake System at Train Level 6 13-Aug-19 18-Aug-19 A83210 A83230 Mainline Test of Brake Syste
A83230 Mainline Test of Traction Performance at Train Level 6 13-Aug-19 18-Aug-19 A83220 A83240 Mainline Test of Traction Pe
A83240 Mainline Test of PA-PIS System at Train Level 4 19-Aug-19 22-Aug-19 A83230 A83250 Mainline Test of PA-PIS Sys
A83250 Mainline Test of Onboard ATP System at Train Level 4 23-Aug-19 26-Aug-19 A83240 A83260 Mainline Test of Onboard A
Train# 36 14 27-Aug-19 09-Sep-19 09-Sep-19, Train# 36
A83260 Mainline Test of Brake System at Train Level 6 27-Aug-19 01-Sep-19 A83250 A83270 Mainline Test of Brake Sys
A83270 Mainline Test of Traction Performance at Train Level 6 27-Aug-19 01-Sep-19 A83260 A83280 Mainline Test of Traction P
A83280 Mainline Test of PA-PIS System at Train Level 4 02-Sep-19 05-Sep-19 A83270 A83290 Mainline Test of PA-PIS Sy
Date Revision Checked Approved
MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer
02-Feb-17 (70)

Activity ID Activity Name Original Start Finish Predecessors Successors 2016 2017 2018 2019 2020
Duration F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A MJ
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 55
A83290 Mainline Test of Onboard ATP System at Train Level 4 06-Sep-19 09-Sep-19 A83280 A79740, A178680 Mainline Test of Onboard
TEST 215 11-May-19 11-Dec-19 11-Dec-19, TEST
Integration Test 120 11-May-19 07-Sep-19 07-Sep-19, Integration Test
A79680 Requited traction/control power 25 11-May-19 04-Jun-19 A82500, A82460, A79690, A3870 Requited traction/control power
A82420, A82380,
A82340, A82300,
A82260, A82220,
A82180, A82140,
A82100, A82060,
A82020, A81980,
A74920, A75020,
A75620, A75720,
A74620, A74720,
A72760, A74820,
A75220, A75320,
A75420, A75520,
A75120

A79690 Train Washing Plant/Wheel Truing Machine 25 05-Jun-19 29-Jun-19 A79680 A79700 Train Washing Plant/Wheel Truin
A79700 Shoe contact point and passing test 25 30-Jun-19 24-Jul-19 A79690 A79710 Shoe contact point and passing test
A79710 Interlocking/Onboard ATP system 25 25-Jul-19 18-Aug-19 A79700 A79720 Interlocking/Onboard ATP system
A79720 Train Radio/PA_PIS system 20 19-Aug-19 07-Sep-19 A79710 A79740, A178680 Train Radio/PA_PIS system
System 93 10-Sep-19 11-Dec-19 11-Dec-19, System
Commissioning Test 93 10-Sep-19 11-Dec-19 11-Dec-19, Com
A79740 Commissioning Test 93 10-Sep-19 11-Dec-19 A79720, A83290 A82610, A1155, Commissioning Test
A1145
Training 61 24-Sep-19 23-Nov-19 23-Nov-19, Training
A82610 Training for O&M Personnel 61 24-Sep-19 23-Nov-19 A79740 Training for O&M Personnel
Rolling stock 93 10-Sep-19 11-Dec-19 11-Dec-19, Rolling stock
Commissioning Test 93 10-Sep-19 11-Dec-19 11-Dec-19, Com
A178680 Commissioning Test 93 10-Sep-19 11-Dec-19 A79720, A83290 A178670 Commissioning Test
Training 93 10-Sep-19 11-Dec-19 11-Dec-19, Training
A178670 Training for O&M Personnel 93 10-Sep-19 11-Dec-19 A178680 Training for O&M

Date Revision Checked Approved


MRT - 7 PROJECT 30-Jan-17
11-Dec-19
REV1(116DELAYS) FROM JDD -LA...
PROJECT FINISH REV1 (46MONT...
Actual ...
Remaini...
Critical ...
17-Aug-19 PROJECT FINISH REV0 (42MONT...
UNIVERSAL LRT CORPORATION (BVI) LTD 18-Feb-16 PROJECT START Milestone
Summary
EPC SCHEDULE OF WORK FOR MRTS AND ITT Prepared by:
Jessan Dizor / Leslie Ann Miralles
Planning Engineer