A. Daftar Harga Satuan Bahan Pasir

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 38

DAFTAR HARGA SATUAN UPAH & BAHAN

GRESIK

No. JENIS BAHAN SAT HARGA

A. DAFTAR HARGA SATUAN BAHAN


PASIR
1 Pasir cor / pasang m3 Rp 238,000.00
2 Pasir urug m3 Rp 153,000.00
3 Sirtu m3 Rp 157,500.00
4 Tanah Paras m3 Rp 60,000.00

BATU, SEMEN DAN PAVING


1 Batu Pecah 3/5 (pecah mesin) m3 Rp 285,000.00
2 Batu beton 2/3 (pecah mesin) m3 Rp 288,000.00
3 Kerikil beton 2/3 m3 Rp 288,000.00
4 Batu Pecah 1/2 (pecah mesin) m3 Rp 333,000.00
5 Batu Pecah 1/1 (pecah mesin) m3 Rp 337,000.00
6 Batu Pecah 0.5/0,5 (pecah mesin) m3 Rp 342,000.00
7 Ijuk kg Rp 7,700.00
8 Semen Gresik 40 kg Zak Rp 48,000.00
9 Semen Gresik kg Rp 1,200.00
10 Semen putih Zak Rp 90,250.00
11 Semen warna kg Rp 9,500.00
12 Kapur Bubuk / Pasang Zak Rp 5,750.00
13 Batu bata merah klas I bh Rp 700.00
16 Batu kumbung (bt. Umpak) 30x30 bh Rp 7,375.00
36 Roster Warna bh Rp 1,500.00
40 Air Kerja ltr Rp 500.00

BESI, LOGAM DAN BETON


1 Besi polos kg Rp 8,550.00
2 Besi beton Ulir kg Rp 9,000.00
3 Kawat Bendrat kg Rp 19,000.00

KAYU
1 Kayu Jati Balok 8/12, 6/12 m3 Rp 12,000,000.00
2 Kayu Jati Usuk 5/7, 4/6 m3 Rp 7,500,000.00
3 Kayu Jati Papan 2/20 m3 Rp 10,000,000.00
4 Kayu Jati Reng 2/3, 3/5 m3 Rp 6,000,000.00
1 Kayu Meranti Balok 8/12, 6/12 m3 Rp 4,000,000.00
2 Kayu Meranti Usuk 5/7, 4/6 m3 Rp 3,750,000.00
3 Kayu Meranti Papan 2/20 m3 Rp 4,300,000.00
4 Kayu Meranti Reng 2/3, 3/5 m3 Rp 3,600,000.00
5 Kayu Kruing Balok 8/12, 6/12 m3 Rp 6,300,000.00
6 Kayu Kruing Usuk 5/7, 4/6 m3 Rp 4,500,000.00
7 Kayu Kruing Papan 2/20 m3 Rp 6,000,000.00
8 Kayu Kruing Reng 2/3, 3/5 m3 Rp 4,000,000.00
5 Kayu Kamper Balok 8/12, 6/12 m3 Rp 7,000,000.00
6 Kayu Kamper Usuk 5/7, 4/6 m3 Rp 6,500,000.00
7 Kayu Kamper Papan 2/20 m3 Rp 7,000,000.00
8 Kayu Kamper Reng 2/3, 3/5 m3 Rp 6,500,000.00
9 Kayu Bekisting Meranti (MC) Bekisting/Perancah m3 Rp 3,100,000.00
10 Dolken kayu gelam btg Rp 26,000.00
11 Triplek 3 mm (2.40 x 1.22) lbr Rp 59,000.00
12 Triplek 4 mm (2.40 x 1.22) lbr Rp 75,000.00
13 Triplek 9 mm (2.40 x 1.22) lbr Rp 125,000.00
14 Triplek 12 mm (2.40 x 1.22) lbr Rp 167,000.00
15 Triplek 18 mm (2.40 x 1.22) lbr Rp 240,000.00
16 Teak Wood 3 mm (2.40 x 1.22) lbr Rp 65,000.00
17 Teak Wood 4 mm (2.40 x 1.22) lbr Rp 80,000.00
18 Milamin 3 mm (2.40 x 1.22) lbr Rp 100,000.00
19 Milamin 4 mm (2.40 x 1.22) lbr Rp 95,000.00
20 Kusen + daun pintu PVC unit Rp 375,000.00

KERAMIK DAN PELAPIS DINDING


1 Keramik Ukuran 10 x 20 cm m2 Rp 40,500.00
2 Keramik Ukuran 20 x 20 cm (Motif / Warna) m2 Rp 46,000.00
3 Keramik Ukuran 20 x 25 cm (Dinding) m2 Rp 48,000.00
4 Keramik Ukuran 25 x 30 cm (Dinding) m2 Rp 55,000.00
5 Keramik Ukuran 30 x 30 cm Putih (Polos) m2 Rp 45,000.00
6 Keramik Ukuran 30 x 30 cm Motif m2 Rp 52,000.00
7 Keramik Ukuran 40 x 40 cm Putih (Polos) m2 Rp 50,000.00
8 Keramik Ukuran 40 x 40 cm Motif m2 Rp 58,000.00

PENUTUP ATAP DAN PLAFOND


1 Genteng Karangpilang bh Rp 4,500.00
2 Genteng Wuwung jawa / lokal bh Rp 5,000.00
3 Genteng Wuwung Karang Pilang / Wisma bh Rp 15,000.00
4 Genteng Ngelayur bh Rp 2,400.00
6 Kalsiboard lbr Rp 56,000.00

CAT - CATAN
1 Cat Tembok (Decolith/Vinilex) kg Rp 21,000.00
2 Cat Kayu (Emco) kg Rp 55,000.00
3 Cat Besi (Emco) kg Rp 55,000.00
3 Meni kg Rp 29,000.00
4 Plamur kg Rp 24,000.00
5 Politur kg Rp 55,000.00
6 Kuas bh Rp 7,000.00
7 Kertas Gosok Besi lbr Rp 5,000.00
8 Kertas Gosok Kayu lbr Rp 5,000.00
9 Kertas Gosok Tembok lbr Rp 5,000.00
10 Lem kayu kg Rp 13,000.00
11 Kapek bh Rp -
12 Wall Paper lebar 55 cm m' Rp 19,500.00
13 Lem wallpaper kg Rp 51,000.00
14 Dempul jadi impra kg Rp 23,000.00
15 Plamur kayu kg Rp 25,000.00
16 Wood Filler kg Rp 27,000.00
17 Minyak Tanah ltr Rp 11,000.00
18 Solar ltr Rp 6,400.00
19 Premium ltr Rp 6,900.00
20 Pelumas/Olie ltr Rp 20,000.00
21 Minyak Aspal ltr Rp 20,000.00
22 Minyak Cat/Thinner A ltr Rp 25,000.00
23 Minyak Cat/Thinner B ltr Rp 21,000.00
24 Spirtus ltr Rp 15,000.00
25 Minyak begisting ltr Rp 22,500.00
26 Aspal/Bitumen kg Rp 9,400.00
27 Aspal Curah kg Rp 8,000.00
28 Coal Teer kg Rp 35,000.00

PAKU
1 Paku Reng / Usuk kg Rp 19,000.00

SANITAIR DAN RIOLERING


1 Pipa PVC AW O 3/4" m1 Rp 7,750.00
2 Pipa PVC AW O 1" m1 Rp 9,625.00
3 Pipa PVC AW O 1 1/2" m1 Rp 16,250.00
4 Pipa PVC AW O 2" m1 Rp 20,000.00
5 Pipa PVC AW O 2 1/2" m1 Rp 30,000.00
6 Pipa PVC AW O 3" m1 Rp 41,250.00
7 Pipa PVC AW O 4" m1 Rp 66,250.00
9 Keni PVC AW O 3/4" m1 Rp 3,000.00
10 Keni PVC AW O 1" m1 Rp 4,500.00
11 Keni PVC AW O 1 1/2" m1 Rp 5,500.00
12 Keni PVC AW O 2" m1 Rp 7,000.00
13 Keni PVC AW O 2 1/2" m1 Rp 70,000.00
14 Keni PVC AW O 3" m1 Rp 12,000.00
15 Keni PVC AW O 4" m1 Rp 15,000.00
16 Pipa galvanish O 1 1/2" m1 Rp 40,000.00
17 Kran Air Kuningan 1/2" bh Rp 20,000.00
18 Kran Air Kuningan 3/4" bh Rp 25,000.00
19 Seal Tape Roll Rp 2,750.00
20 Kloset Jongkok Porselin INA (Warna Cerah) unit Rp 140,000.00
21 Afour Lantai unit Rp 20,000.00
22 Afour Bak Air unit Rp 15,000.00
23 Water proof kg Rp -
PENGGANTUNG, KUNCI DAN KACA
1 Kunci Merk Anchor bh Rp 70,000.00
2 Kunci Merk Kuda Terbang bh Rp 70,000.00
3 Kunci Merk Arch bh Rp 55,000.00
4 Kunci silinder bh Rp 124,000.00
5 Kunci Merk Union bh Rp 6,000.00
6 Slot Merk Union bh Rp 15,000.00
7 Grendel Pintu bh Rp 15,000.00
8 Grendel Jendela bh Rp 8,000.00
9 Grendel pintu Tanam bh Rp 50,000.00
10 Engsel Pintu aluminium bh Rp 25,000.00
11 Engsel Jendela aluminium bh Rp 15,000.00
12 Engsel Pintu Aluminium Pasang Rp 25,000.00
13 Espanyolet/ Kunci Pintu Aluminium Pasang Rp 35,000.00
14 Hak Angin aluminium bh Rp 12,000.00
15 Heandle Jendela bh Rp 10,000.00
16 Heandel Pintu bh Rp 87,000.00
17 Kaca Polos 5 mm m2 Rp 65,000.00

