Professional Documents
Culture Documents
Campinas Project Pilot 02
Campinas Project Pilot 02
PVsyst TRIAL
Project: Projeto_Piloto_2
Variant: New simulation variant
Tables on a building
System power: 9.00 kWp
Souzas - Brazil
PVsyst TRIAL
PVsyst TRIAL
PVsyst V7.2.2
VC0, Simulation date:
31/05/21 11:03
with v7.2.2
Project summary
Geographical Site Situation Project settings
Souzas Latitude -22.88 °S Albedo 0.20
Brazil Longitude -46.96 °W
Altitude 667 m
PVsyst TRIAL
Time zone UTC-3
Meteo data
Souzas
Meteonorm 8.0 (2008-2015), Sat=100% - Synthetic
System summary
Grid-Connected System Tables on a building
System information
PVsyst TRIAL
PV Array Inverters
Nb. of modules 30 units Nb. of units 1 Unit
Pnom total 9.00 kWp Pnom total 8.20 kWac
Pnom ratio 1.098
Results summary
Produced Energy 14.84 MWh/year Specific production 1649 kWh/kWp/year Perf. Ratio PR 79.95 %
Table of contents
Project and results summary 2
General parameters, PV Array Characteristics, System losses 3
Near shading definition - Iso-shadings diagram 5
Main results 6
PVsyst TRIAL
Loss diagram 7
Special graphs 8
PVsyst TRIAL
31/05/21 PVsyst Evaluation mode Page 2/8
Project: Projeto_Piloto_2
Variant: New simulation variant
PVsyst V7.2.2
VC0, Simulation date:
31/05/21 11:03
with v7.2.2
General parameters
Grid-Connected System Tables on a building
PV Field Orientation
Orientation Sheds configuration Models used
PVsyst TRIAL
Fixed plane Transposition Perez
Tilt/Azimuth 30 / -20 ° Diffuse Perez, Meteonorm
Circumsolar separate
PV Array Characteristics
PV module Inverter
Manufacturer Generic Manufacturer Generic
Model TSM-DD05H-08-(II)-300 Model Primo 8.2-1
(Original PVsyst database) (Original PVsyst database)
Unit Nom. Power 300 Wp Unit Nom. Power 8.20 kWac
PVsyst TRIAL
Number of PV modules
Nominal (STC)
Modules
At operating cond. (50°C)
Pmpp
U mpp
I mpp
30
9.00
2 Strings x 15
8.18 kWp
444 V
18 A
units
kWp
In series
Number of inverters
Total power
Operating voltage
Pnom ratio (DC:AC)
2 * MPPT 50% 1
8.2
80-800
1.10
units
kWac
V
PVsyst TRIAL
Array Soiling Losses
Loss Fraction
Loss Fraction -0.8 % Loss Fraction 2.0 % at MPP Loss Fraction 0.1 %
PVsyst TRIAL
31/05/21 PVsyst Evaluation mode Page 3/8
Project: Projeto_Piloto_2
Variant: New simulation variant
PVsyst V7.2.2
VC0, Simulation date:
31/05/21 11:03
with v7.2.2
AC wiring losses
Inv. output line up to injection point
Inverter voltage 230 Vac mono
Loss Fraction 1.24 % at STC
Inverter: Primo 8.2-1
PVsyst TRIAL
Wire section (1 Inv.) Copper 1 x 2 x 10 mm²
Wires length 20 m
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
31/05/21 PVsyst Evaluation mode Page 4/8
Project: Projeto_Piloto_2
Variant: New simulation variant
PVsyst V7.2.2
VC0, Simulation date:
31/05/21 11:03
with v7.2.2
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
31/05/21 PVsyst Evaluation mode Page 5/8
Project: Projeto_Piloto_2
Variant: New simulation variant
PVsyst V7.2.2
VC0, Simulation date:
31/05/21 11:03
with v7.2.2
Main results
System Production
Produced Energy 14.84 MWh/year Specific production 1649 kWh/kWp/year
Performance Ratio PR 79.95 %
PVsyst TRIAL
Normalized productions (per installed kWp) Performance Ratio PR
PVsyst TRIAL
January
GlobHor
kWh/m²
200.8
DiffHor
kWh/m²
84.04
Balances and main results
T_Amb
°C
23.54
GlobInc
kWh/m²
178.2
GlobEff
kWh/m²
165.6
EArray
MWh
1.325
E_Grid
MWh
1.271
PR
ratio
0.793
February 147.1 70.38 24.01 138.4 129.0 1.026 0.983 0.789
March 169.3 75.38 23.48 176.0 165.2 1.310 1.257 0.794
April 151.9 50.28 21.81 178.2 167.9 1.332 1.279 0.797
May 132.4 40.12 18.91 173.9 162.4 1.311 1.259 0.804
June 114.0 38.33 17.91 157.7 146.6 1.202 1.155 0.814
July 133.2 31.52 17.55 184.1 171.4 1.390 1.336 0.806
August 152.6 40.84 19.31 190.4 179.5 1.438 1.380 0.806
PVsyst TRIAL
September 157.4 62.07 20.53 170.9 160.9 1.290 1.238 0.805
October 198.6 67.09 22.54 196.7 184.5 1.465 1.406 0.794
November 175.5 83.35 22.10 157.5 146.2 1.183 1.135 0.801
December 185.8 83.72 23.46 160.7 148.7 1.193 1.144 0.791
Year 1918.6 727.13 21.25 2062.6 1928.0 15.464 14.842 0.800
Legends
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation E_Grid Energy injected into grid
T_Amb Ambient Temperature PR Performance Ratio
GlobInc Global incident in coll. plane
GlobEff Effective Global, corr. for IAM and shadings
PVsyst TRIAL
31/05/21 PVsyst Evaluation mode Page 6/8
Project: Projeto_Piloto_2
Variant: New simulation variant
PVsyst V7.2.2
VC0, Simulation date:
31/05/21 11:03
with v7.2.2
Loss diagram
1919 kWh/m² Global horizontal irradiation
+7.5% Global incident in coll. plane
PVsyst TRIAL
-1.29% Near Shadings: irradiance loss
PVsyst TRIAL
+0.75% Module quality loss
PVsyst TRIAL
31/05/21 PVsyst Evaluation mode Page 7/8
Project: Projeto_Piloto_2
Variant: New simulation variant
PVsyst V7.2.2
VC0, Simulation date:
31/05/21 11:03
with v7.2.2
Special graphs
Daily Input/Output diagram
PVsyst TRIAL
PVsyst TRIAL
System Output Power Distribution
PVsyst TRIAL
PVsyst TRIAL
31/05/21 PVsyst Evaluation mode Page 8/8