LPSE Kementerian Pendidikan dan Kebudayaan - Penataan Lingkungan Benteng Oranje

DAFTAR KUANTITAS DAN HARGA

No Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak (%) Pajak (Rp.) Total (Rp.)

I PEKERJAAN PERSIAPAN
Mobilisasi /Demobilisasi Tenaga Kerja Ls 1.00 2,000,000.00 10.00 200,000.00 2,200,000.00
Pembuatan Kantor Sementara Lantai Plesteran Ls 1.00 5,997,967.17 10.00 599,796.72 6,597,763.89
Pembuatan Gudang Semen dan Peralatan Ls 1.00 4,000,000.00 10.00 400,000.00 4,400,000.00
Pembuatan Bedeng Pekerja Ls 1.00 4,500,000.00 10.00 450,000.00 4,950,000.00
Papan Nama Proyek Uk. 120 x 120 cm Ls 1.00 300,000.00 10.00 30,000.00 330,000.00
Pembongkaran Dinding Pagar Eksisting M2 72.90 158,749.56 10.00 1,157,284.29 12,730,127.22
Pembongkaran Kolom dan Ring Balk Pagar Eksisting M3 3.61 317,499.12 10.00 114,617.18 1,260,789.01
Genset Kap. 2.2 kvA dan Air Kerja Ls 1.00 8,300,000.00 10.00 830,000.00 9,130,000.00
Dokumentasi, Laporan & Asbuilt Drawing Ls 1.00 4,000,000.00 10.00 400,000.00 4,400,000.00
Pembersihan Akhir Lokasi Pekerjaan Ls 1.00 1,500,000.00 10.00 150,000.00 1,650,000.00
II PEKERJAAN PAGAR SEGMEN II (GERBANG -BASTION GILOLO)
A. PEKERJAAN BETON
1. Sloof Type II, Uk. 20 x 100 (Beton Mutu K-300) M3 5.40 1,897,700.66 10.00 1,024,758.36 11,272,341.92
a. Pek. Bekisting M2 54.00 276,376.90 10.00 1,492,435.26 16,416,787.86
b. Pek. Besi Beton Kg 574.14 19,181.83 10.00 1,101,305.59 12,114,361.46
2. Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300) M3 8.21 1,897,700.66 10.00 1,558,012.24 17,138,134.66
a. Pek. Bekisting M2 102.60 276,376.90 10.00 2,835,626.99 31,191,896.93
b. Pek. Besi Beton Kg 981.41 19,181.83 10.00 1,882,523.98 20,707,763.76
3. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-
250) M3 2.61 1,858,726.39 10.00 485,127.59 5,336,403.47
a. Pek. Bekisting M2 34.80 415,466.40 10.00 1,445,823.07 15,904,053.79
b. Pek. Besi Beton Kg 346.21 19,181.83 10.00 664,094.14 7,305,035.50
4. Kolom Baru Type III, Uk. 30 x 30 x 290 (Beton Mutu K-
250) M3 4.62 1,858,726.39 10.00 858,731.59 9,446,047.51
a. Pek. Bekisting M2 61.56 415,466.40 10.00 2,557,611.16 28,133,722.74
b. Pek. Besi Beton Kg 618.02 19,181.83 10.00 1,185,475.46 13,040,230.03
B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
1. Plesteran Permukaan Sloof Type II, Uk. 20 x 100
M2 56.70 104,202.62 10.00 590,828.86 6,499,117.41
Camp. 1PC 3PP
2. Plesteran Permukaan Sloof Type III, Uk. 20 x 80
M2 87.21 104,202.62 10.00 908,751.05 9,996,261.54
Camp. 1PC 3PP

3. Plesteran Badan Kolom Baru Type II, Camp. 1PC 3PP M2 17.76 104,202.62 10.00 185,063.85 2,035,702.38

4. Plesteran Badan Kolom Baru Type III, Camp. 1PC 3PP M2 33.74 104,202.62 10.00 351,579.64 3,867,376.04
5. Plesteran Profil Kepala dan Kaki Kolom Type II,
M2 12.60 106,720.20 10.00 134,467.45 1,479,141.97
Camp. 1PC 2PP
6. Plesteran Profil Kepala dan Kaki Kolom Type III,
M2 29.64 106,720.20 10.00 316,318.67 3,479,505.40
Camp. 1PC 2PP
7. Acian Sloof, Kolom dan Profil M2 180.95 56,446.52 10.00 1,021,399.78 11,235,397.57
8. Perakitan dan Pemasangan Pagar Besi Beton Polos
16 M2 156.60 1,150,520.51 10.00 18,017,151.19 198,188,663.05
C. PEKERJAAN PENGECETAN
1. Pengecatan Permukaan Sloof Type II M2 56.70 66,346.72 10.00 376,185.90 4,138,044.93
2. Pengecatan Permukaan Sloof Type III M2 87.21 66,346.72 10.00 578,609.75 6,364,707.20
3. Pengecatan Kolom Baru type II dan Profil M2 30.36 66,346.72 10.00 201,428.64 2,215,715.06
4. Pengecatan Kolom Baru type III dan Profil M2 63.38 66,346.72 10.00 420,505.51 4,625,560.62
5. Pengecatan Permukaan Pagar dengan Cat Besi M2 234.90 92,810.58 10.00 2,180,120.52 23,981,325.77
III PEKERJAAN GERBANG MASUK

1. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250)


M3 1.80 1,858,726.39 10.00 334,570.75 3,680,278.25
a. Pek. Bekisting M2 14.40 415,466.40 10.00 598,271.62 6,580,987.78
b. Pek. Besi Beton Kg 143.56 19,181.83 10.00 275,374.35 3,029,117.87
2. Plesteran Badan Kolom Camp. 1PC 3PP M2 14.40 104,202.62 10.00 150,051.77 1,650,569.50
3. Plesteran Profil Kepala dan Kaki Kolom, Camp. 1PC 2PP
M2 3.68 106,720.20 10.00 39,273.03 432,003.37
4. Acian Sloof, Kolom dan Profil M2 18.08 56,446.52 10.00 102,055.31 1,122,608.39
5. Pas. Pintu Besi Gerbang M2 19.70 3,025,202.80 10.00 5,959,649.52 65,556,144.68
6. Pengecatan Kolom dan Profil M2 18.08 66,346.72 10.00 119,954.87 1,319,503.57
7. Pengecatan Permukaan Pagar dengan Cat Besi M2 29.55 92,810.58 10.00 274,255.26 3,016,807.90

JUMLAH TOTAL 600,150,000.00

TERBILANG : ENAM RATUS JUTA SERATUS LIMA PULUH RIBU RUPIAH


LAPORAN KEMAJUAN FISIK MINGGU - 01
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
PERIODE : 02 OKTOBER 2019 S/D 08 OKTOBER 2019
TAHUN ANGGARAN : 2019

KONTRAK REALISASI S/D MINGGU LALU


SATUAN JUMLAH BOBOT Bobot / Bobot Trhdp
NO
URAIAN SAT. VOLUME Volume
HARGA (Rp) HARGA (Rp) (%) Item Pek. (%) Seluruh Pek. (%)
1 2 3 4 5 6 7 8 9 10
I PEKERJAAN PERSIAPAN
Mobilisasi /Demobilisasi Tenaga Kerja Ls 1.00 2,000,000.00 2,000,000.00 0.37 - - -
Pembuatan Kantor Sementara Lantai Plesteran Ls 1.00 5,997,967.17 5,997,967.17 1.10 - - -
Pembuatan Gudang Semen dan Peralatan Ls 1.00 4,000,000.00 4,000,000.00 0.73 - - -
Pembuatan Bedeng Pekerja Ls 1.00 4,500,000.00 4,500,000.00 0.82 - - -
Papan Nama Proyek Uk. 120 x 120 cm Ls 1.00 300,000.00 300,000.00 0.05 - - -
Pembongkaran Dinding Pagar Eksisting M2 72.90 158,749.56 11,572,842.92 2.12 - - -
Pembongkaran Kolom dan Ring Balk Pagar Eksisting M3 3.61 317,499.12 1,146,171.82 0.21 - - -
Genset Kap. 2.2 kvA dan Air Kerja Ls 1.00 8,300,000.00 8,300,000.00 1.52 - - -
Dokumentasi, Laporan & Asbuilt Drawing Ls 1.00 4,000,000.00 4,000,000.00 0.73 - - -
Pembersihan Akhir Lokasi Pekerjaan Ls 1.00 1,500,000.00 1,500,000.00 0.27 - - -
II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)
A. PEKERJAAN BETON
1. Sloof Type II, Uk. 20 x 100 (Beton Mutu K-300) M3 5.40 1,897,700.66 10,247,583.56 1.88 - - -
a. Pek. Bekisting M2 54.00 276,376.90 14,924,352.60 2.74 - - -
b. Pek. Besi Beton Kg 574.14 19,181.83 11,013,055.88 2.02 - - -
2. Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300) M3 8.21 1,897,700.66 15,580,122.42 2.86 - - -
a. Pek. Bekisting M2 102.60 276,376.90 28,356,269.94 5.20 - - -
b. Pek. Besi Beton Kg 981.41 19,181.83 18,825,239.78 3.45 - - -
3. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 2.61 1,858,726.39 4,851,275.88 0.89 - - -
a. Pek. Bekisting M2 34.80 415,466.40 14,458,230.72 2.65 - - -
b. Pek. Besi Beton Kg 346.21 19,181.83 6,640,941.36 1.22 - - -
4. Kolom Baru Type III, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 4.62 1,858,726.39 8,587,315.92 1.57 - - -
a. Pek. Bekisting M2 61.56 415,466.40 25,576,111.58 4.69 - - -
b. Pek. Besi Beton Kg 618.02 19,181.83 11,854,754.58 2.17 - - -
B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
1. Plesteran Permukaan Sloof Type II, Uk. 20 x 100 Camp. 1PC 3PP M2 56.70 104,202.62 5,908,288.55 1.08 - - -
2. Plesteran Permukaan Sloof Type III, Uk. 20 x 80 Camp. 1PC 3PP M2 87.21 104,202.62 9,087,510.49 1.67 - - -
3. Plesteran Badan Kolom Baru Type II, Camp. 1PC 3PP M2 17.76 104,202.62 1,850,638.53 0.34 - - -
4. Plesteran Badan Kolom Baru Type III, Camp. 1PC 3PP M2 33.74 104,202.62 3,515,796.40 0.64 - - -
5. Plesteran Profil Kepala dan Kaki Kolom Type II, Camp. 1PC 2PP M2 12.60 106,720.20 1,344,674.52 0.25 - - -
6. Plesteran Profil Kepala dan Kaki Kolom Type III, Camp. 1PC 2PP M2 29.64 106,720.20 3,163,186.73 0.58 - - -
7. Acian Sloof, Kolom dan Profil M2 180.95 56,446.52 10,213,997.79 1.87 - - -
8. Perakitan dan Pemasangan Pagar Besi Beton Polos 16 M2 156.60 1,150,520.51 180,171,511.87 33.02 - - -
C. PEKERJAAN PENGECETAN
1. Pengecatan Permukaan Sloof Type II M2 56.70 66,346.72 3,761,859.02 0.69 - - -
2. Pengecatan Permukaan Sloof Type III M2 87.21 66,346.72 5,786,097.45 1.06 - - -
3. Pengecatan Kolom Baru type II dan Profil M2 30.36 66,346.72 2,014,286.42 0.37 - - -
4. Pengecatan Kolom Baru type III dan Profil M2 63.38 66,346.72 4,205,055.11 0.77 - - -
5. Pengecatan Permukaan Pagar dengan Cat Besi M2 234.90 92,810.58 21,801,205.24 4.00 - - -
KONTRAK REALISASI S/D MINGGU LALU
SATUAN JUMLAH BOBOT Bobot / Bobot Trhdp
NO
URAIAN SAT. VOLUME Volume
HARGA (Rp) HARGA (Rp) (%) Item Pek. (%) Seluruh Pek. (%)
1 2 3 4 5 6 7 8 9 10
III PEKERJAAN GERBANG MASUK
1. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 1.80 1,858,726.39 3,345,707.50 0.61 - - -
a. Pek. Bekisting M2 14.40 415,466.40 5,982,716.16 1.10 - - -
b. Pek. Besi Beton Kg 143.56 19,181.83 2,753,743.51 0.50 - - -
2. Plesteran Badan Kolom Camp. 1PC 3PP M2 14.40 104,202.62 1,500,517.73 0.28 - - -
3. Plesteran Profil Kepala dan Kaki Kolom, Camp. 1PC 2PP M2 3.68 106,720.20 392,730.34 0.07 - - -
4. Acian Sloof, Kolom dan Profil M2 18.08 56,446.52 1,020,553.08 0.19 - - -
5. Pas. Pintu Besi Gerbang M2 19.70 3,025,202.80 59,596,495.16 10.92 - - -
6. Pengecatan Kolom dan Profil M2 18.08 66,346.72 1,199,548.70 0.22 - - -
7. Pengecatan Permukaan Pagar dengan Cat Besi M2 29.55 92,810.58 2,742,552.64 0.50 - - -
A Jumlah Total Pekerjaan 545,590,909.09 100.00 -
B PPN (10 % x A) 54,559,090.91
C Total (A + B) 600,150,000.00
D Dibulatkan 600,150,000.00

Disetujui Oleh : Diperiksa Oleh : Diper


Pejabat Pembuat Komitmen (PPK) Direksi Lapangan Konsult
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA CV. LINTAS

(LINDA A. HIDAYATI) (MULYANI) (ANWA


NIP. 19770819 200812 2 003 Pengaw
UAN FISIK MINGGU - 01

WAKTU PELAKSANAAN : 70 HARI KALENDER


WAKTU TERPAKAI : 7 HARI KALENDER
SISA WAKTU : 63 HARI KALENDER

Realisasi Pekerjaan
REALISASI MINGGU INI REALISASI S/D MINGGU INI
Bobot / Bobot Trhdp Bobot / Bobot Trhdp
Volume Volume
Item Pek. (%) Seluruh Pek. (%) Item Pek. (%) Seluruh Pek. (%)
11 12 13 14 15 16

0.50 50.00 0.18 0.50 50.00 0.18


1.00 100.00 1.10 1.00 100.00 1.10
1.00 100.00 0.73 1.00 100.00 0.73
1.00 100.00 0.82 1.00 100.00 0.82
1.00 100.00 0.05 1.00 100.00 0.05
37.65 51.65 1.10 37.65 51.65 1.10
1.75 48.48 0.10 1.75 48.48 0.10
1.00 100.00 1.52 1.00 100.00 1.52
0.10 10.00 0.07 0.10 10.00 0.07
- - - - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
19.94 12.73 4.20 19.94 12.73 4.20

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
Realisasi Pekerjaan
REALISASI MINGGU INI REALISASI S/D MINGGU INI
Bobot / Bobot Trhdp Bobot / Bobot Trhdp
Volume Volume
Item Pek. (%) Seluruh Pek. (%) Item Pek. (%) Seluruh Pek. (%)
11 12 13 14 15 16

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
9.89 9.89

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (RUGAYA S. HAMID)


Pengawas Lapangan Direktris
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 02 OKTOBER 2019 S/D 08 OKTOBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Mobilisasi /Demobilisasi Tenaga Kerja 0.20 Ls Alat danTenaga Kerja - 0.20

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-01

Hari Ke : 1
Tanggal : 02 Oktober 2019

AKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 1.00 Org
Tukang 1.00 Org
Pekerja 8.00 Org
Sopir 1.00 Org
Ass. Sopir 1.00 Org

14.00 Org

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 02 OKTOBER 2019 S/D 08 OKTOBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Mobilisasi /Demobilisasi Tenaga Kerja 0.30 Ls Alat danTenaga Kerja - 0.30
Pembuatan Gudang Semen dan Peralatan 0.50 Ls - 0.50
Pembuatan Bedeng Pekerja 0.40 Ls - 0.40
Papan Nama Proyek Uk. 120 x 120 cm 1.00 Ls - 1.00
Genset Kap. 2.2 kvA dan Air Kerja 0.014 Ls - 0.014
Dokumentasi, Laporan & Asbuilt Drawing 0.017 Ls - 0.017

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


Perakitan dan Pemasangan Pagar Besi Beton Polos 16 3.32 M2 Besi Beton 30.32 100.77
Tombak Besi Cor/Tempa dia. 16 6.00 19.94
Pengelasan 37.00 122.96

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-01

Hari Ke : 2
Tanggal : 03 Oktober 2019

AKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Ls Mandor 1.00 Org Dump Truck 1.00 unit
Ls Kepala Tukang 3.00 Org
Ls Tukang 3.00 Org
Ls Pekerja 9.00 Org
Ls Sopir 1.00 Org
Ass. Sopir 1.00

kg
Bh
cm

19.00 Org

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 02 OKTOBER 2019 S/D 08 OKTOBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Pembuatan Gudang Semen dan Peralatan 0.50 Ls - 0.50
Pembuatan Bedeng Pekerja 0.60 Ls - 0.60
Pembongkaran Dinding Pagar Eksisting 9.41 M2 Hamar - 6.00
Pembongkaran Kolom dan Ring Balk Pagar Eksisting 0.44 M3 Hamar - 4.00
Genset Kap. 2.2 kvA dan Air Kerja 0.50 Ls - 0.50
Dokumentasi, Laporan & Asbuilt Drawing 0.017 Ls - 0.017

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


Perakitan dan Pemasangan Pagar Besi Beton Polos 16 3.32 M2 Besi Beton 30.32 100.77
Tombak Besi Cor/Tempa dia. 16 6.00 19.94
Pengelasan 37.00 122.96

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-01

Hari Ke : 3
Tanggal : 04 Oktober 2019

AKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 2.00 set


Ls Mandor 1.00 Org Dump Truck 1.00 unit
Bh Kepala Tukang 3.00 Org
Bh Tukang 3.00 Org
Ls Pekerja 9.00 Org
Ls Sopir 1.00 Org
Ass. Sopir 1.00

kg
Bh
cm

19.00 Org

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 02 OKTOBER 2019 S/D 08 OKTOBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Pembongkaran Dinding Pagar Eksisting 9.41 M2 Hamar - 6.00
Pembongkaran Kolom dan Ring Balk Pagar Eksisting 0.44 M3 Hamar - 4.00
Genset Kap. 2.2 kvA dan Air Kerja 0.50 Ls - 0.50
Dokumentasi, Laporan & Asbuilt Drawing 0.017 Ls - 0.017

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


Perakitan dan Pemasangan Pagar Besi Beton Polos 16 3.32 M2 Besi Beton 30.32 100.77
Tombak Besi Cor/Tempa dia. 16 6.00 19.94
Pengelasan 37.00 122.96

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-01

Hari Ke : 4
Tanggal : 05 Oktober 2019

AKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Bh Pelaksana lapangan 1.00 Org Alat Tukang 2.00 set


Bh Mandor 1.00 Org Dump Truck 1.00 unit
Ls Kepala Tukang 2.00 Org
Ls Tukang 3.00 Org
Pekerja 9.00 Org
Sopir 1.00 Org
kg Ass. Sopir 1.00
Bh
cm

18.00 Org

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 02 OKTOBER 2019 S/D 08 OKTOBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Pembongkaran Dinding Pagar Eksisting 9.41 M2 Hamar - 6.00
Pembongkaran Kolom dan Ring Balk Pagar Eksisting 0.44 M3 Hamar - 4.00
Dokumentasi, Laporan & Asbuilt Drawing 0.017 Ls - 0.017

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


Perakitan dan Pemasangan Pagar Besi Beton Polos 16 3.32 M2 Besi Beton 30.32 100.77
Tombak Besi Cor/Tempa dia. 16 6.00 19.94
Pengelasan 37.00 122.96

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-01

Hari Ke : 5
Tanggal : 06 Oktober 2019

AKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Bh Pelaksana lapangan 1.00 Org Alat Tukang 2.00 set


Bh Mandor 1.00 Org Dump Truck 1.00 unit
Ls Kepala Tukang 2.00 Org
Tukang 3.00 Org
Pekerja 9.00 Org
kg Sopir 1.00 Org
Bh Ass. Sopir 1.00
cm

18.00 Org

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 02 OKTOBER 2019 S/D 08 OKTOBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Pembongkaran Dinding Pagar Eksisting 9.41 M2 Hamar - 6.00
Pembongkaran Kolom dan Ring Balk Pagar Eksisting 0.44 M3 Hamar - 4.00
Dokumentasi, Laporan & Asbuilt Drawing 0.017 Ls - 0.017

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


Perakitan dan Pemasangan Pagar Besi Beton Polos 16 3.32 M2 Besi Beton 30.32 100.77
Tombak Besi Cor/Tempa dia. 16 6.00 19.94
Pengelasan 37.00 122.96

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-01

Hari Ke : 6
Tanggal : 07 Oktober 2019

AKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Bh Pelaksana lapangan 1.00 Org Alat Tukang 2.00 set


Bh Mandor 1.00 Org Dump Truck 1.00 unit
Ls Kepala Tukang 2.00 Org
Tukang 3.00 Org
Pekerja 9.00 Org
kg Sopir 1.00 Org
Bh Ass. Sopir 1.00
cm

18.00 Org

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 02 OKTOBER 2019 S/D 08 OKTOBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.017 Ls - 0.017

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


Perakitan dan Pemasangan Pagar Besi Beton Polos 16 3.32 M2 Besi Beton 30.32 100.77
Tombak Besi Cor/Tempa dia. 16 6.00 19.94
Pengelasan 37.00 122.96

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-01

Hari Ke : 7
Tanggal : 08 Oktober 2019

AKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 2.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 1.00 Org
kg Tukang 2.00 Org
Bh Pekerja - Org
cm Sopir 1.00 Org
Ass. Sopir 1.00

7.00 Org

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN FISIK MINGGU - 02
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
PERIODE : 09 OKTOBER 2019 S/D 15 OKTOBER 2019
TAHUN ANGGARAN : 2019

KONTRAK REALISASI S/D MINGGU LALU


SATUAN JUMLAH BOBOT Bobot / Bobot Trhdp
NO
URAIAN SAT. VOLUME Volume
HARGA (Rp) HARGA (Rp) (%) Item Pek. (%) Seluruh Pek. (%)
1 2 3 4 5 6 7 8 9 10
I PEKERJAAN PERSIAPAN
Mobilisasi /Demobilisasi Tenaga Kerja Ls 1.00 2,000,000.00 2,000,000.00 0.37 0.50 50.00 0.18
Pembuatan Kantor Sementara Lantai Plesteran Ls 1.00 5,997,967.17 5,997,967.17 1.10 1.00 100.00 1.10
Pembuatan Gudang Semen dan Peralatan Ls 1.00 4,000,000.00 4,000,000.00 0.73 1.00 100.00 0.73
Pembuatan Bedeng Pekerja Ls 1.00 4,500,000.00 4,500,000.00 0.82 1.00 100.00 0.82
Papan Nama Proyek Uk. 120 x 120 cm Ls 1.00 300,000.00 300,000.00 0.05 1.00 100.00 0.05
Pembongkaran Dinding Pagar Eksisting M2 72.90 158,749.56 11,572,842.92 2.12 37.65 51.65 1.10
Pembongkaran Kolom dan Ring Balk Pagar Eksisting M3 3.61 317,499.12 1,146,171.82 0.21 1.75 48.48 0.10
Genset Kap. 2.2 kvA dan Air Kerja Ls 1.00 8,300,000.00 8,300,000.00 1.52 1.00 100.00 1.52
Dokumentasi, Laporan & Asbuilt Drawing Ls 1.00 4,000,000.00 4,000,000.00 0.73 0.10 10.00 0.07
Pembersihan Akhir Lokasi Pekerjaan Ls 1.00 1,500,000.00 1,500,000.00 0.27 - - -
II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)
A. PEKERJAAN BETON
1. Sloof Type II, Uk. 20 x 100 (Beton Mutu K-300) M3 5.40 1,897,700.66 10,247,583.56 1.88 - - -
a. Pek. Bekisting M2 54.00 276,376.90 14,924,352.60 2.74 - - -
b. Pek. Besi Beton Kg 574.14 19,181.83 11,013,055.88 2.02 - - -
2. Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300) M3 8.21 1,897,700.66 15,580,122.42 2.86 - - -
a. Pek. Bekisting M2 102.60 276,376.90 28,356,269.94 5.20 - - -
b. Pek. Besi Beton Kg 981.41 19,181.83 18,825,239.78 3.45 - - -
3. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 2.61 1,858,726.39 4,851,275.88 0.89 - - -
a. Pek. Bekisting M2 34.80 415,466.40 14,458,230.72 2.65 - - -
b. Pek. Besi Beton Kg 346.21 19,181.83 6,640,941.36 1.22 - - -
4. Kolom Baru Type III, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 4.62 1,858,726.39 8,587,315.92 1.57 - - -
a. Pek. Bekisting M2 61.56 415,466.40 25,576,111.58 4.69 - - -
b. Pek. Besi Beton Kg 618.02 19,181.83 11,854,754.58 2.17 - - -
B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
1. Plesteran Permukaan Sloof Type II, Uk. 20 x 100 Camp. 1PC 3PP M2 56.70 104,202.62 5,908,288.55 1.08 - - -
2. Plesteran Permukaan Sloof Type III, Uk. 20 x 80 Camp. 1PC 3PP M2 87.21 104,202.62 9,087,510.49 1.67 - - -
3. Plesteran Badan Kolom Baru Type II, Camp. 1PC 3PP M2 17.76 104,202.62 1,850,638.53 0.34 - - -
4. Plesteran Badan Kolom Baru Type III, Camp. 1PC 3PP M2 33.74 104,202.62 3,515,796.40 0.64 - - -
5. Plesteran Profil Kepala dan Kaki Kolom Type II, Camp. 1PC 2PP M2 12.60 106,720.20 1,344,674.52 0.25 - - -
6. Plesteran Profil Kepala dan Kaki Kolom Type III, Camp. 1PC 2PP M2 29.64 106,720.20 3,163,186.73 0.58 - - -
7. Acian Sloof, Kolom dan Profil M2 180.95 56,446.52 10,213,997.79 1.87 - - -
8. Perakitan dan Pemasangan Pagar Besi Beton Polos 16 M2 156.60 1,150,520.51 180,171,511.87 33.02 19.94 12.73 4.20
C. PEKERJAAN PENGECETAN
1. Pengecatan Permukaan Sloof Type II M2 56.70 66,346.72 3,761,859.02 0.69 - - -
2. Pengecatan Permukaan Sloof Type III M2 87.21 66,346.72 5,786,097.45 1.06 - - -
3. Pengecatan Kolom Baru type II dan Profil M2 30.36 66,346.72 2,014,286.42 0.37 - - -
4. Pengecatan Kolom Baru type III dan Profil M2 63.38 66,346.72 4,205,055.11 0.77 - - -
5. Pengecatan Permukaan Pagar dengan Cat Besi M2 234.90 92,810.58 21,801,205.24 4.00 - - -
KONTRAK REALISASI S/D MINGGU LALU
SATUAN JUMLAH BOBOT Bobot / Bobot Trhdp
NO
URAIAN SAT. VOLUME Volume
HARGA (Rp) HARGA (Rp) (%) Item Pek. (%) Seluruh Pek. (%)
1 2 3 4 5 6 7 8 9 10
III PEKERJAAN GERBANG MASUK
1. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 1.80 1,858,726.39 3,345,707.50 0.61 - - -
a. Pek. Bekisting M2 14.40 415,466.40 5,982,716.16 1.10 - - -
b. Pek. Besi Beton Kg 143.56 19,181.83 2,753,743.51 0.50 - - -
2. Plesteran Badan Kolom Camp. 1PC 3PP M2 14.40 104,202.62 1,500,517.73 0.28 - - -
3. Plesteran Profil Kepala dan Kaki Kolom, Camp. 1PC 2PP M2 3.68 106,720.20 392,730.34 0.07 - - -
4. Acian Sloof, Kolom dan Profil M2 18.08 56,446.52 1,020,553.08 0.19 - - -
5. Pas. Pintu Besi Gerbang M2 19.70 3,025,202.80 59,596,495.16 10.92 - - -
6. Pengecatan Kolom dan Profil M2 18.08 66,346.72 1,199,548.70 0.22 - - -
7. Pengecatan Permukaan Pagar dengan Cat Besi M2 29.55 92,810.58 2,742,552.64 0.50 - - -
A Jumlah Total Pekerjaan 545,590,909.09 100.00 9.89
B PPN (10 % x A) 54,559,090.91
C Total (A + B) 600,150,000.00
D Dibulatkan 600,150,000.00

Disetujui Oleh : Diperiksa Oleh : Diperik


Pejabat Pembuat Komitmen (PPK) Direksi Lapangan Konsulta
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA CV. LINTAS

(LINDA A. HIDAYATI) (MULYANI) (ANWAR


NIP. 19770819 200812 2 003 Pengawa
UAN FISIK MINGGU - 02

WAKTU PELAKSANAAN : 70 HARI KALENDER


WAKTU TERPAKAI : 14 HARI KALENDER
SISA WAKTU : 56 HARI KALENDER

Realisasi Pekerjaan
REALISASI MINGGU INI REALISASI S/D MINGGU INI
Bobot / Bobot Trhdp Bobot / Bobot Trhdp
Volume Volume
Item Pek. (%) Seluruh Pek. (%) Item Pek. (%) Seluruh Pek. (%)
11 12 13 14 15 16

- - - 0.50 50.00 0.18


- - - 1.00 100.00 1.10
- - - 1.00 100.00 0.73
- - - 1.00 100.00 0.82
- - - 1.00 100.00 0.05
35.25 48.35 1.03 72.90 100.00 2.12
1.86 51.52 0.11 3.61 100.00 0.21
- - - 1.00 100.00 1.52
0.10 10.00 0.07 0.20 20.00 0.15
- - - - - -

- - - - - -
54.00 100.00 2.74 54.00 100.00 2.74
574.14 100.00 2.02 574.14 100.00 2.02
- - - - - -
40.20 39.18 2.04 40.20 39.18 2.04
981.41 100.00 3.45 981.41 100.00 3.45
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
42.78 27.32 9.02 62.72 40.05 13.23

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
Realisasi Pekerjaan
REALISASI MINGGU INI REALISASI S/D MINGGU INI
Bobot / Bobot Trhdp Bobot / Bobot Trhdp
Volume Volume
Item Pek. (%) Seluruh Pek. (%) Item Pek. (%) Seluruh Pek. (%)
11 12 13 14 15 16

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
20.47 30.36

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (RUGAYA S. HAMID)


Pengawas Lapangan Direktris
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 09 OKTOBER 2019 S/D 15 OKTOBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN SAT
I PEKERJAAN PERSIAPAN
Pembongkaran Dinding Pagar Eksisting 8.81 M2 Hamar - 6.00 Bh
Pembongkaran Kolom dan Ring Balk Pagar Eksisting 0.47 M3 Hamar - 4.00 Bh
Dokumentasi, Laporan & Asbuilt Drawing 0.014 Ls - 0.014 Ls

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


Perakitan dan Pemasangan Pagar Besi Beton Polos 16 7.13 M2 Besi Beton 30.32 216.20 kg
Tombak Besi Cor/Tempa dia. 16 6.00 42.78 Bh
Pengelasan 37.00 263.81 cm

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-02

Hari Ke : 8
Tanggal : 09 Oktober 2019

TENGA KERJA DAN PERALATAN


TENAGA KERJA VOL SAT ALAT VOL SAT

Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
Tukang 3.00 Org
Pekerja 9.00 Org
Sopir 1.00 Org
Ass. Sopir 1.00 Org