LISTRIK
1 Lampu TL 40 Watt bh Rp 30,000.00
3 Lampu Pijar 25 Watt bh Rp 4,000.00
2 Kabel NYA 1000 V 1,5 MM mtr Rp 5,000.00
3 Kabel NYA 1000 V 2,5 MM mtr Rp 9,000.00
4 Kabel NYA 1000 V 4 MM mtr Rp 15,000.00
5 Saklar Tunggal (Setara Broco/Nikko) bh Rp 13,000.00
6 Saklar Ganda (Setara Broco/Nikko) bh Rp 26,000.00
7 Stop Kontak (Setara Broco/Nikko) bh Rp 14,000.00
8 Sekering Kast bh Rp 21,000.00
9 Isolasi bh Rp 6,500.00
10 Kabel NYA 500 Volt 2 x 2,5 mm2 mtr Rp 3,500.00
11 Pipa Paralon 5/8 mtr Rp 3,125.00
12 T Doos pvc bh Rp 1,500.00
13 Reflektor Terbuka 40 W Single Set Rp 80,000.00
14 Reflektor Terbuka 40 W Doble Set Rp 3,500.00
15 Fiting Plafon bh Rp 12,000.00

B. DAFTAR UPAH TENAGA KERJA


1 Mandor Org/ hari Rp 145,000.00
2 Kepala Tukang Batu Org/ hari Rp 130,000.00
3 Kepala Tukang Kayu Org/ hari Rp 130,000.00
4 Kepala Tukang Besi Org/ hari Rp 130,000.00
5 Kepala Tukang Cat Org/ hari Rp 130,000.00
6 Kepala Tukang Listrik Org/ hari Rp 130,000.00
7 Kepala Tukang Pipa Org/ hari Rp 130,000.00
8 Tukang Gali Tanah Org/ hari Rp 125,000.00
9 Tukang Batu Org/ hari Rp 125,000.00
10 Tukang Kayu Org/ hari Rp 125,000.00
11 Tukang Besi Org/ hari Rp 125,000.00
12 Tukang Cat Org/ hari Rp 125,000.00
13 Tukang Plitur Org/ hari Rp 125,000.00
14 Tukang Pipa Org/ hari Rp 125,000.00
15 Tukang Listrik Org/ hari Rp 125,000.00
16 Pekerja Org/ hari Rp 90,000.00
ENGINEERING ESTIMATE ( EE )

REKAPITULASI
RENCANA ANGGARAN BIAYA ( RAB )

PROGRAM : PENGELOLAAN DANA SPESIFIK GRAND BIDANG PENDIDIKAN


KEGIATAN : PENGELOLAAN DANA INSENTIF DAERAH BIDANG PENDIDIKAN
PEKERJAAN : REHABILITASI RUANG KELAS SDN DI KEC BALONGPANGGANG
LOKASI : SDN 2 BALONGPANGGANG Kec Balongpanggang Kab Gresik
TAHUN : 2015

REKAPITULASI SELURUH PEKERJAAN

NO. URAIAN KEGIATAN JUMLAH

A REHABILITASI RUANG KELAS

I. PEKERJAAN PERSIAPAN Rp 10,477,327.26


II. PEKERJAAN TANAH #REF!
III. PEKERJAAN PASANGAN #REF!
IV. PEKERJAAN BETON #REF!
V. PEKERJAAN PLESTERAN DAN BENANGAN #REF!
VI. PEKERJAAN RANGKA ATAP #REF!
VII. PEKERJAAN PENUTUP ATAP #REF!
VIII. PEKERJAAN PLAFOND #REF!
IX. PEKERJAAN LANTAI #REF!
X. PEKERJAAN PENGECATAN #REF!

JUMLAH #REF!
DIBULATKAN #REF!
PPN 10% #REF!
JUMLAH #REF!

Terbilang : Seratus Enam Puluh Dua Juta Sembilan Ratus Sembilan Puluh Sembilan Ribu Seratus Rupiah

Gresik, 2015
Menyetujui/Mengetahui Dibuat oleh
KEPALA BIDANG TATA KONSULTAN PERENCANA
BANGUNAN DAN PENGAWASAN CV. TITIAN CAHAYA CONSULTAN
Selaku
PEJABAT PEMBUAT KOMITMEN ( PPK )

Ir ACHMAD WASHIL M.R,MT SISWO. ST


NIP. 19660127 199803 1 001 Direktur

Mengetahui
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN GRESIK
Selaku
KUASA PENGGUNA ANGGARAN

Ir BAMBANG ISDIANTO, MM
NIP. 19580126 198512 1 002
RENCANA ANGGARAN BIAYA
( R. A. B )

PROGRAM : PENGELOLAAN DANA SPESIFIK GRAND BIDANG PENDIDIKAN


KEGIATAN : PENGELOLAAN DANA INSENTIF DAERAH BIDANG PENDIDIKAN
PEKERJAAN : REHABILITASI RUANG KELAS SDN DI KEC BALONGPANGGANG
LOKASI : SDN 2 BALONGPANGGANG Kec Balongpanggang Kab Gresik

NO JENIS PEKERJAAN VOLUME HARGA SATUAN JUMLAH

1 2 3 4 5

A REHABILITASI RUANG KELAS

I. PEKERJAAN PERSIAPAN
1 Pembongkaran genteng bubungan 24.50 m¹ Rp 2,717.80 Rp 66,586.10
2 Pembongkaran genteng 294.00 m² Rp 8,720.50 Rp 2,563,827.00
3 Pembongkaran litsplank 73.00 m¹ Rp 10,560.90 Rp 770,945.70
4 Pembongkaran gording 196.00 m¹ Rp 4,970.15 Rp 974,149.40
5 Pembongkaran usuk/reng 294.00 m² Rp 3,535.28 Rp 1,039,372.32
6 Pembongkaran Kuda - Kuda 6.00 bh Rp 98,024.06 Rp 588,144.38
7 Pembongkaran Kusen 27.41 m³ Rp 62,790.00 Rp 1,720,759.95
8 Pembongkaran plafond + rangka 179.93 m² Rp 15,303.68 Rp 2,753,542.42
Rp 10,477,327.26
II. PEKERJAAN TANAH
4 Urugkan bawah lantai tebal 20 cm #REF! m³ Rp 225,881.25 #REF!
#REF!
III. PEKERJAAN PASANGAN
1 Pasangan Peninggian 1/2 bata 1 : 5 #REF! m² Rp 124,228.07 #REF!
#REF!
IV. PEKERJAAN BETON
1 Rabat beton tebal 5 cm #REF! m³ Rp 872,046.00 #REF!
2 Kolom 12/15 #REF! m³ Rp 5,834,257.50 #REF!
3 Ring Balk/Ring gewel 12/15 #REF! m³ Rp 4,934,771.32 #REF!
#REF!
V. PEKERJAAN PLESTERAN DAN BENANGAN
1 Plesteran dinding 1 : 5 #REF! m² Rp 54,109.90 #REF!
#REF!
VI. PEKERJAAN RANGKA ATAP
1 Kuda-kuda Kayu Kruing 0.27 m³ Rp 11,158,113.75 Rp 3,066,785.25
2 Gording Kayu Meranti 8/12 Baru #REF! m³ Rp 8,379,000.00 #REF!
4 Ikatan angin Kruing 6/12 #REF! m³ Rp 11,158,113.75 #REF!
5 reng Kamper 2/3 Baru #REF! m² Rp 33,563.75 #REF!
reng Kamper 2/3 Lama #REF! m² Rp 22,800.00 #REF!
6 Usuk 5/7 Lama #REF! m² Rp 22,800.00 #REF!
7 Papan reuter Meranti 2/20 #REF! m¹ Rp 91,406.25 #REF!
8 Papan Kompres + seng #REF! m¹ Rp 71,772.75 #REF!
9 Papan listplank 3/25 ( Lama Dipasang kembali ) #REF! m¹ Rp 37,325.00 #REF!
#REF!
VII. PEKERJAAN PENUTUP ATAP
1 Pasang genteng Karangpilang #REF! m² Rp 139,944.50 #REF!
2 Bubungan Karangpilang #REF! m¹ Rp 156,106.00 #REF!
#REF!
VIII. PEKERJAAN PLAFOND
1 Pasang Rangka Plafond Kayu Meranti Baru #REF! m² Rp 111,063.75 #REF!
2 Pasang Rangka Plafond Kayu Lama #REF! m² Rp 58,875.00 #REF!
2 Kalsiboard #REF! m² Rp 39,725.70 #REF!
#REF!
IX. PEKERJAAN LANTAI
1 Lantai keramik 30 x30 #REF! m² Rp 212,218.45 #REF!
#REF!
X. PEKERJAAN PENGECATAN
1 Cat dinding #REF! m² Rp 22,273.66 #REF!
2 Cat plafon #REF! m² Rp 22,273.66 #REF!
3 Cat kayu/besi #REF! m² Rp 38,632.50 #REF!
#REF!
Plat

BERAT BESI PER-M³ BETON


STROUS O 40 cm
Panjang = 7.96178344 m1
T.pokok = 84.86 kg
0.012 0.888 84.86
Begel = 26.32 kg 26.32
0.008 0.395 111.173333
Total 1m3 = 111.173333 kg

STROUS O 30 cm ( S2 )
Panjang = 14.1542817 m1
T.pokok = 100.571 kg
0.012 0.888
Begel = 26.32 kg
0.006 0.222
Total 1m3 = 126.887619 kg

STROUS O 30 cm ( S1 )
Panjang = 14.1542817 m1
T.pokok = 62.857 kg
0.012 0.888
Begel = 26.32 kg
0.006 0.222
Total 1m3 = 89.1733333 kg

STROUS O 30 cm ( S1 )
Panjang = 14.1542817 m1
T.pokok = 62.857 kg
0.012 0.888
Begel = 26.32 kg
0.006 0.222
Total 1m3 = 89.1733333 kg

PLAT BETON (tumpuan -lapangan)


Jumlah per m3= 1.04166667 bh Berat besi / m1
Tebal = 0.12 m1 O 12 mm = 0.888 kg/m1
X = 4 m1 O 10 mm = 0.617 kg/m1
Y = 2 m1 O 8 mm = 0.395 kg/m1
x' = 2 m1 O 6 mm = 0.222 kg/m1
y' = 1 m1

