New Site

UL 2100 & GL 1800

Project H3I Phase 2


Prepared by : Quality Team
EHS and Tools Site Preparation

New Site UL 2100 GL 1800 H3I Project


EHS and Tools Site Preparation

1
2 • WORKING AT NIGHT
7 3

6 4
1 Safety Helmet
2 Safety Glass
8
3 Safety Glove
4 Cover all/ Wear pack
5 Safety Shoes
6 Full body Harness
5 7 Double lanyard with Absorber and Snap hook
8 Working Position Lanyard
New Site UL 2100 GL 1800 H3I Project
General Site Information

Site Type Greenfield

System UL 2100

Longitude 109.403250

Latitude -0.108910

New Site UL 2100 GL 1800 H3I Project


Cabinet Type
Cabinet type used is TP48200A-HD15A6

Scenario 1 ( use RTN 905 ) Scenario 2 ( use RTN 950 )

BBU BBU
DDF DDF DDF DDF
RTN 905 RTN 950
DCDU DCDU

New Site UL 2100 GL 1800 H3I Project


Ground Part Installation
Pengamanan Cabinet  Pemasangan cabinet mechanical anchor ataupun belt protection

New Site UL 2100 GL 1800 H3I Project


Ground Part Installation
Pengamanan Cabinet

New Site UL 2100 GL 1800 H3I Project


Ground Part Installation
Cabinet and Equipment Overview

New Site UL 2100 GL 1800 H3I Project


Ground Part Installation TP48200A Belt Installation
Cabinet and Equipment Overview

Install 2 anchor bolt pada setiap kaki cabinet belt


New Site UL 2100 GL 1800 H3I Project
Ground Part Installation
Cabinet and Equipment Overview

Arrester Breaker PDU LLVD


Breaker PDU BLVD
Main Input Rectifier Breaker Battery

SMU
RECTIFIER Module

BBU

DDF
RTN 905
DCDU 12B

New Site UL 2100 GL 1800 H3I Project


Ground Part Installation
Cabinet and Equipment Overview

1 Power Cable dari ACPDB

2 Grounding Cable Cabinet

3 Optical Cable/CPRI dari RRU

Battery Cable dan Grounding 4

Cable Data dan Coaxial/IF 5


4
3 RRU Power Cable 6 6
2 5 7
1 Water Sensor External Alarm Cable 7

New Site UL 2100 GL 1800 H3I Project


Ground Part Installation
Cabinet and Equipment Overview

1 Power Cable dari ACPDB

7 2 Optical Cable dari RRU

3 Cabinet Grounding Cable

4 Spare
1 2 3 4 5 6
5 Cable Data and Coaxial/IF

6 Power Cable RRU

7 Label baterai terpasang

New Site UL 2100 GL 1800 H3I Project


Ground Part Installation
Cabinet and Equipment Overview

Smoke Tem – Humidity


Sensor Sensor

Water Temperature
Sensor Sensor

Cabinet Sensor Alarm Installation


New Site UL 2100 GL 1800 H3I Project
Ground Part Installation
Cabinet and Equipment Overview

ACPDB Rectifier/TP 48200

POWER Cable harus menggunakan skun cable, di Label and di crimping dengan alat yang sesuai.

New Site UL 2100 GL 1800 H3I Project


Ground Part Installation
Cabinet and Equipment Overview

DCDU dan RTN Power Rectifier / TP 48200

RTN IDU

1 2 3 4 5 6 7 8 9 10 11
DCDU

MCB for DCDU MCB for RTN

POWER Cable harus menggunakan skun cable, diLabel, dan dicrimping dengan alat crimping yang sesuai
Power DCDU terkoneksi ke PDU LLVD 80 A (2) dan Power RTN/IDU terkoneksi ke PDU BLVD 16 A (8 & 9)

New Site UL 2100 GL 1800 H3I Project


Ground Part Installation
Labeling Equipment Overview

New Site UL 2100 GL 1800 H3I Project


Ground Part Installation External Alarm Connection from
ACPDB
Cabinet and Equipment Overview