18.00 Org

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 09 OKTOBER 2019 S/D 15 OKTOBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN SAT
I PEKERJAAN PERSIAPAN
Pembongkaran Dinding Pagar Eksisting 8.81 M2 Hamar - 6.00 Bh
Pembongkaran Kolom dan Ring Balk Pagar Eksisting 0.47 M3 Hamar - 4.00 Bh
Dokumentasi, Laporan & Asbuilt Drawing 0.014 Ls - 0.014 Ls

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


Perakitan dan Pemasangan Pagar Besi Beton Polos 16 7.13 M2 Besi Beton 30.32 216.20 kg
Tombak Besi Cor/Tempa dia. 16 6.00 42.78 Bh
Pengelasan 37.00 263.81 cm

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-02

Hari Ke : 9
Tanggal : 10 Oktober 2019

TENGA KERJA DAN PERALATAN


TENAGA KERJA VOL SAT ALAT VOL SAT

Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
Tukang 3.00 Org
Pekerja 9.00 Org
Sopir 1.00 Org
Ass. Sopir 1.00 Org

18.00 Org

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 09 OKTOBER 2019 S/D 15 OKTOBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN SAT
I PEKERJAAN PERSIAPAN
Pembongkaran Dinding Pagar Eksisting 8.81 M2 Hamar - 6.00 Bh
Pembongkaran Kolom dan Ring Balk Pagar Eksisting 0.47 M3 Hamar - 4.00 Bh
Dokumentasi, Laporan & Asbuilt Drawing 0.014 Ls - 0.014 Ls

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


Perakitan dan Pemasangan Pagar Besi Beton Polos 16 7.13 M2 Besi Beton 30.32 216.20 kg
Tombak Besi Cor/Tempa dia. 16 6.00 42.78 Bh
Pengelasan 37.00 263.81 cm
1. Sloof Type II, Uk. 20 x 100 (Beton Mutu K-300)
a. Pek. Bekisting 10.80 M2 Kayu kelas III 0.05 0.49 m3
Paku 5 - 10 cm 0.30 3.24 kg
Minyak bekisting 0.10 1.08 Ltr

b. Pek. Besi Beton 114.83 Kg Besi beton (polos/ulir) 1.05 120.57 kg


Kawat beton 0.15 17.22 kg
2. Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300)
a. Pek. Bekisting 8.04 M2 Kayu kelas III 0.05 0.36 m3
Paku 5 - 10 cm 0.30 2.41 kg
Minyak bekisting 0.10 0.80 Ltr

b. Pek. Besi Beton 196.28 kg Besi beton (polos/ulir) 1.05 206.10 kg


Kawat beton 0.15 29.44 kg

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-02

Hari Ke : 10
Tanggal : 11 Oktober 2019

TENGA KERJA DAN PERALATAN


TENAGA KERJA VOL SAT ALAT VOL SAT

Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
Tukang 3.00 Org
Pekerja 9.00 Org
Sopir 1.00 Org
Ass. Sopir 1.00 Org

18.00 Org

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 09 OKTOBER 2019 S/D 15 OKTOBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN SAT
I PEKERJAAN PERSIAPAN
Pembongkaran Dinding Pagar Eksisting 8.81 M2 Hamar - 6.00 Bh
Pembongkaran Kolom dan Ring Balk Pagar Eksisting 0.47 M3 Hamar - 4.00 Bh
Dokumentasi, Laporan & Asbuilt Drawing 0.014 Ls - 0.014 Ls

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


Perakitan dan Pemasangan Pagar Besi Beton Polos 16 7.13 M2 Besi Beton 30.32 216.20 kg
Tombak Besi Cor/Tempa dia. 16 6.00 42.78 Bh
Pengelasan 37.00 263.81 cm
1. Sloof Type II, Uk. 20 x 100 (Beton Mutu K-300)
a. Pek. Bekisting 10.80 M2 Kayu kelas III 0.05 0.49 m3
Paku 5 - 10 cm 0.30 3.24 kg
Minyak bekisting 0.10 1.08 Ltr

b. Pek. Besi Beton 114.83 Kg Besi beton (polos/ulir) 1.05 120.57 kg


Kawat beton 0.15 17.22 kg
2. Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300)
a. Pek. Bekisting 8.04 M2 Kayu kelas III 0.05 0.36 m3
Paku 5 - 10 cm 0.30 2.41 kg
Minyak bekisting 0.10 0.80 Ltr

b. Pek. Besi Beton 196.28 kg Besi beton (polos/ulir) 1.05 206.10 kg


Kawat beton 0.15 29.44 kg

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-02

Hari Ke : 11
Tanggal : 12 Oktober 2019

TENGA KERJA DAN PERALATAN


TENAGA KERJA VOL SAT ALAT VOL SAT

Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
Tukang 3.00 Org
Pekerja 9.00 Org
Sopir 1.00 Org
Ass. Sopir 1.00 Org

18.00 Org

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 09 OKTOBER 2019 S/D 15 OKTOBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN SAT
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.014 Ls - 0.014 Ls

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO) 7.13 M2 Besi Beton 30.32 216.20 kg
Perakitan dan Pemasangan Pagar Besi Beton Polos 16 Tombak Besi Cor/Tempa dia. 16 6.00 42.78 Bh
Pengelasan 37.00 263.81 cm
1. Sloof Type II, Uk. 20 x 100 (Beton Mutu K-300)
a. Pek. Bekisting 10.80 M2 Kayu kelas III 0.05 0.49 m3
Paku 5 - 10 cm 0.30 3.24 kg
Minyak bekisting 0.10 1.08 Ltr

b. Pek. Besi Beton 114.83 kg Besi beton (polos/ulir) 1.05 120.57 kg


Kawat beton 0.15 17.22 kg
2. Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300)
a. Pek. Bekisting 8.04 M2 Kayu kelas III 0.05 0.36 m3
Paku 5 - 10 cm 0.30 2.41 kg
Minyak bekisting 0.10 0.80 Ltr

0 b. Pek. Besi Beton 196.28 kg Besi beton (polos/ulir) 1.05 206.10 kg


Kawat beton 0.15 29.44 kg

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-02

Hari Ke : 12
Tanggal : 13 Oktober 2019

TENGA KERJA DAN PERALATAN


TENAGA KERJA VOL SAT ALAT VOL SAT

Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
Tukang 3.00 Org
Pekerja 9.00 Org
Sopir 1.00 Org
Ass. Sopir 1.00 Org

18.00 Org

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 09 OKTOBER 2019 S/D 15 OKTOBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN SAT
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.014 Ls - 0.014 Ls

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO) 7.13 M2 Besi Beton 30.32 216.20 kg
Perakitan dan Pemasangan Pagar Besi Beton Polos 16 Tombak Besi Cor/Tempa dia. 16 6.00 42.78 Bh
Pengelasan 37.00 263.81 cm
1. Sloof Type II, Uk. 20 x 100 (Beton Mutu K-300)
a. Pek. Bekisting 10.80 M2 Kayu kelas III 0.05 0.49 m3
Paku 5 - 10 cm 0.30 3.24 kg
Minyak bekisting 0.10 1.08 Ltr

b. Pek. Besi Beton 114.83 kg Besi beton (polos/ulir) 1.05 120.57 kg


Kawat beton 0.15 17.22 kg
2. Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300)
a. Pek. Bekisting 8.04 M2 Kayu kelas III 0.05 0.36 m3
Paku 5 - 10 cm 0.30 2.41 kg
Minyak bekisting 0.10 0.80 Ltr

b. Pek. Besi Beton 196.28 kg Besi beton (polos/ulir) 1.05 206.10 kg


Kawat beton 0.15 29.44 kg

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-02

Hari Ke : 13
Tanggal : 14 Oktober 2019

TENGA KERJA DAN PERALATAN


TENAGA KERJA VOL SAT ALAT VOL SAT

Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
Tukang 3.00 Org
Pekerja 9.00 Org
Sopir 1.00 Org
Ass. Sopir 1.00 Org

18.00 Org

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 09 OKTOBER 2019 S/D 15 OKTOBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN SAT
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.014 Ls - 0.014 Ls

Sloof Type II, Uk. 20 x 100 (Beton Mutu K-300)


a. Pek. Bekisting 10.80 M2 Kayu kelas III 0.05 0.49 m3
Paku 5 - 10 cm 0.30 3.24 kg
Minyak bekisting 0.10 1.08 Ltr

b. Pek. Besi Beton 114.83 kg Besi beton (polos/ulir) 1.05 120.57 kg


Kawat beton 0.15 17.22 kg
3. Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300)
a. Pek. Bekisting 8.04 M2 Kayu kelas III 0.05 0.36 m3
Paku 5 - 10 cm 0.30 2.41 kg
Minyak bekisting 0.10 0.80 Ltr

b. Pek. Besi Beton 196.28 kg Besi beton (polos/ulir) 1.05 206.10 kg


Kawat beton 0.15 29.44 kg

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-02

Hari Ke : 14
Tanggal : 15 Oktober 2019

TENGA KERJA DAN PERALATAN


TENAGA KERJA VOL SAT ALAT VOL SAT

Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
Tukang 3.00 Org
Pekerja 10.00 Org
Sopir 1.00 Org
Ass. Sopir 1.00 Org

19.00 Org

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN FISIK MINGGU - 03
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
PERIODE : 16 OKTOBER 2019 S/D 22 OKTOBER 2019
TAHUN ANGGARAN : 2019

KONTRAK REALISASI S/D MINGGU LALU


SATUAN JUMLAH BOBOT Bobot / Bobot Trhdp
NO
URAIAN SAT. VOLUME Volume
HARGA (Rp) HARGA (Rp) (%) Item Pek. (%) Seluruh Pek. (%)
1 2 3 4 5 6 7 8 9 10
I PEKERJAAN PERSIAPAN
Mobilisasi /Demobilisasi Tenaga Kerja Ls 1.00 2,000,000.00 2,000,000.00 0.37 0.50 50.00 0.18
Pembuatan Kantor Sementara Lantai Plesteran Ls 1.00 5,997,967.17 5,997,967.17 1.10 1.00 100.00 1.10
Pembuatan Gudang Semen dan Peralatan Ls 1.00 4,000,000.00 4,000,000.00 0.73 1.00 100.00 0.73
Pembuatan Bedeng Pekerja Ls 1.00 4,500,000.00 4,500,000.00 0.82 1.00 100.00 0.82
Papan Nama Proyek Uk. 120 x 120 cm Ls 1.00 300,000.00 300,000.00 0.05 1.00 100.00 0.05
Pembongkaran Dinding Pagar Eksisting M2 72.90 158,749.56 11,572,842.92 2.12 72.90 100.00 2.12
Pembongkaran Kolom dan Ring Balk Pagar Eksisting M3 3.61 317,499.12 1,146,171.82 0.21 3.61 100.00 0.21
Genset Kap. 2.2 kvA dan Air Kerja Ls 1.00 8,300,000.00 8,300,000.00 1.52 1.00 100.00 1.52
Dokumentasi, Laporan & Asbuilt Drawing Ls 1.00 4,000,000.00 4,000,000.00 0.73 0.20 20.00 0.15
Pembersihan Akhir Lokasi Pekerjaan Ls 1.00 1,500,000.00 1,500,000.00 0.27 - - -
II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO) -
A. PEKERJAAN BETON -
1. Sloof Type II, Uk. 20 x 100 (Beton Mutu K-300) M3 5.40 1,897,700.66 10,247,583.56 1.88 - - -
a. Pek. Bekisting M2 54.00 276,376.90 14,924,352.60 2.74 54.00 100.00 2.74
b. Pek. Besi Beton Kg 574.14 19,181.83 11,013,055.88 2.02 574.14 100.00 2.02
2. Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300) M3 8.21 1,897,700.66 15,580,122.42 2.86 - - -
a. Pek. Bekisting M2 102.60 276,376.90 28,356,269.94 5.20 40.20 39.18 2.04
b. Pek. Besi Beton Kg 981.41 19,181.83 18,825,239.78 3.45 981.41 100.00 3.45
3. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 2.61 1,858,726.39 4,851,275.88 0.89 - - -
a. Pek. Bekisting M2 34.80 415,466.40 14,458,230.72 2.65 - - -
b. Pek. Besi Beton Kg 346.21 19,181.83 6,640,941.36 1.22 - - -
4. Kolom Baru Type III, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 4.62 1,858,726.39 8,587,315.92 1.57 - - -
a. Pek. Bekisting M2 61.56 415,466.40 25,576,111.58 4.69 - - -
b. Pek. Besi Beton Kg 618.02 19,181.83 11,854,754.58 2.17 - - -
B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR -
1. Plesteran Permukaan Sloof Type II, Uk. 20 x 100 Camp. 1PC 3PP M2 56.70 104,202.62 5,908,288.55 1.08 - - -
2. Plesteran Permukaan Sloof Type III, Uk. 20 x 80 Camp. 1PC 3PP M2 87.21 104,202.62 9,087,510.49 1.67 - - -
3. Plesteran Badan Kolom Baru Type II, Camp. 1PC 3PP M2 17.76 104,202.62 1,850,638.53 0.34 - - -
4. Plesteran Badan Kolom Baru Type III, Camp. 1PC 3PP M2 33.74 104,202.62 3,515,796.40 0.64 - - -
5. Plesteran Profil Kepala dan Kaki Kolom Type II, Camp. 1PC 2PP M2 12.60 106,720.20 1,344,674.52 0.25 - - -
6. Plesteran Profil Kepala dan Kaki Kolom Type III, Camp. 1PC 2PP M2 29.64 106,720.20 3,163,186.73 0.58 - - -
7. Acian Sloof, Kolom dan Profil M2 180.95 56,446.52 10,213,997.79 1.87 - - -
8. Perakitan dan Pemasangan Pagar Besi Beton Polos 16 M2 156.60 1,150,520.51 180,171,511.87 33.02 62.72 40.05 13.23
C. PEKERJAAN PENGECETAN -
1. Pengecatan Permukaan Sloof Type II M2 56.70 66,346.72 3,761,859.02 0.69 - - -
2. Pengecatan Permukaan Sloof Type III M2 87.21 66,346.72 5,786,097.45 1.06 - - -
3. Pengecatan Kolom Baru type II dan Profil M2 30.36 66,346.72 2,014,286.42 0.37 - - -
4. Pengecatan Kolom Baru type III dan Profil M2 63.38 66,346.72 4,205,055.11 0.77 - - -
5. Pengecatan Permukaan Pagar dengan Cat Besi M2 234.90 92,810.58 21,801,205.24 4.00 - - -
KONTRAK REALISASI S/D MINGGU LALU
SATUAN JUMLAH BOBOT Bobot / Bobot Trhdp
NO
URAIAN SAT. VOLUME Volume
HARGA (Rp) HARGA (Rp) (%) Item Pek. (%) Seluruh Pek. (%)
1 2 3 4 5 6 7 8 9 10
III PEKERJAAN GERBANG MASUK -
1. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 1.80 1,858,726.39 3,345,707.50 0.61 - - -
a. Pek. Bekisting M2 14.40 415,466.40 5,982,716.16 1.10 - - -
b. Pek. Besi Beton Kg 143.56 19,181.83 2,753,743.51 0.50 - - -
2. Plesteran Badan Kolom Camp. 1PC 3PP M2 14.40 104,202.62 1,500,517.73 0.28 - - -
3. Plesteran Profil Kepala dan Kaki Kolom, Camp. 1PC 2PP M2 3.68 106,720.20 392,730.34 0.07 - - -
4. Acian Sloof, Kolom dan Profil M2 18.08 56,446.52 1,020,553.08 0.19 - - -
5. Pas. Pintu Besi Gerbang M2 19.70 3,025,202.80 59,596,495.16 10.92 - - -
6. Pengecatan Kolom dan Profil M2 18.08 66,346.72 1,199,548.70 0.22 - - -
7. Pengecatan Permukaan Pagar dengan Cat Besi M2 29.55 92,810.58 2,742,552.64 0.50 - - -
A Jumlah Total Pekerjaan 545,590,909.09 100.00 30.36
B PPN (10 % x A) 54,559,090.91
C Total (A + B) 600,150,000.00
D Dibulatkan 600,150,000.00

Disetujui Oleh : Diperiksa Oleh : Diper


Pejabat Pembuat Komitmen (PPK) Direksi Lapangan Konsult
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA CV. LINTAS

(LINDA A. HIDAYATI) (MULYANI) (ANWA


NIP. 19770819 200812 2 003 Pengaw
UAN FISIK MINGGU - 03

WAKTU PELAKSANAAN : 70 HARI KALENDER


WAKTU TERPAKAI : 21 HARI KALENDER
SISA WAKTU : 49 HARI KALENDER

Realisasi Pekerjaan
REALISASI MINGGU INI REALISASI S/D MINGGU INI
Bobot / Bobot Trhdp Bobot / Bobot Trhdp
Volume Volume
Item Pek. (%) Seluruh Pek. (%) Item Pek. (%) Seluruh Pek. (%)
11 12 13 14 15 16

- - - 0.50 50.00 0.18


- - - 1.00 100.00 1.10
- - - 1.00 100.00 0.73
- - - 1.00 100.00 0.82
- - - 1.00 100.00 0.05
- - - 72.90 100.00 2.12
- - - 3.61 100.00 0.21
- - - 1.00 100.00 1.52
0.10 10.00 0.07 0.30 30.00 0.22
- - - - - -

2.10 38.89 0.73 2.10 38.89 0.73


- - - 54.00 100.00 2.74
- - - 574.14 100.00 2.02
2.67 32.52 0.93 2.67 32.52 0.93
62.40 60.82 3.16 102.60 100.00 5.20
- - - 981.41 100.00 3.45
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
42.78 27.32 9.02 105.50 67.37 22.25

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
Realisasi Pekerjaan
REALISASI MINGGU INI REALISASI S/D MINGGU INI
Bobot / Bobot Trhdp Bobot / Bobot Trhdp
Volume Volume
Item Pek. (%) Seluruh Pek. (%) Item Pek. (%) Seluruh Pek. (%)
11 12 13 14 15 16

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
13.91 44.28

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (RUGAYA S. HAMID)


Pengawas Lapangan Direktris
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 16 OKTOBER 2019 S/D 22 OKTOBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN SAT
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.017 Ls - 0.017 Ls

1. Sloof Type II, Uk. 20 x 100 (Beton Mutu K-300) 0.70 M3 Semen portland 413.00 289.10 kg
Pasir Beton 681.00 476.70 kg
Kerikil (Maks 30 mm) 1,021.00 714.70 kg
Air 215.00 150.50 Ltr
2. Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300)
a. Pek. Bekisting 15.60 M2 Kayu kelas III 0.05 0.70 m3
Paku 5 - 10 cm 0.30 4.68 kg
Minyak bekisting 0.10 1.56 Ltr

b. Pek. Besi Beton 10.70 kg Besi beton (polos/ulir) 1.05 11.23 kg


Kawat beton 0.15 1.60 kg

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


8. Perakitan dan Pemasangan Pagar Besi Beton Polos 16 6.11 M2 Besi Beton 30.32 185.31 kg
Tombak Besi Cor/Tempa dia. 16 6.00 36.67 Bh
Pengelasan 37.00 226.12 cm

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-03

Hari Ke : 15
Tanggal : 16 Oktober 2019

TENGA KERJA DAN PERALATAN


TENAGA KERJA VOL SAT ALAT VOL SAT

Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
Tukang 3.00 Org
Pekerja 9.00 Org
Sopir 1.00 Org
Ass. Sopir 1.00 Org

18.00 Org

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 16 OKTOBER 2019 S/D 22 OKTOBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN SAT
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.017 Ls - 0.017 Ls

1. Sloof Type II, Uk. 20 x 100 (Beton Mutu K-300) 0.70 M3 Semen portland 413.00 289.10 kg
Pasir Beton 681.00 476.70 kg
Kerikil (Maks 30 mm) 1,021.00 714.70 kg
Air 215.00 150.50 Ltr
2. Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300)
a. Pek. Bekisting 15.60 M2 Kayu kelas III 0.05 0.70 m3
Paku 5 - 10 cm 0.30 4.68 kg
Minyak bekisting 0.10 1.56 Ltr

b. Pek. Besi Beton 10.70 kg Besi beton (polos/ulir) 1.05 11.23 kg


Kawat beton 0.15 1.60 kg

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


8. Perakitan dan Pemasangan Pagar Besi Beton Polos 16 6.11 M2 Besi Beton 30.32 185.31 kg
Tombak Besi Cor/Tempa dia. 16 6.00 36.67 Bh
Pengelasan 37.00 226.12 cm

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-03

Hari Ke : 16
Tanggal : 17 Oktober 2019

TENGA KERJA DAN PERALATAN


TENAGA KERJA VOL SAT ALAT VOL SAT

Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
Tukang 3.00 Org
Pekerja 9.00 Org
Sopir 1.00 Org
Ass. Sopir 1.00 Org

18.00 Org

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 16 OKTOBER 2019 S/D 22 OKTOBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN SAT
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.017 Ls - 0.017 Ls

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


1. Sloof Type II, Uk. 20 x 100 (Beton Mutu K-300) 0.70 M3 Semen portland 413.00 289.10 kg
Pasir Beton 681.00 476.70 kg
Kerikil (Maks 30 mm) 1,021.00 714.70 kg
Air 215.00 150.50 Ltr
2. Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300)
a. Pek. Bekisting 15.60 M2 Kayu kelas III 0.05 0.70 m3
Paku 5 - 10 cm 0.30 4.68 kg
Minyak bekisting 0.10 1.56 Ltr

b. Pek. Besi Beton 10.70 kg Besi beton (polos/ulir) 1.05 11.23 kg


Kawat beton 0.15 1.60 kg

8. Perakitan dan Pemasangan Pagar Besi Beton Polos 16 6.11 M2 Besi Beton 30.32 185.31 kg
Tombak Besi Cor/Tempa dia. 16 6.00 36.67 Bh
Pengelasan 37.00 226.12 cm

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-03

Hari Ke : 17
Tanggal : 18 Oktober 2019

TENGA KERJA DAN PERALATAN


TENAGA KERJA VOL SAT ALAT VOL SAT

Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
Tukang 3.00 Org
Pekerja 9.00 Org
Sopir 1.00 Org
Ass. Sopir 1.00 Org

18.00 Org

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 16 OKTOBER 2019 S/D 22 OKTOBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN SAT
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.017 Ls - 0.017 Ls

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


2. Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300) 0.89 M3 Semen portland 413.00 367.57 kg
Pasir Beton 681.00 606.09 kg
Kerikil (Maks 30 mm) 1,021.00 908.69 kg
Air 215.00 191.35 Ltr

a. Pek. Bekisting 15.60 M2 Kayu kelas III 0.05 0.70 m3


Paku 5 - 10 cm 0.30 4.68 kg
Minyak bekisting 0.10 1.56 Ltr

b. Pek. Besi Beton 10.70 kg Besi beton (polos/ulir) 1.05 11.23 kg


Kawat beton 0.15 1.60 kg

8. Perakitan dan Pemasangan Pagar Besi Beton Polos 16 6.11 M2 Besi Beton 30.32 185.31 kg
Tombak Besi Cor/Tempa dia. 16 6.00 36.67 Bh
Pengelasan 37.00 226.12 cm

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-03

Hari Ke : 18
Tanggal : 19 Oktober 2019

TENGA KERJA DAN PERALATAN


TENAGA KERJA VOL SAT ALAT VOL SAT

Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
Tukang 3.00 Org
Pekerja 9.00 Org
Sopir 1.00 Org
Ass. Sopir 1.00 Org

18.00 Org

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 16 OKTOBER 2019 S/D 22 OKTOBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN SAT
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.017 Ls - 0.017 Ls

2. Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300) 0.89 M3 Semen portland 413.00 367.57 kg
Pasir Beton 681.00 606.09 kg
Kerikil (Maks 30 mm) 1,021.00 908.69 kg
Air 215.00 191.35 Ltr

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


8. Perakitan dan Pemasangan Pagar Besi Beton Polos 16 6.11 M2 Besi Beton 30.32 185.31 kg
Tombak Besi Cor/Tempa dia. 16 6.00 36.67 Bh
Pengelasan 37.00 226.12 cm

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-03

Hari Ke : 19
Tanggal : 20 Oktober 2019

TENGA KERJA DAN PERALATAN


TENAGA KERJA VOL SAT ALAT VOL SAT

Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
Tukang 3.00 Org
Pekerja 9.00 Org
Sopir 1.00 Org
Ass. Sopir 1.00 Org

18.00 Org

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 16 OKTOBER 2019 S/D 22 OKTOBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN SAT
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.017 Ls - 0.017 Ls

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


2. Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300) 0.89 M3 Semen portland 413.00 367.57 kg
Pasir Beton 681.00 606.09 kg
Kerikil (Maks 30 mm) 1,021.00 908.69 kg
Air 215.00 191.35 Ltr

8. Perakitan dan Pemasangan Pagar Besi Beton Polos 16 6.11 M2 Besi Beton 30.32 185.31 kg
Tombak Besi Cor/Tempa dia. 16 6.00 36.67 Bh
Pengelasan 37.00 226.12 cm

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-03

Hari Ke : 20
Tanggal : 21 Oktober 2019

TENGA KERJA DAN PERALATAN


TENAGA KERJA VOL SAT ALAT VOL SAT

Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
Tukang 2.00 Org
Pekerja 6.00 Org
Sopir 1.00 Org
Ass. Sopir 1.00 Org

14.00 Org

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 16 OKTOBER 2019 S/D 22 OKTOBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN SAT
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.017 Ls - 0.017 Ls

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


8. Perakitan dan Pemasangan Pagar Besi Beton Polos 16 6.11 M2 Besi Beton 30.32 185.31 kg
Tombak Besi Cor/Tempa dia. 16 6.00 36.67 Bh
Pengelasan 37.00 226.12 cm

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-03

Hari Ke : 21
Tanggal : 22 Oktober 2019

TENGA KERJA DAN PERALATAN


TENAGA KERJA VOL SAT ALAT VOL SAT

Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 1.00 Org
Tukang 1.00 Org
Pekerja 2.00 Org
Sopir 1.00 Org
Ass. Sopir 1.00 Org

8.00 Org

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN FISIK MINGGU - 04
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
PERIODE : 23 OKTOBER 2019 S/D 29 OKTOBER 2019
TAHUN ANGGARAN : 2019

KONTRAK REALISASI S/D MINGGU LALU


SATUAN JUMLAH BOBOT Bobot / Bobot Trhdp
NO
URAIAN SAT. VOLUME Volume
HARGA (Rp) HARGA (Rp) (%) Item Pek. (%) Seluruh Pek. (%)
1 2 3 4 5 6 7 8 9 10
I PEKERJAAN PERSIAPAN
Mobilisasi /Demobilisasi Tenaga Kerja Ls 1.00 2,000,000.00 2,000,000.00 0.37 0.50 50.00 0.18
Pembuatan Kantor Sementara Lantai Plesteran Ls 1.00 5,997,967.17 5,997,967.17 1.10 1.00 100.00 1.10
Pembuatan Gudang Semen dan Peralatan Ls 1.00 4,000,000.00 4,000,000.00 0.73 1.00 100.00 0.73
Pembuatan Bedeng Pekerja Ls 1.00 4,500,000.00 4,500,000.00 0.82 1.00 100.00 0.82
Papan Nama Proyek Uk. 120 x 120 cm Ls 1.00 300,000.00 300,000.00 0.05 1.00 100.00 0.05
Pembongkaran Dinding Pagar Eksisting M2 72.90 158,749.56 11,572,842.92 2.12 72.90 100.00 2.12
Pembongkaran Kolom dan Ring Balk Pagar Eksisting M3 3.61 317,499.12 1,146,171.82 0.21 3.61 100.00 0.21
Genset Kap. 2.2 kvA dan Air Kerja Ls 1.00 8,300,000.00 8,300,000.00 1.52 1.00 100.00 1.52
Dokumentasi, Laporan & Asbuilt Drawing Ls 1.00 4,000,000.00 4,000,000.00 0.73 0.30 30.00 0.22
Pembersihan Akhir Lokasi Pekerjaan Ls 1.00 1,500,000.00 1,500,000.00 0.27 - - -
II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO) -
A. PEKERJAAN BETON -
1. Sloof Type II, Uk. 20 x 100 (Beton Mutu K-300) M3 5.40 1,897,700.66 10,247,583.56 1.88 2.10 38.89 0.73
a. Pek. Bekisting M2 54.00 276,376.90 14,924,352.60 2.74 54.00 100.00 2.74
b. Pek. Besi Beton Kg 574.14 19,181.83 11,013,055.88 2.02 574.14 100.00 2.02
2. Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300) M3 8.21 1,897,700.66 15,580,122.42 2.86 2.67 32.52 0.93
a. Pek. Bekisting M2 102.60 276,376.90 28,356,269.94 5.20 102.60 100.00 5.20
b. Pek. Besi Beton Kg 981.41 19,181.83 18,825,239.78 3.45 981.41 100.00 3.45
3. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 2.61 1,858,726.39 4,851,275.88 0.89 - - -
a. Pek. Bekisting M2 34.80 415,466.40 14,458,230.72 2.65 - - -
b. Pek. Besi Beton Kg 346.21 19,181.83 6,640,941.36 1.22 - - -
4. Kolom Baru Type III, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 4.62 1,858,726.39 8,587,315.92 1.57 - - -
a. Pek. Bekisting M2 61.56 415,466.40 25,576,111.58 4.69 - - -
b. Pek. Besi Beton Kg 618.02 19,181.83 11,854,754.58 2.17 - - -
B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR -
1. Plesteran Permukaan Sloof Type II, Uk. 20 x 100 Camp. 1PC 3PP M2 56.70 104,202.62 5,908,288.55 1.08 - - -
2. Plesteran Permukaan Sloof Type III, Uk. 20 x 80 Camp. 1PC 3PP M2 87.21 104,202.62 9,087,510.49 1.67 - - -
3. Plesteran Badan Kolom Baru Type II, Camp. 1PC 3PP M2 17.76 104,202.62 1,850,638.53 0.34 - - -
4. Plesteran Badan Kolom Baru Type III, Camp. 1PC 3PP M2 33.74 104,202.62 3,515,796.40 0.64 - - -
5. Plesteran Profil Kepala dan Kaki Kolom Type II, Camp. 1PC 2PP M2 12.60 106,720.20 1,344,674.52 0.25 - - -
6. Plesteran Profil Kepala dan Kaki Kolom Type III, Camp. 1PC 2PP M2 29.64 106,720.20 3,163,186.73 0.58 - - -
7. Acian Sloof, Kolom dan Profil M2 180.95 56,446.52 10,213,997.79 1.87 - - -
8. Perakitan dan Pemasangan Pagar Besi Beton Polos 16 M2 156.60 1,150,520.51 180,171,511.87 33.02 105.50 67.37 22.25
C. PEKERJAAN PENGECETAN -
1. Pengecatan Permukaan Sloof Type II M2 56.70 66,346.72 3,761,859.02 0.69 - - -
2. Pengecatan Permukaan Sloof Type III M2 87.21 66,346.72 5,786,097.45 1.06 - - -
3. Pengecatan Kolom Baru type II dan Profil M2 30.36 66,346.72 2,014,286.42 0.37 - - -
4. Pengecatan Kolom Baru type III dan Profil M2 63.38 66,346.72 4,205,055.11 0.77 - - -
5. Pengecatan Permukaan Pagar dengan Cat Besi M2 234.90 92,810.58 21,801,205.24 4.00 - - -
KONTRAK REALISASI S/D MINGGU LALU
SATUAN JUMLAH BOBOT Bobot / Bobot Trhdp
NO
URAIAN SAT. VOLUME Volume
HARGA (Rp) HARGA (Rp) (%) Item Pek. (%) Seluruh Pek. (%)
1 2 3 4 5 6 7 8 9 10
III PEKERJAAN GERBANG MASUK -
1. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 1.80 1,858,726.39 3,345,707.50 0.61 - - -
a. Pek. Bekisting M2 14.40 415,466.40 5,982,716.16 1.10 - - -
b. Pek. Besi Beton Kg 143.56 19,181.83 2,753,743.51 0.50 - - -
2. Plesteran Badan Kolom Camp. 1PC 3PP M2 14.40 104,202.62 1,500,517.73 0.28 - - -
3. Plesteran Profil Kepala dan Kaki Kolom, Camp. 1PC 2PP M2 3.68 106,720.20 392,730.34 0.07 - - -
4. Acian Sloof, Kolom dan Profil M2 18.08 56,446.52 1,020,553.08 0.19 - - -
5. Pas. Pintu Besi Gerbang M2 19.70 3,025,202.80 59,596,495.16 10.92 - - -
6. Pengecatan Kolom dan Profil M2 18.08 66,346.72 1,199,548.70 0.22 - - -
7. Pengecatan Permukaan Pagar dengan Cat Besi M2 29.55 92,810.58 2,742,552.64 0.50 - - -
A Jumlah Total Pekerjaan 545,590,909.09 100.00 44.28
B PPN (10 % x A) 54,559,090.91
C Total (A + B) 600,150,000.00
D Dibulatkan 600,150,000.00