T.pokok jarak = 0.2 m1


0.01 = 0.617
Arah X = 36.44 kg
Arah Y = 32.86 kg
T. susut jarak = 0.15 m1
0.008 0.395
Arah X = 48.42 kg
Arah Y = 45.26 kg
Tot. tul = 162.987681 kg
Tot. tul 1 m3 = 169.778834 kg

PLAT BETON (Tul. Double)


Jumlah per m3= 0.54824561 bh Berat besi / m1
Tebal = 0.15 m1 O 12 mm = kg/m1
X = 3.8 m1 O 10 mm = kg/m1
Y = 3.2 m1 O 8 mm = kg/m1
O 6 mm = kg/m1
T.pokok jarak = 0.15 m1
0.012 = 0.888
Arah X = 147.79 kg
Arah Y = 148.50 kg 1.14
Tot. tul = 296.293989 kg 0.96 1.15131579
Tot. tul 1 m3 = 162.44188 kg 2.1
PLAT BETON (Tul. Tunggal)
Jumlah per m3= 1.11111111 bh Berat besi / m1
Tebal = 0.1 m1 O 12 mm = kg/m1
X = 3 m1 O 10 mm = kg/m1
Y = 3 m1 O 8 mm = kg/m1
O 6 mm = kg/m1
T.pokok jarak = 0.15 m1
0.01 = 0.617
Arah X = 38.24 kg
Arah Y = 38.24 kg
Tot. tul = 76.4814286 kg
Tot. tul 1 m3 = 84.9793651 kg

PLAT LEUFEL (Tul. Tunggal)


Jumlah per m3= 15.1515152 bh Berat besi / m1
Tebal = 0.1 m1 O 12 mm = kg/m1
X = 2.2 m1 O 10 mm = kg/m1
Y = 0.3 m1 O 8 mm = kg/m1
O 6 mm = kg/m1
T.pokok jarak = 0.15 m1
0.01 = 0.617
Begel jarak = 0.15 m1
0.08 = 39.474
Tul.pokok = 3.62 kg
Begel = 0.368 kg
Tot. tul = 3.98647619 kg
Tot. tul 1 m3 = 60.4011544 kg

PLAT LEUFEL (Tul. Tunggal)


Jumlah per m3= 18.9393939 bh Berat besi / m1
Tebal = 0.08 m1 O 12 mm = kg/m1
X = 2.2 m1 O 10 mm = kg/m1
Y = 0.3 m1 O 8 mm = kg/m1
O 6 mm = kg/m1
T.pokok jarak = 0.15 m1
0.01 = 0.617
Begel jarak = 0.15 m1
0.01 = 0.617
Tul.pokok = 3.62 kg
Begel = 0.046 kg
Tot. tul = 3.66447619 kg
Tot. tul 1 m3 = 69.4029582 kg

PLAT Talang (Tul. Tunggal)


Jumlah per m3= 66.6666667 bh Berat besi / m1
Tebal = 0.1 m1 O 12 mm = kg/m1
X = 0.5 m1 O 10 mm = kg/m1
Y = 0.3 m1 O 8 mm = kg/m1
O 6 mm = kg/m1
T.pokok jarak = 0.15 m1
0.01 = 0.617
Begel jarak = 0.15 m1
0.01 = 0.617
Tul.pokok = 0.82 kg
Begel = 0.012 kg
Tot. tul = 0.83438095 kg
Tot. tul 1 m3 = 55.6253968 kg

PLAT BETON (tumpuan -lapangan)


Jumlah per m3= 1.04166667 bh Berat besi / m1
Tebal = 0.12 m1 O 12 mm = 0.888 kg/m1
X = 4 m1 O 10 mm = 0.617 kg/m1
Y = 2 m1 O 8 mm = 0.395 kg/m1
x' = 2 m1 O 6 mm = 0.222 kg/m1
y' = 1 m1

T.pokok jarak = 0.2 m1


0.012 = 0.888
Arah X = 52.47 kg
Arah Y = 47.32 kg
T. susut jarak = 0.2 m1
0.010 0.617
Arah X = 59.21 kg
Arah Y = 54.28 kg
Tot. tul = 213.283513 kg
Tot. tul 1 m3 = 222.170326 kg

PLAT lisplank/lefel (Tul. Tunggal)


Jumlah per m3= 142.857143 bh Berat besi / m1
Tebal = 0.07 m1 O 12 mm = kg/m1
X = 0.5 m1 O 10 mm = kg/m1
Y = 0.2 m1 O 8 mm = kg/m1
O 6 mm = kg/m1
T.pokok jarak = 0.15 m1
0.01 = 0.617
Begel jarak = 0.15 m1
0.08 = 39.474
Tul.pokok = 0.62 kg
Begel = 0.064 kg
Tot. tul = 0.68078571 kg
Tot. tul 1 m3 = 97.255102 kg

PLAT BETON (Tul. Double) TANGGA


Jumlah per m3= 0.54824561 bh Berat besi / m1
Tebal = 0.15 m1 O 12 mm = kg/m1
X = 3.8 m1 O 10 mm = kg/m1
Y = 3.2 m1 O 8 mm = kg/m1
O 6 mm = kg/m1
T.pokok jarak = 0.15 m1
0.013 = 1.042
0.01 = 0.617
Arah X = 173.45 kg
Arah Y = 103.13 kg 1.14
Tot. tul = 276.576583 kg 0.96 1.15131579
Tot. tul 1 m3 = 151.631898 kg 2.1

PLAT Talang (Tul. Tunggal)


Jumlah per m3= 66.6666667 bh Berat besi / m1
Tebal = 0.1 m1 O 12 mm = kg/m1
X = 0.5 m1 O 10 mm = kg/m1
Y = 0.3 m1 O 8 mm = kg/m1
O 6 mm = kg/m1
T.pokok jarak = 0.15 m1
0.01 = 0.617
Begel jarak = 0.15 m1
0.01 = 0.617
Tul.pokok = 0.82 kg
Begel = 0.012 kg
Tot. tul = 0.83438095 kg
Tot. tul 1 m3 = 55.6253968 kg

PLAT Talang (Tul. Tunggal)


Jumlah per m3= 260.416667 bh Berat besi / m1
Tebal = 0.08 m1 O 12 mm = kg/m1
X = 0.16 m1 O 10 mm = kg/m1
Y = 0.3 m1 O 8 mm = kg/m1
O 6 mm = kg/m1
T.pokok jarak = 0.15 m1
0.01 = 0.617
Begel jarak = 0.15 m1
0.01 = 0.617
Tul.pokok = 0.26 kg
Begel = 0.0052 kg
Tot. tul = 0.2683619 kg
Tot. tul 1 m3 = 69.8859127 kg
#REF!
#REF! 7.96178344
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! DIPAKAI
#REF!
#REF!
#REF!
#REF!
#REF! 37.007
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
PEKERJAAN POER

BERAT BESI PER-M³ BETON


Jml. Total (kg)
kg besi Vol./P
No Nama dimensi beton(m) Ø besi (m) jarak Pjg. Btg/P Kg besi berat
pls / m1 (m3)
(m) Besi berat
0.013 1.042 0.100 12 22.800 0.576 41.260 152.012

0.013 1.042 0.100 12 22.800 0.576 41.260


1 PC 2 1.200 1.200 0.400
0.013 1.042 0.100 12 19.200 0.576 34.746

0.013 1.042 0.100 12 19.200 0.576 34.746


0.013 1.042 0.100 12 15.600 0.288 56.462 144.868

0.010 0.617 0.100 6 11.400 0.288 24.414


1 PC 1 1.200 0.600 0.400
0.013 1.042 0.100 12 12.000 0.288 43.432

0.010 0.617 0.100 6 9.600 0.288 20.560

0.012 0.888 0.100 6 7.800 0.144 48.109 170.233

0.012 0.888 0.100 6 7.800 0.144 48.109


1 PC 3 0.600 0.600 0.400
0.012 0.888 0.100 6 6.000 0.144 37.007
0.012 0.888 0.100 6 6.000 0.144 37.007

0.012 0.888 0.100 30 83.400 0.720 102.880 196.138

0.012 0.888 0.100 12 75.600 0.720 93.258


1 PL 3.000 1.200 0.200

0.016 1.579 0.150 10 20.200 0.338 94.504 248.425

0.016 1.579 0.150 5 6.350 0.338 29.708


2 P tangga 1.500 0.750 0.300
0.016 1.579 0.150 10 20.200 0.338 94.504

0.016 1.579 0.150 5 6.350 0.338 29.708

0.012 0.888 0.150 4 3.280 0.050 58.264 233.056

0.012 0.888 0.150 4 3.280 0.050 58.264


3 PB Type P2 0.500 0.500 0.200
0.012 0.888 0.150 4 3.280 0.050 58.264

0.012 0.888 0.150 4 3.280 0.050 58.264

0.016 1.579 0.150 4 2.880 0.050 90.949 363.795


0.016 1.579 0.150 4 2.880 0.050 90.949
4 PC Type P1 0.500 0.500 0.200
0.016 1.579 0.150 4 2.880 0.050 90.949