- Phase Failure Alarm


- Arrester Failure Alarm

Grounding Cabinet Connection

New Site UL 2100 GL 1800 H3I Project


Signal Cable Connection Alarm

New Site UL 2100 GL 1800 H3I Project


Tower Part Installation
Cabinet and Equipment Overview

CPRI & IF cable Spare Optical Cable diletakkan di bawah cabinet


Power
cable sehingga tidak terexposed, dilabel dan ties di 4 sisi

New Site UL 2100 GL 1800 H3I Project


Routing Cable
 Installed cable tidy and straight

Vertical Clamp

Horizontal Clamp

 Power cable and CPRI cable dipasang dengan clamp pada setiap jarak
100 cm atau pada setiap langkah cable tray, pada horizontal cable tray
dan vertical cable tray.
 MW IF cable dipasang dengan cable ties (cross/silang) tanpa clamp
pada setiap jarak 100 cm.
 Power dan CPRI cable terpasang pada sisi terpisah dengan microwave
IF cable

New Site UL 2100 GL 1800 H3I Project


Tower Part Installation
Cabinet and Equipment Overview

Waterproofing
grounding kit

Grounding kit power cable RRU dan Koneksi Kabel IF/Coaxial


Harus dipasang waterproofing  Isolasi hitam 3x, rubber 3x, Isolasi hitam 3x dan diikat kabel ties hitam

Instalasi kabel IF/Coaxial


Harus menggunakan kabel ties hitam besar (lebar) dengan instalasi silang (X)

New Site UL 2100 GL 1800 H3I Project


Grounding Connection using Grounding Clip (if needed)

Install grounding clip pada power cable RRU sebelum bending dari vertical tray ke horizontal tray

New Site UL 2100 GL 1800 H3I Project


Tower Part Installation
Antenna and RRU Installation

Antenna and RRU assembly on Ground

All connector must waterproofing properly


labeling with color insulation tape
RRU TX/RXA >>>> Antenna +45
RRU TX/RXB >>>> Antenna - 45
New Site UL 2100 GL 1800 H3I Project
Tower Part Installation
Antenna and RRU Installation

RRU harus dipasang membelakangi antenna dan lurus. Laying cable jumper dari antenna
ke RRU harus rapi, diikat ties, tidak ada tekukan dengan rdius < 20x diameter.

New Site UL 2100 GL 1800 H3I Project


Antenna – Installation Bracket Antenna & Mounting
Lift Antenna

New Site UL 2100 GL 1800 H3I Project


Antenna – Installation Bracket Antenna & Mounting
LOWER
UPPER MOUNTING
MOUNTING

UPPER
MOUNTING

LOWER
MOUNTING

 Setting boom antenna vertical menjadi nol (tegak) sebelum setting antenna parameter
 Pasang ketinggian mounting antenna sesuai dengan collo approved dari ToCo
 Pastikan bracket antenna atas dan bawah tidak terbalik
 Kencangkan semua baut-baut mounting dan bracket. Pastikan ring per, ring plat dan mur pengunci terpasang lengkap (2 mur)

New Site UL 2100 GL 1800 H3I Project


Antenna – Installation Bracket Antenna & Mounting

Mechnical Tilting 
Untuk mensetting
tekan/Tarik antenna
pada bagian atas
sehingga terdorong
keluar

Electrical Tilting 
Untuk mensetting
buka penutup dan
putar ke kanan
atau kiri

 Electrical and Mechanical Tilt, Azimuth and Antenna Height must be installed according TSSR
and Collo Apps Approved

New Site UL 2100 GL 1800 H3I Project


Antenna – Installation Bracket Antenna & Mounting

Mechanical Tilt

Cara mensetting nilai mechanical tilt:


1. Setting nilai inclinometer sesuai dengan nilai mechanical
tilt pada TSSR
2. Pasang/tempel inclinometer pada belakang antenna dekat
dengan label antenna
3. Longgarkan baut bracket scale (pengatur tilting antenna)
4. Dorong antenna kearah luar atau dalam, sehingga air
waterpass pada inclometer berada pada posisi horizontal
(ditengah)
5. Kencangkan kembali baut-baut bracket scale

Electrical Tilt

Cara mensetting nilai electrical tilt:


1. Buka penutup warna putih pada bagian bawah antenna.
2. Putar lingkaran penyesuai (adjustment) sehingga skala
penunjuk angka menjadi sesuai dengan nilai electrical tilt
pada TSSR
3. Pasang kembali penutup warna putih dengan kencang.

