# Task steps Potential Mitigation

Hazards controls
 Preparation for
sand blasting  Unauthorized work  Inspect insulation, cables, connectors, , and PPE
& work start-
 A certified PTW applicant shall obtain PTW
1 up  Conflicting activities
from the concerned authorities
 Make sure that there are no conflicting
activities near the worksite before starting
the job
 Use regulator to control supply.
 Change filter at the advised frequency.
 Insufficient air for breathing  Monitoring the air and ensure good quality of
 Air contaminated. (Breathing air.
 Ensure dead man’s device is always in good
 Blasting in Operation problem)
operating condition.
2  Improper supply of air.  Do not allow workers to play with the sand
 Ineffective filters blasting machine
 Sand blasting on body part/ Body  Make sure sand blasting is done only by trained
injury Locking of dead man’s device personnel
for intermediate inspection  Barricade the area to prevent unauthorized entry
 Put ‘OFF’ machine first.
3 . Changing the position to  Sand blasting on body part (body  Always keep the dead man’s device in
cover other area injury) good operating condition.
 Trip/fall Machine remain ‘ON’  After work completion of work make sure
all the equipment & tool are properly taken
 Locking of dead man’s device back to their storage are
 Maintain good housekeeping
 Poor housekeeping
 

 

 

 