0.016 1.579 0.150 4 2.880 0.050 90.949

0.016 1.579 0.125 10 17.200 0.270 100.586 290.297

0.016 1.579 0.125 6 7.620 0.270 44.562


1 P2 1.200 0.750 0.300
0.016 1.579 0.125 10 17.200 0.270 100.586

0.016 1.579 0.125 6 7.620 0.270 44.562


0.016 1.579 0.125 15 34.800 0.405 135.675 330.765

0.016 1.579 0.125 6 7.620 0.405 29.708


2 P3 1.800 0.750 0.300
0.016 1.579 0.125 15 34.800 0.405 135.675

0.016 1.579 0.125 6 7.620 0.405 29.708

0.016 1.579 0.125 12 24.240 0.675 56.703 226.810

0.016 1.579 0.125 12 24.240 0.675 56.703


3 P4 1.500 1.500 0.300
0.016 1.579 0.125 12 24.240 0.675 56.703
0.016 1.579 0.125 12 24.240 0.675 56.703

0.016 1.579 0.125 12 24.240 0.675 56.703 226.810

0.016 1.579 0.125 12 24.240 0.675 56.703


4 P5 1.500 1.500 0.300
0.016 1.579 0.125 12 24.240 0.675 56.703
4 P5 1.500 1.500 0.300

0.016 1.579 0.125 12 24.240 0.675 56.703


Bekesting

ATAS

3.333 ATAS BESI ULIR


BAWAH

BAWAH

5.000

6.667

2.333

ATAS

4.000 ATAS BESI ULIR


BAWAH

BAWAH

ATAS

8.000 ATAS BESI ULIR


BAWAH

BAWAH

ATAS
8.000 ATAS BESI polos
BAWAH

BAWAH

ATAS

4.333 ATAS BESI ULIR


BAWAH

BAWAH
ATAS

3.778 ATAS BESI ULIR


BAWAH

BAWAH

ATAS

2.667 ATAS BESI ULIR


BAWAH
BAWAH

ATAS

2.667 ATAS BESI ULIR


BAWAH
BAWAH
BERAT BESI PER-M³ BETON
Total (kg)
Nama Ø besi kg besi jml. Tul. Jml. Pjg. Pjg. berat
begisting %
No dimensi beton(m) Kg besi
Balok/Kolom (m) pls / m1 (bh) Begel Btg/m3 Besi/m3 berat
SLOOF
Begel 0.006 0.22 0.150 297 44.444 136.620 30.335 13.33 2.01%
1 0.150 0.150 0.016 1.58 0 44.444 - - 188.233
SL15/15
0.012 0.89 4 44.444 177.778 157.897
Begel 0.006 0.22 0.150 223 33.333 124.880 27.729 13.33 1.51%
1 0.150 0.200 0.016 1.58 0 33.333 - - 146.152
SL15/20
0.012 0.89 4 33.333 133.333 118.423
Begel 0.008 0.39 0.150 112 16.667 96.320 38.022 10.00 1.51%
156.444
0.012 0.89 8 16.667 133.333 118.423
1 0.200 0.300
0.013 1.04 0 16.667 - - -
SL20/30
Begel 0.008 0.39 0.150 134 20.000 101.840 40.201 10.00 1.36%
1 0.200 0.250 146.781
0.012 0.89 6 20.000 120.000 106.581
SL20/25

KOLOM
Begel 0.008 0.39 0.150 371 55.556 148.400 58.580 30.00 1.75%
58.580
1 0.120 0.150
0.010 0.62 4 55.556 222.222 137.063
K 12/15 137.063
Begel 0.008 0.39 0.150 96 14.286 92.160 36.380 15.71 1.52%
36.380
1 0.200 0.350
0.013 1.04 8 14.286 114.286 119.128
K 15 / 35 119.128
Begel 0.008 0.39 0.150 75 11.111 79.500 31.382 13.33 1.18%
31.382
1 0.300 0.300
0.013 1.04 8 11.111 88.889 92.655
K 30 / 30 92.655
Begel 0.006 0.22 0.150 167 25.000 110.220 24.474 20.00 1.13%
24.474
1 0.200 0.200
0.012 0.89 4 25.000 100.000 88.817
K 20 / 20 88.817
Begel 0.006 0.22 0.150 297 44.444 136.620 30.335 26.67 2.01%
1 0.150 0.150 0.016 1.58 0 44.444 - - 188.233
KP
0.012 0.89 4 44.444 177.778 157.897
Begel 0.008 0.39 0.150 139 20.833 125.100 49.382 16.67 2.21%
1 0.120 0.400 0.016 1.58 0 20.833 - - 223.110
Sirip 12/40
0.013 1.04 8 20.833 166.667 173.728
Begel 0.008 0.39 0.150 75 11.111 79.500 31.382 13.33 0.00%
130.068
0.012 0.89 10 11.111 111.111 98.686
1 0.300 0.300
0.016 1.58 0 11.111 - -
K30/30 Lt. 2 -
0.012 0.89 0 11.111 - -
BALOK
Begel 0.008 0.39 0.125 134 16.667 115.240 45.490 45.490 13.33 2.35%
1 0.200 0.300
0.016 1.58 7 16.667 116.667 184.213 184.213
Blk Bordes
Begel 0.006 0.22 0.150 371 55.556 148.400 32.951 16.67 1.75%
1 0.120 0.150 0.016 1.58 0 55.556 - - 170.015
BR3
0.010 0.62 4 55.556 222.222 137.063
Begel 0.008 0.39 0.150 223 33.333 124.880 49.295 13.33 2.26%
1 0.150 0.200 0.016 1.58 0 33.333 - - 226.930
Blf
0.012 0.89 6 33.333 200.000 177.634
Begel 0.008 0.39 0.100 81 8.000 138.510 54.676 10.00 1.45%
68.887
0.012 0.89 2 8.000 16.000 14.211
1 0.250 0.500
0.016 1.58 5 8.000 40.000 63.159
Blk 25/50 113.686
0.016 1.58 4 8.000 32.000 50.527
Begel 0.008 0.39 0.100 126 12.500 177.660 70.130 12.50 1.33%
92.334
0.012 0.89 2 12.500 25.000 22.204
1 0.200 0.400
0.013 1.04 5 12.500 62.500 65.148
Blk 20/40 104.237
0.013 1.04 3 12.500 37.500 39.089
Begel 0.008 0.39 0.100 2 0.148 62.220 24.561 2.36 0.01%
24.824
0.012 0.89 2 0.148 0.296 0.263
1 15.000 0.450
0.012 0.89 3 0.148 0.444 0.395
Blk 15/45 1.316
0.012 0.89 5 0.148 0.741 0.658
Begel 0.008 0.39 0.100 167 16.667 202.070 79.766 13.33 1.77%
79.766
0.012 0.89 0 16.667 - -
1 0.200 0.300
0.013 1.04 5 16.667 83.333 86.864
Blk 20/30 138.982
0.013 1.04 3 16.667 50.000 52.118
Begel 0.008 0.39 0.125 54 6.667 78.840 31.122 8.67 1.22%
1 0.300 0.500 0.016 1.58 8 6.667 53.333 84.212 127.176
BKNSL
0.012 0.89 2 6.667 13.333 11.842
Begel 0.008 0.39 0.125 134 16.667 162.140 64.004 13.33 1.68%
64.004
0.012 0.89 0 16.667 - -
1 0.200 0.300
0.019 2.23 0 16.667 - -
Blk 20/30 131.581
0.016 1.58 5 16.667 83.333 131.581
Begel 0.008 0.39 0.125 101 12.500 142.410 56.215 12.50 2.01%
78.420
0.012 0.89 2 12.500 25.000 22.204
1 0.200 0.400
0.016 1.58 8 12.500 100.000 157.897
Blk 20/40 157.897
0.013 1.04 0 12.500 - -
Begel 0.008 0.39 0.125 178 22.222 135.280 53.401 16.67 1.51%
1 0.150 0.300 0.016 1.58 0 22.222 - - 171.824
BLK
0.012 0.89 6 22.222 133.333 118.423
Begel 0.006 0.22 0.200 223 44.444 102.580 22.777 20.00 1.40%
1 0.150 0.150 0.016 1.58 0 44.444 - - 132.428
lis 15/15
0.010 0.62 4 44.444 177.778 109.651
Begel 0.008 0.39 0.150 223 33.333 124.880 49.295 13.33 2.26%
1 0.150 0.200 0.016 1.58 0 33.333 - - 226.930
Blk 15/20
0.012 0.89 6 33.333 200.000 177.634
Begel 0.006 0.22 0.150 371 55.556 148.400 32.951 16.67 1.75%
1 0.120 0.150 0.016 1.58 0 55.556 - - 170.015
RNG Blk 12/15
0.010 0.62 4 55.556 222.222 137.063
Begel 0.008 0.39 0.150 297 44.444 136.620 53.930 13.33 2.01%
1 0.150 0.150 0.016 1.58 0 44.444 - - 211.827
BR3
0.012 0.89 4 44.444 177.778 157.897
Begel 0.008 0.39 0.150 223 33.333 124.880 49.295 13.33 1.51%
1 0.150 0.200 0.016 1.58 0 33.333 - - 167.718
balok luevel
0.012 0.89 4 33.333 133.333 118.423

SLOOF
Begel 0.008 0.39 0.150 149 22.222 113.240 44.701 13.33 1.51%
1 0.150 0.300 0.016 1.58 0 22.222 - - 163.124
SL15/30
0.012 0.89 6 22.222 133.333 118.423
Begel 0.008 0.39 0.150 84 12.500 89.040 35.148 57.352 10.00 2.29%
0.012 0.89 2 12.500 25.000 22.204
1 0.200 0.400
0.016 1.58 8 12.500 100.000 157.897 157.897
SL20/40

KOLOM
Begel 0.008 0.39 0.150 75 11.111 79.500 31.382 31.382 13.33 1.79%
1 0.300 0.300
0.016 1.58 8 11.111 88.889 140.353 140.353
K1
0.012 0.89 0 11.111 - -
Begel 0.008 0.39 0.150 75 11.111 79.500 31.382 31.382 13.33 1.34%
1 0.300 0.300
0.016 1.58 6 11.111 66.667 105.265 105.265
K2
0.012 0.89 0 11.111 - -
Begel 0.008 0.39 0.150 34 5.000 56.440 22.279 22.279 9.00 0.60%
1 0.400 0.500
0.016 1.58 6 5.000 30.000 47.369 47.369
KA
0.012 0.89 0 5.000 - -
Begel 0.008 0.39 0.150 34 5.000 56.440 22.279 9.00 0.60%
31.161
0.012 0.89 2 5.000 10.000 8.882
1 0.400 0.500
0.016 1.58 6 5.000 30.000 47.369 47.369
KB
0.012 0.89 0 5.000 - -