 Electrical and Mechanical Tilt, Azimuth and Antenna Height must be installed according TSSR and Collo Apps Approved
New Site UL 2100 GL 1800 H3I Project
Tower Part Installation
Antenna and RRU Installation

Pastikan semua instalasi parameter antenna sesuai dengan collo approved dan TSSR planning ( Ketinggian,
Azimuth, MDT dan EDT)

New Site UL 2100 GL 1800 H3I Project


Tower Part Installation
Antenna and RRU Installation

3
3

2
1 Pasang label RRU

RRU Grounding cable harus dipasang dan


2
kencang dan dikoneksikan ke busbar, laying
rapi
3 Konektor jumper pada RRU dan antenna
harus diwaterproof sesuai standard, dilabel
warna
New Site UL 2100 GL 1800 H3I Project
Tower Part Installation
Antenna and RRU Installation

Pasang cable power RRU. Pastikan skun power cable terpasang dan kabel terpasang kencang.
1 Ujung satunya terpasang pada DCDU
Lihat petunjuk pemsangan kabel power CPRI. Kelupas isolator power cable dan koneksikan ke
2
penjepit cable power di RRU

3 Pasang label RRU di dalam

Pasang cable CPRI ke CPRI port di RRU dengan kuat dan pas. Ujung kabel CPRI satunya lagi
3 4
terpasang ke UBPP port sesuai sector RRU/ Pastikan tidak ada cross CPRI
4

New Site UL 2100 GL 1800 H3I Project


Tower Part Installation
Antenna and RRU Installation

Semua kabel grounding RRU harus


dipasang dan terkoneksi ke busbar terdekat

New Site UL 2100 GL 1800 H3I Project


Tower Part Installation
Antenna and RRU Installation

System UL 2100
antenna antenna antenna
+45 -45 +45 -45 +45 -45

Coloring Label
• Red  Sector 1
• Yellow  Sector 2
• Blue  Sector 3

TX/RXA TX/RXA TX/RXA System UL 2100


TX/RXB TX/RXB TX/RXB • 2 ring + 3 ring White Color  TX/RXA >> ANT +45
• 1 ring + 3 ring White Color  TX/RXA >> ANT - 45
New Site UL 2100 GL 1800 H3I Project
Tower Part Installation
Antenna and RRU Installation

System GL 1800
antenna antenna antenna
+45 -45 +45 -45 +45 -45

Coloring Label
• Red  Sector 1
• Yellow  Sector 2
• Blue  Sector 3

TX/RXA TX/RXA TX/RXA System GL 1800


TX/RXB TX/RXB TX/RXB • 2 ring + 2 ring White Color  TX/RXA >> ANT +45
• 1 ring + 2 ring White Color  TX/RXA >> ANT - 45
New Site UL 2100 GL 1800 H3I Project
Tower Part
MICROWAVE Installation
RTN 905 RTN 905( 2+0 )

New Site UL 2100 GL 1800 H3I Project


Tower Part Installation
MICROWAVE Installation

LEG TOWER SIKU


LEG TOWER TUBULAR/BULAT

Instalasi mounting antenna MW pada tower leg model siku dan pipa. Semua baut-baut harus
kencang dan dilengkapi dengan ring per, ring plat, dan baut pengunci (lock not/double nut)
New Site UL 2100 GL 1800 H3I Project
Tower Part Installation
MICROWAVE Installation

3
1 Label antenna, terbuat dari waterproof material (gunakan print label)

2 Label ODU, terbuat dari waterproof material (gunakan print label)

3 Grounding cable terpasang ke ODU dan dilabel

New Site UL 2100 GL 1800 H3I Project


Tower Part Installation
MICROWAVE Installation

1
2

New Site UL 2100 GL 1800 H3I Project


Ground Part Installation
MICROWAVE Installation

New Site UL 2100 GL 1800 H3I Project


Ground Part Installation
MICROWAVE Installation

1 IF connector dibungkus heat shrink and diLabel

2 Label FE site and frekuensi aktual

3 Koneksi kabel grounding RTN/IDU

4 Power Cable RTN/IDU diberi label

5 Label di kabel Ethernet/Optical


5

3
2

4
4

New Site UL 2100 GL 1800 H3I Project


Ground Part Installation
Cabinet and Equipment Overview

Power Equipment Rectifier

1 2 3 4 5 6 7 8 9 10 11

POWER Cable Must Use Cable Lug / ferule and Labeled and Crimp properly
Power RTN connect to BLVD 16 A

New Site UL 2100 GL 1800 H3I Project


Ground Part Installation
Cara instalasi Kabel Termination

Kabel Power/Grounding
Power Cable/Grounding Kabel Ethernet/LAN Kabel IF/Coax

New Site UL 2100 GL 1800 H3I Project


1

2
Thanks You