Measurement Sheet: Site Work
Measurement Sheet: Site Work
PROJECT NAME :
CLIENT :
CONSULTANT : DATE : 10/8/2021 METHOD OF
POMI
LOCATION : REV NO : 00 MEASUREMENT
Sr.No.
UNIT
UNIT
ITEM DESCRIPTION Nos. LENGTH IN m WIDTH IN m HEIGHT IN m QUANTITY Sub Total Qty Round off Qty BOQ QTY BOQ ITEM NO BOQ PAGE NO Dwg No Checking Rate Amount
SITE WORK
Site Preparation P
Disposal
Excavation
Ded
Back Filling 0.00
Back Filling
Excavation
Ded
Sub Struct RCC
PCC
Neck Wall & Column
Block Work WT
Block Work UPSTAND 0.00
Antitermite TREATMENT
Area P
Skirting
100mmhtick Road Base Material Fill
To receive Raft P
To receive Ground Slab P
To receive Water Tank Slab P
To receive Water tank Top Slab P
To receive LV Sub station Slab P
Polythene Sheet
To Water Tank P
Prepared By:.......................
Form Name: Measurement Sheet
1 OF 4
Form No:xxxx
Reviewed By:......................
Approved By:.......................
MEASUREMENT SHEET
PROJECT NAME :
CLIENT :
CONSULTANT : DATE : 10/8/2021 METHOD OF
POMI
LOCATION : REV NO : 00 MEASUREMENT
Sr.No.
UNIT
UNIT
ITEM DESCRIPTION Nos. LENGTH IN m WIDTH IN m HEIGHT IN m QUANTITY Sub Total Qty Round off Qty BOQ QTY BOQ ITEM NO BOQ PAGE NO Dwg No Checking Rate Amount
To Ground Slab P
To Raft Slab P
To Sub stations P
To foundation to Concrete Upstand P
Landscaping area
Hardscape
60mmthick External Pavement Type PA-2
60mmthick External PaRKING Type PA-2
80mm thick, to car aprk entrance /exit
DIVISION-3 CONCRETE
SUB STRUCTURE
PCC
P
P
Water Proof PCC
50mm thick to Water tank P
50mm thick to Raft---Lift pit Top P
75mm thick to Water Tank Top Slab P
75mm thick to Water Tank P
75mm thick to Raft Footing P
75mm thick to Isolated Footing
RCC--Grade C50
Isolated Footing---
Neck Column-
Strap Beam
Raft Foundation
Approved By:.......................
MEASUREMENT SHEET
PROJECT NAME :
CLIENT :
CONSULTANT : DATE : 10/8/2021 METHOD OF
POMI
LOCATION : REV NO : 00 MEASUREMENT
Sr.No.
UNIT
UNIT
ITEM DESCRIPTION Nos. LENGTH IN m WIDTH IN m HEIGHT IN m QUANTITY Sub Total Qty Round off Qty BOQ QTY BOQ ITEM NO BOQ PAGE NO Dwg No Checking Rate Amount
Thickening 0.00 P
Concrete upstand 0.00 P
Grade Slab --100mm thick Sub Station-A142
Single Mesh
SUPER STRUCTURE
Slab
Beam
Column
Staircase
Core Wall
Shear Wall
Entrance Ramp
Entrance Steps
Parapet Wall
DIVISION 6 NA
DIVISION 7
Roof Water Proofing
Wet Area Waterproofing
Sub Structure Water Proofing
Prepared By:.......................
Form Name: Measurement Sheet
3 OF 4
Form No:xxxx
Reviewed By:......................
Approved By:.......................
MEASUREMENT SHEET
PROJECT NAME :
CLIENT :
CONSULTANT : DATE : 10/8/2021 METHOD OF
POMI
LOCATION : REV NO : 00 MEASUREMENT
Sr.No.
UNIT
UNIT
ITEM DESCRIPTION Nos. LENGTH IN m WIDTH IN m HEIGHT IN m QUANTITY Sub Total Qty Round off Qty BOQ QTY BOQ ITEM NO BOQ PAGE NO Dwg No Checking Rate Amount
DIVISION 9 FINISHES
BACK GROUNDS SCREED
Internal Floor Finishes
Internal Wall Finishes
Internal Ceiling Finishes
Staircase Finishes
Stair Floor
Landing Floor
Riser
Tread
Skirting Landing Floor
Skirting Steps
EXTERNAL FINISHES
SCREED
Plaster to Wall Finishes
Prepared By:.......................
Form Name: Measurement Sheet
4 OF 4
Form No:xxxx
Reviewed By:......................
Approved By:.......................