Budhil H.E.

Project
Check for Vibrations in Barrel
All units are in meters
S.No. Particulars Length Width Height Area Volume
1 El. 1378.16 to El. 1382.46 9.15 2.375 4.3 93.44
2 reduction for draft tube 1.85 -26.45 -48.93
3 El. 1382.46 to 1387.10 4.64 52.28 93.44
4 reduction for 3.25m dia. Shaft 4.64 -8.29 -38.47
5 reduction for runner removal gallery 1.75 2.55 -1.7 -7.59
6 reduction for spiral casing 13.4 -1.28 -17.10
7 El. 1387.1 to start of transition 1.9 24.87 47.26
8 transition 0.6 34.68 20.81
9 end of transition to 1395.82 6.2 14.32 88.77
10 concrete in stator rotor foundation 16.09 0.73 11.75

Total Volume of Concrete (cum) 243.39


Total Volume of Concrete (cft) 8567.35
Total Weight of Concrete (t) 608.48

Check for Vibration

USBR Criteria (Volume of concrete in cft > 2 times of machine KW) Criteria not fulfilled
2 times of machine KW 70000.00

CWPC Criteria (4-6 cft concrete per kVA) Criteria not fulfilled
kVA of machines 38888.89
5 times of kVA of machine 194444.44