, Ltd (Factory)
Guangzhou office: Xingang west road 11#, Haizhu district, Guangzhou city, China
Factory address: Huaan East Road 81#, Zhengding, Shijiazhuang City, Hebei Province, China
Contact: Cathy Chen Email: cathy@cectank.com
www.cectank.com
INSTALLATION COST
Cost/Day/Person Total
Item Days Number of Supervisors
(USD) (USD)
Tank A
Tank Installation
11 160 1 1,760.00
supervisors
φ9.17*4.8 m- 1 set
Tank B
Tank Installation
11 160 1 1,760.00
supervisors
φ8.4*5.4 m- 1 set
Lead time: Approx. 35 days from receipt of advanced payment and tank drawings confirmation
Payment terms: 30% deposit against PO, 70% balance before delivery
Warranty: Under proper design and use, 5 years free quality guarantee after installation finished; after 5 years, will
provide quality guarantee with charge.
DESIGN CRITERIA
Design Code: AWWA D103-09, OSHA
Application: Organic liquid, sewage, drinking water or similar
Wind load: 100mph
Snow load: 15psf
Seismic Zone: Zone 4 acc. AWWA
Fluid Temperature: -5~ 75 Degree C.
PH Range: 3~11
Specific Gravity: 1
Operation temperature: Ambient
Pressure: 3500PA (enamel roof), 500~1000PA (membrane roof)
Vacuum: -500PA( enamel roof), -200PA (membrane roof)
Edge Protection: Enameled edge
Panel Bolts: HDG bolt with PP capped
Foundation Type: embedded or above floor
TANK SPECIFICATION
Standard Color: Dark Blue (similar to RAL 5004), Dark Green (similar to RAL 6006)
Enamel Coating: 2 enameling and 2 firing ( 3 enameling and 3 firing is available with extra charge)
Coating Thickness: 230 micron ~450 micron
Steel Size: 2400 x 1200mm
Steel thickness: 3 - 12mm
Adhesion: 3,450 N/cm2
Hardness: 6.0 Mohs
Service Life: 30 Years
Holiday test: 1500 V
QUOTATION CONDITIONS
● Quotation includes above-mentioned accessories, for any further special accessories/design demands, quotation needs to be
revised accordingly.
● Concrete foundation, waterproof construction, Pipework, pipe supporting structures, valves, and instruments are not included.
● The goods need to be shipped within three weeks after the completion of production. If there is any delay, the storage fee 0.5% of
order value/week will be collected.
Installation plan notes (IMPORTANT):
● The customer has to arrange capable 8-10 local helpers (workers), working at least 6 days/week, 10 hours/day.
● The costs of Flight Ticket, Local Accommodation, Local Travel, Food and Other Local Costs for the installation supervisors shall be
covered by the customer.
● The customer has to arrange the installation of big equipment such as crane or scaffold for roof erection.
● The customer has to arrange one coordinator for site management ( It would be better be able to speak Chinese ).
● The customer has to arrange a permanent power supply, electrician and water supply shall be made available to make all required
connections at the time of installation.
● The concrete foundation should be finished base on drawings requirement before the tank arrived at the project site by the
customer.
● Installation day will be counted starting from the day of departure, estimated days not include any delays caused by force majeure,
such as bad weather, environment or strike etc., If happens, we will send a separate bill after installation is fully completed.
● When the installation supervisor arrives at the project site, the goods must already be got out of containers and the foundation is
ready for the installation construction. And the construction conditions must be available before the scene (power supply (220V)
● Installation Supervision charge is collected according to the actual supervising service period, any shortage of payment will be
collected, any overpayment will be refunded.
● The quantity and quality of the material have to be checked immediately after arrival on site. If there are any faults discovered
have to mention within 8 days after getting the material.
● The risk of loss to the goods shall pass to Buyer when the goods are duly delivered to the Carrier at Seller’s factory. The processing
of freight claims or loss claims is the responsibility of the Buyer.
● The tank floor must not be sloped. No barriers on the foundation.
● All the documents provided by us, especially drawings, images, tank design calculations, certificates, data sheets etc., shall not be
accessible to third parties if not necessary for fulfilling the contract.
● The customer is responsible for working permits, all local installation permits, compliance documentation, site insurances and
necessary documentation for the construction works for all our specialist technical advisor/staff. The client is to assist where required
with any work visa or entry visa applications for our specialist technical advisor/staff if required, including the cost of such
requirements. These potential costs are not included in the price at present.
● There is no right of warranty if not follow the maintenance according to our operation manual by the client or a third party.