Disetujui Oleh : Diperiksa Oleh : Diperik


Pejabat Pembuat Komitmen (PPK) Direksi Lapangan Konsulta
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA CV. LINTAS

(LINDA A. HIDAYATI) (MULYANI) (ANWAR


NIP. 19770819 200812 2 003 Pengawa
UAN FISIK MINGGU - 04

WAKTU PELAKSANAAN : 70 HARI KALENDER


WAKTU TERPAKAI : 28 HARI KALENDER
SISA WAKTU : 42 HARI KALENDER

Realisasi Pekerjaan
REALISASI MINGGU INI REALISASI S/D MINGGU INI
Bobot / Bobot Trhdp Bobot / Bobot Trhdp
Volume Volume
Item Pek. (%) Seluruh Pek. (%) Item Pek. (%) Seluruh Pek. (%)
11 12 13 14 15 16

- - - 0.50 50.00 0.18


- - - 1.00 100.00 1.10
- - - 1.00 100.00 0.73
- - - 1.00 100.00 0.82
- - - 1.00 100.00 0.05
- - - 72.90 100.00 2.12
- - - 3.61 100.00 0.21
- - - 1.00 100.00 1.52
0.10 10.00 0.07 0.40 40.00 0.29
- - - - - -

1.15 21.30 0.40 3.25 60.19 1.13


- - - 54.00 100.00 2.74
- - - 574.14 100.00 2.02
3.26 39.71 1.13 5.93 72.23 2.06
- - - 102.60 100.00 5.20
- - - 981.41 100.00 3.45
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
43.27 27.63 9.12 148.77 95.00 31.37

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
Realisasi Pekerjaan
REALISASI MINGGU INI REALISASI S/D MINGGU INI
Bobot / Bobot Trhdp Bobot / Bobot Trhdp
Volume Volume
Item Pek. (%) Seluruh Pek. (%) Item Pek. (%) Seluruh Pek. (%)
11 12 13 14 15 16

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
10.73 55.01

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (RUGAYA S. HAMID)


Pengawas Lapangan Direktris
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 23 OKTOBER 2019 S/D 29 OKTOBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN SAT
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.017 Ls - 0.017 Ls

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


1. Sloof Type II, Uk. 20 x 100 (Beton Mutu K-300) 0.58 M3 Semen portland 413.00 237.48 kg
Pasir Beton 681.00 391.58 kg
Kerikil (Maks 30 mm) 1,021.00 587.08 kg
Air 215.00 123.63 Ltr

2. Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300) 0.82 M3 Semen portland 413.00 336.60 kg
Pasir Beton 681.00 555.02 kg
Kerikil (Maks 30 mm) 1,021.00 832.12 kg
Air 215.00 175.23 Ltr

8. Perakitan dan Pemasangan Pagar Besi Beton Polos 16 6.18 M2 Besi Beton 30.32 187.43 kg
Tombak Besi Cor/Tempa dia. 16 6.00 37.09 Bh
Pengelasan 37.00 228.71 cm

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-04

Hari Ke : 22
Tanggal : 23 Oktober 2019

TENGA KERJA DAN PERALATAN


TENAGA KERJA VOL SAT ALAT VOL SAT

Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
Tukang 3.00 Org
Pekerja 9.00 Org
Sopir 1.00 Org
Ass. Sopir 1.00 Org

18.00 Org

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 23 OKTOBER 2019 S/D 29 OKTOBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN SAT
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.017 Ls - 0.017 Ls

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


1. Sloof Type II, Uk. 20 x 100 (Beton Mutu K-300) 0.58 M3 Semen portland 413.00 237.48 kg
Pasir Beton 681.00 391.58 kg
Kerikil (Maks 30 mm) 1,021.00 587.08 kg
Air 215.00 123.63 Ltr

2. Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300) 0.82 M3 Semen portland 413.00 336.60 kg
Pasir Beton 681.00 555.02 kg
Kerikil (Maks 30 mm) 1,021.00 832.12 kg
Air 215.00 175.23 Ltr

8. Perakitan dan Pemasangan Pagar Besi Beton Polos 16 6.18 M2 Besi Beton 30.32 187.43 kg
Tombak Besi Cor/Tempa dia. 16 6.00 37.09 Bh
Pengelasan 37.00 228.71 cm

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-04

Hari Ke : 23
Tanggal : 24 Oktober 2019

TENGA KERJA DAN PERALATAN


TENAGA KERJA VOL SAT ALAT VOL SAT

Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
Tukang 3.00 Org
Pekerja 9.00 Org
Sopir 1.00 Org
Ass. Sopir 1.00 Org

18.00 Org

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 23 OKTOBER 2019 S/D 29 OKTOBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN SAT
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.017 Ls - 0.017 Ls

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


2. Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300) 0.82 M3 Semen portland 413.00 336.60 kg
Pasir Beton 681.00 555.02 kg
Kerikil (Maks 30 mm) 1,021.00 832.12 kg
Air 215.00 175.23 Ltr

8. Perakitan dan Pemasangan Pagar Besi Beton Polos 16 6.18 M2 Besi Beton 30.32 187.43 kg
Tombak Besi Cor/Tempa dia. 16 6.00 37.09 Bh
Pengelasan 37.00 228.71 cm

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-04

Hari Ke : 24
Tanggal : 25 Oktober 2019

TENGA KERJA DAN PERALATAN


TENAGA KERJA VOL SAT ALAT VOL SAT

Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
Tukang 2.00 Org
Pekerja 4.00 Org
Sopir 1.00 Org
Ass. Sopir 1.00 Org

12.00 Org

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 23 OKTOBER 2019 S/D 29 OKTOBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN SAT
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.017 Ls - 0.017 Ls

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


2. Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300) 0.82 M3 Semen portland 413.00 336.60 kg
Pasir Beton 681.00 555.02 kg
Kerikil (Maks 30 mm) 1,021.00 832.12 kg
Air 215.00 175.23 Ltr

8. Perakitan dan Pemasangan Pagar Besi Beton Polos 16 6.18 M2 Besi Beton 30.32 187.43 kg
Tombak Besi Cor/Tempa dia. 16 6.00 37.09 Bh
Pengelasan 37.00 228.71 cm

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-04

Hari Ke : 25
Tanggal : 26 Oktober 2019

TENGA KERJA DAN PERALATAN


TENAGA KERJA VOL SAT ALAT VOL SAT

Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
Tukang 2.00 Org
Pekerja 4.00 Org
Sopir 1.00 Org
Ass. Sopir 1.00 Org

12.00 Org

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 23 OKTOBER 2019 S/D 29 OKTOBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN SAT
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.017 Ls - 0.017 Ls

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


8. Perakitan dan Pemasangan Pagar Besi Beton Polos 16 6.18 M2 Besi Beton 30.32 187.43 kg
Tombak Besi Cor/Tempa dia. 16 6.00 37.09 Bh
Pengelasan 37.00 228.71 cm

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-04

Hari Ke : 26
Tanggal : 27 Oktober 2019

TENGA KERJA DAN PERALATAN


TENAGA KERJA VOL SAT ALAT VOL SAT

Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 1.00 Org
Tukang 1.00 Org
Pekerja 2.00 Org
Sopir 1.00 Org
Ass. Sopir 1.00 Org

8.00 Org

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 23 OKTOBER 2019 S/D 29 OKTOBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN SAT
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.017 Ls - 0.017 Ls

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


8. Perakitan dan Pemasangan Pagar Besi Beton Polos 16 6.18 M2 Besi Beton 30.32 187.43 kg
Tombak Besi Cor/Tempa dia. 16 6.00 37.09 Bh
Pengelasan 37.00 228.71 cm

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-04

Hari Ke : 27
Tanggal : 28 Oktober 2019

TENGA KERJA DAN PERALATAN


TENAGA KERJA VOL SAT ALAT VOL SAT

Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 1.00 Org
Tukang 1.00 Org
Pekerja 2.00 Org
Sopir 1.00 Org
Ass. Sopir 1.00 Org

8.00 Org

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 23 OKTOBER 2019 S/D 29 OKTOBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN SAT
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.017 Ls - 0.017 Ls

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


8. Perakitan dan Pemasangan Pagar Besi Beton Polos 16 6.18 M2 Besi Beton 30.32 187.43 kg
Tombak Besi Cor/Tempa dia. 16 6.00 37.09 Bh
Pengelasan 37.00 228.71 cm

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-04

Hari Ke : 28
Tanggal : 29 Oktober 2019

TENGA KERJA DAN PERALATAN


TENAGA KERJA VOL SAT ALAT VOL SAT

Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 1.00 Org
Tukang 1.00 Org
Pekerja 2.00 Org
Sopir 1.00 Org
Ass. Sopir 1.00 Org

8.00 Org

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN FISIK BULA
REKAPITULASI TOTAL
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
PERIODE : 02 OKTOBER 2019 S/D 29 OKTOBER 2019
TAHUN ANGGARAN : 2019
KONTRAK
JUMLAH BOBOT
NO
URAIAN
HARGA (Rp) (%)
1 2 3 4

I PEKERJAAN PERSIAPAN 43,316,981.92 7.94

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


A. PEKERJAAN BETON 170,915,254.22 31.33

B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR 215,255,604.88 39.45

C. PEKERJAAN PENGECETAN 37,568,503.25 6.89

III PEKERJAAN GERBANG MASUK 78,534,564.82 14.39

JUMLAH 545,590,909.09 100.00

Disetujui Oleh : Diperiksa Oleh :


Pejabat Pembuat Komitmen (PPK) Direksi Lapangan
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(LINDA A. HIDAYATI) (MULYANI)


NIP. 19770819 200812 2 003
N KEMAJUAN FISIK BULAN - 01
REKAPITULASI TOTAL

REALISASI S/D BULAN LALU REALISASI BULAN INI REALISASI S/D BULAN INI
BOBOT TERHADAP BOBOT TERHADAP BOBOT TERHADAP
SELURUH PEK. SELURUH PEK. SELURUH PEK.
5 6 7

- 7.04 7.04

- 16.59 16.59

- 31.37 31.37

- - -

- - -

- 55.01 55.01

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
N CAGAR BUDAYA MALUKU UTARA CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (RUGAYA S. HAMID)


Pengawas Lapangan Direktris
JADWAL WAKTU PELAKSANAAN PEKERJAAN
(TIME SCHEDULE)
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
PERIODE 30 OKTOBER 2019 S/D 05 NOVEMBER 2019
TAHUN ANGGARAN : 2019
JUMLAH HARGA BULAN I
No. URAIAN PEKERJAAN BOBOT
( Rp ) M M M M M
1 2 3 4 5
I. PEKERJAAN PERSIAPAN
1 Mobilisasi /Demobilisasi Tenaga Kerja 2,000,000.00 0.37 0.10 0.10
2 Pembuatan Kantor Sementara Lantai Plesteran 5,997,967.17 1.10 0.30 0.60 0.20
3 Pembuatan Gudang Semen dan Peralatan 4,000,000.00 0.73 0.25 0.48
4 Pembuatan Bedeng Pekerja 4,500,000.00 0.82 0.10 0.72
5 Papan Nama Proyek Uk. 120 x 120 cm 300,000.00 0.05 0.05
6 Pembongkaran Dinding Pagar Eksisting 11,572,842.92 2.12 1.06 1.06
7 Pembongkaran Kolom dan Ring Balk Pagar Eksisting 1,146,171.82 0.21 0.21
8 Genset Kap. 2.2 kvA dan Air Kerja 8,300,000.00 1.52 0.15 0.15 0.15 0.15 0.15
9 Dokumentasi, Laporan & Asbuilt Drawing 4,000,000.00 0.73 0.07 0.07 0.07 0.07 0.07
10 Pembersihan Akhir Lokasi Pekerjaan 1,500,000.00 0.27
II. PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTIONG GILOLO)
A. PEKERJAAN BETON
1 Sloof Type II, Uk. 20 x 100 (Beton Mutu K-300) 10,247,583.56 1.88
a. Pek. Bekisting 14,924,352.60 2.74 0.80 0.80
b. Pek. Besi Beton 11,013,055.88 2.02 0.67 0.67 0.67
2 Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300) 15,580,122.42 2.86
a. Pek. Bekisting 28,356,269.94 5.20 1.73
b. Pek. Besi Beton 18,825,239.78 3.45 REALISASI 1.15 1.15
3 Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) 4,851,275.88 0.89
a. Pek. Bekisting 14,458,230.72 2.65 0.88
b. Pek. Besi Beton 6,640,941.36 1.22 0.41 0.41
4 Kolom Baru Type III, Uk. 30 x 30 x 290 (Beton Mutu K-250) 8,587,315.92 1.57
a. Pek. Bekisting 25,576,111.58 4.69 1.56
b. Pek. Besi Beton 11,854,754.58 2.17 0.72 0.72
B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
1 Plesteran Permukaan Sloof Type II, Uk. 20 x 100 Camp. 1PC : 3PP 5,908,288.55 1.08
2 Plesteran Permukaan Sloof Type III, Uk. 20 x 80 Camp. 1PC : 3PP 9,087,510.49 1.67
3 Plesteran Badan Kolom Baru Type II, Camp. 1PC : 3PP 1,850,638.53 0.34
4 Plesteran Badan Kolom Baru Type III, Camp. 1PC : 3PP 3,515,796.40 0.64
5 Plesteran Profil Kepala dan Kaki Kolom Type II, Camp. 1PC : 2PP 1,344,674.52 0.25
6 Plesteran Profil Kepala dan Kaki Kolom Type III, Camp. 1PC : 2PP 3,163,186.73 0.58
7 Acian Sloof, Kolom dan Profil 10,213,997.79 1.87
8 Perakitan dan Pemasangan Pagar Besi Beton Polos ᴓ16 180,171,511.87 33.02 0.50 1.00 3.00 4.46 8.00
C. PEKERJAAN PENGECATAN
1 Pengecatan Permukaan Sloof Type II 3,761,859.02 0.69
2 Pengecatan Permukaan Sloof Type III 5,786,097.45 1.06
RENCANA
3 Pengecatan Kolom Baru type II dan Profil 2,014,286.42 0.37
4 Pengecatan Kolom Baru type III dan Profil 4,205,055.11 0.77
5 Pengecatan Permukaan Pagar dengan Cat Besi 21,801,205.24 4.00
IV. PEKERJAAN GERBANG MASUK
1 Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) 3,345,707.50 0.61
a. Pek. Bekisting 5,982,716.16 1.10 1.10
b. Pek. Besi Beton 2,753,743.51 0.50 0.50
2 Plesteran Badan Kolom Camp. 1PC : 3PP 1,500,517.73 0.28
3 Plesteran Profil Kepala dan Kaki Kolom, Camp. 1PC : 2PP 392,730.34 0.07
4 Acian Sloof, Kolom dan Profil 1,020,553.08 0.19
5 Pas. Pintu Besi Gerbang 59,596,495.16 10.92 1.00 1.00
6 Pengecatan Kolom dan Profil 1,199,548.70 0.22
7 Pengecatan Permukaan Pagar dengan Cat Besi 2,742,552.64 0.50
JUMLAH 545,590,909 100.00
RENCANA 1.18 3.09 6.34 11.52 17.16
AKUMULASI - 1.18 4.27 10.61 22.13 39.29
REALISASI RENCANA BOBOT/MINNGU (%) 9.89 20.47 13.91 10.73
AKUMULASI - 9.89 30.36 44.28 55.01
DEVIASI 0 8.71 26.10 33.67 32.88

Disetujui Oleh : Diperiksa Oleh : Diperiksa Oleh :


Pejabat Pembuat Komitmen (PPK) Direksi Lapangan Konsultan Pengawas
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA CV. LINTAS RAYA DESAI

(LINDA A. HIDAYATI) (MULYANI) (ANWAR ADE, ST.)


NIP. 19770819 200812 2 003 Pengawas Lapangan
LAKSANAAN PEKERJAAN
SCHEDULE)

BULAN II BULAN III


M M M M M KET
6 7 8 9 10

0.17 100

0.15 0.15 0.15 0.15 0.15


0.07 0.07 0.07 0.07 0.07
0.14 0.14

0.47 0.47 0.47 0.47


1.14

0.71 0.71 0.71 0.71


1.73 1.73
REALISASI 1.15
0.22 0.22 0.22 0.22
0.88 0.88
0.41
0.39 0.39 0.39 0.39
1.56 1.56
0.72
50

0.36 0.36 0.36


0.56 0.56 0.56
0.11 0.11 0.11
0.21 0.21 0.21
0.08 0.08 0.08
0.19 0.19 0.19
0.62 0.62 0.62
8.00 8.06

0.69
RENCANA 1.06
0.37
0.77
1.50 0.75 0.75 1.00

0.61

0.28
0.07
0.19
2.90 3.00 3.02
0.22
0.50 0

20.52 21.52 10.83 5.59 2.25


59.81 81.33 92.16 97.75 100.00

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (RUGAYA S. HAMID)


Pengawas Lapangan Direktris
LAPORAN KEMAJUAN FISIK MINGGU - 05
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
PERIODE : 30 OKTOBER 2019 S/D 05 NOVEMBER 2019
TAHUN ANGGARAN : 2019

KONTRAK REALISASI S/D MINGGU LALU


SATUAN JUMLAH BOBOT Bobot / Bobot Trhdp
NO
URAIAN SAT. VOLUME Volume
HARGA (Rp) HARGA (Rp) (%) Item Pek. (%) Seluruh Pek. (%)
1 2 3 4 5 6 7 8 9 10
I PEKERJAAN PERSIAPAN
Mobilisasi /Demobilisasi Tenaga Kerja Ls 1.00 2,000,000.00 2,000,000.00 0.37 0.50 50.00 0.18
Pembuatan Kantor Sementara Lantai Plesteran Ls 1.00 5,997,967.17 5,997,967.17 1.10 1.00 100.00 1.10
Pembuatan Gudang Semen dan Peralatan Ls 1.00 4,000,000.00 4,000,000.00 0.73 1.00 100.00 0.73
Pembuatan Bedeng Pekerja Ls 1.00 4,500,000.00 4,500,000.00 0.82 1.00 100.00 0.82
Papan Nama Proyek Uk. 120 x 120 cm Ls 1.00 300,000.00 300,000.00 0.05 1.00 100.00 0.05
Pembongkaran Dinding Pagar Eksisting M2 72.90 158,749.56 11,572,842.92 2.12 72.90 100.00 2.12
Pembongkaran Kolom dan Ring Balk Pagar Eksisting M3 3.61 317,499.12 1,146,171.82 0.21 3.61 100.00 0.21
Genset Kap. 2.2 kvA dan Air Kerja Ls 1.00 8,300,000.00 8,300,000.00 1.52 1.00 100.00 1.52
Dokumentasi, Laporan & Asbuilt Drawing Ls 1.00 4,000,000.00 4,000,000.00 0.73 0.40 40.00 0.29
Pembersihan Akhir Lokasi Pekerjaan Ls 1.00 1,500,000.00 1,500,000.00 0.27 - - -
II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)
A. PEKERJAAN BETON
1. Sloof Type II, Uk. 20 x 100 (Beton Mutu K-300) M3 5.40 1,897,700.66 10,247,583.56 1.88 3.25 60.19 1.13
a. Pek. Bekisting M2 54.00 276,376.90 14,924,352.60 2.74 54.00 100.00 2.74
b. Pek. Besi Beton Kg 574.14 19,181.83 11,013,055.88 2.02 574.14 100.00 2.02
2. Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300) M3 8.21 1,897,700.66 15,580,122.42 2.86 5.93 72.23 2.06
a. Pek. Bekisting M2 102.60 276,376.90 28,356,269.94 5.20 102.60 100.00 5.20
b. Pek. Besi Beton Kg 981.41 19,181.83 18,825,239.78 3.45 981.41 100.00 3.45
3. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 2.61 1,858,726.39 4,851,275.88 0.89 - - -
a. Pek. Bekisting M2 34.80 415,466.40 14,458,230.72 2.65 - - -
b. Pek. Besi Beton Kg 346.21 19,181.83 6,640,941.36 1.22 - - -
4. Kolom Baru Type III, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 4.62 1,858,726.39 8,587,315.92 1.57 - - -
a. Pek. Bekisting M2 61.56 415,466.40 25,576,111.58 4.69 - - -
b. Pek. Besi Beton Kg 618.02 19,181.83 11,854,754.58 2.17 - - -
B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
1. Plesteran Permukaan Sloof Type II, Uk. 20 x 100 Camp. 1PC 3PP M2 56.70 104,202.62 5,908,288.55 1.08 - - -
2. Plesteran Permukaan Sloof Type III, Uk. 20 x 80 Camp. 1PC 3PP M2 87.21 104,202.62 9,087,510.49 1.67 - - -
3. Plesteran Badan Kolom Baru Type II, Camp. 1PC 3PP M2 17.76 104,202.62 1,850,638.53 0.34 - - -
4. Plesteran Badan Kolom Baru Type III, Camp. 1PC 3PP M2 33.74 104,202.62 3,515,796.40 0.64 - - -
5. Plesteran Profil Kepala dan Kaki Kolom Type II, Camp. 1PC 2PP M2 12.60 106,720.20 1,344,674.52 0.25 - - -
6. Plesteran Profil Kepala dan Kaki Kolom Type III, Camp. 1PC 2PP M2 29.64 106,720.20 3,163,186.73 0.58 - - -
7. Acian Sloof, Kolom dan Profil M2 180.95 56,446.52 10,213,997.79 1.87 - - -
8. Perakitan dan Pemasangan Pagar Besi Beton Polos 16 M2 156.60 1,150,520.51 180,171,511.87 33.02 148.77 95.00 31.37
C. PEKERJAAN PENGECETAN
1. Pengecatan Permukaan Sloof Type II M2 56.70 66,346.72 3,761,859.02 0.69 - - -
2. Pengecatan Permukaan Sloof Type III M2 87.21 66,346.72 5,786,097.45 1.06 - - -
3. Pengecatan Kolom Baru type II dan Profil M2 30.36 66,346.72 2,014,286.42 0.37 - - -
4. Pengecatan Kolom Baru type III dan Profil M2 63.38 66,346.72 4,205,055.11 0.77 - - -
5. Pengecatan Permukaan Pagar dengan Cat Besi M2 234.90 92,810.58 21,801,205.24 4.00 - - -
KONTRAK REALISASI S/D MINGGU LALU
SATUAN JUMLAH BOBOT Bobot / Bobot Trhdp
NO
URAIAN SAT. VOLUME Volume
HARGA (Rp) HARGA (Rp) (%) Item Pek. (%) Seluruh Pek. (%)
1 2 3 4 5 6 7 8 9 10
III PEKERJAAN GERBANG MASUK
1. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 1.80 1,858,726.39 3,345,707.50 0.61 - - -
a. Pek. Bekisting M2 14.40 415,466.40 5,982,716.16 1.10 - - -
b. Pek. Besi Beton Kg 143.56 19,181.83 2,753,743.51 0.50 - - -
2. Plesteran Badan Kolom Camp. 1PC 3PP M2 14.40 104,202.62 1,500,517.73 0.28 - - -
3. Plesteran Profil Kepala dan Kaki Kolom, Camp. 1PC 2PP M2 3.68 106,720.20 392,730.34 0.07 - - -
4. Acian Sloof, Kolom dan Profil M2 18.08 56,446.52 1,020,553.08 0.19 - - -
5. Pas. Pintu Besi Gerbang M2 19.70 3,025,202.80 59,596,495.16 10.92 - - -
6. Pengecatan Kolom dan Profil M2 18.08 66,346.72 1,199,548.70 0.22 - - -
7. Pengecatan Permukaan Pagar dengan Cat Besi M2 29.55 92,810.58 2,742,552.64 0.50 - - -
A Jumlah Total Pekerjaan 545,590,909.09 100.00 55.01
B PPN (10 % x A) 54,559,090.91
C Total (A + B) 600,150,000.00
D Dibulatkan 600,150,000.00

Disetujui Oleh : Diperiksa Oleh : Diperiksa


Pejabat Pembuat Komitmen (PPK) Direksi Lapangan Konsultan P
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA CV. LINTAS RA

(LINDA A. HIDAYATI) (MULYANI) (ANWAR A


NIP. 19770819 200812 2 003 Pengawas
JUAN FISIK MINGGU - 05

WAKTU PELAKSANAAN : 70 HARI KALENDER


WAKTU TERPAKAI : 35 HARI KALENDER
SISA WAKTU : 35 HARI KALENDER

Realisasi Pekerjaan
REALISASI MINGGU INI REALISASI S/D MINGGU INI
Bobot / Bobot Trhdp Bobot / Bobot Trhdp
Volume Volume
Item Pek. (%) Seluruh Pek. (%) Item Pek. (%) Seluruh Pek. (%)
11 12 13 14 15 16

- - - 0.50 50.00 0.18


- - - 1.00 100.00 1.10
- - - 1.00 100.00 0.73
- - - 1.00 100.00 0.82
- - - 1.00 100.00 0.05
- - - 72.90 100.00 2.12
- - - 3.61 100.00 0.21
- - - 1.00 100.00 1.52
0.10 10.00 0.07 0.50 50.00 0.37
- - - - - -

2.15 39.81 0.75 5.40 100.00 1.88


- - - 54.00 100.00 2.74
- - - 574.14 100.00 2.02
2.28 27.77 0.79 8.21 100.00 2.86
- - - 102.60 100.00 5.20
- - - 981.41 100.00 3.45
- - - - - -
15.30 43.97 1.17 15.30 43.97 1.17
346.21 100.00 1.22 346.21 100.00 1.22
- - - - - -
- - - - - -
325.00 52.59 1.14 325.00 52.59 1.14

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - 148.77 95.00 31.37

- - - - - -
- - - - - -
- - - - - -
- - - - - -
117.45 50.00 2.00 117.45 50.00 2.00
Realisasi Pekerjaan
REALISASI MINGGU INI REALISASI S/D MINGGU INI
Bobot / Bobot Trhdp Bobot / Bobot Trhdp
Volume Volume
Item Pek. (%) Seluruh Pek. (%) Item Pek. (%) Seluruh Pek. (%)
11 12 13 14 15 16

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
7.14 62.15

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (RUGAYA S. HAMID)


Pengawas Lapangan Direktris
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 30 OKTOBER 2019 S/D 05 NOVEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.017 Ls - 0.017

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


1. Sloof Type II, Uk. 20 x 100 (Beton Mutu K-300) 0.72 M3 Semen portland 413.00 295.98
Pasir Beton 681.00 488.05
Kerikil (Maks 30 mm) 1,021.00 731.72
Air 215.00 154.08

2. Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300) 0.76 M3 Semen portland 413.00 313.88
Pasir Beton 681.00 517.56
Kerikil (Maks 30 mm) 1,021.00 775.96
Air 215.00 163.40
C. PEKERJAAN PENGECETAN
5. Pengecatan Permukaan Pagar dengan Cat Besi 39.15 M2 Cat Besi 0.10 3.92
Pengencer 0.01 0.39
Kuas 0.01 0.39
Perancah kayu 0.00 0.08

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-05

Hari Ke : 29
Tanggal : 30 Oktober 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
kg Tukang 3.00 Org
kg Pekerja 9.00 Org
kg Sopir 1.00 Org
Ltr Ass. Sopir 1.00 Org

kg
kg
kg
Ltr

Ltr
Ltr
Bh
M3

18.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 30 OKTOBER 2019 S/D 05 NOVEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.017 Ls - 0.017

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


1. Sloof Type II, Uk. 20 x 100 (Beton Mutu K-300) 0.72 M3 Semen portland 413.00 295.98
Pasir Beton 681.00 488.05
Kerikil (Maks 30 mm) 1,021.00 731.72
Air 215.00 154.08

2. Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300) 0.76 M3 Semen portland 413.00 313.88
Pasir Beton 681.00 517.56
Kerikil (Maks 30 mm) 1,021.00 775.96
Air 215.00 163.40
C. PEKERJAAN PENGECETAN
5. Pengecatan Permukaan Pagar dengan Cat Besi 39.15 M2 Cat Besi 0.10 3.92
Pengencer 0.01 0.39
Kuas 0.01 0.39
Perancah kayu 0.00 0.08

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-05

Hari Ke : 30
Tanggal : 31 Oktober 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
kg Tukang 3.00 Org
kg Pekerja 9.00 Org
kg Sopir 1.00 Org
Ltr Ass. Sopir 1.00 Org

kg
kg
kg
Ltr

Ltr
Ltr
Bh
M3

18.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 30 OKTOBER 2019 S/D 05 NOVEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.017 Ls - 0.017

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


1. Sloof Type II, Uk. 20 x 100 (Beton Mutu K-300) 0.72 M3 Semen portland 413.00 295.98
Pasir Beton 681.00 488.05
Kerikil (Maks 30 mm) 1,021.00 731.72
Air 215.00 154.08

2. Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300) 0.76 M3 Semen portland 413.00 313.88
Pasir Beton 681.00 517.56
Kerikil (Maks 30 mm) 1,021.00 775.96
Air 215.00 163.40
C. PEKERJAAN PENGECETAN
5. Pengecatan Permukaan Pagar dengan Cat Besi 39.15 M2 Cat Besi 0.10 3.92
Pengencer 0.01 0.39
Kuas 0.01 0.39
Perancah kayu 0.00 0.08

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-05

Hari Ke : 31
Tanggal : 01 November 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
kg Tukang 3.00 Org
kg Pekerja 9.00 Org
kg Sopir 1.00 Org
Ltr Ass. Sopir 1.00 Org

kg
kg
kg
Ltr

Ltr
Ltr
Bh
M3

18.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 30 OKTOBER 2019 S/D 05 NOVEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.017 Ls - 0.017

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


3. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250)
a. Pek. Bekisting 5.10 M3 Semen portland 384.00 1,958.40
Pasir Beton 692.00 3,529.20
Kerikil (Maks 30 mm) 1,039.00 5,298.90
Air 215.00 1,096.50

b. Pek. Besi Beton 115.40 kg Besi beton (polos/ulir) 1.05 121.17


Kawat beton 0.15 17.31
4. Kolom Baru Type III, Uk. 30 x 30 x 290 (Beton Mutu K-250)
b. Pek. Besi Beton 108.33 kg Besi beton (polos/ulir) 1.05 113.75
Kawat beton 0.15 16.25

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-05

Hari Ke : 32
Tanggal : 02 November 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
Tukang 3.00 Org
kg Pekerja 9.00 Org
kg Sopir 1.00 Org
kg Ass. Sopir 1.00 Org
Ltr

kg
kg

kg
kg

18.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 30 OKTOBER 2019 S/D 05 NOVEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.017 Ls - 0.017

