ENI – IRAQ

ZUBAIR OIL FIELD DEVELOPMENT PROJECT

Method Statement for Touch Up Painting of Structural Steel


– PPG

Issued for Durgarao Jawdat R James Antonio


A EX-CO 00 19/11/2017 Kefah
Construction Vasa Essa Hearley Pratico
GE Validity Rev.
Rev. Status number Prepared Checked Approved Contractor Company
No Date Description
By By by Approval information
Revision Index
Company logo and business name Project Name Company Identification

ZUBAIR OIL FIELD 00251900DAST66762


DEVELOPMENT
Job N. 210/2011/NR/ZU
eni iraq b.v.
Contractor logo and business name Contractor Identification

ZBR/90/W/--------CD/MS/050

Contract N. 210/2011/NR/ZU
GE Middle East, FZE, Dubai, UAE. (Formerly Alstom Middle East FZE)
Vendor logo and business name Vendor Identification

002519-PC-SAS-AP-090

Shams Al Sabah General Contracting Co. Ltd. Order N. 210/2011/NR/ZU


Facility Name Location Scale Sheet of
ZUBAIR-PERMANENT POWER GENERATION ONSHORE N.A. Sheets
1/8
Document Title Supersedes N.

Method Statement for Touch Up Painting of Structural Superseded by N.


Plant Area Plant Unit
Steel -PPG 00
N.A.

Software: Microsoft Word 97-2003 File N° 00251900DAST66762_EXCO00_08.doc


Contractor Document Identification Company Document Identification Originator Document Identification GE Revision Index Sheet of
Rev. Sheets
No. Validity Rev.
Status No.

eni Iraq b.v. 2/8


GE Middle East, FZE, Dubai, UAE.
(Formerly Alstom Middle East FZE) A EX-CO 00
ZBR/90/W/--------CD/MS/050 00251900DAST66762 002519-PC-SAS-AP-090

REVISION HISTORY

Rev. Date No. of sheets Description


EX-CO-00 19/11/2017 8 Issued for Construction

This document is property of eni Iraq BV. 
It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent 
Contractor Document Identification Company Document Identification Originator Document Identification GE Revision Index Sheet of
Rev. Sheets
No. Validity Rev.
Status No.

eni Iraq b.v. 3/8


GE Middle East, FZE, Dubai, UAE.
(Formerly Alstom Middle East FZE) A EX-CO 00
ZBR/90/W/--------CD/MS/050 00251900DAST66762 002519-PC-SAS-AP-090

TABLE OF CONTENTS
1.  SCOPE .........................................................................................................................................4 
2.  REFERENCE ................................................................................................................................4 
3.  TOUCH UP AND REPAIR PROCEDURE .....................................................................................4 
3.1  Scope ...................................................................................................................................................... 4 
3.2  Definition................................................................................................................................................ 4 
3.3  Paint Damaged Area on Structural Steel ..................................................................................... 4 
3.4  Painting System - 004 (Structural Steel) ...................................................................................... 5 
3.5  Painting System - 012 (Galvanized Items) ................................................................................... 5 
3.6  Painting Application Method ........................................................................................................... 5 

This document is property of eni Iraq BV. 
It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent 
Contractor Document Identification Company Document Identification Originator Document Identification GE Revision Index Sheet of
Rev. Sheets
No. Validity Rev.
Status No.

eni Iraq b.v. 4/8


GE Middle East, FZE, Dubai, UAE.
(Formerly Alstom Middle East FZE) A EX-CO 00
ZBR/90/W/--------CD/MS/050 00251900DAST66762 002519-PC-SAS-AP-090

1. SCOPE

The procedure is intended to use for Touch up painting of the Structural Steel coated
surfaces at site for ZUBAIR OIL FIELD DEVELOPMENT PROJECT, IRAQ.

2. REFERENCE

Painting specification_20000.VAR.PAI.FUN.REV 3
Shop Painting Procedure for Structural Steel – PPG_00251900DBSS75235_EX-DE_Rev.B

3. TOUCH UP AND REPAIR PROCEDURE

3.1 Scope

Control of surface preparation and repair on damaged areas. The bare metal mechanical
cleaning standard will be SA 2.5 as a minimum as per recommendation from paint
manufacturer.

3.2 Definition

DFT – Dry Film Thickness.