Begel 0.008 0.39 0.150 149 22.222 113.240 44.701 20.00 0.00%
163.124
0.012 0.89 6 22.222 133.333 118.423
1 0.150 0.300
0.016 1.58 0 22.222 - - -
KD
0.012 0.89 0 22.222 - -
Begel 0.008 0.39 0.150 149 22.222 113.240 44.701 13.33 0.00%
163.124
0.012 0.89 6 22.222 133.333 118.423
1 0.150 0.300
0.016 1.58 0 22.222 - - -
Pagar
0.012 0.89 0 22.222 - -
Begel 0.008 0.39 0.150 186 27.778 119.040 46.990 21.67 0.00%
195.019
0.012 0.89 6 27.778 166.667 148.029
1 0.150 0.240
0.016 1.58 0 27.778 - - -
KSR
0.012 0.89 0 27.778 - -
Begel 0.008 0.39 0.150 223 33.333 124.880 49.295 23.33 0.00%
226.930
0.012 0.89 6 33.333 200.000 177.634
1 0.150 0.200
0.016 1.58 0 33.333 - - -
K15/20 tandon air
0.012 0.89 0 33.333 - -
Begel 0.008 0.39 0.150 34 5.000 56.440 22.279 22.279 9.00 0.80%
1 0.400 0.500
0.016 1.58 8 5.000 40.000 63.159 63.159
K3

Begel 0.008 0.39 0.150 34 5.000 56.440 22.279 22.279 9.00 1.21%
1 0.400 0.500
0.016 1.58 12 5.000 60.000 94.738 94.738
K4

BALOK
Begel 0.008 0.39 0.150 223 33.333 124.880 49.295 18.33 1.51%
1 0.150 0.200 0.016 1.58 0 33.333 - - 167.718
BlF
1 0.150 0.200 167.718
BlF
0.012 0.89 4 33.333 133.333 118.423
Begel 0.008 0.39 0.150 297 44.444 136.620 53.930 20.00 2.01%
1 0.150 0.150 0.016 1.58 0 44.444 - - 211.827
BLT
0.012 0.89 4 44.444 177.778 157.897
Begel 0.008 0.39 0.150 178 26.667 117.480 46.374 17.33 1.51%
1 0.150 0.250 0.016 1.58 0 26.667 - - 164.797
BGT
0.012 0.89 5 26.667 133.333 118.423

Begel 0.008 0.39 0.125 39 4.762 86.190 34.023 8.10 1.15%


42.482
0.012 0.89 2 4.762 9.524 8.459
1 0.300 0.700
0.016 1.58 12 4.762 57.143 90.227 90.227
Blk 30/70
Begel 0.008 0.39 0.125 134 16.667 162.140 64.004 13.33 2.01%
64.004
0.012 0.89 0 16.667 - -
1 0.200 0.300
0.016 1.58 6 16.667 100.000 157.897 157.897
BTDN 1
Begel 0.008 0.39 0.125 178 22.222 197.580 77.993 16.67 2.68%
77.993
0.012 0.89 0 22.222 - -
1 0.150 0.300
0.016 1.58 6 22.222 133.333 210.530 210.530
BTDN 2
Begel 0.008 0.39 0.125 54 6.667 97.740 38.582 8.67 1.21%
50.424
0.012 0.89 2 6.667 13.333 11.842
1 0.300 0.500
0.016 1.58 9 6.667 60.000 94.738 94.738
Blk 30/50
Begel 0.008 0.39 0.125 81 10.000 130.410 51.478 12.00 1.61%
69.242
0.012 0.89 2 10.000 20.000 17.763
1 0.200 0.500
0.016 1.58 8 10.000 80.000 126.318 126.318
Blk 20/50 A
Begel 0.008 0.39 0.125 81 10.000 130.410 51.478 12.00 1.21%
69.242
0.012 0.89 2 10.000 20.000 17.763
1 0.200 0.500
0.016 1.58 6 10.000 60.000 94.738 94.738
Blk 20/50 B
Begel 0.008 0.39 0.125 134 16.667 162.140 64.004 13.33 2.01%
93.609
0.012 0.89 2 16.667 33.333 29.606
1 0.200 0.300
0.016 1.58 6 16.667 100.000 157.897 157.897
Blk TLG 20/30
Begel 0.008 0.39 0.125 67 8.333 107.870 42.581 9.17 1.68%
42.581
0.012 0.89 0 8.333 - -
1 0.300 0.400
0.016 1.58 10 8.333 83.333 131.581 131.581
BKL 2
Begel 0.008 0.39 0.125 134 16.667 162.140 64.004 13.33 2.35%
64.004
0.012 0.89 0 16.667 - -
1 0.200 0.300
0.016 1.58 7 16.667 116.667 184.213 184.213
BKL
Begel 0.008 0.39 0.150 223 33.333 202.930 80.105 18.33 0.00%
198.528
0.012 0.89 4 33.333 133.333 118.423
1 0.150 0.200
0.016 1.58 0 33.333 - - -
BLST
Begel 0.008 0.39 0.125 101 12.500 107.060 42.261 12.50 2.01%
64.465
0.012 0.89 2 12.500 25.000 22.204
1 0.200 0.400
0.016 1.58 8 12.500 100.000 157.897 157.897
Blk 20/40
Begel 0.008 0.39 0.125 134 16.667 115.240 45.490 13.33 1.68%
45.490
0.012 0.89 0 16.667 - -
1 0.200 0.300
0.016 1.58 5 16.667 83.333 131.581 131.581
Blk 20/30
Begel 0.008 0.39 0.125 178 22.222 135.280 53.401 16.67 0.00%
191.561
0.012 0.89 7 22.222 155.556 138.160
1 0.150 0.300
0.016 1.58 0 22.222 - - -
Blk 15/30
Begel 0.008 0.39 0.100 84 8.333 105.840 41.780 9.17 1.51%
56.582
0.012 0.89 2 8.333 16.667 14.803
1 0.300 0.400
0.016 1.58 9 8.333 75.000 118.423 118.423
Blk Knsl A
Begel 0.008 0.39 0.125 267 33.333 149.520 59.022 18.33 0.00%
177.445
0.012 0.89 4 33.333 133.333 118.423
1 0.150 0.200
0.016 1.58 0 33.333 - - -
Blk Knsl B
Begel 0.008 0.39 0.150 149 22.222 113.240 44.701 13.33 1.26%
1 0.150 0.300 0.016 1.58 0 22.222 - - 143.386
BR1
0.012 0.89 5 22.222 111.111 98.686
Begel 0.008 0.39 0.125 134 16.667 115.240 45.490 10.00 1.51%
1 0.200 0.300 0.016 1.58 0 16.667 - - 163.913
BR2
0.012 0.89 8 16.667 133.333 118.423
Begel 0.008 0.39 0.150 297 44.444 136.620 53.930 13.33 2.01%
1 0.150 0.150 0.016 1.58 0 44.444 - - 211.827
BR3
0.012 0.89 4 44.444 177.778 157.897
Begel 0.008 0.39 0.125 134 16.667 128.640 50.780 15.83 0.00%
169.203
0.012 0.89 8 16.667 133.333 118.423
1 0.150 0.400
0.016 1.58 0 16.667 - - -
Blk trk
Begel 0.010 0.62 0.100 56 5.556 112.560 69.425 8.33 1.57%
69.425
0.012 0.89 0 5.556 - -
1 0.300 0.600
0.019 2.23 9 5.556 50.000 111.330
Blk 30/60 122.912
1 0.300 0.600
Blk 30/60 122.912
0.013 1.04 2 5.556 11.111 11.582
Begel 0.008 0.39 0.125 178 22.222 197.580 77.993 16.67 1.18%
77.993
0.012 0.89 0 22.222 - -
1 0.150 0.300
0.016 1.58 0 22.222 - -
Blk 15/30 92.655
0.013 1.04 4 22.222 88.889 92.655
Begel 0.008 0.39 0.150 297 44.444 136.620 53.930 20.00 2.01%
1 0.150 0.150 0.016 1.58 0 44.444 - - 211.827
lis 15/15
0.012 0.89 4 44.444 177.778 157.897
Begel 0.008 0.39 0.125 67 8.333 84.420 33.324 6.67 1.51%
1 0.300 0.400 0.016 1.58 9 8.333 75.000 118.423 151.747
BTA
0.012 0.89 0 8.333 - -
Begel 0.008 0.39 0.125 134 16.667 115.240 45.490 13.33 1.68%
1 0.200 0.300 0.016 1.58 5 16.667 83.333 131.581 177.071
BTA
0.012 0.89 0 16.667 - -

Begel 0.008 0.39 0.150 75 11.111 79.500 31.382 13.33 0.00%


206.823
0.016 1.58 10 11.111 111.111 175.441
1 0.300 0.300
0.016 1.58 0 11.111 - - -
KC
0.012 0.89 0 11.111 - -
Begel 0.008 0.39 0.150 297 44.444 136.620 53.930 13.33 2.01%
1 0.150 0.150 0.016 1.58 0 44.444 - - 211.827
KP
0.012 0.89 4 44.444 177.778 157.897

0.09 0.9

19.06 186.140994

205.21
POLOS

POLOS

POLOS

ULIR

POLOS

ULIR

POLOS

ULIR

POLOS

ULIR

POLOS

ULIR

POLOS

ULIR

POLOS

ULIR

POLOS

ULIR

POLOS

ULIR

POLOS

ULIR
POLOS

ULIR

POLOS

POLOS

ULIR

POLOS

ULIR

POLOS

ULIR

POLOS

ULIR

POLOS

ULIR

POLOS

ULIR

POLOS

ULIR

POLOS

ULIR

POLOS

ULIR

POLOS

ULIR
POLOS

ULIR

POLOS

ULIR

POLOS

ULIR

POLOS

ULIR

POLOS

ULIR

POLOS

ULIR

POLOS

ULIR

POLOS

ULIR

POLOS

ULIR

POLOS

ULIR

POLOS

ULIR

POLOS

ULIR

POLOS

ULIR

POLOS

ULIR

POLOS

ULIR

POLOS

ULIR

POLOS

ULIR
POLOS

ULIR

POLOS

ULIR
ENGINEERING ESTIMATE ( EE )

REKAPITULASI
RENCANA ANGGARAN BIAYA ( RAB )

PROGRAM : PENGELOLAAN DANA SPESIFIK GRAND BIDANG PENDIDIKAN


KEGIATAN : PENGELOLAAN DANA INSENTIF DAERAH BIDANG PENDIDIKAN
PEKERJAAN : REHABILITASI RUANG KELAS SDN DI KEC BALONGPANGGANG
LOKASI : SDN 2 BALONGPANGGANG Kec Balongpanggang Kab Gresik
TAHUN : 2015