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


3. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250)
a. Pek. Bekisting 5.10 M3 Semen portland 384.00 1,958.40
Pasir Beton 692.00 3,529.20
Kerikil (Maks 30 mm) 1,039.00 5,298.90
Air 215.00 1,096.50

b. Pek. Besi Beton 115.40 kg Besi beton (polos/ulir) 1.05 121.17


Kawat beton 0.15 17.31
4. Kolom Baru Type III, Uk. 30 x 30 x 290 (Beton Mutu K-250)
b. Pek. Besi Beton 108.33 kg Besi beton (polos/ulir) 1.05 113.75
Kawat beton 0.15 16.25

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-05

Hari Ke : 33
Tanggal : 03 November 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 1.00 Org
Tukang 2.00 Org
kg Pekerja 7.00 Org
kg Sopir 1.00 Org
kg Ass. Sopir 1.00 Org
Ltr

kg
kg

kg
kg

14.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 30 OKTOBER 2019 S/D 05 NOVEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.017 Ls - 0.017

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


3. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250)
a. Pek. Bekisting 5.10 M3 Semen portland 384.00 1,958.40
Pasir Beton 692.00 3,529.20
Kerikil (Maks 30 mm) 1,039.00 5,298.90
Air 215.00 1,096.50

b. Pek. Besi Beton 115.40 kg Besi beton (polos/ulir) 1.05 121.17


Kawat beton 0.15 17.31
4. Kolom Baru Type III, Uk. 30 x 30 x 290 (Beton Mutu K-250)
b. Pek. Besi Beton 108.33 kg Besi beton (polos/ulir) 1.05 113.75
Kawat beton 0.15 16.25

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-05

Hari Ke : 34
Tanggal : 04 November 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 1.00 Org
Tukang 2.00 Org
kg Pekerja 7.00 Org
kg Sopir 1.00 Org
kg Ass. Sopir 1.00 Org
Ltr

kg
kg

kg
kg

14.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 30 OKTOBER 2019 S/D 05 NOVEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.017 Ls - 0.017

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


3. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250)
a. Pek. Bekisting 5.10 M3 Semen portland 384.00 1,958.40
Pasir Beton 692.00 3,529.20
Kerikil (Maks 30 mm) 1,039.00 5,298.90
Air 215.00 1,096.50

b. Pek. Besi Beton 115.40 kg Besi beton (polos/ulir) 1.05 121.17


Kawat beton 0.15 17.31
4. Kolom Baru Type III, Uk. 30 x 30 x 290 (Beton Mutu K-250)
b. Pek. Besi Beton 108.33 kg Besi beton (polos/ulir) 1.05 113.75
Kawat beton 0.15 16.25

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-05

Hari Ke : 35
Tanggal : 05 November 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 1.00 Org
Tukang 2.00 Org
kg Pekerja 7.00 Org
kg Sopir 1.00 Org
kg Ass. Sopir 1.00 Org
Ltr

kg
kg

kg
kg

14.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN FISIK MINGGU - 04
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
PERIODE : S/D 05 NOVEMBER 2019
TAHUN ANGGARAN : 2019

Realisasi
KONTRAK REALISASI S/D MINGGU LALU REALISAS
SATUAN JUMLAH BOBOT Bobot / Bobot Trhdp
NO
URAIAN SAT. VOLUME Volume Volume
HARGA (Rp) HARGA (Rp) (%) Item Pek. (%) Seluruh Pek. (%)
1 2 3 4 5 6 7 8 9 10 11
I PEKERJAAN PERSIAPAN
Mobilisasi /Demobilisasi Tenaga Kerja Ls 1.00 2,000,000.00 2,000,000.00 0.37 0.50 50.00 0.18 -
Pembuatan Kantor Sementara Lantai Plesteran Ls 1.00 5,997,967.17 5,997,967.17 1.10 1.00 100.00 1.10 -
Pembuatan Gudang Semen dan Peralatan Ls 1.00 4,000,000.00 4,000,000.00 0.73 1.00 100.00 0.73 -
Pembuatan Bedeng Pekerja Ls 1.00 4,500,000.00 4,500,000.00 0.82 1.00 100.00 0.82 -
Papan Nama Proyek Uk. 120 x 120 cm Ls 1.00 300,000.00 300,000.00 0.05 1.00 100.00 0.05 -
Pembongkaran Dinding Pagar Eksisting M2 72.90 158,749.56 11,572,842.92 2.12 72.90 100.00 2.12 -
Pembongkaran Kolom dan Ring Balk Pagar Eksisting M3 3.61 317,499.12 1,146,171.82 0.21 3.61 100.00 0.21 -
Genset Kap. 2.2 kvA dan Air Kerja Ls 1.00 8,300,000.00 8,300,000.00 1.52 1.00 100.00 1.52 -
Dokumentasi, Laporan & Asbuilt Drawing Ls 1.00 4,000,000.00 4,000,000.00 0.73 0.40 40.00 0.29 0.10
Pembersihan Akhir Lokasi Pekerjaan Ls 1.00 1,500,000.00 1,500,000.00 0.27 - - - -
II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)
A. PEKERJAAN BETON
1. Sloof Type II, Uk. 20 x 100 (Beton Mutu K-300) M3 5.40 1,897,700.66 10,247,583.56 1.88 3.25 60.19 1.13 2.15
a. Pek. Bekisting M2 54.00 276,376.90 14,924,352.60 2.74 54.00 100.00 2.74 -
b. Pek. Besi Beton Kg 574.14 19,181.83 11,013,055.88 2.02 574.14 100.00 2.02 -
2. Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300) M3 8.21 1,897,700.66 15,580,122.42 2.86 5.93 72.23 2.06 2.28
a. Pek. Bekisting M2 102.60 276,376.90 28,356,269.94 5.20 102.60 100.00 5.20 -
b. Pek. Besi Beton Kg 981.41 19,181.83 18,825,239.78 3.45 981.41 100.00 3.45 -
3. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 2.61 1,858,726.39 4,851,275.88 0.89 - - - -
a. Pek. Bekisting M2 34.80 415,466.40 14,458,230.72 2.65 - - - 15.30
b. Pek. Besi Beton Kg 346.21 19,181.83 6,640,941.36 1.22 - - - 346.21
4. Kolom Baru Type III, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 4.62 1,858,726.39 8,587,315.92 1.57 - - - -
a. Pek. Bekisting M2 61.56 415,466.40 25,576,111.58 4.69 - - - -
b. Pek. Besi Beton Kg 618.02 19,181.83 11,854,754.58 2.17 - - - 325.00
B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
1. Plesteran Permukaan Sloof Type II, Uk. 20 x 100 Camp. 1PC 3PP M2 56.70 104,202.62 5,908,288.55 1.08 - - - -
2. Plesteran Permukaan Sloof Type III, Uk. 20 x 80 Camp. 1PC 3PP M2 87.21 104,202.62 9,087,510.49 1.67 - - - -
3. Plesteran Badan Kolom Baru Type II, Camp. 1PC 3PP M2 17.76 104,202.62 1,850,638.53 0.34 - - - -
4. Plesteran Badan Kolom Baru Type III, Camp. 1PC 3PP M2 33.74 104,202.62 3,515,796.40 0.64 - - - -
5. Plesteran Profil Kepala dan Kaki Kolom Type II, Camp. 1PC 2PP M2 12.60 106,720.20 1,344,674.52 0.25 - - - -
6. Plesteran Profil Kepala dan Kaki Kolom Type III, Camp. 1PC 2PP M2 29.64 106,720.20 3,163,186.73 0.58 - - - -
7. Acian Sloof, Kolom dan Profil M2 180.95 56,446.52 10,213,997.79 1.87 - - - -
8. Perakitan dan Pemasangan Pagar Besi Beton Polos 16 M2 156.60 1,150,520.51 180,171,511.87 33.02 148.77 95.00 31.37 -
C. PEKERJAAN PENGECETAN
1. Pengecatan Permukaan Sloof Type II M2 56.70 66,346.72 3,761,859.02 0.69 - - - -
2. Pengecatan Permukaan Sloof Type III M2 87.21 66,346.72 5,786,097.45 1.06 - - - -
3. Pengecatan Kolom Baru type II dan Profil M2 30.36 66,346.72 2,014,286.42 0.37 - - - -
4. Pengecatan Kolom Baru type III dan Profil M2 63.38 66,346.72 4,205,055.11 0.77 - - - -
5. Pengecatan Permukaan Pagar dengan Cat Besi M2 234.90 92,810.58 21,801,205.24 4.00 - - - 117.45
Realisasi
KONTRAK REALISASI S/D MINGGU LALU REALISAS
SATUAN JUMLAH BOBOT Bobot / Bobot Trhdp
NO
URAIAN SAT. VOLUME Volume Volume
HARGA (Rp) HARGA (Rp) (%) Item Pek. (%) Seluruh Pek. (%)
1 2 3 4 5 6 7 8 9 10 11
III PEKERJAAN GERBANG MASUK
1. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 1.80 1,858,726.39 3,345,707.50 0.61 - - - -
a. Pek. Bekisting M2 14.40 415,466.40 5,982,716.16 1.10 - - - -
b. Pek. Besi Beton Kg 143.56 19,181.83 2,753,743.51 0.50 - - - -
2. Plesteran Badan Kolom Camp. 1PC 3PP M2 14.40 104,202.62 1,500,517.73 0.28 - - - -
3. Plesteran Profil Kepala dan Kaki Kolom, Camp. 1PC 2PP M2 3.68 106,720.20 392,730.34 0.07 - - - -
4. Acian Sloof, Kolom dan Profil M2 18.08 56,446.52 1,020,553.08 0.19 - - - -
5. Pas. Pintu Besi Gerbang M2 19.70 3,025,202.80 59,596,495.16 10.92 - - - -
6. Pengecatan Kolom dan Profil M2 18.08 66,346.72 1,199,548.70 0.22 - - - -
7. Pengecatan Permukaan Pagar dengan Cat Besi M2 29.55 92,810.58 2,742,552.64 0.50 - - - -
A Jumlah Total Pekerjaan 545,590,909.09 100.00 55.01
B PPN (10 % x A) 54,559,090.91
C Total (A + B) 600,150,000.00
D Dibulatkan 600,150,000.00

Disetujui Oleh : Diperiksa Oleh : Diperiksa Oleh :


Pejabat Pembuat Komitmen (PPK) Direksi Lapangan Konsultan Pengawas
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA CV. LINTAS RAYA DESAIN

(LINDA A. HIDAYATI) (MULYANI) (ANWAR ADE, ST.)


NIP. 19770819 200812 2 003 Pengawas Lapangan
AJUAN FISIK MINGGU - 04

WAKTU PELAKSANAAN : 70 HARI KALENDER


WAKTU TERPAKAI : 35 HARI KALENDER
SISA WAKTU : 35 HARI KALENDER

Realisasi Pekerjaan
REALISASI MINGGU INI REALISASI S/D MINGGU INI
Bobot / Bobot Trhdp Bobot / Bobot Trhdp
Volume
Item Pek. (%) Seluruh Pek. (%) Item Pek. (%) Seluruh Pek. (%)
12 13 14 15 16

- - 0.50 50.00 0.18


- - 1.00 100.00 1.10
- - 1.00 100.00 0.73
- - 1.00 100.00 0.82
- - 1.00 100.00 0.05
- - 72.90 100.00 2.12
- - 3.61 100.00 0.21
- - 1.00 100.00 1.52
10.00 0.07 0.50 50.00 0.37
- - - - -

39.81 0.75 5.40 100.00 1.88


- - 54.00 100.00 2.74
- - 574.14 100.00 2.02
27.77 0.79 8.21 100.00 2.86
- - 102.60 100.00 5.20
- - 981.41 100.00 3.45
- - - - -
43.97 1.17 15.30 43.97 1.17
100.00 1.22 346.21 100.00 1.22
- - - - -
- - - - -
52.59 1.14 325.00 52.59 1.14

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - 148.77 95.00 31.37

- - - - -
- - - - -
- - - - -
- - - - -
50.00 2.00 117.45 50.00 2.00
Realisasi Pekerjaan
REALISASI MINGGU INI REALISASI S/D MINGGU INI
Bobot / Bobot Trhdp Bobot / Bobot Trhdp
Volume
Item Pek. (%) Seluruh Pek. (%) Item Pek. (%) Seluruh Pek. (%)
12 13 14 15 16

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
7.14 62.15

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (RUGAYA S. HAMID)


Pengawas Lapangan Direktris
LAPORAN KEMAJUAN FISIK BULAN - 02
REKAPITULASI TOTAL

PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE


LOKASI : KOTA TERNATE
PERIODE : S/D 05 NOVEMBER 2019
TAHUN ANGGARAN : 2019
KONTRAK REALISASI S/D BULAN LALU
JUMLAH BOBOT BOBOT TERHADAP
NO
URAIAN
HARGA (Rp) (%) SELURUH PEK.
1 2 3 4 5

I PEKERJAAN PERSIAPAN 43,316,981.92 7.94 7.04

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


A. PEKERJAAN BETON 170,915,254.22 31.33 16.59

B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR 215,255,604.88 39.45 31.37

C. PEKERJAAN PENGECETAN 37,568,503.25 6.89 0.00

III PEKERJAAN GERBANG MASUK 78,534,564.82 14.39 0.00

JUMLAH 545,590,909.09 100.00 55.01

Disetujui Oleh : Diperiksa Oleh : Diperiksa Oleh :


Pejabat Pembuat Komitmen (PPK) Direksi Lapangan Konsultan Pengaw
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA CV. LINTAS RAYA DE

(LINDA A. HIDAYATI) (MULYANI) (ANWAR ADE, ST


NIP. 19770819 200812 2 003 Pengawas Lapang
AJUAN FISIK BULAN - 02
ITULASI TOTAL

REALISASI BULAN INI REALISASI S/D BULAN INI


BOBOT TERHADAP BOBOT TERHADAP
SELURUH PEK. SELURUH PEK.
6 7

0.07 7.11

5.07 21.66

0.00 31.37

2 1.998.

0.00 -

7.14 62.15

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (RUGAYA S. HAMID)


Pengawas Lapangan Direktris
JADWAL WAKTU PELAKSANAAN PEKERJAAN
(TIME SCHEDULE)
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
PERIODE S/D 05 NOVEMBER 2019
TAHUN ANGGARAN : 2019
JUMLAH HARGA BULAN I
No. URAIAN PEKERJAAN BOBOT
( Rp ) M M M M M
1 2 3 4 5
I. PEKERJAAN PERSIAPAN
1 Mobilisasi /Demobilisasi Tenaga Kerja 2,000,000.00 0.37 0.10 0.10
2 Pembuatan Kantor Sementara Lantai Plesteran 5,997,967.17 1.10 0.30 0.60 0.20
3 Pembuatan Gudang Semen dan Peralatan 4,000,000.00 0.73 0.25 0.48
4 Pembuatan Bedeng Pekerja 4,500,000.00 0.82 0.10 0.72
5 Papan Nama Proyek Uk. 120 x 120 cm 300,000.00 0.05 0.05
6 Pembongkaran Dinding Pagar Eksisting 11,572,842.92 2.12 1.06 1.06
7 Pembongkaran Kolom dan Ring Balk Pagar Eksisting 1,146,171.82 0.21 0.21
8 Genset Kap. 2.2 kvA dan Air Kerja 8,300,000.00 1.52 0.15 0.15 0.15 0.15 0.15
9 Dokumentasi, Laporan & Asbuilt Drawing 4,000,000.00 0.73 0.07 0.07 0.07 0.07 0.07
10 Pembersihan Akhir Lokasi Pekerjaan 1,500,000.00 0.27
II. PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTIONG GILOLO)
A. PEKERJAAN BETON
1 Sloof Type II, Uk. 20 x 100 (Beton Mutu K-300) 10,247,583.56 1.88
a. Pek. Bekisting 14,924,352.60 2.74 0.80 0.80
b. Pek. Besi Beton 11,013,055.88 2.02 0.67 0.67 0.67
2 Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300) 15,580,122.42 2.86
a. Pek. Bekisting 28,356,269.94 5.20 1.73
b. Pek. Besi Beton 18,825,239.78 3.45 REALISASI 1.15 1.15
3 Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) 4,851,275.88 0.89
a. Pek. Bekisting 14,458,230.72 2.65 0.88
b. Pek. Besi Beton 6,640,941.36 1.22 0.41 0.41
4 Kolom Baru Type III, Uk. 30 x 30 x 290 (Beton Mutu K-250) 8,587,315.92 1.57
a. Pek. Bekisting 25,576,111.58 4.69 1.56
b. Pek. Besi Beton 11,854,754.58 2.17 0.72 0.72
B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
1 Plesteran Permukaan Sloof Type II, Uk. 20 x 100 Camp. 1PC : 3PP 5,908,288.55 1.08
2 Plesteran Permukaan Sloof Type III, Uk. 20 x 80 Camp. 1PC : 3PP 9,087,510.49 1.67
3 Plesteran Badan Kolom Baru Type II, Camp. 1PC : 3PP 1,850,638.53 0.34
4 Plesteran Badan Kolom Baru Type III, Camp. 1PC : 3PP 3,515,796.40 0.64
5 Plesteran Profil Kepala dan Kaki Kolom Type II, Camp. 1PC : 2PP 1,344,674.52 0.25
6 Plesteran Profil Kepala dan Kaki Kolom Type III, Camp. 1PC : 2PP 3,163,186.73 0.58
7 Acian Sloof, Kolom dan Profil 10,213,997.79 1.87
8 Perakitan dan Pemasangan Pagar Besi Beton Polos ᴓ16 180,171,511.87 33.02 0.50 1.00 3.00 4.46 8.00
C. PEKERJAAN PENGECATAN
1 Pengecatan Permukaan Sloof Type II 3,761,859.02 0.69
2 Pengecatan Permukaan Sloof Type III 5,786,097.45 1.06
RENCANA
3 Pengecatan Kolom Baru type II dan Profil 2,014,286.42 0.37
4 Pengecatan Kolom Baru type III dan Profil 4,205,055.11 0.77
5 Pengecatan Permukaan Pagar dengan Cat Besi 21,801,205.24 4.00
IV. PEKERJAAN GERBANG MASUK
1 Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) 3,345,707.50 0.61
a. Pek. Bekisting 5,982,716.16 1.10 1.10
b. Pek. Besi Beton 2,753,743.51 0.50 0.50
2 Plesteran Badan Kolom Camp. 1PC : 3PP 1,500,517.73 0.28
3 Plesteran Profil Kepala dan Kaki Kolom, Camp. 1PC : 2PP 392,730.34 0.07
4 Acian Sloof, Kolom dan Profil 1,020,553.08 0.19
5 Pas. Pintu Besi Gerbang 59,596,495.16 10.92 1.00 1.00
6 Pengecatan Kolom dan Profil 1,199,548.70 0.22
7 Pengecatan Permukaan Pagar dengan Cat Besi 2,742,552.64 0.50
JUMLAH 545,590,909 100.00
RENCANA 1.18 3.09 6.34 11.52 17.16
AKUMULASI - 1.18 4.27 10.61 22.13 39.29
REALISASI RENCANA BOBOT/MINNGU (%) 9.89 20.47 13.91 10.73 7.14
AKUMULASI - 9.89 30.36 44.28 55.01 62.15
DEVIASI 0 8.71 26.10 33.67 32.88 22.86

Disetujui Oleh : Diperiksa Oleh : Diperiksa Oleh :


Pejabat Pembuat Komitmen (PPK) Direksi Lapangan Konsultan Pengawas
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA CV. LINTAS RAYA DESAIN

(LINDA A. HIDAYATI) (MULYANI) (ANWAR ADE, ST.)


NIP. 19770819 200812 2 003 Pengawas Lapangan
ELAKSANAAN PEKERJAAN
E SCHEDULE)

BULAN II BULAN III


M M M M M KET
6 7 8 9 10

0.17 100

0.15 0.15 0.15 0.15 0.15


0.07 0.07 0.07 0.07 0.07
0.14 0.14

0.47 0.47 0.47 0.47


1.14

0.71 0.71 0.71 0.71


1.73 1.73
REALISASI 1.15
0.22 0.22 0.22 0.22
0.88 0.88
0.41
0.39 0.39 0.39 0.39
1.56 1.56
0.72
50
0.36 0.36 0.36
0.56 0.56 0.56
0.11 0.11 0.11
0.21 0.21 0.21
0.08 0.08 0.08
0.19 0.19 0.19
0.62 0.62 0.62
8.00 8.06

0.69
RENCANA 1.06
0.37
0.77
1.50 0.75 0.75 1.00

0.61

0.28
0.07
0.19
2.90 3.00 3.02
0.22
0.50 0

20.52 21.52 10.83 5.59 2.25


59.81 81.33 92.16 97.75 100.00

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (RUGAYA S. HAMID)


Pengawas Lapangan Direktris
CONTRACT CHANGE ORDER (CCO)
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
PERIODE : Thursday, November 07, 2019
TAHUN ANGGARAN : 2019

KONTRAK PEKERJAAN TAMBAH KURANG


NO SATUAN JUMLAH PEKERJAAN TAMBAH PEKERJAAN KURA
URAIAN SAT. VOLUME SATUAN HARGA SATUAN HARGA
HARGA (Rp) HARGA (Rp) VOLUME JUMLAH (RP) VOLUME
(RP) (RP)
1 2 3 4 5 6 7 8 9 10 11
I PEKERJAAN PERSIAPAN
Mobilisasi /Demobilisasi Tenaga Kerja Ls 1.00 2,000,000.00 2,000,000.00 - - - - -
Pembuatan Kantor Sementara Lantai Plesteran Ls 1.00 5,997,967.17 5,997,967.17 - - - - -
Pembuatan Gudang Semen dan Peralatan Ls 1.00 4,000,000.00 4,000,000.00 - - - - -
Pembuatan Bedeng Pekerja Ls 1.00 4,500,000.00 4,500,000.00 - - - - -
Papan Nama Proyek Uk. 120 x 120 cm Ls 1.00 300,000.00 300,000.00 - - - - -
Pembongkaran Dinding Pagar Eksisting M2 72.90 158,749.56 11,572,842.92 - - - - -
Pembongkaran Kolom dan Ring Balk Pagar Eksisting M3 3.61 317,499.12 1,146,171.82 - - - - -
Genset Kap. 2.2 kvA dan Air Kerja Ls 1.00 8,300,000.00 8,300,000.00 - - - - -
Dokumentasi, Laporan & Asbuilt Drawing Ls 1.00 4,000,000.00 4,000,000.00 - - - - -
Pembersihan Akhir Lokasi Pekerjaan Ls 1.00 1,500,000.00 1,500,000.00 - - - - -
II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)
A. PEKERJAAN BETON
1. Sloof Type II, Uk. 20 x 100 (Beton Mutu K-300) M3 5.40 1,897,700.66 10,247,583.56 - - - 0.12 1,897,700.66
a. Pek. Bekisting M2 54.00 276,376.90 14,924,352.60 9.56 276,376.90 2,641,610.41 - -
b. Pek. Besi Beton Kg 574.14 19,181.83 11,013,055.88 11.76 19,181.83
2. Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300) M3 8.21 1,897,700.66 15,580,122.42
a. Pek. Bekisting M2 102.60 276,376.90 28,356,269.94 4.64 276,376.90 1,283,494.32
b. Pek. Besi Beton Kg 981.41 19,181.83 18,825,239.78
3. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 2.61 1,858,726.39 4,851,275.88 1.58 1,858,726.39 2,943,664.98
a. Pek. Bekisting M2 34.80 415,466.40 14,458,230.72 0.94 415,466.40
b. Pek. Besi Beton Kg 346.21 19,181.83 6,640,941.36 46.68 19,181.83
4. Kolom Baru Type III, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 4.62 1,858,726.39 8,587,315.92 1.47 1,858,726.39 2,733,982.06
a. Pek. Bekisting M2 61.56 415,466.40 25,576,111.58 1.86 415,466.40 772,767.50
b. Pek. Besi Beton Kg 618.02 19,181.83 11,854,754.58 53.76 19,181.83
B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
1. Plesteran Permukaan Sloof Type II, Uk. 20 x 100 Camp. 1PC 3PP M2 56.70 104,202.62 5,908,288.55
2. Plesteran Permukaan Sloof Type III, Uk. 20 x 80 Camp. 1PC 3PP M2 87.21 104,202.62 9,087,510.49
3. Plesteran Badan Kolom Baru Type II, Camp. 1PC 3PP M2 17.76 104,202.62 1,850,638.53
4. Plesteran Badan Kolom Baru Type III, Camp. 1PC 3PP M2 33.74 104,202.62 3,515,796.40
5. Plesteran Profil Kepala dan Kaki Kolom Type II, Camp. 1PC 2PP M2 12.60 106,720.20 1,344,674.52
6. Plesteran Profil Kepala dan Kaki Kolom Type III, Camp. 1PC 2PP M2 29.64 106,720.20 3,163,186.73
7. Acian Sloof, Kolom dan Profil M2 180.95 56,446.52 10,213,997.79
8. Perakitan dan Pemasangan Pagar Besi Beton Polos 16 M2 156.60 1,150,520.51 180,171,511.87
C. PEKERJAAN PENGECETAN
1. Pengecatan Permukaan Sloof Type II M2 56.70 66,346.72 3,761,859.02
2. Pengecatan Permukaan Sloof Type III M2 87.21 66,346.72 5,786,097.45
3. Pengecatan Kolom Baru type II dan Profil M2 30.36 66,346.72 2,014,286.42
4. Pengecatan Kolom Baru type III dan Profil M2 63.38 66,346.72 4,205,055.11
5. Pengecatan Permukaan Pagar dengan Cat Besi M2 234.90 92,810.58 21,801,205.24
KONTRAK PEKERJAAN TAMBAH KURANG
NO SATUAN JUMLAH PEKERJAAN TAMBAH PEKERJAAN KURA
URAIAN SAT. VOLUME SATUAN HARGA SATUAN HARGA
HARGA (Rp) HARGA (Rp) VOLUME JUMLAH (RP) VOLUME
(RP) (RP)
1 2 3 4 5 6 7 8 9 10 11
III PEKERJAAN GERBANG MASUK
1. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 1.80 1,858,726.39 3,345,707.50 0.30 1,858,726.39
a. Pek. Bekisting M2 14.40 415,466.40 5,982,716.16 2.40 415,466.40
b. Pek. Besi Beton Kg 143.56 19,181.83 2,753,743.51 21.09 19,181.83
2. Plesteran Badan Kolom Camp. 1PC 3PP M2 14.40 104,202.62 1,500,517.73 2.40 104,202.62
3. Plesteran Profil Kepala dan Kaki Kolom, Camp. 1PC 2PP M2 3.68 106,720.20 392,730.34
4. Acian Sloof, Kolom dan Profil M2 18.08 56,446.52 1,020,553.08 2.40 56,446.52
5. Pas. Pintu Besi Gerbang M2 19.70 3,025,202.80 59,596,495.16 1.61 3,025,202.80
6. Pengecatan Kolom dan Profil M2 18.08 66,346.72 1,199,548.70 2.40 66,346.72
7. Pengecatan Permukaan Pagar dengan Cat Besi M2 29.55 92,810.58 2,742,552.64 2.42 92,810.58

A Jumlah Total Pekerjaan 545,590,909.09 10,375,519.28


B PPN (10 % x A) 54,559,090.91
C Total (A + B) 600,150,000.00
D Dibulatkan 600,150,000.00

Disetujui Oleh : Diperiksa Oleh :


Pejabat Pembuat Komitmen (PPK) Direksi Lapangan Kon
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA CV. LIN

(LINDA A. HIDAYATI) (MULYANI)


NIP. 19770819 200812 2 003 Pen
ANGE ORDER (CCO)

PEKERJAAN TAMBAH KURANG CONTRACT CHANGE ORDER (CCO)


PEKERJAAN KURANG
SATUAN HARGA KET.
SAT. VOLUME JUMLAH HARGA (RP) BOBOT (%)
JUMLAH (RP) (RP)

12 13 14 15 16 17

- Ls 1.00 2,000,000.00 2,000,000.00 0.37 Tetap


- Ls 1.00 5,997,967.17 5,997,967.17 1.10 Tetap
- Ls 1.00 4,000,000.00 4,000,000.00 0.73 Tetap
- Ls 1.00 4,500,000.00 4,500,000.00 0.82 Tetap
- Ls 1.00 300,000.00 300,000.00 0.05 Tetap
- M2 72.90 158,749.56 11,572,842.92 2.12 Tetap
- M3 3.61 317,499.12 1,146,171.82 0.21 Tetap
- Ls 1.00 8,300,000.00 8,300,000.00 1.52 Tetap
- Ls 1.00 4,000,000.00 4,000,000.00 0.73 Tetap
- Ls 1.00 1,500,000.00 1,500,000.00 0.27 Tetap

235,694.42 M3 5.28 1,897,700.66 10,011,889.14 1.84 Kurang


- M2 63.56 276,376.90 17,565,963.01 3.22 Tambah
225,650.60 Kg 562.38 19,181.83 10,787,405.28 1.98 Kurang
M3 8.21 1,897,700.66 15,580,122.42 2.86
M2 107.24 276,376.90 29,639,764.26 5.43
Kg 981.41 19,181.83 18,825,239.78 3.45
M3 4.19 1,858,726.39 7,794,940.86 1.43
388,876.55 M2 33.86 415,466.40 14,069,354.17 2.58 Kurang
895,327.84 Kg 299.53 19,181.83 5,745,613.52 1.05 Kurang
M3 6.09 1,858,726.39 11,321,297.98 2.08
M2 63.42 415,466.40 26,348,879.09 4.83
1,031,210.27 Kg 564.26 19,181.83 10,823,544.31 1.98 Kurang

M2 56.70 104,202.62 5,908,288.55 1.08 Tetap


M2 87.21 104,202.62 9,087,510.49 1.67 Tetap
M2 17.76 104,202.62 1,850,638.53 0.34 Tetap
M2 33.74 104,202.62 3,515,796.40 0.64 Tetap
M2 12.60 106,720.20 1,344,674.52 0.25 Tetap
M2 29.64 106,720.20 3,163,186.73 0.58 Tetap
M2 180.95 56,446.52 10,213,997.79 1.87 Tetap
M2 156.60 1,150,520.51 180,171,511.87 33.02 Tetap

M2 56.70 66,346.72 3,761,859.02 0.69 Tetap


M2 87.21 66,346.72 5,786,097.45 1.06 Tetap
M2 30.36 66,346.72 2,014,286.42 0.37 Tetap
M2 63.38 66,346.72 4,205,055.11 0.77 Tetap
M2 234.90 92,810.58 21,801,205.24 4.00 Tetap
PEKERJAAN TAMBAH KURANG CONTRACT CHANGE ORDER (CCO)
PEKERJAAN KURANG
SATUAN HARGA KET.
SAT. VOLUME JUMLAH HARGA (RP) BOBOT (%)
JUMLAH (RP) (RP)

12 13 14 15 16 17

557,617.92 M3 1.50 1,858,726.39 2,788,089.59 0.51 Kurang


997,119.36 M2 12.00 415,466.40 4,985,596.80 0.91 Kurang
404,517.48 Kg 122.47 19,181.83 2,349,226.04 0.43 Kurang
250,086.29 M2 12.00 104,202.62 1,250,431.44 0.23 Kurang
M2 3.68 106,720.20 392,730.34 0.07 Kurang
135,471.65 M2 15.68 56,446.52 885,081.43 0.16 Kurang
4,870,576.51 M2 18.09 3,025,202.80 54,725,918.65 10.03 Kurang
159,232.13 M2 15.68 66,346.72 1,040,316.57 0.19 Kurang
224,137.55 M2 27.14 92,810.58 2,518,415.09 0.46 Kurang

10,375,518.56 Jumlah Total Pekerjaan 545,590,909.81 100.00


PPN (10 % x A) 54,559,090.98
Total (A + B) 600,150,000.79
Dibulatkan 600,150,000.00

