1. Earthworks and excavation, hauling of soil, compacting of soil.

Mobilization of materials and


construction of temporary facilities for workers and materials storage.
200,000 PhP

2. Reinforced concrete works for flooring slab on grade for first floor and reinforced suspended concrete
slab on steel decking. Construction of reinforced concrete columns and beams with plastering and
waterproofing for all exposed concretes.
3,700,000 PhP

3. Painting works for exterior and interior walls, rubberized anti-skid paint for floors and ramps.
1,000,000 PhP

4. Construction of steel framing accent on wall façade in paint finish.


1,500,000 PhP

5. Landscape works, planter wall/box on 3 sides of the building to serve as a railing. Vertical
garden/greens on metal framing located on the façade of the building.
700,000 PhP

6. Plumbing and sewer works for male and female comfort rooms. Drainage system for the entire
building.
500,000 PhP

7. Installation of doors and windows for comfort rooms, storage room and office room.
200,000 PhP

8. Installation of electronic devices such as, cctv cameras, automated ticket booth and boom gates,
parking sensors, smoke detectors, lcd monitors and signages.
1,500,000

9. Construction of pay booth.


300,000 PhP

10. Demobilization.
30,000 PhP

TOTAL CONSTRUCTION COST 9,630,000 PhP