REKAPITULASI SELURUH PEKERJAAN

NO. URAIAN KEGIATAN JUMLAH

A REHABILITASI RUANG KELAS

I. PEKERJAAN PERSIAPAN Rp 8,350,137.11


II. PEKERJAAN TANAH Err:509
III. PEKERJAAN PASANGAN Err:509
IV. PEKERJAAN BETON Err:509
V. PEKERJAAN PLESTERAN DAN BENANGAN Err:509
VI. PEKERJAAN KUSEN KAYU KAMPER Err:509
VII. PEKERJAAN RANGKA ATAP Err:509
VIII. PEKERJAAN PENUTUP ATAP Err:509
IX. PEKERJAAN PLAFOND Err:509
X. PEKERJAAN LANTAI Err:509
XI. PEKERJAAN PENGGANTUNG KUNCI / KACA Err:509
XII. PEKERJAAN PENGECATAN Rp 4,785,995.14

JUMLAH Err:509
DIBULATKAN Err:509
PPN 10% Err:509
JUMLAH Err:509

Terbilang : Seratus Enam Puluh Dua Juta Sembilan Ratus Sembilan Puluh Sembilan Ribu Seratus Rupiah

Gresik, 2015
Menyetujui/Mengetahui Dibuat oleh
KEPALA BIDANG TATA KONSULTAN PERENCANA
BANGUNAN DAN PENGAWASAN CV. TITIAN CAHAYA CONSULTAN
Selaku
PEJABAT PEMBUAT KOMITMEN ( PPK )

Ir ACHMAD WASHIL M.R,MT SISWO. ST


NIP. 19660127 199803 1 001 Direktur

Mengetahui
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN GRESIK
Selaku
KUASA PENGGUNA ANGGARAN

Ir BAMBANG ISDIANTO, MM
NIP. 19580126 198512 1 002
RENCANA ANGGARAN BIAYA
( R. A. B )

PROGRAM : PENGELOLAAN DANA SPESIFIK GRAND BIDANG PENDIDIKAN


KEGIATAN : PENGELOLAAN DANA INSENTIF DAERAH BIDANG PENDIDIKAN
PEKERJAAN : REHABILITASI RUANG KELAS SDN DI KEC BALONGPANGGANG
LOKASI : SDN 2 BALONGPANGGANG Kec Balongpanggang Kab Gresik

NO JENIS PEKERJAAN VOLUME HARGA SATUAN JUMLAH

1 2 3 4 5

A REHABILITASI RUANG KELAS

I. PEKERJAAN PERSIAPAN
1 Pembongkaran genteng bubungan 23.15 m¹ Rp 2,717.80 Rp 62,917.07
2 Pembongkaran genteng 282.00 m² Rp 3,477.50 Rp 980,655.00
3 Pembongkaran litsplank 81.00 m¹ Rp 10,560.90 Rp 855,432.90
4 Pembongkaran gording 185.20 m¹ Rp 4,970.15 Rp 920,471.78
5 Pembongkaran usuk/reng 282.00 m² Rp 3,535.28 Rp 996,948.96
6 Pembongkaran Kuda - Kuda 7.00 bh Rp 98,024.06 Rp 686,168.44
7 Pembongkaran Kuda Kuda beton 2.91 m³ Rp 693,697.05 Rp 2,021,259.78
7 Pembongkaran plafond + rangka 238.67 m² Rp 7,651.84 Rp 1,826,283.19
Rp 8,350,137.11
II. PEKERJAAN TANAH
1 Galian pondasi 14.98 m³ #NAME? #NAME?
2 Urug pasir bawah pondasi tebal 10 cm 1.87 m³ Rp 257,335.00 Rp 481,731.12
Err:509
III. PEKERJAAN PASANGAN
1 Pasangan dinding Retak + Peninggian 1/2 bata 1 : 5 Err:509 m² Rp 124,228.07 Err:509
Err:509
IV. PEKERJAAN BETON
2 Kolom 12/15 Err:509 m³ Rp 5,834,257.50 Err:509
4 Kolom 20/20 - m³ Rp 7,837,103.40 Rp -
9 Sloof 20/30 - m³ Rp 4,701,371.08 Rp -
10 Sloof 20/25 - m³ Rp 4,590,607.13 Rp -
3 Balok latei 12/15 - m³ Rp 5,674,779.20 Rp -
11 Balok lantai 15/20 - m³ Rp 7,355,021.32 Rp -
5 Plat leuvel tebal 10 cm - m³ Rp 5,402,483.31 Rp -
13 Plat leuvel tebal 8 cm - m³ Rp 6,460,168.84 Rp -
12 Plat leuvel tebal 10 cm 4.76 m³ Rp -
5 Balok 20/35 - m³ Rp 6,174,905.28 Rp -
15 Balok B2 20/40 - m³ Rp 7,561,456.96 Rp -
16 Balok B3 15/20 - m³ Rp 7,355,021.32 Rp -
19 Balok B4 15/45 - m³ Rp 2,126,279.54 Rp -
6 Plat dek tebal 12 cm - m³ Rp 6,539,207.66 Rp -
18 Plat tangga tebal 15 cm - m³ Rp 6,414,645.33 Rp -
19 Plat bordes tebal 15 cm - m³ Rp 6,414,645.33 Rp -
20 Balok bordes 20/40 - m³ Rp 7,561,456.96 Rp -
3 Ring Balk/Ring gewel 12/15 Err:509 m³ Rp 4,934,771.32 Err:509
Err:509
V. PEKERJAAN PLESTERAN DAN BENANGAN
1 Plesteran dinding 1 : 5 Err:509 m² Rp 54,109.90 Err:509
Err:509
VI. PEKERJAAN KUSEN KAYU KAMPER
1 Kusen Pintu/ Jendela Kayu Kamper 6/15 Err:509 m³ Rp 540,000.00 Err:509
1 Daun pintu Panil Kayu Kamper Err:509 m² Rp 13,650.00 Err:509
2 Daun jendela Kayu Kamper Err:509 m² Rp - Err:509
2 Pasang Daun Jendela Err:509 m² Rp 350,000.00 Err:509
Err:509
VII. PEKERJAAN RANGKA ATAP
1 Kuda-kuda Kayu Kruing 1.37 ls Rp - Rp -
2 Gording Kayu Meranti 8/12 Baru Err:509 m³ Rp 57,000.00 Err:509
4 Ikatan angin Kruing 6/12 Err:509 m³ Rp - Err:509
5 reng Kamper 2/3 Baru Err:509 m² Rp - Err:509
6 Usuk 5/7 Kamper Err:509 m² Rp 22,800.00 Err:509
7 Papan reuter Meranti 2/20 Err:509 m¹ Rp - Err:509
8 Papan Kompres + seng Err:509 m¹ Rp 71,772.75 Err:509
9 Papan listplank 3/25 Err:509 m¹ Rp - Err:509
Err:509
VIII. PEKERJAAN PENUTUP ATAP
1 Pasang genteng Karangpilang Err:509 m² Rp - Err:509
2 Bubungan Karangpilang Err:509 m¹ Rp 725.00 Err:509
Err:509
IX. PEKERJAAN PLAFOND
1 Pasang Rangka Plafond Kayu Meranti Baru Err:509 m² Rp - Err:509
2 Pasang Kalsiboard Err:509 m² Rp - Err:509
Err:509
X. PEKERJAAN LANTAI
1 Lantai keramik 30 x30 Err:509 m² Rp 198,335.00 Err:509
2 Keramik dinding 20 x 25 Err:509 m² Rp 231,499.00 Err:509
Err:509
XI. PEKERJAAN PENGGANTUNG KUNCI / KACA
1 Kunci pintu 2 x putar Err:509 bh Rp 55,000.00 Err:509
2 Engsel pintu Err:509 bh Rp 40,000.00 Err:509
3 Engsel jendela Err:509 bh Rp 15,000.00 Err:509
4 Hak angin Err:509 bh Rp 33,500.00 Err:509
5 Grendel jendela Err:509 bh Rp 8,000.00 Err:509
6 Grendel Tanam Err:509 bh Rp 50,000.00 Err:509
7 Kaca polos tebal 5 mm Err:509 m² Rp - Err:509
Err:509
XII. PEKERJAAN PENGECATAN
1 Cat dinding 480.52 m² Rp 9,960.00 Rp 4,785,995.14
2 Cat plafon - m² Rp 9,960.00 Rp -
3 Cat kayu/besi - m² Rp 38,632.50 Rp -
Rp 4,785,995.14
RINCIAN PERHITUNGAN VOLUME PEKERJAAN
_________________________________