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (RUGAYA S. HAMID)


Pengawas Lapangan Direktris
LAPORAN KEMAJUAN FISIK MINGGU - 06
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
PERIODE : 06 NOVEMBER 2019 S/D 12 NOVEMBER 2019
TAHUN ANGGARAN : 2019

KONTRAK REALISASI S/D MINGGU LALU


SATUAN JUMLAH BOBOT Bobot / Bobot Trhdp
NO
URAIAN SAT. VOLUME Volume
HARGA (Rp) HARGA (Rp) (%) Item Pek. (%) Seluruh Pek. (%)
1 2 3 4 5 6 7 8 9 10
I PEKERJAAN PERSIAPAN
Mobilisasi /Demobilisasi Tenaga Kerja Ls 1.00 2,000,000.00 2,000,000.00 0.37 0.50 50.00 0.18
Pembuatan Kantor Sementara Lantai Plesteran Ls 1.00 5,997,967.17 5,997,967.17 1.10 1.00 100.00 1.10
Pembuatan Gudang Semen dan Peralatan Ls 1.00 4,000,000.00 4,000,000.00 0.73 1.00 100.00 0.73
Pembuatan Bedeng Pekerja Ls 1.00 4,500,000.00 4,500,000.00 0.82 1.00 100.00 0.82
Papan Nama Proyek Uk. 120 x 120 cm Ls 1.00 300,000.00 300,000.00 0.05 1.00 100.00 0.05
Pembongkaran Dinding Pagar Eksisting M2 72.90 158,749.56 11,572,842.92 2.12 72.90 100.00 2.12
Pembongkaran Kolom dan Ring Balk Pagar Eksisting M3 3.61 317,499.12 1,146,171.82 0.21 3.61 100.00 0.21
Genset Kap. 2.2 kvA dan Air Kerja Ls 1.00 8,300,000.00 8,300,000.00 1.52 1.00 100.00 1.52
Dokumentasi, Laporan & Asbuilt Drawing Ls 1.00 4,000,000.00 4,000,000.00 0.73 0.50 50.00 0.37
Pembersihan Akhir Lokasi Pekerjaan Ls 1.00 1,500,000.00 1,500,000.00 0.27 - - -
II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)
A. PEKERJAAN BETON
1. Sloof Type II, Uk. 20 x 100 (Beton Mutu K-300) M3 5.28 1,897,700.66 10,011,889.14 1.84 5.40 102.35 1.88
a. Pek. Bekisting M2 63.56 276,376.90 17,565,963.01 3.22 54.00 84.96 2.74
b. Pek. Besi Beton Kg 562.38 19,181.83 10,787,405.28 1.98 574.14 102.09 2.02
2. Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300) M3 8.21 1,897,700.66 15,580,122.42 2.86 8.21 100.00 2.86
a. Pek. Bekisting M2 107.24 276,376.90 29,639,764.26 5.43 102.60 95.67 5.20
b. Pek. Besi Beton Kg 981.41 19,181.83 18,825,239.78 3.45 981.41 100.00 3.45
3. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 4.19 1,858,726.39 7,794,940.86 1.43 - - -
a. Pek. Bekisting M2 33.86 415,466.40 14,069,354.17 2.58 15.30 45.18 1.17
b. Pek. Besi Beton Kg 299.53 19,181.83 5,745,613.52 1.05 346.21 115.58 1.22
4. Kolom Baru Type III, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 6.09 1,858,726.39 11,321,297.98 2.08 - - -
a. Pek. Bekisting M2 63.42 415,466.40 26,348,879.09 4.83 - - -
b. Pek. Besi Beton Kg 564.26 19,181.83 10,823,544.31 1.98 325.00 57.60 1.14
B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
1. Plesteran Permukaan Sloof Type II, Uk. 20 x 100 Camp. 1PC 3PP M2 56.70 104,202.62 5,908,288.55 1.08 - - -
2. Plesteran Permukaan Sloof Type III, Uk. 20 x 80 Camp. 1PC 3PP M2 87.21 104,202.62 9,087,510.49 1.67 - - -
3. Plesteran Badan Kolom Baru Type II, Camp. 1PC 3PP M2 17.76 104,202.62 1,850,638.53 0.34 - - -
4. Plesteran Badan Kolom Baru Type III, Camp. 1PC 3PP M2 33.74 104,202.62 3,515,796.40 0.64 - - -
5. Plesteran Profil Kepala dan Kaki Kolom Type II, Camp. 1PC 2PP M2 12.60 106,720.20 1,344,674.52 0.25 - - -
6. Plesteran Profil Kepala dan Kaki Kolom Type III, Camp. 1PC 2PP M2 29.64 106,720.20 3,163,186.73 0.58 - - -
7. Acian Sloof, Kolom dan Profil M2 180.95 56,446.52 10,213,997.79 1.87 - - -
8. Perakitan dan Pemasangan Pagar Besi Beton Polos 16 M2 156.60 1,150,520.51 180,171,511.87 33.02 148.77 95.00 31.37
C. PEKERJAAN PENGECETAN
1. Pengecatan Permukaan Sloof Type II M2 56.70 66,346.72 3,761,859.02 0.69 - - -
2. Pengecatan Permukaan Sloof Type III M2 87.21 66,346.72 5,786,097.45 1.06 - - -
3. Pengecatan Kolom Baru type II dan Profil M2 30.36 66,346.72 2,014,286.42 0.37 - - -
4. Pengecatan Kolom Baru type III dan Profil M2 63.38 66,346.72 4,205,055.11 0.77 - - -
5. Pengecatan Permukaan Pagar dengan Cat Besi M2 234.90 92,810.58 21,801,205.24 4.00 - - -
KONTRAK REALISASI S/D MINGGU LALU
SATUAN JUMLAH BOBOT Bobot / Bobot Trhdp
NO
URAIAN SAT. VOLUME Volume
HARGA (Rp) HARGA (Rp) (%) Item Pek. (%) Seluruh Pek. (%)
1 2 3 4 5 6 7 8 9 10
III PEKERJAAN GERBANG MASUK
1. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 1.50 1,858,726.39 2,788,089.59 0.51 - - -
a. Pek. Bekisting M2 12.00 415,466.40 4,985,596.80 0.91 - - -
b. Pek. Besi Beton Kg 122.47 19,181.83 2,349,226.04 0.43 - - -
2. Plesteran Badan Kolom Camp. 1PC 3PP M2 12.00 104,202.62 1,250,431.44 0.23 - - -
3. Plesteran Profil Kepala dan Kaki Kolom, Camp. 1PC 2PP M2 3.68 106,720.20 392,730.34 0.07 - - -
4. Acian Sloof, Kolom dan Profil M2 15.68 56,446.52 885,081.43 0.16 - - -
5. Pas. Pintu Besi Gerbang M2 18.09 3,025,202.80 54,725,918.65 10.03 - - -
6. Pengecatan Kolom dan Profil M2 15.68 66,346.72 1,040,316.57 0.19 - - -
7. Pengecatan Permukaan Pagar dengan Cat Besi M2 27.14 92,810.58 2,518,415.09 0.46 - - -
A Jumlah Total Pekerjaan 545,590,909.81 100.00 60.15
B PPN (10 % x A) 54,559,090.98
C Total (A + B) 600,150,000.79
D Dibulatkan 600,150,000.00

Disetujui Oleh : Diperiksa Oleh : Diperiksa


Pejabat Pembuat Komitmen (PPK) Direksi Lapangan Konsultan P
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA CV. LINTAS RA

(LINDA A. HIDAYATI) (MULYANI) (ANWAR A


NIP. 19770819 200812 2 003 Pengawas
JUAN FISIK MINGGU - 06

WAKTU PELAKSANAAN : 70 HARI KALENDER


WAKTU TERPAKAI : 42 HARI KALENDER
SISA WAKTU : 28 HARI KALENDER

Realisasi Pekerjaan
REALISASI MINGGU INI REALISASI S/D MINGGU INI
Bobot / Bobot Trhdp Bobot / Bobot Trhdp
Volume Volume
Item Pek. (%) Seluruh Pek. (%) Item Pek. (%) Seluruh Pek. (%)
11 12 13 14 15 16

- - - 0.50 50.00 0.18


- - - 1.00 100.00 1.10
- - - 1.00 100.00 0.73
- - - 1.00 100.00 0.82
- - - 1.00 100.00 0.05
- - - 72.90 100.00 2.12
- - - 3.61 100.00 0.21
- - - 1.00 100.00 1.52
0.15 15.00 0.11 0.65 65.00 0.48
- - - - - -

(0.12) (2.35) (0.04) 5.28 100.00 1.84


9.56 15.04 0.48 63.56 100.00 3.22
(11.76) (2.09) (0.04) 562.38 100.00 1.98
- - - 8.21 100.00 2.86
4.64 4.33 0.24 107.24 100.00 5.43
- - - 981.41 100.00 3.45
4.19 100.00 1.43 4.19 100.00 1.43
18.56 54.82 1.41 33.86 100.00 2.58
(46.68) (15.58) (0.16) 299.53 100.00 1.05
6.09 100.00 2.08 6.09 100.00 2.08
63.42 100.00 4.83 63.42 100.00 4.83
239.26 42.40 0.84 564.26 100.00 1.98

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
7.83 5.00 1.65 156.60 100.00 33.02

- - - - - -
- - - - - -
- - - - - -
- - - - - -
117.45 50.00 2.00 117.45 50.00 2.00
Realisasi Pekerjaan
REALISASI MINGGU INI REALISASI S/D MINGGU INI
Bobot / Bobot Trhdp Bobot / Bobot Trhdp
Volume Volume
Item Pek. (%) Seluruh Pek. (%) Item Pek. (%) Seluruh Pek. (%)
11 12 13 14 15 16

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
14.82 74.97

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (RUGAYA S. HAMID)


Pengawas Lapangan Direktris
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 06 NOVEMBER 2019 S/D 12 NOVEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.021 Ls - 0.021

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


1. Sloof Type II, Uk. 20 x 100 (Beton Mutu K-300)
a. Pek. Bekisting 9.56 M2 Kayu kelas III 0.05 0.43
Paku 5 - 10 cm 0.30 2.87
Minyak bekisting 0.10 0.96

2. Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300)


a. Pek. Bekisting 4.64 M2 Kayu kelas III 0.05 0.21
Paku 5 - 10 cm 0.30 1.39
Minyak bekisting 0.10 0.46
B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
8. Perakitan dan Pemasangan Pagar Besi Beton Polos 16 7.83 M2 Besi Beton 30.32 237.42
Tombak Besi Cor/Tempa dia. 16 6.00 46.98
Pengelasan 37.00 289.71

C. PEKERJAAN PENGECETAN
5. Pengecatan Permukaan Pagar dengan Cat Besi 39.15 M2 Cat Besi 0.10 3.92
Pengencer 0.01 0.39
Kuas 0.01 0.39
Perancah kayu 0.00 0.08

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-06

Hari Ke : 36
Tanggal : 06 November 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
Tukang 3.00 Org
m3 Pekerja 10.00 Org
kg Sopir 1.00 Org
Ltr Ass. Sopir 1.00 Org

m3
kg
Ltr

kg
Bh
cm

Ltr
Ltr
Bh
M3

19.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 06 NOVEMBER 2019 S/D 12 NOVEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.021 Ls - 0.021

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


3. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250)
a. Pek. Bekisting 9.28 M2 Kayu kelas III 0.05 0.42
Paku 5 - 10 cm 0.30 2.78
Minyak bekisting 0.10 0.93

4. Kolom Baru Type III, Uk. 30 x 30 x 290 (Beton Mutu K-250)


a. Pek. Bekisting 15.86 M2 Kayu kelas III 0.05 0.21
Paku 5 - 10 cm 0.30 1.39
Minyak bekisting 0.10 0.46

b. Pek. Besi Beton 79.75 kg Besi beton (polos/ulir) 1.05 83.74


Kawat beton 0.15 11.96

C. PEKERJAAN PENGECETAN
5. Pengecatan Permukaan Pagar dengan Cat Besi 39.15 M2 Cat Besi 0.10 3.92
Pengencer 0.01 0.39
Kuas 0.01 0.39
Perancah kayu 0.00 0.08

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-06

Hari Ke : 37
Tanggal : 07 November 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
Tukang 3.00 Org
m3 Pekerja 10.00 Org
kg Sopir 1.00 Org
Ltr Ass. Sopir 1.00 Org

m3
kg
Ltr

kg
kg

Ltr
Ltr
Bh
M3

19.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 06 NOVEMBER 2019 S/D 12 NOVEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.021 Ls - 0.021

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


4. Kolom Baru Type III, Uk. 30 x 30 x 290 (Beton Mutu K-250)
a. Pek. Bekisting 15.86 M2 Kayu kelas III 0.05 0.71
Paku 5 - 10 cm 0.30 4.76
Minyak bekisting 0.10 1.59

b. Pek. Besi Beton 79.75 kg Besi beton (polos/ulir) 1.05 83.74


Kawat beton 0.15 11.96

C. PEKERJAAN PENGECETAN
5. Pengecatan Permukaan Pagar dengan Cat Besi 39.15 M2 Cat Besi 0.10 3.92
Pengencer 0.01 0.39
Kuas 0.01 0.39
Perancah kayu 0.00 0.08

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-06

Hari Ke : 38
Tanggal : 08 November 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
Tukang 3.00 Org
m3 Pekerja 10.00 Org
kg Sopir 1.00 Org
Ltr Ass. Sopir 1.00 Org

kg
kg

Ltr
Ltr
Bh
M3

19.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 06 NOVEMBER 2019 S/D 12 NOVEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.021 Ls - 0.021

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


4. Kolom Baru Type III, Uk. 30 x 30 x 290 (Beton Mutu K-250) 1.52 M3 Semen portland 384.00 584.73
Pasir Beton 692.00 1,053.72
Kerikil (Maks 30 mm) 1,039.00 1,582.11
Air 215.00 327.39
4. Kolom Baru Type III, Uk. 30 x 30 x 290 (Beton Mutu K-250)
a. Pek. Bekisting 15.86 M2 Kayu kelas III 0.05 0.71
Paku 5 - 10 cm 0.30 4.76
Minyak bekisting 0.10 1.59

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-06

Hari Ke : 39
Tanggal : 09 November 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
kg Tukang 3.00 Org
kg Pekerja 10.00 Org
kg Sopir 1.00 Org
Ltr Ass. Sopir 1.00 Org

m3
kg
Ltr

19.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 06 NOVEMBER 2019 S/D 12 NOVEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.021 Ls - 0.021

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


4. Kolom Baru Type III, Uk. 30 x 30 x 290 (Beton Mutu K-250) 1.52 M3 Semen portland 384.00 584.73
Pasir Beton 692.00 1,053.72
Kerikil (Maks 30 mm) 1,039.00 1,582.11
Air 215.00 327.39
4. Kolom Baru Type III, Uk. 30 x 30 x 290 (Beton Mutu K-250)
a. Pek. Bekisting 15.86 M2 Kayu kelas III 0.05 0.71
Paku 5 - 10 cm 0.30 4.76
Minyak bekisting 0.10 1.59

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-06

Hari Ke : 40
Tanggal : 10 November 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
kg Tukang 3.00 Org
kg Pekerja 10.00 Org
kg Sopir 1.00 Org
Ltr Ass. Sopir 1.00 Org

m3
kg
Ltr

19.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 06 NOVEMBER 2019 S/D 12 NOVEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.021 Ls - 0.021

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


4. Kolom Baru Type III, Uk. 30 x 30 x 290 (Beton Mutu K-250) 1.52 M3 Semen portland 384.00 584.73
Pasir Beton 692.00 1,053.72
Kerikil (Maks 30 mm) 1,039.00 1,582.11
Air 215.00 327.39
4. Kolom Baru Type III, Uk. 30 x 30 x 290 (Beton Mutu K-250)
a. Pek. Bekisting 15.86 M2 Kayu kelas III 0.05 0.71
Paku 5 - 10 cm 0.30 4.76
Minyak bekisting 0.10 1.59

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-06

Hari Ke : 41
Tanggal : 11 November 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
kg Tukang 3.00 Org
kg Pekerja 10.00 Org
kg Sopir 1.00 Org
Ltr Ass. Sopir 1.00 Org

m3
kg
Ltr

19.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 06 NOVEMBER 2019 S/D 12 NOVEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.021 Ls - 0.021

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


4. Kolom Baru Type III, Uk. 30 x 30 x 290 (Beton Mutu K-250) 1.52 M3 Semen portland 384.00 584.73
Pasir Beton 692.00 1,053.72
Kerikil (Maks 30 mm) 1,039.00 1,582.11
Air 215.00 327.39
4. Kolom Baru Type III, Uk. 30 x 30 x 290 (Beton Mutu K-250)
a. Pek. Bekisting 15.86 M2 Kayu kelas III 0.05 0.71
Paku 5 - 10 cm 0.30 4.76
Minyak bekisting 0.10 1.59

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-06

Hari Ke : 42
Tanggal : 12 November 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
kg Tukang 3.00 Org
kg Pekerja 10.00 Org
kg Sopir 1.00 Org
Ltr Ass. Sopir 1.00 Org

m3
kg
Ltr

19.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN FISIK MINGGU - 07
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
PERIODE : 13 NOVEMBER 2019 S/D 19 NOVEMBER 2019
TAHUN ANGGARAN : 2019

KONTRAK REALISASI S/D MINGGU LALU


SATUAN JUMLAH BOBOT Bobot / Bobot Trhdp
NO
URAIAN SAT. VOLUME Volume
HARGA (Rp) HARGA (Rp) (%) Item Pek. (%) Seluruh Pek. (%)
1 2 3 4 5 6 7 8 9 10
I PEKERJAAN PERSIAPAN
Mobilisasi /Demobilisasi Tenaga Kerja Ls 1.00 2,000,000.00 2,000,000.00 0.37 0.50 50.00 0.18
Pembuatan Kantor Sementara Lantai Plesteran Ls 1.00 5,997,967.17 5,997,967.17 1.10 1.00 100.00 1.10
Pembuatan Gudang Semen dan Peralatan Ls 1.00 4,000,000.00 4,000,000.00 0.73 1.00 100.00 0.73
Pembuatan Bedeng Pekerja Ls 1.00 4,500,000.00 4,500,000.00 0.82 1.00 100.00 0.82
Papan Nama Proyek Uk. 120 x 120 cm Ls 1.00 300,000.00 300,000.00 0.05 1.00 100.00 0.05
Pembongkaran Dinding Pagar Eksisting M2 72.90 158,749.56 11,572,842.92 2.12 72.90 100.00 2.12
Pembongkaran Kolom dan Ring Balk Pagar Eksisting M3 3.61 317,499.12 1,146,171.82 0.21 3.61 100.00 0.21
Genset Kap. 2.2 kvA dan Air Kerja Ls 1.00 8,300,000.00 8,300,000.00 1.52 1.00 100.00 1.52
Dokumentasi, Laporan & Asbuilt Drawing Ls 1.00 4,000,000.00 4,000,000.00 0.73 0.65 65.00 0.48
Pembersihan Akhir Lokasi Pekerjaan Ls 1.00 1,500,000.00 1,500,000.00 0.27 - - -
II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)
A. PEKERJAAN BETON
1. Sloof Type II, Uk. 20 x 100 (Beton Mutu K-300) M3 5.28 1,897,700.66 10,011,889.14 1.84 5.28 100.00 1.84
a. Pek. Bekisting M2 63.56 276,376.90 17,565,963.01 3.22 63.56 100.00 3.22
b. Pek. Besi Beton Kg 562.38 19,181.83 10,787,405.28 1.98 562.38 100.00 1.98
2. Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300) M3 8.21 1,897,700.66 15,580,122.42 2.86 8.21 100.00 2.86
a. Pek. Bekisting M2 107.24 276,376.90 29,639,764.26 5.43 107.24 100.00 5.43
b. Pek. Besi Beton Kg 981.41 19,181.83 18,825,239.78 3.45 981.41 100.00 3.45
3. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 4.19 1,858,726.39 7,794,940.86 1.43 4.19 100.00 1.43
a. Pek. Bekisting M2 33.86 415,466.40 14,069,354.17 2.58 33.86 100.00 2.58
b. Pek. Besi Beton Kg 299.53 19,181.83 5,745,613.52 1.05 299.53 100.00 1.05
4. Kolom Baru Type III, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 6.09 1,858,726.39 11,321,297.98 2.08 6.09 100.00 2.08
a. Pek. Bekisting M2 63.42 415,466.40 26,348,879.09 4.83 63.42 100.00 4.83
b. Pek. Besi Beton Kg 564.26 19,181.83 10,823,544.31 1.98 564.26 100.00 1.98
B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
1. Plesteran Permukaan Sloof Type II, Uk. 20 x 100 Camp. 1PC 3PP M2 56.70 104,202.62 5,908,288.55 1.08 - - -
2. Plesteran Permukaan Sloof Type III, Uk. 20 x 80 Camp. 1PC 3PP M2 87.21 104,202.62 9,087,510.49 1.67 - - -
3. Plesteran Badan Kolom Baru Type II, Camp. 1PC 3PP M2 17.76 104,202.62 1,850,638.53 0.34 - - -
4. Plesteran Badan Kolom Baru Type III, Camp. 1PC 3PP M2 33.74 104,202.62 3,515,796.40 0.64 - - -
5. Plesteran Profil Kepala dan Kaki Kolom Type II, Camp. 1PC 2PP M2 12.60 106,720.20 1,344,674.52 0.25 - - -
6. Plesteran Profil Kepala dan Kaki Kolom Type III, Camp. 1PC 2PP M2 29.64 106,720.20 3,163,186.73 0.58 - - -
7. Acian Sloof, Kolom dan Profil M2 180.95 56,446.52 10,213,997.79 1.87 - - -
8. Perakitan dan Pemasangan Pagar Besi Beton Polos 16 M2 156.60 1,150,520.51 180,171,511.87 33.02 156.60 100.00 33.02
C. PEKERJAAN PENGECETAN
1. Pengecatan Permukaan Sloof Type II M2 56.70 66,346.72 3,761,859.02 0.69 - - -
2. Pengecatan Permukaan Sloof Type III M2 87.21 66,346.72 5,786,097.45 1.06 - - -
3. Pengecatan Kolom Baru type II dan Profil M2 30.36 66,346.72 2,014,286.42 0.37 - - -
4. Pengecatan Kolom Baru type III dan Profil M2 63.38 66,346.72 4,205,055.11 0.77 - - -
5. Pengecatan Permukaan Pagar dengan Cat Besi M2 234.90 92,810.58 21,801,205.24 4.00 117.45 50.00 2.00
KONTRAK REALISASI S/D MINGGU LALU
SATUAN JUMLAH BOBOT Bobot / Bobot Trhdp
NO
URAIAN SAT. VOLUME Volume
HARGA (Rp) HARGA (Rp) (%) Item Pek. (%) Seluruh Pek. (%)
1 2 3 4 5 6 7 8 9 10
III PEKERJAAN GERBANG MASUK
1. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 1.50 1,858,726.39 2,788,089.59 0.51 - - -
a. Pek. Bekisting M2 12.00 415,466.40 4,985,596.80 0.91 - - -
b. Pek. Besi Beton Kg 122.47 19,181.83 2,349,226.04 0.43 - - -
2. Plesteran Badan Kolom Camp. 1PC 3PP M2 12.00 104,202.62 1,250,431.44 0.23 - - -
3. Plesteran Profil Kepala dan Kaki Kolom, Camp. 1PC 2PP M2 3.68 106,720.20 392,730.34 0.07 - - -
4. Acian Sloof, Kolom dan Profil M2 15.68 56,446.52 885,081.43 0.16 - - -
5. Pas. Pintu Besi Gerbang M2 18.09 3,025,202.80 54,725,918.65 10.03 - - -
6. Pengecatan Kolom dan Profil M2 15.68 66,346.72 1,040,316.57 0.19 - - -
7. Pengecatan Permukaan Pagar dengan Cat Besi M2 27.14 92,810.58 2,518,415.09 0.46 - - -
A Jumlah Total Pekerjaan 545,590,909.81 100.00 74.97
B PPN (10 % x A) 54,559,090.98
C Total (A + B) 600,150,000.79
D Dibulatkan 600,150,000.00

Disetujui Oleh : Diperiksa Oleh : Diperiksa


Pejabat Pembuat Komitmen (PPK) Direksi Lapangan Konsultan P
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA CV. LINTAS RA

(LINDA A. HIDAYATI) (MULYANI) (ANWAR A


NIP. 19770819 200812 2 003 Pengawas
JUAN FISIK MINGGU - 07

WAKTU PELAKSANAAN : 70 HARI KALENDER


WAKTU TERPAKAI : 49 HARI KALENDER
SISA WAKTU : 21 HARI KALENDER

Realisasi Pekerjaan
REALISASI MINGGU INI REALISASI S/D MINGGU INI
Bobot / Bobot Trhdp Bobot / Bobot Trhdp
Volume Volume
Item Pek. (%) Seluruh Pek. (%) Item Pek. (%) Seluruh Pek. (%)
11 12 13 14 15 16

- - - 0.50 50.00 0.18


- - - 1.00 100.00 1.10
- - - 1.00 100.00 0.73
- - - 1.00 100.00 0.82
- - - 1.00 100.00 0.05
- - - 72.90 100.00 2.12
- - - 3.61 100.00 0.21
- - - 1.00 100.00 1.52
0.15 15.00 0.11 0.80 80.00 0.59
- - - - - -

- - - 5.28 100.00 1.84


- - - 63.56 100.00 3.22
- - - 562.38 100.00 1.98
- - - 8.21 100.00 2.86
- - - 107.24 100.00 5.43
- - - 981.41 100.00 3.45
- - - 4.19 100.00 1.43
- - - 33.86 100.00 2.58
- - - 299.53 100.00 1.05
- - - 6.09 100.00 2.08
- - - 63.42 100.00 4.83
- - - 564.26 100.00 1.98

26.35 46.47 0.50 26.35 46.47 0.50


31.65 36.29 0.60 31.65 36.29 0.60
8.65 48.70 0.17 8.65 48.70 0.17
12.36 36.63 0.24 12.36 36.63 0.24
3.60 28.57 0.07 3.60 28.57 0.07
10.65 35.93 0.21 10.65 35.93 0.21
93.26 51.54 0.96 93.26 51.54 0.96
- - - 156.60 100.00 33.02

- - - - - -
- - - - - -
- - - - - -
- - - - - -
100.50 42.78 1.71 217.95 92.78 3.71
Realisasi Pekerjaan
REALISASI MINGGU INI REALISASI S/D MINGGU INI
Bobot / Bobot Trhdp Bobot / Bobot Trhdp
Volume Volume
Item Pek. (%) Seluruh Pek. (%) Item Pek. (%) Seluruh Pek. (%)
11 12 13 14 15 16

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
3.25 17.97 1.80 3.25 17.97 1.80
- - - - - -
- - - - - -
6.37 81.34

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (RUGAYA S. HAMID)


Pengawas Lapangan Direktris
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 13 NOVEMBER 2019 S/D 19 NOVEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.021 Ls - 0.021

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
1. Plesteran Permukaan Sloof Type II, Uk. 20 x 100 Camp. 1PC 3PP 13.18 M2 Semen portland 7.78 102.45
Pasir Halus Pantai 0.02 0.30

C. PEKERJAAN PENGECETAN
5. Pengecatan Permukaan Pagar dengan Cat Besi 33.50 M2 Cat Besi 0.10 3.35
Pengencer 0.01 0.34
Kuas 0.01 0.34
Perancah kayu 0.00 0.07

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-07

Hari Ke : 43
Tanggal : 13 November 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
Tukang 2.00 Org
kg Pekerja 9.00 Org
M3 Sopir 1.00 Org
Ass. Sopir 1.00 Org

Ltr
Ltr
Bh
M3

17.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 13 NOVEMBER 2019 S/D 19 NOVEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.021 Ls - 0.021

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
1. Plesteran Permukaan Sloof Type II, Uk. 20 x 100 Camp. 1PC 3PP 13.18 M2 Semen portland 7.78 102.45
Pasir Halus Pantai 0.02 0.30

7. Acian Sloof, Kolom dan Profil 15.54 M2 Semen portland 3.25 50.52

C. PEKERJAAN PENGECETAN
5. Pengecatan Permukaan Pagar dengan Cat Besi 33.50 M2 Cat Besi 0.10 3.35
Pengencer 0.01 0.34
Kuas 0.01 0.34
Perancah kayu 0.00 0.07

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-07

Hari Ke : 44
Tanggal : 14 November 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
Tukang 2.00 Org
kg Pekerja 9.00 Org
M3 Sopir 1.00 Org
Ass. Sopir 1.00 Org
kg

Ltr
Ltr
Bh
M3

17.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 13 NOVEMBER 2019 S/D 19 NOVEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.021 Ls - 0.021

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
2. Plesteran Permukaan Sloof Type III, Uk. 20 x 80 Camp. 1PC 3PP 15.83 M2 Semen portland 7.78 123.06
Pasir Halus Pantai 0.02 0.36

3. Plesteran Badan Kolom Baru Type II, Camp. 1PC 3PP 4.33 M2 Semen portland 7.78 33.63
Pasir Halus Pantai 0.02 0.10

7. Acian Sloof, Kolom dan Profil 15.54 M2 Semen portland 4.25 66.06

C. PEKERJAAN PENGECETAN
5. Pengecatan Permukaan Pagar dengan Cat Besi 33.50 M2 Cat Besi 0.10 3.35
Pengencer 0.01 0.34
Kuas 0.01 0.34
Perancah kayu 0.00 0.07

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-07

Hari Ke : 45
Tanggal : 15 November 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
Tukang 3.00 Org
kg Pekerja 11.00 Org
M3 Sopir 1.00 Org
Ass. Sopir 1.00 Org
kg
M3

kg

Ltr
Ltr
Bh
M3

20.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 13 NOVEMBER 2019 S/D 19 NOVEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.021 Ls - 0.021

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
2. Plesteran Permukaan Sloof Type III, Uk. 20 x 80 Camp. 1PC 3PP 15.83 M2 Semen portland 7.78 123.06
Pasir Halus Pantai 0.02 0.36

3. Plesteran Badan Kolom Baru Type II, Camp. 1PC 3PP 4.33 M2 Semen portland 7.78 33.63
Pasir Halus Pantai 0.02 0.10

4. Plesteran Badan Kolom Baru Type III, Camp. 1PC 3PP 6.18 M2 Semen portland 7.78 48.06
Pasir Halus Pantai 0.02 0.14

7. Acian Sloof, Kolom dan Profil 15.54 M2 Semen portland 4.25 66.06

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-07

Hari Ke : 46
Tanggal : 16 November 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
Tukang 3.00 Org
kg Pekerja 11.00 Org
M3 Sopir 1.00 Org
Ass. Sopir 1.00 Org
kg
M3

kg
M3

kg

20.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 13 NOVEMBER 2019 S/D 19 NOVEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.021 Ls - 0.021

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
4. Plesteran Badan Kolom Baru Type III, Camp. 1PC 3PP 6.18 M2 Semen portland 7.78 48.06
Pasir Halus Pantai 0.02 0.14

5. Plesteran Profil Kepala dan Kaki Kolom Type II, Camp. 1PC 2PP 3.60 M2 Semen portland 10.22 36.81
Pasir Halus Pantai 0.02 0.07

6. Plesteran Profil Kepala dan Kaki Kolom Type III, Camp. 1PC 2PP 5.33 M2 Semen portland 10.22 54.44
Pasir Halus Pantai 0.02 0.11

