Project
Check for Vibrations in Barrel
All units are in meters
S.No. Particulars Length Width Height Area Volume
1 El. 1378.16 to El. 1382.46 9.15 2.375 4.3 93.44
2 reduction for draft tube 1.85 -26.45 -48.93
3 El. 1382.46 to 1387.10 4.64 52.28 93.44
4 reduction for 3.25m dia. Shaft 4.64 -8.29 -38.47
5 reduction for runner removal gallery 1.75 2.55 -1.7 -7.59
6 reduction for spiral casing 13.4 -1.28 -17.10
7 El. 1387.1 to start of transition 1.9 24.87 47.26
8 transition 0.6 34.68 20.81
9 end of transition to 1395.82 6.2 14.32 88.77
10 concrete in stator rotor foundation 16.09 0.73 11.75
USBR Criteria (Volume of concrete in cft > 2 times of machine KW) Criteria not fulfilled
2 times of machine KW 70000.00
CWPC Criteria (4-6 cft concrete per kVA) Criteria not fulfilled
kVA of machines 38888.89
5 times of kVA of machine 194444.44
file:///conversion/tmp/activity_task_scratch/547906231.xls
30.29
168.59