NO PERHITUNGAN

1 PEKERJAAN TANAH
a Boor strous 35.00 x 3.00 = 105.00
b GALIAN PLAT 1 1.20 x 1.20 x 0.40 x 26.00 = 14.98
c GALIAN PLAT 2 0.60 x 0.60 x 0.40 x 9.00 = 1.30
d URUKAN PASIR BAWAH PLAT 1 1.20 x 0.60 x 0.10 x 26.00 = 1.87
e URUKAN PASIR BAWAH PLAT 2 0.60 x 0.60 x 0.10 x 9.00 = 0.32
f URUKAN SIRTU 27.00 x 10.00 x 0.40 = 108.00
g URUKAN PASIR BAWAH LANTAI 27.00 x 10.00 x 0.05 = 13.50
h URUKAN PASIR BAWAH KUMBUNG 131.00 x 0.27 x 0.10 = 3.54
1 PEKERJAAN PASANGAN
a Pasangan batu kumbung 131.00 x 0.27 x 0.54 = 19.10
a Pasangan dinding 1 : 3 67.00 x 0.50 = 33.50
a Pasangan dinding 1 : 6 67.00 x 2.90 + 27.00 x 0.80 - 1.14 x 8.00 = 206.76
a Plesteran 1 : 3 33.50 x 2.00 = 67.00
a Plesteran 1 : 6 206.76 x 2.00 = 413.52
2 PEKERJAAN BETON
a Rabat Beton 7.00 x 14.70 x 0.05 + 2.00 x 15.00 x 0.05 = 0.00
b Pekerjaan strous 3.14 x 0.15 x 0.15 x 3.00 x 35.00 = 7.42
c Pekerjaan Poer 120 X 120 X 40 1.20 x 1.20 x 0.40 x 26.00 = 14.98
d Pekerjaan Poer 60 X 60 X 40 0.60 x 0.60 x 0.40 x 9.00 = 1.30
e Sloop 25/40 0.25 x 0.40 x 94.00 = 9.40
f Sloop 20/25 0.20 x 0.25 x 37.00 = 1.85
g K1 25/40 18.00 x 4.00 x 0.25 x 0.40 = 7.20
h K2 12/30 10.00 x 4.00 x 0.12 x 0.30 = 1.44
i K3 25/30 9.00 x 4.00 x 0.25 x 0.30 = 2.70
j B1 25/60 126.00 x 0.25 x 0.48 = 15.12
k B2 25/35 70.00 x 0.25 x 0.23 = 4.03
l B3 15/45 27.00 x 0.15 x 0.33 = 1.34
m Plat Deg 12 cm 27.00 x 10.00 x 0.12 = 32.40
3 PEKERJAAN PENGECATAN
a Cat dinding 67.00 + 413.52 = 480.52
b Cat plafon = 0.00
c Cat kayu =

31
RENCANA ANGGARAN BIAYA ( RAB )
Program : 1.01.1.03.01.16 Program Wajib Belajar Pendidikan Dasar Sembilan Tahun
Kegiatan : 1.01.1.03.01.16.41 RehabilitasiSedang/Berat Bangunan Sekolah
Pekerjaan : Rehabilitasi Ruang Kelas SDN 2 WRINGINANOM
Lokasi : SDN 2 WRINGINANOM Kec Wringinanom

HARGA JUMLAH
NO URAIAN PEKERJAAN SAT VOL SATUAN HARGA
Rp. Rp.

A KESEHATAN KESELAMATAN KERJA


1 Helm bh 6.00 50,000.00 300,000.00
2 Masker bh 540.00 1,750.00 945,000.00
3 Sarung Tangan psg 6.00 18,500.00 111,000.00
4 Sepatu Keselamatan psg 6.00 200,000.00 1,200,000.00
5 P3K set 1.00 100,000.00 100,000.00
6 BPJS (( 0,25% + 0,19% )*Harga Kontrak Sebelum p ls 1.00 344,000.00 344,000.00

JUMLAH 3,000,000.00
DIBULATKAN 3,000,000.00
PPN 10% 300,000.00
JUMLAH 3,300,000.00
Terbilang : Tiga Juta Tiga Ratus Rupiah
RENCANA ANGGARAN BIAYA ( RAB )
Program : 1.01.1.03.01.16 Program Wajib Belajar Pendidikan Dasar Sembilan Tahun
Kegiatan : 1.01.1.03.01.16.41 RehabilitasiSedang/Berat Bangunan Sekolah
Pekerjaan : Rehabilitasi Ruang Kelas SDN 2 WRINGINANOM
Lokasi : SDN 2 WRINGINANOM Kec Wringinanom

NO URAIAN PEKERJAAN JUMLAH

A PEKERJAAN PERSIAPAN
I PEKERJAAN PERSIAPAN 500,000.00
#NAME? #NAME?
#NAME? #NAME? 6,856,272.56
II PEKERJAAN BETON Err:509
III PEKERJAAN PASANGAN Err:509
IV PEKERJAAN ELEKTRIKAL 1,734,924.75
V PEKERJAAN FINISHING 17,962,140.33

JUMLAH Err:509
DIBULATKAN Err:509
PPN 10% Err:509
JUMLAH Err:509
Terbilang : Seratus Sembilan Puluh Sembilan Juta Sembilan Ratus Sembilan Puluh Sembilan Ribu
Delapan Ratus Rupiah

Gresik, 2017
Menyetujui/Mengetahui Dibuat oleh
KEPALA BIDANG PENGEMBANGAN KONSULTAN PERENCANA
MENEJEMEN PENDIDIKAN CV. GIRITAMA KONSULTAN
Selaku
PEJABAT PEMBUAT KOMITMEN ( PPK )

SUWONO, S,Sos NUR ALI, ST


NIP. 19630327 199010 1 001 Direktur

Mengetahui
KEPALA DINAS PENDIDIKAN
KABUPATEN GRESIK
Selaku
PENGGUNA ANGGARAN

MAHIN. S.Pd, MM
Pembina Tingkat 1
NIP. 19610625 198403 1 003
ANALISA HARGA SATUAN MATA PEKERJAAN

PROGRAM : 1.01.1.03.01.16 Program Wajib Belajar Pendidikan Dasar Sembilan Tahun


KEGIATAN : 1.01.1.03.01.16.41 RehabilitasiSedang/Berat Bangunan Sekolah
PEKERJAAN : Rehabilitasi Ruang Kelas SDN 2 WRINGINANOM
LOKASI : SDN 2 WRINGINANOM Kec Wringinanom

NO MATA PEKERJAAN KOEF. SAT. HARGA SATUAN JUMLAH

PEKERJAAN GALIAN DAN URUGAN

1 Bor strous O 30 / m1
Upah : An. BOW
Tukang bor 0.1250 hari Rp 125,000.00 Rp 15,625.00
Pekerja 0.2500 hari Rp 90,000.00 Rp 22,500.00
Jumlah Upah Rp 38,125.00
Alat :
Sewa Bor strous 0.0420 hari Rp 50,000.00 Rp 2,100.00
Jumlah Sewa Alat Rp 2,100.00
Jumlah Harga Satuan Rp 40,225.00
2 Galian tanah biasa sedalam 1 m / m³
Upah : An. ( SNI 2835:2008 ) 6.1 ( Revisi 2008 )
Mandor 0.0250 hari Rp 145,000.00 Rp 3,625.00
Pekerja 0.7500 hari Rp 90,000.00 Rp 67,500.00
Jumlah Upah Rp 71,125.00
Jumlah Harga Satuan Rp 71,125.00
3 Galian tanah biasa sedalam 2 m / m³
Upah : An. ( SNI 2835:2008 ) 6.2 ( Revisi 2008 )
Mandor 0.0450 hari Rp 145,000.00 Rp 6,525.00
Pekerja 0.9000 hari Rp 90,000.00 Rp 81,000.00
Jumlah Upah Rp 87,525.00
Jumlah Harga Satuan Rp 87,525.00
4 Galian tanah biasa sedalam 3 m / m³
Upah : An. ( SNI 2835:2008 ) 6.3 ( Revisi 2008 )
Mandor 0.0670 hari Rp 145,000.00 Rp 9,715.00
Pekerja 1.0500 hari Rp 90,000.00 Rp 94,500.00
Jumlah Upah Rp 104,215.00
Jumlah Harga Satuan Rp 104,215.00
5 Galian tanah Keras sedalam 1 m / m³
Upah : An. ( SNI 2835:2008 ) 6.4 ( Revisi 2008 )
Mandor 0.0320 hari Rp 145,000.00 Rp 4,640.00
Pekerja 1.0000 hari Rp 90,000.00 Rp 90,000.00
Jumlah Upah Rp 94,640.00
Jumlah Harga Satuan Rp 94,640.00
6 Galian tanah Cadas sedalam 1 m / m³
Upah : An. ( SNI 2835:2008 ) 6.5 ( Revisi 2008 )
Mandor 0.0600 hari Rp 145,000.00 Rp 8,700.00
Pekerja 1.5000 hari Rp 90,000.00 Rp 135,000.00
Jumlah Upah Rp 143,700.00
Jumlah Harga Satuan Rp 143,700.00
7 Galian tanah Lumpur sedalam 1 m / m³
Upah : An. ( SNI 2835:2008 ) 6.6 ( Revisi 2008 )
Mandor 0.0450 hari Rp 145,000.00 Rp 6,525.00
Pekerja 1.2000 hari Rp 90,000.00 Rp 108,000.00
Jumlah Upah Rp 114,525.00
Jumlah Harga Satuan Rp 114,525.00
8 Stripping Tebing Setinggi 1 m / m2
Upah : An. ( SNI 2835:2008 ) 6.7 ( Revisi 2008 )
Mandor 0.0050 hari Rp 145,000.00 Rp 725.00
Pekerja 0.0500 hari Rp 90,000.00 Rp 4,500.00
Jumlah Upah Rp 5,225.00
Jumlah Harga Satuan Rp 5,225.00
9 Membuang 1 m3 Tanah Sejauh 15 Meter
Upah : An. ( SNI 2835:2008 ) 6.8 ( Revisi 2008 )
Mandor 0.0100 hari Rp 145,000.00 Rp 1,450.00
RENCANA ANGGARAN BIAYA ( RAB )

HARGA JUMLAH
NO URAIAN PEKERJAAN SAT VOL SATUAN HARGA
Rp. Rp.

A PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi ls 1.00 500,000.00 500,000.00
JUMLAH A 500,000.00
B PEMBANGUNAN RPS
I PEKERJAAN TANAH
1 Bor Strous Q 30 L= 3 M m' 105.00 40,225.00 4,223,625.00
2 Galian pondasi m³ 16.27 71,125.00 1,157,346.00
3 Urug pasir bawah pondasi tebal 10 cm m³ 5.73 257,335.00 1,475,301.56
4 Urug Tanah Sirtu bawah Lantai t 40 cm m³ 108.00 225,881.25 24,395,175.00
5 Urug Pasir bawah Lantai tebal 5 cm m³ 13.50 257,335.00 3,474,022.50
JUMLAH A 6,856,272.56
II PEKERJAAN BETON
Rabat Beton t= 5 cm m³ - 831,059.30 -
1 Pekerjaan Beton strous m³ 7.42 2,248,744.84 16,681,751.42
2 Pekerjaan Poer 120 x 60 x 40 m³ 14.98 3,809,271.12 57,047,644.27
3 Kolom 30 x 30 m³ 7.20 6,340,105.72 45,648,761.20
4 Balok 25/50 m³ 15.12 6,174,905.28 93,364,567.77
5 Balok 20/30 m³ 4.03 7,536,155.32 30,333,025.17
6 Balok 15/20 m³ 1.34 7,561,456.96 10,105,887.23
7 Plat Deg 12 cm m³ 32.40 6,539,207.66 211,870,328.34
3 Balok 20/30 m132 Err:509 - Err:509
4 Balok Anak 15/25 m133 Err:509 - Err:509
5 Plat Beton Atap tb.10 cm m134 Err:509 - Err:509
6 Plat Kanopi T=10 cm m135 Err:509 - Err:509
8 Plat Lisplank Beton 7 cm m³ Err:509 7,035,095.19 Err:509
JUMLAH i Err:509
III PEKERJAAN PASANGAN
1 Pas. Rolag Bata m² 413.52 255,190.00 105,526,577.10
1 Pas. Dinding bata 1:6 m² 206.76 124,228.07 25,685,495.14
2 Plesteran 1:5 m² 413.52 54,109.90 22,375,612.42
3 Acian m² 413.52 34,460.69 14,250,238.63
4 Benangan m' - 11,768.13 -
5 Profil Plester m' - 59,984.84 -
2 Keramik Tempat Duduk m² Err:509 212,218.45 Err:509
2 Keramik Tempat Duduk m² 2.88 212,218.45 611,189.14
JUMLAH ii Err:509
iii PEKERJAAN KUSEN PINTU DAN JENDELA
1 Kusen Pintu/ Jendela Alumunium m³ Err:509 151,136.97 Err:509
2 Daun pintu Alumunium m² - 900,000.00 -
3 Daun jendela Alumunium m² Err:509 262,984.60 Err:509
Pasang Daun Jendela m² -
4 Jelusi Alumunium m² - 105,375.47 -
5 Kunci pintu 2 x putar bh - 132,680.00 -
6 Engsel pintu bh - 61,327.05 -
7 Engsel jendela bh - 30,816.00 -
8 Hak angin bh - 39,911.00 -
9 Grendel jendela bh - 23,326.00 -
Grendel Tanam bh Err:509 Err:509
10 Kaca polos tebal 5 mm m² Err:509 114,597.00 Err:509
JUMLAH iii Err:509

iv PEKERJAAN ATAP
1 Kuda Kuda Kayu Kruing m³ Err:509 11,158,113.75 Err:509
2 Gording Kayu Kruing m³ Err:509 8,379,000.00 Err:509
3 Gording Kayu Lama ( Bagian Belakang ) m132 Err:509 1,227,000.00 Err:509
4 Pasang Ikatan Angin ( Kayu Lama ) m133 Err:509 1,227,000.00 Err:509
1 Pasang Galvalum C 75 T 1 mm m² Err:509 180,000.00 Err:509
6 Pasang Usuk Kamper 5/7 m² Err:509 45,412.50 Err:509
7 Pasang Reuter Meranti m' Err:509 91,406.25 Err:509
8 Pasang Kompres + Seng m' Err:509 71,772.75 Err:509
2 Pasang Listplang Wotplank m' Err:509 76,264.25 Err:509
3 Pasang Genteng Karangpilang m² Err:509 139,944.50 Err:509
4 Pasang Bubungan Karangpilang m' 17.00 156,106.00 2,653,802.00
JUMLAH iv Err:509

iii PEKERJAAN SANITAIR


1 Pipa air hujan PVC 3" m' - 101,534.98 -
2 Roof Drain 3" bh - 92,474.75 -
JUMLAH III -
iv PEKERJAAN PINTU DAN JENDELA ALUMINIUM
1 Pintu P1 unit - 1,989,279.64 -
2 Pintu P2 (pintu Geser) unit - 2,790,173.81 -
3 Pasang Glsasblock 20x20 bh - 20,000.00 -
4 Pasang BV1 unit - 1,423,872.22 -
5 Sunscren Hollow 40x40 m² - 430,541.25 -
6 Pasang Kembali Jendela Lama unit - 150,000.00 -
JUMLAH IV -
v PEKERJAAN PLAFOND
1 Pas. Plafond Kalsiboard Rangka Hoollow m² Err:509 190,021.30 Err:509
2 Pas. Plafond Rangka Kayu Lama ( Bagian Dalam Da m² Err:509 58,875.00 Err:509
3 Pasang Plafon Kalsiboard m² Err:509 39,725.70 Err:509
2 Pas. List plafond gypsum m' 0.00 21,020.15 -
JUMLAH V Err:509
IV PEKERJAAN ELEKTRIKAL
1 Instalasi titik lampu ttk 5.00 199,822.50 999,112.50
2 Instalasi titik stop kontak ttk 1.00 243,291.25 243,291.25
3 Stop kontak bh 1.00 34,882.00 34,882.00
4 Saklar seri bh 1.00 47,722.00 47,722.00
5 Saklar Tunggal bh 1.00 33,812.00 33,812.00
6 Lampu SL 18 watt bh 5.00 75,221.00 376,105.00

JUMLAH V 1,734,924.75
V PEKERJAAN FINISHING
1 Pekerjaan Cat Dinding m² 961.04 16,027.00 15,402,634.56
2 Pekerjaan Cat Plafon m² 86.21 16,027.00 1,381,703.27
3 Pekerjaan Cat Kayu m² 28.00 42,064.38 1,177,802.50
JUMLAH vi 17,962,140.33

JUMLAH B Err:509
C RUANG PANTRY & TEMPAT JEMUR
i PEKERJAAN BETON
1 Kolom 15/25 m³ - 3,976,314.24 -
2 Kolom Praktis 12/12 m³ - 5,580,794.37 -
3 Blok Ring 12/17 m³ - 5,580,794.37 -
4 Balok 15/25 m³ - 5,635,169.54 -
5 Plat Lantai tb.10 cm m³ - 4,211,485.58 -
6 Plat Meja t=7cm m³ - 4,670,983.02 -
JUMLAH I -
ii PEKERJAAN PASANGAN
1 Pas. Dinding Batu bata 1:5 m² - 135,073.59 -
2 Plesteran 1:5 m² - 59,984.84 -
3 Acian m² - 34,460.69 -
4 Benangan m' - 11,768.13 -
5 Keramik lantai 40x40 m² - 212,148.37 -
6 keramik dinding 20x25 m² - 199,843.37 -
- JUMLAH II -
iii PEKERJAAN PLAFOND
1 Pas. Plafond Gypsumboard 9mm Rangka Galvalum m² - 100,538.27 -
2 Pas. List plafond gypsum m' 0.00 21,020.15 -
- JUMLAH III -
iv PEKERJAAN SANITAIR -
1 Pas. Kran air bh - 49,808.50 -
2 Pas. Kitcen sink unit - 766,066.50 -
3 Pipa air hujan 3" m' - 101,534.98 -
4 Pipa air bersih PVC 3/4" m' - 49,808.50 -
5 Pipa saluran kitchen sink 2" m' - 65,047.98 -
6 Roof drain 3" bh - 92,474.75 -
7 Talang Zincalume m' - 80,000.00 -
JUMLAH IV -
v PEKERJAAN ELEKTRIKAL
1 Instalasi titik lampu ttk - 222,667.00 -
2 Instalasi titik stop kontak ttk - 123,670.60 -
3 Stop kontak bh - 42,885.60 -
4 Saklar seri bh - 48,235.60 -
5 Saklar Tunggal bh - 48,235.60 -
6 Lampu PL 8 watt bh - 64,285.60 -
JUMLAH V -
vi PEKERJAAN KUSEN, PINTU DAN JENDELA ALUMINIUM
1 Pintu P1 unit - 1,989,279.64 -
2 BV2 unit - 799,328.97 -
3 Pasang Kembali Jendela Lama (BV) unit - 150,000.00 -
JUMLAH VI -
vii PEKERJAAN FINISHING
1 Cat Plafond m² - 20,616.23 -
2 Cat dinding dalam m² - 20,616.23 -
3 Cat dinding luar ( watershield ) m² - 40,646.63 -
4 Cat kolom ( watershield ) m² - 40,646.63 -
5 Cat Listplank beton ( watershield ) m² - 40,646.63 -
6 Cat Balok (weathersield) m² - 40,646.63 -
JUMLAH VII -
JUMLAH C -
D PEKERJAAN PENGGANTIAN DAN PERBAIKAN
i PEKERJAAN PASANGAN
1 Pas. Dinding Batu bata 1:5 (toilet lt 2 & gudang) m² - 135,073.59 -
2 Plesteran 1:5 m² - 59,984.84 -
3 Acian m² - 34,460.69 -
4 Keramik lantai 40x40 (gudang) m² - 212,148.37 -
5 Keramik lantai 20x20 (toilet) m² - 197,703.37 -
6 Keramik Diniding 20x25 (toilet) m² - 199,843.37 -
JUMLAH II -
ii PEKERJAAN PENGECATAN
1 Pengecatan dinding interior unit - 20,616.23 -
JUMLAH III -
iii PEKERJAAN SANITAIR
1 Closed Duduk unit - 2,228,917.00 -
2 Floor Drain Stainless Anti Bau bh - 295,774.75 -
JUMLAH IV -
iv PEKERJAAN KUSEN & PINTU
1 Pasang Kembali Pintu Gudang unit - 150,000.00 -
2 Pasang Pintu Toilet Alumunium standard (P3) unit - 506,618.25 -
3 Pasang pintu Tralis Rangka Hollow lantai 2 m² - 430,541.25 -
4 Perbaikan Pintu Tralis Lantai 1 unit - 150,000.00 -
- JUMLAH IV -
v PEKERJAAN PEMASANGAN EXHAUST FAN
1 Pemasangan Titik titik - 45,080.00 -
2 Exhaust Fan 10 " bh - 450,000.00 -
3 Exhaust Fan 16 " bh - 750,000.00 -
JUMLAH VI -
vi PEKERJAAN ATAP
1 Pasangan Kanopi Polivinille Rangka Hollow 4x4 m² - 520,000.00 -
JUMLAH V -
JUMLAH D -

You might also like