7. Acian Sloof, Kolom dan Profil 15.54 M2 Semen portland 4.25 66.06

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-07

Hari Ke : 47
Tanggal : 17 November 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
Tukang 3.00 Org
kg Pekerja 10.00 Org
M3 Sopir 1.00 Org
Ass. Sopir 1.00 Org
kg
M3

kg
M3

kg

19.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 13 NOVEMBER 2019 S/D 19 NOVEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.021 Ls - 0.021

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
6. Plesteran Profil Kepala dan Kaki Kolom Type III, Camp. 1PC 2PP 5.33 Semen portland 10.22 54.44
Pasir Halus Pantai 0.02 0.11

7. Acian Sloof, Kolom dan Profil 15.54 M3 Semen portland 4.25 66.06

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-07

Hari Ke : 48
Tanggal : 18 November 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
Tukang 2.00 Org
kg Pekerja 9.00 Org
M3 Sopir 1.00 Org
Ass. Sopir 1.00 Org
kg

17.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 13 NOVEMBER 2019 S/D 19 NOVEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.021 Ls - 0.021

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
7. Acian Sloof, Kolom dan Profil 15.54 M3 Semen portland 4.25 66.06

III PEKERJAAN GERBANG MASUK


5. Pas. Pintu Besi Gerbang 3.25 M2 Besi Beton 30.32 98.55
Tombak Besi Cor/Tempa dia. 16 6.00 19.50
Pengelasan 37.00 120.25

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-07

Hari Ke : 49
Tanggal : 19 November 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 2.00 Org
Tukang 2.00 Org
kg Pekerja 9.00 Org
Sopir 1.00 Org
Ass. Sopir 1.00 Org
kg
Bh
cm

17.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN FISIK MINGGU - 08
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
PERIODE : 20 NOVEMBER 2019 S/D 26 NOVEMBER 2019
TAHUN ANGGARAN : 2019

KONTRAK REALISASI S/D MINGGU LALU


SATUAN JUMLAH BOBOT Bobot / Bobot Trhdp
NO
URAIAN SAT. VOLUME Volume
HARGA (Rp) HARGA (Rp) (%) Item Pek. (%) Seluruh Pek. (%)
1 2 3 4 5 6 7 8 9 10
I PEKERJAAN PERSIAPAN
Mobilisasi /Demobilisasi Tenaga Kerja Ls 1.00 2,000,000.00 2,000,000.00 0.37 0.50 50.00 0.18
Pembuatan Kantor Sementara Lantai Plesteran Ls 1.00 5,997,967.17 5,997,967.17 1.10 1.00 100.00 1.10
Pembuatan Gudang Semen dan Peralatan Ls 1.00 4,000,000.00 4,000,000.00 0.73 1.00 100.00 0.73
Pembuatan Bedeng Pekerja Ls 1.00 4,500,000.00 4,500,000.00 0.82 1.00 100.00 0.82
Papan Nama Proyek Uk. 120 x 120 cm Ls 1.00 300,000.00 300,000.00 0.05 1.00 100.00 0.05
Pembongkaran Dinding Pagar Eksisting M2 72.90 158,749.56 11,572,842.92 2.12 72.90 100.00 2.12
Pembongkaran Kolom dan Ring Balk Pagar Eksisting M3 3.61 317,499.12 1,146,171.82 0.21 3.61 100.00 0.21
Genset Kap. 2.2 kvA dan Air Kerja Ls 1.00 8,300,000.00 8,300,000.00 1.52 1.00 100.00 1.52
Dokumentasi, Laporan & Asbuilt Drawing Ls 1.00 4,000,000.00 4,000,000.00 0.73 0.80 80.00 0.59
Pembersihan Akhir Lokasi Pekerjaan Ls 1.00 1,500,000.00 1,500,000.00 0.27 - - -
II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)
A. PEKERJAAN BETON
1. Sloof Type II, Uk. 20 x 100 (Beton Mutu K-300) M3 5.28 1,897,700.66 10,011,889.14 1.84 5.28 100.00 1.84
a. Pek. Bekisting M2 63.56 276,376.90 17,565,963.01 3.22 63.56 100.00 3.22
b. Pek. Besi Beton Kg 562.38 19,181.83 10,787,405.28 1.98 562.38 100.00 1.98
2. Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300) M3 8.21 1,897,700.66 15,580,122.42 2.86 8.21 100.00 2.86
a. Pek. Bekisting M2 107.24 276,376.90 29,639,764.26 5.43 107.24 100.00 5.43
b. Pek. Besi Beton Kg 981.41 19,181.83 18,825,239.78 3.45 981.41 100.00 3.45
3. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 4.19 1,858,726.39 7,794,940.86 1.43 4.19 100.00 1.43
a. Pek. Bekisting M2 33.86 415,466.40 14,069,354.17 2.58 33.86 100.00 2.58
b. Pek. Besi Beton Kg 299.53 19,181.83 5,745,613.52 1.05 299.53 100.00 1.05
4. Kolom Baru Type III, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 6.09 1,858,726.39 11,321,297.98 2.08 6.09 100.00 2.08
a. Pek. Bekisting M2 63.42 415,466.40 26,348,879.09 4.83 63.42 100.00 4.83
b. Pek. Besi Beton Kg 564.26 19,181.83 10,823,544.31 1.98 564.26 100.00 1.98
B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
1. Plesteran Permukaan Sloof Type II, Uk. 20 x 100 Camp. 1PC 3PP M2 56.70 104,202.62 5,908,288.55 1.08 26.35 46.47 0.50
2. Plesteran Permukaan Sloof Type III, Uk. 20 x 80 Camp. 1PC 3PP M2 87.21 104,202.62 9,087,510.49 1.67 31.65 36.29 0.60
3. Plesteran Badan Kolom Baru Type II, Camp. 1PC 3PP M2 17.76 104,202.62 1,850,638.53 0.34 8.65 48.70 0.17
4. Plesteran Badan Kolom Baru Type III, Camp. 1PC 3PP M2 33.74 104,202.62 3,515,796.40 0.64 12.36 36.63 0.24
5. Plesteran Profil Kepala dan Kaki Kolom Type II, Camp. 1PC 2PP M2 12.60 106,720.20 1,344,674.52 0.25 3.60 28.57 0.07
6. Plesteran Profil Kepala dan Kaki Kolom Type III, Camp. 1PC 2PP M2 29.64 106,720.20 3,163,186.73 0.58 10.65 35.93 0.21
7. Acian Sloof, Kolom dan Profil M2 180.95 56,446.52 10,213,997.79 1.87 93.26 51.54 0.96
8. Perakitan dan Pemasangan Pagar Besi Beton Polos 16 M2 156.60 1,150,520.51 180,171,511.87 33.02 156.60 100.00 33.02
C. PEKERJAAN PENGECETAN
1. Pengecatan Permukaan Sloof Type II M2 56.70 66,346.72 3,761,859.02 0.69 - - -
2. Pengecatan Permukaan Sloof Type III M2 87.21 66,346.72 5,786,097.45 1.06 - - -
3. Pengecatan Kolom Baru type II dan Profil M2 30.36 66,346.72 2,014,286.42 0.37 - - -
4. Pengecatan Kolom Baru type III dan Profil M2 63.38 66,346.72 4,205,055.11 0.77 - - -
5. Pengecatan Permukaan Pagar dengan Cat Besi M2 234.90 92,810.58 21,801,205.24 4.00 217.95 92.78 3.71
KONTRAK REALISASI S/D MINGGU LALU
SATUAN JUMLAH BOBOT Bobot / Bobot Trhdp
NO
URAIAN SAT. VOLUME Volume
HARGA (Rp) HARGA (Rp) (%) Item Pek. (%) Seluruh Pek. (%)
1 2 3 4 5 6 7 8 9 10
III PEKERJAAN GERBANG MASUK
1. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 1.50 1,858,726.39 2,788,089.59 0.51 - - -
a. Pek. Bekisting M2 12.00 415,466.40 4,985,596.80 0.91 - - -
b. Pek. Besi Beton Kg 122.47 19,181.83 2,349,226.04 0.43 - - -
2. Plesteran Badan Kolom Camp. 1PC 3PP M2 12.00 104,202.62 1,250,431.44 0.23 - - -
3. Plesteran Profil Kepala dan Kaki Kolom, Camp. 1PC 2PP M2 3.68 106,720.20 392,730.34 0.07 - - -
4. Acian Sloof, Kolom dan Profil M2 15.68 56,446.52 885,081.43 0.16 - - -
5. Pas. Pintu Besi Gerbang M2 18.09 3,025,202.80 54,725,918.65 10.03 3.25 17.97 1.80
6. Pengecatan Kolom dan Profil M2 15.68 66,346.72 1,040,316.57 0.19 - - -
7. Pengecatan Permukaan Pagar dengan Cat Besi M2 27.14 92,810.58 2,518,415.09 0.46 - - -
A Jumlah Total Pekerjaan 545,590,909.81 100.00 81.34
B PPN (10 % x A) 54,559,090.98
C Total (A + B) 600,150,000.79
D Dibulatkan 600,150,000.00

Disetujui Oleh : Diperiksa Oleh : Diperiksa


Pejabat Pembuat Komitmen (PPK) Direksi Lapangan Konsultan P
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA CV. LINTAS RA

(LINDA A. HIDAYATI) (MULYANI) (ANWAR A


NIP. 19770819 200812 2 003 Pengawas
JUAN FISIK MINGGU - 08

WAKTU PELAKSANAAN : 70 HARI KALENDER


WAKTU TERPAKAI : 56 HARI KALENDER
SISA WAKTU : 14 HARI KALENDER

Realisasi Pekerjaan
REALISASI MINGGU INI REALISASI S/D MINGGU INI
Bobot / Bobot Trhdp Bobot / Bobot Trhdp
Volume Volume
Item Pek. (%) Seluruh Pek. (%) Item Pek. (%) Seluruh Pek. (%)
11 12 13 14 15 16

- - - 0.50 50.00 0.18


- - - 1.00 100.00 1.10
- - - 1.00 100.00 0.73
- - - 1.00 100.00 0.82
- - - 1.00 100.00 0.05
- - - 72.90 100.00 2.12
- - - 3.61 100.00 0.21
- - - 1.00 100.00 1.52
- - - 0.80 80.00 0.59
- - - - - -

- - - 5.28 100.00 1.84


- - - 63.56 100.00 3.22
- - - 562.38 100.00 1.98
- - - 8.21 100.00 2.86
- - - 107.24 100.00 5.43
- - - 981.41 100.00 3.45
- - - 4.19 100.00 1.43
- - - 33.86 100.00 2.58
- - - 299.53 100.00 1.05
- - - 6.09 100.00 2.08
- - - 63.42 100.00 4.83
- - - 564.26 100.00 1.98

- - - 26.35 46.47 0.50


55.56 63.71 1.06 87.21 100.00 1.67
- - - 8.65 48.70 0.17
21.38 63.37 0.41 33.74 100.00 0.64
9.00 71.43 0.18 12.60 100.00 0.25
9.68 32.66 0.19 20.33 68.59 0.40
60.85 33.63 0.63 154.11 85.17 1.59
- - - 156.60 100.00 33.02

- - - - - -
- - - - - -
- - - - - -
- - - - - -
16.95 7.22 0.29 234.90 100.00 4.00
Realisasi Pekerjaan
REALISASI MINGGU INI REALISASI S/D MINGGU INI
Bobot / Bobot Trhdp Bobot / Bobot Trhdp
Volume Volume
Item Pek. (%) Seluruh Pek. (%) Item Pek. (%) Seluruh Pek. (%)
11 12 13 14 15 16

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
8.25 45.61 4.57 11.50 63.57 6.38
- - - - - -
- - - - - -
7.33 88.67

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (RUGAYA S. HAMID)


Pengawas Lapangan Direktris
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 20 NOVEMBER 2019 S/D 26 NOVEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
2. Plesteran Permukaan Sloof Type III, Uk. 20 x 80 Camp. 1PC 3PP 18.52 M2 Semen portland 7.78 144.01
Pasir Halus Pantai 0.02 0.43

4. Plesteran Badan Kolom Baru Type III, Camp. 1PC 3PP 10.69 M2 Semen portland 7.78 83.13
Pasir Halus Pantai 0.02 0.25

7. Acian Sloof, Kolom dan Profil 8.69 M2 Semen portland 4.25 36.94

C. PEKERJAAN PENGECETAN
5. Pengecatan Permukaan Pagar dengan Cat Besi 16.95 M2 Cat Besi 0.10 1.70
Pengencer 0.01 0.17
Kuas 0.01 0.17
Perancah kayu 0.00 0.03

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-08

Hari Ke : 50
Tanggal : 20 November 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
kg Kepala Tukang 3.00 Org
M3 Tukang 3.00 Org
Pekerja 11.00 Org
kg Sopir 1.00 Org
M3 Ass. Sopir 1.00 Org

kg

Ltr
Ltr
Bh
M3

21.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 20 NOVEMBER 2019 S/D 26 NOVEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
2. Plesteran Permukaan Sloof Type III, Uk. 20 x 80 Camp. 1PC 3PP 18.52 M2 Semen portland 7.78 144.01
Pasir Halus Pantai 0.02 0.43

4. Plesteran Badan Kolom Baru Type III, Camp. 1PC 3PP 10.69 M2 Semen portland 7.78 83.13
Pasir Halus Pantai 0.02 0.25

7. Acian Sloof, Kolom dan Profil 8.69 M2 Semen portland 4.25 36.94

III PEKERJAAN GERBANG MASUK


5. Pas. Pintu Besi Gerbang 8.25 M2 Besi Beton 30.32 250.16
Tombak Besi Cor/Tempa dia. 16 6.00 49.50
Pengelasan 37.00 305.25

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-08

Hari Ke : 51
Tanggal : 21 November 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
kg Kepala Tukang 3.00 Org
M3 Tukang 3.00 Org
Pekerja 10.00 Org
kg Sopir 1.00 Org
M3 Ass. Sopir 1.00 Org

kg

kg
Bh
cm

20.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 20 NOVEMBER 2019 S/D 26 NOVEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
2. Plesteran Permukaan Sloof Type III, Uk. 20 x 80 Camp. 1PC 3PP 18.52 M2 Semen portland 7.78 144.01
Pasir Halus Pantai 0.02 0.43

5. Plesteran Profil Kepala dan Kaki Kolom Type II, Camp. 1PC 2PP 4.50 M2 Semen portland 10.22 46.01
Pasir Halus Pantai 0.02 0.09

7. Acian Sloof, Kolom dan Profil 8.69 M2 Semen portland 4.25 36.94

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-08

Hari Ke : 52
Tanggal : 22 November 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
kg Kepala Tukang 2.00 Org
M3 Tukang 2.00 Org
Pekerja 8.00 Org
kg Sopir 1.00 Org
M3 Ass. Sopir 1.00 Org

kg

16.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 20 NOVEMBER 2019 S/D 26 NOVEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
5. Plesteran Profil Kepala dan Kaki Kolom Type II, Camp. 1PC 2PP 4.50 M2 Semen portland 10.22 46.01
Pasir Halus Pantai 0.02 0.09

6. Plesteran Profil Kepala dan Kaki Kolom Type III, Camp. 1PC 2PP 4.84 M2 Semen portland 10.22 49.48
Pasir Halus Pantai 0.02 0.10

7. Acian Sloof, Kolom dan Profil 8.69 M2 Semen portland 4.25 36.94

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-08

Hari Ke : 53
Tanggal : 23 November 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
kg Kepala Tukang 2.00 Org
M3 Tukang 2.00 Org
Pekerja 8.00 Org
kg Sopir 1.00 Org
M3 Ass. Sopir 1.00 Org

kg

16.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 20 NOVEMBER 2019 S/D 26 NOVEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
6. Plesteran Profil Kepala dan Kaki Kolom Type III, Camp. 1PC 2PP 4.84 M2 Semen portland 10.22 49.48
Pasir Halus Pantai 0.02 0.10

7. Acian Sloof, Kolom dan Profil 8.69 M2 Semen portland 4.25 36.94

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-08

Hari Ke : 54
Tanggal : 24 November 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
kg Kepala Tukang 2.00 Org
M3 Tukang 2.00 Org
Pekerja 8.00 Org
kg Sopir 1.00 Org
Ass. Sopir 1.00 Org

16.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 20 NOVEMBER 2019 S/D 26 NOVEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
7. Acian Sloof, Kolom dan Profil 8.69 M2 Semen portland 4.25 36.94

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-08

Hari Ke : 55
Tanggal : 25 November 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
kg Kepala Tukang 2.00 Org
Tukang 2.00 Org
Pekerja 8.00 Org
Sopir 1.00 Org
Ass. Sopir 1.00 Org

16.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 20 NOVEMBER 2019 S/D 26 NOVEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
7. Acian Sloof, Kolom dan Profil 8.69 M2 Semen portland 4.25 36.94

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-08

Hari Ke : 56
Tanggal : 26 November 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
kg Kepala Tukang 1.00 Org
Tukang 1.00 Org
Pekerja 4.00 Org
Sopir 1.00 Org
Ass. Sopir 1.00 Org

10.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN FISIK BULAN - 02
REKAPITULASI TOTAL
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
PERIODE : 30 OKTOBER 2019 S/D 26 NOVEMBER 2019
TAHUN ANGGARAN : 2019
KONTRAK REALISASI S/D BULAN LALU
NO JUMLAH BOBOT BOBOT TERHADAP
URAIAN
HARGA (Rp) (%) SELURUH PEK.
1 2 3 4 5

I PEKERJAAN PERSIAPAN 43,316,981.92 7.94 7.04

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


A. PEKERJAAN BETON 178,514,013.82 32.72 16.59

B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR 215,255,604.88 39.45 31.37

C. PEKERJAAN PENGECETAN 37,568,503.25 6.89 -

III PEKERJAAN GERBANG MASUK 70,935,805.94 13.00 -

JUMLAH 545,590,909.81 100.00 55.01

Disetujui Oleh : Diperiksa Oleh :


Pejabat Pembuat Komitmen (PPK) Direksi Lapangan
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(LINDA A. HIDAYATI) (MULYANI)


NIP. 19770819 200812 2 003
MAJUAN FISIK BULAN - 02
APITULASI TOTAL

REALISASI BULAN INI REALISASI S/D BULAN INI


BOBOT TERHADAP BOBOT TERHADAP
SELURUH PEK. SELURUH PEK.
6 7

0.29 7.33

16.12 32.72

6.87 38.24

4.00 4.00

6.38 6.38

33.66 88.67

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (RUGAYA S. HAMID)


Pengawas Lapangan Direktris
JADWAL WAKTU PELAKSANAAN PEKERJAAN
(TIME SCHEDULE)
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
PERIODE 30 OKTOBER 2019 S/D 26 NOVEMBER 2019
TAHUN ANGGARAN : 2019
JUMLAH HARGA BULAN I
No. URAIAN PEKERJAAN BOBOT
( Rp ) M M M M M
1 2 3 4 5
I. PEKERJAAN PERSIAPAN
1 Mobilisasi /Demobilisasi Tenaga Kerja 2,000,000.00 0.37 0.10 0.10
2 Pembuatan Kantor Sementara Lantai Plesteran 5,997,967.17 1.10 0.30 0.60 0.20
3 Pembuatan Gudang Semen dan Peralatan 4,000,000.00 0.73 0.25 0.48
4 Pembuatan Bedeng Pekerja 4,500,000.00 0.82 0.10 0.72
5 Papan Nama Proyek Uk. 120 x 120 cm 300,000.00 0.05 0.05
6 Pembongkaran Dinding Pagar Eksisting 11,572,842.92 2.12 1.06 1.06
7 Pembongkaran Kolom dan Ring Balk Pagar Eksisting 1,146,171.82 0.21 0.21
8 Genset Kap. 2.2 kvA dan Air Kerja 8,300,000.00 1.52 0.15 0.15 0.15 0.15 0.15
9 Dokumentasi, Laporan & Asbuilt Drawing 4,000,000.00 0.73 0.07 0.07 0.07 0.07 0.07
10 Pembersihan Akhir Lokasi Pekerjaan 1,500,000.00 0.27
II. PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTIONG GILOLO)
A. PEKERJAAN BETON
1 Sloof Type II, Uk. 20 x 100 (Beton Mutu K-300) 10,247,583.56 1.88
a. Pek. Bekisting 14,924,352.60 2.74 0.80 0.80
b. Pek. Besi Beton 11,013,055.88 2.02 0.67 0.67 0.67
2 Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300) 15,580,122.42 2.86
a. Pek. Bekisting 28,356,269.94 5.20 1.73
b. Pek. Besi Beton 18,825,239.78 3.45 REALISASI 1.15 1.15
3 Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) 4,851,275.88 0.89
a. Pek. Bekisting 14,458,230.72 2.65 0.88
b. Pek. Besi Beton 6,640,941.36 1.22 0.41 0.41
4 Kolom Baru Type III, Uk. 30 x 30 x 290 (Beton Mutu K-250) 8,587,315.92 1.57
a. Pek. Bekisting 25,576,111.58 4.69 1.56
b. Pek. Besi Beton 11,854,754.58 2.17 0.72 0.72
B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
1 Plesteran Permukaan Sloof Type II, Uk. 20 x 100 Camp. 1PC : 3PP 5,908,288.55 1.08
2 Plesteran Permukaan Sloof Type III, Uk. 20 x 80 Camp. 1PC : 3PP 9,087,510.49 1.67
3 Plesteran Badan Kolom Baru Type II, Camp. 1PC : 3PP 1,850,638.53 0.34
4 Plesteran Badan Kolom Baru Type III, Camp. 1PC : 3PP 3,515,796.40 0.64
5 Plesteran Profil Kepala dan Kaki Kolom Type II, Camp. 1PC : 2PP 1,344,674.52 0.25
6 Plesteran Profil Kepala dan Kaki Kolom Type III, Camp. 1PC : 2PP 3,163,186.73 0.58
7 Acian Sloof, Kolom dan Profil 10,213,997.79 1.87
8 Perakitan dan Pemasangan Pagar Besi Beton Polos ᴓ16 180,171,511.87 33.02 0.50 1.00 3.00 4.46 8.00
C. PEKERJAAN PENGECATAN
1 Pengecatan Permukaan Sloof Type II 3,761,859.02 0.69
2 Pengecatan Permukaan Sloof Type III 5,786,097.45 1.06
RENCANA
3 Pengecatan Kolom Baru type II dan Profil 2,014,286.42 0.37
4 Pengecatan Kolom Baru type III dan Profil 4,205,055.11 0.77
5 Pengecatan Permukaan Pagar dengan Cat Besi 21,801,205.24 4.00
IV. PEKERJAAN GERBANG MASUK
1 Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) 3,345,707.50 0.61
a. Pek. Bekisting 5,982,716.16 1.10 1.10
b. Pek. Besi Beton 2,753,743.51 0.50 0.50
2 Plesteran Badan Kolom Camp. 1PC : 3PP 1,500,517.73 0.28
3 Plesteran Profil Kepala dan Kaki Kolom, Camp. 1PC : 2PP 392,730.34 0.07
4 Acian Sloof, Kolom dan Profil 1,020,553.08 0.19
5 Pas. Pintu Besi Gerbang 59,596,495.16 10.92 1.00 1.00
6 Pengecatan Kolom dan Profil 1,199,548.70 0.22
7 Pengecatan Permukaan Pagar dengan Cat Besi 2,742,552.64 0.50
JUMLAH 545,590,909 100.00
RENCANA 1.18 3.09 6.34 11.52 17.16
AKUMULASI - 1.18 4.27 10.61 22.13 39.29
REALISASI RENCANA BOBOT/MINNGU (%) 9.89 20.47 13.91 10.73 7.14
AKUMULASI - 9.89 30.36 44.28 55.01 62.15
DEVIASI 0 8.71 26.10 33.67 32.88 22.86

Disetujui Oleh : Diperiksa Oleh : Diperiksa Oleh :


Pejabat Pembuat Komitmen (PPK) Direksi Lapangan Konsultan Pengawas
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA CV. LINTAS RAYA DESAIN

(LINDA A. HIDAYATI) (MULYANI) (ANWAR ADE, ST.)


NIP. 19770819 200812 2 003 Pengawas Lapangan
ELAKSANAAN PEKERJAAN
E SCHEDULE)

BULAN II BULAN III


M M M M M KET
6 7 8 9 10

0.17 100

0.15 0.15 0.15 0.15 0.15


0.07 0.07 0.07 0.07 0.07
0.14 0.14

0.47 0.47 0.47 0.47


1.14

0.71 0.71 0.71 0.71


1.73 1.73
REALISASI 1.15
0.22 0.22 0.22 0.22
0.88 0.88
0.41
0.39 0.39 0.39 0.39
1.56 1.56
0.72
50
0.36 0.36 0.36
0.56 0.56 0.56
0.11 0.11 0.11
0.21 0.21 0.21
0.08 0.08 0.08
0.19 0.19 0.19
0.62 0.62 0.62
8.00 8.06

0.69
RENCANA 1.06
0.37
0.77
1.50 0.75 0.75 1.00

0.61

0.28
0.07
0.19
2.90 3.00 3.02
0.22
0.50 0

20.52 21.52 10.83 5.59 2.25


59.81 81.33 92.16 97.75 100.00
12.82 6.37 7.33
74.97 81.34 88.67
15.16 0.01 -3.50

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (RUGAYA S. HAMID)


Pengawas Lapangan Direktris
LAPORAN KEMAJUAN FISIK MINGGU - 09
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
PERIODE : 27 NOVEMBER 2019 S/D 03 DESEMBER 2019
TAHUN ANGGARAN : 2019

KONTRAK REALISASI S/D MINGGU LALU


SATUAN JUMLAH BOBOT Bobot / Bobot Trhdp
NO
URAIAN SAT. VOLUME Volume
HARGA (Rp) HARGA (Rp) (%) Item Pek. (%) Seluruh Pek. (%)
1 2 3 4 5 6 7 8 9 10
I PEKERJAAN PERSIAPAN
Mobilisasi /Demobilisasi Tenaga Kerja Ls 1.00 2,000,000.00 2,000,000.00 0.37 0.50 50.00 0.18
Pembuatan Kantor Sementara Lantai Plesteran Ls 1.00 5,997,967.17 5,997,967.17 1.10 1.00 100.00 1.10
Pembuatan Gudang Semen dan Peralatan Ls 1.00 4,000,000.00 4,000,000.00 0.73 1.00 100.00 0.73
Pembuatan Bedeng Pekerja Ls 1.00 4,500,000.00 4,500,000.00 0.82 1.00 100.00 0.82
Papan Nama Proyek Uk. 120 x 120 cm Ls 1.00 300,000.00 300,000.00 0.05 1.00 100.00 0.05
Pembongkaran Dinding Pagar Eksisting M2 72.90 158,749.56 11,572,842.92 2.12 72.90 100.00 2.12
Pembongkaran Kolom dan Ring Balk Pagar Eksisting M3 3.61 317,499.12 1,146,171.82 0.21 3.61 100.00 0.21
Genset Kap. 2.2 kvA dan Air Kerja Ls 1.00 8,300,000.00 8,300,000.00 1.52 1.00 100.00 1.52
Dokumentasi, Laporan & Asbuilt Drawing Ls 1.00 4,000,000.00 4,000,000.00 0.73 0.80 80.00 0.59
Pembersihan Akhir Lokasi Pekerjaan Ls 1.00 1,500,000.00 1,500,000.00 0.27 - - -
II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)
A. PEKERJAAN BETON
1. Sloof Type II, Uk. 20 x 100 (Beton Mutu K-300) M3 5.28 1,897,700.66 10,011,889.14 1.84 5.28 100.00 1.84
a. Pek. Bekisting M2 63.56 276,376.90 17,565,963.01 3.22 63.56 100.00 3.22
b. Pek. Besi Beton Kg 562.38 19,181.83 10,787,405.28 1.98 562.38 100.00 1.98
2. Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300) M3 8.21 1,897,700.66 15,580,122.42 2.86 8.21 100.00 2.86
a. Pek. Bekisting M2 107.24 276,376.90 29,639,764.26 5.43 107.24 100.00 5.43
b. Pek. Besi Beton Kg 981.41 19,181.83 18,825,239.78 3.45 981.41 100.00 3.45
3. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 4.19 1,858,726.39 7,794,940.86 1.43 4.19 100.00 1.43
a. Pek. Bekisting M2 33.86 415,466.40 14,069,354.17 2.58 33.86 100.00 2.58
b. Pek. Besi Beton Kg 299.53 19,181.83 5,745,613.52 1.05 299.53 100.00 1.05
4. Kolom Baru Type III, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 6.09 1,858,726.39 11,321,297.98 2.08 6.09 100.00 2.08
a. Pek. Bekisting M2 63.42 415,466.40 26,348,879.09 4.83 63.42 100.00 4.83
b. Pek. Besi Beton Kg 564.26 19,181.83 10,823,544.31 1.98 564.26 100.00 1.98
B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
1. Plesteran Permukaan Sloof Type II, Uk. 20 x 100 Camp. 1PC 3PP M2 56.70 104,202.62 5,908,288.55 1.08 26.35 46.47 0.50
2. Plesteran Permukaan Sloof Type III, Uk. 20 x 80 Camp. 1PC 3PP M2 87.21 104,202.62 9,087,510.49 1.67 87.21 100.00 1.67
3. Plesteran Badan Kolom Baru Type II, Camp. 1PC 3PP M2 17.76 104,202.62 1,850,638.53 0.34 8.65 48.70 0.17
4. Plesteran Badan Kolom Baru Type III, Camp. 1PC 3PP M2 33.74 104,202.62 3,515,796.40 0.64 33.74 100.00 0.64
5. Plesteran Profil Kepala dan Kaki Kolom Type II, Camp. 1PC 2PP M2 12.60 106,720.20 1,344,674.52 0.25 12.60 100.00 0.25
6. Plesteran Profil Kepala dan Kaki Kolom Type III, Camp. 1PC 2PP M2 29.64 106,720.20 3,163,186.73 0.58 20.33 68.59 0.40
7. Acian Sloof, Kolom dan Profil M2 180.95 56,446.52 10,213,997.79 1.87 154.11 85.17 1.59
8. Perakitan dan Pemasangan Pagar Besi Beton Polos 16 M2 156.60 1,150,520.51 180,171,511.87 33.02 156.60 100.00 33.02
C. PEKERJAAN PENGECETAN
1. Pengecatan Permukaan Sloof Type II M2 56.70 66,346.72 3,761,859.02 0.69 - - -
2. Pengecatan Permukaan Sloof Type III M2 87.21 66,346.72 5,786,097.45 1.06 - - -
3. Pengecatan Kolom Baru type II dan Profil M2 30.36 66,346.72 2,014,286.42 0.37 - - -
4. Pengecatan Kolom Baru type III dan Profil M2 63.38 66,346.72 4,205,055.11 0.77 - - -
5. Pengecatan Permukaan Pagar dengan Cat Besi M2 234.90 92,810.58 21,801,205.24 4.00 234.90 100.00 4.00
KONTRAK REALISASI S/D MINGGU LALU
SATUAN JUMLAH BOBOT Bobot / Bobot Trhdp
NO
URAIAN SAT. VOLUME Volume
HARGA (Rp) HARGA (Rp) (%) Item Pek. (%) Seluruh Pek. (%)
1 2 3 4 5 6 7 8 9 10
III PEKERJAAN GERBANG MASUK
1. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 1.50 1,858,726.39 2,788,089.59 0.51 - - -
a. Pek. Bekisting M2 12.00 415,466.40 4,985,596.80 0.91 - - -
b. Pek. Besi Beton Kg 122.47 19,181.83 2,349,226.04 0.43 - - -
2. Plesteran Badan Kolom Camp. 1PC 3PP M2 12.00 104,202.62 1,250,431.44 0.23 - - -
3. Plesteran Profil Kepala dan Kaki Kolom, Camp. 1PC 2PP M2 3.68 106,720.20 392,730.34 0.07 - - -
4. Acian Sloof, Kolom dan Profil M2 15.68 56,446.52 885,081.43 0.16 - - -
5. Pas. Pintu Besi Gerbang M2 18.09 3,025,202.80 54,725,918.65 10.03 11.50 63.57 6.38
6. Pengecatan Kolom dan Profil M2 15.68 66,346.72 1,040,316.57 0.19 - - -
7. Pengecatan Permukaan Pagar dengan Cat Besi M2 27.14 92,810.58 2,518,415.09 0.46 - - -
A Jumlah Total Pekerjaan 545,590,909.81 100.00 88.67
B PPN (10 % x A) 54,559,090.98
C Total (A + B) 600,150,000.79
D Dibulatkan 600,150,000.00