3.3 Paint Damaged Area on Structural Steel

- Visually inspect surface areas for contamination such as oil, grease, duct / dirt,
etc.
- Remove any contamination by cleaning with solvent or approved cleaner.
- Mechanically clean the area using power tool wire brush, or sanding disk.
- Feather the edges on the surrounding of the exiting coating to smooth finish.
- Visually examine to ensure all surfaces are cleaned up to standard.
- Apply One Coat of INTERZINC 52-60 microns DFT.
- Check thickness of dry coating with non-destructive dry film thickness gauge, if
less than specified thickness, apply additional coats as needed.
- Apply One Coat of INTERGARD 475 HS -200 microns.
- Apply One Coat of INTERTHANE 990– 70 microns as per the specification on
the repaired area.

Note:- Repair of Defects.

Damaged areas, defect in the coating system such as over-runs, drips and smears that
have to removed or areas with inadequate dry film coating thickness shall be re-cleaned.
The re-cleaning shall carry over on the surrounding coating not less than 75 microns all
round and edges shall be feathered (over a width of at least 50mm) After the surface
cleaning the specified coating system or the required layers of the specified coating shall
be re-applied. In case of the application of additional coats these shall blend in with the
final coating on adjoining areas. Before over coating, requires abrading shall be done to
obtain good bonding.

This document is property of eni Iraq BV. 
It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent 
Contractor Document Identification Company Document Identification Originator Document Identification GE Revision Index Sheet of
Rev. Sheets
No. Validity Rev.
Status No.

eni Iraq b.v. 5/8


GE Middle East, FZE, Dubai, UAE.
(Formerly Alstom Middle East FZE) A EX-CO 00
ZBR/90/W/--------CD/MS/050 00251900DAST66762 002519-PC-SAS-AP-090

3.4 Painting System - 004 (Structural Steel)

Referring to Table – 2a & 6, from Painting specification_20000.VAR.PAI.FUN.REV 3

PRIMER COAT :- INTERZINC - 60 microns


MID COAT :- INTERGARD 475 HS - 200 microns
FINISH COAT :- INTERTHANE 990(RAL 6024) – 70 micron

TOTAL DFT – 330 microns

3.5 Painting System - 012 (Galvanized Items)

Referring to Table – 2b & 6, from Painting specification_20000.VAR.PAI.FUN.REV 3

PRIMER COAT :- INTERGARD 251- 50 microns


MID COAT :- INTERGARD 475 HS - 150 microns
FINISH COAT :- INTERTHANE 990(RAL 1023) – 70 microns
(Handrail)
INTERTHANE 990(RAL 6024) – 70 microns
(Staircase/Ladder)
TOTAL DFT – 270 microns

3.6 Painting Application Method

Brush and roller shall be used for touch up or repairs to localized damage. All brushes
and roller covers shall be of good quality to enable the proper application of the paint.
Paint shall be applied in a smooth even coat, deep brush and roller marks should be
avoided, all runs and sags are to be immediately brushed out, paint shall be properly
applied onto all corners and crevices.

This document is property of eni Iraq BV. 
It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent 
Contractor Document Identification Company Document Identification Originator Document Identification GE Revision Index Sheet of
Rev. Sheets
No. Validity Rev.
Status No.

eni Iraq b.v. 6/8


GE Middle East, FZE, Dubai, UAE.
(Formerly Alstom Middle East FZE) A EX-CO 00
ZBR/90/W/--------CD/MS/050 00251900DAST66762 002519-PC-SAS-AP-090

TABLE – 2 a

This document is property of eni Iraq BV. 
It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent 
Contractor Document Identification Company Document Identification Originator Document Identification GE Revision Index Sheet of
Rev. Sheets
No. Validity Rev.
Status No.

eni Iraq b.v. 7/8


GE Middle East, FZE, Dubai, UAE.
(Formerly Alstom Middle East FZE) A EX-CO 00
ZBR/90/W/--------CD/MS/050 00251900DAST66762 002519-PC-SAS-AP-090

TABLE – 2 b

This document is property of eni Iraq BV. 
It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent 
Contractor Document Identification Company Document Identification Originator Document Identification GE Revision Index Sheet of
Rev. Sheets
No. Validity Rev.
Status No.

eni Iraq b.v. 8/8


GE Middle East, FZE, Dubai, UAE.
(Formerly Alstom Middle East FZE) A EX-CO 00
ZBR/90/W/--------CD/MS/050 00251900DAST66762 002519-PC-SAS-AP-090

TABLE – 6 (Qualified Painting System)

This document is property of eni Iraq BV. 
It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent 

You might also like