- The scope of this document provide the information about the certification program,
and what will going to happen during the test execution.
- It clarifies what type of card needed and what is expected from the representative.
- Provides the contact details (UL)
UL’s transaction security division guides companies in different ways to safeguard the
security, compliance, and interoperability.
- Advice
- Test
- Certification services
- Security evaluation
- Test tools
For implementing the new technologies and full life cycle of our product development.
Certification process:
- Testing.
- Implementation.
-Implementation options.
- Contact with.
- Project Engagement
- Preparation
- Certification
- Project closure
Project Engagement:
- Document is shared
- Provides the scope and the basic configuration of the issuer certification
- The document returned within minimum of 2 weeks prior to agreed start of
certification.
Preparation:
- It requires some preparation from the issuer for the smooth process.
1) Required preparation:
- Metadata
- Production cards
- Readiness call
- Checklist
Certification.
Intake test execution is the process of executing the tests step by step to obtain the actual
result that can be compared with expected result to check whether the tests passed or
failed.
-Verdict determines the opinion which may be pass, fail, and pass with issue, N/A.
Example,
-Regression testing
- All the progress of tests is tracked in the test administration and report.
- End of the progress the test administration report is converted into final report
4. Issue resolution
5. Failure of certification
Once the progress is completed and approved by no changes made to the issuer. Any
changes that result in different test case outcome will require a new certification (for
example)
If during the entire progress, the system issues prevent test cases from being completed and
cannot resolved within 2 to 3 days, the progress will be cancelled.
Project closure.
Refunding policy:
In this refunding policy, to ensure a zero balance needed to be refunded on the used cards.
2. Alignments between issuer and the UL on the timelines and the location will be discussed
in initial meeting.
Certification information:
Prior to engaging with UL and starting the certification, the issuer will need to complete the
the following information and confirm that all necessary requirements have been met.
- Stakeholder Information
- Portfolio Information
- Functional Checklist
- Resolution Timelines
- Fraud Rules
Summary:
-Total number of test cases passed in percentage for different types of devices.
-Comments.