Disetujui Oleh : Diperiksa Oleh : Diperiksa


Pejabat Pembuat Komitmen (PPK) Direksi Lapangan Konsultan P
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA CV. LINTAS RA

(LINDA A. HIDAYATI) (MULYANI) (ANWAR A


NIP. 19770819 200812 2 003 Pengawas
JUAN FISIK MINGGU - 09

WAKTU PELAKSANAAN : 70 HARI KALENDER


WAKTU TERPAKAI : 63 HARI KALENDER
SISA WAKTU : 7 HARI KALENDER

Realisasi Pekerjaan
REALISASI MINGGU INI REALISASI S/D MINGGU INI
Bobot / Bobot Trhdp Bobot / Bobot Trhdp
Volume Volume
Item Pek. (%) Seluruh Pek. (%) Item Pek. (%) Seluruh Pek. (%)
11 12 13 14 15 16

- - - 0.50 50.00 0.18


- - - 1.00 100.00 1.10
- - - 1.00 100.00 0.73
- - - 1.00 100.00 0.82
- - - 1.00 100.00 0.05
- - - 72.90 100.00 2.12
- - - 3.61 100.00 0.21
- - - 1.00 100.00 1.52
0.08 8.00 0.06 0.88 88.00 0.65
- - - - - -

- - - 5.28 100.00 1.84


- - - 63.56 100.00 3.22
- - - 562.38 100.00 1.98
- - - 8.21 100.00 2.86
- - - 107.24 100.00 5.43
- - - 981.41 100.00 3.45
- - - 4.19 100.00 1.43
- - - 33.86 100.00 2.58
- - - 299.53 100.00 1.05
- - - 6.09 100.00 2.08
- - - 63.42 100.00 4.83
- - - 564.26 100.00 1.98

30.35 53.53 0.58 56.70 100.00 1.08


- - - 87.21 100.00 1.67
9.11 51.30 0.17 17.76 100.00 0.34
- - - 33.74 100.00 0.64
- - - 12.60 100.00 0.25
9.31 31.41 0.18 29.64 100.00 0.58
26.84 14.83 0.28 180.95 100.00 1.87
- - - 156.60 100.00 33.02

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - 234.90 100.00 4.00
Realisasi Pekerjaan
REALISASI MINGGU INI REALISASI S/D MINGGU INI
Bobot / Bobot Trhdp Bobot / Bobot Trhdp
Volume Volume
Item Pek. (%) Seluruh Pek. (%) Item Pek. (%) Seluruh Pek. (%)
11 12 13 14 15 16

- - - - - -
12.00 100.00 0.91 12.00 100.00 0.91
122.47 100.00 0.43 122.47 100.00 0.43
- - - - - -
- - - - - -
- - - - - -
5.50 30.40 3.05 17.00 93.97 9.43
- - - - - -
13.57 50.00 0.23 13.57 50.00 0.23
5.90 94.56

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (RUGAYA S. HAMID)


Pengawas Lapangan Direktris
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 27 NOVEMBER 2019 S/D 03 DESEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.016 Ls - 0.016

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
1. Plesteran Permukaan Sloof Type II, Uk. 20 x 100 Camp. 1PC 3PP 10.12 M2 Semen portland 7.78 78.67
Pasir Halus Pantai 0.02 0.23

3. Plesteran Badan Kolom Baru Type II, Camp. 1PC 3PP 9.11 M2 Semen portland 7.78 70.84
Pasir Halus Pantai 0.02 0.21

III PEKERJAAN GERBANG MASUK


b. Pek. Besi Beton 61.24 kg Besi beton (polos/ulir) 1.05 64.30
Kawat beton 0.15 9.19

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-09

Hari Ke : 57
Tanggal : 27 November 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 3.00 Org
Tukang 3.00 Org
kg Pekerja 11.00 Org
M3 Sopir 1.00 Org
Ass. Sopir 1.00 Org
kg
M3

kg
kg

21.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 27 NOVEMBER 2019 S/D 03 DESEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.016 Ls - 0.016

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
1. Plesteran Permukaan Sloof Type II, Uk. 20 x 100 Camp. 1PC 3PP 10.12 M2 Semen portland 7.78 78.67
Pasir Halus Pantai 0.02 0.23

III PEKERJAAN GERBANG MASUK


b. Pek. Besi Beton 61.24 kg Besi beton (polos/ulir) 1.05 64.30
Kawat beton 0.15 9.19

5. Pas. Pintu Besi Gerbang 5.50 M2 Besi Beton 30.32 166.77


Tombak Besi Cor/Tempa dia. 16 6.00 33.00
Pengelasan 37.00 203.50

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-09

Hari Ke : 58
Tanggal : 28 November 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 3.00 Org
Tukang 3.00 Org
kg Pekerja 11.00 Org
M3 Sopir 1.00 Org
Ass. Sopir 1.00 Org

kg
kg

kg
Bh
cm

21.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 27 NOVEMBER 2019 S/D 03 DESEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.016 Ls - 0.016

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
1. Plesteran Permukaan Sloof Type II, Uk. 20 x 100 Camp. 1PC 3PP 10.12 M2 Semen portland 7.78 78.67
Pasir Halus Pantai 0.02 0.23

7. Acian Sloof, Kolom dan Profil 8.95 M2 Semen portland 4.25 38.02

III PEKERJAAN GERBANG MASUK


7. Pengecatan Permukaan Pagar dengan Cat Besi 6.78 M2 Cat Besi 0.10 0.68
Pengencer 0.01 0.07
Kuas 0.01 0.07
Perancah kayu 0.0020 0.01

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-09

Hari Ke : 59
Tanggal : 29 November 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 3.00 Org
Tukang 3.00 Org
kg Pekerja 10.00 Org
M3 Sopir 1.00 Org
Ass. Sopir 1.00 Org
kg

Ltr
Ltr
Bh
m3

20.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 27 NOVEMBER 2019 S/D 03 DESEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.016 Ls - 0.016

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
7. Acian Sloof, Kolom dan Profil 8.95 M2 Semen portland 4.25 38.02

III PEKERJAAN GERBANG MASUK


a. Pek. Bekisting 6.00 M2 Kayu kelas III 0.05 0.27
Paku 5 - 10 cm 0.30 1.80
Minyak bekisting 0.10 0.60

7. Pengecatan Permukaan Pagar dengan Cat Besi 6.78 M2 Cat Besi 0.10 0.68
Pengencer 0.01 0.07
Kuas 0.01 0.07
Perancah kayu 0.0020 0.01

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-09

Hari Ke : 60
Tanggal : 30 November 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 3.00 Org
Tukang 3.00 Org
kg Pekerja 11.00 Org
Sopir 1.00 Org
Ass. Sopir 1.00 Org
m3
kg
Ltr

Ltr
Ltr
Bh
m3

21.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 27 NOVEMBER 2019 S/D 03 DESEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.016 Ls - 0.016

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
7. Acian Sloof, Kolom dan Profil 8.95 M2 Semen portland 4.25 38.02

III PEKERJAAN GERBANG MASUK


a. Pek. Bekisting 6.00 M2 Kayu kelas III 0.05 0.27
Paku 5 - 10 cm 0.30 1.80
Minyak bekisting 0.10 0.60

7. Pengecatan Permukaan Pagar dengan Cat Besi 6.78 M2 Cat Besi 0.10 0.68
Pengencer 0.01 0.07
Kuas 0.01 0.07
Perancah kayu 0.0020 0.01

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-09

Hari Ke : 61
Tanggal : 01 Desember 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 3.00 Org
Tukang 3.00 Org
kg Pekerja 11.00 Org
Sopir 1.00 Org
Ass. Sopir 1.00 Org
m3
kg
Ltr

Ltr
Ltr
Bh
m3

21.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 27 NOVEMBER 2019 S/D 03 DESEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-09

Hari Ke : 62
Tanggal : 02 Desember 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Pelaksana lapangan - Org Alat Tukang - set


Mandor - Org Dump Truck - unit
Kepala Tukang - Org
Tukang - Org
Pekerja - Org
Sopir - Org
Ass. Sopir - Org

- Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 27 NOVEMBER 2019 S/D 03 DESEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-09

Hari Ke : 63
Tanggal : 03 Desember 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Pelaksana lapangan - Org Alat Tukang - set


Mandor - Org Dump Truck - unit
Kepala Tukang - Org
Tukang - Org
Pekerja - Org
Sopir - Org
Ass. Sopir - Org

- Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN FISIK MINGGU - 10
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
PERIODE : 04 DESEMBER 2019 S/D 10 DESEMBER 2019
TAHUN ANGGARAN : 2019

KONTRAK REALISASI S/D MINGGU LALU


SATUAN JUMLAH BOBOT Bobot / Bobot Trhdp
NO
URAIAN SAT. VOLUME Volume
HARGA (Rp) HARGA (Rp) (%) Item Pek. (%) Seluruh Pek. (%)
1 2 3 4 5 6 7 8 9 10
I PEKERJAAN PERSIAPAN
Mobilisasi /Demobilisasi Tenaga Kerja Ls 1.00 2,000,000.00 2,000,000.00 0.37 0.50 50.00 0.18
Pembuatan Kantor Sementara Lantai Plesteran Ls 1.00 5,997,967.17 5,997,967.17 1.10 1.00 100.00 1.10
Pembuatan Gudang Semen dan Peralatan Ls 1.00 4,000,000.00 4,000,000.00 0.73 1.00 100.00 0.73
Pembuatan Bedeng Pekerja Ls 1.00 4,500,000.00 4,500,000.00 0.82 1.00 100.00 0.82
Papan Nama Proyek Uk. 120 x 120 cm Ls 1.00 300,000.00 300,000.00 0.05 1.00 100.00 0.05
Pembongkaran Dinding Pagar Eksisting M2 72.90 158,749.56 11,572,842.92 2.12 72.90 100.00 2.12
Pembongkaran Kolom dan Ring Balk Pagar Eksisting M3 3.61 317,499.12 1,146,171.82 0.21 3.61 100.00 0.21
Genset Kap. 2.2 kvA dan Air Kerja Ls 1.00 8,300,000.00 8,300,000.00 1.52 1.00 100.00 1.52
Dokumentasi, Laporan & Asbuilt Drawing Ls 1.00 4,000,000.00 4,000,000.00 0.73 0.88 88.00 0.65
Pembersihan Akhir Lokasi Pekerjaan Ls 1.00 1,500,000.00 1,500,000.00 0.27 - - -
II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)
A. PEKERJAAN BETON
1. Sloof Type II, Uk. 20 x 100 (Beton Mutu K-300) M3 5.28 1,897,700.66 10,011,889.14 1.84 5.28 100.00 1.84
a. Pek. Bekisting M2 63.56 276,376.90 17,565,963.01 3.22 63.56 100.00 3.22
b. Pek. Besi Beton Kg 562.38 19,181.83 10,787,405.28 1.98 562.38 100.00 1.98
2. Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300) M3 8.21 1,897,700.66 15,580,122.42 2.86 8.21 100.00 2.86
a. Pek. Bekisting M2 107.24 276,376.90 29,639,764.26 5.43 107.24 100.00 5.43
b. Pek. Besi Beton Kg 981.41 19,181.83 18,825,239.78 3.45 981.41 100.00 3.45
3. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 4.19 1,858,726.39 7,794,940.86 1.43 4.19 100.00 1.43
a. Pek. Bekisting M2 33.86 415,466.40 14,069,354.17 2.58 33.86 100.00 2.58
b. Pek. Besi Beton Kg 299.53 19,181.83 5,745,613.52 1.05 299.53 100.00 1.05
4. Kolom Baru Type III, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 6.09 1,858,726.39 11,321,297.98 2.08 6.09 100.00 2.08
a. Pek. Bekisting M2 63.42 415,466.40 26,348,879.09 4.83 63.42 100.00 4.83
b. Pek. Besi Beton Kg 564.26 19,181.83 10,823,544.31 1.98 564.26 100.00 1.98
B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
1. Plesteran Permukaan Sloof Type II, Uk. 20 x 100 Camp. 1PC 3PP M2 56.70 104,202.62 5,908,288.55 1.08 56.70 100.00 1.08
2. Plesteran Permukaan Sloof Type III, Uk. 20 x 80 Camp. 1PC 3PP M2 87.21 104,202.62 9,087,510.49 1.67 87.21 100.00 1.67
3. Plesteran Badan Kolom Baru Type II, Camp. 1PC 3PP M2 17.76 104,202.62 1,850,638.53 0.34 17.76 100.00 0.34
4. Plesteran Badan Kolom Baru Type III, Camp. 1PC 3PP M2 33.74 104,202.62 3,515,796.40 0.64 33.74 100.00 0.64
5. Plesteran Profil Kepala dan Kaki Kolom Type II, Camp. 1PC 2PP M2 12.60 106,720.20 1,344,674.52 0.25 12.60 100.00 0.25
6. Plesteran Profil Kepala dan Kaki Kolom Type III, Camp. 1PC 2PP M2 29.64 106,720.20 3,163,186.73 0.58 29.64 100.00 0.58
7. Acian Sloof, Kolom dan Profil M2 180.95 56,446.52 10,213,997.79 1.87 180.95 100.00 1.87
8. Perakitan dan Pemasangan Pagar Besi Beton Polos 16 M2 156.60 1,150,520.51 180,171,511.87 33.02 156.60 100.00 33.02
C. PEKERJAAN PENGECETAN
1. Pengecatan Permukaan Sloof Type II M2 56.70 66,346.72 3,761,859.02 0.69 - - -
2. Pengecatan Permukaan Sloof Type III M2 87.21 66,346.72 5,786,097.45 1.06 - - -
3. Pengecatan Kolom Baru type II dan Profil M2 30.36 66,346.72 2,014,286.42 0.37 - - -
4. Pengecatan Kolom Baru type III dan Profil M2 63.38 66,346.72 4,205,055.11 0.77 - - -
5. Pengecatan Permukaan Pagar dengan Cat Besi M2 234.90 92,810.58 21,801,205.24 4.00 234.90 100.00 4.00
KONTRAK REALISASI S/D MINGGU LALU
SATUAN JUMLAH BOBOT Bobot / Bobot Trhdp
NO
URAIAN SAT. VOLUME Volume
HARGA (Rp) HARGA (Rp) (%) Item Pek. (%) Seluruh Pek. (%)
1 2 3 4 5 6 7 8 9 10
III PEKERJAAN GERBANG MASUK
1. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 1.50 1,858,726.39 2,788,089.59 0.51 - - -
a. Pek. Bekisting M2 12.00 415,466.40 4,985,596.80 0.91 12.00 100.00 0.91
b. Pek. Besi Beton Kg 122.47 19,181.83 2,349,226.04 0.43 122.47 100.00 0.43
2. Plesteran Badan Kolom Camp. 1PC 3PP M2 12.00 104,202.62 1,250,431.44 0.23 - - -
3. Plesteran Profil Kepala dan Kaki Kolom, Camp. 1PC 2PP M2 3.68 106,720.20 392,730.34 0.07 - - -
4. Acian Sloof, Kolom dan Profil M2 15.68 56,446.52 885,081.43 0.16 - - -
5. Pas. Pintu Besi Gerbang M2 18.09 3,025,202.80 54,725,918.65 10.03 17.00 93.97 9.43
6. Pengecatan Kolom dan Profil M2 15.68 66,346.72 1,040,316.57 0.19 - - -
7. Pengecatan Permukaan Pagar dengan Cat Besi M2 27.14 92,810.58 2,518,415.09 0.46 13.57 50.00 0.23
A Jumlah Total Pekerjaan 545,590,909.81 100.00 94.56
B PPN (10 % x A) 54,559,090.98
C Total (A + B) 600,150,000.79
D Dibulatkan 600,150,000.00

Disetujui Oleh : Diperiksa Oleh : Diperiksa


Pejabat Pembuat Komitmen (PPK) Direksi Lapangan Konsultan P
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA CV. LINTAS RA

(LINDA A. HIDAYATI) (MULYANI) (ANWAR A


NIP. 19770819 200812 2 003 Pengawas
JUAN FISIK MINGGU - 10

WAKTU PELAKSANAAN : 70 HARI KALENDER


WAKTU TERPAKAI : 70 HARI KALENDER
SISA WAKTU : 0 HARI KALENDER

Realisasi Pekerjaan
REALISASI MINGGU INI REALISASI S/D MINGGU INI
Bobot / Bobot Trhdp Bobot / Bobot Trhdp
Volume Volume
Item Pek. (%) Seluruh Pek. (%) Item Pek. (%) Seluruh Pek. (%)
11 12 13 14 15 16

- - - 0.50 50.00 0.18


- - - 1.00 100.00 1.10
- - - 1.00 100.00 0.73
- - - 1.00 100.00 0.82
- - - 1.00 100.00 0.05
- - - 72.90 100.00 2.12
- - - 3.61 100.00 0.21
- - - 1.00 100.00 1.52
0.07 7.00 0.05 0.95 95.00 0.70
- - - - - -

- - - 5.28 100.00 1.84


- - - 63.56 100.00 3.22
- - - 562.38 100.00 1.98
- - - 8.21 100.00 2.86
- - - 107.24 100.00 5.43
- - - 981.41 100.00 3.45
- - - 4.19 100.00 1.43
- - - 33.86 100.00 2.58
- - - 299.53 100.00 1.05
- - - 6.09 100.00 2.08
- - - 63.42 100.00 4.83
- - - 564.26 100.00 1.98

- - - 56.70 100.00 1.08


- - - 87.21 100.00 1.67
- - - 17.76 100.00 0.34
- - - 33.74 100.00 0.64
- - - 12.60 100.00 0.25
- - - 29.64 100.00 0.58
- - - 180.95 100.00 1.87
- - - 156.60 100.00 33.02

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - 234.90 100.00 4.00
Realisasi Pekerjaan
REALISASI MINGGU INI REALISASI S/D MINGGU INI
Bobot / Bobot Trhdp Bobot / Bobot Trhdp
Volume Volume
Item Pek. (%) Seluruh Pek. (%) Item Pek. (%) Seluruh Pek. (%)
11 12 13 14 15 16

1.50 100.00 0.51 1.50 100.00 0.51


- - - 12.00 100.00 0.91
- - - 122.47 100.00 0.43
12.00 100.00 0.23 12.00 100.00 0.23
3.68 100.00 0.07 3.68 100.00 0.07
15.68 100.00 0.16 15.68 100.00 0.16
1.09 6.03 0.60 18.09 100.00 10.03
- - - - - -
13.57 50.00 0.23 27.14 100.00 0.46
1.86 96.42

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (RUGAYA S. HAMID)


Pengawas Lapangan Direktris
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 04 DESEMBER 2019 S/D 10 DESEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.012 Ls - 0.012

III PEKERJAAN GERBANG MASUK


1. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) 1.50 M3 Semen portland 384.00 576.00
Pasir Beton 692.00 1,038.00
Kerikil (Maks 30 mm) 1,039.00 1,558.50
Air 215.00 322.50

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-10

Hari Ke : 64
Tanggal : 04 Desember 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 1.00 Org
kg Tukang 1.00 Org
kg Pekerja 5.00 Org
kg Sopir 1.00 Org
Ltr Ass. Sopir 1.00 Org

11.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 04 DESEMBER 2019 S/D 10 DESEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.012 Ls - 0.012

III PEKERJAAN GERBANG MASUK


7. Pengecatan Permukaan Pagar dengan Cat Besi 6.78 M2 Cat Besi 0.10 0.68
Pengencer 0.01 0.07
Kuas 0.01 0.07
Perancah kayu 0.0020 0.01

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-10

Hari Ke : 65
Tanggal : 05 Desember 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 1.00 Org
Ltr Tukang 1.00 Org
Ltr Pekerja 2.00 Org
Bh Sopir 1.00 Org
m3 Ass. Sopir 1.00 Org

8.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 04 DESEMBER 2019 S/D 10 DESEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.012 Ls - 0.012

III PEKERJAAN GERBANG MASUK


7. Pengecatan Permukaan Pagar dengan Cat Besi 6.78 M2 Cat Besi 0.10 0.68
Pengencer 0.01 0.07
Kuas 0.01 0.07
Perancah kayu 0.0020 0.01

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-10

Hari Ke : 66
Tanggal : 06 Desember 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 1.00 Org
Ltr Tukang 1.00 Org
Ltr Pekerja 2.00 Org
Bh Sopir 1.00 Org
m3 Ass. Sopir 1.00 Org

8.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 04 DESEMBER 2019 S/D 10 DESEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-10

Hari Ke : 67
Tanggal : 07 Desember 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Pelaksana lapangan - Org Alat Tukang - set


Mandor - Org Dump Truck - unit
Kepala Tukang - Org
Tukang - Org
Pekerja - Org
Sopir - Org
Ass. Sopir - Org

- Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 04 DESEMBER 2019 S/D 10 DESEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.012 Ls - 0.012

III PEKERJAAN GERBANG MASUK


2. Plesteran Badan Kolom Camp. 1PC 3PP 6.00 M2 Semen portland 7.78 46.66
Pasir Halus Pantai 0.02 0.14

3. Plesteran Profil Kepala dan Kaki Kolom, Camp. 1PC 2PP 1.84 M2 Semen portland 10.22 18.81
Pasir Halus Pantai 0.02 0.04

4. Acian Sloof, Kolom dan Profil 5.23 M2 Semen portland 4.25 22.21

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-10

Hari Ke : 68
Tanggal : 08 Desember 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 1.00 Org
kg Tukang 1.00 Org
M3 Pekerja 8.00 Org
Sopir 1.00 Org
kg Ass. Sopir 1.00 Org
M3

kg

14.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 04 DESEMBER 2019 S/D 10 DESEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.012 Ls - 0.012

III PEKERJAAN GERBANG MASUK


2. Plesteran Badan Kolom Camp. 1PC 3PP 6.00 M2 Semen portland 7.78 46.66
Pasir Halus Pantai 0.02 0.14

3. Plesteran Profil Kepala dan Kaki Kolom, Camp. 1PC 2PP 1.84 M2 Semen portland 10.22 18.81
Pasir Halus Pantai 0.02 0.04

4. Acian Sloof, Kolom dan Profil 5.23 M2 Semen portland 4.25 22.21

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-10

Hari Ke : 69
Tanggal : 09 Desember 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 1.00 Org
kg Tukang 1.00 Org
M3 Pekerja 8.00 Org
Sopir 1.00 Org
kg Ass. Sopir 1.00 Org
M3

kg

14.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 04 DESEMBER 2019 S/D 10 DESEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.012 Ls - 0.012

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-10

Hari Ke : 70
Tanggal : 10 Desember 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 1.00 Org
Tukang 1.00 Org
Pekerja 3.00 Org
Sopir 1.00 Org
Ass. Sopir 1.00 Org

9.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN FISIK MINGGU - 11
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
PERIODE : 11 DESEMBER 2019 S/D 14 DESEMBER 2019
TAHUN ANGGARAN : 2019

KONTRAK REALISASI S/D MINGGU LALU


SATUAN JUMLAH BOBOT Bobot / Bobot Trhdp
NO
URAIAN SAT. VOLUME Volume
HARGA (Rp) HARGA (Rp) (%) Item Pek. (%) Seluruh Pek. (%)
1 2 3 4 5 6 7 8 9 10
I PEKERJAAN PERSIAPAN
Mobilisasi /Demobilisasi Tenaga Kerja Ls 1.00 2,000,000.00 2,000,000.00 0.37 0.50 50.00 0.18
Pembuatan Kantor Sementara Lantai Plesteran Ls 1.00 5,997,967.17 5,997,967.17 1.10 1.00 100.00 1.10
Pembuatan Gudang Semen dan Peralatan Ls 1.00 4,000,000.00 4,000,000.00 0.73 1.00 100.00 0.73
Pembuatan Bedeng Pekerja Ls 1.00 4,500,000.00 4,500,000.00 0.82 1.00 100.00 0.82
Papan Nama Proyek Uk. 120 x 120 cm Ls 1.00 300,000.00 300,000.00 0.05 1.00 100.00 0.05
Pembongkaran Dinding Pagar Eksisting M2 72.90 158,749.56 11,572,842.92 2.12 72.90 100.00 2.12
Pembongkaran Kolom dan Ring Balk Pagar Eksisting M3 3.61 317,499.12 1,146,171.82 0.21 3.61 100.00 0.21
Genset Kap. 2.2 kvA dan Air Kerja Ls 1.00 8,300,000.00 8,300,000.00 1.52 1.00 100.00 1.52
Dokumentasi, Laporan & Asbuilt Drawing Ls 1.00 4,000,000.00 4,000,000.00 0.73 0.95 95.00 0.70
Pembersihan Akhir Lokasi Pekerjaan Ls 1.00 1,500,000.00 1,500,000.00 0.27 - - -
II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)
A. PEKERJAAN BETON
1. Sloof Type II, Uk. 20 x 100 (Beton Mutu K-300) M3 5.28 1,897,700.66 10,011,889.14 1.84 5.28 100.00 1.84
a. Pek. Bekisting M2 63.56 276,376.90 17,565,963.01 3.22 63.56 100.00 3.22
b. Pek. Besi Beton Kg 562.38 19,181.83 10,787,405.28 1.98 562.38 100.00 1.98
2. Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300) M3 8.21 1,897,700.66 15,580,122.42 2.86 8.21 100.00 2.86
a. Pek. Bekisting M2 107.24 276,376.90 29,639,764.26 5.43 107.24 100.00 5.43
b. Pek. Besi Beton Kg 981.41 19,181.83 18,825,239.78 3.45 981.41 100.00 3.45
3. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 4.19 1,858,726.39 7,794,940.86 1.43 4.19 100.00 1.43
a. Pek. Bekisting M2 33.86 415,466.40 14,069,354.17 2.58 33.86 100.00 2.58
b. Pek. Besi Beton Kg 299.53 19,181.83 5,745,613.52 1.05 299.53 100.00 1.05
4. Kolom Baru Type III, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 6.09 1,858,726.39 11,321,297.98 2.08 6.09 100.00 2.08
a. Pek. Bekisting M2 63.42 415,466.40 26,348,879.09 4.83 63.42 100.00 4.83
b. Pek. Besi Beton Kg 564.26 19,181.83 10,823,544.31 1.98 564.26 100.00 1.98
B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
1. Plesteran Permukaan Sloof Type II, Uk. 20 x 100 Camp. 1PC 3PP M2 56.70 104,202.62 5,908,288.55 1.08 56.70 100.00 1.08
2. Plesteran Permukaan Sloof Type III, Uk. 20 x 80 Camp. 1PC 3PP M2 87.21 104,202.62 9,087,510.49 1.67 87.21 100.00 1.67
3. Plesteran Badan Kolom Baru Type II, Camp. 1PC 3PP M2 17.76 104,202.62 1,850,638.53 0.34 17.76 100.00 0.34
4. Plesteran Badan Kolom Baru Type III, Camp. 1PC 3PP M2 33.74 104,202.62 3,515,796.40 0.64 33.74 100.00 0.64
5. Plesteran Profil Kepala dan Kaki Kolom Type II, Camp. 1PC 2PP M2 12.60 106,720.20 1,344,674.52 0.25 12.60 100.00 0.25
6. Plesteran Profil Kepala dan Kaki Kolom Type III, Camp. 1PC 2PP M2 29.64 106,720.20 3,163,186.73 0.58 29.64 100.00 0.58
7. Acian Sloof, Kolom dan Profil M2 180.95 56,446.52 10,213,997.79 1.87 180.95 100.00 1.87
8. Perakitan dan Pemasangan Pagar Besi Beton Polos 16 M2 156.60 1,150,520.51 180,171,511.87 33.02 156.60 100.00 33.02
C. PEKERJAAN PENGECETAN
1. Pengecatan Permukaan Sloof Type II M2 56.70 66,346.72 3,761,859.02 0.69 - - -
2. Pengecatan Permukaan Sloof Type III M2 87.21 66,346.72 5,786,097.45 1.06 - - -
3. Pengecatan Kolom Baru type II dan Profil M2 30.36 66,346.72 2,014,286.42 0.37 - - -
4. Pengecatan Kolom Baru type III dan Profil M2 63.38 66,346.72 4,205,055.11 0.77 - - -
5. Pengecatan Permukaan Pagar dengan Cat Besi M2 234.90 92,810.58 21,801,205.24 4.00 234.90 100.00 4.00
KONTRAK REALISASI S/D MINGGU LALU
SATUAN JUMLAH BOBOT Bobot / Bobot Trhdp
NO
URAIAN SAT. VOLUME Volume
HARGA (Rp) HARGA (Rp) (%) Item Pek. (%) Seluruh Pek. (%)
1 2 3 4 5 6 7 8 9 10
III PEKERJAAN GERBANG MASUK
1. Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) M3 1.50 1,858,726.39 2,788,089.59 0.51 1.50 100.00 0.51
a. Pek. Bekisting M2 12.00 415,466.40 4,985,596.80 0.91 12.00 100.00 0.91
b. Pek. Besi Beton Kg 122.47 19,181.83 2,349,226.04 0.43 122.47 100.00 0.43
2. Plesteran Badan Kolom Camp. 1PC 3PP M2 12.00 104,202.62 1,250,431.44 0.23 12.00 100.00 0.23
3. Plesteran Profil Kepala dan Kaki Kolom, Camp. 1PC 2PP M2 3.68 106,720.20 392,730.34 0.07 3.68 100.00 0.07
4. Acian Sloof, Kolom dan Profil M2 15.68 56,446.52 885,081.43 0.16 15.68 100.00 0.16
5. Pas. Pintu Besi Gerbang M2 18.09 3,025,202.80 54,725,918.65 10.03 18.09 100.00 10.03
6. Pengecatan Kolom dan Profil M2 15.68 66,346.72 1,040,316.57 0.19 - - -
7. Pengecatan Permukaan Pagar dengan Cat Besi M2 27.14 92,810.58 2,518,415.09 0.46 27.14 100.00 0.46
A Jumlah Total Pekerjaan 545,590,909.81 100.00 96.42
B PPN (10 % x A) 54,559,090.98
C Total (A + B) 600,150,000.79
D Dibulatkan 600,150,000.00

Disetujui Oleh : Diperiksa Oleh : Diperiksa


Pejabat Pembuat Komitmen (PPK) Direksi Lapangan Konsultan P
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA CV. LINTAS RA

(LINDA A. HIDAYATI) (MULYANI) (ANWAR A


NIP. 19770819 200812 2 003 Pengawas
JUAN FISIK MINGGU - 11

WAKTU PELAKSANAAN : 70 HARI KALENDER


WAKTU TERPAKAI : 74 HARI KALENDER
SISA WAKTU : -4 HARI KALENDER

Realisasi Pekerjaan
REALISASI MINGGU INI REALISASI S/D MINGGU INI
Bobot / Bobot Trhdp Bobot / Bobot Trhdp
Volume Volume
Item Pek. (%) Seluruh Pek. (%) Item Pek. (%) Seluruh Pek. (%)
11 12 13 14 15 16

