Sl.No.

Short Description of Items Unit

1 KSRRB M200.11.1 Clearing and grubbing road Ha


2 KSRRB M300-14 Excavation for road in all types of soil Cum
3 KSRRB 300-58 Compaction of original ground Sqm
4 KSRRB M300-53 Embankment or murrum/gravel M
5 Construction of sub base with GSB Cum
6 KSRRB M400-17Wet mix macadam Cum
7 KSRRB M500-56.1 Slurry Seal Sqm

8 KSRRB M500-6 Primer coat with SS bitumen emulsion of granular base Sqm

9 KSBRRB M500-10 Tack Coat 80/100 grade bitumen (vg 10)


16 KSRRB M300-14 Excavation for road in all types of soil Cum
17 KSRRB M300-52.2 Scarifying existing bituminous Sqm
18 KSRRB300 Compation of original ground Sqm
20 Construction of sub base with GSB Cum
21 KSRRB M600-1 DLC Cum
22 KSRRBM600-2 Unreinforced dowel jointed plain cement concrete Cum
24 KSRRB M2100 -1O PCC M10 Cum
25 PCC for side drains M20 Cum
26 KSRRB M2200-6 TMT STEEL MT

Sl.No. Short Description of Items Unit

37 KSRRB M200.11.1 Clearing and grubbing road Ha


38 KSRRB M300-14 Excavation for road in all types of soil Cum
39 KSRRB M300-54 Embankment with material deposited with road cutting Cum
40 KSRRB 300 Compaction of original ground Cum
41 KSRRB M300-53 Embankment or murrum/gravel Cum
42 KSRRB M300 -Construction of subgrade Cum
43 KSRRBM 800- Cable M
44 Construction of sub base with GSB Cum
45 KSRRB M400 Wet mix macadam Cum
46 KSRRB Filling pot holes and patch repairs with open graded permix Sqm
47 KSRRBM500-56.1 Slurry Seal Sqm
48 KSRRB M600-6 Primer coat SS bitumen Sqm
49 KSRRB M500-10 Tack coat using 80/100 grade bitumen vg 10 Sqm
50 KSRRB M500-17 Bituminous macadam with vg30 binder Cum
51 KSRRB M500-19 Semi dense bituminous concrete 40 mm thick Cum
55 KSRRB M300 5.2 Scrifying exising bituminous suface to a depth of 50 mm Sqm
56 KSRRB M300-59-2 Loosening ,levelling,compacting original ground Sqm
57 KSRRB M600-1 DLC Cum
58 KSRRBM600-2 Unreinforced dowel jointed plain cement concrete Cum
59 KSRRB M2100 -1O PCC M10 Cum
60 PCC for side drains M20 Cum
61 KSRRB M2200-6 TMT STEEL MT
73 KSRRB N200-21-1 Dismantling of existing structures Cum
74 Earthwok excavation for foundation of Structure Cum
75 KSRRB M2900 PCC M10 Cum
76 M20 PCC/RCC Sub Structure Cum
77 NP3 PIPES FOR CULVERTS M
SHDP PACKAGE 362
Physical & Financial Progress

Quantity
BOQ Quantity
Quantity claimed paid to Rate in Rs
(Estimated)
labour

362 A
0.99 0.00 7000.00
6600.00 0.00 30.00
16500.00 0.00 6.00
92.00 0.00 500.00
2475.00 0.00 1750.00
4125.00 0.00 1750.00
225.00 0.00 30.00

16500.00 0.00 20.00

0.00
9207.70 7458.77 75.00
22540.00 25676.00 3.00
18970.00 17748.65 6.00
2836.50 2836.50 2500.00
5701.50 3455.73 4900.00
9882.60 6888.92 8100.00
543.00 31.46 5000.00
2099.60 102.96 7500.00
89.98 5.74 70000.00

BOQ Quantity
Quantity claimed Rate in Rs
(Estimated)

362 B
0.9 0.85 17280.44
19.14 13304.81 80
13393.68 9812.87 50
20187 18637 6
4271.3 7659.94 450
892.3 833.05 450
50 50 1500
3804.52 7201.97 2300
3352.2 3051.13 2300
293.25 293.25 190
733.13 733.13 29
12640.8 11487.9 34
27118.8 25.321 10
1392.94 8500 1300.73
677.97 9500 632.84
6380 3 5616.25
5220 25 5206.5
835.2 4500 839.89
1624 7500 1635.22
276.56 5000 133.65
1148.4 7500 656.1
68.42 70000 18.66
27.5 27.5 250
97.23 97.23 75
10.67 10.57 5000
92.37 99.19 6000
50 50 5500
Financial Progress TOTAL
Amount
EXPENSES
MATERIAL LABOUR

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
559407.75
77028.00
106491.90
7091250.00
16933077.00
55800252.00
157300.00
772200.00
401800.00
82,300,606.7

Financial Progress TOTAL


Amount
EXPENSES
MATERIAL LABOUR

14688.374
1064384.8
490643.5
111822
3446973
374872.5
75000
16564531
7017599
55717.5
21260.77
390588.6
253.21
11056205
6011980
16848.75
130162.5
3779505
12264150
668250
4920750
1306200
6875
7292.25
52850
595140
275000
70,719,542.8