0.50 50.00 0.18 1.00 100.00 0.37


- - - 1.00 100.00 1.10
- - - 1.00 100.00 0.73
- - - 1.00 100.00 0.82
- - - 1.00 100.00 0.05
- - - 72.90 100.00 2.12
- - - 3.61 100.00 0.21
- - - 1.00 100.00 1.52
0.05 5.00 0.04 1.00 100.00 0.73
1.00 100.00 0.27 1.00 100.00 0.27

- - - 5.28 100.00 1.84


- - - 63.56 100.00 3.22
- - - 562.38 100.00 1.98
- - - 8.21 100.00 2.86
- - - 107.24 100.00 5.43
- - - 981.41 100.00 3.45
- - - 4.19 100.00 1.43
- - - 33.86 100.00 2.58
- - - 299.53 100.00 1.05
- - - 6.09 100.00 2.08
- - - 63.42 100.00 4.83
- - - 564.26 100.00 1.98

- - - 56.70 100.00 1.08


- - - 87.21 100.00 1.67
- - - 17.76 100.00 0.34
- - - 33.74 100.00 0.64
- - - 12.60 100.00 0.25
- - - 29.64 100.00 0.58
- - - 180.95 100.00 1.87
- - - 156.60 100.00 33.02

56.70 100.00 0.69 56.70 100.00 0.69


87.21 100.00 1.06 87.21 100.00 1.06
30.36 100.00 0.37 30.36 100.00 0.37
63.38 100.00 0.77 63.38 100.00 0.77
- - - 234.90 100.00 4.00
Realisasi Pekerjaan
REALISASI MINGGU INI REALISASI S/D MINGGU INI
Bobot / Bobot Trhdp Bobot / Bobot Trhdp
Volume Volume
Item Pek. (%) Seluruh Pek. (%) Item Pek. (%) Seluruh Pek. (%)
11 12 13 14 15 16

- - - 1.50 100.00 0.51


- - - 12.00 100.00 0.91
- - - 122.47 100.00 0.43
- - - 12.00 100.00 0.23
- - - 3.68 100.00 0.07
- - - 15.68 100.00 0.16
- - - 18.09 100.00 10.03
15.68 100.00 0.19 15.68 100.00 0.19
- - - 27.14 100.00 0.46
3.58 100.00

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (RUGAYA S. HAMID)


Pengawas Lapangan Direktris
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 11 DESEMBER 2019 S/D 14 DESEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.012 Ls - 0.012

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


C. PEKERJAAN PENGECETAN
1. Pengecatan Permukaan Sloof Type II 18.90 M2 Cat Besi 0.10 1.89
Pengencer 0.01 0.19
Kuas 0.01 0.19
Perancah kayu 0.0020 0.04

2. Pengecatan Permukaan Sloof Type III 29.07 M2 Cat Besi 0.10 2.91
Pengencer 0.01 0.29
Kuas 0.01 0.29
Perancah kayu 0.0020 0.06

3. Pengecatan Kolom Baru type II dan Profil 10.12 M2 Cat Besi 0.10 2.91
Pengencer 0.01 0.29
Kuas 0.01 0.29
Perancah kayu 0.0020 0.06

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-11

Hari Ke : 71
Tanggal : 11 Desember 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 3.00 Org
Tukang 3.00 Org
Ltr Pekerja 10.00 Org
Ltr Sopir 1.00 Org
Bh Ass. Sopir 1.00 Org
m3

Ltr
Ltr
Bh
m3

Ltr
Ltr
Bh
m3

20.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 11 DESEMBER 2019 S/D 14 DESEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.012 Ls - 0.012

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


C. PEKERJAAN PENGECETAN
1. Pengecatan Permukaan Sloof Type II 18.90 M2 Cat Besi 0.10 1.89
Pengencer 0.01 0.19
Kuas 0.01 0.19
Perancah kayu 0.0020 0.04

2. Pengecatan Permukaan Sloof Type III 29.07 M2 Cat Besi 0.10 2.91
Pengencer 0.01 0.29
Kuas 0.01 0.29
Perancah kayu 0.0020 0.06

3. Pengecatan Kolom Baru type II dan Profil 10.12 M2 Cat Besi 0.10 1.01
Pengencer 0.01 0.10
Kuas 0.01 0.10
Perancah kayu 0.0020 0.02

III PEKERJAAN GERBANG MASUK


6. Pengecatan Kolom dan Profil 7.84 M2 Cat Besi 0.10 0.78
Pengencer 0.01 0.08
Kuas 0.01 0.08
Perancah kayu 0.0020 0.02

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-11

Hari Ke : 72
Tanggal : 12 Desember 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 3.00 Org
Tukang 3.00 Org
Ltr Pekerja 10.00 Org
Ltr Sopir 1.00 Org
Bh Ass. Sopir 1.00 Org
m3

Ltr
Ltr
Bh
m3

Ltr
Ltr
Bh
m3

Ltr
Ltr
Bh
m3

20.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 11 DESEMBER 2019 S/D 14 DESEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.012 Ls - 0.012

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


C. PEKERJAAN PENGECETAN
1. Pengecatan Permukaan Sloof Type II 18.90 M2 Cat Besi 0.10 1.89
Pengencer 0.01 0.19
Kuas 0.01 0.19
Perancah kayu 0.0020 0.04

2. Pengecatan Permukaan Sloof Type III 29.07 M2 Cat Besi 0.10 2.91
Pengencer 0.01 0.29
Kuas 0.01 0.29
Perancah kayu 0.0020 0.06

3. Pengecatan Kolom Baru type II dan Profil 10.12 M2 Cat Besi 0.10 1.01
Pengencer 0.01 0.10
Kuas 0.01 0.10
Perancah kayu 0.0020 0.02

III PEKERJAAN GERBANG MASUK


6. Pengecatan Kolom dan Profil 7.84 M2 Cat Besi 0.10 0.78
Pengencer 0.01 0.08
Kuas 0.01 0.08
Perancah kayu 0.0020 0.02

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-11

Hari Ke : 73
Tanggal : 13 Desember 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Mandor 1.00 Org Dump Truck 1.00 unit
Kepala Tukang 3.00 Org
Tukang 3.00 Org
Ltr Pekerja 10.00 Org
Ltr Sopir 1.00 Org
Bh Ass. Sopir 1.00 Org
m3

Ltr
Ltr
Bh
m3

Ltr
Ltr
Bh
m3

Ltr
Ltr
Bh
m3

20.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
STATUS LAPORAN : 11 DESEMBER 2019 S/D 14 DESEMBER 2019
TAHUN ANGGARAN : 2019

PEMAKAIAN MATERIAL BAHAN


NO PEKERJAAN HARI INI VOL SAT
JENIS KOEF VOL BAHAN
I PEKERJAAN PERSIAPAN
Dokumentasi, Laporan & Asbuilt Drawing 0.018 Ls - 0.018
Pembersihan Akhir Lokasi Pekerjaan 1.00 Ls - 1.000
Mobilisasi /Demobilisasi Tenaga Kerja 0.50 Ls - 0.500

PEKERJAAN DIMULAI : Jam 8:00 s/d Jam 17:00 (Istirahat 1 Jam) CUACA :
Catatan / Saran :

Diperiksa Oleh :
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(MULYANI)
Direksi Lapangan
LAPORAN HARIAN MINGGU KE-11

Hari Ke : 74
Tanggal : 14 Desember 2019

EMAKAIAN MATERIAL BAHAN TENGA KERJA DAN PERALATAN


SAT TENAGA KERJA VOL SAT ALAT VOL SAT

Ls Pelaksana lapangan 1.00 Org Alat Tukang 1.00 set


Ls Mandor 1.00 Org Dump Truck 1.00 unit
Ls Kepala Tukang 3.00 Org
Tukang 3.00 Org
Pekerja 10.00 Org
Sopir 1.00 Org
Ass. Sopir 1.00 Org

20.00 Org
CUACA :

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (ZAINAL ALHADAR)


Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN FISIK BULA
REKAPITULASI TOTAL
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
PERIODE : 27 NOVEMBER 2019 S/D 14 DESEMBER 2019
TAHUN ANGGARAN : 2019
KONTRAK
JUMLAH BOBOT
NO
URAIAN
HARGA (Rp) (%)
1 2 3 4

I PEKERJAAN PERSIAPAN 43,316,981.92 7.94

II PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTION GILOLO)


A. PEKERJAAN BETON 178,514,013.82 32.72

B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR 215,255,604.88 39.45

C. PEKERJAAN PENGECETAN 37,568,503.25 6.89

III PEKERJAAN GERBANG MASUK 70,935,805.94 13.00

JUMLAH 545,590,909.81 100.00

Disetujui Oleh : Diperiksa Oleh :


Pejabat Pembuat Komitmen (PPK) Direksi Lapangan
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA

(LINDA A. HIDAYATI) (MULYANI)


NIP. 19770819 200812 2 003
N KEMAJUAN FISIK BULAN - 03
REKAPITULASI TOTAL

REALISASI S/D BULAN LALU REALISASI BULAN INI REALISASI S/D BULAN INI
BOBOT TERHADAP BOBOT TERHADAP BOBOT TERHADAP
SELURUH PEK. SELURUH PEK. SELURUH PEK.
5 6 7

7.33 0.60 7.94

32.72 - 32.72

38.24 1.21 39.45

4.00 2.89 6.89

6.38 6.63 13.00

88.67 11.33 100.00

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
N CAGAR BUDAYA MALUKU UTARA CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (RUGAYA S. HAMID)


Pengawas Lapangan Direktris
JADWAL WAKTU PELAKSANAAN PEKERJAAN
(TIME SCHEDULE)
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
PERIODE 27 NOVEMBER 2019 S/D 14 DESEMBER 2019
TAHUN ANGGARAN : 2019
JUMLAH HARGA BULAN I
No. URAIAN PEKERJAAN BOBOT
( Rp ) M M M M M
1 2 3 4 5
I. PEKERJAAN PERSIAPAN
1 Mobilisasi /Demobilisasi Tenaga Kerja 2,000,000.00 0.37 0.10 0.10
2 Pembuatan Kantor Sementara Lantai Plesteran 5,997,967.17 1.10 0.30 0.60 0.20
3 Pembuatan Gudang Semen dan Peralatan 4,000,000.00 0.73 0.25 0.48
4 Pembuatan Bedeng Pekerja 4,500,000.00 0.82 0.10 0.72
5 Papan Nama Proyek Uk. 120 x 120 cm 300,000.00 0.05 0.05
6 Pembongkaran Dinding Pagar Eksisting 11,572,842.92 2.12 1.06 1.06
7 Pembongkaran Kolom dan Ring Balk Pagar Eksisting 1,146,171.82 0.21 0.21
8 Genset Kap. 2.2 kvA dan Air Kerja 8,300,000.00 1.52 0.15 0.15 0.15 0.15 0.15
9 Dokumentasi, Laporan & Asbuilt Drawing 4,000,000.00 0.73 0.07 0.07 0.07 0.07 0.07
10 Pembersihan Akhir Lokasi Pekerjaan 1,500,000.00 0.27
II. PEKERJAAN PAGAR SEGMEN II (GERBANG - BASTIONG GILOLO)
A. PEKERJAAN BETON
1 Sloof Type II, Uk. 20 x 100 (Beton Mutu K-300) 10,247,583.56 1.88
a. Pek. Bekisting 14,924,352.60 2.74 0.80 0.80
b. Pek. Besi Beton 11,013,055.88 2.02 0.67 0.67 0.67
2 Sloof Type III, Uk. 20 x 80 (Beton Mutu K-300) 15,580,122.42 2.86
a. Pek. Bekisting 28,356,269.94 5.20 1.73
b. Pek. Besi Beton 18,825,239.78 3.45 REALISASI 1.15 1.15
3 Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) 4,851,275.88 0.89
a. Pek. Bekisting 14,458,230.72 2.65 0.88
b. Pek. Besi Beton 6,640,941.36 1.22 0.41 0.41
4 Kolom Baru Type III, Uk. 30 x 30 x 290 (Beton Mutu K-250) 8,587,315.92 1.57
a. Pek. Bekisting 25,576,111.58 4.69 1.56
b. Pek. Besi Beton 11,854,754.58 2.17 0.72 0.72
B. PEKERJAAN PLESTERAN DAN BESI BETON PAGAR
1 Plesteran Permukaan Sloof Type II, Uk. 20 x 100 Camp. 1PC : 3PP 5,908,288.55 1.08
2 Plesteran Permukaan Sloof Type III, Uk. 20 x 80 Camp. 1PC : 3PP 9,087,510.49 1.67
3 Plesteran Badan Kolom Baru Type II, Camp. 1PC : 3PP 1,850,638.53 0.34
4 Plesteran Badan Kolom Baru Type III, Camp. 1PC : 3PP 3,515,796.40 0.64
5 Plesteran Profil Kepala dan Kaki Kolom Type II, Camp. 1PC : 2PP 1,344,674.52 0.25
6 Plesteran Profil Kepala dan Kaki Kolom Type III, Camp. 1PC : 2PP 3,163,186.73 0.58
7 Acian Sloof, Kolom dan Profil 10,213,997.79 1.87
8 Perakitan dan Pemasangan Pagar Besi Beton Polos ᴓ16 180,171,511.87 33.02 0.50 1.00 3.00 4.46 8.00
C. PEKERJAAN PENGECATAN
1 Pengecatan Permukaan Sloof Type II 3,761,859.02 0.69
2 Pengecatan Permukaan Sloof Type III 5,786,097.45 1.06
RENCANA
3 Pengecatan Kolom Baru type II dan Profil 2,014,286.42 0.37
4 Pengecatan Kolom Baru type III dan Profil 4,205,055.11 0.77
5 Pengecatan Permukaan Pagar dengan Cat Besi 21,801,205.24 4.00
IV. PEKERJAAN GERBANG MASUK
1 Kolom Baru Type II, Uk. 30 x 30 x 290 (Beton Mutu K-250) 3,345,707.50 0.61
a. Pek. Bekisting 5,982,716.16 1.10 1.10
b. Pek. Besi Beton 2,753,743.51 0.50 0.50
2 Plesteran Badan Kolom Camp. 1PC : 3PP 1,500,517.73 0.28
3 Plesteran Profil Kepala dan Kaki Kolom, Camp. 1PC : 2PP 392,730.34 0.07
4 Acian Sloof, Kolom dan Profil 1,020,553.08 0.19
5 Pas. Pintu Besi Gerbang 59,596,495.16 10.92 1.00 1.00
6 Pengecatan Kolom dan Profil 1,199,548.70 0.22
7 Pengecatan Permukaan Pagar dengan Cat Besi 2,742,552.64 0.50
JUMLAH 545,590,909 100.00
RENCANA 1.18 3.09 6.34 11.52 17.16
AKUMULASI - 1.18 4.27 10.61 22.13 39.29
REALISASI RENCANA BOBOT/MINNGU (%) 9.89 20.47 13.91 10.73 7.14
AKUMULASI - 9.89 30.36 44.28 55.01 62.15
DEVIASI 0 8.71 26.10 33.67 32.88 22.86

Disetujui Oleh : Diperiksa Oleh : Diperiksa Oleh :


Pejabat Pembuat Komitmen (PPK) Direksi Lapangan Konsultan Pengawas
BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA BALAI PELESTARIAN CAGAR BUDAYA MALUKU UTARA CV. LINTAS RAYA DESAI

(LINDA A. HIDAYATI) (MULYANI) (ANWAR ADE, ST.)


NIP. 19770819 200812 2 003 Pengawas Lapangan
LAKSANAAN PEKERJAAN
SCHEDULE)

BULAN II BULAN III


M M M M M KET
+ 4 HARI
6 7 8 9 10

0.17 100

0.15 0.15 0.15 0.15 0.15


0.07 0.07 0.07 0.07 0.07
0.14 0.14

0.47 0.47 0.47 0.47


1.14

0.71 0.71 0.71 0.71


1.73 1.73
REALISASI 1.15
0.22 0.22 0.22 0.22
0.88 0.88
0.41
0.39 0.39 0.39 0.39
1.56 1.56
0.72
50

0.36 0.36 0.36


0.56 0.56 0.56
0.11 0.11 0.11
0.21 0.21 0.21
0.08 0.08 0.08
0.19 0.19 0.19
0.62 0.62 0.62
8.00 8.06

0.69
RENCANA 1.06
0.37
0.77
1.50 0.75 0.75 1.00

0.61

0.28
0.07
0.19
2.90 3.00 3.02
0.22
0.50 0

20.52 21.52 10.83 5.59 2.25 -


59.81 81.33 92.16 97.75 100.00 100.00
12.82 6.37 7.33 5.90 1.86 3.58
74.97 81.34 88.67 94.56 96.42 100.00
15.16 0.01 -3.50 -3.19 -3.58 0.00

Diperiksa Oleh : Dibuat Oleh :


Konsultan Pengawas Kontraktor Pelaksana
CV. LINTAS RAYA DESAIN CV. MULIA TEHNIK

(ANWAR ADE, ST.) (RUGAYA S. HAMID)


Pengawas Lapangan Direktris
BACK-UP VOLUME PEKERJAAN
PEKERJAAN : PENATAAN LINGKUNGAN BENTENG ORANJE
LOKASI : KOTA TERNATE
TAHUN ANGGARAN : 2019

SLOOF TIPE II 20 x 100 (S1 - S15)


p 2.70 m
l 0.20 m
tr 0.98 m
n (jml) 10 bh
Vol. Beton Over Stek Berat Panjang Berat Besi
Type BETON PEMBESIAN Ø Besi (mm) s (m') n (Tulangan) p (m') Hook (m') Ø Besi (m) n (Bh)
(Vc) (m') (Kg/m') (m) (Kg)
p (m) l (m) t (m) n (Bh) (m3) Sloof Type II 30 x 30
S1 2.70 0.20 1.20 1 0.65 Tul. Utama Atas 12 3.00 2.70 0.05 - 0.12 0.888 8.25 10.00 73.24
S2 2.70 0.20 1.02 1 0.55 Tul. Utama Tengah 12 10.00 2.70 0.05 - 0.12 0.888 27.50 10.00 244.13
S3 2.70 0.20 0.95 1 0.51 Tul. Utama Bawah 12 2.00 2.70 0.05 - 0.12 0.888 5.50 10.00 48.83
S4 2.70 0.20 0.96 1 0.52 Sengkang 8 0.13 22.00 2.12 0.08 0.06 0.08 0.395 49.72 10.00 196.18
S5 2.70 0.20 0.95 1 0.51 Vol. Berat Total 562.38
S6 2.70 0.20 0.94 1 0.51
S7 2.70 0.20 0.94 1 0.51
S8 2.70 0.20 0.94 1 0.51
S9 2.70 0.20 0.94 1 0.51
S10 2.70 0.20 0.93 1 0.50
Vol. Total 5.28

Vol.
Type Bekisting
Bekisting
p (m) l (m) t (m) n (Bh) (m2)
S1 2.70 0.20 1.20 1 7.56
S2 2.70 0.20 1.02 1 6.59
S3 2.70 0.20 0.95 1 6.21
S4 2.70 0.20 0.96 1 6.26
S5 2.70 0.20 0.95 1 6.21
S6 2.70 0.20 0.94 1 6.16
S7 2.70 0.20 0.94 1 6.16
S8 2.70 0.20 0.94 1 6.16
S9 2.70 0.20 0.94 1 6.16
S10 2.70 0.20 0.93 1 6.10
Vol. Total 63.56

SLOOF TIPE III 20 x 80 (S16 - S29)


p 2.70 m
l 0.20 m
tr 1.09 m
n (jml) 14 bh
Vol. Beton Over Stek Berat Panjang Berat Besi
BETON PEMBESIAN Ø Besi (mm) s (m') n (Tulangan) p (m') Hook (m') Ø Besi (m) n (Bh)
Type (Vc) (m') (Kg/m') (m) (Kg)
p (m) l (m) t (m) n (Bh) (m3) Sloof Type II 30 x 30
S11 2.70 0.20 0.97 1 0.52 Tul. Utama Atas 12 3.00 2.70 0.05 - 0.12 0.888 8.25 19.00 139.16
S12 2.70 0.20 0.95 1 0.51 Tul. Utama Tengah 12 10.00 2.70 0.05 - 0.12 0.888 27.50 19.00 463.85
S13 2.70 0.20 0.69 1 0.37 Tul. Utama Bawah 12 2.00 2.70 0.05 - 0.12 0.888 5.50 19.00 92.77
S14 2.70 0.20 0.70 1 0.38 Sengkang 8 0.13 22.00 2.34 0.08 0.06 0.08 0.395 54.56 19.00 409.02
S15 2.70 0.20 0.70 1 0.38 Vol. Berat Total 1,104.80
S16 2.70 0.20 0.65 1 0.35
S17 2.70 0.20 0.70 1 0.38
S18 2.70 0.20 0.69 1 0.37
S19 2.70 0.20 0.70 1 0.38
S20 2.70 0.20 0.68 1 0.37
S21 2.70 0.20 0.70 1 0.38
S22 2.70 0.20 0.74 1 0.40
S23 2.70 0.20 0.74 1 0.40
S24 2.70 0.20 0.76 1 0.41
S25 2.70 0.20 0.75 1 0.40
S26 2.70 0.20 1.13 1 0.61
S27 2.70 0.20 1.40 1 0.76
S28 2.70 0.20 1.20 1 0.65
S29 2.70 0.20 1.22 1 0.66
Vol. Total 8.67

Vol.
Type Bekisting
Bekisting
p (m) l (m) t (m) n (Bh) (m2)
S11 2.70 0.20 0.97 1 6.32
S12 2.70 0.20 0.95 1 6.21
S13 2.70 0.20 0.69 1 4.81
S14 2.70 0.20 0.70 1 4.86
S15 2.70 0.20 0.70 1 4.86
S16 2.70 0.20 0.65 1 4.59
S17 2.70 0.20 0.70 1 4.86
S18 2.70 0.20 0.69 1 4.81
S19 2.70 0.20 0.70 1 4.86
S20 2.70 0.20 0.68 1 4.75
S21 2.70 0.20 0.70 1 4.86
S22 2.70 0.20 0.74 1 5.08
S23 2.70 0.20 0.74 1 5.08
S24 2.70 0.20 0.76 1 5.18
S25 2.70 0.20 0.75 1 5.10
S26 2.70 0.20 1.13 1 7.18
S27 2.70 0.20 1.40 1 8.64
S28 2.70 0.20 1.20 1 7.56
S29 2.70 0.20 1.22 1 7.64
Vol. Total 107.24

KOLOM TIPE II (K1 - K10)


p 0.30 m
l 0.30 m
tr 2.82 m
n (jml) 10 bh
Vol. Beton Over Stek Berat Panjang Berat Besi
Type BETON PEMBESIAN Ø Besi (mm) s (m') n (Tulangan) tr (m') Hook (m') Ø Besi (m) n (Bh)
(Vc) (m') (Kg/m') (m) (Kg)
p (m) l (m) tr (m) n (Bh) (m3) Kolom Type I 30 x 30
K1 0.30 0.30 2.89 1 1.91 Tul. Utama Atas 12 3.00 2.82 0.05 0.10 0.12 0.888 8.92 10.00 79.15
K2 0.30 0.30 2.90 1 0.26 Tul. Utama Tengah 12 2.00 2.82 0.05 0.10 0.12 0.888 5.94 10.00 52.77
K3 0.30 0.30 2.86 1 0.26 Tul. Utama Bawah 12 3.00 2.82 0.05 0.10 0.12 0.888 8.92 10.00 79.15
K4 0.30 0.30 2.80 1 0.25 Sengkang 8 0.15 19.00 1.04 0.08 0.06 0.08 0.395 22.42 10.00 88.46
K5 0.30 0.30 2.79 1 0.25 Vol. Berat Total 299.53
K6 0.30 0.30 2.84 1 0.26
K7 0.30 0.30 2.78 1 0.25
K8 0.30 0.30 2.78 1 0.25
K9 0.30 0.30 2.74 1 0.25
K10 0.30 0.30 2.84 1 0.26
Vol. Total 4.19

Vol.
Type Bekisting Type PLESTERAN KOLOM Vol. Bekisting
Bekisting
p (m) l (m) t (m) n (Bh) (m2) p (m) l (m) t (m) n (Bh) (m2)
K1 0.30 0.30 2.89 1 3.47 K1 0.30 1.20 2.89 1 3.47
K2 0.30 0.30 2.90 1 3.48 K2 0.30 1.20 2.90 1 3.48
K3 0.30 0.30 2.86 1 3.43 K3 0.30 1.20 2.86 1 3.43
K4 0.30 0.30 2.80 1 3.36 K4 0.30 1.20 2.80 1 3.36
K5 0.30 0.30 2.79 1 3.35 K5 0.30 1.20 2.79 1 3.35
K6 0.30 0.30 2.84 1 3.41 K6 0.30 1.20 2.84 1 3.41
K7 0.30 0.30 2.78 1 3.34 K7 0.30 1.20 2.78 1 3.34
K8 0.30 0.30 2.78 1 3.34 K8 0.30 1.20 2.78 1 3.34
K9 0.30 0.30 2.74 1 3.29 K9 0.30 1.20 2.74 1 3.29
K10 0.30 0.30 2.84 1 3.41 K10 0.30 1.20 2.84 1 3.41
Vol. Total 33.86 Vol. Total 33.86

KOLOM TIPE III (K11 - K30)


p 0.30 m
l 0.30 m
H 2.64 m
n (jml) 20.00 bh
Vol. Beton Over Stek Berat Panjang Berat Besi
Type BETON PEMBESIAN Ø Besi (mm) s (m') n (Tulangan) H (m') Hook (m') Ø Besi (m) n (Bh)
(Vc) (m') (Kg/m') (m) (Kg)
p (m) l (m) tr (m) n (Bh) (m3) Kolom Type I 30 x 30
K11 0.30 0.30 2.49 1 1.67 Tul. Utama Atas 12 3.00 2.64 0.05 0.10 0.12 0.888 8.38 20.00 148.74
K12 0.30 0.30 2.60 1 0.23 Tul. Utama Tengah 12 2.00 2.64 0.05 0.10 0.12 0.888 5.59 20.00 99.16
K13 0.30 0.30 2.58 1 0.23 Tul. Utama Bawah 12 3.00 2.64 0.05 0.10 0.12 0.888 8.38 20.00 148.74
K14 0.30 0.30 2.53 1 0.23 Sengkang 8 0.15 18.00 1.04 0.08 0.06 0.08 0.395 21.24 20.00 167.61
K15 0.30 0.30 2.50 1 0.23 Vol. Berat Total 564.26
K16 0.30 0.30 2.59 1 0.23
K17 0.30 0.30 2.57 1 0.23
K18 0.30 0.30 2.57 1 0.23
K19 0.30 0.30 2.55 1 0.23
K20 0.30 0.30 2.55 1 0.23 11.95
K21 0.30 0.30 2.58 1 0.23
K22 0.30 0.30 2.59 1 0.23
K23 0.30 0.30 2.59 1 0.23
K24 0.30 0.30 2.60 1 0.23
K25 0.30 0.30 2.56 1 0.23
K26 0.30 0.30 2.82 1 0.25
K27 0.30 0.30 2.86 1 0.26
K28 0.30 0.30 2.88 1 0.26
K29 0.30 0.30 3.14 1 0.28
K30 0.30 0.30 2.70 1 0.24
Vol. Total 6.21

Vol. Vol. Beton


Type Bekisting Type PLESTERAN
Bekisting (Vc)
p (m) l (m) t (m) n (Bh) (m2) p (m) l (m) tr (m) n (Bh) (m2)
K11 0.30 0.30 2.49 1 2.99 K11 0.30 1.20 2.49 1 2.99
K12 0.30 0.30 2.60 1 3.12 K12 0.30 1.20 2.60 1 3.12
K13 0.30 0.30 2.58 1 3.10 K13 0.30 1.20 2.58 1 3.10
K14 0.30 0.30 2.53 1 3.04 K14 0.30 1.20 2.53 1 3.04
K15 0.30 0.30 2.50 1 3.00 K15 0.30 1.20 2.50 1 3.00
K16 0.30 0.30 2.59 1 3.11 K16 0.30 1.20 2.59 1 3.11
K17 0.30 0.30 2.57 1 3.08 K17 0.30 1.20 2.57 1 3.08
K18 0.30 0.30 2.57 1 3.08 K18 0.30 1.20 2.57 1 3.08
K19 0.30 0.30 2.55 1 3.06 K19 0.30 1.20 2.55 1 3.06
K20 0.30 0.30 2.55 1 3.06 K20 0.30 1.20 2.55 1 3.06
K21 0.30 0.30 2.58 1 3.10 K21 0.30 1.20 2.58 1 3.10
K22 0.30 0.30 2.59 1 3.11 K22 0.30 1.20 2.59 1 3.11
K23 0.30 0.30 2.59 1 3.11 K23 0.30 1.20 2.59 1 3.11
K24 0.30 0.30 2.60 1 3.12 K24 0.30 1.20 2.60 1 3.12
K25 0.30 0.30 2.56 1 3.07 K25 0.30 1.20 2.56 1 3.07
K26 0.30 0.30 2.82 1 3.38 K26 0.30 1.20 2.82 1 3.38
K27 0.30 0.30 2.86 1 3.43 K27 0.30 1.20 2.86 1 3.43
K28 0.30 0.30 2.88 1 3.46 K28 0.30 1.20 2.88 1 3.46
K29 0.30 0.30 3.14 1 3.77 K29 0.30 1.20 3.14 1 3.77
K30 0.30 0.30 2.70 1 3.24 K30 0.30 1.20 2.70 1 3.24
Vol. Total 63.42 Vol. Total 63.42

IVPEKERJAAN GERBANG MASUK


1 Kolom Baru Type II, Uk. 30 x 30 x 290 ( 0.50 0.50 3.00 2.00 1.50 M2
a. Pek. Bekisting 2.00 3.00 2.00 12.00 M2
b. Pek. Besi Beton 122.47 Kg

2 Plesteran Badan Kolom Camp. 1PC : 3PP 2.00 3.00 2.00 12.00 M2

3 Kepala 0.54 2.00 1.08 M2


Plesteran Profil Kepala dan K Kaki 1.71 1.30 2.00 2.60 M2
3.68 M2

4 Pas. Pintu Besi Gerbang 2.25 4.02 2.00 18.09 M2

18.09 1.50 27.14 M2

KETERANGAN GAMBAR
Pa
nj Jumlah Berat Besi
Kode Ø Besi Stek/fak. Kehilangan Kait Panjang Total Jumlah Berat Besi (Kg)
an Tulangan (Kg)
Kolom 30 g
x 30
Tul. Atas 5 D12 ### 0.50 0.10 5.00 18.00 0.888 1.00 15.98
Tul. Tengah 6 D 12 ### 0.50 0.10 6.00 21.60 0.888 1.00 19.18
Tul. Bawah 5 D12 ### 0.50 0.10 5.00 18.00 0.888 1.00 15.98
Sengkang D8 ### 0.12 0.08 20.00 25.60 0.395 1.00 10.10
Jumlah 61.24
Jumlah Kolom 2.00
Volume Total 122.47
02 OKTOBER 2019 - 10 DESEMBER 2019
Minggu 1 02 OKTOBER 2019 S/D 08 OKTOBER 2019 7
Minggu 2 09 OKTOBER 2019 S/D 15 OKTOBER 2019 7
BULAN 1
Minggu 3 16 OKTOBER 2019 S/D 22 OKTOBER 2019 7
Minggu 4 23 OKTOBER 2019 S/D 29 OKTOBER 2019 7
Minggu 5 30 OKTOBER 2019 S/D 05 NOVEMBER 2019 7
Minggu 6 06 NOVEMBER 2019 S/D 12 NOVEMBER 2019 7
BULAN 2
Minggu 7 13 NOVEMBER 2019 S/D 19 NOVEMBER 2019 7